使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Operator
Welcome to the Fording Canadian Coal Trust 2005 second-quarter financial results conference call. At this time all participants are in a listen-only mode. Following management's prepared remarks there will be an opportunity for analysts and unitholders to ask questions. The media may monitor this call in listen-only mode. They are free to quote any member of management, but they are asked not to quote remarks from any other participant without that participant's permission. (OPERATOR INSTRUCTIONS)
I advise participants that this conference call is being recorded on Monday July 25, 2005. This call is also being webcast and an archive will be available on the Trust's website at www.Fording.ca. I will now turn the conference over to Mr. Jim Popowich, President of Fording Canadian Coal Trust. Please go ahead, Mr. Popowich.
Jim Popowich - President and CEO
Thank you, everyone, for joining us today. With me on today's call are Ron Millos, our Chief Financial Officer, and joining us by telephone Gordon Eberth, Vice President Marketing for Elk Valley Coal. We also have other members of our senior management team with us in the room.
On Friday we released our financial results for the second quarter, and I will assume you have had a chance to read the news release. We plan to touch on the major points this morning. Ron will update a number of items including the reorganization and unit split approved by our unitholders at our 2005 Annual and Special Meeting held in May. Gord Ebert will then take you through the coal market, and then I will give you an update on current plans and expectations for the Trust's remainder of the year. I will now turn things over to Ron.
Ron Millos - CFO
Thanks, Jim. First of all I will remind participants that certain statements made in today's call are forward-looking, which are subject to known and unknown risks, as well as uncertainties and other factors that could cause actual results to differ materially from those suggested today. Some of the risks, uncertainties, and other factors that affect the reliability of our forward-looking information are disclosed in our public filings with the securities regulatory authorities in Canada and the United States.
You should also know that Jim Popowich and myself are officers of the Trust, whereby we report to and take direction from the trustees, and are also officers of Elk Valley Coal Partnership, reporting to and taking direction from the managing partner Teck Cominco. We both wear two hats on occasion. You should bear in mind throughout this presentation and in our responses to our question that, on occasion, we may be speaking to 100% of Elk Valley Coal's results and at other times we may refer to the Trust's 60% share of Elk Valley's results. We will do our best to try not to confuse you too much.
I would like to draw your attention to the reduction of our interest in Elk Valley Coal. In 2004 the attainment of synergies resulted in a reduction of the Trust's distribution entitlement effective April 1, 2004. This is just a reminder that this does affect the comparability of the year-to-date information for the first six months of 2005 versus 2004. Our news release provides more detail on this item; and bear in mind this point as we discuss our results.
I would now like to speak to the reorganization of the Trust that was approved by unitholders in May at our 2005 Annual and Special Meeting. Briefly, for anyone not familiar with the details of the proposed reorganization, it is intended to maintain a flow-through structure that effectively results in distributions received from Elk Valley Coal and NYCO not being taxed the Fording Inc. level. Instead, the unitholder will pay taxes based on their own situation.
This reorganization is meant to better ensure that this original goal of forming the Trust is maintained. We believe the reorganization results in our units being a more competitive currency comparable to other flow-through structures should the Trust decide to issue units for future acquisitions, expansions, or other opportunities. For further details we refer unitholders to the management information circular dated April 2, 2005.
Completion of the reorganization is subject to receipt of certain third-party approvals including a favorable advance tax ruling from the Canadian Revenue Agency, and the trustees' decision to proceed with the reorganization. We are currently awaiting the advance tax ruling from the Canada Revenue Agency and are not able to give an estimated date of when the ruling might ultimately be issued. If a favorable tax ruling is received and the trustees decide to proceed with the reorganization, we will issue a news release announcing the details. It is expected to take approximately two weeks from the decision date to complete the reorganization.
No decision has yet been made on whether to proceed with the second step reorganization approved by unitholders, whereby the Trust would in effect convert its partnership interest in Elk Valley Coal into a royalty on the production from the underlying coal mines. This proposed royalty reorganization would be undertaken to take advantage of an exemption from nonresident owner restrictions that are only available to royalty trusts. The royalty reorganization will only be undertaken if the trustees determine that implementation of this type of structure is necessary in order to preserve the Trust's status as a mutual fund under the Tax Act. In the event that the trustees elect to proceed with the royalty reorganization, a news release will be issued describing the details.
Unitholders also approved a 3 for 1 unit split at the Annual and Special Meeting, either as part of the reorganization or as a separate event if the reorganization does not proceed for whatever reason and the trustees exercise their discretion to proceed with the split. If this occurs, unitholders will be informed of the record date for the unit split by way of a news release. The record date will be seven -- or the split will occur about seven trading days after the date of a news release announcing the trustees' division.
You will also note from our financial statements that we have a large tax expense for the second quarter of 2005 due mainly to the increased earnings driven by the higher coal prices. This resulted in taxable income exceeding the interest expense on Fording's subordinated debt and the tax losses carryforward from prior years. This expense has been recorded without giving any effect to the proposed reorganization.
About 13 million of the current portion of future income tax is expected to be payable to taxation authorities and, accordingly, has been deducted from cash available for distribution. I'll now turn the call back to Jim.
Jim Popowich - President and CEO
Thank you, Ron. I'm very pleased to say that we had a strong second quarter. We continued to see momentum in our earnings as the effect of new higher-priced coal year prices are realized. Our quarterly revenues were up 51% over the same period in '04, up to $469 million.
So let's take a look at the Elk Valley Coal operations, our primary asset. As I expect you have all had a good look at the numbers reported in the financial statements, I will keep the highlights brief. In the second quarter our U.S. dollar coal prices increased from $51 per tonne in the second quarter of 2004 to U.S. $94 a tonne in 2005. On a Canadian dollar equivalent basis, after including the effects of the hedging program, prices averaged $119 Canadian per tonne in 2005, compared with $72 per tonne in the second quarter of 2004. This led to increased Trust revenues, as I indicated earlier, and income from operations up from $54 million in '04 to $180 million in '05, and finally net income up from 13 million in '04 to 123 million in '05.
Elk Valley Coal experienced a decrease in sales volume in the second quarter of '05 compared to '04 due to the scheduling of coal deliveries to customers and vessel arrivals in order to build adequate inventory volumes and product mix at the ports. These higher port inventories will allow for more efficient loading of vessels. We believe Elk Valley Coal is now better set up to manage their increased shipping program in the second half of the year.
Overall, production at Elk Valley Coal was up 7% over '04. Our share of this production was up slightly in the quarter to 4.1 million tonnes as compared to 4.0 million in 2004. On a year to date basis our share of production was affected by the 5% reduction in the Trust's interest in Elk Valley Coal at the start of the second quarter in '04.
Coal production at Cardinal River operations was lower than expected due to equipment deliveries -- a delay in equipment deliveries, that is -- and equipment availabilities. Difficult mining conditions, and I should mention they had some of the heaviest rains in years during the second quarter. And higher than anticipated strip ratios at the mine, which impacted coal release. Production at Elk Valley's other mines was at expected levels.
On the operating costs side, the cost of product sold increased about 10% for the quarter and was up slightly on a year to date basis compared with the same periods in 2004. Unit cost of coal produced -- unit cost of product sold, that is, increased 18% in the second quarter and 8% for the year to date from 2004 levels.
This was due primarily to three areas. Higher diesel prices, and prices were up about 33% year-over-year; additional labor for the full operations at Cardinal River; and additional overtime required to increase production; and higher repairs and maintenance costs required to keep mining fleets in good operating conditions to meet production targets. Other costs were as expected.
I stressed in the first quarter that the supply of haul truck tires had become a concern. This situation has not improved, and Elk Valley Coal continues to work with suppliers to get its required allotment. Obviously a lack of tires will impact the ability to produce coal, and Elk Valley Coal is working hard to prolong tire life at its operations through increased emphasis on haulroad maintenance. New technologies are also being tested to monitor tire pressure and temperatures at the mines, with some good results. We are also testing a new two-piece tire that has potential to reduce tire costs in the future.
Looking at Elk Valley Coal's transportation and other costs, there was a significant increase in the quarter, which was not unexpected. Costs were up 20% from the same quarter in 2004. This was primarily due to higher rail rates from the new contract with Canadian Pacific Railway and higher port rates due to increased coal prices.
On the rail side a five-year agreement with CP Rail was recently signed, which was retroactive to April 1, 2004, that covers costs on westbound shipments of coal from the Elk Valley mines. We believe this contract provides a commitment from CP Rail to move future volumes to meet announced expansion plans.
With respect to higher port costs, port contracts at Westshore Terminals are tied to the Canadian dollar price of coal, which provides for some variability in our transportation costs. Elk Valley Coal is also reviewing the port rates for the Elkview mine with Westshore. Discussions have begun, but no timetable has been established for the completion of this review.
Now turning to capacity additions, production ramp up at the Cheviot pit at the Cardinal River operations is continuing. However, delays in the delivery of mining equipment and difficult mining conditions during the early stages of operations have and continue to impact raw coal release. We do, however, expect that full annualized production will be achieved at the mine near the end of the year, somewhat behind our original anticipated schedule.
At Fording River, plant modifications and mine equipment additions are proceeding on schedule, and we expect to achieve a 10.5 million annualized rate in the third quarter.
Elk Valley Coal increased its estimated spending on our 2005 expansion projects to $122 million, which equals 72 million at the Trust level. The majority of the increase is for the early 2005 purchase of mining equipment at the Elkview operations. These purchases were originally scheduled for '06. We expect annual production at Elkview to be increased to 7 million tonnes of coal in late 2007.
Elk Valley Coal is targeting to finalize agreements with POSCO and Nippon Steel Corporation during the third quarter. This transaction provides for 10-year sales contracts and a 2.5% equity investment for each company in the new entity that will own and operate the Elkview mine. The US$50 million of proceeds will be used to finance the capital expansion program at the Elkview mine. These developments are contributing to Elk Valley Coal's target of increasing coal production capacity by about 12% to 28 million tonnes by the end of this year.
Looking toward the future, Elk Valley Coal's goal is to constantly prove up and move resources into the reserve category to keep reserve life at about 25 years. Elk Valley Coal also has other resources for future growth. Preliminary drilling at properties in Northeast British Columbia is underway to evaluate the extent of coal resources in that area. Of course any future decision to proceed with redevelopment of these properties would depend on several variables. There would have to be good exploration results, customer support, and comfort that long-term market conditions would be favorable. If a decision is made to develop these properties, it would take about two years to get to the commercial production stage.
Now I'll turn things over to Gordon to take you through the coal markets. Gordon?
Gordon Eberth - VP Marketing
Thank you, Jim. Well, the situation is much the same as we reported in the first quarter. Hard coking coal supply continues to be tight as producers are not able to bring on new met coal production quickly due to infrastructure bottlenecks, equipment delays, and demand for skilled labor. Based on steel producers indications, demand for seaborne hard coking coal will (ph) likely to continue to grow through to 2010.
Demand for steel is expected to remain strong on a global basis for the balance of 2005. However, concerns have materialized over extremely high steel production growth rates in China and the recent announcements by certain U.S. and European steel makers regarding reductions in steel production. Steel consumers built up inventories in 2004 and are now attempting to bring their levels of steel inventory down to more normal volumes.
However, we see this as a short-term phenomenon, as most steel producers have stated they expect to work through the existing steel inventories by the end of the year. Furthermore we understand there hasn't been any impact on previously announced expansion plans to increase steel production over the next few years. This leads us to believe steel producers still see continued growth for their products in the foreseeable future.
It's important to remember that there are operational buffers that tend to moderate the impact of short-term fluctuations such as this on hard coking coal production. Foremost among these is that steel mills will normally operate their own coke oven batteries at a fairly constant level, and will adjust for lower or higher steel production by decreasing or increasing their purchases of third-party coke.
If you look at the global steel mill expansion plans, combined with the current low supply situation of high-quality metallurgical coal, it would seem that the fundamentals for a tight coal supply are still strong and will remain so at least until new high-quality met coal supply comes to market. And that won't likely be before 2007 at least. Although higher coal prices are serving to attract some new supply to the market from both Canada and Australia, significant near-term growth has not materialized primarily due to a lack of sufficient infrastructure capacity and the difficulties in advancing mining development.
What do all these factors mean for prices in 2006? It is far too early to say, as we don't even enter into talks with our customers until later this fall, and many things can change between now and then. We will have a better idea as time goes on. Jim, I will now turn things back to you.
Jim Popowich - President and CEO
Thank you for the update, Gordon. Turning to NYCO for a moment, income from operations decreased approximately 2 million in the second quarter and 4 million year to date in 2005, compared with the respective periods in 2004. This was primarily due to our sales mix, which resulted in lower average prices than in '04 and the impact of a higher U.S.-Canadian exchange rate compared to the same period last year.
We have seen a strengthening in sales volumes in 2005 compared with 2004, and have worked to stabilize our position in key markets, and improve our marketing sales and distribution network to meet our customer needs, with a focus on high-end products. We will continue to focus on this strategy in order to obtain the best value from these assets.
Now back to summary and outlook. Due to higher sales prices and earnings from Elk Valley Coal's met coal operation, the Trust declared distributions for the second quarter of $137 million or $2.80 per unit, which were paid in July to unitholders of record at June 30.
Now we would like to talk for a few minutes about some of the challenges that we see going forward. With increased prices for petroleum products and for commodities in general, cost pressures will continue throughout 2005. In addition, global mining activities have created a demand for equipment and parts that outpace the supply. For example, the risk of a shortage of tires continues to be high. Elk Valley Coal is taking steps to extend existing tire life to mitigate any potential negative impact. We see this as a short-term issue only, as the tire suppliers have indicated they expect to increase supply in the third quarter of 2006.
Rail service was below Elk Valley Coal's needs in the first half of the year. However, rail performance did improve in the latter half of the second quarter, and we expect service levels to be sufficient to move planned production volumes in 2005.
A collective agreement at the Line Creek operations expired on May 31, 2005, and Elk Valley Coal is currently in negotiations. It will also be entering into negotiations with the Elkview operations later this year, as that collective agreement expires at the end of October.
In order to move ahead with our proposed reorganization, we need a favorable tax ruling from the Canada Revenue Agency. We are hopeful that the CRA will be in touch with us shortly. As Ron mentioned earlier, upon receipt of a favorable ruling and the trustees' decision to proceed, it would take about two weeks to complete the reorganization.
So in summary, we've had a good quarter; there are, however, a number of challenges Elk Valley Coal is managing, such as higher diesel cost, transportation constraints, equipment and tire shortages. These are all things that impact everyone in the industry and are more short-term in duration. The benefit that Elk Valley Coal has -- competitive world-class operations with modern mines and processing facilities, mine location, and long-life reserves -- are all long-term assets.
Going forward, we will continue to use the tight supply environment to grow sales through the expansion of our Elk Valley Coal operations. In order to remain a low-cost producer and maximize cash flows through the commodity price cycle, the focus will be on cost control and productivity improvements, use of technology, and best practices across all operations. We're also hopeful that in short order we will be able to proceed with the proposed reorganization approved by our unitholders at our recent Annual and Special Meeting.
We continue to target 2005 sales volumes of approximately 27 million tonnes. From both operational and market perspectives, fundamentals for our business are positive for 2005 and, we believe, into 2006. With new coal year prices fully in effect for the second half of the year and increased sales volumes for the completion of our expansion plans, we expect improved returns for our unitholders during the second half of the year. And on that note, we can now open the line for questions.
Operator
(OPERATOR INSTRUCTIONS) Dirk Lever from RBC Capital Markets.
Dirk Lever - Analyst
Congratulations on the good quarter. Perhaps you could give us a little bit more color on your negotiations that you are about to enter into or you are going through with Westshore? Are you looking to effectively get a longer-term contract that falls in line with what you had, say, with the rails? Is that what you are aiming to do?
Ron Millos - CFO
No, Dirk, the contract has a clause that allows a rate review, and we are just requesting a rate review.
Dirk Lever - Analyst
Okay, thank you.
Operator
Terence Ortslan from TSO & Associates.
Terence Ortslan - Analyst
Actually it was a similar question. The Westshore, I think it implies in the text that whatever will come out of it will be implied to continue to 2010. Am I reading that right?
Ron Millos - CFO
That is correct.
Terence Ortslan - Analyst
But if the prices change in the meantime, (indiscernible) terms, how could it be till 2010?
Jim Popowich - President and CEO
I'm sorry, would you repeat that again, Terence?
Terence Ortslan - Analyst
Sorry. It will be revised, and if not will go to arbitration, correct?
Ron Millos - CFO
Potentially that is correct.
Terence Ortslan - Analyst
Then if it is revised it goes till 2010, (indiscernible) your text. But if the prices do change, continual (ph) terms, how can it be applied to 2010? There must be a constant revision of this contract.
Ron Millos - CFO
It is just the rate review and we will go through the process. A new rate or rate mechanism will be determined, and that will apply for the balance of the contract.
Terence Ortslan - Analyst
It's a rate mechanism, not the rate itself, that will be applied?
Jim Popowich - President and CEO
That is correct, it surrounds that.
Terence Ortslan - Analyst
If it goes to arbitration, when? How do you determine to go to arbitration, at what point in time?
Jim Popowich - President and CEO
It would be dependent on whether the parties could come to an agreement or not. We have no schedule. We are having discussions right now, Terence, and we have no schedule as to how long it is going to take.
Terence Ortslan - Analyst
No matter what, it will apply to April 1, 2005, time period? It will be retroactive to that, right?
Jim Popowich - President and CEO
We believe so.
Terence Ortslan - Analyst
Will you accrue to it, in case this thing is prolonged into next year in discussions and arbitration?
Ron Millos - CFO
That would be correct. We would be accruing what we think the rates would be. That is basically under the terms of the existing contract.
Jim Popowich - President and CEO
That is right.
Terence Ortslan - Analyst
Thank you guys, thank you very much.
Operator
Jim Clark (ph) from Milestone Equities.
Jim Clark - Analyst
What percentage of the met coal sales during the quarter were under the old pricing versus the new pricing?
Jim Popowich - President and CEO
It was about 55% was -- we crossed over sometime in mid-May in general terms. There were some contracts that are earlier and later; but you could say that it was about 55% under the new terms.
Jim Clark - Analyst
Is the new pricing at the $122 per tonne level?
Jim Popowich - President and CEO
Approximately, that is right.
Jim Clark - Analyst
Thank you.
Operator
Haytham Hodaly from Salman Partners.
Haytham Hodaly - Analyst
Just one quick question, just on transportation guidance. Your full-year number was 37 to 38. First quarter was obviously a lot lower, which would indicate that the third and fourth quarter should be somewhere in the low 40s. Does that 37 to 38 number still hold?
Ron Millos - CFO
Yes, it does.
Haytham Hodaly - Analyst
You are still comfortable with that? Fair enough.
Jim Popowich - President and CEO
Yes we are.
Haytham Hodaly - Analyst
You know what, I will leave it at that for now. Thank you.
Operator
Greg Barnes from Canaccord Capital.
Greg Barnes - Analyst
Just wondering if you could give us some idea of where spot hard coking coal prices are right now? I haven't heard anything lately.
Jim Popowich - President and CEO
Gord, have we seen anything lately?
Gordon Eberth - VP Marketing
There has been very little. We've heard some discussions that U.S. producers selling into North American steel mills are still getting prices in line with where they were at the beginning of the year. Indeed, we have had interest from a number of customers for more volumes at the current contract price for 2005.
It has been a very quiet spot market. There hasn't been much. There was an Indian tender where the prices offered were at and above the 2005 levels, but we haven't heard that those deals have been consummated. So it has basically been a quiet market. I think most of the buyers bought whatever whole coal that they did need earlier on in the year.
Greg Barnes - Analyst
So that is a reflection of the fact that they are just full up, not that they are slowing down or that you guys are all sold out? Could that be it, too?
Gordon Eberth - VP Marketing
No, last year was extremely nerve-wracking for most customers who didn't have enough coal. So I think this year they made sure that they had bought enough. And they bit the bullet early in the year.
Greg Barnes - Analyst
Do you expect the same kind of developments this year when you get into the negotiation time frame? They'll (multiple speakers) earlier rather than later?
Jim Popowich - President and CEO
That is about six months away; we will see.
Gordon Eberth - VP Marketing
I would imagine that once summer is over we start having the preliminary discussions, just where things are going. But it is hard to say. Last year it went very quickly, I think more quickly than we expected. So it is very difficult to forecast. But most of our contracts are long term. So we get into market price discussions as the market seems to be forming. It's hard to say if that is going to be this year or early in 2006.
Greg Barnes - Analyst
Sure. Thanks very much.
Operator
Alec Kodatsky from Scotia Capital.
Alec Kodatsky - Analyst
I had a question regarding the rail availability by the end of the second quarter. You noted that you had seen an improvement. Is it up to the level of what you are expecting as far as an annualized rate for the rest of the year?
Jim Popowich - President and CEO
In the latter part of the second quarter, particularly in June, we were at rates that we would expect for the rest of the year and that would take care of our shipments. So those are positive signs.
Alec Kodatsky - Analyst
That is both from the Cardinal River and the Elk Valley operations, is that correct?
Jim Popowich - President and CEO
That is correct, Alec.
Alec Kodatsky - Analyst
I just have a second follow-up question, getting back to the met coal market itself. I was wondering if maybe Gordon could provide any additional insight on how in particular the port expansions are going ahead in Australia.
Gordon Eberth - VP Marketing
The major expansion, Alec, is on Dalrymple Bay. It was published last week that that was expected to be in place by mid 2007. We are hearing it could be a little bit later, probably towards the end of the third-quarter 2007. That is the initial tranche of expansion at Dalyrmple Bay. The larger volumes will take a bit longer. But it seems that it will be '07 before we start seeing a big export capacity increase.
Alec Kodatsky - Analyst
So the bias seems to be later rather than sooner.
Gordon Eberth - VP Marketing
Yes, that is pretty well (indiscernible) we have been expecting, I think what we said earlier on. It just takes -- these are major projects, it's hard getting equipment and machinery, and it does take some time.
Alec Kodatsky - Analyst
Thank you very much.
Operator
John Norton (ph), who is a shareholder.
John Norton - Shareholder
What percentage of the coal goes east, as compared to Asian markets, and are the profitabilities similar?
Gordon Eberth - VP Marketing
Jim I can handle that. East, if you mean North America, North American mills in the U.S. and Canada, it is about 10%. We do about another -- probably another 35% of our sales goes to Europe; but that is shipped through Vancouver. Basically this year all our sales are very, very comparable in terms of the net back to the mine.
John Norton - Shareholder
Thank you.
Operator
Brian MacArthur from UBS.
Brian MacArthur - Analyst
I just wanted to try and get into the taxes a little bit more. For the first time you sort of indicated what you might have to pay if you can't get this tax ruling. I.e. if we go through from the income before tax line, and tick off the shelter from the subordinated debt, and then tick off the mining taxes, you can kind of back calculate. You paid your 37 million on whatever number it is; and roughly said you have had to defer 13 of that. Or 13 of that you will have to pay.
It looks like you're using tax pools of over 200 million pro rata this year. Can you, A, confirm that? And B, if this ruling went through favorably for you, will you be able to plow back that 13 million, i.e. still use? Do the tax pools revert? Or what actually happens then to that 13 million?
Jim Popowich - President and CEO
Ron?
Ron Millos - CFO
Depends on when we get our ruling, would be the best way of describing that. If we get it shortly, there is an opportunity that we might get some of the 13 back. If it takes several months, unlikely; and the 13 million will start to grow.
Brian MacArthur - Analyst
Right. And as it grows then, effectively, if the tax really takes a long time, the same thing would apply. It's kind of in the sense they're taxes payable, and even though you don't pay them out until 11 months' delay, you effectively -- you owe them to the government and there is no way you can get them back. Does it just keep growing that way at a proportional rate?
Ron Millos - CFO
That is a fair comment.
Brian MacArthur - Analyst
Like the closest we can get, given the numbers we have. If that were to be the case then, say by the end -- if you didn't win the tax ruling, would be it fair to say by the end of '06 you'd have used up most of the pools and we just go to a normalized rate?
Ron Millos - CFO
Yes.
Brian MacArthur - Analyst
Second thing, if I can just ask one other quick question, where there any what I would call CIF sales in the second quarters? I.e. the $94 a tonne realized price, where there any that included transportation that you paid to customers? Or how much of that -- how many sales like that did you have in the quarter?
Jim Popowich - President and CEO
Brian, I believe there were a number of them. I don't have the exact --.
Gordon Eberth - VP Marketing
Wouldn't have the exact numbers, but there were. There are ongoing sales, so it is fairly even distribution throughout the year.
Brian MacArthur - Analyst
Throughout the year, okay. So we should just gross it up proportionately for whatever (multiple speakers).
Gordon Eberth - VP Marketing
Yes.
Jim Popowich - President and CEO
That is a fair assessment. Thanks, Brian.
Brian MacArthur - Analyst
Thank you very much.
Operator
(OPERATOR INSTRUCTIONS) John Hughes from Desjardins Securities.
John Hughes - Analyst
Just one quick one, last; everything has been answered. Just wondering in terms of your sales going forward for the second half of the year. Do you expect them to be split evenly between the two fiscal quarters?
Jim Popowich - President and CEO
Yes, we do.
John Hughes - Analyst
That is it. Thank you.
Operator
Haytham Hodaly from Salman Partners.
Haytham Hodaly - Analyst
Just a quick question. You've increased both sustaining and expansion CapEx. Looking forward, I guess your payout ratio this quarter was around -- just over -- close to 91%. Are you thinking of holding back additional capital for future expansions even though you may not need that capital in the near term? What do you see your payout ratio going to next year?
Ron Millos - CFO
At this time there has been no decision made to hold back any distributions for future capital.
Haytham Hodaly - Analyst
Is that something that could be considered, Ron?
Ron Millos - CFO
That is something that the trustees may consider; but at this time that hasn't been discussed in any great detail.
Haytham Hodaly - Analyst
Was the majority of the increase in both sustaining and expansion CapEx -- is that all going to be used throughout this year?
Jim Popowich - President and CEO
Yes.
Haytham Hodaly - Analyst
Thank you.
Operator
(OPERATOR INSTRUCTIONS) Brian MacArthur from UBS.
Brian MacArthur - Analyst
Just hypothetically, if this tax ruling is delayed for the next six months, eight months, does there come a point where you would actually execute the 3 for 1 share split anyway? Like how long do you think it would go on before you actually decided to go ahead and do that anyway? Because my understanding is you could do that independently of the other decisions.
Ron Millos - CFO
Yes, we can do the split independently. If we get a sense that the ruling is going to get delayed for an extensive period of time, I think we would seriously consider advancing the split. It adds a little bit of a hiccup to the ruling, but not substantially. But you are right, Brian, if what was six to eight months' expectation, I think we would move relatively quickly on it.
Brian MacArthur - Analyst
Thank you very much.
Operator
Larry Carp (ph), who is a shareholder.
Larry Carp - Shareholder
My question is sort of the follow-up to the one that was just asked. I'm kind of perplexed as to why the tax ruling and the split are tied together. What is your thinking as to why you would delay the split?
Ron Millos - CFO
It will cost us more money to do the split as a separate transaction.
Larry Carp - Shareholder
Are we talking a material cost?
Ron Millos - CFO
No, it is not material; it is just we decided that we would do them together, and that is our plan.
Larry Carp - Shareholder
Okay.
Operator
(OPERATOR INSTRUCTIONS) Mr. Popowich, there are no further questions at this time. Please continue.
Jim Popowich - President and CEO
Thanks, everyone, for joining us today. We do appreciate your interest; and we look forward to our third-quarter conference call in October. Bye for now.
Operator
Ladies and gentlemen. this concludes the conference call for today. Thank you for participating. Please disconnect your lines.