  • Operator

  • Ladies and gentlemen, thank you for standing by.

  • Welcome to Teck's fourth-quarter 2024 earnings release conference call.

  • (Operator Instructions) This conference call is being recorded on Thursday, February 20, 2025.

  • I would now like to turn the conference over to Emma Chapman, Vice President, Investor Relations.

  • Please go ahead.

  • Emma Chapman - Vice President, Investor Relations

  • Thank you, operator, and good morning, everyone.

  • And thank you for joining us for Teck's fourth-quarter 2024 conference call.

  • Today's call contains forward-looking statements.

  • Actual results may vary due to various risks and uncertainties.

  • Teck does not assume the obligation to update any forward-looking statements.

  • Please refer to slide 3 for the assumptions underlying our forward-looking statements.

  • We will reference non-GAAP measures throughout this presentation.

  • And explanations and reconciliations are in our MD&A and the latest press release on our website.

  • Jonathan Price, our CEO, will start with an overview of our fourth-quarter and full-year results.

  • Crystal Prystai, our CFO, will follow the financial and operational review.

  • And Jonathan will conclude with closing remarks, followed by a Q&A session.

  • With that, I'll hand the call over to Jonathan.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thank you, Emma, and good morning, everyone.

  • I'll start with highlights from 2024 on slide 4.

  • Last year was a transformational year to Teck, and we made significant advancements in our value creation strategy.

  • We completed the sale of our steelmaking coal business for value, enabling Teck to reposition as a pure-play energy transition metals company focused on copper and zinc.

  • With the USD8.6 billion in proceeds from the transaction, we announced the largest cash return to shareholders in our history.

  • And we began executing the return immediately.

  • In 2024, we returned $1.8 billion in cash to shareholders including $514 million in dividends or approximately $1 per share, and $1.25 billion in share buybacks.

  • We also enhanced our resilience by further strengthening our industry-leading balance sheet.

  • We reduced our debt by $2.5 billion and retain funding for our near-term value-accretive growth projects.

  • We currently have $11.3 billion in liquidity, including $7.1 billion in cash.

  • This includes our sustainability-linked revolving credit facility, which we recently reduced by USD1 billion to USD3 billion, and extended for a five-year term to October 2029.

  • We were in a net cash position of $2.1 billion as of December 31.

  • In 2024, we generated $2.9 billion in adjusted EBITDA, more than double the prior year.

  • We set a record for annual copper production with a 50% increase from the prior year to 446,000 tonnes.

  • In zinc, Red Dog had strong performance, increasing zinc in concentrate production while improving our net cash unit costs by USD0.16 per pound.

  • We continue to have a strong focus on cost discipline and managing the controllable costs across our business.

  • We are starting to see the positive impact of the structural cost reductions that we have implemented across our business, following the sale of the steelmaking coal business in July.

  • Over the full year, we reduced our corporate cost by 21% or $88 million compared with 2023.

  • We did all this safely, with a high potential incident frequency that remained low across the operations that we control.

  • Finally, we progressed our value-accretive near-term copper growth projects.

  • We completed construction of QB in Chile and ramped up the operations to design throughput by the end of the year.

  • And we continue to lay the foundation for our next phase of copper growth by progressing our near-term copper projects.

  • Overall, we made significant progress across the four pillars of our strategy for responsible growth and value creation.

  • Now looking at our fourth-quarter highlights on slide 5.

  • Our strong full-year results were enabled by our fourth-quarter performance.

  • This was our third consecutive quarter of record copper production as QB ramped up to design throughput rates by the end of the year.

  • Our adjusted EBITDA increased by 160% to $835 million compared to the same period last year.

  • We reduced our debt by a further $275 million and returned $549 million in cash to shareholders through share buybacks and our base quarterly dividend.

  • And we continue to advance our near-term copper growth projects towards potential sanction decisions this year.

  • Turning now to an update on safety and sustainability on slide 6.

  • We remain committed to ensuring the health and safety of our people, operating responsibly, and building strong relationships with communities.

  • As I mentioned earlier, we maintained a low high potential incident frequency of 0.12 across the operations that we control in 2024.

  • And with our continued focus on sustainability, we released our 2024 Climate Change and Nature Report in December.

  • This combines the recommendations of the TCFD and the TNSD to deliver an integrated report covering our progress on climate and the major related aspects of our business.

  • We will provide an update on all our sustainability performance in our 2024 sustainability report, which we expect to release in March.

  • We continue to receive recognition for our sustainability leadership.

  • Most recently, Mediacorp named Teck as one of Canada's Top 100 Employers for the eighth consecutive year.

  • Forbes also named us one of the World's Top Companies for Women for 2024.

  • Turning to our progress at QB on slide 7.

  • In Q4, QB delivered the strongest quarter so far with mill throughput rates increasing quarter over quarter and achieving design throughput rates.

  • This is a plant with a robust design, and it continues to operate well.

  • Recoveries improved to approximately 85% in the quarter and averaged 87% in November and December as a result of our successful improvement work on the grinding and flotation circuits in Q3 and Q4.

  • Great (technical difficulty) The improvement in our mining drivers led to copper production at QB increasing quarter over quarter to 6,700 tonnes from 52,500 tonnes in Q3.

  • We also achieved record daily production throughout the quarter.

  • For the full year, QB copper production was within our revised guidance at 208,000 tonnes.

  • Looking forward to 2025, we are well positioned for further growth in copper production at lower net cash unit costs at QB, setting us up for improved margins.

  • Our 2025 guidance range of 230,000 to 270,000 tonnes at QB represents a significant increase from 2024.

  • This guidance reflects an extended 18-day shutdown in January to conduct maintenance and reliability work, and complete additional tailings lifts as part of the operational ramp-up.

  • We expect to continue to have regular quarterly maintenance shutdowns per our operating plans.

  • In 2025, we expect to see an overall increase in average grade of 0.6%.

  • In line with the mine plan, we are processing more transitionals, which is lower-grade material, particularly in the first quarter of the year.

  • Grades are expected to increase into the second half of the year.

  • Our focus is on achieving steady-state operational performance with consistent online time, with design recovery rates of 86% to 92% depending on ore feed material.

  • We expect a significant reduction in QB's net cash unit cost in 2025 to USD1.80 to USD2.15 per pound from USD2.72 per pound in 2024.

  • This reduction is primarily driven by a combination of higher copper production, cost discipline, and increased molybdenum byproduct credits as the QB molybdenum plant continues to ramp up.

  • Overall, we are pleased with the performance of QB, and we expect to see the operation generate significant cash flows in 2025.

  • Looking at our copper segment in 2025 on slide 8.

  • We expect significant growth in our copper production with improving margins this year.

  • Our copper production is expected to continue to grow to 490,000 to 565,000 tonnes from 446,000 tonnes in 2024 due to the ongoing QB ramp-up and improved grades at HVC.

  • We also expect a significant reduction in our copper net cash unit costs in 2025 to USD1.65 to USD1.95 per pound from USD2.20 per pound in 2024.

  • We already saw an increase in our corporate EBITDA margin in 2024 and expect this to continue to improve to 53% in 2025 based on consensus estimates.

  • Slide 9 outlines our well-funded value-accretive near-term copper projects, including the mine life extension of Highland Valley in British Columbia and our low capital intensity greenfield projects at Zafranal in Peru and San Nicolas in Mexico.

  • These are attractive projects that are simpler in scope and complexity than our QB2 project, with significantly lower capital intensities.

  • We continue our work to define the most capital-efficient and value-accretive path of the expansion of QB, both through the optimization of the mill and low-capital debottlenecking opportunities, which could increase throughput by 15% to 25%.

  • Through the execution of these projects, we have a clear path to increase our annual copper production to approximately 800,000 tonnes per annum before the end of the decade.

  • I'll now hand the call over to Crystal to provide further details on our fourth-quarter and full-year results.

  • Crystal Prystai - Senior Vice President, Chief Financial Officer

  • Thanks, Jonathan.

  • Good morning, everyone.

  • I will start with our financial performance in Q4 and for the full year on slide 11.

  • Our adjusted EBITDA more than doubled in 2024 to $2.9 billion and increased by 160% to $835 million in the fourth quarter.

  • We had strong cash flow generation of $1.3 billion in the quarter, benefiting from the working capital release at Red Dog and QB.

  • Over the full year, we reduced our corporate cost by 21% or $88 million compared with 2023.

  • This reflects our strong cost focus and structural cost reductions that we implemented across our business following the sale of the steelmaking coal business.

  • We expect to reduce our corporate cost further in 2025 as reflected in our annual guidance.

  • We returned a total of $1.8 billion in cash to shareholders in 2024, including $549 million in the fourth quarter.

  • We also reduced our debt by $2.5 billion in 2024, including $275 million in the fourth quarter, with the scheduled semiannual repayment on the QB project finance facility and other debt reductions.

  • The chart on slide 12 summarizes the key drivers of our financial performance in the fourth quarter as compared to the same period last year.

  • As a result of the completion of the sale of the steelmaking coal business last July, EVR results are presented as discontinued operations for all periods reported in our Q4 financial statements and MD&A.

  • Our adjusted EBITDA increased by 160% in the fourth quarter, driven by strong base metals prices and higher copper and zinc sales volumes, reflecting the ramp-up of QB and strong sales from Red Dog.

  • Copper and zinc sales volumes each increased by 24% from Q4 of 2023.

  • Our strong adjusted EBITDA also reflects improved zinc unit costs, driven by our rigorous approach to cost discipline as well as lower smelter processing charges and higher sales volumes.

  • Now looking at each of our reporting segments in greater detail and starting with copper on slide 13.

  • In the fourth quarter, gross profit before depreciation and amortization from our copper segment more than doubled to $732 million compared to the same period in 2023.

  • The increase was primarily due to strong sales volumes and copper prices.

  • QB ramp-up continued to support growth in copper, and we had our third consecutive record quarter of copper production in Q4.

  • This was partially offset by lower production at Antamina due to a decline in grades from the same quarter last year as expected in our mine plan.

  • While Highland Valley's production was lower than the same quarter in 2023, it improved quarter over quarter as expected due to increased mining in the higher-grade Lornex pit and improved haul truck performance.

  • Production at Carmen de Andacollo increased due to higher grades, recoveries, and mill throughput, reflecting our efforts to improve water availability in the quarter.

  • Our net cash unit cost increased as QB continued to ramp up.

  • In Q4 2023, most of the costs associated with QB continued to be capitalized as ramp-up costs.

  • Excluding QB, our total net cash unit cost improved by USD0.33 a pound compared to Q4 2023, as a result of higher copper production and substantially higher molybdenum production from both Antamina and Highland Valley.

  • And finally, we were pleased to ratify a new three-year collective agreements with two of the three unions at QB, representing 78% of the labor force and for all unionized labor at Antamina.

  • Looking forward, in the first quarter of this year, we expect QB's production to reflect the extended 18-day shutdown in January as well as processing lower-grade material in the quarter, as Jonathan outlined earlier.

  • Now moving to a forward look at 2025 in our copper segment on slide 14.

  • Our copper production is expected to continue to grow to 490,000 to 565,000 tonnes from 446,000 tonnes in 2024.

  • This increase is primarily due to the ramp-up of QB as well as a significant increase in production from Highland Valley.

  • Highland Valley's copper production is expected to increase as we continue to mine more ore from the Lornex pit, which is both higher grade and softer, leading to increased throughput.

  • These factors combined should more than offset lower recovery rates expected from the Lornex ore.

  • We also expect production at Carmen de Andacollo to increase, reflecting improved water availability through the year.

  • We expect a significant reduction in our copper net cash unit costs in 2025 to USD1.65 to USD1.95 per pound from USD2.20 per pound in 2024.

  • This reduction reflects an increase in copper and molybdenum production as well as continued cost discipline across our operations.

  • We expect our molybdenum production to increase to 5,100 to 7,400 tonnes from 3,300 tonnes last year.

  • This is based on the continued ramp-up of the molybdenum plant at QB and increased molybdenum production at Highland Valley as we mine in the Lornex pit.

  • Turning now to our zinc segment on slide 15.

  • Our gross profit before depreciation and amortization from our zinc segment more than doubled from the same quarter last year to $320 million.

  • This was driven by higher zinc prices as well as strong rental sales volumes due to the timing of sales, lower treatment charges, and higher byproduct revenues.

  • This was partially offset by higher NANA royalty expense as a result of Red Dog's strong profitability.

  • As expected in our mine plan and our annual guidance, Red Dog zinc production declined in Q4 due to lower price.

  • Our zinc cost improved significantly from Q4 2023, reflecting lower smelter processing charges, the effect of higher sales, and an increase in silver byproduct credits.

  • At Trail operations, our refined zinc production was impacted by the localized fire in the electrolytic plant in September 2024, as previously disclosed.

  • The repair of one of the four sections of the electrolytic plant continues to progress and is scheduled to be completed by the end of the first quarter of the year.

  • And finally, as we progress the work required to extend the life of Red Dog, we successfully obtained a permit for construction of an all-season exploration access road, which will enable us to progress the next phase of exploration and resource assessment.

  • Looking forward to Q1, we expect zinc and concentrate sales from Red Dog of 75,000 to 90,000 tonnes, reflecting the normal seasonality of sales.

  • Turning to 2025 outlook for our zinc segment on slide 16.

  • Our guidance for zinc and concentrate production is 525,000 to 575,000 tonnes, a decrease from 616,000 tonnes produced in 2024.

  • Our Red Dog production guidance for 2025 and the following years reflects expected grade decline as the mine life advances.

  • At Antamina, zinc production is expected to increase as we mine a higher proportion of copper zinc ore relative to copper-only ore in 2025.

  • We are focused on maximizing profitability and cash generation from Trail operations.

  • In light of current tightness of the zinc concentrate market, we expect to operate Trail at lower production rates in 2025, with guidance for refining production of 190,000 to 230,000 tonnes compared with 256,000 tonnes in 2024.

  • Trail remains a strategically important asset, providing critical and strategic minerals such as germanium and indium as well, as its valuable integration with Red Dog.

  • Our net cash unit cost for the zinc segment in 2025 are expected to be between USD0.45 and USD0.55 per pound compared with USD0.39 per pound in 2024.

  • The expected increase is due to lower zinc production and higher labor and consumable costs, partly offset by lower zinc treatment charges, higher byproduct credits, and a continued focus on cost discipline across our operations.

  • Turning now to slide 17.

  • We remain committed to our capital allocation framework, which balances investment in value-accretive growth with returns to shareholders while maintaining a strong balance sheet through the cycle.

  • Our capital allocation framework commits us to return between 30% and 100% of available cash flows to our shareholders.

  • In 2024, we deployed the proceeds received from the sale of the steelmaking coal business across the pillars of our capital allocation framework, balancing returns to shareholders with debt reductions, and earmarking cash for our near-term value-accretive growth projects.

  • Looking at our balance sheet now on slide 18.

  • We currently have one of the strongest balance sheets in the sector, and we continue to maintain investment-grade credit ratings.

  • In 2024, our cash balance increased significantly as a result of the proceeds received from the sale of the steelmaking coal business.

  • This also resulted in higher finance income as we earned interest on the higher cash balance.

  • With the proceeds, we reduced our debt by CAD2.5 billion.

  • We currently have liquidity of $11.3 billion, including $7.1 billion in cash.

  • We were in a net cash position of $2.1 billion as of December 31, and our remaining outstanding term notes of USD1 billion are long dated.

  • We will continue to deleverage as we make semiannual repayments on the QB project finance facilities through 2031.

  • Our industry-leading balance sheet is a competitive advantage for Teck, providing us with resilience to navigate current market conditions and allowing us to execute on our copper growth strategy while returning cash to shareholders, ensuring we create value for our shareholders.

  • Turning to slide 19 and our track record of returning cash to shareholders.

  • We continue to balance our investment growth with returns to shareholders.

  • And in 2024, we returned $1.8 billion to shareholders through share buybacks and dividends.

  • This builds on our strong history of cash returns to shareholders, which totaled approximately $5.1 billion since 2020.

  • We retain our annual base dividend of $0.50 per share.

  • And in each of the past two years, we have paid a supplemental dividend of $0.50 per share, bringing total dividends to $1 per share in 2023 and 2024.

  • And we continue to be in the market daily, actively buying back our shares with $3.25 billion in share buybacks authorized last year.

  • As of yesterday, we had executed $1.45 billion of the $3.25 billion authorization under our normal course issuer bid, representing approximately 22.7 million class B shares.

  • This leaves approximately 1.8 billion of our authorized share buyback remaining to further improve our per share value.

  • And with the strong cash flow generation potential of our business, we could see further cash return to shareholders in line with our capital allocation framework.

  • We remain committed to returning between 30% and 100% of future available cash flows to our shareholders.

  • Turning to our capital expenditure guidance for 2025 on slide 20.

  • We are focused on investing in our value-accretive near-term copper growth projects as we progress towards potential sanction decisions in 2025.

  • Our guidance for 2025 sustaining capital and capitalized stripping remains within our expected range of CAD1 billion to CAD1.2 billion.

  • Sustaining capital will remain relatively flat at between $750 million and $845 million from $836 million in 2024.

  • And capitalized stripping is expected to decline to between $260 million to $300 million from $373 million in 2024 as we have largely completed the required waste stripping in the Lornex pit at Highland Valley.

  • Our growth capital is expected to be between $875 million to $980 million or around USD625 million to USD700 million in 2025.

  • This growth capital is for multiple projects across our portfolio with our focus on advancing our value-accretive near-term copper projects to potential sanction decisions in 2025.

  • On an attributable basis, we anticipate pre-sanctioned copper growth capital of approximately USD430 million to USD485 million in 2025.

  • This includes approximately USD100 million to USD110 million for the mine life extension at Highland Valley and USD220 million to USD240 million for Zafranal.

  • Both projects are currently focused on advancing detailed engineering, design, and project execution planning, which are critical steps in meeting our investment requirements for potential project sanctioning.

  • Zafranal already has its main permit.

  • And we are, therefore, proceeding with advanced early works in 2025 to enable construction to start when the project is sanctioned.

  • We also expect to spend USD25 million to USD30 million to progress QB debottlenecking this year.

  • The remaining copper growth capital expenditures are focused on advancing studies for our pipeline of medium- to long-term projects, including Galore Creek, Shaft Creek, NewRange, and NuevaUnión.

  • These investments ensure that we are well positioned to advance these growth projects efficiently while remaining disciplined with our capital allocation.

  • With that, I'll turn it back to Jonathan.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks, Crystal.

  • So as we look forward, I want to take a moment to acknowledge the economic and political backdrop in which we are operating on slide 22.

  • Globally, we are witnessing a period of significant economic uncertainty and change that will alter trade flows and potentially impact global supply chains and market dynamics.

  • In this context, the outlook for our commodities remains robust, driven by the underlying demand factors of economic growth and urbanization, electrification to ensure energy security, and growth in the digital economy.

  • These secular tailwinds underpin significant demand for both copper and zinc, and when coupled with supply-side constraints, underline the strength in our strategy as a pure-play base metals company with a deep pipeline of copper growth opportunities.

  • Turning to slide 23.

  • We are closely monitoring the potential impact of tariffs and other restrictions between the US and Canada, which is a fluid and rapidly evolving situation.

  • Teck has a resilient business, driven by the diversification of our products and operations, coupled with an agile and sophisticated commercial strategy and a very strong balance sheet.

  • To put the potential tariffs into context, any imposed tariffs by the US are not expected to have a material impact on our business.

  • Our copper and zinc concentrate sales would not be impacted as we primarily sell to Asia and Europe and not into the US.

  • Trails' refined zinc, lead, and specialty metals, such as germanium, indium, and sulfur products are sold into the US.

  • But in the event that tariffs are imposed, we expect trade flows to adjust.

  • While Teck produces a large proportion of the ex-China supply for this diverse group of metals, they comprise less than 15% of our revenues. (technical difficulty) actively monitor and respond to the situation (technical difficulty) potential impacts

  • (technical difficulty).

  • We have a strong commercial strategy and logistic (technical difficulty) to quickly pivot and respond to changing market conditions.

  • We are closely watching (technical difficulty) and engaging with our customers, and we remain resilient in the current environment.

  • So to conclude on slide 24, our focus at Teck is to create value for our shareholders.

  • And our priorities are focused on doing just that in 2025 and beyond.

  • We've entered the year with QB operating at design throughput capacity rates, and our primary focus is to complete the QB ramp-up to steady state.

  • We will continue to drive operational excellence across our portfolio of high-quality copper and zinc operations and projects with a strong focus on cost discipline.

  • This will ensure that we not only increase our copper production, but also increase our margins.

  • Importantly, we remain committed to returning cash to our shareholders through the execution of our authorized share buyback program and annual base dividend.

  • We are progressing our near-term copper projects to possible sanction decisions in 2025, positioning us for our next phase of copper growth.

  • And I feel confident that we have the resilience to navigate uncertainty and create value through our strong financial position and agile commercial strategy.

  • Overall, I'm very excited about the opportunities ahead of us to continue to drive value creation.

  • Thank you.

  • With that, operator, please open the line for questions.

  • Operator

  • (Operator Instructions) Orest Wowkodaw, Scotiabank.

  • Orest Wowkodaw - Analyst

  • Hi, good morning.

  • I wonder if we can get a bit more color on the QB2 rev.

  • Obviously, really strong performance in November, December.

  • January, impacted by the extended 18-month -- 18-day shutdown.

  • What's the performance been like since it restarted?

  • And do you think QB2 is on track to reach that sort of steady-state full nameplate by midyear.

  • I'm wondering if anything has come out of the shutdown that may, perhaps, either advance that or delay that?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Hi, Orest.

  • Thank you very much for that question.

  • Look, overall, I would say the ramp-up is progressing well.

  • And it continues to be in line with what we would call normal course or benchmark ramp-up timetables.

  • We have planned quarterly shutdowns.

  • They are embedded in our operating plans, and we've communicated that previously.

  • And as you highlighted, we did have an extended shutdown for 18 days in January to conduct maintenance reliability work and to complete some tailing lifts as part of the operational ramp-up.

  • That 18-day shutdown is fully reflected in the guidance range of 230,000 to 270,000 tonnes for 2025.

  • And post that shutdown, the plant and the operation more generally has been running very much in line with our underlying operational plans.

  • So we do have good confidence in the -- in achieving the guidance range that we've set out.

  • As you've seen, we've mentioned a few things, for example, having lower grades towards the start of the year and higher grades towards the back end of the year, and processing some more transitionals at the front end of the year, which, as you know, can lead to lower recoveries.

  • But all of that is fully accounted for in the guidance range that we put forward.

  • And we're very pleased with the way that the plant and the operation as a whole is operating today.

  • Orest Wowkodaw - Analyst

  • Thanks.

  • And just as a follow-up, what is the planned cadence for future maintenance shutdowns at QB2 for the rest of the year?

  • Like, is it sort of like a week or quarter now starting in Q2, or just what's the plan?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yeah.

  • Look, that's a reasonable assumption, Orest.

  • Overall, the online time for the plant is expected to be around 92%.

  • That does imply a shutdown of around seven days in every quarter.

  • As we did last year, we've typically been having those shutdowns in the first month of each quarter.

  • And going forward, in 2025, we expect to maintain a similar cadence.

  • Orest Wowkodaw - Analyst

  • Okay.

  • So nothing -- no longer shutdown currently planned beyond what we saw in January?

  • Jonathan Price - President, Chief Executive Officer, Director

  • That's correct.

  • Orest Wowkodaw - Analyst

  • Okay.

  • Thank you very much.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks, Orest.

  • Operator

  • Carlos De Alba, Morgan Stanley.

  • Carlos de Alba - Analyst

  • Yeah.

  • Thank you, and good morning, everyone.

  • So the balance sheet is undeniably strong.

  • And so there is -- how should we reconcile, Jonathan, your capital allocation framework, the fact that under our estimates and consensus sell-side estimates, you're going to generate anywhere between CAD1 billion to CAD2 billion or more per year in the coming years of free cash flow?

  • How do we reconcile this strong balance sheet, your capital allocation framework, or returning money shareholders, and potential M&A with Teck goes and buys smaller projects or smaller companies, even though it does have a very robust pipeline of projects?

  • Or maybe we just see more outsized returns to shareholders that you have done in the last few years.

  • This is a key question that we are discussing with investors.

  • And clearly, as you know, the potential for M&A and I would say, risk in a way is something that -- yeah, we would like to see how, coming from your perspective and the Board perspective, you are looking at this?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yeah.

  • Carlos, thanks very much for that question.

  • It was a fairly broad one.

  • Look, the capital allocation approach that we take here in the business is very much focused on value creation for our shareholders.

  • We do have a very strong balance sheet, as Crystal outlined.

  • We reduced debt quite significantly last year, and we are currently running a net cash position on that balance sheet.

  • Also, we do still have a very significant outstanding authorization of share buybacks that we will continue to execute through the course of this year.

  • That's in the range of $1.8 billion of cash still to be deployed through the buyback of our shares.

  • And as Crystal mentioned, we're in the market executing on that every day, in addition to the base dividend that we have and that we've maintained through this year.

  • We've always said that if we continue to generate cash in excess of the needs of the business, that will make its way through the capital allocation framework.

  • And under that framework, we do have the potential to return a further 30% or 100% of cash that's in excess of our needs.

  • As you know, we also have a stable of projects in the portfolio.

  • And when we went through the use of proceeds from the sale of EVR last year, one of the things we said we would do is reserve some cash for the development of what we consider to be low-capital-intensity and high-returning projects that we have in the portfolio.

  • One of those being the Highland Valley copper mine life extension here in British Columbia, another being the Zafranal project in Peru, and the other greenfield being the San Nicolas project in Mexico.

  • We continue to focus on the organic growth in the business because we see that as being the most value-accretive path for our shareholders.

  • We are, of course, very aware of the M&A activity in the sector that is spoken about.

  • But from Teck's perspective, our focus remains creating as much value as we can for our shareholders.

  • And we believe that the projects we have in the portfolio are a great way to achieve that.

  • So it's a good position to be in.

  • It gives us resilience.

  • It gives us options, but we will maintain our focus on creating value for shareholders and executing on the plans that I think we've clearly set out.

  • Carlos de Alba - Analyst

  • Great.

  • Thank you.

  • And just a very short follow-up.

  • Is Zafranal arguably the greenfield project that as of now will be next?

  • Jonathan Price - President, Chief Executive Officer, Director

  • So we are quite advanced on Zafranal, as you know, in terms of having the environmental permit associated with that.

  • And as you see from our disclosures around our copper growth spend this year, we are increasing the spend there, reflective of a project that is close to a sanction decision.

  • We continue to work very hard on San Nicolas as well.

  • We see that as a very attractive option.

  • And ultimately, the economics of those projects, the progress of the other permits that are required to actually take a project through into execution, and the completion of the right level of engineering work that needs to be done prior to sanction will determine which of those projects is up for sanction first.

  • But I think you can see from our disclosures that Zafranal today is in a very strong position.

  • Carlos de Alba - Analyst

  • Thank you, Jonathan.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks, Carlos.

  • Operator

  • Liam Fitzpatrick, Deutsche Bank.

  • Liam Fitzpatrick - Analyst

  • Hi, Jonathan.

  • Two questions from me on QB.

  • The first one is on the topic of a potential tie-up or some sort of JV with Collahuasi.

  • We've seen an interesting deal announced today by Anglo and Codelco.

  • And it would seem that from a value-unlock perspective, this is a fairly obvious area for Teck and the other companies involved.

  • Can you give any color on where the discussions are?

  • And are there any reasons why this hasn't been looked at or pursued more aggressively?

  • And my second question is on QB costs.

  • Just looking at the absolute costs in Q4, they did go up quite significantly.

  • Is there anything in there that you can talk to that should unwind?

  • Because looking at it, it seems like there's a lot of cost that has to come out through 2025 for you to hit the unit cost guidance.

  • Thank you.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Liam, thank you for those questions.

  • I'll, in a moment, hand the second question over to Crystal.

  • But just starting with your question on QB Collahuasi.

  • And as we've discussed before, we do recognize the potential value of some form of tie-up between those two operation.

  • And it's something that we've done a good deal of work on to understand the various ways in which that value could be unlocked.

  • As we've also consistently said, our number one focus remains on optimizing value for Teck shareholders, and we look at all the decisions we make through that lens.

  • Right now, our focus remains on the ramp-up of QB to full production and steady state, and as we've spoken about previously, the optimization and debottlenecking of that plant, which will be some of the most capital-efficient unlock of tonnes that we have anywhere in the portfolio.

  • So that remains a key focus for us.

  • We have, as you would expect, had a level of engagement around the opportunities with QB Collahuasi, with the partners on the other side.

  • But as you'd appreciate, those discussions are confidential in nature.

  • And of course, we can't say anything more about those at this point in time, other than to reaffirm that we recognize the value potential there.

  • And we will always act in the best interest of Teck shareholders in terms of how we maximize value from the portfolio that we have.

  • And with that, I'll hand over to Crystal on the cost question.

  • Crystal Prystai - Senior Vice President, Chief Financial Officer

  • Hi, Liam.

  • Thanks for your question.

  • I think you've drawn out the key point just in the context of, as we look forward, expecting a significant reduction in QB costs as we move to more stabilized production levels through 2025 and we complete the demobilization of contractors that supported the ramp-up through 2024.

  • In the fourth quarter, of course, we saw an increase in volume that does drive a modest increase in operating costs as we have higher electricity and supplies.

  • And when you balance that over higher production, that should normalize.

  • There were also some one-time costs that we incurred in the fourth quarter.

  • We mentioned the settlement of two of three of our labor contracts, which were, of course, a good outcome.

  • Those lead to bonuses paid to those unions as we resolve those contracts.

  • So we do continue to expect a decline in our unit costs for QB and for the copper business as we move into 2025.

  • And we see an uptick in our production levels as well as in the molybdenum credits we expect in 2025.

  • Liam Fitzpatrick - Analyst

  • Okay.

  • Thank you, both.

  • Operator

  • Craig Hutchison, TFD Cowen.

  • Craig Hutchison - Analyst

  • Hi, good morning, guys.

  • Just a question on the Highland Valley life extension.

  • There's a note in your MD&A just saying that there's, I guess, been a challenge by one of the indigenous government organizations that delayed the approval process for the EA.

  • Does that have to be resolved before the EA -- can it be issued?

  • Or can you get the EA and then resolve these issues after the fact?

  • And I guess, just maybe as a follow-up, do you have a [fair] anticipated timeline for, I guess, solving or getting any additional impact benefit agreements with those that don't have already?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yeah, Craig, thank you for that question.

  • It's a good one.

  • And as you can imagine, it's a file we're working very hard on at the moment.

  • We are in the final phases of the EA process for the mine life extension project.

  • And the dispute process that we've referenced is a formal established path of that environmental assessment process, which is designed to resolve issues.

  • As noted, we have secured agreements with other indigenous government organizations that are involved in the approval process for Highland Valley mine life extension.

  • And then we got those coming through in December and January.

  • And we do continue to engage with SSN, who are the parties that have disputed the approval of this project.

  • But we have a very long track record of working successfully with indigenous nations and sharing the benefits of the operation and of future growth with those nations.

  • And we do remain confident in our ability to move forward successfully.

  • We also have a good track record of permitting here, specifically, in British Columbia.

  • And it's worth noting that the province of British Columbia recently announced that they would be working to fast track permitting on this project.

  • So we do have a lot of support with respect to this.

  • And we remain confident in getting this done, getting the approvals we need.

  • It's a project that we believe has compelling returns, and we do expect to be in a position to sanction it later this year.

  • Craig Hutchison - Analyst

  • Okay.

  • Great.

  • And maybe just a follow-up question.

  • You guys mentioned you got the permit for the road for exploration at Red Dog.

  • The step-up in growth capital this year versus last, does that include spending on the road this year, or is that a separate line item?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yes, it does include that, Craig.

  • You're exactly right.

  • Craig Hutchison - Analyst

  • Okay.

  • Great.

  • Thanks, guys.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thank you.

  • Operator

  • Lawson Winder, Bank of America Securities.

  • Lawson Winder - Analyst

  • Thank you, operator.

  • Good morning, Jonathan and Crystal.

  • Thanks for the update.

  • Wanted to ask about capital allocation and zinc.

  • And so just pointing to zinc showing some signs of life in '24 and Teck having a range of projects in zinc, and also noting that to maintain the current zinc business, it will require significant investment.

  • When you think about allocating capital to the various projects, are the zinc and copper segments separate buckets?

  • Or could there be a situation where zinc prices point to higher IRRs?

  • And as a result, you de-emphasize copper growth?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Look, I think we look at capital allocation holistically across the entire organization.

  • We're not contemplating that separately for copper and zinc.

  • Everything has to compete for the capital we have and compete on the range of metrics that we've spoken about before and particularly returns on this growth.

  • Look, I think we see the fundamentals for zinc to be attractive.

  • There is strong demand for zinc, and perhaps, the demand growth outlook is not as compelling as it is for copper.

  • But we've seen a dearth of new supply in zinc for many, many years; no major zinc projects coming through.

  • And at Red Dog, of course, we have a world-class Tier 1 operation.

  • And while that comes to end of current life around 2031, we have a couple of very high-quality ore bodies nearby.

  • And that is where the spending is being directed today to understand the potential future of Red Dog and the potential for a significant life extension there.

  • So based on those fundamentals, based on the quality of the project we have at Red Dog, we continue to see that as a core part of the portfolio.

  • Of course, in addition to Red Dog, we do get zinc concentrate from Antamina.

  • And in the future, in the event we sanction San Nicolas, that will be a further source of zinc concentrate for us.

  • So we hold a strong position in that market right now.

  • Provided the fundamentals remain intact, we would continue to want to maintain a strong position in that market into the future.

  • Lawson Winder - Analyst

  • Okay.

  • Thanks, Jonathan.

  • And then just looking at another asset that has a significant zinc (technical difficulty) your Mexican asset, has the political situation in Mexico evolved any more favorably at this point?

  • And what's your thinking in terms of actually making a decision to invest capital into San Nick?

  • Thank you.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yeah.

  • So we remain highly interested in the San Nicolas project.

  • It's a relatively small, simple flow sheet.

  • It will have a low capital intensity.

  • It's very high grade, which means it will deliver strong margins through its life.

  • We're closely monitoring the mining environment in Mexico.

  • And I was in Mexico City in January and had an opportunity to meet with President Sheinbaum and talk to her about San Nicolas and about mining more generally.

  • While at the present time, it doesn't get to be a priority for the administrative (technical difficulty) its legislation on mining, given it has its hands full with its neighbor to the north, we do see longer term, a focus there on foreign direct investment, a focus on building critical minerals supply chain and capability.

  • And I would say the signals we get from the administration are encouraging, particularly given the commodities that San Nicolas will be producing and particularly given the track record of being responsible in our approach to developing operating mines that both ourselves and Agnico Eagle bring to the table.

  • Now we don't see any negative immediate impacts in relation to San Nicolas.

  • So we continue to do our study work.

  • But it would be fair to say, of course, that we won't make a sanction decision, and we won't commit significant dollars to further investments on the ground in Mexico until such time as we have certainty of permitting and the support of the government.

  • But we remain optimistic.

  • Lawson Winder - Analyst

  • Fantastic.

  • Thanks, Jonathan.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thank you, Lawson.

  • Operator

  • Myles Allsop, UBS.

  • Myles Allsop - Analyst

  • Great.

  • Maybe just on QB, could you remind us how much you mentioned about capitalizing costs, how much you're capitalizing at the moment?

  • Is it just interest, or is it other like costs as well?

  • And when will you stop capitalizing those?

  • And then maybe second on Trail, it's going to be free cash flow negative last year.

  • It is likely to be even more cash flow negative this year.

  • I mean, what does it take to decide to close Trail?

  • And I know you said it's strategically important.

  • But when it's burning cash, how long do you maintain that view of strategic importance?

  • Jonathan Price - President, Chief Executive Officer, Director

  • I'll come back to your second question on Trail in a moment. (technical difficulty) to Crystal for the first question on QB costs.

  • Crystal Prystai - Senior Vice President, Chief Financial Officer

  • Yeah.

  • Thank you, Myles.

  • Maybe just a bit of a clarification there.

  • When I mentioned that we were capitalizing ramp-up costs associated with QB, that was in Q4 of 2023.

  • Through 2024, we've been -- we have not been capitalizing interest on the project.

  • Of course, construction was complete in the first quarter with the port and molybdenum plant in the second quarter.

  • So no longer capitalizing interest, depreciating the assets there, and we haven't been capitalizing ramp-up costs in 2024.

  • So the only capitalization you're seeing at QB is in relation to sustaining capital costs and to a very minor extent, capitalized stripping.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks, Crystal.

  • And then moving on to Trail, Myles, a couple of comments there.

  • We've been very focused on profitability and cash generation at Trail.

  • And we've made a number of changes to support that.

  • We've implemented cost reductions at the site in relation to maintenance and nonroutine work.

  • We've reduced headcount at the site and with new leadership there, worked on a whole series of cost reduction opportunities across the operation.

  • We have reduced our refined zinc production this year in the context of the TC environment.

  • And that, again, will directly improve Trail's profitability and cash generation.

  • The (inaudible) plant that we did a significant amount of maintenance on, is now operating very well.

  • And our production of lead in particular is very strong.

  • And we do also have the option at Trail to sell excess power to generate cash flows as needed.

  • So we've taken a very commercial focus to the way that we're operating Trail right now.

  • I'm very pleased with the early results that we are seeing there.

  • And I think Trail is doing the things it needs to do to continue to earn its place in the portfolio from a profitability and cash flow generation perspective.

  • The other comment I would make on Trail that it really is, particularly in the current context, quite a strategic asset.

  • It's key to our portfolio, particularly that integration with the Red Dog mine, and gives us optimal market access for the Red Dog concentrate.

  • Importantly, though, it produces a number of metals, which have become quite strategic and important in the current context of the relationship between Canada and the US.

  • We estimate that Trail would be the fourth largest producer of germanium in the world and the only primary producer of germanium in North America.

  • And this is at a time where China has cut off or restricted supplies of germanium into the US.

  • And it's a critical component for defense spending, for example, and goes directly to that national security agenda.

  • So foundationally, it's absolutely critical that we achieve profitability and cash flow generation from Trail.

  • And I'm confident that we're on the right path there.

  • And then secondly, there's a compelling strategic overlay with Trail being part of an integrated flow sheet that we have with Red Dog.

  • Myles Allsop - Analyst

  • How much revenue do you get from germanium and the smaller metals?

  • Is that becoming a meaningful stream that will surprise the upside given what's happening?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Yeah.

  • So it's -- look, it's relatively small in terms of the direct revenue and cash flow profitability impact on the business.

  • What it has, I think, is a lot of ancillary strategic benefits from a relationship perspective in a period of time where trade relations are strained.

  • And that flows all the way back upstream to the outlook for the Red Dog mine, which, of course, is in the US, in Alaska.

  • And as we look forward to the future expansions of Red Dog, the proportion of specialty metals in that concentrate will actually increase.

  • So we think it's interesting for a number of reasons.

  • But the -- again, just on Trail, the core focus there is on profitability and cash generation.

  • And we're in good shape there with a number of the changes that have recently been made and the new operating strategy that that team has put in place for 2025.

  • Myles Allsop - Analyst

  • Great.

  • Thank you.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks, Myles.

  • Operator

  • Bill Peterson, JPMorgan.

  • Bill Peterson - Analyst

  • Yeah, good morning.

  • Thanks for taking the questions.

  • Maybe on the growth projects, you spoke to the EA assessment of Highland Valley and a little bit on Mexico.

  • But if we think about a higher level, I guess, at this stage for 2025, can you go through each project in terms of what's in your control versus local authorities?

  • What should we be looking out for next steps?

  • And I guess, on Zafranal in particular, you discussed a potential sanction decision.

  • What are the key requirements you're looking for, whether it be market related or expectations on cost or IRRs you're looking for to potentially sanction by year-end?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Look, I mean, I think as ever, the things that are in our control remain the studies and the completion of those studies.

  • There remain the engineering work that we're undertaking.

  • And of course, there remain the engagement with vendors and contractors that ultimately will support the project.

  • As is the case with any project, to a certain extent, permitting is beyond our control.

  • But of course, it's something that we engage on very heavily.

  • And it's something where we work very closely with the regulators in a collaborative fashion through that process.

  • I think all of these projects will have to earn their place in the portfolio and earn their place in terms of capital allocation.

  • Of course, we have a view that that is the case, which is why we are pursuing them as near-term priorities.

  • And the economics that we see associated with these projects are compelling, offering a combination of strong IRRs, strong cash flow generation, strong EBITDA contribution to the group, and a meaningful contribution to our product base.

  • So all of those things must be true ultimately for a project to be sanctioned and for the risks to be appropriately managed.

  • So we're comfortable with the portfolio that we have, HVC being a brownfield mine life extension here in BC and then two greenfield projects with Zafranal in Peru being one that Teck will construct and operate, and then San Nicolas in Mexico under that 50/50 joint venture with Agnico Eagle, which will be constructed and ultimately operated by the joint venture company.

  • So we're very happy with the shape of that portfolio.

  • We'll continue to progress these projects to sanction decisions.

  • And as I said, provided the financial metrics are there, we expect to sanction them and see them in their place in our portfolio going forward.

  • Bill Peterson - Analyst

  • Yeah, thanks for that.

  • And then I wanted to ask about costs maybe in a slightly different way than a prior question.

  • First, you talked about the union, two out of the three being negotiated, one more to go.

  • I guess, how should we think about a run rate impact to the model and costs?

  • And then, I guess, tying it one step further on the cost trajectory for QB2, how should we think about the exit rate cost per pound, given the expected output increases throughout the year?

  • Jonathan Price - President, Chief Executive Officer, Director

  • Crystal, over to you, please.

  • Crystal Prystai - Senior Vice President, Chief Financial Officer

  • Yeah.

  • I mean I think in the context of sort of run rate costs, of course, Emma and the team can take you through more of the details.

  • But I think in terms of labor costs, you can continue to assume sort of lower single-digit inflation year on year.

  • And I'll get Emma to follow up with you offline.

  • And then in terms of sort of run rate, I think in the way that we've talked about production escalating as we go through the year to more stable run rates at QB, I think you can think about the cost in the same way as we've established our guidance with a lower end and a higher end.

  • And we've continued to disclose the unit cost for QB to give you that indication.

  • So I think I would see that as sort of a tale of two halves of the year, similar to production.

  • Bill Peterson - Analyst

  • Thank you, Jonathan and Crystal.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thanks for those questions, Bill.

  • Operator

  • That's all the time we have for questions today.

  • I will now hand the call back over to Jonathan Price for closing remarks.

  • Jonathan Price - President, Chief Executive Officer, Director

  • Thank you, operator, and thanks again to everyone for joining us today.

  • Before we sign off, I did want to note that it is Fraser Phillips' last quarterly conference call with Teck before his retirement.

  • I'd like to sincerely thank Fraser for his many contributions to Teck over the past eight years, and wish him and his wife, Kimberly, all the very best for their next chapter.

  • Meanwhile, we look forward to seeing many of you in person at a major mining conference in Florida next week.

  • If you have any further questions, please reach out to Emma Chapman and to our IR team.

  • Enjoy the rest of your day.

  • Operator

  • This concludes today's conference call.

  • You may disconnect your lines.

  • Thank you for participating, and have a pleasant day.