  • Paul Skinner - Chairman

  • Well good morning, everybody and thank you for joining us for this presentation of Rio's results for the first half of 2006. Leigh and I are here, and as you can see on the screen, Guy Elliott, our CFO, is in Sydney today. The sequence of the presentation is, that I will start with a summary of the results and outlook, Leigh will then give you an overview of our operational performance during the first half of the year, and then Guy will take you through the financial results in more detail. Leigh will then come back and talk a little bit about our projects and development opportunities, after which we'll take your questions.

  • Underlying earnings in the first half of 2006 increased to a record of $3.75 billion, and these are U.S. dollars throughout this presentation, and that reflects an increase of 80% on the same period of last year; and actually an increase of more than 250% if you go back as recently as the first half of 2004. The increase in earnings driven by solid operational performance, despite some weather and other challenges, production growth at several of our business units, and continuing strong demand in our markets. Earnings benefited in particular from recent investments in projects to expand capacity in copper and iron ore.

  • Higher prices of many of our products clearly also made a major contribution to earnings. There was some softening of molybdenum from the record highs of last year, but this was more than compensated by increases in other products, particularly copper and iron ore. The business and you'll hear more about this, continued to experience the impact of industry-wide cost pressures during the first half year. It makes good business sense to incur some additional cost in the pursuit of higher margin production, but we remain very alert for the need not to allow these costs to become embedded at the operational level. Net earnings were up 75% to 3.8 billion and, as in 2005, there were relatively few excluded items.

  • In addition to the record underlying earnings, cash flows from operations plus dividends were also at a record of $5.2 billion. And the quality of the assets we have ensures strong cash flows throughout the cycle, but exceptional cash flows at times of buoyant markets like those we see today. And that cash flow is funding a record level of investment in the growth of the business, reflected in the first half capital expenditure which was up to $1.8 billion. It also allows us to return surplus capital to shareholders, while retaining the flexibility to take advantage of opportunities as they arise.

  • Our financial position remains very strong. Net debt rose modestly to 2.6 billion, reflecting our high level of capital expenditure, capital management program and the timing of tax payments on growing earnings. Our gearing at the end of the first half was 14%. In February we announced our intention to return $4 billion to shareholders by the end of 2007. In April we paid a special dividend of 1.5 billion, in addition to our ordinary. We've bought back since February just over $1 billion of shares on the London market, bringing our total capital return under the 4 billion program to just north of 2.5 billion. So ratably running ahead of the delivery schedule.

  • Finally the significant expansion projects we have under way in our iron ore and diamond operations in Western Australia, our Ilmenite project in Madagascar remain on schedule and on budget in what remains, across the industry, a challenging construction environment. And Leigh is going to talk quite a bit more about the project later in the presentation.

  • A few words on China, which remains very important to the supply/demand balance, most of the products that we're involved with. In the first half of the year about 14% of our revenues came from China, but the indirect price leverage effect of China is proportionately greater than that. The Chinese economy continues to grow rapidly, reported at about 11% in the second quarter, and the indicators point to continued strong economic activity this year as fixed asset investment and bank lending continue to rise. We continue to experience strong demand for our products and our customer base in China is broadening all the time.

  • Each of our businesses has a clear strategy to benefit from Chinese growth and we're increasing the active in procurement from Chinese suppliers. Overall we think the demand outlook in China remains very positive, reflecting the trend of urbanization, infrastructure, construction and rising industrial production. Our focus is on continued investment in capacity growth to meet the growing demand from our Chinese customers over the longer term. And I think the $3 billion that we've recently spent in increasing iron ore capacity in infrastructure fully reflects that intention.

  • Looking forward, recent increases in interest rates in many of the world's major economies and the political events in the Middle East have driven additional volatility in financial markets, of which you'd be only too well aware. But on balance we believe that the global economic outlook remains positive. In addition to strong Chinese economic activity, we're seeing good growth in other parts of Asia and a continued steady recovery in Japan, which remains a key market for Rio Tinto as well. Europe is doing reasonably, despite the slow pace of structural reform. U.S. growth has been strong, although we may see some moderation in response to higher interest rates, particularly if the housing market shows any sign of turning down.

  • Metal and mineral inventories generally remain low and the supply side is running hard to keep up and catch up and continues to suffer from infrastructure and other constraints. At the beginning of this year I said that we believe the prospects for 2006 were favorable, and we continue to see strong demand and therefore no reason to change that basic point of view. In the pack you've got, towards the end is a more detailed paper on our view of the economic outlook from [Ivac Tupolai], our Head of Economics, Ivac's in the audience today and you can talk to him about that afterwards if you'd like to do so.

  • So with that introduction Leigh if I can hand over to you to carry on the presentation. Thank you.

  • Leigh Clifford - CEO

  • Thank you Paul and good morning everybody. Looking at earnings, without exception, every one of our product groups showed a substantial increase in earnings in the first half of 2006. Copper earnings up 2 billion rose 140%, driven by increased production and strong copper, gold and molybdenum markets. Iron ore earnings of 955 million rose 40% as our expansion projects contributed additional volumes and from April we saw the benefit of higher negotiated prices. Energy earnings of 377 million rose 23% with good contributions from our thermal coal operations in the U.S. and Australia. Aluminium earnings of 369 million rose 82% as a result of rising alumina volumes and higher aluminium prices.

  • Industrial minerals earnings of 137 million rose 10% as production of titanium feedstock increased. Finally in diamonds, earnings of 113 million rose 14% with production at Diavik. There also were a number of tax benefits which contributed to underlying earnings of the North American business units and Guy will talk about these more a little later.

  • Turning to the operations, as Paul said, we continued to invest heavily in value adding growth and first half production reflected the benefits of that increased spending in many areas. In 2006 we were able to produce record first half volumes of alumina, bauxite, iron ore, talk and U.S. coal. In this strong pricing environment we continue to push all the businesses to operate safely at full stretch. I think the operations have responded well to this challenge, but it does constrain our ability to catch up production should there be some kind of external event such as the cyclones in Australia which impacted us early in the year.

  • Of course we're not alone in seeking increased production and you'll be familiar with the shortages and cost pressures impacting the global mining industry as it seeks to respond to strong demand. We're not immune to those pressures and we do remain mindful, as Paul said, that we should not back them into our cost space going forward. And Guy will talk more about cost later in his presentation. One way of addressing cost is through ensuring world class operating performance and productivity across our business. As they roll out across the group, our improving performance together or IPT initiatives are beginning to deliver solid results in terms of consistently good operational performance and efficiencies. And you'll hear more about IPT at the seminar in early September which Guy will be hosting.

  • Turning to margins, Rio Tinto's operating margins have long been among the best in the mining business and it remains strong at all points in the cycle, reflecting the quality of our assets. In 2006, notwithstanding cost pressures, our first half EBIT margin rose to 44% as we enjoyed a strong pricing environment.

  • Now perhaps let me review our product groups individually. The average copper price for the first half of 2006 was 271 cents per pound, an increase of 29% on the first half of 2005. As a result and benefiting from strong gold and molybdenum prices, the copper group enjoyed outstanding margins in the first half of 2006. At Kennecott Utah Copper, copper and gold volumes rose as grades improved. Molybdenum production also rose, although the grade did decline as expected towards the end of the period. We again benefited from having moly roasting contracts in place. The Kennecott smelter performed well and in the second half it will be impacted by a scheduled maintenance shutdown of 45 days in September and October.

  • I'd like to highlight the contribution Northparkes made in the first half of the year. Although relatively small in scale, Northparkes is one of the most productive copper mines in the world and is a best-in-class block caving operation. The team there is achieving production beyond the original design capacity and this is showing through net their excellent earnings numbers for the first half. The block cave experience we are building within the group will be an important aspect of our future operations.

  • At Escondida we saw the benefit of production at Norte. The sulphide leach operation produced its first cathode in June and will make an increasing contribution in the second half. At Palabora the block cave operation is going well with production rates improving. Finally, the contribution from Grasberg was disappointing was as lower grades impacted metal production. Contribution in the second half is likely to decline further. But while the performance of Grasberg has been fluctuating recently, this is a major ore body which be in production for decades. It remains an important asset in the Group's Copper portfolio.

  • We have talked in the past about operational flexibility, which has been achieved at KUC, and our ability to target moly production. This chart illustrates what I mean. Since 2003 the moly price has risen strongly from around $5 per pound to a peak of close to $40 per pound before settling back to the mid 20s today. Over this period we have been able to respond by increasing moly production by a multiple of more than three. At the same time, copper production at KUC has remained more or less stable. Over the last 18 months net earnings from moly have totaled nearly $1.1 billion. Our optimization efforts have increased this contribution by nearly half. IPT working with the KUC team has been instrumental in achieving this result both by improving mine planning and optimizing processing operations. We are using this positive experience to gain a better understanding of intermediate and longer-term moly opportunities as mining gets deeper.

  • Turning to Iron Ore, demand remained very strong during the first half of 2006. Chinese imports continued to grow rapidly with an increase of 23% to 162 million tons in the half-year, compared with the equivalent period in 2005. In June we agreed a price increase of 19% for the 2006 contract year, reflecting the continuing tightness of the iron ore market. In the Pilbara our operations recovered well from the significant impact of five cyclones early in the year. In fact June and July have been strong months for production and shipping. Notwithstanding this interruption and associated costs, we achieved record production levels for the half-year as the mine expansions begin to deliver. The expansion projects for the mine are for the port and rail infrastructure and the Brownfield mine developments remain on schedule and within budget, notwithstanding the challenging construction environment of Western Australia.

  • We started construction on the Hope Downs project in April, within ten months of announcing the formation of the joint venture. I'm pleased at the pace at which we've been able to bring this project through feasibility studies and permitting for the point of development. It illustrates the speed at which Rio Tinto can take decisions and act when there is a good business opportunity. In April we signed the mining concession for the Simandou Iron Ore Project with the government of Guinea. This is a project with the potential to be a major supplier of iron ore to the world market and represents a significant platform for Rio Tinto's future involvement in the Atlantic Basin. Finally it was good to see Icemelt shipping its first delivery of nearly 40,000 tons of pig iron to the U.S. in June. After a planned maintenance shutdown, Icemelt is back up and performing well.

  • Turning to Energy, The thermal coal markets remain strong both in the Pacific Basin and in North America. Demand for coking coal was softer in the first half, impacting Hail Creek and the margins of the product group. In the Powder River Basin the completion of the maintenance program increased available rail capacity and the Antelope and Spring Creek mines achieved record production as the mine expansions continued. In Australia thermal coal production rose in line with available port capacity and the Claremont project advanced towards approval. Claremont has the potential to replace the Blair Athol mine and be a cost competitive 12 million ton operation starting up in 2010.

  • In Uranium the market continues to strengthen as demand exerts upward pressure on the spot and long-term prices. Production at ERA was impacted by Cyclone Monica earlier in the year, but drilling continued on what looked like interesting exploration prospects in the vicinity of the [Maranjian] mine. With ERA and Rossing our position in the Uranium market remains strong with a 15% share of world mine supply in 2005.

  • Turning to aluminium, the market improved with the average first half price rising 37% to 115 cents. The aluminum market remains strong but was below the peak of 2005. At Weipa bauxite production was a first half record. Investment continues in increasing capacity to over 16 million tons and a new ship loader is scheduled for installation in the second half. Production of alumina was also a record as the Comalco Alumina Refinery ramped up. Reliability of CAR continues to improve with production averaging over 90% of capacity in the second quarter. We are now well into a planned routine shutdown of the refinery, which will lead to about one month's lost output. One unit has been completed and we're now well into the second and last units. CAR II remains under evaluation.

  • And the experience we are gaining as operational performance of CAR I improves is providing important learnings for the second phase of the CAR project. The smelters generally performed well and we continue to seek opportunities to expand our smelter interests in regions where power costs are competitive. We're also focused on building alumina alliances which allow us to leverage the fabulous Weipa bauxite resource.

  • An example of what I mean by an exciting smelter opportunity is the partnership we have established with a general holding corporation which is owned by the government of Abu Dhabi to study the construction of a 550 to 700,000 ton smelter in the Emirate. This opportunity allows us to leverage a very strong upstream position in bauxite and alumina, as well as our technical skills in smelter construction and operations. A pre-feasibility study is under way and we will report progress to you in due course.

  • Turning to diamonds, progress continued on the underground developments at Argyle and Diavik. The underground development at Argyle has now reached the total length of eight kilometers. At Diavik our total tunnel length of three kilometers required for the underground feasibility studies at A154 and A418, 1.8 kilometers have been completed. The A418 dike is nearly complete and dewatering will start in September.

  • Production from that ore body is scheduled for 2008. Both operations were impacted by weather earlier in the year. At Diavik the early spring caused the early suspension of ice road deliveries. You'll be aware that in the Arctic the ice road provides the only vehicular access to the mine. The suspension of the ice road therefore had a major impact on operational plans for the year.

  • And this has been overcome by a three-phase cargo uplift using Hercules and other carrier aircraft to transport critical supplies. Although achieved at some cost, it is a testament to the ingenuity of the Diavik team that they have been able to increase production under this constraint. At Argyle the weather effect was heavy rain which impacted production in the first quarter. Again, the Argyle team did a good job in recovering production so that the half ended strongly.

  • Turning to Industrial Minerals, in iron and titanium the UGS plant performed well, setting new production records as the ramp up continues towards 375,000 tons per year. In Madagascar, basic infrastructure construction is under way and more on that project later. Demand for high-grade coal outfeed stocks continues to be strong. The price of ferrous and zircon coal products remains firm. In Rio Tinto Minerals, the new organizational structure is delivering and remains on track to achieve significant cost savings by 2008. The boric acid project remains on track and within budget with completion scheduled for the third quarter of 2006. Studies of Potasio Rio Colorado potash project in Argentina are progressing and again I will touch on this project later in the presentation. Potash would compliment the other assets of Rio Tinto Minerals. On balance, the Industrial Minerals product group has a good first half with a recovery in margins, notwithstanding the effects of a strong Canadian dollar and rising energy costs.

  • So as I've highlighted, we had a number of weather related impacts on the business early in the year and I hope I've demonstrated that we've been able to mitigate those effects successfully. Iron ore and diamonds for example have delivered a good performance after a challenging first quarter. In this strong pricing environment the operations are running at full stretch and delivering record volumes in a range of products. The expansion projects we have under way represent the biggest investment program in the history of the group that are on track and will deliver substantial value to shareholders in the years to come.

  • With that let me hand over to Guy in Australia.

  • Guy Elliott - Financial Director

  • Hey and good morning everybody. In presenting these results I'll follow our standard waterfall format. Starting with price, markets strengthened during 2006 reflecting sustained demand for our products and continued tightness in supply. Compared with the first half of 2005, prices increased earnings by $1.8 billion in the first six months of 2006. There was movement in the U.S. dollar in the first half relative to the currencies in which we incur the majority of our costs, but these movements balanced each other out. Combining price effects, the exchange movements and inflation, earnings increased versus the first half of 2005 by $1.7 million.

  • Prices for our major commodities were significantly above those experienced in the first half of 2005. The copper price averaged $2.71 per pound in the first six months of 2006, which represents an increase of 79% compared with the same period in 2005. This boosted earnings by $1 billion, accounting for over half of the total half price variance. The strength of the iron ore market, which led to the negotiation of the 19% price increase, lifted earnings by $396 million. Strong demand for Australian thermal coal and like tighter energy markets in the U.S. are feeding through to higher realized prices for coal. Together with an improvement in uranium prices, these factors enable the energy group to generate $207 million of additional earnings compared with the first half of 2005.

  • Moly prices have slipped back 26% from their highs during 2005, averaging $23 a pound. But we're still enjoying very strong prices for a commodity which is historically traded in the region of $3 a pound. Aluminium and alumina added $242 million jointly, with the price of aluminium averaging 115 cents a pound, a 37% increase over the first half of 2005. More favorable pricing for Industrial Minerals and Diamonds improved earnings by a further $18 million in each of those product groups. The other price variance relates mainly to higher treatment and refining charges and hedging activity at Palabora.

  • In 2005 we were able to capitalize on strong market conditions by expanding many of our business units' production. In the first half of 2006 market conditions remained extremely favorable, but some of our operations were constrained by the impact of severe weather conditions in parts of Northern Australia. This impacted production of iron ore, bauxite, diamonds and uranium. In addition, lower grades and production at Grasberg impacted volumes negatively by $195 million compared to the first half of 2005. Nevertheless volume increases contributed $129 million to earnings in the first half. If it wasn't for weather impacts across the group's operations, that increase would have been well over double that figure.

  • Looking at the product groups in more detail, copper benefited from improved grades at Kennecott Utah Copper. The commissioning of Escondida Norte and increased volumes at Northparkes were excellent operational performances being achieved. This added a net $171 million to earnings, more than offsetting lower grades of Freeport where $90 million of lower output volumes were reported in copper. The optimization of mine production at Kennecott Utah Copper in favor of the higher moly grades continued, raising moly production by 11% and contributing $67 million to earnings. The gains from copper and moly were partly offset by significantly lower gold production, most notably at Grasberg and Cortez, in line with lower grades at these two joint venture operations. This reduced earnings by $79 million.

  • Iron ore sales increased by 3% compared to the first half of 2005, adding $30 million to earnings, though they were affected by a severe series of cyclones earlier in the year. Sales volumes for coking coal fell back during the first half of 2006 due to decreased demand in some markets.

  • Diamonds were impacted by lower grades and volumes of Argyle where heavy rains were experienced in the first quarter of the year. The combined volume effect of aluminium and industrial minerals, net of some smaller items, was a negative $2 million. The aluminium product group benefited from increased alumina production from the Comalco Alumina Refinery where volumes increased by one third while aluminium production was marginally lower, which reflected low rainfalls in the hydro/power catchment area in New Zealand and consequent decision to reduce production at [Enzus]. Finally, in Industrial Minerals volumes increased for titanium dioxide feedstocks and their related co products of iron and titanium in line with recent capacity expansions there. This offset weaker markets for borates and talc.

  • Turning to costs, non-cash costs were $71 million higher than the first half of 2005 net of a small one-off credit. This was as expected following the recent expansions that have been taking place in iron ore, coking coal, copper and thermal coal. The negative impact of cash cost increases on earnings was $42 million in the first half of 2006. Cost pressures worsened in the first half of the year, the recent severe cyclone season also impacted results notably at our Australian iron ore operations.

  • Rising energy costs accounted for $56 million of the total negative variance. I will break down these costs in a bit more detail in a moment. Now of course rising costs are a concern in any business. But we should be mindful that some of these costs are being taken on consciously in pursuit of value creation. When margins are high it makes sense to incur some of these additional costs in order to increase production.

  • Now turning to the detail on costs, you'll see that we've broken out the $442 million cash cost variance into what we've called investment costs and common industry costs. An increase in investment costs, which include bringing expansions on stream, business improvement programs, technology, a larger budget for exploration and other items reduced earnings by $99 million. We welcome an increase in these costs as we view them as value creating investments which will have lasting beneficial impacts on the company.

  • Common industry costs include energy, input prices and general costs of production. The negative earnings variance arising from a rise in these costs was $343 million. These are the areas which cause us greatest concern and where we remain very focused on business improvement programs to raise operational performance and productivity. I've already referred to energy, which is related mostly to the rising price of oil, and we have a limited ability of course to control that. But the inverse of this cost increase is the earnings benefit we've gained in our coal and uranium businesses because of course we are an energy producer.

  • Rising input prices impacted earnings in the half year by over $70 million, reflecting ongoing tightness in the supply of many of our key inputs in raw materials. Finally in the cost of production category, we've captured those costs generic to the mining business including labor contractual rates, the effective grade variability of maintenance and so on. These reduced earnings by over $200 million in the first half. We do not as yet see an end to the rise in this type of cost, although their rate of increase might be expected to ease over time.

  • Breaking production costs down further shows that the direct costs of the adverse weather effects we've mentioned contributed to a negative earnings effect -- a negative earnings variance of over $25 million in the first half. Now this excludes the effect on earnings of lost tonnage which would have been characterized in volumes. When fluctuation in annual weather patterns can be -- while we do expect fluctuations in annual weather patterns, we would hope that we wouldn't be hit by five cyclones in Northern Australia every year.

  • Other factors contributing significantly to cost in the first half were grade effects, labor as wages in the sector have risen substantially more than inflation and contractor costs, reflecting increased mining activity and competition for skills. To give you an example of the effect of using contractors, at Hamersley we'd normally expect about 25% of our manpower to be contractors. This figure would exclude employees working on the expansion projects.

  • Today this figure approaches 40%. As contractors bring their own capital equipment, the cost is inevitably higher and the total cost of the contracted staff, including capital, approaches that of the 60% of the manpower from our own payrolls. Now it still makes business sense for us to use contractors because the margin of the additional production secured is so high. But these costs could be removed from the business quite rapidly should the price [I've booked] for minerals start to deteriorate.

  • Turning to other, the combined effect of other items on earnings contributed $316 million. The most significant item relates to the recognition of a deferred tax asset of $211 million. This reflects improved projections for estimated future taxable earnings in our U.S. businesses net of a write off of a U.K. deferred tax asset taken centrally. In addition, a reduction in Canadian tax rates has led to a $46 million reduction in deferred tax provisions. These benefits flow chiefly to Kennecott Utah Copper, to IT, [routing] to Energy America and Diavik. Other items mainly related to the exclusion of earnings from divested businesses were offset by positive items principally relating to provision adjustments. So this brings us therefore to the first half underlying earnings number of $3.75 billion.

  • Moving to net earnings, for the first half these were $45 million higher than underlying earnings. We realized a $10 million gain from the disposable interest in smaller businesses. In addition net earnings included a reduction in an environmental provision at Kennecott Utah Copper of $37 million, which reverts part to an exceptional charge taken in 2002. These two items together with some sundry items bring us to the net earnings figure of $3,796,000.

  • Moving now to cash flow, the group's cash flow from operations increased 39% in the first half to $4.4 billion. Dividends from jointly controlled entities and associates made a strong contribution of a further $788 million to bring total cash flow to $5.2 billion, up 52%. The quality of our assets, which produced quality of cash flows at all points in the cycle, become particularly evident in good market conditions when their cash generative strength is outstanding.

  • On the balance sheet, net debt at the end of June was $2.6 billion, up $1.3 billion since the end of 2005. While operational cash flow and dividends increased substantially, so also did outflows of cash and in particular capital management. As a consequence, gearing rose to 14%. Nevertheless our balance sheet remains very strong.

  • Reviewing in more detail the destination for those cash outflows, capital investment rose 58% to $1.8 billion as the group invested in additional value adding production. This remains the first priority for the use of this cash flow. The group is spending a record level of capital on growth projects. These remain on budget and on schedule and they will bring lasting value to shareholders. Cash return to shareholders in the form of the ordinary dividend, the special dividend and the share buy-back totaled $3.1 billion. This was an increase of 124% on the first half of the previous year. Finally an inevitable consequence of success, the tax authorities share of cash outflows rose to $1.6 billion.

  • Dealing finally with capital management, I've shown that shareholders benefited from significant cash returns in the first half of this year. Our policy is to set the level of the interim dividend at half of the level of the previous year's full dividend. So our interim dividend in 2006 is set at EUR 0.40 per share. Notwithstanding our capital investment and capital management programs and our substantial tax payments, our balance sheet remains only lightly geared. This provides us with the flexibility to pursue value-adding opportunities as they arise.

  • The capital management program we announced in February is ahead of schedule with $2.5 billion of the $44 billion total returned by the end of June. To date approximately half of the intended share buy-backs have been completed. We're only six months into the program and we remain totally committed to it. Since the end of June we've bought back a further $225 million. I can assure that we've no intention of accumulating surplus cash and we'll sure that anything in excess of our planned needs will be returned to shareholders in the most efficient manner. We will look again at options for capital management around the year-end and this will include a review of the level of the final dividend.

  • Now let me pass you back to Leigh.

  • Leigh Clifford - CEO

  • Thank you, Guy. I'd now like to conclude today's presentation with a look at our pipeline of growth projects, starting with an update on our committed projects which remain on schedule and within budget. We have a broad range of projects currently under construction across four continents, with the most significant commitments shown on this world map. Our share of the capital expenditure committed to these projects is approximately $5 billion and I'll talk about some specific projects in a moment, but it's worth emphasizing that nearly three quarters of these projects represent new growth opportunities beyond the existing mine life extensions and sustaining capital.

  • I'd now like to turn to our conceptual and early stage projects. These cover a broad range of geographies, products and activities. While not all of these projects may be developed, they offer the group many future options for growth. Its early days, but we estimate that our share of capital expenditure for all of the projects shown on this slide would be in excess of $10 billion.

  • I'll be speaking about some of these projects in more detail, but in general I would like to draw to your attention the number of projects where the estimated capital expenditure exceeds $1 billion. I've already mentioned the Simandou Iron Ore project where we've been carrying out exploration and evaluation work since 1997. We've spent nearly $30 million on the project to date and a pre-feasibility study is now under way. Should the project proceed to development, it would represent a sizeable investment with the potential to open up a new iron ore province.

  • In Indonesia we are currently negotiating a contract of work with the Indonesian government for the La Sampala Nickel project. There are several years of work ahead of us before we get to feasibility stage, but we believe that this project, along with the Eagle Nickel project in the USA, offers a significant entry into the nickel market. Additionally we have a range of opportunities at an early stage of development.

  • In South Africa diamond drilling is progressing on the Chapudi coal project where a lot of magnitude study is under way. In India progress is being made as we advance our [Bunda] diamond discovery towards bulk sampling. In the U.S. we continue to seek out interesting coal opportunities in the vicinity of the Powder River Basin. Also in the U.S. we have entered into an agreement with Northern Dynasty Minerals to evaluate the pebble project, a promising but early stage copper discovery in Alaska. Finally, in Australia I've already mentioned Claremont where the joint venture partners will be soon considering approval of the project.

  • In the first half of 2006 the group's total pre-tax expenditure on exploration and evaluation rose 22% to $113 million. Our Exploration Group has continued to expand its remit and its coverage with a significantly stepped up effort in Russia, Asia and Africa. An example of that newly formed Asian region where we now have a dedicated team looking at opportunities. In the Rio/Nor joint venture we have made advances in target identification and early stage evaluation in the Siberian region. It is innovative activities like this and in our proven track record of Greenfield and Brownfield success that the value of our unbroken commitment to exploration in recent years is demonstrated.

  • Moving on to our significant investment in iron ore expansion projects. These remain on budget and on or ahead of schedule. The first phase of the expansion of Hamersley's port capacity to 116 million tons was completed as planned in the first half of this year. The second phase announced in October 2005 is on schedule to raise capacity further to 140 million tons by the end of 2007. Together with the 55 million ton port facilities at Cape Lambert, this will give us an annual infrastructure capacity of close to 200 million tons. We are currently carrying out feasibility studies to expand Cape Lambert and envisage a further phase of expansion that would take us to 220 million tons.

  • We're also expanding our mines in line with growing demand. The 15 million ton Brownfield expansions are on track and the Marandoo and Nammuldi mines are complete and ton price is scheduled for completion by the end of the year. Expansion at Hamersley's Yandicoogina mine from 36 to 52 million tons per annum is progressing well and is due to be completed by the end of next year. The construction has started on the first phase of the $1 million Hope Downs project within ten months of the announcement of our joint venture with Hancock Prospecting.

  • In Madagascar, the mineral sands project is progressing to schedule. Construction has started on laying down basic infrastructure such as roads, water, power supply and mine salt preparation and most of this work has been awarded to local civil construction companies. We expect to award the main port construction contract later this year and the tender process there is being conducted with the World Bank. The project objectives remain unchanged and we expect first shipments at the end of 2008, ramping up to 750 million tons per annum ilmenite by 2012. The mine will supply ilmenite for a new high quality chloride slag to meet demand from the pigment industry at a time when we believe that the supply and demand balance will be favorable.

  • Turning to Argentina, Potasio Rio Colorado represents an opportunity to diversify into a new commodity for the group. We've identified a large-scale resource of high mineralogical and structural quality and consistency. The solution mining trials are going well and the technology comes from the oil industry, with which Andrew, who is here, formerly Head of BP Technology and now Product Group Head of Industrial Minerals is very familiar.

  • If approved, Potasio Rio Colorado will be the first major potash producer in the southern hemisphere with approximately 5% of global potash supply. With its proximity to Brazil, PRC is well positioned to supply the growing agricultural sector in that country and we expect a decision to be reached on that project next year. In December 2005 we were pleased to win the tender for the privatization of the La Granja copper project located in Peru. La Granja is a major surface outcropping ore body which we believe could support a large long life copper mining operation. It contains more than 2 billion tons of mineralization.

  • We're spending $60 million on exploration and feasibility work associated with the development of the project. With a grade of 0.6% copper and challenging mineralogy, low-cost processing technology will be required to extract value. Sulphide bioleaching with recovery of copper metal using electrowinning could be the approach, similar to the methods employed at the new leach project at Escondida. La Granja illustrates that we're willing to take on technological risk in a measured way if the upside potential is there. It also shows our ability to spot opportunities and be innovative in looking for technical solutions in our pursuit of world-class resources.

  • So in summary, the operations put in a very good performance in the first half, notwithstanding the weather related challenges early in the year. delivering into strong markets we achieved record production in many minerals and metals and generated record cash flows. The substantial global investment program we are undertaking continues to deliver growth and the projects are on time and budget. We have seen good demand for our products in our key markets and the outlook remains positive. The company is financially robust and while strong operationally, we are focused on building our capabilities further through our business improvement programs.

  • Perhaps now we can take your questions.

  • Paul Skinner - Chairman

  • Thanks very much, Leigh and Guy. So we start the questions over here. Thank you. If you could just identify yourselves as usual it would be helpful.

  • Heath Jansen - Analyst

  • Good morning, Heath Jansen from Citigroup, just a couple questions. Firstly on the recognition of the $211 million of additional tax assets, I'm just wondering if you could give us an indication of what we'll likely expect going forward in terms of amount? And obviously the tax rate forms it's 22%, I'm just wondering if you can give us an indication of what the tax rate might be in the second half.

  • And then secondly, your very strong performance in copper, particularly out of Kennecott Utah Copper, so I was just wondering really if you could perhaps give us a bit of a breakdown on whether there's any recognition of price participation there as well?

  • Paul Skinner - Chairman

  • Perhaps Guy you could address the tax question and perhaps also make an initial comment on copper, to which Leigh may wish to add?

  • Guy Elliott - Financial Director

  • Yes certainly, Heath. Look we've made our best estimate of the future earnings potential that we've got in the U.S., which clearly is better than we though previously. And that reflects some of the things which leave us discussing Kennecott, but also at Kennecott Energy or now we call it Rio Tinto Energy America, in particular. And so that's what led to this assessment, but it's possible that we will find further opportunities like that in the second half. It's not clear at this point, but if that does become clear we will probably talk about it in the seminar in October.

  • On the subject of price participation, I'm not quite sure what you are referring to. I mean if it's to do with provisional pricing I have some numbers on that, but I'm not sure that was your question.

  • Paul Skinner - Chairman

  • Can we just check that Steve?

  • Leigh Clifford - CEO

  • That's the essence of the question, Guy.

  • Guy Elliott - Financial Director

  • Yes. Okay well let me give some numbers on that because it is a significant number. The impact in the first half was $294 million compared to $5 million in the first half of 2005. We had 343 million pounds of copper provision that priced at the 30 of June and the closing price was [337 cents] a pound. Now this clearly affected Escondida mainly, but also there were effects at Northparkes and to a lesser extent Freeport. So it was a significant number and reflects I think the very strong conditions in which we find ourselves.

  • Leigh Clifford - CEO

  • Heath, maybe I can just comment a little bit on KUC because I know a number people here over the years have listened to us talk about KUC. Go back a couple of years when we put a lot of emphasis on restructuring the labor agreements at KUC and frankly that's yielded tremendous results in operational flexibility and also it's allowed the management to really focus on improving the business.

  • We also had upsets and challenges in the early days of the smelter there. The smelter is running well, I think the whole operation is running well and we've been able to focus on improving performance. And I touched briefly upon the flexibility with which we've been able to operate that mine, in particular increasing the output of moly without damaging our copper production, and increasing recovery of moly in the concentrated process. And I think that's -- we're starting to see some of the benefits of the RPT efforts there so that's really underpinned a strong performance from KUC in a very strong market environment.

  • Heath Jansen - Analyst

  • Thank you.

  • Paul McTaggart - Analyst

  • Paul McTaggart from HSBC, some follow-up questions on copper. Firstly I was in the [illustration wings] and caught a lot of noise around Grasberg and yet another mine plain development interchange and alteration in the near-term would notably impact grades, if you would care to comment? Second on Kennecott again, clearly molybdenum prices have come off you're still mining high grades of molybdenum with some impact on color grades, could you give us a sense of how long that will go on for and whether you expect the grades in terms of up or down for the next 12 or 18 months or so? And I think that's enough, thanks.

  • Leigh Clifford - CEO

  • Perhaps if Tom -- I know now Bret's responsible for copper, but maybe between the two of you can respond on the Freeport issue and then maybe you can talk about moly in copper.

  • Bret Clayton - CEO, Copper Group

  • Just quickly on the Freeport [inaudible] --.

  • Paul Skinner - Chairman

  • Sorry, for those of you who don't know Bret, Bret Clayton, who's recently left Rio Tinto Energy America, our coal business in the U.S., to head the Copper group in succession to Tom. Bret?

  • Bret Clayton - CEO, Copper Group

  • With regard to Freeport, they did announce reduction in future production for the remainder of the year. And as Leigh said, we do expect that to impact us slightly in the second half, production rates should be slightly lower than what you saw in the first half, reminding you of the impact on the metal strip that that has. With regard to Utah Copper and moly, I think at the year-end results we had said that we expected moly production to be down about 10% this compared to '05.

  • And while we expect it to be slightly down still, we expect a better result than that. And I guess all I would say is that that reflects -- it's kind of an ongoing target, moving target as we continue our optimization efforts and we've kind of highlighted that grades are decreasing. But we're still in the early portions of the plans for 2007 and, while we do see production decreasing, I'd still it's still a little too early to give more of a precise number on that because there are continued optimization efforts going on in that area and we're hopeful of, in the current environment, continuing to optimize that production.

  • Paul Skinner - Chairman

  • Thank you, Bret. Do you want to follow that?

  • Paul McTaggart - Analyst

  • Yes the follow-up question was really not much this year for Freeport, there's not too many people aware of that. But the noise that I was hearing that really there was going to be a follow-on issue through '07 '08 and it was going to be more than just an '06 material reduction in production.

  • Bret Clayton - CEO, Copper Group

  • Yes there is a decline in production and there was about a 5% reduction in production through 2010 if you looked at the old plan versus the new plan. And the impact was also to push some production from '07 and '08 into '09 and '10. And because of the impact of the metal strip next year, that does have a -- at least as it currently stands, does have a more adverse impact on our copper production for next year.

  • We're still working with Freeport right now, we actually have some mine planning experts from our Technology Group that are working with them to look at what opportunities we may have to impact that, as well as we're working with them on the underground, bringing forward some of the underground expansions that might also favorably impact on that.

  • Paul Skinner - Chairman

  • Thank you, Bret. I mean just to re-establish maybe a little perspective, I mean this is a huge ore body, one of the world's greatest. This will go on for decades and our participation in that over those decades is well defined in advance. Thanks anyway. Another question? Yes? Sorry, let's take the one in front from John.

  • John McKenna - Analyst

  • Hi, John McKenna from Deutsche Bank, just a couple of questions. One on iron ore with first half sales of 3% up on last year, which is a pretty marvelous number given what's going on here in WA. Can you give us some guidance on what you expect on a year-on-year basis for sales of iron ore for this year? Is it going to be in line with your production number would you think? And just a question on Abu Dhabi on the smelter development there, is development in China in terms of aluminium expansion or alumina expansion having any impact in terms of your view there? And what agreement have you got in place in terms of alumina supply, i.e. if you go into Abu Dhabi, would you be supplying more than your 50% stake of alumina?

  • Paul Skinner - Chairman

  • Leigh, do you want to take this?

  • Leigh Clifford - CEO

  • For the -- look John, if you look at the first half in Pilbara, in actual fact although it sort of wasn't the one hit we got out of Cyclone Monty in 2004, the impact of those five cyclones, the rain basically was somewhat greater and we had some difficulty supplying. And so in some respects, the sales being 3% up because 2005 was an unaffected year, wasn't too bad an effort. That was the best we could do. The situation now is that production, as I said in my notes, in June and July has been very strong, shipments are very strong, demand is very strong and I would expect that every kilogram we can put in a ship is going to be sold for the remainder of the year.

  • So you could expect that we will be absolutely flat out. It's pleasing that the ports are running well and sales will be strong in the second half and certainly reflecting that very strong demand that we're seeing.

  • With regards to Abu Dhabi, we had a hint of agreement, we are going through feasibility study at the moment. I understand what you're saying about alumina and aluminium in China, the aluminium smelting in China is really, I don't think it's as well placed as it might be given their power -- the whole energy and power demand position. And the reason we have contemplated an aluminium smelter or joint venture aluminium smelter in Abu Dhabi is because of the strong likelihood of very competitive power.

  • The alumina supply will be from Rio Tinto and we will supply more than our share, we'll supply all the alumina for that aluminium smelter and that's -- so that's the basis of the deal we're looking at and we're obviously working on the fine detail of that and the economics. And I would say we'll report back sometime during next year.

  • Paul Skinner - Chairman

  • Thanks, Leigh. Yes?

  • Nick Hatch - Analyst

  • Nick Hatch from Investec, you've talked a lot about the project pipeline and the capital management program. I was just wondering in the current environment, given high commodity prices and the degree of M&A activity, whether you had reviewed your policy towards acquisitions and perhaps if you could share with us your philosophy there in general? And if you do find a more enticing area of growth, would you consider hostile action? Or would you only do anything on a friendly basis?

  • Paul Skinner - Chairman

  • Perhaps I could make a brief opening comment, Leigh, that you might want to add to. We're continually looking at all opportunities to grow value for our shareholders. We continuously monitor all of the assets in the industry which we would aspire to own. Having said that, money is not burning a hole in our pocket. We've got a very strong program of organic growth going forward, Leigh I think explained that very well and I expect to see a rising pattern of capital expenditure from within our existing portfolio in the coming years. That said, we would be very happy to move forward on any value accretive opportunity which was consistent with our strategy and might come to us, as they have done in the past, through M&A. And be sure we continue to remain alert to all of those possibilities. So that I think would be my general response to your question.

  • Leigh Clifford - CEO

  • Nick, I think if you look at history, we have engaged in hostile takeovers, North, [Colin] Allied. We've engaged in friendly deals, if I could call the way the Hope Downs project was marketed. You know it was certainly competitive, but it was a different sort of deal and I think we emerged out of the mist to snatch the prize on that occasion. So we're prepared to move and you shouldn't imagine that we don't look at opportunities, as Paul said.

  • Paul Skinner - Chairman

  • Yes, go to the back and then down the side.

  • Tama Willis - Analyst

  • Hi it's Tama Willis here from Deutsche Bank, just a couple of questions. Firstly just on your view on China, you're looking for continued strong growth, we have obviously some tightening measures in China at the moment. Can you give us a view in terms of what you're seeing on the ground there going forward? And just on TCRC's, you've offered some comments regarding TCRC's negotiations at the moment and price participation among other things, could you just also tell us your view there?

  • Leigh Clifford - CEO

  • Can I just say what we're seeing on the ground, and I suppose the principal areas are in the aluminium/alumina business and in iron ore. I think I've said a couple of times today in various [for] that the demand for iron ore is extremely strong. We're seeing it strong in China, Korea and Japan. And you know I think we wouldn't forget that despite the occasional comments that are made in the course of negotiations. Demand is strong and I think we're all aware of the economic growth, notwithstanding the central government's desires.

  • As regards to aluminium, we've seen quite a boost in alumina capacity and obviously that's having some impact on the spot price. Fortunately we are big consumers of alumina, we have long-term contracts and we have a contract position so our sales in the spot alumina market are rather modest. As regards to TCRC's, are you in a position or? Okay Bret, why don't you just make a comment on where TCRC's are because they've gained a bit of publicity in recent times.

  • Bret Clayton - CEO, Copper Group

  • Just to remind people that about half of our copper production is sold as finished goods. The other half that we sell is concentrates, most of that is marketed through the joint ventures at Escondida and Freeport, not through us. We obviously do Northparkes. What I would say is what you're seeing is the impacts of the supply and demand market right now, which currently favors concentrate producers versus the smelting and refining capacity after you've seen an increase in that capacity both in China and India. And so -- I've had various questions about this, I don't think there's anything unusual about the negotiations.

  • The current position just favors the concentrate producers over refiners and smelters and so that's what you're in the negotiations with regard to price participation, which is involved but is not involved in a large percentage of the contracts. It's not involved in any of the spot contracts, so it's only a small portion of the market.

  • Paul Skinner - Chairman

  • Thank you, Bret.

  • Tom Aswerner - Analyst

  • [Tom Aswerner] from [AG Group], three questions if I may. Firstly you seem to be attracted to the potash side of the equation of the product, maybe you can give us some more insight why you are so interested in that product over the medium to long term, whereas actually the world leader at the moment, Potash Corporation, is struggling a little bit? The second refers to within the Aluminium Group, your positioning there in the value chain and what you think about that value chain and your position in it, especially in context of increasing energy costs? The last question, a financial question, the CapEx, maybe you can remind us there in terms of your guidance and also maybe breakout the maintenance versus the expansion side of CapEx?

  • Paul Skinner - Chairman

  • All right. Andrew indeed, who is CEO of our Industrial Minerals Group and very much involved in the potash project might make some remarks on that.

  • Andrew Mackenzie - CEO Industrial Minerals Group

  • I think on potash we're both attracted to the markets and the resource that we own. On the market side of things we happen to feel that when we look at cost we feel like the opportunity is in the fertilizer business of potash, say compared to some of the other minerals as a straight mining play. I mean what you mine is basically what you put on a farmer's field and so most of the rent is on the mining side of the business and something that we know rather well.

  • I think that the opportunity that we have in Argentina relative to PTS is very much that we have real cost savings in being able to some of the markets that we intend to target, particularly the southern United States and more importantly Brazil. And that's one where we expect to actually do rather well and we're already talking to many of those potential customers because they are actually customers for many of our borate products as well. That's it really.

  • Paul Skinner - Chairman

  • And it's always worth adding also that this potash deposit in Argentina that we're talking about is fully consistent with the classical Rio Tinto approach to large long life low-cost oil bodies. This is an outstanding potash deposit which, as Andrew says, we expect to be able to recover economically and highly competitively. So it's the right kind of platform to be moving forward into a new business on. Aluminium value chain, Leigh?

  • Leigh Clifford - CEO

  • Yes maybe I can comment on that while Guy gives some thought to the split between the capital, which is maintenance and new capacity. I think if you look at the aluminium value chain, firstly the mineral that is short here is bauxite, mostly a mineral of the tropics. We happen to be endowed with probably the best bauxite resource in the world at Weipa, enormous resource.

  • We're mining at something around less than 20 million tons a year and we have an enormous life there. I think there's a billion of reserves and 2 billion of resources or something like that. So the question is, our aluminium business sits on the Weipa bauxite resource and we are -- we have the share in the world's biggest alumina producer in the QAL alumina refinery. We had the new CAR project so we're well placed to add value to that great bauxite resource.

  • You then look at the smelters. [Amedly] in Queensland, the Boyne smelters are coal fired but we have an equity in the station so we have security of the power there. The two other principal smelters in New Zealand in Tasmania are hydro powered where electricity is hydro based. In Wales the smelter there we have at Anglesey is different again and it's in the, if you like in the twilight of its time.

  • So we are looking at making sure we're very much participating in the alumina side of the business as I say from bauxite, although we tried a little bit of bauxite. We are looking at being in the aluminium nickel where we can get securer power supplies and competitive power supplies. So hence our focus on Abu Dhabi and Abu Dhabi I think, we have the potential to have a very good relationship in an area of the world it has extremely competitive power supply. So that's the focus of our activities in the, if you like the value chain in the aluminium business, built on a great resource.

  • Paul Skinner - Chairman

  • Guy? On the CapEx split?

  • Guy Elliott - Financial Director

  • Capital expenditure, you would have seen that we've spent $1.8 billion in the first half of the year and I would be surprised if we didn't spend at least that in the second half of the year. So you might see a capital expenditure for the year somewhere short of $4 billion and we'll certainly be giving you a more accurate estimate in the seminars.

  • Now the other question you asked was how much of this was maintenance expenditure and how much of it was diverted to growth or the continuation of existing operations. It's a bit difficult measure sometimes to make that and of course environmental expenditure comes into it too. But the most recent estimate that we made was on the level of something like $1.2 billion a year being in that category. And of course we always look for some benefits coming out of this so you know it's not necessarily a strictly correct to regard it as sustaining capital, but a number of that order would probably be the right sort of order to look at.

  • Paul Skinner - Chairman

  • Thank you very much, guy. Yes? Just here in the front.

  • Jeremy Gray - Analyst

  • It's Jeremy [Gray] from Credit Suisse, obviously commodities go up and down and hot divisions of your business which are hot one year are not so hot the next and it was only a few years ago when people suggested you needed to shut down Kennecott.

  • Leigh Clifford - CEO

  • Of course they don't own up anymore you know.

  • Jeremy Gray - Analyst

  • Well I guess what is really apparent now is that iron ore and copper really are a very big part of the business and the smaller businesses seem to be dwarfed, even though they're smaller businesses are really what have given you -- helped to give you that valuation premium relative to a pure play. If there's any cast in terms of acquisitions, would it be fair to say that if the right opportunity came along that you might explore opportunities outside of copper and iron ore, even though are plenty of good copper plays out there right now to buy? But just to give you that greater breadth and earnings breadth that you probably at the moment feel a little bit lopsided?

  • Paul Skinner - Chairman

  • Well we may appear a little lopsided but we're not falling over by any means. And I think it's worth just restating that our approach to portfolio development is focused very much on the quality of resource, whatever the nature of that resource, and its ability to drive value. So we don't have a dogmatically defined aspired portfolio x% of this, y% of that and z% of something else.

  • As it happens, right now we've got two very prominent business in terms of earnings and cash generation, but we've got some very other significant businesses. In fact I don't think we have what most people would call a small business. Certainly as we've been discussing, if there were ways to expand those businesses, we would be very happy to see them get bigger. Aluminium is a good example and Leigh has outlined just the magnitude of the starting point of that value chain in the Weipa bauxite resource.

  • Similarly we would be happy to find our way into other businesses. We're not currently significant players in nickel but you will have seen from the map shown that we've got at least two nickel projects which could take us significantly into that business. So I think the short answer is we're aware of the point you raise, which is a reasonable point, but our approach will be through the focus on quality of asset and value creation potential.

  • Leigh Clifford - CEO

  • I think it's interesting to look at where our Energy business would have been, you know go aback a few years and look at what the prospects going forward. We have a tremendous base on thermal coal in Australia, thermal coal in the United States and our uranium position, especially with prices where they are now, really opens up the range of opportunities around our existing uranium businesses. And you know at 377 million for the underlying earnings for the first half, it's not too small.

  • Paul Skinner - Chairman

  • But it's a good question, thank you. Anybody over here?

  • Leigh Clifford - CEO

  • John.

  • Paul Skinner - Chairman

  • John again.

  • John McKenna - Analyst

  • John McKenna from Deutsche Bank, just on the Chinese procurements, can you give us any sort of quantification in terms of what impact that's having on ore? [inaudible] procurement that you mentioned at all? And did IPT have impact in this first half? You know is there anything we can sort of look at there? And I think that's about it.

  • Leigh Clifford - CEO

  • Yes I will -- in terms of procurement, we have an increasing number of people based in China. We've been trying to increase our sourcing of materials from China and I can't even remember what it is but I know it's expanding rapidly. When I went through with the procurement people in Australia recently I was quite surprised at the extent of their engagement looking to source electrical cable, we were looking at a number of the components of the Madagascar project out of China.

  • I know our people in Hamersley have been looking at a number of rail car options and I'll have to say everything that I've been shown is quite impressive. So not dramatic at the moment, but I would expect that it's going to increase. As I said, we've got a number of procurement people based in China. I don't know, Guy or Tom, have you got any better perception of what we're doing out of procurement out of China? Guy?

  • Guy Elliott - Financial Director

  • I would say really, as you said, Leigh, that it's relatively modest at the moment in the region of 100 million but it is rising very rapidly. And some of the things that you have mentioned of course have not yet been -- we haven't paid for them and I would anticipate that that number would escalate very rapidly.

  • Leigh Clifford - CEO

  • As regards to IPT, well Keith can give you some maybe snapshot, but I'd have to say we're very pleased with how this is starting to impact on the business and it did make a contribution in the first half. And we'll be going through more detailed presentation in September. But I'd have to say we're seeing a couple of areas that's been actually pretty critical to the challenges that we face. Do you want to make a comment there, Keith?

  • Keith Johnson - CEO Diamonds

  • Sure yes okay. I mean we've talked about this a couple of times before, I think a few things worth saying about it. Firstly we want this to be something that is deeply embedded in the business, which means its benefits are very really entwined in the numbers that we see today.

  • So we talked about my -- where we've had a lot of the IPT effort focused around optimizing that moly chain, it's pretty difficult to really disentangle the impact of IPT from what has just been a lot of good work from the Kennecott people that's ongoing. We've seen good work around maintenance, we've seen some of that in coal in the U.S. and again we've seen some good volume numbers coming out of there where again the IPT work is very much part of that. So we've seen clear dollar benefits in the first half that are now already would a multiple of what this program has cost us to put together. And I think in September we'll flush that out a bit more and give you a bit more detail about some of the specifics we've been working on.

  • Paul Skinner - Chairman

  • Thank you, Keith.

  • Unidentified Audience Member

  • Just a quick question on the uranium market. Of course we all know that price has improved a lot, but you've yet to see a big increase in terms of your revenue stream coming through from the ERA offering. So I was just wondering first of all if you could give us some communication about the percentage of contracts that might be coming up over the next 12 months and whether you can look to actually push through higher prices and then perhaps look to break the historicals of contract that [rising] cost on?

  • Leigh Clifford - CEO

  • Well of course the uranium price hockey stick has really come into effect. And typically the utilities in uranium are contracts, multi-year contracts. And in the case of ERA we had some contracts with the shareholders who were then at the time, which were index related. Now what's happening, those contracts are running out a little more slowly at ERA. Some of those date back quite a period of time than they do at Rossing.

  • So you're going to see some benefits start to occur at Rossing in 2008 and beyond -- or 2007 and beyond and in fact in the second half of this year. And at ERA it's a little slower it'll certainly see some benefit in 2007 but a greater degree in 2008. And as you know the price is narrowing, the spot and long-term prices are in excess of $40. So it opens up a lot of technical opportunities for us and Tom and the uranium -- the Energy Group people have been also looking at the options that are available for us at Ranger where there's good prospectivity. So a little bit in 2007 in price and then in second half of 2006 really start to impact 2007 and certainly 2008.

  • Paul Skinner - Chairman

  • Thank you. Are we done? It looks like it. I think we are. Thanks again all of you for coming, much appreciate it. And thank you for your questions. Cup of coffee afterwards if you'd like, a lot of the team are here. Thank you.