Operator
Good morning, ladies and gentlemen, and welcome to the Ocean Power Technologies fiscal 2012 fourth-quarter conference call. At this time all participants are in a listen-only mode. Following management's prepared remarks, we will hold a question-and-answer session. (Operator instructions). As a reminder, this conference is being recorded and webcast.
I would now like to turn the conference over to Chief Financial Officer of Ocean Power Technologies, Mr. Brian Posner.
Brian Posner - CFO
Thank you. Welcome to Ocean Power Technologies' earnings call for the fourth quarter, ended April 30, 2012. OPT issued its earnings press release earlier today, and we will soon file the Company's annual report on Form 10-K with the Securities and Exchange Commission. All public filings can be viewed on the SEC website@SEC.gov, or you may go to the OPT website, OceanPowerTechnologies.com. With me on today's call is Chuck Dunleavy, our Chief Executive Officer.
Moving down to slide two of our presentation, during the course of this conference call, management may make projections or other forward-looking statements regarding future events or financial performance of the Company within the meaning of the Safe Harbor provision of the Private Securities Litigation Reform Act of 1995. As indicated in this slide, these forward-looking statements are subject to numerous assumptions made by management regarding future circumstances over which the Company may have little or no control and involve risk and uncertainties and other factors that may cause actual results to be materially different from any future results expressed or implied by such forward-looking statements. We refer you to the Company's Form 10-K and other recent filings with the Securities and Exchange Commission for a description of these and other risk factors.
I will now turn the call over to Chuck Dunleavy, OPT's CEO.
Chuck Dunleavy - CEO
Thank you, Brian, and thanks, everyone, for being with us today. Brian and I will be available to answer questions following our prepared remarks.
First, turning to slide three, let me provide an update on fiscal 2012 and other recent developments. It's been a very productive time here at Ocean Power Technologies. As I will discuss further in a moment, we just signed an agreement with Lockheed Martin to enhance our efforts to bring a large-scale wave power station to Australia that leverages a AUD66.5 million grant which we have received from the Commonwealth. This is very exciting and we are gratified to have the support of the strong companies such as Lockheed Martin behind the initiative.
In addition, building on the successful completion of ocean testing of OPT's first utility-scale PB150 off Scotland, we recently completed testing of the Company's new advanced power takeoff system for our PB150 PowerBuoy in Oregon. We are also making progress towards deployment of that system. We continue to work on our WavePort project in Spain and are accelerating our business development efforts in the Autonomous PowerBuoy market after the very successful operation of the U.S. Navy's Littoral Expeditionary Autonomous PowerBuoy. At the same time, we reduced our annual operating loss and our cash usage as well during fiscal 2012.
Now let me go into more detail on some of our latest developments. Turning to slide 4, a very important milestone for OPT in fiscal year 2012 was the ocean deployment of our LEAP Autonomous PowerBuoy off New Jersey. This buoy, which is significantly smaller and more compact than our utility PowerBuoys, exceeded the project specification for payload power delivery during ocean operations last fall. Our partners for this effort included Rutgers University's Institute of Marine Coastal Sciences, CODAR ocean sensors and Mikros Systems Corporation. The buoy was designed by OPT to provide persistent energy for the U.S. Navy's radar and communications payloads, which called for continuous power of 150 watts. The actual results show that the PowerBuoys supplied constant power in excess of 400 watts throughout the entire deployment period and produced peak sustained electrical power of 1500 watts. Such performance more than supported the payload 24 hours a day, seven days a week for the duration of the ocean operation.
In fact, the onboard power management and storage system allowed the payload to be operational even during extended periods of zero wave activity. The PowerBuoy operated on a fully autonomous basis, implementing the requisite power managements and self protection functions without the need for human intervention. This it all was maintained, even as the autonomous PowerBuoy withstood hurricane Irene, which hit the New Jersey coastline on August 27, 2011, and had waves of up to 53 feet.
These results demonstrate a strong performance under our contract with the U.S. Navy for their maritime security mission. More broadly, the fact that we can offer the unique ability to supply persistent levels of power in deep ocean even during extended no-wave periods represents an entirely new offering to satisfy offshore power needs for a multitude of applications. We are currently in active dialogue for other potential commercial applications of the Autonomous PowerBuoy by the oil and gas industry as well as by oceanographic data gathering initiatives and desalination companies, all of which could replace diesel generators that are costly, dirty and require frequent maintenance. We are placing more resources into developing these attractive end markets for our Autonomous PowerBuoys.
Turning to slide five, I'd like to give you an update on our current initiatives in Australia and Japan, where we have seen some exciting activity lately. As announced earlier this week, we entered into a teaming agreement with Lockheed Martin with the specific goal and focus to develop a 19-megawatt wave energy project in Australia. Lockheed will provide assistance in the areas of design manufacturability of our PowerBuoys, supply chain and overall project management. The project is to be developed by a special-purpose Australian company, Victorian Wave Partners, which is currently owned by our subsidiary, Ocean Power Technologies Australasia. We are actively assessing financing opportunities for the project and pursuing power purchase agreements with local industry utilities.
In addition, we have begun the permitting process for the project and community consultation is well underway. The potential project has been received very positively in the community. Funding for the project includes the previously announced grant of AUD66.5 million, or about that same amount in US dollars from the Commonwealth of Australia's Department of Resources, Energy and Tourism. The grant is subject to a funding fee which sets out the terms including funding milestones which require significant additional funding to enable the receipt of the grant funds and also the completion of the project.
We also wish to express our appreciation to the Commonwealth government for their continued support of this project off the coast of Portland, Victoria, which we expect to create a significant number of local Australian jobs as we develop this project and also maintain operations over the life of the power station.
In Japan we've been working closely with our partner, Mitsui Engineering & Shipbuilding, on the next phases of development of a PowerBuoy project there. Analysis and design work is expected to continue through much of fiscal 2013, after which a recommendation may be made on final deployment parameters for a PowerBuoy to be built and operated off Japan with the follow-on potential for a multi-megawatt WavePower station.
Turning to slide six, I'd like to give an update on our important project in Reedsport, Oregon, which has received funding support from the US Department of Energy and also from PNGC Power, a power cooperative serving the northwestern portion of the United States. We recently announced progress here as well with the successful completion of the rigorous testing on our next-generation power takeoff unit, or PTO, which has been shipped to Oregon for integration with the rest of the PB150. As a reminder, this PowerBuoy's direct drive PTO was developed to be more durable, involve less maintenance and provide better long-term efficiency than our previous hydraulic design. From a technology standpoint, it's a significant leap forward.
Over the coming weeks, the PTO will be integrated into the spar. We'll then perform some further testing, after which we will complete final assembly of the spar, float and eave plates. Then the entire PB150 will be transported from Portland to the Reedsport Coos Bay coastal area for interim staging. We expect this first Reedsport PB150 to be ready for deployment late this summer, with the exact deployment time line to be decided by the weather window. Lockheed Martin is providing design, manufacturing and supply chain management expertise on this project to enhance our technology as we move toward larger-scale commercialization. We look forward to updating you on the developments on this project in the months ahead.
Now let me give you an update on developments in Spain, as shown on slide 7. We continue work on our previously announced EUR2.2 million WavePort project to design, supply and deploy a PowerBuoy with an advanced energy conversion system that includes a new wave assessment model. The grant to OPT is part of a total award of EUR4.5 million through a consortium of enterprises which includes OPT. Substantial progress is being made along with our consortium partners, United Kingdom's University of Exeter, DeGima in Spain, the Wave Energy Centre of Portugal and Norway's Fugro Oceanor. The new system is expected to assess the characteristics of incoming waves before they reach the PowerBuoy power station, allowing more time for OPT's proprietary electronic tuning to react. This could significantly boost the output of the PowerBuoy and reduce the cost per megawatt hour of energy produced.
The PowerBuoy being developed for the project is planned to be installed at an existing mooring site off Santona, Spain.
Now let me turn the call over to Brian for a discussion of OPT's operating results for fiscal year 2012.
Brian Posner - CFO
Thank you, Chuck. As noted on slide 8, OPT reported revenues of $1.4 million for the fiscal fourth quarter as compared to revenues of $1.9 million for the three months ended April 30, 2011. This decrease primarily reflects lower revenues related to the Company's project in Reedsport, Oregon, as well as the lower revenue applied to the Navy's LEAP program on a year-over-year basis, since that project was successfully completed in the fiscal 2012 third quarter.
These revenue declines were partially offset by an increase in revenue from the Company's WavePort project and from development work related to the next generation PowerBuoy. The operating loss for the three months ended April 30, 2012 was $4.2 million as compared to an operating loss of $5.4 million for the three months ended April 30, 2011. The reduction in operating loss year-over-year was due primarily to a decrease in product development costs, principally for the PB150 system that underwent successful ocean trials off the coast of Scotland in 2011, in addition to lower costs related to the PB150 PowerBuoy in Reedsport, Oregon, partially offset by costs related to the increased investment in advanced technology development.
The net loss was $4.1 million for the three months ended April 30, 2012, compared to $5.3 million for the same period in the prior year. This decrease in net loss was due primarily to a decline in operating loss.
For the full fiscal year ended April 30, 2012, OPT reported revenues of $5.7 million as compared to revenues of $6.7 million in fiscal 2011. This decrease primarily reflects lower revenues associated with the U.S. Navy's Deep Water Active Detection System project and declines in revenue tied to the Company's LEAP program as well as the project in Oregon. The fiscal 2012 revenue decline was partially offset by work on the Company's WavePort project in Spain and by the funded development of the PB500 next-generation PowerBuoy.
The operating loss for the 12 months ended April 30, 2012 was $16.6 million as compared to an operating loss of $21.3 million for the year ended April 30, 2011. The reduction in operating loss of nearly $5 million year-over-year was due primarily to a decrease in product development costs, principally for the PB150 system off the coast of Scotland, in addition to lower costs related to the PB150 PowerBuoy in Reedsport, Oregon, and the Company's Hawaii project for the U.S. Navy, as that project neared completion during fiscal 2012. The net loss was $15.2 million for the 12 months ended April 30, 2012, compared to $20.5 million for the same period in the prior year. This decrease in net loss was due primarily to the decline in operating loss as well as a higher reported income tax benefit.
Turning to slide 9, on April 30, 2012, total cash, cash equivalents, restricted cash from investments, were $33.2 million. The net decrease in cash and investments of $22 million for the 12 months ended April 30, 2012 compared to a reduction in such balances of $18.5 million for fiscal 2011. Note that OPT received approximately $1.1 million and $0.4 million in connection with the sale of New Jersey net operating tax losses during the 12 months ended April 30, 2012, and 2011, respectively.
Cash usage declined in fiscal 2012, primarily due to the completion of ocean trials of the PB150 off the coast of Scotland. OPT expects its net cash used to continue to decrease into fiscal 2013.
Now I will turn the call back over to Chuck for some closing comments.
Chuck Dunleavy - CEO
Thanks, Brian. Turning to slide 10, it's also important to note that during fiscal year 2012, we made some significant changes to our leadership team. Tim Stiven was appointed as managing director of Ocean Power Technologies Ltd., OPT's UK-based wholly-owned subsidiary. Tim is responsible for all of OPT's UK and European operations. During his career, Tim has held a number of positions involving marine engineering and sustainable energy. At QinetiQ, an international defense and security company, he led new market ventures in the energy and environmental markets. In addition, as a marine engineer officer in the Royal Navy, he specialized in leading complex technology development programs to meet the Navy's future equipment requirements. He holds Masters of Science degrees in Naval Architecture from University College in London and in Sustainable Energy Systems from the University of Edinburgh. He is also a chartered engineer.
We further announced in fiscal 2012 two new members of our Board of Directors, David Davis and Bruce peacock. David is the Vice President of PJM grid development for the independent power producer, NRG Energy. PJM International is the largest Independent system operator in North America. David brings strong relationships with regulators, legislators and other stakeholders within both the renewable and conventional energy sectors, with over 20 years of applicable experience.
Bruce Peacock, currently the Chief Business Officer of Ophthotec, a biopharmaceutical company, has over 30 years experience at companies with international operations, bringing new products to commercial status in regulatory-driven markets. Both of these individuals have already played active roles in shaping our strategy for fiscal 2013 and beyond.
Turning now to slide 11, I'd like to state our near-term goals over the coming months. We completed our goals stated in the third quarter earnings call to complete land testing of the power take-off for our Oregon PB150. And as I mentioned earlier, we are on track to be ready to deploy our first Oregon PB150 late this summer, the first step in OPT's plans to build up to a 1.5 megawatt power station in Reedsport. We will also continue to provide further updates on our ongoing business initiatives in Australia and Japan as well as our PowerBuoy for the WavePort project in Spain.
In addition, we expect fiscal 2013 will include developments with regard to commercialization of our Autonomous and utility PowerBuoys and growth opportunities around the globe. We continue to believe the Company is well positioned for a very active year and look forward to keeping our investors posted on milestone and order flow going forward.
This concludes our prepared statement for the year end review. We'll now open the call for questions. So operator, would you please go ahead?
Operator
(Operator instructions) Jason Feldman, UBS.
Jason Feldman - Analyst
So it certainly sounds positive that you have this teaming agreement with Lockheed, but I was hoping you could explain a little bit more about exactly what it means and what it doesn't mean. What else still needs to happen to get the project really started? Is this still just a question of gathering financing?
Brian Posner - CFO
I'll take a shot. Basically, what it means is we have combined expertise between OPT and Lockheed Martin to work on this project and move it forward basically using our WavePower technology with their expertise in such areas as design, production, system integration and overall program management. So it gives a validation to the project that perhaps wasn't there before we entered into this teaming agreement.
What we are working on very hard now in the next critical steps are working on getting a power purchase agreement as well as financing. It's our responsibility at OPT to do that, but we'll also have the support of Lockheed Martin in this process as well. So those are the next major milestones on this project. We are also doing, as Chuck mentioned in his prepared remarks, community consultation. We are in contact with the Commonwealth quite a bit there as well. So again, the next critical milestone for power purchase agreement and financing to move this project forward.
Jason Feldman - Analyst
Okay, so --
Chuck Dunleavy - CEO
Excuse me, Jason. I'd just add a couple quick points to what Brian just said. It's maybe not well known is that Lockheed Martin does have a significant presence in Australia already. And when you take that into consideration along with the fact that they've articulated a very clear strategy with respect to this presence in energy security and renewable energy, that, I think, makes a very strong statement to the very stakeholders that we are talking to, as Brian just said, in connection with financing and also the power purchase agreement.
Jason Feldman - Analyst
Okay. So is it fair to characterize it, is to say the expectation is that this agreement should help, I guess, in two primary areas -- one is, when hopefully you actually start manufacturing and delivering on this, they will obviously help with logistics and manufacturing and supply chain, etc., as you described; but second, the fact that you have this agreement essentially gives you additional credibility in your attempt to get financing?
Chuck Dunleavy - CEO
I think that's a very good way of describing it, Jason.
Jason Feldman - Analyst
Okay. And potentially they have contacts, as well, which would be helpful, I think. And is this a replacement? I think your previous relationship in Australia was with Leighton? Is this --
Chuck Dunleavy - CEO
You're spot on, good recollection. Yes, we had previously announced that we were working with Leighton. They continue to be a potential supplier in connection with this project. But as to the leadership role which they had assumed with respect to this project, that now is being taken by Lockheed.
Jason Feldman - Analyst
Okay, got it. And then last question -- cash at the current burn rate, and I know that you said very directly that you expect the cash burn rate to be lower next year. But at the current rate, it's a little bit more than two years of cash remaining. Do you see that as sufficient time to further commercialize your product and wind up being in a different position? Or, at what point do you need to start thinking about alternative financing options for the Company?
Chuck Dunleavy - CEO
Sure. It's a really important point and one which our board and management spends a lot of time on, this very key strategic point. First of all, we do believe that our cash is sufficient to get us to a point where we really are generating internal cash, and that's a really important point. It's one of the reasons why we are significantly accelerating our resources through selling very actively out there, selling and marketing the autonomous product because it has a much shorter cycle time, not only to getting the order but also fulfilling order, completing the revenue cycle for it. And we believe it has some substantial profit opportunities for the Company. Again, I'm speaking to these what we refer to as the Autonomous PowerBuoy market.
We are still very much dedicated, as well, to developing the utility side of the marketplace. But with that all said, we very much are looking at and considering other ways to bring capital into the month and into the Company, not just from the more traditional sense, which is go to market, hire a banker, etc., but other ways which include actively talking with perspective strategic partners and, as well, at the project finance level. And this is, I think, exactly the path that we are pursuing in Australia, which is to say the formation of a special-purpose vehicle, when that will enable funding to be attracted to it. As it stands on its own, OPT's revenue generation opportunity is to sell products and services to that special-purpose vehicle. That's another way to generate profit and funds internally for the Company, but without specifically going to a more archetypal bank-based financing.
So we're looking at all of those and really accelerating our efforts to driving from the standpoint of organic profit generation as soon as we can.
Jason Feldman - Analyst
Great, thank you very much.
Operator
Rob Stone, Cowen and Company.
Rob Stone - Analyst
I have a couple of questions about Australia as well. One is respect with respect to the ability to sign PPAs. To what extent is the government involved in acquiring or incenting to local players in the power market to work with you on this?
Chuck Dunleavy - CEO
Sure, well, I think one important thing that the government has done is not only articulated a general strategy and policy, which is very supportive of renewable energy, but in addition, in 2011 they passed the so-called carbon tax or carbon act, which set a floor price for carbon, if I remember correctly, of AUD23 per ton of CO2, which is a substantial price, especially if you look at other worldwide conditions on this point.
But I think those two points are very central to the level of support from the government. And it manifested not only in, again, the articulation of policy and the carbon law or regulations, rather, but you also see it in the number of actual programs at both the federal and state level in Australia to foster the growth of renewable energy projects. So there have been recent announcements about some of the companies within the marine renewable energy space and other renewables, solar and wind, who have enjoyed various forms of actual grants from the Commonwealth and, in some cases, state governments. So it's a very, very active market, one which we find very attractive and one in which we hope to gain a lot of traction.
Rob Stone - Analyst
Okay. And for a project of this size, how close to the goal line does the initial grant get you? What's the scope of the funding that's needed overall?
Brian Posner - CFO
What we've said in the past is the grant represents about 30% of the total budgeted cost for the project.
Chuck Dunleavy - CEO
So a very substantial piece of it, no doubt, and it's a great support to the project.
Rob Stone - Analyst
Okay. My next question is on Reedsport. You'll hopefully float the boat by sometime in the summer. What's your expectation in terms of project time lines, going from one PowerBuoy to the second one or multiple-unit deployment?
Chuck Dunleavy - CEO
Sure. I think the quick answer is we've not articulated an exact time line associated with the build-out or scale-up of that site, Rob. And I'll take a pass on it in terms of anything specific. But we are clearly on a course to leverage this particular launch and deployment. We've been very grateful for the support of both DOE -- US Department of Energy, as well as PNGC Power, as we noted a little bit earlier in our prepared remarks. And we are talking with other potential customers for the buildout for the scale up.
And I think, though, the quickest answer to your question is we'll have to stay tuned. We are definitely working on that, and I think it's fair to say that the progress that we make with this first system will also be an important step or milestone in trying to bring home that goal of funding for the buildout of the system.
So we are, right now, actively involved with trying to deliver that.
Rob Stone - Analyst
Okay, I guess, to put a slightly finer point on the question, then, how long do you think, roughly, you would need that system in the water to validate performance and then be in a position to take that data and to seek additional investors?
Chuck Dunleavy - CEO
Sure. Well, I guess with bringing a new technology to market, there's never enough time in the field or within which your installed product base is out there performing in customers' hands. But that's kind of more of a put than anything, but it is true, I think, in some respects. A little more specifically, though, to answer your question, number one, the contract that we have with the DOE for this system is for a total of 18 months performance of the system. We believe that we can demonstrate strong performance in less than that period of time, in a way that will help facilitate our looking to bring in orders for the scale-up.
So it's not a month or two. I think that in general people are going to be looking, as we will, and our engineers are looking very closely at this. It's a great opportunity to expand our knowledge of the PB150 pipeline. Remember, this is the second one we are putting in the water, meaning that it follows from the one we had put in the water last year in Scotland. And that was about six months. We did a lot of learning on that. We had very good results, which we announced in the press release -- I think it was in June of 2011, about the results of that system. But in general, I would say that we like to get some good performance, especially over the rigorous storm conditions that you have and that we anticipate off Oregon this winter. I think it will be a very important time for us to demonstrate our technology.
Rob Stone - Analyst
Are you going to schedule a hurricane or two? (laughs).
Chuck Dunleavy - CEO
Well, you know, we spent a lot of time preparing for real severe conditions. You never know what nature will provide, but our system was certified by Lloyds Register for performance in very, very high waves, basically waves up to 28 meters. So that's, what, 80 to 90 feet -- foot-high waves. So we have that comfort level which is generated by that certification.
But again, there's nothing like being out near the ocean and seeing what nature has to put your way.
Rob Stone - Analyst
Okay, my last question, if you don't mind, is on the Autonomous PowerBuoys. You mentioned that you are in active discussions with potential commercial partners. Other than taking an order, is there something else that needs to happen to start commercial activity for that product?
Chuck Dunleavy - CEO
No. We're out there looking to sell multiple buoys, multiple Autonomous PowerBuoys, right now. So the shape of discussions and meetings that we have range from, okay, I'd like one, to all right, let me start off with maybe a small number. In most cases of our discussion, the ball our eye is on, as it has been articulated by the customer, is if it goes well we could see prospects for some significant volumes here.
But, you know, it ain't done until we get a purchase order. And so we are really keeping our heads down. I had mentioned in the prepared comments about accelerating our resources. It really comes down to more feet on the street representing OPT in the marketplace. So we have a pretty broad amount of effort associated with the autonomous marketing and selling effort.
Rob Stone - Analyst
And you mentioned in your prepared remarks, specifically targeting this activity because it's a shorter order cycle, shorter time to cash conversion. In theory, and I know producing the first units of a new commercial product is always a maiden voyage kind of exercise. But assuming you got an order this month, let's say, how long would it take to turn that into first revenue, roughly, do you think?
Chuck Dunleavy - CEO
Sure. Well, I'll give you the exact example of what transpired with our first system. Remember, that was the first article, the first system that we did, which was last year. This was for the LEAP PowerBuoy, Littoral Expeditionary Autonomous PowerBuoy system we built for the Navy. The build time for that system, the build time was about three months. And then we put it through, I would say, about another month, month and a half of additional testing before we put it in the water.
And so that's a time frame that I expressed with respect to the first article. We expect that to decrease, and I think that in general it has a very strong prospect to be turned around in large quantities like on a quarterly basis, if you will.
Rob Stone - Analyst
Okay, very good. That's all I had, thank you.
Operator
(Operator instructions) George Santana, Ascendiant.
George Santana - Analyst
Congrats again on the Lockheed Martin; that's fabulous. A couple more questions on the Australian government grant. Does OPT or OPT special-purpose company face any time deadlines in the near future for any other steps in the project's development?
Chuck Dunleavy - CEO
Really, we're shooting for the end of the year to at least get some funding commitment for the first stage of the project. So we are working very hard, as I said earlier, on the power purchase agreements and getting some financing commitment for at least the first stage of the project, by the end of the calendar year.
George Santana - Analyst
And is the structure of the government grant a cost share, or can the grant money be the first dollar into the project?
Brian Posner - CFO
No, right now, the way the grant is written, it's a cost share. In other words, we have to get some additional funding. Now, it could be project finance, it could be additional grants. We're looking, obviously, at different vehicles. But the government grant is contingent upon additional funding being received for the project.
George Santana - Analyst
Does it delineate whether the grant money can be the entire equity portion so that all you have to raise is debt for the project? Or, do you also have to come in with equity?
Chuck Dunleavy - CEO
It's a flexible structure.
Brian Posner - CFO
Yes, actually, the Commonwealth is -- I think, in general, we believe has done a great job in structuring it because, while it represents the interests of the taxpayers very strongly, requires cost-sharing at the milestones, in addition, though, from the standpoint of structuring the deal, which is, I'd say, from our standpoint, there's a level of flexibility that's most appreciated. And it gives us the flexibility to do what I think you have on your mind, which is to establish some more textbook-like project finance sources of capital, which we would hope to be able to tap into, as well as for other forms of equity.
Chuck Dunleavy - CEO
So there is that flexibility, as Brian just said.
George Santana - Analyst
Okay, because it sounds like it's a better structure than what we've seen here in the United States where, you know, yes, that's great that's a cost share. But you have to go ahead and raise equity, and that can't be all of it. And then you're really tripped up; 30% is a very generous slug.
Chuck Dunleavy - CEO
Yes, true.
George Santana - Analyst
Another question -- can you (technical difficulty) process that Lockheed Martin conducted? So if I recall correctly, you have an experience working together in Oregon. Is it the same team that now has provided that expertise now in Australia, implying that this is really now a unit working with you globally? Or is it just kind of by country?
Chuck Dunleavy - CEO
Sure. You know, they have, as I said a little bit earlier, articulated a very strong policy as a corporate entity, which arcs over all of their operations, but a strong policy and a strategy with respect to energy security, including renewable energy, sustainability, demand management, etc. And that is, I think, something that includes or reaches out to their entity in Australia, which is the primary entity that we'll be working with in Australia.
But in addition, to that, yes, to the early part of your question -- some of the people who are involved with the Reedsport project will also be adding value to what we do in Australia. And from our standpoint, that is fantastic. You have that opportunity to draw on the breadth of Lockheed's operation but in a way that just capitalizes on the learning that's already been done -- Lockheed's learning, as well as our own, by the way.
So I think they're doing a really strong -- taking a very strong approach to this in applying the breadth of Lockheed's resources, not being constrained by any kind of artificial org chart aspect. They are showing great flexibility in wanting to facilitate the introduction of wave energy. And that was picked up, I think, in the quote in our press release by Dan Heller. And Dan, specifically, is part of their new business ventures group, particularly within what they call the systems and sensors. But there's a great amount of dialogue that occurs between that group and what's going on, on the street, on the ground in Australia. So it's really good communications. And again, it speaks to the breadth of the resources they are putting into this. So we are very appreciative of that.
George Santana - Analyst
That sounds great. Keep up the great work. Thanks.
Operator
That concludes our questioning period. Mr. Dunleavy, you may proceed with any closing remarks.
Chuck Dunleavy - CEO
Thank you, and thanks to all of you, once again, for attending today's call. If you have any further questions, please don't hesitate to contact us. Otherwise, we look forward to speaking with you next quarter.
Operator