Operator
Welcome to the Northeast Utilities Q1 earnings call.
My name is Yvette, and I will be your operator for today's call.
At this time, all participants are in a listen-only mode.
Later, we will conduct a question-and answer-session.
Please note that this conference is being recorded.
I will now turn your call over to Jeffrey Kotkin.
Mr. Kotkin, you may begin.
- VP, IR
Thank you very much.
Good morning and thank you for joining us.
I'm Jeff Kotkin, NU's Vice President for Investor Relations.
Speaking today will be Jim Judge, NU Executive Vice President and Chief Financial Officer and Lee Olivier, NU Executive Vice President and Chief Operating Officer.
Also joining us today are Jim Muntz, President of our Transition Business; Jay Buth, our Controller; Phil Lembo, our Treasurer; John Marrera, our Director of Corporate Financial Forecasting Investor Relations.
Before we begin, I'd like to remind you that some of the statements made during this investor call may be forward-looking as defined within the meaning of the Safe Harbor provisions of the US Private Securities Litigation Reform Act of 1995.
These forward-looking statements are subject to risk and uncertainty, which may cause the actual results to differ materially from forecasts and projections.
Some of these factors are set forth in the news release issued yesterday.
If you have not yet seen that news release, it is posted on our website at www.nu.com and has been filed as an exhibit to our Form 8-K.
Additional information about the various factors that may cause actual results to differ can be found in our annual report on Form 10-K for the year ended December 31, 2012.
Additionally, our explanation of how and why we use certain non-GAAP measures is contained within our news release and in our most recent 10-K.
Now I will turn over the call to Jim.
- EVP and CFO
Thank you, Jeff, and thank you, everyone, for joining us this morning.
I know that you have a number of calls this week, as companies report their results in advance of the many conferences taking place over the next few weeks.
We appreciate that you are spending some time with us this morning.
Before I begin, I'd like to thank all of you in the investment community for the many calls and e-mails that we did receive expressing your concern for the safety and well-being of our employees in the wake of the terrible Boston Marathon tragedy on Patriots' Day.
It is much appreciated, as all of us in the Boston community attempt to move on from this horrific event, which occurred within the steps of our corporate office in Boston.
So thank you all.
In my remarks today, I will discuss our first-quarter results, recent financing activity, economic conditions in our region, and I will conclude with an update on various regulatory and energy policy issues, including recent storm filings and the FERC-ROE proceeding.
I'm sure that most of you saw our earnings release issued late yesterday.
We earned $228.1 million, or $0.72 per share this quarter.
While this is ahead of Wall Street's expectation for the quarter, it is very consistent with our $2.40 to $2.60 per-share earnings guidance for the year.
So we feel comfortable saying that we are on plan.
I should remind you that this is the last quarter when we will be comparing pre-merger NU with post-merger NU, so future earnings reports will be more an apples-to-apples basis.
Aside from the addition of NSTAR to this year's results, one of the bigger drivers for the quarter was weather.
We had record warmth in the first quarter of 2012 and pretty typical temperatures in the first quarter of 2013.
We had a typical, cold New England winter this year.
Heating degree days were up nearly 21% in the Hartford area this year compared to 2012.
As a result, we experienced a 3% increase in electric sales for the quarter and a 22% increase in natural gas sales.
For legacy NU, higher electric and gas sales added $0.09 per share to earnings per share based on the pre-merger share count.
Another significant factor that benefited earnings was the continued investment in our transmission business.
Transmission earnings totaled $79.9 million in the first quarter of 2013, compared with $46.3 million in the first quarter of 2012.
The increase was due in part to adding in nearly $18 million of NSTAR transmission earnings to the NU consolidated transmission results in the first quarter of this year.
Approximately $16.5 million of the increase, or about $0.09 per share, resulted from transmission earnings growth in the legacy NU system.
It reflects continued investment in our transmission infrastructure over the past year and a lower effective tax rate that resulted from the resolution of state tax audits.
That resolution added approximately $6 million to our transmission earnings in the first quarter of this year.
Overall, on a consolidated basis, the tax resolution added approximately $13.5 million, or $0.04 per share to our first-quarter 2013 earnings.
Much of the increase in transmission infrastructure occurred at Western Mass Electric, as we near completion of the Greater Springfield Reliability Project.
Lee will discuss Greater Springfield and other news projects shortly.
Turning to distribution, we realized a decline in operations and maintenance costs, which added $0.08 per share to the quarter's results.
A number of factors contributed to this decline.
First, during the mild, snowless first quarter last year, we were able to accomplish a good deal of maintenance that normally would've been done later in the year.
That raised O&M in the first quarter of 2012.
Due to the snow and storms of the first quarter of this year, less routine maintenance was undertaken, and much more time was spent on storm outage recovery.
So much of the reduced O&M is really a timing issue.
We do not expect to see such year-over-year reductions in distribution maintenance costs as we move through the year.
Second, we are implementing efficiencies across the merged Company, where we expect the savings to be permanent.
Those efficiencies are helping us achieve the 3%-per-year reduction in core O&M that we first discussed with you last October and which we expect will continue through 2015.
We are on track to achieve those reductions, while at the same time continuing to improve reliability and customer service.
We continue to feel very comfortable with our 2013 earnings guidance of $2.40 to $2.60 per share, as well as our longer-term earnings per share growth rate of 6.9% -- excuse me, 6.29% off the $2.28 per share of operating earnings that we recorded in 2012.
There were a few other earnings drivers I should mention that helped us in the first quarter of this year.
Yankee Gas and Public Service of New Hampshire each benefited from a $7 million annualized distribution rate increase that took effect last summer.
Together they added about $0.01 per share to earnings in the quarter.
Turning to the parent and unregulated Companies, we earned $7.2 million in the first quarter of 2013.
That excludes $1.8 million of after-tax merger expenses.
In the first quarter of 2012, the pre-merger parent and unregulated Companies had net expenses of $2.6 million, and that excludes $1.1 million of merger expenses.
This year's improvement reflects lower interest expense, earnings from NSTAR communications, and a lower effective tax rate that resulted from the resolution of the tax audits that I mentioned earlier.
Lower interest expense was driven by a couple of factors.
One is the low rate we are paying on Northeast Utilities' commercial paper program, which replaced bank borrowings last summer.
The effective rate of the commercial paper program, as of the end of March 2013 was about 35 basis points, compared to a costs for short-term debt of about 2% from the same period last year.
Another factor was the maturity in April 2012 of $263 million of NU-parent 7.25% notes, which were refinanced last spring when NU issued $300 million of variable-rate notes that mature in September of this year.
In addition to that maturity this year, NU has another $250 million of 5.65% notes that will mature on June 1. With these two large NU parent maturities due within three-and-a-half months of each other, we are evaluating refinancing strategies for the $550 million of maturing debt.
Another financing event that will have a positive impact going forward and occurred just yesterday was PSNH's redemption at par of $109 million of pollution-control revenue bonds that were due to mature in 2021.
The rate on those bonds was 5.45%, and we expect to refinance this debt in the near-term.
Let me comment on economic conditions in our region.
I would characterize the local economy as generally better than the US, and it is exhibiting some signs of improvement, particularly in the labor market, when compared to the US.
The unemployment rate for Massachusetts dropped in the first quarter, declining to 6.5% from 6.7% at year end.
The unemployment rate for Connecticut also decreased in the first quarter to 8% from 8.1% at year end.
While the unemployment rate in New Hampshire did increase slightly in Q1 to 5.8% from 5.7% at year end, it is still well below the national rate, which is now at 7.7%.
Also, the housing market in parts of our service area is showing signs of strength when compared to the US.
Now I would like to provide you with a brief update on Connecticut's comprehensive energy strategy, followed by a regulatory update that covers the filings we made in March associated with prior storm costs, as well as recent developments around the FERC ROE case.
But first, the developments around Connecticut's energy strategy.
On February 19, Connecticut issued a final version of its plan.
In its simplest terms, the goal is cleaner, cheaper, more reliable energy for Connecticut customers.
The strategy includes a series of policy proposals, an aim to expand energy choices, improve environmental conditions, create clean-energy jobs, and enhance the quality of life for customers in the state.
It includes a seven-year initiative for expanding natural gas use, with a goal of providing nearly 300,000 utility customers with access to natural gas and building an estimated 900 miles of new natural-gas mains.
In addition to natural-gas expansion, the strategy also calls for significant expansion of energy-efficiency investment in Connecticut and a review of Connecticut's renewable-energy portfolio standards, with the potential for including Canadian hydroelectric generation as a qualifying resource under certain circumstances.
It also includes investment in alternative fuel transportation.
Many of the recommendations in the strategy require actions by PURA, as well as the Connecticut legislature.
Various legislative proposals concerning redefining and expanding renewables, expanding energy efficiency programs, and encouraging installation of natural gas heat have been reported favorably out of the legislature's Energy and Technology Committee, and are likely to be considered by the full legislature before the session ends on June 5. We look forward to the opportunities that this energy initiative will provide Connecticut and Northeast Utilities over the long term.
Now for some recent regulatory updates.
Storm restoration was again a focus of our attention in the first quarter of this year.
Following on the heels of storm Sandy in October last year was a major blizzard in February, known as Nemo, which caused extensive damage to NSTAR Electric's Southeastern Mass serviced area.
That is four devastating storms in a 16-month period, the likes of which we hadn't experienced in over 20 years.
Nemo's restoration resulted in about $100 million of deferred storm costs.
Combined with the approximately $570 million of deferred storm costs from 2011 and 2012, mostly at Connecticut Light and Power, we now have about $670 million of costs we need to recover.
On March 1, NSTAR Electric filed a request with the Mass CPU for recovery of approximately $35 million of costs related to tropical storm Irene and the October 2011 snowstorm, over a five-year period, beginning January 1, 2014, in accordance with our Massachusetts merger settlement agreement.
We also expect NSTAR Electric to file for 2012 and 2013 major storm costs later this year.
On March 28, Connecticut Light and Power filed a request with Connecticut's Public Utility Regulatory Authority for recovery of restoration costs associated with major storms which occurred in 2011 and 2012.
Effectively, the request seeks recovery of $414 million of deferred costs over a six-year period beginning December 1, 2014.
The amount reflects a reduction of $40 million we agreed to forego as part of the Connecticut merger settlement agreement.
A schedule has not yet been set for the Connecticut Light and Power docket.
Turning from storm recovery to FERC proceedings, the complaint by various parties against the base ROE earned by New England transmission owners lead to the hearing phase this coming Monday.
On April 17, the transmission owners and other parties of the proceeding filed updated transmission ROE analysis with the FERC, updating information previously filed to reflect current market conditions.
Subsequently, on April 26, the transmission owners further updated the analysis to reflect a revision to one Company's earnings growth rate, which moves the ROE 50 basis points higher and underscores the sensitivity of the analysis to minor changes.
This updated analysis results in a midpoint of 10.3% using the New England transmission owners' projected methodology approach and 9.7% using the historical methodology.
The analysis indicated that our current base ROE of 11.14% continues to be within the zone of reasonableness, and therefore should not be changed.
Based upon our updated testimony, the range is in two scenarios.
One is 6.1% to 13.2%, and the other is 7.3% to 13.2%.
So the 11.14% is well within those ranges.
Other parties recommended reducing the base ROE by approximately 200 basis points.
To remind you, each 10 basis-point reduction would be the equivalent of $2.1 million of annual earnings at our current investment level.
We continue to believe that FERC's decision in this complaint will be viewed widely as an important statement on efforts to promote transmission development across the United States.
We and others in the industry believe that a significant reduction in the ROE for New England's transmission owners would have a chilling effect on transmission investment throughout the country and would run counter to FERC's very successful policy since 2005 of encouraging transmission investment as a means to make the grid more reliable and secure.
There's more to come on this issue and an initial decision from an administrative-law judge is scheduled for September 10.
We expect a decision from the FERC commissions -- excuse me, from FERC commissioners in mid to late 2014, which could be followed by requests for reconsideration and an appeal process.
That concludes my formal remarks, so I will turn the call over to Lee.
- EVP and COO
Thank you, Jim.
I will provide you with an update on our major capital projects and our natural-gas-expansion initiatives, and then turn the call back over to Jeff for Q&A.
The Greater Springfield Reliability Project, which represents more than half of our expenditures on the NU's family of projects, reached a significant milestone in early March, when we energize the NU 345-kV section between Connecticut and Massachusetts.
GSRP is now about 95% complete, with some additional substation and 115-kV line work still to go over the balance of this year.
Overall, this project remains on schedule and has been a huge success providing good operators with a critical new link between Western Massachusetts and Connecticut and helping us to continue to reduce congestion costs that are passed through to customers.
We now expect it to be completed as much is 5% below its $718 million budget.
We are very pleased with the management of this complicated project, and it illustrates our continued decade-long core capability of managing large transmission projects and completing them on or below budget and on or ahead of schedule.
Second large piece of news is the three-state Interstate Reliability Project, or IRP.
The Connecticut Siting Council approved the Connecticut section of IRP in January.
Meanwhile, our partner in IRP, National Grid, has received a unanimous endorsement for the project from Rhode Island utility regulators, who have forwarded that endorsement to state siting regulators.
Siting hearings have begun in Massachusetts.
We still need Rhode Island and Massachusetts siting approvals, as well as environmental permits in Connecticut and Rhode Island, and the go-ahead from the Army Corps of Engineers.
We expect to commence substation construction in late 2013 or early 2014 and line work in mid 2014.
Our segment is still expected to cost $218 million.
On the third major piece of news, CL&P's Greater Hartford Central Connecticut project, we continue to work collaboratively with ISO-New England on documenting the results of the need analysis to resolve numerous transmission constraints in central Connecticut.
We believe ISO-New England identified a number of projects throughout the Greater Hartford and Central Connecticut regions that must be built.
ISO is expected to identify the preferred transmission solutions in late 2013 or early 2014, which are will likely to include man 115-kV line upgrades.
These projects collectively are expected to cost around $300 million, and are likely to require much less siting and permitting than the single 345-kV Central Connecticut Reliability Project we had previously discussed with you.
Elsewhere in the transmission system, work on NSTAR Electric's $106 million project to add a 345-kV link to Cape Cod commenced in September 2012, and will be completed this summer.
It is currently approximately 60% complete.
I think many of you have been focused on our work on the Northern Pass Project.
As you may know, the project announced at the end of 2012 that it had identified a new route in a portion of New Hampshire's North Country.
Since that time, our project team has worked very hard to finalize the details of this new proposal and to continue our outreach efforts with local citizens, stakeholders, and communities.
While we had hoped to share the details of our new routing proposal by now, we have decided to continue our work on building support for the new route to ensure it is the best possible proposal for New Hampshire.
There are various options we are evaluating as part of the commitment to ensure that our new route addresses the concerns raised regarding the project's potential to impact scenic views.
We believe it is in the best interest of land owners, communities, and all stakeholders for us to continue to take the time now to consider these various options and refinements.
Of course, once these options and refinements are finalized, we will initiate formal filings and the next step of the public review process.
As a result of this ongoing work, we expect the project to be complete by mid-2017.
The need for the Northern Pass Project is clearer now than ever before.
Volatility in the New England energy markets this past winter underscored our region's need for new sources of clean, low-cost power to diversify our power supply and secure our energy future.
Northern Pass will bring that diversity to New Hampshire and New England in the form of 1,200 megawatts of clean energy from the Hydro-Quebec system, almost all exclusively hydroelectric power.
The benefits will be significant, and they include helping to address New England's acute need to diversify its electric energy supply, which is currently more than 50% dependent on natural gas.
ISO-New England has identified this as a top risk factor and recently warned that New England came dangerously close to an emergency condition this past winter because of the challenges created by our over-reliance on natural-gas generation, freeing up significant natural-gas supplies now used for generation that instead could be used by the region to reduce its dependence on imported oil for space heating.
Reducing carbon dioxide emissions by up to 5 million tons annually, and also, that would be the equivalent of taking approximately 900,000 cars off the road.
Lowering electric costs for New-England consumers by an estimated $200 million to $300 million annually, by displacing more costly fossil fuels, and providing unique and significant economic benefits to the state of New Hampshire, including the creation of 1,200 jobs during construction, approximately $26 million of annual new property taxes, the local communities, and the state.
We continue to estimate that the project will cost $1.2 billion, including the $45 million we expect to expand on Northern Pass this year.
We continue to project $636 million of transmission capital spending in 2013.
Over the first three months of this year, we invested $141 million in our transmission facilities.
On the distribution side, we expect to invest approximately $670 million on our electric infrastructure and $170 million on our natural-gas distribution facilities this year.
In the first quarter of 2013, we invested $126.5 million in our electric-distribution system and $25.5 million in our natural-gas delivery system.
We continue to see increased demand from residential and nonresidential customers to convert their space-heating systems from oil to natural gas.
As I said in our year-end call, we had nearly 8,000 [new hundred] new space-heating customers between NSTAR Gas and Yankee Gas last year.
We currently project approximately 9,100 new space-heating customers in 2013.
In the first quarter, we added 2,800 heating customers, 1,500 which were conversions of existing residences and 13 were a combination of new residential construction and commercial customers.
During our previous earnings call, we discussed Connecticut Governor Malloy's energy strategy.
One of the cornerstones of that strategy is to develop a new approach to increase the penetration of natural gas in Connecticut.
Yankee Gas is now well advanced in preparing a proposal that will fill the state regulators -- we will file with state regulators and the state energy office in the next couple of months.
Areas may include changes to the hurdle-rate model for making new investments to connect customers by extending the payback period, and other possible changes, such as a capital expenditure tracker for new mains.
If approved, such changes would accelerate the conversions in 2014 and beyond.
Turning to generation, with the high gas prices driving high wholesale electricity prices in the first quarter of 2013, PSNH generating units operated well, and with much higher capacity factors than in the first quarter of 2012.
PSNH generating units generated more than 1.1 million megawatt hours in the first quarter of 2013, as compared with 750,000 megawatt hours in the first quarter of 2012.
That's a nearly 50% increase.
We estimate PSNH's generation saved customers about $42.5 million in the quarter, as compared with buying the same amount of power in the wholesale market.
Now I'd like to turn the call back over to Jeff for Q&A.
- VP, IR
Thank you, Lee.
And I will turn the call back to Yvette to just remind you how to enter questions.
Operator
Thank you.
We will now begin the question-and-answer session.
(Operator Instructions)
- VP, IR
Thank you very much.
Our first question this morning is from Travis Miller from MorningStar.
- Analyst
Wondering if you could go a little bit more into that 4% core gas growth?
You mentioned it here at the end of the call, but was there anything in the quarter unusual?
Is there any specific program you guys ran, or any kind of major industrial customer who came in?
Anything one-off or is that a growth rate that we can expect throughout the year?
- EVP and CFO
When you look at the customers that we are adding over our total [cash] customer base, we are getting 2% a year, basically, in customer growth.
What you've seen here in this first quarter is the usage per customer has gone up as well.
I'm not going to commit to say that the underlying gas growth number would be 4% long term, but we certainly anticipated higher growth on the gas business than in the electric side.
And that's consistent with the guidance, the long-term guidance that we provided the street.
- Analyst
What do you think is driving that higher customer usage number, apart from the weather?
Just a core guess, usually it's a little different than what we're seeing across the country.
- EVP and CFO
I think the economy is picking up.
And as I say, you've seen a number of conversions as well.
The combination of those two has gas as the preferred fuel of choice.
- VP, IR
Next question is from Greg Gordon from ISI.
- Analyst
Besides wondering whether the Knicks are going to beat the Celtics when they come up there for the next game, I wanted to know -- it's been an awfully long time since -- that we've been waiting for the finalization of the route on Northern Pass.
I know you guys articulated on the call that the reason for the delay is you just want to firm up local support.
But are there any other extent issues, whether it's underlying changes in economics or costs or things going on up in Canada or down in Connecticut with regard to political sensitivities to changing economic dynamics that are also factors here?
Or is this just finalizing all the small details around getting firm support for the route that is causing the delay?
- EVP and CFO
I would say it's really the latter, Greg.
This is an important project to the state of New Hampshire, to the New-England region, and to the Company.
I think Lee laid out well the merits of the project in terms of environmental benefits and savings for customers and jobs and property taxes in New Hampshire.
We really are just trying to build as much support for the project as we can, addressing any concerns or issues that people have, so it's a matter of increased outreach to the community.
- EVP and COO
And I would just add to that, Greg, that if you look at the economics of the project, looking at where New England is in terms of the volatility, the energy markets in the winter, when we have -- we had, certainly, a more-than-adequate supply for the gas companies for the distribution part of the business, but there is a severe shortage of pipeline capacity for generation.
And what that does is it really, obviously, pushes prices high.
That's the kind of a market where HQ can capture that volatility, and it actually becomes more profitable for them as a result of their situation, which really has no immediate fix on the horizon.
So we think the economics of the project continue to improve.
- Analyst
Okay.
Well, there is a significant gas pipeline expansion coming in from the Algonquin in the 2015-2016.
So I think I see your point that this winter and probably next winter are extremely constrained, but I don't think the gas situation in New England in the longer term is actually that constrained.
- EVP and COO
It actually is constrained, because we have run all the analysis and the pipeline is constrained.
Even with the proposed pipelines coming in, that will certainly solve the issues for the EDCs and solve the issues around supporting our continued growth.
But it will not solve the issue for generation, and that's also the position of ISO-New England as well.
- Analyst
Okay.
Thank you for clearing that up.
- VP, IR
Next question is from Julien Dumoulin-Smith from UBS.
- Analyst
Following up on the last question here, obviously, the RPS Bill moved out of the Senate yesterday.
To what extent does a 5% cap on Hydro limit the ability for the Northern Pass Project to qualify into the RPS as a Hydro resource, or transporting Hydro resources?
- EVP and CFO
We think the passage of the bill by the Senate yesterday is good news for the state and its electric customers.
It furthers the Governor's goals of cheaper, cleaner, more reliable.
If I understand it correctly, large Canadian Hydro would qualify for renewable status only if the state fails to achieve its goal of 20% renewable by 2020.
However, Canadian Hydro could still help the state meet its carbon reduction goals, whether that Hydro comes from Québec or the Maritime provinces.
Even though it is limited to a 5% RFP, it's more than existed prior to this legislative proposal.
I think it's consistent with the Governor's goals in that he's welcoming all large-scale Hydro.
He's not having the government pick winners here.
We think the RFP is likely to occur later this year if the legislation is passed.
- Analyst
Great, and just to be clear, the 5%, that would allow for a partial contracting of Northern Pass or something if you were to win that RFP.
- EVP and CFO
That's correct.
- Analyst
Excellent.
And then going back a little bit in terms of timeline on the routing, not to rehash that last question too much here, but at what point do you think you'll be ready to definitively say we have our routing ready to go.
Is it another three months or another by-year-end at this point?
- EVP and COO
Julien, right now just based upon where we are, I would think by the middle of this year.
So we're talking around the July timeframe, we should be ready to announce the route.
- Analyst
Great.
And then going back to the oil to gas element here, how much of an opportunity is there on the table, particularly given some of the other options pursued at the legislative level to accelerate that conversion rate?
What is the upside here, potentially, in terms of putting capital to work?
- EVP and COO
Well, if you think about the expansion plan over a 10-year period we could have had, between the two companies, the majority of which would be Yankee Gas, we could have had about 160,000 customers.
So you could add about 100,000 customers, Yankee Gas and approximately another 60,000 customers at NSTAR Gas.
So you are talking about taking the Company right now -- the total gas Company is about 490,000 customers.
You are talking about over 600,000, 650,000 customers over a 10-year period.
- VP, IR
Next question is from Paul Patterson from Glenrock.
- Analyst
Just back to Northern Pass for a second here, should we think that, basically, that there have been some delays in terms of getting this routing thing completely resolved.
Would you guys still be -- generally speaking, you guys are still very confident though, am I right, in that you're -- that this is going to actually come to fruition?
You were mentioning the economics and everything improving.
On a scale of 1 to 10, how should we think about the outlook of this project as to where you saw it a quarter ago?
- EVP and COO
Paul, this is Lee Olivier.
I'm not going to opine on your scale.
- Analyst
Okay, you don't have to.
- EVP and COO
I'm not going to opine on your scale, but I can tell you we are very, very confident that this will be built.
For all the reasons I cited in the call, this project looks better and better.
If you go run out renewables, the portfolios for all of these states, which we have, over the course of the next 10 years, it is very, very clear.
You can't meet renewables without creating expenses that would just crush the economy of New England.
This line, from the standpoint of reliability actually, because I talked about what happened this winter in terms of reliability.
That was very, very close in terms of doing load shed this winter.
So if you look out where we are in the region with the shortage of gas, if you look at the renewable portfolio, and all of these states also have carbon-reduction portfolios, this line will be built.
It's different from anything we've done before, because we've always had the right of eminent domain.
It's been a pure reliability project, and this one you don't.
So you've got a lot of stakeholders.
Our view of this is to get it right with the stakeholders now, and that will save a lot of problems that you would have as you start the actual siting process, so it takes a little bit more time.
But this line will be built.
- Analyst
Okay.
Just wanted to clarify that.
Thanks a lot, guys.
- VP, IR
Next question is from Michael Lapides from Goldman Sachs.
- Analyst
Congratulations on a great quarter.
I know you can't really opine on the FERC case.
And honestly, I'm not one who would call myself a great predictor of anything that the FERC is likely to do.
But when you just think long term and strategically where you want to allocate capital over a 5- to 10-year period, if there is a significant reduction in the authorized ROE for you and other transmission providers, would that significantly altered your views on, hey, transmission is a good place to allocate capital over long periods of time?
- EVP and CFO
I think my comments earlier, Michael, commented on that.
That to the extent there is a dramatic reduction here, I do think it would not only chill investment interest at Northeast Utilities, but across the country.
When you have distribution investments that certainly have less risk in terms of siting and development and what have you and the returns in the distribution business are north of 10%, it's hard to imagine that the transmission business, much more complex, much more lead time required, more risk -- development risks, would be -- it should get a premium over what the investment profile is for distribution.
I do think it would have a significant impact on where utilities would opt to invest their capital in the future.
- Analyst
Got it, and one question, unrelated topic.
Just O&M management and cost reductions post merger, how are you think you're tracking so far relative to expectations outlined at the analyst day in October?
- EVP and CFO
I'd say that we are spot on.
The guidance that we have given the street is that we think we will be able to achieve a 3% reduction in O&M a year for '13, 14, and '15.
That translates to about a $50-million-a-year reduction in O&M.
When you look at what we achieved in the first quarter here, it was close to $25 million, so it would imply that we are ahead of pace, but the reality is that there were some timing issues.
There's spending on maintenance that we didn't get do this quarter that we did a lot of a year ago.
So when you adjust for the timing, I would say that we are pretty much right on track with where we want to be with that 3% reduction that we've committed to.
- Analyst
Meaning that your reduction year-over-year at this quarter was a little bit bigger, but you could expect maybe less of a reduction in future quarters during '13.
- EVP and CFO
Exactly, Michael.
- Analyst
Thank you, guys.
Much appreciated, and congratulations on a good quarter.
- VP, IR
Next question is from Maury May from Wellington Shields.
- Analyst
Getting back to the potential for new gas customers, I think you said that you had potential for 100,000 at Yankee and 60,000 at NSTAR Gas, so that would be 160,000.
How can we translate that potential new-customer growth in to rate-base growth.
In other words, do you have a rule of thumb of rate-base growth for customer addition, anything like that?
- EVP and COO
Maury, this is Lee.
We don't have a rule of thumb for that, but if you just look at Yankee Gas as an example, for new customers, the connections now, we spend about $27 million a year for new-customer connections.
If you think about that over the 10-year horizon, that works it way up to about $80 million and $90 million a year of CapEx.
So it's a fairly significant expansion of CapEx, and that is just Yankee.
We have started a similar process of educating legislators and policymakers in Massachusetts, and should there be a Connecticut type of legislation, obviously, that growth in NSTAR Gas could be higher as well.
- Analyst
Okay.
So at Yankee, for example, you are spending $27 million this year for the addition of how many customers?
- EVP and COO
We will do about 4,600 customers, Yankee this year.
- VP, IR
Next question is from Jonathan Reeder from Wells Fargo.
- Analyst
On your analyst-day slides, you had mentioned about the additional CapEx upside over the next several years from potential transmission projects.
Are there any specific items, such as power plant shut downs, that we are waiting to see how they play out?
Or is this just more continuing to evaluate the recently combined system and make proposals into the ISO?
When do you think you might have a better idea on these potential opportunities?
- EVP and COO
Jonathan, this is Lee Olivier.
I think from the standpoint of our [cash] that we provided last fall, which is essentially the $3.9 billion, we actually know where all of that $3.9 billion go.
We know every project, where it is.
Many of these, the majority of them have approvals through the ISO-New England regional system plan, so we literally know where every bit of that $3.9 billion is going right now.
To the extent that there is additional plant shutdowns, power-plant shutdowns, that could create some additional opportunity.
- Analyst
But at this juncture, I guess you haven't identified anything yet outside of that original $3.9 billion in the region?
- EVP and COO
No, no.
Nothing at all.
Obviously, our model has continued to look out the system.
We continued to find areas that need transmission fixes.
As we do, we will update you in the fall.
- VP, IR
Next question is from Andrew Weisel from MacQuarrie.
- Analyst
I saw the comment in the press release that weather-adjusted and Leap-Day-adjusted electric sales were up 1%.
Can you give a little more detail on the split between states and between customer classes?
- EVP and CFO
I don't have that detail, Andrew, in front of me.
What I would say is that we have seen more robust growth in the residential sector on both the electric and gas side than commercial.
I don't have numbers to quote by state or even the combined, but a pretty good quarter, 1% growth on the electric side and 4% base growth on the gas side.
- Analyst
Okay, great, and then one quick one on Northern Pass.
I certainly appreciate that it's a small but vocal minority that are very opposed to it in New Hampshire.
And it sounds like you guys are really going as far out of your way as you can to try to accommodate that group.
Is there a certain point at which you just say, agree to disagree, we're going to move forward?
It's been a moving target, and now you are saying July.
Is there a certain goal you are trying to reach in terms of these customer outreach programs?
Or where do you just say we can't make everybody happy; it's for the greater good?
- EVP and COO
This is Lee Olivier, Andrew.
I guess we will say, we are not there yet.
We are not at a point where we are going to plow through this thing.
It's because we really do think it is appropriate.
PSNH has had a long history of success working with the communities and regulators.
They are very, very good at this.
Right now we are committed to work constructively with, both the state and the local communities and other key stakeholders.
I would say at this point in time, it's premature to say that we would plow on.
We think we are very, very close on this.
Our partner in this, Hydro-Quebec, has a long history as well of working very well in the communities.
They are every bit as concerned as we are about making sure that the outcome here is right in the state and in the communities.
As then as you said, you're never get everyone to concur with you, to agree with you.
There will always be some that will oppose, but once we feel we have a broad enough consensus, we will move forward.
- Analyst
Can you elaborate on what some of the sticking points are?
Is it where the lines go?
Is it buried versus above-ground?
Is it the height of the towers?
- EVP and COO
It's all of the above.
It's literally all of the above.
It's all of those issues.
There is, for instance, land in which we have purchased, we own, or we have bought easements on, and in some of those areas, they're fairly scenic.
And so, where do you lay the line out?
Do you lay it out in front of the tree line of a ridge, or do you lay it out around the back?
That costs you some more money to go around the back of the hill.
But those are all the kinds of conversations we're having.
As we have said, most of these transmission towers are about 135 feet.
We have found ways to get most of the transmission towers down to 85 feet.
That is after a long, long consultation with the National Forest Service.
It's that type of interaction with key stakeholders that takes the time.
- VP, IR
All right.
We don't have anymore questions currently, so we want to thank you for joining us today.
If you have any questions later in the day, you can give either John or me a call.
Have a great day, good luck on the other earnings calls.
- EVP and CFO
Thank you.