Tenaris SA (TS) 2006 Q1 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • - Manager of Investor Relations

  • Good morning. I am Sue Nutt, Manager of Investor Relations for Hydril.

  • Welcome to Hydril's conference call to discuss the financial results for the first quarter of 2006.

  • Before we begin, I have a few words about forward-looking statements. To the extent our remarks today reflect our expectation about Hydril's business or performance for any future period, we are relying on the safe harbor protections ordered by Federal law. Any such remarks should be weighed in the context of the many factors that affect our business, including those discussed in our most recent annual report on Form 10-K, filed with the Securities and Exchange Commission.

  • Today Chris Seaver, Hydril's Chief Executive Officer, and Chris North, Hydril's Chief Financial Officer, will discuss results for the quarter, which will be followed by a question and answer session. Mr. Seaver?

  • - President and CEO

  • Good morning.

  • Continued growth in our premium connection markets resulted in improved financial performance for the first quarter. The outlook for both of our business segments remains strong, and we continue to be focused on meeting the growing demands of our customers. The backlog of capital equipment for our pressure control segment increased 48% during the quarter to $233 million, and includes additional orders received from offshore drilling contractors for deep water blowout prevention systems. Deep water capital equipment orders currently make up about 70% of this backlog, which demonstrates the trust our customers have in the quality, performance and reliability of our equipment.

  • Sequentially first quarter revenue of $114 million was flat while operating income improved 7% to $32.9 million. Net income was $22.7 million or $0.94 per diluted share, up 7% from $0.88 in the fourth quarter.

  • For each of our segments, premium connection and pressure control, I would like to review the key drivers, discuss the operational and financial progress we made during the quarter, and comment on the industry outlook.

  • Our premium connection business is driven primarily by deep formation drilling, that is rigs drilling at targets deeper than 15,000 feet and also by offshore drilling.

  • In the U.S. we look at the deep formation rig count which averaged 204 in the first quarter, up 12% sequentially, and offshore Gulf of Mexico rigs under contract which averaged 130, up 2% sequentially.

  • Internationally, while the correlation with demand for our products is not high we look at the international rig count, which averaged 896 for the quarter, up 3% sequentially.

  • Premium connection revenue for the quarter continued at the level of the prior quarter with a mixed shift to higher margin premium connection products from low margin pipe. This mixed shift in revenue was the main reason that segment operating income increased 16% sequentially and segment operating margin increased from 33% to 37%.

  • Domestically, demand for our products continued to improve during the first quarter and we expect this trend to continue.

  • Historically just under half of our underlying premium connection revenue comes from the U.S. market, where the majority of our products are used in drilling for natural gas. So natural gas prices and the expectation of future natural gas prices can affect demand. So far we have seen no drop in demand for our products due to the price of natural gas.

  • The U.S. deep formation rig count averaged 182 in the fourth quarter, 204 in the first quarter and we expect deep formation rig count to continue to increase. We also expect drilling activity in the Gulf of Mexico to gradually trend higher, but at a slower rate.

  • During the quarter, threaded inventory held by others in our yards increased in joins, or number of pieces, and declined in terms of months of supply. A substantial and variable amount of the threaded inventory in our yards is owned by end users and not by our distributors. And a variable and unknown amount of threaded inventory owned by our distributors exists outside our yards. We have determined that the months of supply indicator we provided in the past is no longer a reliable indicator and is potentially misleading, so we are discontinuing its use.

  • In our international markets, orders were strong during the first quarter, particularly in the eastern hemisphere and we expect international demand to increase gradually during 2006. Demand for our premium connection products outside the United States is generally not affected by the price of natural gas in the U.S.

  • As we reported last quarter, we are continuing to investigate opportunities to increase our international market penetration, and we are seeking suitable partnership relationships, particularly in Russia and China. Also, we believe our products are well suited for SAGD drilling and we have plans to increase our plant capacity in Canada over the next 18 to 24 months to meet the expected increases in SAGD drilling there.

  • Our pressure control business is divided into two distinct segments, aftermarket and capital equipment, each of which is affected by different market considerations.

  • The aftermarket portion of our pressure control segment is heavily influenced by the level of offshore drilling and also by the level of U.S. land drilling, so we track this business by looking at the worldwide offshore rig count and the total U.S. rig count. In the first quarter the worldwide offshore rig count averaged 352, up 2% sequentially, and the total U.S. rig count averaged 1,519, up 3%.

  • The capital equipment portion of this segment is only slightly influenced by these indicators. It is much more heavily influenced by offshore rig new builds and upgrades, particularly deep water new builds and upgrades.

  • Sequentially first quarter revenue for the pressure control segment increased slightly to $40.5 million, and operating income decreased 9% to $10.4 million. Aftermarket revenue was essentially flat with the fourth quarter which was the strongest aftermarket revenue quarter in over 20 years, and capital equipment revenue increased 2% sequentially to $19.7 million.

  • Operating margin for the first quarter was 26%, down from 28% for the fourth quarter. The increase in operating margin was mostly the result of product mix within capital equipment products. In addition, we had slightly higher costs from components manufactured by subcontract vendors. The outlook for our pressure control segment continues to be good. We expect aftermarket revenue to be flat in the second quarter, and then to gradually increase driven by demand from increasing worldwide rig count, particularly the offshore portion of this rig count.

  • Based on our backlog, from here, we expect capital equipment revenue to increase sequentially every quarter into 2007, but at an uneven pace in part because of the timing of completion of components by subcontract vendors. As of the end of the quarter, we believe that full scope purchase orders have been placed on Hydril and its competitors for 23 deep water block prevention systems. We have received eight of these purchase orders. We have identified an additional 11 full scope orders which we expect to be placed this year or early next year. We hope to get our appropriate share of this additional business.

  • Construction is progressing on schedule at our new pressure control plant in Veracruz, Mexico, located near our existing premium connection facility. We expect production to begin about mid-year and to ramp up slowly thereafter. When fully utilized, this plant will increase our pressure control manufacturing capacity by about 15%, which will free up capacity at our Houston plant for production of a larger volume of higher technology deep water equipment.

  • Finally, I invite everyone to visit Hydril's booth, number 2975, at the Offshore Technology Conference in Houston next week.

  • Now, Chris North will review our financial results.

  • - Chief Financial Officer

  • Good morning. Total revenue for the quarter of $114 million was flat sequentially, but as Chris mentioned we had a product mix shift in premium connections from low margin pipe to higher margin connections.

  • Gross margin for the first quarter was 44%, up from 41% in the fourth quarter 2005 due primarily to the product mix shift and to improved plant efficiencies at our domestic premium connection plants.

  • Total SG&A expense was 17 million for the quarter, up 8% from last quarter due primarily to equity compensation expense which included $500,000 for stock option expense mandated by FAS 123 R, higher legal costs and higher engineering costs. We expect SG&A expense to increase about 10% in the second quarter, then rise at a slower rate in each of the remaining quarters of this year. SG&A was 15% of sales for the quarter, up slightly from 14% for the fourth quarter.

  • Operating income of $32.9 million was up 7% from last quarter, while operating margin improved to 29% from 27% last quarter.

  • Our joint venture threading facility in India sustained a small loss during the first quarter due to planned startup costs. Our share of the loss was $45,000. This facility supplies the Indian market and some international markets, and we are adding an additional threading line to support increasing demand. We expect small losses over the next several quarters during startup, and afterward we expect sales and profitability to be lumpy. This joint venture is part of our international expansion efforts, and as Chris stated, we are in negotiations with other pipe sources to replicate this business structure in other critical markets.

  • Net income for the first quarter was $22.7 million or $0.94 per diluted share compared to $21.4 million or $0.88 for the fourth quarter.

  • At the end of the quarter our cap equipment backlog stood at $233 million, up 48% from $157 million last quarter, and up from $30 million a year ago. We expect approximately 30% to 40% of this backlog will be recognized in revenue in 2006, 40% to 50% in 2007 and 15% to 20% in 2008, all subject to variation orders, shipyard slippages and other changes.

  • For the balance sheet, we ended the quarter with $206 million in cash, cash equivalent investments and no debt. During the quarter we generated $27 million of cash from operations, up from $16 million in the fourth quarter. Capital spending of $5 million for the quarter was principally to purchase equipment for the new pressure control plant in Mexico, some capacity additions at our pressure control plant in Houston and for expansion of our premium connection manufacturing capacity in Veracruz, Mexico. We expect our capital expenditures to be in the range of 30 to $35 million for 2006.

  • Last quarter we mentioned that our Board of Directors authorized the repurchase of up to $100 million of our common stock over the next 12 months. At that time we indicated the Company intended to begin repurchasing its shares in the second quarter of 2006 in the open market using a systematic approach, purchasing small amounts of stock daily. No shares have been purchased to date.

  • Operator, we are now ready for questions.

  • Operator

  • Thank you. [OPERATOR INSTRUCTIONS]

  • Our first question comes from Ken Sill with Credit Suisse.

  • - Analyst

  • Good morning, gentlemen.

  • - Chief Financial Officer

  • Good morning, Ken.

  • - Analyst

  • Big build in the backlog, I was wondering if you could give us some details on what the sequential change in orders has been Q4 to Q1, in the capital equipment side of things.

  • - President and CEO

  • We have received three full scope purchase orders during the first quarter for deep water systems.

  • - Analyst

  • And how much in dollar volume have orders been in the last couple of quarters? You can give that to me off line if you don't have it available.

  • - President and CEO

  • Yes, you can calculate it from the backlog and the revenues, but [INDISCERNIBLE]

  • - Analyst

  • Okay, that's fine. And have any more orders been come into the backlog so far this quarter?

  • - President and CEO

  • We are not disclosing that. We are going to do end of quarter to end of quarter.

  • - Analyst

  • End of quarter. Okay, that's cool.

  • And then so now we have got the revenue flowing in, the orders still really strong, 11 more coming, it looks like you're getting about 30% share. Do you expect any dramatic change in the margins on the capital equipment side as the backlog builds up and starts to deliver?

  • - President and CEO

  • There's two parts to that question, one is on a purchase order received basis, right, we are escalating our costs in accordance with our expectation, our estimated cost in accordance with our expectation for the future cost. We are also raising the price to cover those, and so we are expecting gradually the margins to increase on purchase orders received. But remember we have this variable how will we actually reflected in quarterly margins is unknown to us exactly, because there are estimates on our cost.

  • - Analyst

  • Yeah. Okay. And then finally on the orders, we have seen, I guess, in our numbers about 17 jack-ups where shallow water rigs have been ordered this quarter so far year-to-date, how much of that business are you guys winning?

  • - President and CEO

  • About the same share, that is earlier, I've got exact numbers here. We believe we have received... of the ones we know about, there's 62 that we're told, 19 of which we don't know about, we have received about a third of the rest.

  • - Analyst

  • And has the total value of the deep water VOP system, what is that running in the order book now?

  • - President and CEO

  • It depends on the scope of supply, the range is quite wide.

  • - Analyst

  • Okay.

  • - President and CEO

  • A semi-standard system is $18-20 million range. But the scope of supply is very wide here and so we're having inquiries and discussions off both ends of the scale.

  • I have the answer to the other question about booking, total capital equipment bookings were $95.5 million in the first quarter, 114 in the fourth quarter -- 115 in the fourth quarter, 28 in the third quarter before that, 29 the quarter before that, 28 the quarter before that.

  • - Analyst

  • Okay, all right, thanks a lot guys.

  • - President and CEO

  • Thank you Ken.

  • Operator

  • Thank you. Our next question comes from James Wicklund from Banc of America Securities.

  • - Analyst

  • Hi guys.

  • - Chief Financial Officer

  • Morning Jim.

  • - Analyst

  • There is a story running around that V&M, who bought North Star Steel, is going to try and accelerate the European or international model on premium threading where the mills themselves put on threads. Have you all heard anything about them looking to increase market share or aggressively attack that market?

  • - President and CEO

  • Yes. They have been looking to increase their market share for several years, ever since they bought North Star. They are, we understand, building a threading line at the mill right now that compares to the three threading lines we believe they have at Vam PTS, which is up there near us by the airport. So they have been looking to institute that model for years and we don't see this as any change in their plans. Perhaps implementation of some of it, but not a change.

  • - Analyst

  • And does that change the capacity in anyway going forward that you see relative to demand that would impact your margins or industry margins?

  • - President and CEO

  • Not at this time. Everybody's utilization is going up as best we can tell.

  • - Analyst

  • Okay. And do you have a utilization number, Chris, for your premium threading capacity at this point?

  • - President and CEO

  • In the U.S. it's about 75% of capacity, and outside the United States it's about 95% of capacity.

  • - Analyst

  • Okay. And I apologize if I missed this, but are we adding capacity internationally, are you adding capacity internationally?

  • - President and CEO

  • Yes, we are. This last quarter, we've gradually -- creeping capacity is the word we like to use, staying just ahead of demand. So we had some expense in the first quarter to increase capacity at our Mexican facility, and we're expecting this year and the beginning of next year additional gradual increases in other facilities.

  • - Analyst

  • And we would assume that you're doing this gradually in order to keep pricing strong.

  • - President and CEO

  • Well, we like to have a good return on invested capital and we don't need additional capital. So we're not putting it in place.

  • - Analyst

  • Okay. Last question, have you -- of your two primary legs to your stool, have you identified what might be an embryonic stage or idea for a third leg at this point or are you continuing to optimize the two legs that you currently stand on?

  • - President and CEO

  • We have not identified a third leg; we are looking at bolt-on types of acquisitions, products that have similar characteristics to our existing products, that is superior performance in the field, technology content that we can charge for, and the problem we're having is they have to be available and at a reasonable price. And we haven't been able so far to find much, two small product lines in the last two years.

  • - Analyst

  • Okay, appreciate it Chris. Hope to see you Sunday.

  • - President and CEO

  • Thank you, see you Jim.

  • - Analyst

  • Okay.

  • Operator

  • Thank you. Our next question comes from Thiru Ramakrishnan from Simmons.

  • - Analyst

  • This is Thiru Ramakrishnan from Simmons. Good morning guys.

  • - President and CEO

  • Morning, Thiru.

  • - Analyst

  • On the pressure control side, Chris and Chris, walk us through operating margins on after market revenue, on after market revenue sales, do those significantly differ from quarter to quarter?

  • - Chief Financial Officer

  • There may be some mixed shift within some of the equipment, but it doesn't really change a whole lot from quarter to quarter, Thiru.

  • - Analyst

  • Okay, then help me understand, if you look at your pressure control operating margins in Q1 they were down significantly sequentially, but your mix between cap equipment and after market sales was roughly the same.

  • - Chief Financial Officer

  • Right.

  • - Analyst

  • What drove the sequential downtick in margins?

  • - Chief Financial Officer

  • Primarily the mix within capital equipment that we --- percentage completed for the quarter. So we had some projects, remember Chris mentioned we had a little higher cost from subcontract vendors on some of these orders, and just the mix of jack-up, deep water, everything that was going on in the quarter just gave us a little bit lower mix of margin for the quarter.

  • - President and CEO

  • On a go forward basis we're expecting the margin in this segment to be in the mid 20s. So that's where it is.

  • - Analyst

  • Okay. On the premium connection side, nice uptick in margins there on flat revenue, what was the mix in the quarter between North American and international, or I guess U.S. and international?

  • - President and CEO

  • We don't disclose that level of detail. All of the difference was mix, less pipe and more connections, in general terms we had greater increase in domestic revenue than international. Underlying premium connection revenue if you strip out the pipe.

  • - Analyst

  • And have you guys implemented any more price increases domestically?

  • - President and CEO

  • No. We had that one in the fourth quarter. It's beginning to show up in the numbers now and no.

  • - Analyst

  • Thanks, that's all I had.

  • - Chief Financial Officer

  • Thank you.

  • - President and CEO

  • Thank you.

  • Operator

  • Thank you. Our next question comes from Robin Shoemaker with better than Sterns.

  • - Analyst

  • Thank you. Chris, I wanted to ask you about after market pressure control pricing.

  • I believe you mentioned on the last conference call that you had a price increase on January 1, I think it was 7% or something like that.

  • - President and CEO

  • Correct.

  • - Analyst

  • Yeah. You were expecting that to really impact second quarter. So is that still the scenario, didn't really benefit you much in the first quarter, but will impact the second?

  • - President and CEO

  • We already had some of it in the first quarter and we will have more in the second, a little more.

  • - Analyst

  • Okay. And is the 7% after market price increase to be a follow-on price increase, or is this something you're kind of setting once a year or something like that?

  • - President and CEO

  • We do it as the market permits, but we don't have any current plans to raise prices again.

  • - Analyst

  • Yes.

  • - President and CEO

  • Remember this is not a commodity business, and it doesn't have the wild price springs like pressure pumping, drilling rigs, etc.

  • - Analyst

  • Right. Just further on the orders and backlog, did you have additional jack-up VOP orders in the first quarter? I think you mentioned you had 12 total jack-up VOPs at the end of the year?

  • - President and CEO

  • Yes, we had two.

  • - Analyst

  • Two more.

  • - President and CEO

  • Yes.

  • - Analyst

  • Okay. And do you have a sense of how many more jack-up orders are out there yet to be determined?

  • - President and CEO

  • We don't know the answers or the results on 19 rigs, because we got the same list of rigs under contract that we built as everyone else, and we can't tell whether they've been -- they're unknown to us, we can't tell whether they have been placed or not. And so we may have already lost them or they may be available, we're not sure.

  • - Analyst

  • Okay.

  • Lastly, you made reference in your comments to subcontract vendors, and I was wondering if this is an area that is potentially of concern in terms of timing of deliveries for critical equipment that would allow you to meet your delivery schedules, is it something that I can imagine it could become problematic, but what's your read on this issue?

  • - President and CEO

  • Yes, it's an issue that, it could be a significant issue in the future, we're aware of it. The whole supply chain issue is a, vendors supplying everything to us, metal, welding rods as well as subcontractors an issue. We have factored in slippage in our schedules, and we had some in the first quarter and we think we're catching back up to it. But it's a potential issue.

  • - Analyst

  • Okay. Thank you.

  • - President and CEO

  • Thank you Robin.

  • Operator

  • Thank you. Our next question comes from Darren Horowitz with Raymond James.

  • - Analyst

  • Good morning gentlemen.

  • - Chief Financial Officer

  • Good morning, Darren.

  • - Analyst

  • A quick question on the pressure control side -- I know that each deep water VOP that's sold takes about a year to construct, and is usually ordered about 16-18 months in advance. I was curious as to if there were any changes given longer lead times on raw materials for the deep water VOPs, and also for the jack-ups as well, how long in advance before they're actually ordered.

  • - President and CEO

  • There has been a grad -- over the last year there's been a gradual extension in delivery times in materials from forgings. But since the discussions we're having and the purchase orders we're receiving are for deliveries way out into the future, it's not a material issue, that is the delivery of forgings and the lead time on forgings is not a material issue these days. It's less of a factor, for example, than subcontractor performance.

  • - Analyst

  • So that won't be a bottleneck going forward as it relation to you actually getting the VOPs out the door?

  • - President and CEO

  • Correct. We believe not.

  • - Analyst

  • Okay. And how long in advance for the jack-up VOPs at this point?

  • - President and CEO

  • The forging deliveries are the same, it's the same kind of forgings, it's the same block for the body for a jack-up as it is for a deep water system.

  • - Analyst

  • That's helpful.

  • My second question really relates to more free cash flow deployment. Beyond this current share buyback, just refresh our memories if there are any options on that buyback, and/or your thoughts for adding additional capacity for pressure control already beyond what's announced.

  • - President and CEO

  • The first is on buyback. If the marketplace continues the way we expect and other things being equal, there's a high likelihood of renewal of the buyback annually out into the future first. Second, other employment, deployment of cash in terms of increasing our pressure control capacity we are going, we talked about the Mexican facility and we talked about additional machine tools for the Houston plant. Because the delivery of deep water systems is so far out into the future, scheduled out in the future, our current backlog goes into the second half of '08, and the discussions we're having on potential purchase orders are '08, '09 and later, it's not likely that we will need additional manufacturing capacity in Houston or elsewhere in the near term absent, you know, the big boom, which we're not anticipating.

  • - Analyst

  • That's helpful, thank you.

  • - President and CEO

  • Thank you Darren.

  • Operator

  • Thank you. Our next question comes from Geoff Kieburtz from Citigroup.

  • - Analyst

  • Morning.

  • - President and CEO

  • Good morning Geoff.

  • - Chief Financial Officer

  • Good morning Geoff.

  • - Analyst

  • I would just like to continue on this theme a little bit on the backlog.

  • I almost get the sense as you talk about the supply chain and vendor execution issues that you're starting to see perhaps the system being stretched to capacity, that it would be difficult to build more rigs at least from a VOP perspective at a faster rate than what we're seeing currently, is that a fair conclusion?

  • - President and CEO

  • No, I don't think so. It's that everyone is ramping up at the same time and so a lot of these vendors have, who are smaller operators, have startup problems. And so once they get up, get some, you know, to build the second one is easier to build than the first, the frames for a block preventer stack for example, the second one is easier to build than the first, third one easier than the second, so we expect as they ramp up they will become more efficient and we have factored in sufficient time. It is true that the labor market is tight in Houston for all of the activities associated with building rig equipment. But we think it's manageable.

  • - Analyst

  • Okay. So you're kind of walking the line, but you see on the supply side, on your supply side there's probably some improvement that will be achieved over the course of several quarters.

  • - President and CEO

  • Yes, that's what we expect.

  • - Analyst

  • And are you suggesting here that you're using new vendors in some cases when you talk about ramping up?

  • - President and CEO

  • Some are new and some are existing vendors, long term. You remember the capital equipment cycle is quite cyclical, so they had to skinny right down, remember for several years there when there was no business. So while their infrastructure is in place, there are welders that they have to hire, laborers, etc., it's an issue for everybody and they don't hire them in advance, they hire them when they get work.

  • - Analyst

  • And in terms of the scheduling in a little bit of additional time and estimating the costs, are there, is there any way, I'm just trying to understand the contracting here. Are you kind of offering to your customer sort of a definitive delivery time and a fixed price, but then having to manage the cost side over this sort of 18 month time horizon? Or is there a --

  • - President and CEO

  • Yes, that's correct. We give the -- the customers want a fixed delivery and a fixed price, and that's what we give them. When we quote it to them, right, we have in hand costs from our sub vendors, forgings for example, and when we get a purchase order we fix all the costs that we can fix.

  • - Analyst

  • Okay.

  • - President and CEO

  • But some costs we can't fix, so we have to estimate forward what they're going to be.

  • - Analyst

  • Okay. Can you give us a rough idea what percentage of your costs can you fix? How much, I'm trying to get an idea of how much margin exposure you're taking.

  • - President and CEO

  • If it's very rough, a guess, which it's only a guess, about a third we can fix.

  • - Analyst

  • Oh, okay. All right.

  • Shifting gears a little bit, well kind of a related question. You mentioned that you kind of targeted mid 20s margins on the pressure control capital equipment and that's where you're at. Is that -- reconcile that with kind of what you said before about expecting to see rising margins.

  • - President and CEO

  • That's operating margins for the whole segment.

  • - Analyst

  • Okay.

  • - President and CEO

  • Right. Mid 20s.

  • - Analyst

  • Right.

  • - President and CEO

  • And so out into the future, remember during the cycle, at the beginning of the cycle, margins were lower.

  • - Analyst

  • Right.

  • - President and CEO

  • Right, and within the product mix is quite wide and the margins vary widely among products. So as we go now through start and deliver the backlog, some had lower margins than other parts of it. And as we -- the farther we get out into the future, that roughly two-thirds of our costs which we can't fix is subject to how good our estimations were. We're trying to be conservative, but for now we think that we are making a model of the business, you ought to model mid 20s for operating margins for this segment.

  • - Analyst

  • Okay. Not rising.

  • - President and CEO

  • Correct, not rising, in the current range.

  • - Analyst

  • Okay, all right. And then just on your comments regarding the buyback when you mentioned an annual or potential for annual renewal, does that mean you're looking to complete your $100 million buyback over the course of the year?

  • - Chief Financial Officer

  • Over four quarters, yeah, starting in the second quarter. So by the end of the first quarter next year.

  • - Analyst

  • Okay, great. Thanks very much.

  • - President and CEO

  • Thank you Geoff.

  • - Chief Financial Officer

  • Thanks Geoff.

  • Operator

  • Thank you, our next question comes from James West with Lehman Brothers.

  • - Analyst

  • Yes, good morning guys.

  • - Chief Financial Officer

  • Good morning, James.

  • - Analyst

  • I had a question about your market share, this cycle it's been higher than previous cycles. Do you think this level of market share is sustainable in the pressure control business, and are you seeing any different behavior from your major competitors there?

  • - President and CEO

  • The first question is market share is it maintainable, we believe on the deep water portion it is. Yes. Have we seen any difference in behavior by our competitors?

  • - Analyst

  • From the companies that have lost share.

  • - President and CEO

  • No. Not at this time.

  • - Analyst

  • Okay. Another question on a different topic, the joint venture in India looks like it will be very successful for you, I know you talked about the potential for doing ventures in China and Russia, can you give us an update of the status there, and what would you expect in terms of timing?

  • - President and CEO

  • We are in negotiations in both of those, in China and Russia. If they come to fruition Russia ought to be first, and if we're lucky, by the end of this year for Russia.

  • - Analyst

  • Okay, great, that's all I had. Thanks, guys.

  • - President and CEO

  • Thank you.

  • Operator

  • Thank you. [OPERATOR INSTRUCTIONS]

  • Our next question comes from Perry Conner with Capital One Southcoast.

  • - Analyst

  • How's it fellas, good morning?

  • - President and CEO

  • Good morning, Perry. [Laughter] How are you?

  • - Analyst

  • Fine, thank you.

  • Chris, first on the remaining potential VOP orders, of the 11 that are out there to be ordered potentially between the end of this year, early '07, when do those begin to show up in the burn through, I'm assuming potentially ordered 12 months ahead of time, and then begin to come through or are these scheduled even further out now given the visibility on the construction cycle?

  • - President and CEO

  • Even further out. Second half of '08 and after.

  • - Analyst

  • Okay. So as far as any major additions to the backlog, what's the soonest -- other than project work, that would be the soonest they would really come through the capital equipment side, is that fair?

  • - President and CEO

  • For major projects we're not likely to have any that show up in revenue this year. We do have a -- there are non-project bookings, some for short delivery, some for long delivery. We had $16 million worth of them in the quarter. And so remember that we have had a recurring underlying $5-8 million a quarter of onesies and twosies capital equipment business that havedelivery at less than 12 months.

  • - Analyst

  • That was my next question then. So that has doubled within this last quarter, you had $16 million in non-project, is that fair?

  • - President and CEO

  • Some of that is -- no, all of that's about within a year of that $16 million.

  • - Analyst

  • But it was booked during the quarter.

  • - President and CEO

  • Correct.

  • - Analyst

  • Okay, thank you.

  • - President and CEO

  • So it's higher than the customary level, but it varies widely quarter to quarter, remember.

  • - Analyst

  • Okay, fair. And then you mentioned that Veracruz is on schedule, remind me, I apologize, what is the schedule, when would you be up and running?

  • - President and CEO

  • So - cutting chips by mid year and full at the end of the year.

  • - Analyst

  • Okay, year end. Okay. On the threading side and the mix issue, was there anything in the quarter relative to delivery of pipe that slipped that would show up in sequential quarters or this is reflective of where you would see the mix in the next quarters?

  • - President and CEO

  • Nothing slipped. But remember that our pipe, the pipe portion, we sell pipe to facilitate the sale of our connections. And so the business is very lumpy and it's order by order.

  • The same underlying premium connection business can be, we can sell the connections to a distributor, steel mill, Japanese trading company, some other middle man or we can sell the threaded pipe to the end user. It's the same premium connection revenue, sometimes it has pipe with it, sometimes it doesn't. And it varies all over the lot. And so from quarter to quarter it varies.

  • You remember last quarter we had a big run up in sales and next to no additional operating income. Why? Because most of the sales, addition of sales was pipe. This quarter we had a reduction in the pipe, increase in the underlying premium connections, big increase in operating income for the segment on flat revenue. The point is it's variable, very variable, impossible for on outsider to model.

  • - Analyst

  • Right. And the contribution to the incremental margin here was even though there's some you said I think terminology some impact to pricing in the numbers, the vast majority of incremental was mix, is that --

  • - President and CEO

  • On the premium connection side, that's correct.

  • - Analyst

  • Right. That's all I've got guys, thank you.

  • - President and CEO

  • Thank you, Pierre.

  • Operator

  • Thank you. Our final question comes from Phillip Dodge with Stanford Group.

  • - Analyst

  • Good morning everybody, thanks for the comments. Two questions, first, can you discuss the significance of the end user holding more threaded pipe in your yards and whether that would be likely to change if activity level offer went down.

  • - President and CEO

  • Concep -- it depends on the end user first. Conceptually, it makes sense that if activity levels, if drilling activity, end use consumption, actual consumption of premium connections declined, they would -- customers would use the pipe they have in inventory first. Because there are a lot more end users than there are distributors and they're not an accustomed to buying and selling pipe amongst themselves, the drawdown is likely to be quite slow because it's user-specific. A lot of the inventory is very customer-specific, it's not standard stockkeeping units. It's large diameter, unusual grades in wall thicknesses. And so, yes, if there's a downturn in activity in the field the distributor should be -- the end user should be drawing down this inventory, but it's likely to take quite a long time.

  • - Analyst

  • Okay, thanks. The other question if you can elaborate on the SAGD related expansion in Canada, how much capital might be involved and what the timing would be?

  • - President and CEO

  • So we're in the permitting, acquiring land phase of the process right now. So it's going to take about 18 months, a little longer. And total capital might be in the $15 million range, something like that.

  • - Analyst

  • Okay. Thanks very much.

  • - President and CEO

  • Thank you Phil.

  • Operator

  • That concludes our call this morning. Thank you for your participation.