Operator
Good morning, ladies and gentlemen. Thank you for standing by. Welcome to the Aur Resources fourth-quarter and year-end results conference call. At this time all participants in a listen-only mode. Following the presentation we will conduct a question-and-answer session. (OPERATOR INSTRUCTIONS). I would like to remind everyone that this conference call is being recorded on Friday, February 9th, 2007, at 10:00 AM Eastern standard time.
I will now turn the conference over to Mr. Jim Gill, President and CEO. Please go ahead.
Jim Gill - President and CEO
Thank you very much and good morning, everybody. Welcome to Aur's fourth-quarter and year-end conference call. We will follow our usual format, where I will review the technical results, following which Ed Guimaraes will present the financial results. After this we'll take questions, first from those attending by telephone and then those present here in the room.
2006 was a great year for Aur Resources and for the mining business in general. High copper prices received for copper production from the Andacollo and Quebrada Blanca mines allowed Aur to achieve record earnings of $293.7 million, record cash flow from operating activities of a little over $500 million, leaving the Company with consolidated cash of $630 million or C$7.48 per share at year end, after paying $25.5 million of dividends to Aur shareholders and $36.3 million to the minority shareholders of Quebrada Blanca.
In November 2006 Aur declared a special dividend of C$1.00 as well as the regular $0.05 dividend, making total dividends declared of C$1.20 per share for the year, a 10.2% yield on the share price at the beginning of the year.
On the growth side, the Duck Pond mine construction was essentially completed by year end. A production decision for the Andacollo hypogene copper/gold deposit was made in July. An agreement was reached to purchase CMP's 27% of Andacollo, increasing Aur's interest to 90%. These two mining investments will result in an increase in Aur's production by over 90% over the next three years.
In 2007 we expect to produce 220 million pounds of copper at Quebrada Blanca and Andacollo and 30 million pounds of copper and 56 million pounds of zinc at Duck Pond. At a copper price of $2.75 a pound we expect net earnings of $258 million, cash flow from operating activities of $341 million and our cash balances to be $637 million at year end after cash expenditures of $238 million on investing activities and a net $98 million on financing activities.
I would like to remind everyone that Aur is a US dollar reporter, so all dollars are in US dollars unless stated otherwise.
Turning to the production, highlights for the fourth quarter, copper production from the Andacollo and Quebrada Blanca mines was 53.8 million pounds at a cash operating cost per pound of copper sold of $0.82. Cash flow from mining activities was $134 million, and capital expenditures at the mines were $48.8 million, of which $32 million was at Duck Pond.
For the full year copper production was 223 million pounds from Andacollo and Quebrada Blanca at a cash operating cost per pound of copper sold of $0.78. Cash flow from mining activities was $436 million after net capital expenditures at the mines of $85 million.
Looking at Andacollo, the fourth quarter 2006 was another profitable one for Andacollo. We moved 6 million tons of material, of which one million tons was heap leach ore at a grade of 0.6% soluble copper, and 1.1 million tons was dump leach ore at a soluble copper grade of 0.25%. Production was 11.8 million pounds at a cost of $0.78 per pound of copper sold.
Cash flow from operations was $39.7 million in the fourth quarter, and capital expenditures totaled $14.7 million, of which $13.3 million was spent on the development of the hypogene copper gold deposit.
For the full year 2006 Andacollo moved 19.4 million tons of material, of which 3.7 million tons was heap leach ore at a grade of 0.62% soluble copper and 3.6 million tons was dump leach ore at a soluble copper grade of 0.26%. Copper production totaled 41.1 million pounds, and the cost per pound of copper sold was $0.77 for the year.
Cash flow from operations was $112 million, and cash balances at Compania Minera Carmen de Andacollo was $130.6 million at year end. Capital expenditures for the year totaled $7.3 million, of which $4 million was spent on the dump leach project and $0.9 million to complete the heap leach expansion.
Andacollo had an exceptional safety performance in 2006 with no lost-time accidents during the entire year. Despite some challenges related to highly altered ore, Andacollo had its most profitable year ever in 2006. We expect 2007 to be another good year.
Turning to Quebrada Blanca, the Quebrada Blanca mine had a very strong 2006 and set new records for both copper production and profitability. In the fourth quarter we mined 8.8 million tons of rock, of which 1.9 million tons was heap leach ore at a soluble copper grade of 1.14% copper. We also produced 1.8 million tons of dump leach ore at a soluble grade of 0.34% copper. Production was 46.4 million pounds, and copper sales were 47.9 million pounds during the quarter.
The cost per pound of copper sold was $0.83, and cash flow from operations was $94.7 million. Capital expenditures were $2.8 million in the fourth quarter, of which $1.2 million was for overhauls of shovels and powerhouse engines and miscellaneous other items.
For the full year 2006 we mined 34.9 million tons of rock, of which 7.4 million tons was heap leach ore at a soluble grade of 1.13% copper, and 8 million tons was dump leach ore at a soluble copper grade of 0.32% copper.
Production was a new record of 181.6 million pounds, and copper sales totaled 182.5 million pounds for the year. The cash cost per pound of copper sold was $0.78 for the year, and capital expenditures were $6.8 million, of which $2.7 million was for major maintenance and overhauls, $2 million for a new bunkhouse and upgrades to our fire suppression system in the plant and conversion of our water heaters to [Bunker Sea] fuel. Cash flow from operations was $408.5 million.
In 2006 Quebrada Blanca had its most profitable year ever, thanks to the high copper price and record copper production. In 2007 we expect another very good year for the mine and also look forward to initiating the evaluation of our hypogene copper-gold deposit.
Turning for a moment to the development projects, development of the Duck Pond deposit in Newfoundland for production was essentially completed in the fourth quarter of 2006, and the first concentrate was produced on January 11, 2007. Startup of production, originally scheduled for the fourth quarter of 2006, was about a month behind schedule due to a combination of weather conditions and a variety of concentrator commissioning delays.
In the fourth quarter 34,000 tons of development ore was mined and stockpiled on the surface. The port facility construction was completed, mill construction was essentially completed and other surface infrastructure was ready for production. Mine construction capital expenditures totaled $31.6 million in the fourth quarter of 2006 and have been $115 million to date.
Commercial production is not expected to be achieved in February 2007. Duck Pond will contribute meaningful copper and zinc towards metal production for at least the next six to eight years.
Turning to the Andacollo hypogene copper-gold deposit in Chile, development of this deposit for production by late 2009 commenced in the third quarter of 2006, following the formal production decision announced on August 3rd of last year. Basic engineering and design work, geotechnical studies related to mine design, tailings facilities, environmental permitting progressed as planned. Purchase orders for the SAG and ball mills motors were issued to ensure delivery as required to meet the construction schedule.
Mobile mining fleet leases were tendered in late 2006 and completed in January of this year with first deliveries to be received before the middle of 2007. Capital development expenditures totaled $19.1 million in 2006.
On the exploration front, Aur spent $2.8 million on exploration projects and the search for acquisitions in the fourth quarter. Drilling on the Eldorado gold-silver property in Southern Argentina continued to encounter quartz veins and hydrothermal breccias carrying some occurrences of gold-silver mineralization, which we will be further exploring this year.
Work to define drill targets on our Macuchi base metal property in Ecuador, from which 435,000 tons of ore grading 11.5 grams gold and 4.7% copper, was mined in the [40's]. And on the [Coyote] porphyry copper property in Chile was also carried out. The search for development-stage deposits and producing mines which meet our investment criteria continued in Africa, Eastern Europe, CIS countries as well as in the Americas. A number of exploration and acquisition opportunities have been identified, and we currently have more under evaluation.
I would like now to turn the meeting over to Ed, who will take you through the financial results for the fourth quarter and the full year 2006.
Ed Guimaraes - VP and Controller
Aur had another solid quarter from a financial performance perspective with strong revenues, earnings and cash flows, primarily due to high copper prices, which averaged $3.21 per pound in the fourth quarter of this year. Before getting into the numbers I would like to remind everyone that all figures are in US dollars unless stated otherwise.
Please turn to the consolidated statements of operations. Focusing on the fourth quarter, net earnings were $68.5 million, equal to $0.70 or, C$0.80 per share in the fourth quarter of 2006 compared to net earnings of $41.5 million or $0.44 per share for the same quarter last year.
Mining revenues were $181.4 million or 37% higher than the $132.7 million for the same period in 2005, largely due to the fact that ore realized an average of $2.99 per pound of cathode copper sold in the quarter, $0.80 per pound higher than the realized copper price for the same quarter last year. The realized copper price of $2.99 per pound was comprised of an LME average price of $3.21 plus cathode sales premiums of $0.05 minus quotational period pricing adjustments of $0.27.
Looking at expenses, mine cash operating expenses were $49.8 million for the quarter, compared to $42.9 million last year. Aur's average cash operating cost per pound of copper sold was $0.82 for the quarter, $0.11 higher than in the fourth quarter of 2005, primarily as a result of higher energy, labor and asset costs compared to 2005.
There were no unusual items this quarter. All other non-mining expenses before taxes and noncontrolling interests, with the exception of the ENAMI copper price participation and interest income, were essentially on budget and essentially the same as in the corresponding period in 2005, so I won't go over them in detail.
A copper price participation expense payable to ENAMI in April 2007 of $6.9 million was accrued in the fourth quarter of 2006, $4 million higher than the $2.9 million accrued for the same period in 2005. This increase was due to realized -- higher realized copper prices at the Quebrada Blanca mine in 2006.
Interest and other expenses and revenues were positive $6.9 million in the fourth quarter of 2006 compared to positive $3.3 million in 2005, primarily due to higher interest income earned as a result of higher cash balances and a higher average interest rate.
The provision for taxes was $19.4 million in the fourth quarter of 2006 compared to $15 million in 2005, as a result of higher earnings in 2006.
Noncontrolling interests on the income statement related to the interests of Aur's partners in the Andacollo and Quebrada Blanca mines was $26.3 million in the fourth quarter compared to $17.2 million in 2005.
Turning to the full year, net earnings were $293.7 million, equal to $3.02 per share or C$3.43 per share in 2006 compared to net earnings of $142.3 million or $1.49 per share in 2005.
Mining revenues were $738.3 million, approximately 65% higher than the $446.9 million in 2005, largely due to the fact that Aur realized an average of $3.30 per pound of cathode copper sold in 2006 compared to $1.83 per pound last year.
Looking at expenses, mine cash operating expenses were $173.8 million in 2006 compared to $167.2 million in 2005. Aur's average cash operating cost per pound of copper sold was $0.78, $0.11 higher than last year, resulting primarily from 15.5 million fewer pound sold, together with higher energy, reagent and labor costs in 2006 compared to 2005.
There were no unusual items for the year-to-date. All other non-mining expenses before taxes and noncontrolling interests, with the exception of the ENAMI copper price participation and interest income, were essentially on budget and essentially the same as in the corresponding period in 2005, so I won't go over them in detail.
A copper price participation expense of $32.1 million related to the Quebrada Blanca mine and payable to ENAMI in April of 2007 was accrued in 2006 compared to $5.9 million in 2005.
Interest and other expenses and revenues were positive $25.6 million compared to $10.4 million in 2005, primarily due to higher interest income as a result of higher cash balances and a higher average interest rate earned.
Income and resource taxes were $93.4 million compared to $40.1 million as a result of higher earnings in 2006. Noncontrolling interests on the income statement related to the interests of Aur's partners in the Andacollo and Quebrada Blanca mines was $109.4 million compared to $40.7 million in 2005.
Turning to the consolidated statements of retained earnings, Aur's retained earnings at December 31st, 2006, were $477.7 million. This is $19.2 million lower than at September 30th, 2006, and was net of the $87.7 million dividend of C$1.05 per share declared in November 2006 and paid to Aur's shareholders on January 31st, 2007.
Turning to the consolidated balance sheets, total assets at December 31st, 2006, were $1.1 billion, a $397.3 million increase from December 31st, 2005. The Company's current assets were $728.4 million at the end of 2006, including cash of $630.3 million compared to $361.3 million at the end of 2005. The cash increase was principally the result of the high operating cash flow from the mines.
Property, plant and equipment increased by $106.1 million to $394.6 million in 2006 as the amount of expenditures on property, plant and equipment exceeded the depreciation and amortization for the year to date.
Total liabilities at December 31st, 2006, were $501.3 million, a $191.2 million increase from December 31st, 2005, principally due to increased dividends payable, increased price participation amounts due to ENAMI from Quebrada Blanca and higher noncontrolling interests resulting from the higher earnings.
Current liabilities were $292.6 million at December 31st, 2006, an increase of $198.4 million from December 31st, 2005. This increase was primarily due to increased accounts payable and accrued liabilities at the mine sites, a $29.6 million increase in taxes, a C$1 per share special dividend, an additional $26.1 million copper price participations payable, as well as the reclassification of the first scheduled senior note principal repayment from a long-term to a current liability, as the first repayment of $31.3 million is to be made in March 2007.
Other liabilities as shown on the balance sheet totaled $208.8 million and were $7.1 million lower than December 31st, 2005.
Shareholders' equity increased by 47% to $646.9 million, net of $100.8 million of dividends declared in 2006, primarily on the strength of Aur's earnings for the year.
Turning to the consolidated statements of cash flows, focusing on the fourth quarter, cash flow from operating activities was $134 million, equal to $1.30 or C$1.57 per share in the fourth quarter of 2006 compared to $89.3 million or $0.94 per share in the fourth quarter of 2005.
Financing activities totaled $47 million in the fourth quarter of 2006 and included $51.8 million of dividends paid to noncontrolling interests at Quebrada Blanca, partially offset by $4 million of proceeds on common share issuances.
In the fourth quarter of 2005 financing activities totaled $31.3 million and included $32.7 million of dividends paid to noncontrolling interests at Quebrada Blanca, partially offset by $2.8 million of proceeds received from common share issuances.
Investing activities in the fourth quarter totaled $49.2 million and were primarily for investments in property, plant and equipment, including $31.3 million at Duck Pond, $2.8 million at Quebrada Blanca and $13.1 million at Andacollo on the development of the hypogene deposit. In the fourth quarter of 2005 investing activities totaled $22.9 million, primarily for investments in property, plant and equipment, including $16.1 million at Duck Pond, $1.1 million at Quebrada Blanca and $3.4 million at Andacollo
Aur's cash balances increased by $37.8 million in the fourth quarter to $630.3 million at December 31st, 2006.
Turning to the full year, cash flow from operating activities was $504.6 million, equal to $5.19 or C$5.87 per share in 2006 compared to $249.8 million or $2.62 per share in 2005.
Financing activities totaled $108.6 million in 2006 and included $25.5 million of dividends paid to Aur's shareholders, $84.5 million paid to noncontrolling interests at Quebrada Blanca, $5.9 million paid to ENAMI for its price participation, partially offset by $11 million of proceeds on common share issuances. In 2005 financing activities totaled $47.1 million and included $11.8 million of dividends paid to Aur's shareholders and $36.3 million paid to noncontrolling interests at Quebrada Blanca.
Investing activities totaled $127 million in 2006, of which $10 million was for the 2005 copper price participation payment to Teck, $118.3 million was for investments in property, plant and equipment, including $85.1 million at Duck Pond, $6.8 million at Quebrada Blanca, $7.3 million at Andacollo and a further $19.1 million at Andacollo on the development of the hypogene deposit.
In 2005 investing activities totaled $47.9 million, of which $10 million was for the 2004 copper price participation payment to Teck and $39.1 million was for investments in property, plant and equipment, including $30.3 million at Duck Pond, $1.6 million at Quebrada Blanca and $7.2 million at Andacollo.
Aur's cash balances increased by $269 million during the year to $630.3 million or C$7.48 per share at December 31st, 2006.
That completes my review of Aur's financial performance in both the fourth quarter and the 2006 year, and I will now turn the meeting back to Jim, who will present a brief overview of Aur's expectations for the 2007 year. Jim?
Jim Gill - President and CEO
Turning to the 2007 outlook, we have developed this outlook using a copper price of $2.75 a pound, and we also used the zinc price, which was the forward price at January 1st of $1.80 per pound, in developing this outlook.
Turning to production, in 2007 copper production from the Andacollo, Quebrada Blanca and Duck Pond mines is expected to total 250 million pounds, (technical difficulty) which Aur's share will be 204. The Duck Pond mine is also scheduled to produce 56 million pounds of zinc plus byproduct silver and gold.
Aur's share of copper production is expected to increase by 39 million pounds or 23% over 2006, due to the increase in ownership of the Andacollo mine from 63% to 90%, effective January the 1st, 2007, and also due to the startup of production at the Duck Pond mine.
At Andacollo, the Andacollo mine is forecast to produce 43 million pounds of copper at a cash operating cost of $0.83 per pound of copper sold. Operating cash flow is expected to be $58 million, and expenditures on property, plant and equipment are forecast to be $3 million, of which $2 million is for sustaining capital items. The Quebrada Blanca mine production is expected to be about 177 million pounds of copper at a cash operating cost of $0.86 per pound of copper sold. Cash flow from operating activities is expected to be about $254 million at a copper price of $2.75 per pound. Capital expenditures are budgeted to be $13 million, of which $5 million will be to complete the lead anode replacement in the electro-winning plant, $5 million for major equipment overhauls, and $3 million for a number of engineering and construction projects.
We will also spend and expense $2 million to carry out an 11,000-meter, 39-hole drilling program on a portion of the hypogene deposit at Quebrada Blanca, believed to have the potential to have a resource on the order of 1 billion tons.
Looking at Duck Pond, the Duck Pond mine began production on January 11, 2007. Commercial production is expected to be achieved in February, and full production at the rate of 1800 tons of ore per day in April. Production in 2007 is expected to be approximately 30 million pounds of copper and 56 million pounds of zinc, together with 400,000 ounces of silver and 3000 ounces of gold, both contained in copper and zinc concentrates.
Operating cash flow is budgeted to be $75 million before accounting for $27 million to be paid to settle the zinc forward sales contracts and $22 million of capital development expenditures.
Cash operating cost per pound of copper sold net of zinc, silver and gold credits, and after providing for the zinc forward sales settlement is expected to be $0.15 per pound.
Turning to the Andacollo hypogene project, development of the Andacollo hypogene copper-gold deposit for production in late 2009 will be very active with capital of $84 million to be spent during 2007. Engineering, procurement and geotechnical work related to the concentrator, the tailings facility and related infrastructure will be carried out at a cost of $59 million. Mine design, excavation work for the crushing plant, pre stripping and mobile equipment leasing expenditures of $17 million, as well as environmental, electrical power and water, information technology services and manpower training expenditures at a cost of $8 million will be carried out during the year.
The Andacollo hypogene mine is expected to produce on average 178 million pounds of copper and 66,000 ounces of gold annually over the first ten years of its 21-year mine-life and does represent the long-term high-return project for Aur.
On the business development front, business development expenditures will be $8 million for exploration and $3 million to continue the search for acquisition opportunities of advanced-stage projects in 2007. Exploration programs will include drilling on the La Verde and [Ladvacoca] copper properties in Mexico, the Macuchi copper-gold property in Ecuador, continued drilling on the Eldorado [Monsuret] precious metal project in Argentina and the [Coyote] copper property in Chile.
This (technical difficulty) new base metal and precious metal projects for acquisition in Mexico, Central and South America will continue as well as we're monitoring the progress of significant exploration plays in Canada and the United States. The exploration budget has been increased from $5 million to $8 million for 2007, and we expect that to increase to $10 million for 2008.
The search for development-stage projects and producing mines for acquisition will focus on the Cordillera region of Latin America and the evaluation of opportunities in the African copper belt, Russia, other CIS countries in Europe.
Looking at Aur from a consolidated basis, for Aur Resources, mining revenues in 2007 are forecast to be about $759 million, mine operating costs are expected to be $269 million or $0.77 per pound of copper sold net of zinc, copper and silver credits.
Operating earnings are expected to be $346 million. Cash flow from operating activities is projected to be about $341 million. Cash expenditures associated with financing activities are expected to total $98 million, including $93 million for dividends paid to Aur's shareholders in January $55 million of dividends to minority shareholders of Quebrada Blanca.
Cash expenditures on investing activities are expected to total $237 million in 2007, of which $103 million is for the purchase of CMP's 27% interest in the Andacollo mine, completed on January 18, $85 million on development of the hypogene project and the final copper price participation payment of $17.5 million to Teck Cominco.
Aur's cash balance at December 31st, 2007, is forecast to be $637 million. Aur's net earnings and operating cash flows are materially impacted by the changes in the price of copper. A $0.50 per pound change in the copper price will change the forecast net earnings and operating cash flow by approximately $79 million and $120 million, respectively.
Before taking questions I would like to make a few comments on the 2007 outlook. Net earnings are expected to be about $41 million lower in 2007 than they were in 2006. While this change is comprised of quite a number of individual items, the following are believed to be the most relevant.
The forecast copper price in 2007 budget is $2.75 per pound. This will result in a $0.51 per pound less revenue than in 2006, or $119 million revenue reduction on the same 233 million pounds sold in 2006.
The addition of 30 million pounds from Duck Pond will generate $83 million of copper sales revenue. The net result, then, is a copper revenue reduction of about $36 million in 2007 by comparison to 2006. There is also a $27 million zinc forward sale settlement expense in the current forecast.
Secondly, depreciation has increased by about 100% from $31 million in 2006 to $64 million in 2007. The vast majority of this change is due to, firstly, the startup of Duck Pond, depreciation of $16 million for 2007, and also an increase of $13 million at Andacollo, resulting from the purchase of the additional 27% interest in January and the reduction in supergene mine life by one year, due to the hypogene mine startup. The $2 million balance is from the Quebrada Blanca mine.
On the cash flows, important items to note are that $93 million of dividends will be paid to Aur's shareholders during 2007. The final $32 million copper price participation will be paid to ENAMI by Quebrada Blanca. Teck Cominco will be paid $17.5 million as copper price participations in 2007 are due quarterly rather than annually, as they have been in the past. At the end of 2007 there will remain only $2.5 million of payments to be made to Teck Cominco. The copper price participations will, therefore, be essentially zero beginning in 2008.
$103 million was paid by Aur to purchase the 27% additional interest in Andacollo, which has a significant impact on cash at the end of 2007, and also $84 million will be spent in 2007 on the development of our hypogene copper-gold deposit. After these important cash outflows and $125 million loan facility drawdown, Aur will still have $637 million in cash at the end of 2007.
Looking at the cost per pound of copper sold, as we have worked very hard to keep our operating costs at a minimum without harming our ability to reach our production targets. In 2007, however, the cost will rise on average to $0.77 per pound of copper sold net of zinc, silver and gold credits. At Quebrada Blanca and Andacollo, costs are expected to be about $0.86 and $0.83, respectively. This was compared to about $0.82 and $0.78, respectively, in the second half of 2006. The increases in 2007 at Quebrada Blanca of $0.04 per pound is due almost entirely to higher energy costs, while at Andacollo, the $0.05 per pound increase is due to $0.03 of increased labor and energy costs per pound and $0.02 due to in-process inventory adjustments.
At Duck Pond the cost per pound of copper net of zinc, silver and gold credits of $0.15 includes $27 million of zinc forward sales settlements. If you do not include this, the actual operating costs at Duck Pond would be negative $0.79 per pound of copper sold. And Aur's total cost per pound of copper sold including all the mines, would be $0.66 per pound net of zinc, gold and silver credits.
That pretty much sums up our presentation. I would like to extend to all of you an invitation to attend our annual meeting, which will be held at 4:30 on May the 3rd at the National Club here in Toronto, and we hope to see as many of you there as can make it.
Operator, I would now like to open the floor for questions, first from the people on the phone and then followed up by anybody in the audience here.
Operator
(OPERATOR INSTRUCTIONS). David Charles, GMP Securities.
David Charles - Analyst
The first question might sound a little bit foolish, but I'm just wondering, given that you have $630 million in cash, why did you take down the over $100 million line of credit that you recently announced?
I suppose the second question is just, I'm curious as to why you are doing -- well, I'm not curious as to why you are doing it. But I just want to have a little bit more background on the drilling program that you expect to do at QB this year and what your goals are for that.
Jim Gill - President and CEO
Why don't I answer the second question first and let Ed answer the first question second.
Why we are doing the drilling at the hypogene project is because we want to evaluate the potential for having a similar scenario to what we have had at Andacollo, where, once the heap leach resource or reserves are fully mined out, that we could have a long-life primary copper project developed there. In terms of timing in order to get sufficient drilling done to begin a full valuation in terms of feasibility and so on, it takes a few years. As you know, we tried to start doing that about a year and a half ago, and because of the high cost and the low productivity of the drillers, we suspended it. We just want to get back to it now.
Ed Guimaraes - VP and Controller
On your first question -- and you're absolutely right, we have a lot of cash on the balance sheet. But unfortunately, most of that cash is in Chile. To repatriate the cash that's in Chile, that would have some withholding tax implications. So we obtained the loan facility in order to pay the $88 million dividend to our shareholders in January as well as we plan on drawing down another $35 million to repay the first principal repayment of $31.25 million on the senior notes in March.
David Charles - Analyst
So basically you're just saying it was more flexible to do it this way?
Ed Guimaraes - VP and Controller
That's correct.
David Charles - Analyst
Maybe Jim, just going back to the answer you gave, you said something about $1 billion total resource. Can you describe a little bit what exactly you're looking for at QB?
Jim Gill - President and CEO
We're looking for a very large, very high-grade ore body, but whether we're going to find it or not, we'll see. I'm just joking.
As you know, there has been about seven drill holes that have been drilled into this hypogene deposit, which is basically the primary deposit from which, originally, the supergene we're currently operating at was formed. The indications there are that there is a very large porphyry copper deposit line directly beneath the currently [levine] mine supergene deposit. The seven drill holes that were done -- and we didn't do them; Teck Cominco did them -- indicated hundreds of meters of mineralization, in a grade that was somewhere around 0.7% copper.
We believe that it's necessary to do a lot more drilling. We can't even classified these as inferred resources at this point in time. So our objective here, based on the geophysical information that we have and the geological information that we have to-date, that by doing this 39-hole 11,000-meter program this year, we will, in a preliminary way, have outlined whether or not there is a potential to have 1 billion tons in that portion of the deposit.
David Charles - Analyst
Would this porphyry have any other metals associated with it? Would there byproduct gold, molybdenum or anything like that, or is it just copper?
Jim Gill - President and CEO
There was very little information gathered in the drilling done in the past on byproducts; and we will be looking at moly, we will be looking at gold. Obviously, we are hopeful there will be some. We know there is some moly around and there is some gold. But I can't answer whether there is anything of any consequence at all, at this point.
Operator
Lawrence Smith, Blackmont Capital.
Lawrence Smith - Analyst
When you give guidance on the operating cash flow, that number is before the minority interest? That's my assumption, if you could just confirm that?
Secondly, I wonder if you could give us some guidance on what your assumption is for zinc treatment charges in 2007?
Ed Guimaraes - VP and Controller
I will let Jim answer the second part of that question. But as far as minority interests go, they get added back. What flows through the income statement will get added back on your operating cash flow.
Jim Gill - President and CEO
On the zinc treatment charges, of course, you know nobody knows what the zinc treatment charges are really going to be.
Lawrence Smith - Analyst
Well, we're not supposed to admit that, though.
Jim Gill - President and CEO
Well, if you know, we would sure like to --
Lawrence Smith - Analyst
I'm just curious what your assumption is.
Jim Gill - President and CEO
No, we don't know. We have assumed that we are going to -- and I'm giving you round numbers here -- we're assuming that price participation will start at about $3000 a ton and will be on the same basis that it has in the past, which is about plus 16/minus 14 on metal prices above that level, and we have used -- I believe we've used about $150 on [TZ's].
Lawrence Smith - Analyst
What about on the payable? Like are taking it up to 90?
Jim Gill - President and CEO
85.
Operator
Tony Lesiak, UBS.
Tony Lesiak - Analyst
Can you comment on the tax rates that you're going to be looking for, for the Company, in '07?
Ed Guimaraes - VP and Controller
No problem. Tax rates are essentially -- I think the good rule of thumb will be 20%. And that is essentially the 17% first-category tax in Chile as well as there is some specific mining tax payments or accruals you should be making as well, for Chile. There's no tax expense in Canada except for there will be some Newfoundland mining duties, which will be a cash tax. But there will be no federal income taxes for Duck Pond, as we have sufficient tax pools to shelter any income from Duck Pond.
As far as the Newfoundland mining duties, that is still up in the air. We are still looking at the calculation, and it could be anywhere from 12% to 19%.
Tony Lesiak - Analyst
Any timing for bringing back some of the cash from some of your Chilean operations?
Ed Guimaraes - VP and Controller
None in the immediate future.
Tony Lesiak - Analyst
I guess you are waiting to see how the acquisition study goes and whether there is any opportunities there?
Jim Gill - President and CEO
Well, we have to be aware that we are able to invest money in Chile from the wholly-owned Chilean (technical difficulty) into acquisitions as well. If we repatriate money outside of Chile in order to make an acquisition outside of Chile, we have to pay 18% withholding tax. If the acquisition is made directly by the Chilean entity, we do not have to.
Tony Lesiak - Analyst
In terms of timing and in terms of cutoff dates, when you're going to pull the plug on this whole acquisition study, last year when you spoke to us, you mentioned you would give it until the end of this year to see if there was anything out there; otherwise, you would start giving some money back or more money back. Is that being delayed now, or do you have a new timeframe?
Jim Gill - President and CEO
Well, I think we need to clarify the situation if people are not confused. We intend to continue our search for new exploration discoveries and acquisitions for the foreseeable future. We do have three years remaining on the original five-year, $50 million commitment to doing that, so we're not about to abandon that. In fact, as I mentioned earlier, the exploration component of our business development is actually going to increase from $10 million per year to $13 million starting next year, and we are increasing exploration this year.
With respect to the distribution of cash in excess of what we think we can use, I think the fact that we paid $1 a share dividend reflects that we do take that commitment seriously if we have extra cash. We will continue to revisit that in the fourth quarter of each year.
Tony Lesiak - Analyst
Can you comment whether or not you have changed your internal assumptions for looking at M&A opportunities in terms of the copper price you use?
Jim Gill - President and CEO
I can tell you that we have increased them from the $0.95 we were using sometime ago. We are not using a price less than $1.20 now.
Tony Lesiak - Analyst
So it's more than $1.20? Because I think it was $1.20 year ago.
Jim Gill - President and CEO
You have some risk adjustments that we make, so it depends on the individual. But between $1.20 and $1.50. I personally think the copper price is going to be above $1.50 on a long-term basis.
Operator
Ian Howat, National Bank Financial.
Ian Howat - Analyst
The ENAMI payments -- those end after this year or end with the final payment this year?
Jim Gill - President and CEO
At the Quebrada Blanca mine we'll be finished. There was a maximum amount in the copper price participation agreement, and that maximum amount will have been paid off by the third quarter of this year.
Ian Howat - Analyst
Okay, third quarter of this year. Okay.
Jim Gill - President and CEO
It's all provided for there.
Ian Howat - Analyst
How much did it provide for, like how much are you going to be expensing under your scenario for 2007?
Ed Guimaraes - VP and Controller
I think it's about --
Jim Gill - President and CEO
$13.1 million.
Ian Howat - Analyst
What is your anticipation of your copper premiums this year?
Ed Guimaraes - VP and Controller
Well, the copper premiums we have used in our budget are $125 per ton, roughly $0.05 per pound.
Ian Howat - Analyst
In your price estimate, of using the $2.75 -- is that the price you have used as opposed to -- that's the LME price and then you have factored in any price adjustments?
Ed Guimaraes - VP and Controller
That's just the LME price. Of course, we factor in what we think is going to happen, based on the forward curve, just a flat $2.75.
Jim Gill - President and CEO
That's right. But that $2.75 doesn't include any premiums.
Ian Howat - Analyst
Oh, no, I realize that. But if the price is $2.75 this year, ideally in Q1 you would have to take some price adjustments. Those have not been factored into your estimates for the year; is that correct?
Ed Guimaraes - VP and Controller
That's correct.
Jim Gill - President and CEO
Let me just clarify that again. As far as the outlook, we have taken that into account.
Ian Howat - Analyst
So that may be the LME price, but your effective price is probably lower than that?
Ed Guimaraes - VP and Controller
Right.
Ian Howat - Analyst
Do you want to tell us what that is so we can figure out whether our numbers are right or not?
Jim Gill - President and CEO
I don't have that number.
Ian Howat - Analyst
But it has been factored into yours? Okay. I think that's it for me. Thank you very much.
Operator
Mr. Gill, there are no further questions at this time. Please continue.
Unidentified Audience Member
Could you give us an idea where you provisionally price copper at the end of Q4?
Jim Gill - President and CEO
Really, I can't go into too much detail there. The only thing we know with certainty is the amount of unsettled shipments that we had at the end of November, which settled in January. We know that's about a $0.46 drop. But I anticipate that it should be in the order of about a $0.25 negative quotational period pricing adjustment.
Unidentified Audience Member
In Q1?
Jim Gill - President and CEO
In Q1. But that depends a lot on the where we see costs --
Ed Guimaraes - VP and Controller
That's only for the December and November --
Jim Gill - President and CEO
That's correct. That's all I'm talking about, it's the quotational period adjustments that were outstanding at the end of December 2006.
Unidentified Audience Member
That's what we should be worried about, isn't it?
Jim Gill - President and CEO
Yes.
Unidentified Audience Member
For Q1?
Jim Gill - President and CEO
That's right.
Unidentified Audience Member
Okay.
Jim Gill - President and CEO
Okay, well, listen, thank you, everybody. I guess we will see you in April, hopefully at the annual meeting, and our conference call I guess is -- probably on May 3rd -- and our conference call will be May 4th, the morning after. So see you.
Operator
Ladies and gentlemen, this concludes the conference call for today. Thank you for participating. Please disconnect your lines.