使用警語:中文譯文來源為 Google 翻譯,僅供參考,實際內容請以英文原文為主
Operator
Ladies and gentlemen, thank you for standing by.
Welcome to the Freeport-McMoRan Copper & Gold third quarter earnings conference call.
At this time, all participants are in a listen-only mode.
Later, we will conduct a question-and-answer session.
(Operator Instructions) I would now like to turn the conference over to Ms.
Kathleen Quirk, Executive Vice President and Chief Financial Officer.
Please go ahead, ma'am.
Kathleen Quirk - EVP, CFO and Treasurer
Thank you.
Good morning, everyone, and welcome to the Freeport-McMoRan Copper & Gold third quarter 2011 earnings conference call.
Our results were released earlier this morning, and a copy of the press release is available on our website at www.FCX.com.
Our conference call today is being broadcast live on the internet and anyone may listen to the call by accessing our website home page and clicking on the webcast link for the conference call.
As usual, we have several slides to supplement our comments this morning, and you can access the slides by using the webcast link on www.FCX.com.
In addition to analysts and investors, the financial press has been invited to listen to today's call and a replay of the webcast will be available on our website later today.
Before we begin today's comments, we'd like to remind everyone that today's press release and certain of our comments on this call will include forward-looking statements.
We'd like to refer everyone to the cautionary language included in our press release and presentation materials and to the risk factors described in our SEC filings.
On the call with me today is Richard Adkerson, President and Chief Executive Officer, Jim Bob Moffett, Chairman of the Board, we also have Mark Johnson with us today, and also Rick Coleman who manages our expansion and construction activities.
I'll start by briefly summarizing the financial results and then turn the call over to Richard who will review our recent performance and outlook.
As usual, after our remarks, we will open the call for questions.
Today, FCX reported third quarter 2011 net income attributable to common stock of $1.1 billion or $1.10 per share, compared with $1.2 billion or $1.24 per share for the third quarter of 2010.
Our third quarter results included additional tax provision of approximately $50 million or $0.05 per share associated with Peru's new mining tax and royalty.
For the first nine months of 2011, we reported net income attributable to common stock of $3.9 billion or $4.10 per share, compared with $2.7 billion or $2.94 per share for the comparable period of 2010.
Our third quarter 2011 consolidated copper sales of 947 millions pounds was slightly higher than what we estimated in July of 940 million pounds, primarily because of the timing of shipments in North America.
As anticipated, third quarter 2011 sales -- copper sales were lower than the prior year quarter sales, primarily because of lower sales in Indonesia and South America; partly offset by higher production and sales from North America.
Our third quarter 2011 consolidated gold sales of 409,000 ounces were slightly below our previous estimate of 415,000 ounces and lower than the third quarter 2010 sales of 497,000 ounces.
That primarily reflected lower Grasberg production.
Third quarter 2011 consolidated molybdenum sales of 19 million pounds were higher than our July estimate of 18 million pounds and also higher than last year's third quarter sales of 17 million pounds.
During the third quarter of 2011, our production and sales of copper and gold were adversely affected by labor disruptions at PT Freeport Indonesia.
The estimated impact on our third quarter 2011 production including the eight day strike in July 2011 and the ongoing strike that commenced on September 15th, totaled approximately 70 million pounds of copper and 100,000 ounces of gold in the third quarter.
Without these impacts, our third quarter 2011 sales from Grasberg would've exceeded our forecasted production in sales because of access to higher grade ore previously scheduled to be mined in future periods.
We've also developed revised operating plans to produce and ship concentrates at modified levels with a reduced workforce and we sold concentrate from inventory during the third quarter, which partly mitigated the lower production level.
Our realized price for copper in the third quarter of 2011 averaged $3.60 per pound that was $0.10 higher than our realized price of $3.50 per pound in the third quarter of 2010.
For gold, our recorded realization averaged approximately $1,693 per ounce in the third quarter of 2011, that was higher than last year's realization of $1,266 per ounce.
Of our third quarter molybdenum price of $16.34 per pound was similar to the year-ago period.
Our consolidated average unit net cash costs during the third quarter of averaged $0.80 per pound, that was lower than last year's unit net cash cost of $0.82 per pound in last year's third quarter.
Our higher site production delivery costs reflected lower copper sales volume in Indonesia and South America and increased mining and milling activities in North America.
We had higher molybdenum and gold and silver credits, which more than offset these higher site production and delivery costs.
Operating cash flows during the third quarter of 2011 totaled $1.8 billion, that was significantly above capital expenditures, which totaled just over $700 million during the third quarter.
For the first nine months of 2011, operating cash flows totaled $5.9 billion and capital expenditures totaled $1.7 billion.
We ended the quarter with total debt approximating $3.5 billion and our consolidated cash position was $5.1 billion.
FCX has approximately 948 million common shares outstanding.
I'd now like to turn the call over to Richard who will be referring to the slide materials on our website.
Richard Adkerson - Pres, CEO
Thanks, Kathleen.
And good morning, everyone.
Slide 3 has the details on the financial results that Kathleen talked about, and I want to just speak to a couple of things that she mentioned.
In terms of assessing our production numbers and our financial results for the third quarter, there are a couple of factors that I'd like to point out.
First, our long-term mine plan, as our guidance in the second quarter reflected, provided that we would have been in a lower grade material in the Grasberg mine than we were a year ago without the strike.
So, our guidance, going in to the third quarter before the strike situation projected lower numbers, and -- because of this grade issue.
Now, as always, our team on the ground works to find ways of getting access to higher grade materials and adjusting the mine plan to optimize those plans and that was part of the process that is reflected in the results that we achieved.
The strike had a significant impact on us.
As Kathleen said, both a work stoppage in early July and then the ongoing strike that started in mid-September reduced our third quarter copper production by 70 million pounds from what it otherwise would have been and 100,000 ounces.
So, that is an adverse impact to us.
It results in lower taxes and royalties to the government of Indonesia than there otherwise would have been because of that; and of course, the workers who are on strike are not being paid.
So, all of us, all the stakeholders have a strong incentive to try to resolve this strike, and we're committed to trying to do that on a fair basis.
But we did revise our operating plans.
Our management team on the ground at PTFI, our Indonesian national staff people and contractors, and some of the workers that are in the union have allowed us to operate on a reduced basis.
Our mill has operated in recent days at 75% to 80% of capacity.
We are operating in the mining at a roughly two-thirds of our normal rates.
Our underground operations have ramped up.
And we've been able to ship concentrate inventory with some disruptions, but shipping inventory to the port and loading sales.
We'll continue to do that, there's uncertainty about how this will proceed in the fourth quarter.
Our hope is and what we are certainly working towards is to get this strike resolved on a mutually satisfactory basis with all parties so that we can go back to totally normal operations.
Without that, we will continue to work to the extent we can with our reduced workforce.
We've been pretty effective with that.
But it does create a degree of uncertainty about what will transpire here in the fourth quarter, and as you look at the fourth quarter results projections, you need to take that into account.
Our revised, annual guidance is of 980 million pounds of copper is 50 million pounds lower than the EPS estimate in July; and gold is consistent with our previous estimates, but it does reflect lower copper and gold volumes than we otherwise would have achieve if we hadn't had to deal with this reduced workforce because of the strike.
Turning to slide 4.
Not only are we dealing with this strike, we are dealing with the macro economic uncertainties around the world today that caused copper prices to drop dramatically during the third quarter and creating the current situation involving the macro economics impact on the financial markets.
We are financially strong.
We demonstrated during the 2008 crisis our ability to adjust to adverse conditions.
Of course, today's conditions are nowhere nearly as significant for us as they were then, but another factor to point out is just how much stronger financially we were then at that time.
We've reduced our debt to a level that's below the amount of cash that we already have; and at today's copper price of $3.30 and our ability to produce copper this year at less than $1 a pound indicates that we are -- we're very profitable in generating -- continuing to generate substantial cash in excess of our capital requirements -- capital expenditure requirements.
And so, we're confident of our ability to operate in the current condition and we continue to be very optimistic about our commodities for the future.
We are not changing any of our operating plans or our capital spending plans because of the current conditions.
And as we work to resolve the strike issues we have in Indonesia, the labor issue we have in Peru at Cerro Verde; and as we deal with the macro economic uncertainties around the world today, our management team is focused on running our business in a safe and efficient way and focused on future growth because of our optimism about the future for our commodities.
Slide 5 shows our cost situation.
One thing that I am very proud of all of our operations on is even though commodity prices have risen in recent years, we continue to have a real focus on constraining cost; and as a commodity producer, that's always a key factor and our team has done a good job of mitigating some upward cost pressures that have to do with input cost and also just the competition for goods and services in our industry.
And as you can see from the numbers that we are reporting today, we've done a good job for it.
Our unit cost before byproduct credits is up slightly from the second quarter, but byproduct credits are higher because it principally causes a higher gold price and we ended up with a net unit cost of $0.80 a pound for the third -- for the third quarter.
I mentioned markets, and we've got the price -- the movements of copper, gold, and molybdenum on slide 6.
There is currently a disconnect between the financial markets' view of copper and their view of producers equities like ours and the physical markets that we are seeing on the ground today.
The physical markets remain relatively tight in the US where growth is slower than it was going into the year and Europe's growth is slower than it is going into the year, continue to be tight in both marketplaces.
China continues to consume copper although there are concerns about its credit tightening activities.
But on a global basis, the physical markets are much stronger than you would see, as indicated by the financial markets' reactions.
And that's driven by these macro economic factors that create a lot of uncertainty of where the marketplace is going.
We don't know and then we don't run our business on our ability to project these factors.
We are prepared to react to the circumstances that come to us, we want to preserve our asset, preserves our opportunities for a bright future.
And that's driven by the fundamentals of demand because of what we believe will be global growth in future years and the continuing supply side constraints in our business of where it continues to be difficult to find and develop new copper mines where there are challenges in developing and continuing to operate aging mines because of falling grades, and the need to move underground, issues with governments, communities and work forces.
Volatility is part of our situation because of the financial markets; but we are highly positive because of these fundamentals of longer-term demand, supply constraint, about the outlook for our business and that's driving our strategy.
A couple of comments on the labor situation.
In Indonesia, we have worked in good faith to reach a mutually satisfactory agreement with the union.
The strike really is -- doesn't have basis under Indonesian law.
We're working cooperatively with the government, which is designated our operations in Papua as a vital national object so the government recognizes the importance of our operations to the community, to Papua, to the government itself.
Our pay packages have been and continue to be at the top of workers, for workers in Indonesia.
We are offering a substantial increase to pay.
As we talk about the new, two year contract, we see our offer as being fair and generous.
We have worked in a government designated process of having discussions including participating with the union in a mediation process.
The mediator was designated by the office of manpower, the government of Indonesia came up with conclusions and we accepted those conclusions, the union did not.
And as I said, we are committed to working with the union.
We value our workers, our work force in Indonesia.
They have been key to our success.
Our labor cost -- total labor costs at PTFI include not only the direct pay for the mine workers but all the support costs that go into it.
We have over 22,000 person workforce; and when we look at our labor cost at PTFI, it is consistent with our labor costs for our other operations in terms of the percentage of that cost to the price of copper.
The reason PTFI operations are so profitable is because the high grade mine there; and as I said, we're committed to being fair and generous with our workforce and are hopeful that we can reach a resolution soon.
In Peru at Cerro Verde, we also are having a strike situation and we are actively negotiating with the union, with the assistance of the government, and we are working in good faith to complete a new labor agreement there.
Production has not been materially affected at Cerro Verde because of our use of our existing management group and contractors that work with us to continue operations there.
We're hopeful for our near-term solution there.
As we deal with this and as we deal with today's macro economic situation, as I said, our management team continues to be focused on creating value from our existing assets.
And on slide 9 shows we have very large proved and probable reserves of copper, 120 billion pounds using a $2 price.
We have a very significant, additional amount of mineralized material, over 100 billion pounds that are associated with our existing mines.
When you add all that together and looking at the positive copper future that we see for the world, we are very committed to converting these reserves and resources into cash flow producing assets and creating value for our Company shareholders that's not reflected in today's copper price.
The new projects that we have can be divided basically into three types.
One is advancing restarts of projects and operations that were either curtailed or deferred in 2008 and 2009, and we made great progress with that.
At Morenci, we've restarted the mine, we've increased the mine rate, we have started operations at Miami, near Phoenix where we have significant abandonment obligations.
We're starting -- we restarted the Chino mine in New Mexico where we had -- we shut that mine down in 2008.
All of these projects are increasing us about 400 million pounds of copper a year and progressing very well.
With our molybdenum business, where we are the industry largest and lowest cost producer, we are moving towards starting up the Climax mine outside of Leadville, Colorado in 2012.
With a ramp up that would ultimately lead to an annual production rate of about 20 million pounds a year.
This ramp-up that we will undertake is going to be dependent on market conditions.
Climax ultimately could produce 30 million pounds a year and is expandable beyond that.
We will operate Climax in our existing, producing pure molybdenum mine in Henderson, Colorado in a manner that flexes to meet market demands.
We produce significant amounts of molybdenum as a byproduct of copper.
At Climax, construction is now 80% complete.
We are working on mine development.
We should complete mechanical instruction by the end of this year and be prepared to ramp up in 2012.
In South America at our mine in Chile, the El Abra mine we've commenced production on our sulfide leach project called Sulfolix, which is replacing the depleting or depleted oxide ore resource.
This project extends the mine life by 10 plus years to produce 300 million pounds of copper.
We have a great partnership with Cadelco on this operation and we are completing this project -- it is virtually completed now.
Since the Phelps Dodge acquisition in 2007, we've continued exploration there and significantly expanded the sulfide resource that's available to us and so we're looking at studies for a potential major mill project that would be incremental to the sulfide leach project; and we've had a really positive, recent drilling results and are very excited about our ability to have a major mill project at El Abra.
In Indonesia, the underground reserves there that are available to us represent what appears to be the most profitable, exciting copper mine development project in the world.
The aggregate reserves are 37 billion pounds of copper and 33 million ounces of gold.
Grasberg is unique because of its high grades of copper and gold in the same ore material.
We are operating in a very large block cave operation where we had begun operating block cave operations in the early 1980s.
The DOZ mine has a current capacity of 80,000 tons per day, a very large mine.
We've initiated mining at the big Gossan which is a high-grade mine.
The Grasberg block cave, which contains the reserves that will allow us to develop after the pit is depleted which is expected, currently, to occur in mid-2016 has been developed -- access has been developed, initial mine development has occurred and we expect that plus the deep MLZ, which is an extension of the DOZ at depth; and laterally will allow us to have underground production at rates that's consistent with where we operate today in the open pit of 240,000 tons per day.
This require significant capital.
We will be expecting to spend our share of that capital at roughly $500 million a year over the next five years.
These underground reserves are in close proximity to our existing mill facilities.
Because of the way the deposit and the mill lays out, we were able to access the underground deposits vertically -- horizontally as opposed to lowering shafts and this allows for more efficient, lower cost operations.
And so, we will continue to be at Grasberg, among the very lowest cost mines in the world because of the development opportunities we have and also the combination of copper and gold grades of such significance.
Now, beyond the near-term projects we're working on, slide 15 shows the major expansions that we are progressing aggressively.
This includes a tripling of the mill throughput at Cerro Verde, a new million operation at Morenci, and also expanding the Tenke Fungurumi mine in the next stage of development.
These 3 projects, which are not yet in our numbers -- either our future production volumes or our cost numbers, we expect them to be added shortly as we complete our internal approval process would add roughly $1 billion a year of incremental copper and involve 1 billion pounds a year of incremental copper and $6 billion of capital investment, very attractive rate of return projects in today's world.
The Morenci mill is a very exciting operation for 100 plus year old mine that not too long ago was considered to be on its last legs.
We're operating it very profitably today.
We're expanding it and this would be another major expansion of increasing the mill capacity to mine the sulfide ore that we are identifying and getting capacity up to 115,000 tons per day, involved increasing the mining rate over $1 billion of capital with good rates of return and significant incremental production.
We are completing the feasibility study on that by early next year and then we'll be moving into permitting this year, and we expect to achieve full rates out of this project by 2014.
And as we are doing this, we are continuing to drill at depth, finding good results, and we believe this will lead to a further large sale expansion at Morenci.
The Cerro Verde project is one where we, as I said, are looking to triple its mill throughput significant increase in the mining rate to take advantage of the resource that we have available to us.
It does involve significant capital at $4 billion, but that's the world the industry lives in today.
And this would be a very attractive project.
We have the opportunity to achieve power and water resources there, which is a challenge in Chile -- in northern Chile and Peru, by working in cooperation with the local community there to obtain our water from a wastewater treatment plant which is -- and that has resulted in us having really strong support from the Arequipa community in the surrounding region.
We expect to commence construction in 2013 and begin production in 2016.
Tenke Fungurume, positive aspect about that operation is that our existing mill has operated beyond design capacity.
We've taken advantage of that to incrementally increase production.
Our operations there are going well.
Our delivery system of product using a significant trucking operation is going well and we are now looking at our first expansion beyond the initial project.
This would involve with a significant increase in our mining rate, additional tank house capacity, capital cost of $850 million to give us incremental production of 150 million pounds a year in an approximately two year time frame.
While were doing this, we are continuing to do exploratory drilling and metallurgical work to see what the next stage goes and also developing a long-term strategy from taking advantage of this significant resource that we have over this very large concession in Katanga.
The third set of projects, again, we have the resources that allow us to consider this.
This is not something where we have to find new resources to do it, but we are looking at, as I mentioned, a large-scale further expansion at Morenci, mill projects in Arizona at Sierrita, Baghdad, Ajo, Twin Buttes, ultimate expansions in the Safford, Lone Star area for -- where our mine there, near Morenci.
In South America, I mentioned the El Abra major mill expansion, and then at Tenke Fungurume, further -- we have the opportunity to further expand our oxide operations there as well as dealing with the very indicated large volumes of mixed ore and sulfide ore there.
So as we look forward, our company, we have these very near term projects and major expansions and the longer-term expansions.
In the meantime we've upped significantly our expiration spending.
We expect to spend $250 million a year, focused primarily -- principally on the resources near our existing areas of operations.
This allows us to look at expansions -- expand, get permits, progress in ways that are much less complicated than you would with Greenfield projects.
It can be done at less cost and proceed with communities and with permitting agencies on a much more straightforward basis.
I want to close by looking at our 2011 outlook.
Again, I want to emphasize that this outlook has degrees of uncertainty that are not typical for Freeport's operations; but based on our ability to continue to operate as we've been operating at Grasberg, of course, we hope to get back to normal operations with resolution of the strike.
We are giving a sales outlook of 3.8 billion pounds for the year, which is about 100 million pounds lower than our previous guidance.
Gold, at 1.6 million is consistent with where we were; 1 million pounds higher, molybdenum at 78 million pounds.
Our unit cash costs because of the higher gold prices principally at $1,600 gold would be less than $1 a pound; and at $3.25 copper, our operating cash flows would be $7 billion and capital expenditures currently are at $2.6 billion for 2011; although, we would expect that to be higher as we get some of these projects approved.
Our quarterly -- our outlook beyond 2011 for 2012 and 2013 are presented on slide 22.
You can see how that variation goes and particularly how the gold sales at Grasberg vary depending on where we are in terms of access to the higher grade materials at the lower part of the pit.
Quarterly outlook is updated for 2011 on slide 23.
And our current outlook for annual unit production cost is on slide 24.
These costs are consistent with our prior guidance with somewhat higher byproduct credits; and the current outlook is for costs at 95% net -- $0.95 net per unit; and we present the sales by region at the chart at the lower part of the slide.
I mentioned our cash flow outlook, operating cash flows at $3.50 copper is roughly $6 billion and that would be EBITDA of over $8 billion.
Capital expenditures -- sensitivities are shown on slide 26 for your reference.
Capital expenditures are on slide 27.
We are looking at $2.6 billion this year.
Next year, we would expect to have roughly that level plus $1 billion of projects we expect to have approved to go forward in 2012.
And that is projects at Cerro Verde, Tenke Fungurume, and Morenci.
From a financial policy standpoint our board has been focused on maintaining a strong balance sheet, strong liquidity.
As we continue to invest in our attractive growth projects, we have historically had a shareholder-friendly policy of paying substantial dividends.
We certainly should have opportunities to do that as we go forward and our board will be reviewing our financial policy as always on an ongoing basis.
So we -- with that, we'd like to turn the -- operator, we'd like to turn the call over for questions.
Operator
Ladies and gentlemen, we will now begin the question-and-answer session.
(Operator Instructions) One moment please for our first question.
The first question comes from the line of Michael Gambardella with JPMorgan.
Michael Gambardella - Analyst
Yes, good morning, Richard and Jim Bob, Kathleen.
I have a question on potential for a share buyback?
And given the balance sheet, with the $5 billion in cash and you have net cash on the balance sheet; and given the growth prospects that you have certainly well-funded with the internal cash flows and your comment on the value of the stock down here, and I would agree with stock is cheap down here.
What is your view on using some of that cash for share buyback?
Richard Adkerson - Pres, CEO
We are -- well, Mike, our focus is on investments.
I mean, we really want to look at taking advantage as aggressively as we can on these opportunities to grow our business because of our positive view about the future for the business.
We do have an authorized share buyback program.
As you know better than anyone, we have a long history of returning cash to shareholders in the form of dividends; and historically with share buybacks, it's something that our board considers on an ongoing basis.
And we understand your comment and it will be a matter for the board's consideration.
Michael Gambardella - Analyst
One other question just about Grasberg.
I think I heard you say that the mine is currently operating at around two-thirds of its capacity, is that correct?
Richard Adkerson - Pres, CEO
That's right.
In terms of the open pit mine rate, the underground is really more like 80% of its capacity.
And that -- when I talk about mine rates, that includes the significant waste material that we move as well as ore production.
So, we are dealing with both of those and adjusting our mine plans in relation to our current available workforce.
And all that adds up to the mill, which is where we produce the concentrate and it's like at 75% to 80% of capacity.
Michael Gambardella - Analyst
Okay.
And what percent of the workforce are you doing that with right now?
Richard Adkerson - Pres, CEO
Well, our workforce includes our management team, which is all there, our staff, workers, our junior, and senior staff; and they've been extraordinarily supportive of our operations.
So, we have people doing jobs that they normally don't do.
And we have had some union workers that have decided to come to work.
Maybe in the range of 10% to 15%, it varies day by day.
So when we add it all up, its about 60% of our regular workforce.
Regular workforce includes not only the mine workers but infrastructure, we have fewer people up there so there's a reduced infrastructure requirement for them.
And the union workers, I said 10% to 15%, it's more like 15% to 20%, Mark is telling me.
Michael Gambardella - Analyst
Okay.
Thanks a lot.
Richard Adkerson - Pres, CEO
Thanks, Mike.
Operator
Your next question comes from the line of Jorge Beristain with Deutsche Bank.
Jorge Beristain - Analyst
Good morning, Kathleen, Richard, and Jim, and congratulations I think on good results in the face of adversity.
My question is really about the fourth quarter guidance, which you put for copper at 915 pounds.
I'm just trying to understand how much of the strike impact is embedded in that assumption, if any?
The union has basically extended the strike through November 15, and you guys produce about 3 million pounds per day there.
So, that would be 135 million pounds of lost production.
But you are saying your operating at about 75% to 80% of throughput.
So, I'm just trying to understand, are you baking through a November 15 lost production because of the strike at this point?
Or how many pounds would you say have been shaved off that guidance number?
Kathleen Quirk - EVP, CFO and Treasurer
Well, for the year, including the third quarter impacts, we're estimating of 100 million pounds of copper and 100,000 ounces of gold.
Most of the gold impact was actually in the third quarter.
The copper impact in the third quarter is 70 million pounds, so that leaves about 30 million pound impact for the fourth quarter.
We were -- our fourth quarter was projected, in any case, to be our lowest grade quarter of the year.
And actually with the strike action in the third quarter, some of the higher grade material that we expected to mine in third quarter has been pushed into the fourth quarter.
But these assumptions assume that we're operating under strike conditions, at this moderated rate that Richard's been talking about.
So, we've baked that in to the forecast.
Richard Adkerson - Pres, CEO
So, Jorge, it just assumes were doing what we're doing now and in recent days.
Jorge Beristain - Analyst
Through till November 15, or through the entire fourth quarter?
Richard Adkerson - Pres, CEO
No, all the way through to the end of the year.
So, that's just an assumption, it's a projection.
Our hope is that we get the strike resolved and get everybody back to work.
But in terms of giving you and others in the investment community guidance, we thought the best way to do that now is to just say if we continue to operate right now -- as we are right now through the end of the quarter to give you those results.
Jorge Beristain - Analyst
So to paraphrase then, if you're talking about a 90 day quarter to lose 30 million pounds of production at Grasberg is like 0.3 million pounds a day.
That's pretty good for an operation that does 3 million pounds a day?
Richard Adkerson - Pres, CEO
Yes.
And as I tried to emphasize at the start of my comments, there's a combination of factors going on here.
1 is our revised mine plans on how to deal with this and then taking into account the lost capacity that we have because of the strike situation.
So, using overall averages doesn't take into account exactly how we're responding to the situation, and because of this ore body being of the quality it is, it gives us more flexibility than you might have with other operations.
Mark Johnson - COO
The other aspect of that, Richard is -- this is Mark Johnson, is that in a higher grade areas of the Grasberg, we're operating at 100% of pre-strike capacity.
Where we're giving up some of the production due to the strike impact is in the lower grade areas, and we are deferring some of the stripping.
As Richard said in the underground, were pretty much where we were prior to the strike.
So, the incremental tons that we are giving up right now are not at an average grade.
They are more on the lower grade side of things.
Jorge Beristain - Analyst
Right, that sounds very positive.
And sorry, if I could just ask a second question, Richard, you've been talking up this idea of these growth plans at Cerro, Morenci, and Tenke for a while; is there a firm date by which you would expect the board would approve these projects?
Is there like an end December deadline, or early Q1 where we would know if these projects are authorized?
Richard Adkerson - Pres, CEO
Yes.
We will have that presented -- it's just a question of completing the necessary work to get the data together.
We've been keeping our board informed.
They've been very supportive of what we're doing, so it's a natural process here.
And nothing -- the board is very supportive of our overall strategy.
So, we anticipate getting that done in due course.
Jorge Beristain - Analyst
Thank you.
Richard Adkerson - Pres, CEO
I just want to make a comment as I'm listening to the questions of Jorge and so forth.
Our resource that we have available to us at Grasberg is going to be there.
It's a question of when we're able to mine it.
And our first priority as we operate day-to-day is to do what we can to protect the safety of our people, the people in the local community, and so forth.
So, this is going to be a dynamic situation and we will -- we are going to get back to normal.
We will do it and we'll keep you informed as we move on.
Operator
Your next question comes from the line of Sal Tharani with Goldman Sachs.
Sal Tharani - Analyst
Thank you.
Good morning.
Richard Adkerson - Pres, CEO
Good morning, Sal.
Sal Tharani - Analyst
I wanted to just understand the CapEx for Cerro Verde.
You have increased that number from the previous presentation by $500 million; is that something additional you are doing over there?
Richard Adkerson - Pres, CEO
Well, Sal, you're going to hear this over and over in this industry.
I mean, as companies work on projects, despite the fact we've got these economic uncertainties, the factors that go into spending money on capital projects in this industry continues to rise.
And so some of that is escalation as we get ready to actually order equipment and contract for services, cost are higher than they were estimated in our previous studies.
There are other factors that go in.
We've changed the scope of this water project that we are doing for Arequipa that is going to be the source of our water.
We found that we are going to have to build some additional power line facilities and transmission facilities that are different than we originally anticipated.
But I will just make an observation because we are engaged in so many of these projects and we watch what is going on with others in the industry; is that capital cost escalation is a significant factor, it's going to have an impact on supply, development, and the timing of projects.
Sal Tharani - Analyst
Understood.
Thank you.
And also, you are forecasting gold forecasting -- if I look at your total forecast and subtract the first 3 quarters, it appears to be higher than what you mentioned later in the press release that you are going to do 280,000 ounces in Grasberg because it comes out about [355,000].
I was wondering that gap, is that significantly higher than what you do outside of Grasberg for gold?
Richard Adkerson - Pres, CEO
Yes, I'll tell you what, Sal, it is -- essentially all of our gold is Grasberg so it is not anything --
Kathleen Quirk - EVP, CFO and Treasurer
We've got some coming from South America.
Richard Adkerson - Pres, CEO
Some coming from South America.
Sal Tharani - Analyst
But if I take your total gold forecast for the year, subtract the first 3 quarter, it comes to 355,000 ounces; while you say in the press release later on that at Grasberg you expect fourth quarter to be 280,000 ounces.
I just was wondering, how do we reconcile that?
Kathleen Quirk - EVP, CFO and Treasurer
Yes, we're expecting from Indonesia total for the year, and you look on page 24, 1.45 million ounces.
And roughly 100,000 ounces from South America.
So, I think the math works.
We'll go offline with you if you still have questions.
Richard Adkerson - Pres, CEO
Yes.
Let us take a look at that and we will go forward with the next question, operator.
Sal Tharani - Analyst
Okay, thanks.
Richard Adkerson - Pres, CEO
Thanks, Sal.
Operator
Your next question comes from the line of Oscar Cabrera with Bank of America.
Oscar Cabrera - Analyst
Good morning, everyone.
Just getting back to Grasberg, the additional color on mining 100% of the open pit, that was very helpful.
But I just would like to understand what type of stockpile you are working with in terms of -- I don't know if you can disclose how many days and what type of grades you have in the stockpile?
Richard Adkerson - Pres, CEO
This is not really stock -- we developed short-term stockpiles depending on our mine plans and so forth; but we don't have significant stockpile situation there.
We basically move material very quickly from the mine crushing system through our ore drops into the mill so stockpiles, there's not a long term stockpiles for us there in terms of our current operations.
Oscar Cabrera - Analyst
So, in terms of the -- you indicated in your presentation that 2012 production for copper is also lower than what you were anticipating.
I mean, the number is not that significantly lower; but is this all coming from Grasberg and mining lower grades?
Richard Adkerson - Pres, CEO
No, this whole thing -- about half of it is from Grasberg but the total adjustments -- I don't think it's 2% or less and it's just normal mine planning adjustments.
We're now going into developing our annual plans, which we complete in the fourth quarter; but that's just normal adjustments for mine plans.
Nothing significant.
Oscar Cabrera - Analyst
Okay, great.
No, that's very hopeful.
And then the next question is over the last couple weeks, Cadelco has been able to obtain financing from 1 of the Japanese -- large Japanese melting companies, and I guess can you talk about your project in El Abra and the sulfite?
That looks to be something that is very attractive.
In your discussions with the Company, is there any sense that you can push this forward?
You've been referring to it for about a year now, but are we closer to seeing anything coming forward?
Richard Adkerson - Pres, CEO
Well, we are working actively on it.
And, I mean we are also working jointly with Cadelco, but this is a project in the pre-feasibility stage.
And so, that's going to take a significant amount of time to advance it.
That's just the nature of these projects.
Because it involves being where it is located in northern Chile, there is a challenging water issues and power issues and we are working cooperatively with Cadelco on those issues.
But just going back to my comments about why we are optimistic about the future of copper, 1 of the things is supply constraints and as attractive as this project is and as aggressive as we are and willing to pursue it.
It's going to take several years to do the pre-feasibility study and deal with the water and power issues, which we believe we can.
It will cost money but that's indicative of the constraints on supplies and why even though we can produce copper at such a low unit cost, you can't just turn on projects and get production very quickly.
Oscar Cabrera - Analyst
Understood.
Thanks a lot, Richard.
Richard Adkerson - Pres, CEO
Okay, Oscar.
Thank you.
Operator
Your next question comes from the line of Brian MacArthur with UBS Securities.
Brian MacArthur - Analyst
Good morning.
I just want to go back 1 more time on the Grasberg situation.
First of all, we've talked a lot about production and we talk about sales going forward.
Is there any inventory effect at the port; ie.
I know you're running at 75% at site, give or take, but do we borrow any inventory going forward?
Or is that all smoothing out over the next few quarters?
Richard Adkerson - Pres, CEO
It -- our inventory at port builds up and then drops as ships come in.
And this is just a normal situation.
We did have some inventory that we drew down, but we try to ship it as quickly as we can.
And it's just a question of shipping schedules and so forth.
So, at any point in time, the inventory's going to be driven by kind of the steady production that comes out of the mill, gets down there, ships come in, it's loaded, and inventory drops.
But there's nothing unusual about it now, other than the fact that we are operating at a reduced level.
Brian MacArthur - Analyst
So, we probably got -- you would have always had a 100%, your production's come down, you probably drew a bit in this quarter; but going forward it'll just be flat going forward, there will be no mismatch per se other than your normal ship loading?
Richard Adkerson - Pres, CEO
Okay.
But, as we always have, the amount of sales at the end of any quarter is based on ship loading.
And, Brian, I know you recall in the past that sometimes it's a shallow sea and rough weather can delay a ship, we record sales when it is loaded on the ship.
So the timing, if you want to call it mismatch or whatever, is strictly a function of getting the concentrate on the ships and getting it out of there, and that skips ship schedules and loading conditions.
Kathleen Quirk - EVP, CFO and Treasurer
We are just forecasting normal inventory levels in our outlook.
Brian MacArthur - Analyst
Okay, great.
That helps.
And then just on -- that was 1 of my questions -- the deferred profits in this quarter, I know it was something like 200 and something last quarter and 101 at the end of this quarter; do you know what the deferred profit -- I've lost track of how this works -- whether it was a gain or loss in the quarter?
And what it would be?
Kathleen Quirk - EVP, CFO and Treasurer
It was income during the quarter because inventories were lower.
If you look in the footnotes on the income statement, Brian, there's a summary of what the impact was.
It was a positive impact of $84 million to net income.
But as you know, that number moves depending on -- depending on the changes in these inter-Company inventory levels.
Brian MacArthur - Analyst
Great.
Yes, that's what I was looking for, I just missed that because I had the year-end.
And the final question, I think someone mentioned, and I just want to be clear about this; as we work through the fourth quarter, which makes sense, obviously with all the uncertainty, we focus on where we make money.
So, was there a comment made that we sort of slowed down our stripping ore bit?
I think someone said that to one of the answers to the earlier questions?
And therefore, is that significant; and is there catch up as we go into the future quarters?
Richard Adkerson - Pres, CEO
It's just a question of how we plan our mining activities given the reduced workforce.
And so, obviously, to the extent that we adjust stripping or ore mining in these conditions, it affects what we're doing going forward.
So, again, the mine plan's -- the mine plan -- we're not doing anything that would be inconsistent with our long-term mine plan in terms of protecting pit stability and in terms of maximizing the MPV out of the ore.
So, it's just a question of how we do that with the reduced workforce that we have.
Brian MacArthur - Analyst
Right.
Which makes sense.
And then I guess, so my final question just on this because I think I totally understand the maximization.
You also had gold production down a little bit year-over-year versus your previous guidance.
Is that just more the normal reset that we all the time rounding error, as opposed to anything to do with the strike?
Richard Adkerson - Pres, CEO
That's correct.
Beyond 2011.
Brian MacArthur - Analyst
Right.
Richard Adkerson - Pres, CEO
Beyond 2011.
Brian MacArthur - Analyst
Okay, great.
Thank you very much.
That helps a lot.
Kathleen Quirk - EVP, CFO and Treasurer
Thanks, Brian.
Richard Adkerson - Pres, CEO
Let me just make a comment.
We have a very long list of questions, and so I am going to ask everyone to just limit your question to a single question.
If you want to get back in the queue, just to give everybody a chance that wants to have a question and a chance to ask it.
Operator
Your next question comes from the line of Paretosh Misra with Morgan Stanley.
Paretosh Misra - Analyst
Thanks.
Good morning.
Richard Adkerson - Pres, CEO
Good morning.
Paretosh Misra - Analyst
I guess I can ask only 1.
So, what are your thoughts on your capital structure?
Would you like to keep some debt or is there an optimum debt to capital ratio that you would like to maintain?
Just wondering what are your thoughts on that.
Richard Adkerson - Pres, CEO
No, we don't have any targeted capital structure.
We look at the debt situation.
Over the last 4 years, our credit rating has improved significantly.
And so this gives us time -- opportunities to repay debt on an opportunistic basis and reduce our interest costs.
We point out that a good portion of our interest cost does not get the benefit of tax deductibility.
So, we just approach everything on the cash flow basis of optimizing our cash flows as opposed to targeting any level of debt.
We would be more comfortable with a greater level of debt on our balance sheet, and we certainly have the financial capability of doing that.
And -- but we just look at it in terms of maximizing cash flows.
Paretosh Misra - Analyst
Thank you.
Operator
Your next question comes from the line of Brian Yu with Citi.
Brian Yu - Analyst
Good morning.
Richard, I was just wondering if you've got a breakout for that billion dollars in CapEx for projects under evaluation next year?
Richard Adkerson - Pres, CEO
Let's see.
Brian Yu - Analyst
Just between the 3 major ones.
Kathleen Quirk - EVP, CFO and Treasurer
Yes, it includes the 3 projects that are in advanced stages Cerro Verde, Morenci, and Tenke.
We are going to be in a permitting process for most of next year in Cerro Verde and so the costs include advancing the engineering and also potentially advancing our earthworks there.
We've also got capital associated with the second phase at Tenke and this Morenci mill expansion, but it's probably evenly distributed between those 3 projects.
Brian Yu - Analyst
Okay.
Great, thanks.
Richard Adkerson - Pres, CEO
Thanks, Brian.
Operator
Your next question comes from the line of Tony Rizzutto with Dahlman Rose.
Tony Rizzuto - Analyst
Thank you very much.
Hi, Richard, Jim Bob, and Kathleen.
Richard, I take from your earlier comments that the operating plan modifications that you guys have been employing at Grasberg shouldn't affect the life of the open pit?
Richard Adkerson - Pres, CEO
Well, this question of the life of the open pit is a dynamic question in and of itself even without the considerations of the strike.
So, at the present time, we don't see any significant change as a result of recent events.
But that's something that we are continuing to evaluate and it could change based on that other evaluation.
Tony Rizzuto - Analyst
Okay, thank you very much, Richard.
I appreciate that.
Richard Adkerson - Pres, CEO
Okay, Tony.
Operator
Your next question comes from the line of Kuni Chen with CRT Capital Group.
Kuni Chen - Analyst
Hi.
Good morning, everybody.
Just 1 more quick 1 on Grasberg.
Can you maybe lay out some of the near-term milestones?
When you meet again with the union and the mediators, and maybe just give us some perspective on how far apart the 2 sides may be at this point?
Richard Adkerson - Pres, CEO
Kuni, it wouldn't be appropriate for us to talk about that because as we've said and is well-known, been reported in Indonesia, one of the next steps is filing in labor court for a consideration following -- the union is not accepting the mediator's response.
So, how that goes is subject to that court case and it just wouldn't be appropriate for us to make any comments on specifics.
Kuni Chen - Analyst
Okay, so no comment at all on timing for labor court or --?
Richard Adkerson - Pres, CEO
No, that is uncertain.
We have filed our initial filing with the court, which is simply following the procedure set out under Indonesian law.
So, that's just where we are.
Kuni Chen - Analyst
Okay, thanks.
Operator
Your next question comes from the line of Richard Garchitorena with Credit Suisse.
Richard Garchitorena - Analyst
Thanks.
Good morning, everybody.
1 question for me, looks like the guidance for 2012 volumes came down by about 100 million pounds and 100,000 ounces.
I just wanted to make sure that largely related to the higher ore grade that you are mining this quarter, and basically it's going to decline as you move into the fourth quarter and into next year?
Richard Adkerson - Pres, CEO
Well, Richard, it's just more of the overall process of the continuing changes in mine plan.
And it's not all Grasberg, as I said, it's about half Grasberg but it's nothing unusual, it's just ordinary business course mine plan changes.
Richard Garchitorena - Analyst
Okay, thanks.
Operator
Your next question comes from the line of Brett Levy with Jefferies & Company.
Brett Levy - Analyst
Hey, guys.
In terms of the ramp up of the Climax moly mine, it does look -- kind of if you look at demand and supply growth here that might be the incremental capacity that really pushes prices down.
As you guys kind of look at your supply and demand dynamics for moly in the next couples years, is there something that just sort of causes you to say, We're just going to wait on this 1?
Richard Adkerson - Pres, CEO
Well, we've crossed the bridge in terms of completing spending the capital and hiring the people, so we're committed to -- we're very near to completed.
We've actually turned the power on to the mills, the mechanical completion there is going to be finished by the end of this year, roughly.
We started mining activities this past summer, we're hiring the workforce.
So, in terms of completing the project, we've crossed the rubicon.
Now, the issue is how are we going to operate it; and because of both Climax and Henderson, we have the ability to flex production to be responsive to market conditions and that's what we will do.
Brett Levy - Analyst
Okay, thanks very much, guys.
Richard Adkerson - Pres, CEO
All right.
Thank you, Brett.
Operator
Your next question comes from the line of Eliot Glazer with Pequot Capital.
Eliot Glazer - Analyst
Yes, good morning.
The situation in Indonesia is obviously muddled.
Recently, a story came out on Reuters, quoting a new energy and mining minister, Jero Wacik inaugurated today to replace Salas, said one of his first priorities was to renegotiate, quote- to unfair -unquote, production sharing contracts.
Can you give us your view on what that means?
Richard Adkerson - Pres, CEO
Well, the government has been restructured, the line up of ministers has changed.
You -- sort of like here in the United States, you can see press reports on all sorts of things and this has been a feature of our being in Indonesia now for 40 years.
We have ongoing discussions with senior government officials.
We've always have positive relationships, we've always had great support for our contracts.
Our government and our C Company has honored our contracts since the early 1970s and we're confident that we will be able to work together on a positive basis going forward.
So I would just -- that's the only comment I would make about that.
We don't anticipate there being any change with our relationships with the government, with the new cabinet situation.
Eliot Glazer - Analyst
The article goes on to say the local power to negotiate contracts has been handed over to a locally elected governor and the local government now has more power in these negotiations.
Any thoughts on that?
Richard Adkerson - Pres, CEO
Our contract is with the Government of Indonesia.
The contract has a status of law in Indonesia.
We work cooperatively with the provincial governor and his office with the regency, the community where we work with.
So, all those things are things we work with.
Our contract is with the central government.
Eliot Glazer - Analyst
Thank you.
Operator
Your next question comes from the line of Wayne Atwell with Rodman & Renshaw.
Wayne Atwell - Analyst
I have a quick question for you, sort of an overview question.
You have done a great job of managing your M&A program.
You have a number of wonderful projects in your queue.
But with a very strong balance sheet and good cash flow and dynamic environment in the commodities sector, what thought are you giving to diversifying and maybe going into met coal and iron ore?
There's some other commodities and you're in 2 or 3 of the best; but have you given thought to being diversified and having a broader profile?
Richard Adkerson - Pres, CEO
We always have our eyes open for opportunities that may come to us.
Our board has not made the decision to diversify just for the sake of diversification.
We believe -- we are confident in saying that success in the mining business depends on the quality of the assets and not the mix of the assets.
So, given the quality of the assets we have and the development opportunities that we have, it would take a significant opportunity to be attractive to us to compete with our own development projects.
But I believe the story of 2008 was that the macro economic forces affect base metals and other commodities across the board and diversification is not going to protect you from macro economic events.
So, we have the opportunity through our contacts with the industry and with the investment banks, opportunities are presented to us all the time.
And if we had the opportunity for a high quality asset that we believe would be -- add incremental value to our shareholders, we're prepared to take it.
But our strategy is focused on our internal investments and our internal growth prospects.
Wayne Atwell - Analyst
Great.
Thank you.
Operator
Your next question comes from the line of Isabel Darrigrandi with Celfin Capital.
Isabel Darrigrandi - Analyst
Yes, good morning.
My question is regarding Cerro Verde.
I would like to know if you are at all concerned that the current labor conflict could escalate at Cerro Verde given the current socio and political context in Peru, and the sometimes violent and illegal disruptions that other mining operators have had to deal with in recent years?
And, just if you could comment how you guys are handling the situation and if you believe you can resolve it in the near term.
Thank you.
Richard Adkerson - Pres, CEO
Thank you for your question.
Yes, we do, Isabel, believe we can resolve it in the near-term.
And we've had a peaceful situation with this strike and with previous issues related to labor at Cerro Verde.
We have a very positive relationship with the community of Arequipa because of the efforts we've made to improve the standards of living there.
And so, our situation there is different from some of the other mining projects in Peru.
We take it very seriously.
We listen carefully to the union and to the workforce, and we are working to get a resolution and we believe we are making current progress of getting it resolved.
So, we don't expect the kinds of violence that you suggested and we are taking this very seriously and believe we can meet reach a mutually acceptable resolution in the near future.
Isabel Darrigrandi - Analyst
Thank you very much.
Richard Adkerson - Pres, CEO
Thank you.
Operator
Your next question comes from the line of Sanil Daptardar with Sentinel Investments.
Sanil Daptardar - Analyst
Yes.
Thanks.
Just if the striking workers accept your offer, how much increase in cost -- operating cost do you see for 2012?
Richard Adkerson - Pres, CEO
I think that's speculation about that and about where we are with the process.
The cost increase would -- there would be a cost increase because we're offering a substantial increase to the workforce.
Labor is about 25% to 30% of our cost there, and so you can get some sense about what would be a reasonable increase on that.
But as I said in response to an earlier question, I'm reluctant to -- and I'm not going to get into too much details here because of the sensitivity of the negotiations and the fact that we've got this legal process going on, Sanil.
So, as things get clarified, we'll give more detailed guidance.
Sanil Daptardar - Analyst
Okay, thanks, Richard.
Richard Adkerson - Pres, CEO
The end of the day, Grasberg is going to continue to be a very low-cost producer because of the high grades of copper and gold.
And the truth is, commodity price movements are going to be much more important.
Sanil Daptardar - Analyst
Okay, thanks, Richard.
Richard Adkerson - Pres, CEO
Thanks.
Operator
Your next question comes from the line of Jorge Beristain with Deutsche Bank.
Jorge Beristain - Analyst
Thanks for the follow-up.
I just wanted to get clarification on the news of the Grasberg pipeline which was damaged over the weekend.
Ultimately, was that caused by a rock slide or was it actual sabotage and has it been fully repaired?
Richard Adkerson - Pres, CEO
Yes, it was sabotage.
This happens from time to time, it's not necessarily related to the strike.
Rock slides really are an issue with our pipeline.
There are just places as it goes from the mill down to the port where it is above ground and there's access to it.
And at times, illegal miners have disrupted it.
It's not a significant issue to get it repaired and get it operating again.
Jorge Beristain - Analyst
Thank you.
Operator
Your final question will come from the line of Sal Tharani with Goldman Sachs.
Mr.
Tharani, your line maybe on mute.
Sal Tharani - Analyst
Sorry.
Thanks.
Hi, Richard.
Can you give us an idea, your DOZ mine, which is at 80,000 tons per day right now of ore mining and you are planning to go to 240,000 once you see the open pit and start doing underground.
What is the timeframe you are looking at from going to 80,000 to 240,000?
Richard Adkerson - Pres, CEO
Well, that would be triggered when we stop mining the open pit and start mining operations of the Grasberg block cave.
So, if you think about 80,000 tons per day from the DOZ complex, we would look at ramping up to 160,000 tons per day in the Grasberg block cave.
We've done access work for that, we've begun initial mine development.
But there would be a ramp-up period from the time that we stop mining in the pit since this is a block cave that is directly underneath the pit, same ore body; and we can't start the caving operations so long as we are mining in the pit.
So, there would be a period of time for the ramp-up and we are looking at steps as how to mitigate that.
This is an issue that we've been -- had in our 10Ks and talked about for years in terms of mitigating that ramp-up period.
But there will be a ramp-up period from when the open pit stops and we start ramping up the Grasberg block cave.
If it's the same ore body, we are just mining it with a different mining method.
This is a case where we will do stockpiles to help us do that.
We're looking at ways of adjusting the operations in the DOC and MLZ to help mitigate this effect, but it is part of our future.
Sal Tharani - Analyst
Thank you very much.
Richard Adkerson - Pres, CEO
Alright.
Thanks, Sal.
Alright, well, we appreciate everyone's participation and interest in our call and we look forward to giving you further updates as the fourth quarter progresses.
Thanks, everybody.
Operator
Ladies and gentlemen, that concludes our call for today.
Thank you for your participation and you may now disconnect.