Ameresco, Inc. (AMRC) 2024 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

    Operator

  • Thank you for standing by. My name is Demi, and I'll be your conference operator today. At this time, I would like to welcome everyone to the Ameresco, Inc., fourth-quarter and full-year 2024 earnings conference call. (Operator Instructions)

    感謝您稍候。我叫 Demi,今天將擔任本次電話會議的接線員。此刻,我謹代表主辦方歡迎各位參加 Ameresco, Inc. 2024 年第四季及全年財報電話會議。(接線員指示)

  • I would now like to turn the conference over to Leila Dillon, Senior Vice President, Marketing and Communications. Please go ahead.

    現在我想將會議交給行銷與傳播資深副總裁 Leila Dillon。請開始。

  • Leila Dillon - Senior Vice President, Corporate Marketing and Communications

    Leila Dillon - Senior Vice President, Corporate Marketing and Communications

  • Thank you, Demi, and good afternoon, everyone. We appreciate you joining us for today's call. Our speakers on the call today will be George Sakellaris, Ameresco's Chairman and Chief Executive Officer; Mark Chiplock, Chief Financial Officer; and Nicole Bulgarino, President of Federal and Utility Infrastructure. In addition, Mike Bakas and Josh Baribeau will be available during Q&A to help answer questions.

    謝謝你,Demi,各位下午好。感謝各位參加今天的電話會議。今天出席的講者包括:Ameresco 董事長兼執行長 George Sakellaris;財務長 Mark Chiplock;以及聯邦與公用事業基礎建設總裁 Nicole Bulgarino。此外,Mike Bakas 與 Josh Baribeau 也將在問答環節待命協助回答問題。

  • Before I turn the call over to George, I would like to make a brief statement regarding forward-looking remarks. Today's earnings materials contain forward-looking statements, including statements regarding our expectations. All forward-looking statements are subject to risks and uncertainties. Please refer to today's earnings materials, the Safe Harbor language on slide 2 of our supplemental information, and our SEC filings for a discussion of the major risk factors that could cause our actual results to differ from those in our forward-looking statements.

    在我把電話交給 George 之前,我想就前瞻性陳述做一段簡短說明。今天的財報資料包含前瞻性陳述,包括關於我們預期的陳述。所有前瞻性陳述均受風險與不確定性影響。請參閱今天的財報資料、我們補充資訊第 2 頁投影片中的「安全港」聲明,以及我們向 SEC 提交的文件,以了解可能導致實際結果與前瞻性陳述不同的主要風險因素。

  • In addition, we use several non-GAAP measures when presenting our financial results. We have included the reconciliations to these measures and additional information in our supplemental slides that were posted to our website.

    此外,在呈報財務結果時,我們使用若干非 GAAP 指標。我們已在發布於網站的補充投影片中提供這些指標的調節表及其他補充資訊。

  • Please note that all comparisons that will be discussed today are on a year-over-year basis, unless otherwise noted. I will now turn the call over to George. George?

    請注意,除非另有說明,今天討論的所有比較皆以年對年為基礎。現在我將電話交給 George。George?

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Thank you, Leila, and good afternoon, everyone. We ended 2024 on a strong note, which contributed to our annual revenue and adjusted EBITDA growth of 29% and 38%, respectively. We also delivered a record project backlog and placed a record level of energy assets into operation. Fourth-quarter results were highlighted by 21% revenue and 59% adjusted EBITDA growth, with particular strength in our projects and energy asset businesses as well as the benefit from the successful sale of our noncore AEG business.

    謝謝你,Leila,各位下午好。我們以強勁的態勢結束 2024 年,推動全年營收與調整後 EBITDA 分別成長 29% 與 38%。我們也創下專案在手訂單(backlog)新高,並將創紀錄水準的能源資產投入營運。第四季的亮點包括營收成長 21% 與調整後 EBITDA 成長 59%,其中以我們的專案與能源資產業務表現尤為強勁,並受惠於成功出售非核心的 AEG 業務。

  • Growth in our contracted backlog was a key highlight, increasing 92% year over year with a record of $1.1 billion in conversions during the fourth quarter. This resulted in total project backlog growth of 24% year over year to a record $4.8 billion.

    合約在手訂單的成長是關鍵亮點,年對年增加 92%,且第四季轉換金額創紀錄達 11 億美元。因此,專案在手訂單總額年對年成長 24%,達到創紀錄的 48 億美元。

  • During the quarter, we also brought an additional 31 megawatts of energy assets into operation, bringing our annual additions to a record 241 megawatts. Our total operating energy assets now stand at 731 megawatts with another 637 megawatts in development.

    本季我們也新增 31 兆瓦的能源資產投入營運,使全年新增量創紀錄達 241 兆瓦。我們目前營運中的能源資產總量為 731 兆瓦,另有 637 兆瓦正在開發中。

  • While I'm very proud of our team's accomplishments, we did encounter challenges from two large legacy projects that significantly impacted our results during the fourth quarter and the full year. While we do our best to anticipate and mitigate these impacts, there are times when we experience schedule delays and significant inflation, which result in unrecoverable cost overruns.

    雖然我為團隊的成就感到非常自豪,但我們確實在兩個大型既有(legacy)專案上遭遇挑戰,對第四季與全年業績造成重大影響。儘管我們盡力預先評估並降低這些影響,但有時仍會遇到工期延誤與顯著通膨,導致無法回收的成本超支。

  • Over time, we have tightened our project review process and applied what we have learned to better mitigate this risk. We believe that the financial impact of those two projects is largely behind us. Importantly, our team's strength lies in our ability to successfully execute and deliver on hundreds of projects in a dynamically changing industry.

    隨著時間推進,我們已收緊專案審查流程,並將所學應用於更有效地降低此類風險。我們相信這兩個專案的財務影響大致已經過去。更重要的是,我們團隊的強項在於能在快速變動的產業中,成功執行並交付數百個專案。

  • Now I would like to have Nicole comment on the impact of the new administration in Washington. Nicole?

    接下來我想請 Nicole 評論華盛頓新政府的影響。Nicole?

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • Thank you, George, and good afternoon, everyone. We are working diligently to stay on top of all the information and changes coming out of DC that might impact the industry. As many of you are aware, federal policies play an important role in our business. The federal government is a significant customer, representing approximately 20% of our 2024 revenue.

    謝謝你,George,各位下午好。我們正努力掌握來自華府(DC)的所有資訊與變動,以評估其可能對產業造成的影響。如各位所知,聯邦政策在我們的業務中扮演重要角色。聯邦政府是重要客戶,約占我們 2024 年營收的 20%。

  • This work includes a wide variety of federal entities, both civilian and military. While to date, the direct impact to Ameresco has been minimal, we have encountered one cancellation on a project contracted earlier in January and a pause on two other contracts. And given the recent changes in the federal workforce, we are anticipating the potential for additional delays.

    這些工作涵蓋多元的聯邦機構,包括文職與軍方單位。截至目前,對 Ameresco 的直接影響不大,但我們在 1 月稍早簽約的一個專案遭遇取消,另有兩份合約被暫停。此外,鑑於近期聯邦人力的變動,我們預期可能出現更多延遲。

  • That said, the majority of our federal projects are continuing in their normal cadence and on schedule. I believe that our federal work, especially through the well-established energy savings performance contract mechanism, is well aligned with the approach and goals of the current administration. ESPCs allow federal agencies to procure energy savings and facility improvements with no upfront capital cost or special appropriations from Congress. Federal agencies have been using the ESPC contract vehicle for over 25 years to significantly reduce energy and operating costs in a budget-neutral manner.

    即便如此,我們大多數的聯邦專案仍按既定節奏推進並如期進行。我認為,我們的聯邦業務,特別是透過成熟的「節能績效合約」(ESPC)機制,與現任政府的做法與目標高度一致。ESPC 讓聯邦機構在無需前期資本支出或國會特別撥款的情況下,採購節能效益與設施改善。聯邦機構使用 ESPC 這一合約工具已超過 25 年,以預算中立的方式大幅降低能源與營運成本。

  • As a reminder, the majority of our federal projects are focused on cost savings, resiliency, and upgrading critical infrastructure, which we believe will continue to be in great demand and is in line with the current administration's priorities, as shown through the large multimillion-dollar military housing contract we announced just last week. In addition, these ESPC projects are often signed with long O&M contracts as proven by our current contracted O&M backlog that stands at over $1 billion.

    提醒各位,我們多數聯邦專案聚焦於節省成本、韌性,以及關鍵基礎設施升級;我們相信這些需求將持續強勁,並符合現任政府的優先事項,這也可從我們就在上週宣布的數千萬美元規模軍方住宅合約中看出。此外,這些 ESPC 專案通常會搭配長期的營運與維護(O&M)合約;從我們目前已簽約的 O&M 在手訂單超過 10 億美元即可證明。

  • In closing, we will continue to closely monitor the impacts of the changes in DC. However, we feel strongly that the fundamental drivers and benefits of our federal projects remain.

    最後,我們將持續密切監控華府變動所帶來的影響。然而,我們堅信聯邦專案的基本驅動因素與效益依然存在。

  • I will now turn the call back over to George. George?

    現在我把電話交回給 George。George?

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Thank you, Nicole. As we have mentioned in the past, we expect to continue to see long-term demand from our federal agency customers given the need for secure, resilient, and reliable power. But as always, we remain focused on policy changes that might impact our business and have incorporated the potential for delays and disruptions into our 2025 guidance, which Mark will discuss in his comments.

    謝謝你,Nicole。如同我們過去提到的,鑑於對安全、具韌性且可靠電力的需求,我們預期聯邦機構客戶的長期需求將持續存在。但一如既往,我們仍專注於可能影響業務的政策變動,並已將潛在的延遲與干擾納入 2025 年財測指引中,Mark 將在他的發言中進一步說明。

  • And while we work through short-term challenges, we have built a diversified and resilient business model that we believe can manage through difficult environments. Beyond the multi-year visibility of our strong and growing project backlog, we have also purposely grown our recurring energy asset and O&M businesses, which now account for the majority of our annual adjusted EBITDA. These business lines generally have long-term contracts, providing annuity-like revenue visibility, helping us to mitigate short-term volatility in the project business.

    此外,在我們應對短期挑戰的同時,我們已建立多元且具韌性的商業模式,我們相信能在艱困環境中妥善因應。除了強勁且持續成長的專案在手訂單所帶來的多年能見度之外,我們也刻意擴大具經常性收入的能源資產與 O&M 業務;目前這些業務已占我們年度調整後 EBITDA 的大多數。這些業務線通常具有長期合約,提供類年金式的營收能見度,有助於降低專案業務的短期波動。

  • We also have deliberately expanded geographically. Ameresco now has operations in every state, Canada, the UK, and growing footprint in continental Europe. 2024 marked a significant milestone for this region with over $250 million of revenue generated from our expanding European business.

    我們也刻意進行地理版圖擴張。Ameresco 目前在全美各州、加拿大、英國皆有營運,並在歐洲大陸持續擴大布局。2024 年對該地區而言是重要里程碑,我們不斷擴張的歐洲業務創造了超過 2.5 億美元的營收。

  • I will now turn the call over to Mark to comment on our financial performance and 2025 outlook. Mark?

    我現在把電話交給 Mark,請他評論我們的財務表現以及 2025 年展望。Mark?

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Thank you, George, and good afternoon, everyone. Strong execution across our business led to a record revenue finish to the year with total revenues in the quarter growing over 20% to $533 million and each of our four business lines experiencing solid growth. Our projects business revenue grew 21%, reflecting our consistent focus on execution and conversion of our backlog.

    謝謝你,George,各位下午好。我們在各項業務上的強勁執行,帶動全年營收以創紀錄的表現收官;本季總營收成長逾 20%,達 5.33 億美元,且我們四大業務線皆呈現穩健成長。我們的專案業務營收成長 21%,反映我們持續聚焦於執行力以及將在手訂單(backlog)轉化為營收。

  • Energy asset revenue grew 31%, driven largely by the greater number of operating assets compared to last year. We added another 31 megawatts of assets into operations this quarter, bringing our full-year adds to a record 240 megawatts.

    能源資產營收成長 31%,主要受惠於相較去年有更多資產投入營運。本季我們再新增 31 兆瓦資產投入營運,使全年新增量達到創紀錄的 240 兆瓦。

  • Our base of operating assets now stands at 731 megawatts. O&M revenue grew 9% as we continued to win more long-term O&M business, while revenue from our other line of business grew 14% with strong performances from our off-grid PV and consulting businesses.

    我們目前的營運資產規模已達 731 兆瓦。隨著我們持續贏得更多長期 O&M(營運與維護)業務,O&M 營收成長 9%;同時,我們其他業務線營收成長 14%,其中離網型 PV(太陽能光電)與顧問業務表現強勁。

  • Gross margin of 12.5% for the quarter was significantly lower than expected. As George mentioned, unanticipated cost overruns on two projects negatively impacted gross profit by approximately $20 million or 400 basis points. For the full year, the impact to gross profit from these two projects was approximately $38 million or 260 basis points. We believe that the financial impact of these two projects is largely behind us.

    本季毛利率為 12.5%,顯著低於預期。如 George 所提,兩個專案出現未預期的成本超支,使毛利約減少 2,000 萬美元,約相當於 400 個基點。就全年而言,這兩個專案對毛利的影響約為 3,800 萬美元,約相當於 260 個基點。我們認為,這兩個專案的財務影響大致已經過去。

  • Operating income of $44.7 million, an increase of 31%, was bolstered by our revenue growth and the completed sale of our AEG business unit, which resulted in a gain recognized in the quarter of approximately $38 million. This increase was partially offset by noncash asset impairment charges of $12 million related primarily to the announced closing of one of our landfill gas sites by the county. We also saw higher depreciation expenses of $8 million directly related to the growth of our operating asset portfolio. Net income attributable to common shareholders was $37.1 million, increasing by 15%.

    營業利益為 4,470 萬美元,成長 31%,主要受惠於營收成長以及完成出售我們的 AEG 事業單位;該交易使我們在本季認列約 3,800 萬美元的處分利益。此增幅部分被 1,200 萬美元的非現金資產減損費用所抵銷,主要與郡政府宣布關閉我們其中一處垃圾掩埋場沼氣站點相關。我們也看到折舊費用增加 800 萬美元,直接反映營運資產組合的成長。歸屬於普通股股東之淨利為 3,710 萬美元,成長 15%。

  • We continue to take advantage of clean energy tax incentives, which resulted in an effective tax rate benefit for 2024 of 59%, compared to a benefit of 67% in 2023. Fourth-quarter adjusted EBITDA of $87.2 million increased 59%.

    我們持續善用潔淨能源稅務優惠,使 2024 年有效稅率呈現 59% 的稅務利益,相較 2023 年為 67% 的稅務利益。第四季調整後 EBITDA 為 8,720 萬美元,成長 59%。

  • The growth of our project backlog continued to be outstanding, fueled by our business development activity, which remained very healthy with over $700 million of new project awards in the quarter. Importantly, we added new awards at two times our 2024 project revenue. Total project backlog increased 24% to $4.8 billion. These metrics demonstrate our continued focus on execution and the strong demand for our projects.

    我們的專案在手訂單持續呈現亮眼成長,主要由業務開發活動所帶動;本季業務開發維持非常健康,新增專案得標金額超過 7 億美元。重要的是,我們新增得標金額為 2024 年專案營收的兩倍。專案在手訂單總額成長 24%,達 48 億美元。這些指標展現我們持續聚焦於執行力,以及市場對我們專案的強勁需求。

  • Turning to our balance sheet and cash flows. We ended the quarter in a solid cash position with approximately $109 million in cash. Our total corporate debt declined to $243 million from $273 million as the cash proceeds from our sale of AEG were used to pay down a large portion of our outstanding term loan. During the fourth quarter, we successfully executed approximately $237 million in project financing commitment to help fund our asset business.

    接著談資產負債表與現金流。本季末我們的現金部位穩健,現金約 1.09 億美元。由於出售 AEG 的現金收入用於償還相當大部分的未償還定期貸款,我們的公司層級總負債由 2.73 億美元降至 2.43 億美元。第四季期間,我們成功完成約 2.37 億美元的專案融資承諾,以協助資助我們的資產業務。

  • Our adjusted cash from operations during the quarter was $54 million, bringing our full-year total to $282 million. Our eight-quarter rolling average adjusted cash from operations was $46 million.

    本季調整後營運活動現金流為 5,400 萬美元,使全年合計達 2.82 億美元。我們過去八季的調整後營運活動現金流滾動平均為 4,600 萬美元。

  • Before turning to our 2025 guidance, I wanted to touch on some of the recent events impacting our RNG business. First, in December, Treasury finalized new rules governing the Section 48 investment tax credit. These rules clarified that the ITC would apply to our RNG projects that began construction before the end of 2024 and were placed in service in 2023 or later.

    在談 2025 年財測之前,我想先提及近期影響我們 RNG(再生天然氣)業務的一些事件。首先,財政部於 12 月定案了規範第 48 條投資稅額抵免(ITC)的新規則。這些規則釐清:ITC 適用於我們在 2024 年底前開始施工、且於 2023 年或之後投入使用(placed in service)的 RNG 專案。

  • Importantly, we can choose to either use the tax credits internally or sell the credits to third-party investors under the transferability rules. Our RNG assets placed in service between 2023 and 2024 generated ITCs of approximately $100 million, part of which we recognized as a tax benefit in 2024, with the remainder expected to be sold for cash in 2025. In addition, we have safe harbored RNG projects expected to go COD between 2025 and 2027 with an estimated $200 million of additional potential credits.

    重要的是,依可轉讓(transferability)規則,我們可以選擇在公司內部使用稅額抵免,或將抵免出售給第三方投資人。我們於 2023 至 2024 年間投入使用的 RNG 資產,產生約 1 億美元的 ITC;其中一部分我們已於 2024 年認列為稅務利益,其餘預期將於 2025 年出售換取現金。此外,我們還有符合安全港(safe harbor)的 RNG 專案,預計於 2025 至 2027 年達到 COD(商轉日),估計可再帶來約 2 億美元的額外潛在抵免。

  • Second, in January, the Treasury released its initial guidance on the Section 45Z Clean Fuels production tax credit. 45Z, which takes effect this year, provides a tax credit for the production of transportation fuels sold from 2025 through 2027.

    第二,財政部於 1 月發布了第 45Z 條潔淨燃料生產稅額抵免的初步指引。45Z 於今年生效,針對 2025 至 2027 年間銷售的運輸燃料產量提供稅額抵免。

  • All of our landfill RNG plants qualify for this credit. And like the ITC, we have the option to either use the credit ourselves or to lower our tax rate or to sell them to third parties for cash. Once the guidance is finalized, we believe our total annual benefit from 45Z could be approximately $8 million to $10 million.

    我們所有的垃圾掩埋場 RNG 工廠皆符合此項抵免資格。且與 ITC 類似,我們可選擇自行使用該抵免(以降低稅負/有效稅率),或將其出售給第三方換取現金。一旦指引定案,我們認為 45Z 帶來的年度總效益可能約為 800 萬至 1,000 萬美元。

  • Finally, D3 RIN prices weakened at the end of last year, fueled by the EPA's proposed rule to partially waive the 2024 cellulosic biofuel volume requirement due to a forecasted shortfall in production. While the waiver has not yet been finalized, our guidance reflects the current market for RINs. We continue to deploy our dynamic hedging strategy to manage the risks associated with RIN price volatility and its impact on our earnings. As of today, less than 30% of our overall expected 2025 RIN generation is merchant.

    最後,去年底 D3 RIN 價格走弱,主要受 EPA(美國環保署)提出的規則草案影響;該草案擬因預測產量不足而部分豁免 2024 年纖維素生質燃料的法定用量要求。雖然該豁免尚未定案,我們的財測已反映目前的 RIN 市場狀況。我們持續採用動態避險策略,以管理 RIN 價格波動及其對獲利的影響所帶來的風險。截至今日,我們整體預期 2025 年 RIN 產生量中,低於 30% 為現貨(merchant)。

  • Now turning to 2025 guidance. We believe our guidance reflects the current unpredictable political and regulatory environment. We are guiding revenue of $1.9 billion and adjusted EBITDA of $235 million at the midpoint of our ranges.

    接著談 2025 年財測。我們認為,本次指引反映了當前難以預測的政治與監管環境。我們在區間中位數的指引為:營收 19 億美元、調整後 EBITDA 2.35 億美元。

  • Included in our EPS guidance is the anticipation of an estimated net tax benefit, but the benefit will likely be lower than last year as we optimize the mix of credits that we keep versus credits that we sell for cash. We anticipate placing approximately 100 to 120 megawatts of energy assets in service, including one to two RNG plants. Our expected CapEx is $350 million to $400 million, the majority of which we expect to fund with additional energy asset debt, tax equity or tax credit sales.

    我們的 EPS 指引已納入預期的估計淨稅務利益,但由於我們將最佳化保留的抵免與出售換現金的抵免之組合,該利益可能低於去年。我們預期將約 100 至 120 兆瓦的能源資產投入使用,其中包含 1 至 2 座 RNG 工廠。我們預期資本支出(CapEx)為 3.5 億至 4 億美元,其中大部分預計以新增能源資產負債、稅務股權(tax equity)或出售稅額抵免來籌資。

  • For additional clarity on our EPS guidance, I thought it would be helpful to provide more color on certain factors that have an impact on EPS, depreciation, interest expenses, and noncontrolling interest. As our energy asset portfolio grows, we anticipate a corresponding increase in our depreciation expenses. Additionally, our strategic use of nonrecourse debt to finance this growth will lead to higher interest expenses. And as we expand our global footprint, we will continue to use strategic joint venture arrangements, which allow us to leverage our partners' local expertise and resources.

    為了讓大家更清楚理解我們的 EPS 指引,我認為補充說明若干會影響 EPS、折舊、利息費用與非控制權益的因素會有所幫助。隨著我們的能源資產組合成長,我們預期折舊費用也將相應增加。此外,我們策略性運用無追索權負債(nonrecourse debt)來為此成長融資,將導致利息費用上升。同時,隨著我們擴大全球布局,我們將持續採用策略性合資安排,以運用合作夥伴的在地專業與資源。

  • Our Ameresco Sunel Energy JV in Europe is an example of such a partnership. When we have a majority stake and have control under these arrangements, we report 100% of the joint venture's revenue and expenses. However, our adjusted EBITDA and net income are reduced by the noncontrolling interest of our JV partner, reflecting their ownership stake in the joint venture.

    我們在歐洲的 Ameresco Sunel Energy 合資企業(JV)就是此類合作夥伴關係的一個例子。在這些安排下,當我們持有控股權並具備控制權時,我們會認列合資企業 100% 的營收與費用。然而,我們的調整後 EBITDA 與淨利會因合資夥伴的非控制權益而減少,以反映其在合資企業中的持股比例。

  • Given these factors have a significant impact on our EPS results, we've provided estimated ranges for them in our 2025 guidance as detailed in our press release. Also, I want to call out that our 2025 guidance does not include the potential impact of a change in accounting principle related to sale leaseback arrangements that is currently being assessed. If implemented, this change could result in lower annual interest and other expenses with an estimated impact of $20 million in 2025.

    鑑於這些因素對我們的每股盈餘(EPS)結果有重大影響,我們已在新聞稿所述的 2025 年指引中提供其估計區間。此外,我想特別指出,我們的 2025 年指引未納入目前正在評估、與售後租回(sale leaseback)安排相關的會計原則變更之潛在影響。若實施,該變更可能使年度利息及其他費用降低,估計在 2025 年的影響為 2,000 萬美元。

  • Finally, I will provide some shaping on 2025. We anticipate that first-quarter revenue and adjusted EBITDA will be similar to Q1 last year. And because the first quarter is our seasonally lowest revenue quarter and due to the linear nature of depreciation and interest expenses, we expect to have negative EPS. With respect to the cadence of revenue, we expect revenues in the second half of the year to represent approximately 60% of our total revenue for 2025. This is consistent with our performance from the past couple of years.

    最後,我將就 2025 年提供一些輪廓性的說明。我們預期第一季營收與調整後 EBITDA 將與去年第一季相近。且由於第一季是我們季節性營收最低的季度,加上折舊與利息費用呈線性特性,我們預期 EPS 將為負值。就營收節奏而言,我們預期 2025 年下半年營收約占全年總營收的 60%。這與我們過去幾年的表現一致。

  • Now I'd like to turn the call back over to George for closing comments.

    現在我想把電話會議交回給 George 作結語。

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Thank you, Mark. As you have heard, we ended the year on a very solid footing with record project backlog and O&M backlog and a record number of energy assets in operation. As we look to 2025, we are cautiously navigating the transition of the federal government. However, I am confident in our ability to execute in this dynamic environment.

    謝謝你,Mark。如各位所聽到的,我們在年底以非常穩健的基礎收官,專案在手訂單(backlog)與營運與維護(O&M)在手訂單均創新高,且投入營運的能源資產數量也創下新高。展望 2025 年,我們正審慎因應聯邦政府交接的過渡期。不過,我對我們在此一動態環境中的執行能力充滿信心。

  • There is a strong demand for our budget-neutral solutions that provide customers with significant cost savings, resiliency, and much needed infrastructure improvements. We remain focused on the profitable execution of our tremendous project backlog and assets in development and the generation of cash flow.

    市場對我們的「預算中立」解決方案需求強勁,該方案可為客戶帶來顯著的成本節省、韌性,以及迫切需要的基礎設施改善。我們仍專注於以獲利方式執行龐大的專案在手訂單與開發中的資產,並創造現金流。

  • In closing, I would like to once again thank our employees, customers, and stockholders for their continued support. Operator, we would like to open the call to questions now.

    最後,我想再次感謝我們的員工、客戶與股東持續的支持。主持人,我們現在想開放提問。

  • Operator

    Operator

  • We will now begin the question-and-answer session. (Operator Instructions) Stephen Gengaro, Stifel.

    我們現在開始問答環節。(主持人指示) Stifel 的 Stephen Gengaro。

  • Stephen Gengaro - Analyst

    Stephen Gengaro - Analyst

  • Can you talk a little bit about -- you obviously talked about kind of where the backlog is, et cetera. But can you talk a little bit about what you are seeing in your conversations with customers over -- basically since January as opposed to the back half of '24 and whether they're at all sort of paralyzed by the uncertainty around the administration or sort of how those conversations are going and how you think customers are kind of reacting to that?

    你能否談談——你顯然已談到在手訂單大致的情況等等。但你能否談談自今年 1 月以來、相較於 2024 年下半年,你在與客戶對話中看到的情況?以及他們是否因政府班底的不確定性而有些停滯不前,或是這些對話進展如何、你認為客戶大致如何反應?

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • I think the -- especially the last six months -- and Nicole can add a little bit color to it -- or even the last 1.5 months or so, especially on the federal sector, the activity is still very good. Actually, there is just a couple of RFPs out today.

    我認為——尤其是過去六個月——Nicole 也可以補充一些細節——甚至過去大約一個半月左右,特別是在聯邦部門方面,活動仍然非常活躍。事實上,今天就有幾個 RFP(徵求提案)釋出。

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • Yeah. I think it's -- and certainly on our Department of Defense side, there's been still an active RFPs, as George stated, coming out when you're looking at microgrids and that type of work. I mean, there has been certainly some slowness within -- in surety of the -- like on the civilian side, like TSA as example. At this point, I think -- and even in our utility business, I mean, we're seeing several active RFPs because they're related for the need of energy.

    是的。我認為確實如此——尤其在我們國防部(Department of Defense)這一端,正如 George 所說,仍有活躍的 RFP 釋出,當你看微電網(microgrids)以及那類型的工作時更是如此。我的意思是,在——在某種程度上——民用端確實有些放緩,例如以 TSA 為例。但就目前而言,我認為——甚至在我們的公用事業業務方面,我們也看到多個活躍的 RFP,因為它們與能源需求相關。

  • Stephen Gengaro - Analyst

    Stephen Gengaro - Analyst

  • Okay, thanks. And the other question I wanted to ask quickly is when you think about the deployment of -- in the energy assets business this year. And I appreciate you gave kind of some revenue guidance on sort of the quarterly cadence for '25. But is there any lumpiness or anything we should be aware of on sort of the deployment of energy assets throughout '25?

    好的,謝謝。我想快速再問另一個問題:當你思考今年能源資產業務的投放(deployment)時。我也很感謝你提供了 2025 年按季度節奏的營收指引。但在 2025 年整年能源資產的投放上,是否會有任何不均勻(lumpiness)或我們需要留意的事項?

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • No. The only thing that I would say on the energy assets is the supply of equipment, like transformers, especially the larger size of transformers of the interconnection, utility interconnection, and then the renewable natural gas, sometimes the pipelines getting the right ways and interconnections. But generally, as you can see, our development backlog of the assets is very, very, very good. And the financial markets, they're still very good as we demonstrated for what we were able to do in the last quarter.

    不會。就能源資產而言,我唯一想說的是設備供應,例如變壓器,特別是用於併網(interconnection)的較大型變壓器、公用事業併網,以及可再生天然氣(renewable natural gas)方面,有時管線取得通行權(right of way)與併網也需要時間。但整體而言,如你所見,我們資產的開發在手訂單非常、非常、非常好。而金融市場仍然非常良好,正如我們在上一季所展示、我們能夠完成的事項。

  • So -- but because of the new administration hiccups here and there, I think you will find them even on the projects as well as some of the assets. But the overall market environment is still very good.

    所以——但由於新政府上任,這裡那裡可能會有些小插曲(hiccups),我想你會在專案以及部分資產上都看到。但整體市場環境仍然非常好。

  • Operator

    Operator

  • Noah Kaye, Oppenheimer.

    Oppenheimer 的 Noah Kaye。

  • Noah Kaye - Analyst

    Noah Kaye - Analyst

  • Thanks. The first one might be a Nicole question as well. No surprise. I guess given that ESPCs are a decades-long, time-tested way to save the government money upfront and have always been kind of bipartisan, what should we make of the pause that you're seeing now around? I mean, I guess the better question is what conversations with relevant counterparts is the company having on what's driving some of these decisions? And how quickly might we see kind of a reversion to, let's call it, business as usual?

    謝謝。第一個問題可能也要請 Nicole 回答。不意外。我想,鑑於 ESPC 一直是經過數十年驗證、可讓政府在前期節省資金的方式,而且一向具有跨黨派支持,我們該如何看待你們現在看到的這種暫停?我的意思是,我想更好的問題是:公司正與相關對口單位進行哪些對話,以了解是什麼在驅動其中一些決策?以及我們可能多快會看到某種回歸——姑且稱之為——照常運作(business as usual)?

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • So the pause that we mentioned in just a few minutes ago is related to specifically GSA. And if you -- I mean, everyone has seen the headlines and they're looking at selling a lot of their assets. And so those projects, in particular, are paused as they're evaluating which buildings they may sell. So we don't -- we kind of expect that to be the -- this is a specific case to GSA and still expect that same value to be appreciated by this administration on the [SPCs].

    我們剛才提到的暫停,具體是與 GSA 相關。而且如果你——我的意思是,大家都看過新聞標題,他們正在考慮出售大量資產。因此,這些專案特別是因為他們在評估可能出售哪些建築而暫停。所以我們不——我們某種程度上預期這會是 GSA 的特定個案,並仍預期本屆政府會同樣認可[SPCs] 的價值。

  • Noah Kaye - Analyst

    Noah Kaye - Analyst

  • Very helpful. Thank you. (multiple speakers) Yeah, go ahead, George.

    非常有幫助。謝謝。(多位發言者) 是的,請說,George。

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • No. Go ahead.

    不。你先請。

  • Noah Kaye - Analyst

    Noah Kaye - Analyst

  • No, please, I appreciate your thoughts.

    不,請說,我很感謝你的想法。

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Yeah. What might happen is some of this GSA projects, let's say, might have a project -- they hit 5, 6 or 10 buildings. They might want to decide to sell two or three or four of that. So we have to rescope the projects and go ahead with the rest of the buildings. So most likely, that's what you will see happening.

    好的。可能發生的情況是,這些 GSA 專案,假設有一個專案——涵蓋 5、6 或 10 棟建築。他們可能會決定出售其中兩棟、三棟或四棟。因此我們必須重新界定專案範圍(rescope),並針對其餘建築繼續推進。所以最有可能,你會看到的就是這樣的發展。

  • Noah Kaye - Analyst

    Noah Kaye - Analyst

  • But because you have an IDIQ, that covers ostensibly the scope of whatever buildings are remaining, there's still lots of opportunities to mine in terms of deep energy retrofit.

    但因為你們有一份 IDIQ,表面上涵蓋了剩餘各棟建築的範圍,所以在深度節能改造(deep energy retrofit)方面,仍然有很多可以挖掘的機會。

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • That is correct.

    沒錯。

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • That is correct. And this administration likes this kind of projects.

    沒錯。而且本屆政府喜歡這類專案。

  • Noah Kaye - Analyst

    Noah Kaye - Analyst

  • Good. A question on the guide. And Mark, thank you for providing some guideposts around seasonality of revenues in 1Q. I guess when we think about at least the relative contribution from the different parts of the business, you put in a really good amount, as you said, a record amount of energy assets. You've got your RIN exposure pretty well handled, as you mentioned.

    很好。我有一個關於指引(guidance)的问题。Mark,也謝謝你提供一些關於第一季(1Q)營收季節性的參考方向。我想當我們思考至少各業務板塊的相對貢獻時,你們如你所說,投入了相當多、而且是創紀錄數量的能源資產。你也如同提到的,把 RIN 的曝險處理得相當到位。

  • So is there a way to think about sort of the EBITDA growth at least from certain projects and the O&M and then kind of thinking about the project business being more of the swing variable? Maybe you could just give us a little bit of color on how to bridge.

    那麼,有沒有一種方式可以去思考 EBITDA 的成長,至少是來自某些專案與 O&M(營運與維護),並且把專案業務視為較具波動性的變數?也許你可以再多給我們一些說明,讓我們知道該如何銜接(bridge)。

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Yeah. I mean, I think that we're coming into the year, and we talked a lot about the backlog, right? So we have a lot of our project backlog coming -- our project revenue coming from contracted revenue. So we'll expect to see a decent amount of contribution there. And then obviously, last year, with all of the megawatts of new assets that we placed in operations, of course, that's not going to be completely incremental to 2025, just given that a lot of that came on board throughout 2024. But we will see some additional contribution there.

    是的。我的意思是,我想我們進入今年時,我們談了很多關於在手訂單(backlog),對吧?所以我們有很多專案在手訂單——我們的專案營收——是來自已簽約的合約收入。因此我們預期那部分會有相當不錯的貢獻。然後很明顯地,去年我們有大量新增資產(以兆瓦計)投入營運,當然,考量到其中很多是在 2024 年期間陸續上線,這不會在 2025 年完全成為新增的增量。但我們仍會看到一些額外貢獻。

  • Just remember that when we put some of these assets online, they do still take some time to ramp up. We expect some amount of incremental contribution there. And then O&Ms, that always remains pretty linear. We would expect a little bit of growth there. So -- but again, we've got some steady contribution from those recurring streams. So I mean, I guess that's about the best color I can give you in terms of how those -- how those three lines of business will contribute to the EBITDA growth.

    請記得,當我們讓其中一些資產上線時,它們仍需要一些時間爬坡(ramp up)。我們預期那裡會有一定程度的增量貢獻。至於 O&M,那一向相當線性。我們預期那裡會有一些成長。所以——但再說一次,這些經常性收入來源會帶來穩定貢獻。因此,就這三條業務線如何對 EBITDA 成長做出貢獻而言,我想這大概是我能提供的最佳補充說明。

  • Operator

    Operator

  • Craig Irwin, ROTH Capital.

    Craig Irwin,ROTH Capital。

  • Craig Irwin - Analyst

    Craig Irwin - Analyst

  • So, George, I was hoping maybe you could give us a little bit more color on the sort of shift in the way you put your guidance together. So I appreciate the conservatism around anticipating a change in the federal building footprint, right? Nobody knows these buildings better than you guys do, except for maybe the owners, but you're doing some very important work as far as managing the profile, the financials of these buildings.

    George,我希望你能再多給我們一些關於你們組合指引方式轉變的細節。我理解你們在預期聯邦建築使用面積(footprint)可能改變方面採取保守作法,對吧?除了可能的業主之外,沒有人比你們更了解這些建築;而你們在管理這些建築的狀況、財務表現方面,做的是非常重要的工作。

  • Can you maybe scope out for us what the delta would have been or what the contribution could have been that if you'd have taken a straight line with what's in backlog today, what looks like it's ready to be executed that would have been -- that you would expect if nothing changes in DC so that we can kind of estimate the adjustment down for your conservatism around changes that are going to happen over the next couple of years?

    你能否幫我們界定一下,如果你們依照目前在手訂單、看起來已準備好執行的項目去做直線推估(straight line),在華府(DC)若沒有任何變化的情況下,原本的差額(delta)會是多少、或可能的貢獻會是什麼?這樣我們就能估算你們因為對未來一兩年變動所採取的保守調整,究竟下修了多少。

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Well, I think the most important -- the impact that we will get is probably during the next six months until everything stabilizes and the new people in the federal government get their positions. And the bottleneck is not -- the project backlog is excellent right now. I mean, and if nothing had happened, I don't want to give a number out, but it could be a considerably better performance for this year than we have right now.

    我想最重要的——我們受到的影響——大概會發生在接下來六個月,直到一切穩定下來、聯邦政府的新任人員到位。而瓶頸並不在——目前的專案在手訂單非常好。我的意思是,如果什麼事都沒發生,我不想報出一個數字,但今年的表現可能會比我們現在所呈現的好得多。

  • So -- and that's where we try to push out some projects, at least about six months, I would say, a rough estimate that we have pushed out those particular projects and a couple of other ones that were in the execution stage. But if you have new people, it takes a little bit more time.

    所以——也因此我們嘗試把一些專案往後推,至少大約六個月;我會說,粗略估計,我們把那些特定專案以及另外幾個已在執行階段的專案往後延了。但如果換了新的人,確實就需要多一點時間。

  • And then if you have to rescope this particular projects, now you have to do the financing all over again and so on. And I know in one particular project that was canceled, actually, we are -- they're going to do the project, but we're negotiating the scope for the remaining buildings, and it's going to take a few months to do it.

    然後如果你必須重新界定(rescope)這些特定專案,那你就得把融資再做一遍,等等。而且我知道有一個特定專案雖然被取消了,但其實他們還是會做,只是我們正在就剩餘建築的範圍進行協商,這會需要幾個月時間。

  • So -- but you're right that this administration of this energy savings performance contracts because they are budget neutral, they love them. And a year to two years from now, I guarantee you that the federal government will be picking up more business.

    所以——但你說得對,本屆政府很喜歡這種能源節省績效合約(ESPC),因為它們對預算是中性的(budget neutral)。而在一到兩年後,我可以向你保證,聯邦政府會承接更多業務。

  • And the other thing I want to point out that we have haircut a little bit the other part of the business because some of the money, even though, let's say, a school system or a college or hospitals, they do get some money from the IRA program. So they buy down the energy savings performance contracts. So we have seen a little bit of slowdown on that particular project, but we haven't lost any project either. But the timing has been shifted a little bit.

    另外我也想指出,我們也稍微下修了另一部分業務,因為有些資金——即使像是學區、學院或醫院——他們確實能從 IRA 計畫拿到一些錢。所以他們會用這些資金去降低(buy down)能源節省績效合約(ESPC)的成本。因此我們看到那一類專案有些放緩,但我們也沒有失去任何專案。只是時程稍微往後移了一點。

  • Craig Irwin - Analyst

    Craig Irwin - Analyst

  • Excellent. Excellent. So then I guess I will ask the second question, something I called you on privately this past quarter. So we've been hearing that because of the success in the ESPC program over the last many, many years and the outperformance of the portfolio of projects that's been done versus typical federal construction that the administration is actually looking at moving most federal contracting, from roads to libraries to -- you name it, into a very similar ESPC-like vehicle. Obviously, it would not be an $80 billion IDIQ. It would be in the hundreds of billions.

    很好。很好。那我想我會問第二個問題,這是我在上一季私下打電話跟你聊過的。我們一直聽說,由於 ESPC 計畫在過去很多很多年裡的成功,以及已完成的專案組合相較於典型的聯邦建設案有更好的表現(outperformance),政府其實正在考慮把大多數聯邦採購——從道路到圖書館到——你說得出來的各種項目——都轉到一種類似 ESPC 的載具(vehicle)裡。很顯然,它不會只是 800 億美元的 IDIQ。它可能會是數千億美元規模。

  • Given your leadership in developing the performance contracting industry and sort of helping set up the entire structure that's allowed this budget-neutral investment to be such an important contribution to the building stock, have you been involved in those conversations at all? Does it make sense for you for nonenergy-related projects to maybe have a similar contracting structure? And would this be a growth opportunity if we saw some similar type of contracting mechanism brought to a much wider scope of projects across the country?

    鑑於你們在推動績效合約產業的發展上具領導地位,並且某種程度上協助建立了整個架構,使這種預算中性投資能對建築存量做出如此重要的貢獻,你們有參與這些討論嗎?對於非能源相關的專案,採用類似的合約架構是否合理?如果我們看到類似的合約機制被擴大到全國更廣泛的專案範圍,這會不會成為一個成長機會?

  • George Sakellaris - Chairman of the Board, President, Chief Executive Officer

    George Sakellaris - Chairman of the Board, President, Chief Executive Officer

  • Yeah. I would love to do some of their ships, some of the Air Force bombers and so on. I think there's tremendous potential that you apply this concept to many other areas. One of the areas that we are not -- we could be talking about it down the road is the data centers. And that's -- we haven't talked about it yet, but -- because we wanted to have something concrete and then we will start talking about it. And I think down the road, we will probably hear something about that.

    是的。我很想做他們的一些船艦、一些空軍轟炸機等等。我認為把這個概念應用到許多其他領域,有非常巨大的潛力。其中一個我們目前還沒有——未來可能會談到的領域是資料中心(data centers)。而那個——我們還沒開始談,但——因為我們希望先有一些具體內容,然後我們才會開始對外談。我想未來某個時間點,我們可能會聽到一些相關消息。

  • Operator

    Operator

  • (Operator Instructions) Eric Stine, Craig-Hallum.

    (接線員指示) Eric Stine,Craig-Hallum。

  • Eric Stine - Analyst

    Eric Stine - Analyst

  • So just sticking with the federal business, obviously, the big focus today. Just curious, I mean, other than the GSA business, which you touched on and think that that may change in scope, is it fair to say that what you are doing here is, by and large, it is simply saying you think there's a pause? Just curious, is that the way we should think about it?

    就只談聯邦業務,顯然這是今天的重點。我只是好奇,我是說,除了你們提到的 GSA 業務、而且你們認為其範疇可能會改變之外,是否可以說你們在這裡做的,基本上就是在表達你們認為會有一段暫停期?只是想確認一下,我們應該這樣理解嗎?

  • And then also, you mentioned the one cancellation. Is that something you are factoring in for 2025 that that becomes more widespread? Or do you think that that cancellation is kind of a one-off?

    另外,你提到有一筆取消案。你們是否在 2025 年的預測中把它納入考量,認為這種情況會變得更普遍?還是你們認為那次取消比較像是一次性的?

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • The cancellation was a one-off, and we've already accounted for it in the numbers. And the other two are pauses, and we've accounted for that in our guidance, the delay in those as well. And it is related to GSA.

    那次取消是一次性的,我們已經在數字裡反映了。另外兩個是暫停,我們也已在我們的指引中納入考量,包括它們的延後。而且這與 GSA 有關。

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Yeah. I think more broadly, Eric, right, to be clear, we gave a lot of consideration to anything that could be exposed, right, by policy changes, other project pauses, potential cancellations, maybe tariff policies, federal funding cutbacks. We gave consideration to all of it and try to smartly build that into our guidance ranges. So we definitely took that approach.

    是的。我想更廣泛地說,Eric,為了說清楚,我們對任何可能因政策變動而暴露風險的事項都做了很多考量,像是其他專案暫停、潛在取消、也許關稅政策、聯邦資金削減。我們把這些都納入考量,並嘗試以審慎的方式把它們建構進我們的指引區間。所以我們確實採取了這樣的做法。

  • Eric Stine - Analyst

    Eric Stine - Analyst

  • Okay. And so there is the possibility, not sitting here early in the year, but it sounds like you have attempted to be very conservative and maybe that's the best approach given where we're at right now. But I mean, this is something that that could change as the year progresses depending on how things play out.

    好的。所以確實存在這種可能性,雖然現在還在年初,但聽起來你們已經嘗試非常保守,而在目前的情況下這或許是最好的做法。不過,我的意思是,這件事可能會隨著年度推進、視情況發展而改變。

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Certainly. Yes.

    當然。是的。

  • Operator

    Operator

  • William Grippin, UBS.

    William Grippin,UBS。

  • William Grippin - Analyst

    William Grippin - Analyst

  • Just my first one, I wanted to come back to the guidance here, maybe to put a finer point on it. If I look back over the last four years at your contracted projects backlog as of the end of the year, that's perfectly correlated to your reported project segment revenue in the following year, right, one-to-one basis consistently for the last four years.

    我第一個問題想回到這份指引,或許把重點說得更精準一些。如果我回頭看你們過去四年在年底的已簽約專案在手訂單(backlog),它與你們隔年所報告的專案部門營收是完全相關的,對吧,過去四年一直都是一比一的關係。

  • So I take your $2.5 billion contracted projects backlog. If I look at that relative to the $1.9 billion revenue guidance at the midpoint, that seems to imply to me that you're actually not assuming any federal revenue in the 2025 guide. But just based on the conversation here on the call here, I feel like I'm probably missing something. So maybe could you elaborate a little bit more on what you're actually assuming is in versus out? And what explains that pretty substantial gap between your contracted backlog there and then the actual overall revenue guide that you've given?

    所以我拿你們 25 億美元的已簽約專案在手訂單來看。如果我把它和你們營收指引中點值的 19 億美元相比,這看起來似乎意味著你們在 2025 年指引中其實沒有假設任何聯邦營收。但就我們在這通電話裡的對話來看,我覺得我可能漏掉了什麼。所以你們能否再多說明一下,你們實際上假設哪些會納入、哪些不會納入?以及是什麼原因造成你們已簽約在手訂單與你們給出的整體營收指引之間有這麼大的落差?

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Yeah. No, yeah, we're certainly assuming some federal revenue in the 2025 guide. I think what you probably have to look at is we have around $1.1 billion of 12-month contracted that gives us very good line of sight into 2025 out of the contracted backlog. Remember, the implementation period of this contracted can be over 12 to 36 months.

    是的。不,我們在 2025 年指引中當然有假設一些聯邦營收。我想你可能需要看的點是:在已簽約在手訂單中,我們大約有 11 億美元屬於 12 個月內的已簽約,這讓我們對 2025 年有非常好的能見度。請記得,這些已簽約專案的實施期間可能是 12 到 36 個月。

  • So again, in our guide, we're basing it off of our -- the best information and what we see is our 12-month contracted and that will -- that should, assuming we execute directly, directly run into the revenue line. So yeah, we wouldn't expect to execute on 100% of the contracted in the very next year because that implementation period as these projects get larger, could be over two, three years.

    所以再說一次,在我們的指引中,我們是基於我們掌握的最佳資訊,以及我們看到的 12 個月內已簽約金額;在假設我們能直接執行的前提下,這些應該會直接反映到營收線上。所以是的,我們不會預期在隔年就執行完 100% 的已簽約金額,因為隨著這些專案規模變大,其實施期間可能會跨兩年、三年。

  • Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

    Nicole Bulgarino - President, Federal Solutions and Utility Infrastructure

  • Yeah, especially in the federal end.

    是的,尤其是在聯邦端。

  • Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

    Mark Chiplock - Senior Vice President - Finance, Chief Accounting Officer

  • Especially in the federal.

    尤其是在聯邦端。

  • William Grippin - Analyst

    William Grippin - Analyst

  • Right. Okay. And then just on the RNG side here, the last couple of days, there have been some reports in the media about the EPA proposing potentially cutting up to 65% of staff. It was also reported maybe that was just referring to a budget cut. But as I understand it, the EPA has to approve your ability to generate RINs at an RNG facility before you can actually start recognizing those.

    了解。好的。另外在 RNG 這邊,過去幾天媒體有一些報導提到 EPA 可能提議裁減多達 65% 的人力。也有報導說那可能只是指預算削減。但據我理解,在你們能開始認列 RINs 之前,EPA 必須先核准你們在 RNG 設施產生 RINs 的資格。

  • So are you -- I guess what are you assuming in the guide for contribution from the two RNG plants this year in terms of timing? And does it contemplate any potential delays in sort of the necessary regulatory approvals?

    所以你們在今年指引中,對兩座 RNG 廠的貢獻在時程上是怎麼假設的?而且是否有把必要的監管核准可能延遲的情況納入考量?

  • Michael Bakas - President, Renewable Fuels

    Michael Bakas - President, Renewable Fuels

  • Yeah. This is Mike Bakas. What I would say is just keep something in mind, and we went through this year because you're probably familiar with the EPA change, it is the rules on certification. And we could no longer store the gas and how to sell to the voluntary market.

    是的。我是 Mike Bakas。我想說的是請記住一點,我們今年也經歷過,因為你可能熟悉 EPA 的變更,也就是認證規則。我們不再能夠儲存天然氣並以自願市場的方式出售。

  • We -- before our plants, like, for example, our Keller plant and our Roxana plant, two large facilities, I think about 26-, 27-megawatt equivalent. Before it got certified, we were actually selling the environmental attributes at a pretty healthy rate while we're waiting for certification. And considering it was first off the gate, we were able to get certification, I think, within like a month or two for those facilities.

    我們——在我們的工廠,例如 Keller 廠與 Roxana 廠,兩個大型設施,我想大約是 26、27 兆瓦當量。在取得認證之前,我們其實在等待認證期間,就以相當不錯的價格出售環境屬性。而且考量到那是第一批,我們能在大概一到兩個月內就為那些設施取得認證。

  • So I think we're still pretty comfortable that certification will move along at a fairly good clip. We haven't seen any hiccups yet so far at the EPA. And if you look at some of the things that have been coming out from the administration, it seems to be very pro biofuels.

    所以我認為我們仍相當有信心,認證流程會以相當快的速度推進。到目前為止,我們在 EPA 那邊還沒有看到任何卡關。而且如果你看看政府近期釋出的某些訊息,似乎是非常支持生質燃料的。

  • Operator

    Operator

  • (Operator Instructions) There are no further questions at this time. Ladies and gentlemen, this concludes today's conference call. Thank you all for joining. You may now disconnect.

    (接線員指示) 目前沒有其他問題。各位女士、先生,今天的電話會議到此結束。感謝各位參與。您現在可以掛線。