Taseko Mines Ltd (TGB) 2023 Q3 法說會逐字稿

完整原文

使用警語:中文譯文來源為 Google 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

  • Good Morning. My name is Allen, and I will be your conference operator today. At this time, I would like to welcome everyone to the Taseko's third quarter earnings conference call. (Operator Instruction)

  • Thank you. Mr. Brian Bergot, Vice President of Investor Relations, you may begin your conference.

  • Brian Bergot - Vice President - Investor Relations

  • Thank you, operator, welcome everyone, and thank you for joining to Taseko's third quarter 2023 conference call. The news release and regulatory filing announcing our financial and operational results was issued yesterday after market close and is available on our website at to Tasekomines.com as well as on SEDAR. I'm joined today by Taseko's, President and CEO, Stuart McDonald; Taseko's Chief Financial Officer, Bryce Hamming; and our Chief Operating Officer, Richard Tremblay.

  • As usual, before we get into opening remarks by management, I would like to remind our listeners that our comments and answers to your questions will contain forward-looking information. This information by its nature is subject to risks and uncertainties that may cause the stated outcome to differ materially from the actual outcome. Further information on these risks and uncertainties, I encourage you to read the cautionary note that accompanies our third quarter MD&A and the related news release as well as the risk factors particular to our company.

  • I would also like to point out that we will use various non-GAAP measures during the call. You can find explanations and reconciliations regarding these measures in the related news release. And finally, all dollar amounts we will discuss today are in Canadian dollars unless otherwise specified following opening or opening remarks, we'll open the phone lines to analysts and investors for questions.

  • I will now turn the call over to Stuart for his remarks.

  • Stuart McDonald - President, Chief Executive Officer, Director

  • Thank you, Brian, and welcome, everyone to our third quarter earnings call, and it's been a very busy three months since our last call, but we've been able to make some great strides forward with our business. We had a very strong. We have very strong operating results at Gibraltar, solid earnings as well this quarter, but I'll start with our most exciting news, and that's our permitting success at Florence.

  • We announced earlier this week. The EPA confirm that no appeals have been received. And our final UIC permit is now effective great result for us and a testament to the work our project team has done over the last 10 years. We've methodically worked our way through a very rigorous and detailed permitting process, which technically de-risked the project with successful test facility operations. And at the same time, we've been able to build a strong community support that we enjoy today.

  • In this day and age to be able to permit a project with no substantive opposition or appeals. As I said, it's a great result, a big milestone for our company. So we're moving forward. We're at Florence a yesterday with our Board of Directors reviewing our construction plans.

  • Next steps will be site preparation and clearing for the wellfield expansion. That work will start in the next few weeks. Drilling contractors are planned to be on site and drilling early in the New year. We're also working to finalize key vendor contracts, and our construction team is going out for firm quotes on the remaining equipment and materials that need to be procured moving forward in a disciplined way and aware of the inflationary risks in uncertain markets that we're in today.

  • We aren't racing to complete construction. We're focused on delivering the project on budget and ensuring that we have the right financing package in place. Previously said that we're targeting to raise US$100 million at the project level consisting of debt and a royalty. We had very good progress on those discussions, and we're now very close to getting firm commitments in place and we should be able to provide additional details on that in the near future, we're expecting to be able to close those financings early in the new year for the drilling commences and our construction spending starts to ramp up.

  • At that point, we would have $175 million of committed funding for Florence constructions. In addition to our current available liquidity of about $110 million. Florence's profile as a low carbon U.S. based copper producer and continues to generate a lot of interest from potential customers, investors and other miners.

  • Few months ago, the U.S. Department of Energy identified copper as a critical material. This opens up the possibility of tax incentives for the project. And our preliminary review indicates we could potentially benefit from a tax credit as high as 30% on the SX/EW copper processing infrastructure at Florence, we'll need to apply and be accepted, but this has potential to be a very meaningful piece of funding available to us in 2025.

  • As we said in the past, we have a very unique opportunity here, a low impact and low cost projects now fully permitted in the Tier 1 jurisdiction. We're looking forward to realizing that value over the next couple of years. Markets are markets everywhere are challenged right now, and we've seen copper prices impacted recently as well. 2025 looks like a great time to be bringing on a new project.

  • Turning to Gibraltar now, it was a very strong production quarter as we indicated on last quarter's call, we had made good progress advancing mining deeper into the Gibraltar pit. We're now well established in the bottom of that pit.

  • With that set up in place the mine delivered excellent results this quarter with copper production of over $35 million and C1 cash costs of $2.20 per pound. Copper grades improved as expected averaging 0.26% for the period. Mining benefited from the large continuous mineralized zones and the softer ore resulted in mill throughput over 87,000 tons per day, which is above design capacity. Your quality also led to improved copper recoveries in the mill, 85% for the quarter, which is a good result. Total site cost was CAD102 million, which is generally in line with recent quarters. We benefited from a 60% increase in Moly sales, which generated a byproduct of $0.23 per pound of copper.

  • Through three quarters. Gibraltar mine has produced 88 million pounds of copper, and we're well on track to achieve our original production guidance of 115 million pounds plus or minus 5%. We're hopeful to be on the plus side of that number. Gibraltar pit will continue to be the primary source of mill feed through to the middle of next year, then we'll transition to or from the new Connectra pit for the second half of next year.

  • We should continue to see good daily mill throughput from both pits, but metal production will be affected by some planned mill downtime in two significant downtimes are planned. Mill number two will be down for two weeks in Q1 mill number one will be down for about three weeks in the second quarter, and that's for the crusher move and a major maintenance.

  • So that will certainly have some impact on production next year. But taking that into account, we're generally expecting 2024 for copper production to be similar to this year, still working through some details, and we'll be able to give some more specific guidance with our year-end results in February.

  • With that, I'll now turn the call over to Bryce for some additional commentary on our financials.

  • Bryce Hamming - Chief Financial Officer

  • Thanks Stuart. Good morning, everyone. It indeed was a great quarter for Gibraltar, and this is reflected in our financial performance. Revenue in the third quarter was the higher sales volume ever recorded at $144 million from the sale of 32 million pounds of copper, higher sales volume are increased ownership in Gibraltar, a steady realized price of 3.83 per pound and the weaker Canadian dollar, the drivers of the record revenue. We also had at least 5 million pounds of excess concentrate inventory through the Vancouver Port Strike in July at the end of September.

  • We will sell that copper in Q4 and should be back to more, more normal levels by year end. So we should see another great earnings quarter to finish the year for October, we produced over 11 million pounds of copper, so we continued to be on track. Total site costs were $102 million in the third quarter, a $3 million decrease from the second quarter, but generally in line with our previous quarters and guidance.

  • Even though our mining rates in the quarter were lower than the previous quarters, diesel comes consumption was 3% higher due to the longer loaded hauls out of the Gibraltar pit and diesel prices also increased and were 11% higher compared to Q2. Moly byproduct credit in the quarter was $0.23 per pound, significantly higher in the second quarter as a result of much higher moly production and sales as well as a higher realized moly price of $23 per pound.

  • Lower site costs, higher production and increased moly byproduct credit resulted in a 17% decrease in C1 costs from $2.66 per pound in the second quarter to $2.20 per pound in the third quarter. Lower costs and strong sales drove adjusted EBITDA of $63 million for the quarter. GAAP earnings for the quarter were $900,000 or $0.09 per share. And adjusted net earnings after removing unrealized foreign exchange and derivative losses were $20 million or $0.07 per share.

  • For the third quarter, $18 million spent at Florence fair to $13 million in the second quarter year to date, we have capitalized $45 million of development costs at Florence spending was up this quarter due to some additional procurement for the commercial facility and increased costs for our PTF rinsing program. At Gibraltar work continued on the in-pit crusher and stuff in the electrical substation relocation projects, $7 million spent in the quarter.

  • Work is wrapped up for the year now leaving approximately $9 million to be spent in the second quarter next year on that project when the primary crushers moved, we ended the quarter with approximately CAD150 million of available liquidity including CAD82 million of cash. Last week, we received the first $20 million U.S. tranche from the $25 million Bank of America equipment loan commitment for Florence, which closed after the quarter end. So it's not included in that liquidity number.

  • We will then work next on closing the Mitsui transaction in the coming months. We've also significantly advanced with Endeavor Financial or financial advisor on project finance, and they're working on additional Florence project level financing. So we'll be making further announcements on those in the coming weeks. We are looking for up to $100 million of additional funding, as Stuart mentioned, in debt and royalties. And we have the ability to do more at the Florence project given its relatively. It's relatively unencumbered at the moment with robust economics and that's if we need to.

  • The operation of the PTF facility has not only allowed us to obtain the permits performance, but has also made the project bankable, just to finish up, the price of copper has declined in recent weeks, but now sitting in the $3.60 to $3.70 range. But thanks to our price protection program, we will receive a minimum price of $3.75 per pound through the end of the year for most of our production.

  • We have also recently extended our price protection into 2024, we have purchased put option contracts for 21 million pounds from January to March with a strike of $3.25 per pound. This was undertaken to prevent any copper price surprises, given the uncertainty in the world at the moment, we'll look to add more to that in the coming months to cover more of 2024 as we prepare for construction.

  • With that, I'll turn it over to the operator for questions. Operator?

  • Operator

  • Thank you. (Operator Instruction) Your first question comes from Craig Hutchison of TD Securities. Your line is already over.

  • Craig Hutchison - Analyst

  • Hi, good morning, guys. Thanks for taking my questions. [Keith Meister], you mentioned a couple of things I wanted to clarify, you mentioned there's a potential tax credit for Florence. And if I'm not mistaken, you said it was a potential source of funding in 2025. Can you just maybe elaborate on that? Is that something you could potentially monetize if you get that credit?

  • Bryce Hamming - Chief Financial Officer

  • Yes, that's our understanding. Based on the preliminary work we've done is there's potentially a 30% tax credit there on that related to our CapEx from the processing infrastructure. So obviously, the main piece being the SX/EW plants on and on top of that, yes, as you said, there's potential to actually monetize that from the tax rules allow for that. So yes, are early days, but a good opportunity. And I think a result of of the deal we bringing in copper and as a critical mineral in over the summer.

  • Craig Hutchison - Analyst

  • Okay. That's interesting. And maybe just on Gibraltar, you guys are on track to hit your guidance for the year. Can you provide any clarity just in terms of Q4 on kind of grades you're seeing? Or are you still sort of the bottom of the pit on? And then just some clarity perhaps on some capitalized stripping here for the next couple of quarters, quite low in this quarter? Thanks.

  • Richard Tremblay - Chief Operating Officer

  • Good morning, Craig. Richard here. Grades in Q4 are going to be slightly lower than Q3, but very much in line with kind of how we've operated in Q3, but slightly lower. It's a bit and then capitalized stripping, we do see an increase in capitalized stripping in Q4 as we're deploying more shovels and the connector pit and getting that pit ready for future ore release.

  • Craig Hutchison - Analyst

  • Okay, great. Thanks, guys.

  • Operator

  • Next question comes from Alex Bedwany of Canaccord Genuity. Your line is already open..

  • Alex Bedwany - Analyst

  • Good morning, guys. Thanks for taking my questions. And first question is just how quickly can the working capital build unwind over the over the next quarter, obviously, it was about CAD34 million. How much of that do you think will unwind with the sales and now that the port issues have been resolved. And the second question for the second half of next year from connected, what can you tell us about the ore hardness and the grade as it compares to what you currently mining from Gibraltar? Just trying to get a sense of have throughput levels and grades?

  • Bryce Hamming - Chief Financial Officer

  • It's Bryce. Maybe I'll take the first part of that question. Just with the working capital. We had excess inventory at the end of the quarter. We're expecting we'll be through that by the end of November. So we should realize the sales of excess copper inventory into the Q4 results? And more normal levels for the end of the year at this stage.

  • Richard Tremblay - Chief Operating Officer

  • And then the second part of the question for connector pit. Richard here. In terms of ore hardness, it is the ore from connector pit is showing that it's more similar to the Gibraltar pit or a little bit harder, but still quite soft compared to other ores that we process on the property previously. And then grade wise, as we start, we'll see a little bit lower grade than what we're currently processing now. But then it will increase as we get deeper similar to the same sequence we have experienced historically.

  • Alex Bedwany - Analyst

  • Okay, very clear. And the last one, if I may. What does the strip ratio is going to look like and for the next quarter or the next three quarters as you finish up at Gibraltar,

  • Richard Tremblay - Chief Operating Officer

  • Strip ratios with extra quarter actually continued to be quite low given the thought being at the bottom of the pit and in the century in a very low strip ratio area with that high amounts of ore available to mine.

  • Alex Bedwany - Analyst

  • Great, very great. Thank you, guys.

  • Richard Tremblay - Chief Operating Officer

  • Thanks.

  • Operator

  • There are no further question at this time. I would hand over the call to the management team. Please proceed.

  • Brian Bergot - Vice President - Investor Relations

  • Great. Okay. Thanks, everyone for for dialing in and we will talk to you again in February at our next earnings call. Thanks very much.

  • Operator

  • Ladies and gentlemen, this concludes today's conference call. Thank you for your participation and you may now.