使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Operator
We now have John Baker, President and CEO of Florida Rock Industries Inc., in conference. Please be aware that each of your lines is in a listen-only mode. At the conclusion of John Baker's presentation, we will open the floor for questions. At the time, instructions will be given as to the procedure to follow if you would like to ask a question. I would now like to turn the conference over to John Baker. Mr. Baker, you may begin.
John Baker - CEO
Good morning. My name is John Baker and I am President and CEO of Florida Rock Industries. With me are John Milton, our Executive Vice President and Chief Financial Officer and Wally Patzke, our Vice President and Chief Accounting Officer. You are cautioned that any statements which we make today which relate to the future are by their nature subject to risks and uncertainties that could cause actual results and events to differ materially from those indicated in such forward-looking statements. These include general business conditions, competitive factors, political, economic, regulatory and weather conditions, pricing, government spending levels on transportation projects, interest rate changes, energy and transportation costs and technological contingencies.
Additional information regarding these and other risk factors and uncertainties may be found in the Company's filings with the Securities and Exchange Commission.
Yesterday after the market closed, (technical difficulty) we announced record earnings for the Company's third quarter of $45,878,000 or 69 $0.69 per diluted share, up 39% from a year ago. Sales in the quarter increased 25% to 313 million. Volumes increased in all segments with aggregate tonnages up 3.6%, concrete up 9.6% and cement tonnage up 16.8 percent.
Operating profit for the quarter increased 50% year-over-year to 76,890,000. Included in the quarter were after-tax real estate gains of 1,157,000 and insurance proceeds of 2,653,000. These nonrecurring items were partially offset at the net income line by a depletion adjustment to deferred taxes of 2,862,000.
The quarter was characterized by strong demand for all our products with Florida leading the way. Cement was tight during the quarter, but we had ample inventories to see us through. Rail service improved from our Miami quarry, though it still trails volumes moved a year ago.
Looking forward, we have implemented price increases in concrete, cement and stone effective July 1. In Florida, these generally got instant traction and we expect concrete to be up $5 per yard and cement up $5 per ton. Stone prices will be up roughly $0.80 per ton. We had no increase in our sand products in Florida.
Outside of Florida, somewhat smaller increases of approximately 5% were implemented and though generally successful, they will phase in over the next three months. These price increases unfortunately are not in a vacuum. We are seeing significant cost increases in fuel and utilities which together were up $6 million in this quarter alone.
The fourth quarter is generally a period of high demand for us, interspersed with sporadic hurricanes. This year's following the path, though so far, our Florida operations have been spared any major disruption. We took our cement plant down unexpectedly this week for repairs and we will use this downtime to shorten the scheduled shutdown in October. We have sufficient inventories to get us through without disruption, though there will be about $1 million in extra expense this quarter.
Our business looks very strong at this point. Housing continues to show its resilience and we're seeing increased commercial and highway activity in a number of our markets. We continue to look at acquisition opportunities though there is nothing to report at this time.
As you know, we have applied for a permit to expand our Newberry cement plant's capacity from 850,000 to 1,700,000 tons of cement annually. Yesterday, we received the permits from the state for this project. Local permits are not yet in-hand, though we are optimistic about their insurance. We continue to study the market to determine whether this project makes sense but in the meanwhile, we are completing the design of the plant and we'll be ready to begin construction once the local permits are achieved.
We have commissioned construction of a new aggregates plant in Miami. This will raise our production about 25% and will improve efficiencies significantly. We have made deals to add roughly 20 million tons of reserves in Miami to support this expansion in the past few weeks.
We're in the final stages of permitting a new sand plant in central Florida which will serve the Tampa Bay area and we have purchased 1300 acres of land in Naples, Florida. The permitting on that is just beginning.
In our concrete business, we opened a ready-mix and bought plant in Pinellas (ph), Florida this past week. This plant is Flagler County, which is the fastest-growing county in the nation. The permitting will become the largest ready-mix plant in our system in northeast Washington and we plan to open a ready-mix and block plant within the next year in southwest Florida.
In taking a look at every plant we own that is at 90% of capacity and where we think appropriate for the market, we will develop expansion plants. Generally however, we have available capacity at all our ready-mix plant and most of our sand plants.
We appreciate your interest in our company and we'll try to answer any questions you may have. Before we do, however, I would like to ask John Milton to give you the specifics on our segment volumes and then to elaborate on the depletion adjustment which I mentioned earlier. John?
John Milton - CFO
Thank you, John. In our Aggregates segment, volumes for this third quarter at our producing locations were 11,988,000 tons; that compares to 11,356,000 tons in the third quarter a year ago. That shows a 5.6% increase, but as we reported in John's remarks and in the press release, the total volume increase in Aggregates was 3.6% and that relates to the fact that our terminals where we sell some of the products were actually down slightly year-over-year primarily due to transportation issues.
In our Concrete segment, our yardage for the third quarter were 1,953,000 yards; that compares with a year-ago's 1,782,000 yards.
In our Cement segment, our total cement tonnage for the quarter was 656,000 tons, compared to a year ago of 561,000 tons.
Now as John briefly mentioned, we had an adjustment related to our depletion, and I would like to explain to you as best I can how that occurred. At our request during this quarter, KPMG as our new auditors brought in their expert on depletion to review our methodology for accounting for depletion for both book and tax purposes. In the course of that review, KPMG's expert determined that the company inadvertently had been using an incorrect methodology for some time in the manner in which it calculated the portion of deferred taxes attributable to percentage depletion taken for tax purposes. In order to convert to the correct methodology, the Company this quarter has recorded in its income statement and balance sheet a total of $2,862,000 in deferred taxes to account for depletion -- percentage depletion taken for tax purposes in excess of cost depletion taken for book purposes in this and prior years. The affect on any single prior year was determined not to be material.
Accordingly, the incorrect methodology previously employed did not result in a material misstatement of the Company's financial statements for this or any prior year. Company cash flows for these years were not affected as the methodology only relates to the reporting of temporary differences in book and tax income that will be reversed in future periods by increasing book income by a like amount over the remaining book life of our mineral reserve assets.
John Baker - CEO
Thank you, John. Okay, at this point, we would be delighted to try to entertain any questions that you all might have.
Operator
(Operator Instructions). David MacGregor, Longbow Research.
David MacGregor - Analyst
On the aggregate business, a big sequential recovery in EBITs (ph). Was there any benefit associated with costs that might been realized maybe in Q2? And I guess the real question is just -- how sustainable is a 35% margin in this business?
John Baker - CEO
To be honest with you, I think it is very sustainable at our locations. We have been having some pretty high cost. I'm not at all pleased with our costs, so I'm very comfortable with that.
David MacGregor - Analyst
Okay. And then on the cement side, I guess I was expecting maybe a little more leverage there and I'm just thinking back to last quarter when you had the outage on the finishing mill up at Newberry and you said that cost you about a million at EBIT line. So it kind of looks like you had, making that adjustment, a 12% increase in your cement and calcium segment revenues, but only a 9% increase in EBITs. And you talked about the 6 million of higher costs year-over-year and I'm just wondering, was that sort of the factor here, or was there something else that may have precluded the operating leverage?
John Baker - CEO
That's the biggest factor. We have had some outages at our calcium plant in Brooksville that had some affect on that. But by far, the biggest change has been our coal and utility prices. I think our coal prices were up some 77% since our contract expired on December 31, '04. So it's a huge number.
David MacGregor - Analyst
Has there been much of a change in terms of the mix between your imported cement versus what you're producing from your own clinker?
John Baker - CEO
The increase has been in imported cement.
David MacGregor - Analyst
Any chance you could quantify that for us?
John Milton - CFO
Sure. Our cement tons -- .
John Milton - CFO
John, I have them here. Newberry cement plant quarter-over-quarter, we did 247,000 tons this year, 225,000 tons last year. At what we call our Southern cement operations at Tampa and Port Manatee, we had 409,000 tons this year versus 336,000 tons last year.
David MacGregor - Analyst
Okay, that's helpful. Final question. On the number of expansions that you had cited at the conclusion of your prepared remarks, I'm just wondering what the impact ends up being on your capital expenditures and reserve acquisitions numbers. Can you review those for us in terms of your expectations for the year?
John Baker - CEO
For this year, we have spent year-to-date right at 100 million. I think we will probably be at 125, 130 by September 30. Most of those expenditures though are in future years and we have not completed our budget for next year. So I would be totally speculating if I gave you anything.
David MacGregor - Analyst
Great, thank you very much.
Operator
John Riley, CJS Securities.
John Riley - Analyst
Great quarter. Just a follow-up to his CapEx question. It is pretty clear that you're running out of ways to invest in growth areas. Could you tell us about what your future plans would be in years, and are there ways to invest in your existing facilities as well?
John Baker - CEO
Yes. I think that's really the story. I think if we do the cement plant, which we're still studying hard and have not made the final decision yet -- but if we do that, that's 130 million. The aggregates plant in Miami is probably 25 or 30; (indiscernible) plants 5, those ready-mix plants are 3 to 5 million apiece. I think for the next year, given what I have said and hopefully some greenfield sites that we feel like we're getting close to having nailed down, we will have a fairly robust internal capital expenditure program.
Obviously, until you have an acquisition, you don't know where that is. But I feel like this year, we -- ahead of us, we have some pretty significant expenditures that we are excited about.
John Riley - Analyst
All of those projects that you mention are in the Florida region. Are you looking outside of that market also at best scenarios?
John Baker - CEO
Absolutely. We continue to look really in all of our markets that we're in and we're looking outside -- we've looked in Texas and Oklahoma, other states as well, and we want to concentrate on Sunbelt states that have opportunities to grow, and that's where we're looking. We have not come up with anything at this point worth mentioning outside of our existing footprint however.
John Riley - Analyst
Right, and then just one last question. Related to your balance sheet, it's -- as you came out for the first time in a net cash position. Could you tell us what your ideal capital structure would be? Do you think you're underlevered, and at what point do you increase buybacks or do another onetime dividend?
John Baker - CEO
I think we're underlevered. I think we're underlevered at this point. And again, given the projects that we are looking at, and I think at this point, I don't foresee any special dividend or probably buybacks at least for six to nine months. I think we would want to see how these projects go, how the year goes before we would do anything like that at this point. We are very comfortable with a debt-to-equity ratio of 50%, which we are a long way from at this point, but in our view we are not going to panic at that point. We want to do some acquisitions and we want to keep our powder dry for the time being.
John Riley - Analyst
Sounds great, we look forward to seeing you at our conference.
John Baker - CEO
Thank you so much.
Operator
Barry Vogel, Barry Vogel & Associates.
Barry Vogel - Analyst
Good morning, gentlemen. John Milton, I had a couple of small questions for you that I'm sure you can handle very easily. Can you give us the tonnage for Lafarge in each of the first and second quarters?
John Milton - CFO
We don't give Lafarge tonnages, Barry, but I would be glad to try to give you the tonnages as best I have them. Right now, what I have is -- we had 409 for this quarter.
Barry Vogel - Analyst
Right.
John Milton - CFO
Year-to-date is all I have in front of me. Year-to-date there is 1.189 million and year-to-date through the third quarter last year was 1.068 million.
Barry Vogel - Analyst
And as far as a price per ton that you add in the quarter as Newberry, what was that price per ton?
John Milton - CFO
At Newberry, the price per ton for the third quarter was $82.21.
Barry Vogel - Analyst
Okay. And considering you had instant traction, according to John, on the $5 a ton price increase in cement, does that mean we should just add about $5.00 to your average prices for Newberry in the fourth quarter?
John Milton - CFO
Exactly.
Barry Vogel - Analyst
Okay. And as far as calcium tonnage, I guess I can figure that out. Mr. Baker, underleveraged is not even the word for it. You have a superb balance sheet, you've done an outstanding job obviously. As far as acquisitions, what is the problem the way you see it at this time?
John Baker - CEO
I think they've been very expensive.
Barry Vogel - Analyst
What if they continue to remain expensive?
John Baker - CEO
Then our job is to either, A, to develop internal projects, and there's a lot of potential there, Barry. Or, B, give the money back to the shareholders in one form or fashion.
Barry Vogel - Analyst
Now I can see you're starting to expand significantly in Florida based on your comments on your call. Am I correct that you are inferring that there's plenty of opportunities for internal expansion?
John Baker - CEO
I think so, I think so.
Barry Vogel - Analyst
Are we looking at, considering what you just said and your confidence about your operating margins and aggregates, at least at 35%, which is terrific, that you could spend like 100 to 150 million a year for the next few years?
John Baker - CEO
If you count the cement, I think that is about right.
Barry Vogel - Analyst
Yes, I do count the cement.
John Baker - CEO
Right.
Barry Vogel - Analyst
And is there any reason do you think you would not go forward with the cement at Newberry?
John Baker - CEO
We're still studying the marketing and trying to get comfortable. We're in some pretty heady times right now and we want to make sure that if we double the cement plant that we have got -- we're not going to have something that we will regret and that we have something that will make returns for our shareholders if the economy were to slip back some. At this point I would tell you, we are 90% there, though there's still some discussions with others that remain unresolved.
Barry Vogel - Analyst
Now as I remembered, I forgot the name of it, there was a competitor that was opening a plant right by Newberry.
John Baker - CEO
Right, Suwanee.
Barry Vogel - Analyst
Suwanee -- have they some on completely?
John Baker - CEO
They have come on completely and probably have been running almost a 1.5 or 2 years now.
Barry Vogel - Analyst
And are they running flat out as well?
John Baker - CEO
Yes.
Barry Vogel - Analyst
Are there any projects that you know about that have been announced by anybody in Florida?
John Baker - CEO
Yes. Renker (ph) has announced an expansion of their plant at Brooksville, and their stated justification is that they're going to replace imports, which of course is an option for us as well. And Suwanee has said that they are going to try to permit a piece of land down near Orlando as a cement plant.
Barry Vogel - Analyst
Did they talk about tonnages?
John Baker - CEO
I think they said a million tons.
Barry Vogel - Analyst
And how big is the current market in Florida for cement?
John Baker - CEO
About 10.5 is the current market.
Barry Vogel - Analyst
Thanks very much, John, you guys are doing a terrific job.
John Baker - CEO
Thank you.
Operator
Jack Kasprzak, BB&T Capital Markets.
Jack Kasprzak - Analyst
My first question is on cement imports. The import market has been tight; in fact last year, there were shortages and it was difficult to get any imports. The cost of freight rate had gone up significantly. Can you characterize the situation now? Was it still tight but less tight, or is it loosening up significantly from what you guys see?
John Baker - CEO
Well, we had not gone out for next year's volumes yet, so I'm going to be speaking a little bit about some stuff that is six months old. But then I will try to give you my flavor on what I think the markets are.
When we went to out last fall, we were able to increase our imports 5 or 6%, something like that. Some, but not much, would be the way I would characterize it. Freight was very tight and we ended up paying higher freight costs for the cement that we imported than we had the year prior.
We think we have a deal that would limit the increases into next year. And so I would say that what I would expect is that we would get as much as cement as we got last year in '05 as we'll get in '06, and maybe perhaps more, but that is yet to be determined. What you hear about the shipping markets is they go up and they go down, and they have done both in the last three or four months. They are down from their, but they're still substantially higher, substantially higher, than where they were just a year and a half ago.
Jack Kasprzak - Analyst
Would you think that if the cost of importing cement were to go down a little, that you could still get price increases, or are you still getting price increases now that they have come down because demand is so strong? In other words, they're somewhat independent of one another rather than necessarily directly correlated?
John Baker - CEO
The demand has made them be, for the time being I think , independent.
Jack Kasprzak - Analyst
Okay. And are there any more cement price increases announced for the fall?
John Baker - CEO
Not by us. And when I say not by us, I think in Virginia and Maryland, there are a number of announcements out by Lafarge and others for a $10 increase. There has been no increase announced in Florida for anything in January, though I must tell you, I would expect that there will be an increase.
Jack Kasprzak - Analyst
Okay. And lastly, with regard to Virginia and Maryland, Florida has obviously been the star market, but how would you characterize those markets which had been somewhat softer, particularly on the highway side? Are you seeing a pick-up in your mid-Atlantic markets?
John Baker - CEO
Not really. In our Washington, D.C. operations, the concrete business is pretty strong there, and again, it's the same thing. Where you have cement, you can do very well in the concrete business right now. In the aggregates business, our business has been slow in Georgia, Virginia and Maryland.
Jack Kasprzak - Analyst
Okay, thank you John.
Operator
John Fox, Fenimore.
John Fox - Analyst
Good morning. I have a question on a couple of the unusual items. The landfill -- what segment was that in? I assume aggregates?
John Baker - CEO
Correct.
John Fox - Analyst
Okay. And could you talk a little bit more about the insurance proceeds and where that came in?
John Baker - CEO
Sure. Most of that was from a lawsuit to that we had settled three or four years ago and the insurance company denied coverage. And we went back and won the lawsuit that got the coverage. We have, in addition to that, we insure some of the executives and unfortunately, one of our retirees died and we got the proceeds from that insurance company.
John Fox - Analyst
Okay. Is that in any of the segments, or that's in other or?
John Baker - CEO
That would be other.
John Milton - CFO
Life insurance is in other. The insurance recovery for the other is in -- for the lawsuit is in the Aggregates segment.
John Fox - Analyst
Okay, great. And John Milton, do you have concrete blocks in the price per block?
John Milton - CFO
I do, John. In the block market for the third quarter, the average pricing was $1.13 per block, and that compares to $0.90 per block a year ago.
John Fox - Analyst
Okay. DO you have the number of blocks?
John Milton - CFO
I do have a block volume. The block volume for this third quarter was 21,702,000.
John Fox - Analyst
Okay, great. And you mentioned about the weather in June was wet. Can we infer from that that volumes would have been better? Is that the reason you mentioned it?
John Milton - CFO
Yes.
John Fox - Analyst
Okay. So it did have some impact on volume?
John Milton - CFO
It did, and it has been wet in July as well.
John Fox - Analyst
Okay, thank you so much.
Operator
Gary McCam (ph), McCam & Company.
Gary McCam - Analyst
Good morning, fellows. The imported cement -- what -- with the increase there, do you do anything special or extra for quality control to see if the quality of what is coming in is as it is supposed to be now that there's increases?
John Baker - CEO
Sure. Sure. Let me respond to that in several ways. The cement that we import, we test very rigorously to make sure that the quality is good. And the cement that we're buying comes primarily from two locations, one Colombia and one in Venezuela, that are plants that have been around a long time and have a very consistent quality record. At our Tampa operation, we actually, we grind a substantial amount of it and obviously, we test the re-ground product as well before we ship it or bag it.
Gary McCam - Analyst
But with the increased imports --.
John Baker - CEO
We're just getting more from the same places.
Gary McCam - Analyst
Okay. I was thinking back a few years ago when the cigar boom was real good big, you had all of these extra cigars coming into the country and the quality slipped quite a bit because people really did not have a chance to look at so many of them. I did not know if that was posing your problem or not?
John Baker - CEO
No, it really is not.
Gary McCam - Analyst
Alright thank you.
Operator
Justin Boyer (ph), George Weiss Associates.
Unidentified Speaker
Hi, this is Damian (ph) actually. Have you heard anything new in terms of the import duties from Mexico? Is there any changes in that or any changes that you foresee there?
John Baker - CEO
I have not heard anything new. CMIX (ph) has been very active and they have enlisted the support of the Associated General Contractors as well as the Home Builders to lobby for the eradication of those duties on cement imported from Mexico. And I think it's in the political process now and I have no clue how that is going to turn out.
Unidentified Speaker
In terms of your inventories, did volume go down in any segments? Because it looked like inventory value was up, but -- I know that your costs are going up too, so did inventory volumes go down? How do feel about inventory?
John Baker - CEO
Volumes were up overall in every segment. In some cases, we were able to build inventories through increased production, but I think pricing probably has more to do with it than anything.
Unidentified Speaker
Thank you. That was my question.
Operator
Cliff Walsh, Sidoti & Company.
Cliff Walsh - Analyst
Good morning, everyone. Can you comment on the rail situation? You mentioned that it improved a little bit. Is there anything to suggest that we will see ongoing improvements there, or just maybe a little color on that situation?
John Baker - CEO
It's day-to-day. In fact, it slipped a little last month, I noticed. But I know that they -- they being the CSX -- is working very hard on it. They are training engineers. They have more equipment. I think they are optimistic that it will improve. Obviously, that's important to us as we expand the Miami quarry. I think they will get that right.
Cliff Walsh - Analyst
Okay. And John Milton, can you give us a sense of the market breakdown in the quarter, if you could, and maybe comment on how much the business is made up of home building and housing?
John Milton - CFO
Well, we really have not recalculated that on a quarterly basis. Our sense I think is that we are still about 50% residential throughout the market and the other 50% probably somewhat evenly divided between nonresidential construction and highway construction.
Cliff Walsh - Analyst
Okay, great. Thanks so much guys.
Operator
Joel Locker (ph), Carlin (ph) Financial.
Joel Locker - Analyst
Hi, guys. I just wanted to clarify. You said the cement average in the quarter was $88.23 a ton?
John Milton - CFO
No, I think it was 82.
John Baker - CEO
Let me clarify that, because the specific question that Barry asked was the average price of cement at Newberry. That's our manufacturing facility, and the average price there I gave him was $82.21.
Joel Locker - Analyst
So what was it overall for the quarter?
John Milton - CFO
Overall for the all of the cement volume, including some slag product that we produced in Tampa, the average price for the quarter was $84.75.
Joel Locker - Analyst
So that was pretty similar to last quarter when I think it was 84.09?
John Milton - CFO
That's exactly right.
John Baker - CEO
And there were no price increases during the quarter, so that would make sense.
Joel Locker - Analyst
And what do you expect the overall average for cement to be in the fourth quarter?
John Baker - CEO
$5 up.
Joel Locker - Analyst
So it's just right around 90 bucks, a little under?
John Baker - CEO
Right.
Operator
(Operator Instructions). Andrew Shirley (ph), Ivory Capital.
Andrew Shirley - Analyst
An earlier caller touched on the CMIX (ph) efforts regarding antidumping and I was wondering if you can comment, if CMIX and AGC are successful in having the antidumping order lifted, do you expect it to have any material impact on U.S. cement prices?
John Baker - CEO
You know, I do not. And in fact, we have been supportive. We were part of the coalition that opposed CMIX for years, and in the last year or so, we've dropped out and actually lent our support to them. I feel like CMIX is the issue because they are the dominant produce there. And I think in the markets we're in, they have no reason in the world to try to be negative. And in fact at this point if we could get some more cement, it would be a positive.
Andrew Shirley - Analyst
So do you think they are pushing for it to get into -- or to have more access to other markets?
John Baker - CEO
I certainly think they would like to go into California, Arizona, Texas; and in fact, the truth of the matter is, they have been going into those markets and paying the duty. So I think if nothing else, it would help CMIX just because they would not have to incur the duties.
Andrew Shirley - Analyst
Do you know approximately how much the duties are?
John Baker - CEO
I don't, but it is a big number. It's in the hundreds of millions.
Andrew Shirley - Analyst
Okay, great. Thanks.
Operator
Jack Kasprzak.
Jack Kasprzak - Analyst
Thank you. John Milton, could you give us your average ready-mix price per yard in the quarter? Do you have that?
John Milton - CFO
On ready mix concrete, the average price for the quarter was $81.35 per yard.
Jack Kasprzak - Analyst
Great, thank you.
Operator
(Operator Instructions).
John Baker - CEO
Thank you very much. We appreciate your interest. Ya'll have been very supportive for a long time and as I mentioned in my earlier comments, we're very optimistic about our business. There's clearly always questions about what will happen if interest rates go up, if home building were to slow. But at this point, the foreseeable future looks very, very solid for the time being. Thank you so much and we will talk to you next time.
Operator
That concludes today's teleconference. You may disconnect at this time.