Teck Resources Ltd (TECK) 2021 Q2 法說會逐字稿

完整原文

使用警語:中文譯文來源為 Google 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

  • Ladies and gentlemen, thank you for standing by. Welcome to Teck's Second Quarter 2021 Earnings Release Conference Call. (Operator Instructions) This conference call is being recorded on Tuesday, July 27, 2021.

  • I would now like to turn the conference call over to Fraser Phillips, Senior Vice President, Investor Relations and Strategic Analysis. Please go ahead.

  • H. Fraser Phillips - SVP of IR & Strategic Analysis

  • Thanks very much, Laurie. Good morning, everyone, and thanks for joining us for Teck's Second Quarter 2021 Call. Before we begin, I would like to draw your attention to the caution regarding forward-looking statements that's on Slide 2.

  • This presentation contains forward-looking statements regarding our business. This slide describes the assumptions underlying those statements. Various risks and uncertainties may cause actual results to vary. Teck does not assume the obligation to update any forward-looking statement. I'd also like to point out that we use various non-GAAP measures in this presentation. You can find explanations and reconciliations regarding these measures in the appendix.

  • With that, I want the call over to Don Lindsay, our President and CEO.

  • Donald R. Lindsay - President, CEO & Director

  • Well, thank you, Fraser, and good morning, everyone. I will begin on Slide 3 with our second quarter highlights, followed by Jonathan Price, our CFO, who will provide additional color on our financial results, and we'll then conclude with a Q&A session, where Jonathan and myself and several additional members of our senior team will be happy to answer any questions.

  • So, solid performance at our operations and our priority projects against the backdrop of improving market conditions made for a very positive second quarter of 2021. At our QB2 project, we had our best quarterly progress to date and this is despite the largest COVID-19 case surge so far in Chile.

  • Let me review a few numbers just to describe how it was. During the second quarter, the number of COVID-19 cases skyrocketed to a high of around 8,900 per day in Chile. Thankfully, recently, the number of cases has declined, is now averaging about 1,500 per day. Critical care bed occupancy is still high, though, at 88%, but it is down from the peak of 99%. And in the Tarapacá region, where QB2 is located, that number is 49%. And there is currently a daily average of 30 cases compared with a high of 251.

  • Chile has done a very commendable job with their vaccination program. Of its total population of 19 million people, around 85% have had their first dose and 74% have had their second dose.

  • And at QB2 itself, more than 60% of the project workforce is fully vaccinated with over 80% of the workers having received at least one dose. Most recent wave of the pandemic has had a much larger impact on QB2 than the first wave. When construction restarted last year following the temporary suspension, we had nowhere near the challenges that we have had in these past 3 months. All of the restrictions, protocols and testing that have been so important in the prevention of the spread of COVID-19 are also a large burden that has put the QB team -- QB2 team to the test, but our team has risen to that challenge. The substantial progress in the second quarter has been a hard one and is remarkable under these challenging conditions.

  • Just a bit more color on what it's like for those of you who may be sitting in an investment center, perhaps in New York where it's wide open. What we're dealing with now is when an individual has symptoms, they are taken off their project and they're taken the hotels on the coast where we've secured them permanently for quarantine purposes. They are PCR tested. The results are returned in about 4 days. They are then contact traced and the contact individuals are also taken off the project and put in quarantine hotels, and they are PCR tested. If they test negative, they are to return to work. If they test positive, they quarantine for 14 days.

  • At the peak in Q2, we had 350 individuals in quarantine and monthly averages were very high. So you can imagine what that does to your crew consistency, to your productivity and the construction weekly plans, especially when the affected individuals are mission-critical people like supervisors or crane operators or welders. And then you combine that with absenteeism running at 12% during the quarter, it is a huge challenge. And so that is why we are immensely proud of the progress that we made during that quarter. And now we are very excited because just in the last couple of weeks, we've now got things down to just about 3 active cases and we are able, already putting 3 people to a room and increase in resources in sight and finally getting a chance to go to full strength.

  • So this will be a tale of 2 projects: the project up to date, heavily influenced by COVID, and we hope for the next 12 months an entirely different project where we can make full progress. We continue to expect first production at QB2 in the second half of 2022, which is next year, and QB2 is expected to double our consolidated copper production by 2023.

  • At the same time, our Neptune facility upgrade is ramping up to full capacity across the site. The equipment there is performing according to or better than planned. I was there week before last, it is exciting to see. And this upgrade is a key component of securing a long-term low cost, much, much lower cost and reliable supply chain for our steelmaking coal business.

  • We saw a significant improvement in our financial results in the second quarter, reflecting spot price increases in all of our key commodities. Adjusted EBITDA was up 104% compared with Q2 last year. Our operations performed well during the second quarter. Production was in line with plan across our business units, and we met our quarterly sales guidance in steelmaking coal and in zinc.

  • At the very end of the quarter, though, our rail logistics were impacted by the wildfires in British Columbia, and the situation remains very difficult, and the provincial government declared a state of emergency last week. We extend our deepest condolences to all those who have been directly affected. While the wildfires did not impact our second quarter results, they are currently impacting transportation at our operations in B.C. Rail services have been disrupted, which is expected to negatively impact our steelmaking coal business.

  • Our third quarter steelmaking coal sales are now expected to be reduced by 500,000 to 800,000 tonnes with guidance revised to 5.7 million to 6.1 million tonnes for the quarter.

  • Our annual production guidance, that range has been lowered by 500,000 tonnes to between 25 million and 26 million tonnes. And we have increased our annual transportation cost guidance range by CAD 3 per tonne to CAD 39 to CAD 42 per tonne. And I think it's important to view that increase in context and in our transportation cost as a result of the wildfires within the context of current steelmaking coal prices. While we're raising our cost guidance range by CAD 3, the Australian FOB price during the quarter rose by USD 100. So that's just a little bit of context for you. And it is due to the wildfires the cost increased.

  • We do have contracts in place to ship through all 3 West Coast ports, and that gives us the flexibility to divert some trains and vessels to Ridley Terminals, which is clearly very economic for us. At the same time, like others in the industry, we are seeing signs of cost inflation across the business more generally. We have noted increases in the cost of certain key supplies, including mining equipment, fuel, tires and explosives, driven largely by price increases for underlying commodities such as steel, crude oil and natural gas.

  • For our operations, the largest impact is on our fuel costs. While the impact on our second quarter results was slight as we delivered an adjusted EBITDA margin of 39%, we expect these price increases to put modest upward pressure on our cash unit costs in the second half of the year. Despite this, we have not changed our guidance for full year total cash unit costs in copper and zinc and adjusted site cash costs of sales and steelmaking coal, and we have lowered our guidance for full year net cash unit costs in zinc.

  • Finally, we were very proud to be named to the Best 50 Corporate Citizens in Canada, which is the 15th consecutive year that we have been ranked as one of the top 50 companies in Canada for corporate citizenship.

  • Now turning to an overview of our second quarter 2021 financial results on Slide 4. Our financial results are significantly improved compared to Q2 last year, supported by improved commodity prices. Copper prices reached all-time record highs in the quarter with average prices 81% higher than in Q2 last year. Our realized steelmaking coal prices benefited from around 2 million tonnes of sales to customers in China that were priced at premium CFR China prices.

  • Revenues were up by almost 50% from a year ago to $2.6 billion. Profitability improved even more with adjusted EBITDA increasing 104% to $989 million and bottom line adjusted profit attributable to shareholders increased 281% to $339 million, which is $0.63 per share on a diluted basis. And Jonathan will review our financial results in more detail in a few minutes.

  • I'll now run through some second quarter highlights by business units starting with copper on Slide 5. Our copper business unit had a strong Q2 with a 385% increase in EBITDA compared to the same period last year, driven by substantially higher copper prices. Production was higher than in the same period last year when Antamina had temporarily suspended operations due to COVID-19.

  • Total cash unit costs were USD 1.80 per pound, which was USD 0.23 per pound higher than a year ago. but the increase in cost is primarily due to higher workers' participation and royalty expense resulting from increased profitability at Antamina and this had a USD 0.20 per pound impact compared to a year ago as well as higher consumables costs and the strengthening of the Canadian dollar.

  • Despite those cost pressures, we delivered an adjusted EBITDA margin for the copper business unit, of 67%. We've maintained our annual production and operating cost guidance in copper.

  • Turning to an update on our QB2 project on Slide 6. As I mentioned earlier, the project has continued to effectively advance construction with the best quarter of progress to date despite the significant ongoing wave of COVID-19 in Chile. We continued to maintain and enhance our extensive COVID-19 protocols in order to protect the health and safety of our workers and the communities in which we operate.

  • Prescreening and on-site testing have been key to our success in managing COVID. And in fact, we have screened out 1,300 positive cases, more than 1,300 positive cases that otherwise would have gone to site.

  • Additionally, in coordination with the government, we've successfully rolled out a vaccination campaign for our workers right on site. With COVID-19 cases in Chile declining, coupled with the countries and the project workforces high rates of vaccination, we are aggressively ramping up towards peak workforce levels. The critical path, which is the grinding circuit, remains on plan, and we are still on track for first production in the second half of next year. And based on the solid pace of construction through that last quarter, we expect to achieve 60% overall completion in early August, so either next week or earlier part of the week after.

  • Our capital cost estimate remains at USD 5.26 billion, including contingency and escalation. And our estimate for COVID-19 capital impacts, which are tracked separately, has been updated to USD 600 million as a result of the forecasted impact of the second wave of COVID-19.

  • Slide 7 provides an aerial view of the concentrator area where we are making strong weekly construction progress. The grinding lines shown in the background, currently remain the critical or the longest path for the project, and we have made significant progress here with all 6 mills now in place. And behind that, you can see the tower for the (inaudible) that has been erected where the stockpile dome will go up, and we continue to advance the structural steel of the grinding building and the mechanical installation of the stage flotation reactor cells, which you can see in the middle left of the photo in green, just to the after the 14 large 650 cubic meter flotation cells in blue.

  • In the foreground, you can see where we've advanced construction and mechanical installation of the copper and bulk concentrator thickeners and the regrinding facilities. And lastly, in the middle right, you can see the advanced stage of the on-site power substitution.

  • Slide 8 shows the starter dam of the tailings management facility where we have raised the dam elevation significantly in the quarter. We are continuing to utilize the Teck mine fleet and some of our new fleet of Cat 794s, which are performing well.

  • Slide 9 shows our progress in advancing the Jetty from the onshore workfront, and we have 2 additional offshore workfronts now to advance the Jetty from a jack-up barge and temporary island where we've commenced pile driving. As the pipeline right of way and platform development is now effectively complete, we are focused on advancing the pipe stringing, welding placement and backfill. And Slide 9 shows the pipeline trench, the welded water pipe on the right, and the stringing concentrate pipeline on the left, ready for welding. In the back right, you'll see our port workings.

  • To see more of the latest progress on QB2, I encourage you to watch a video of the project and view our latest quarterly photo gallery, which we have posted with our quarterly conference call materials in the Investors section of teck.com, and you will find links to them in our Q2 press release.

  • Next, our zinc business unit results for the second quarter are summarized on Slide 11. And as a reminder, Antamina zinc-related financial results are reported in our copper business unit. Red Dog has strong performance in the quarter, with production increasing by 67% compared with the same period last year. As we had previously flagged lower 2020 production volumes at Red Dog resulted in lower material available for '20 for sale and higher unit cash cost of sale for our zinc mining operations in the first half of this year. But we are now through that.

  • Red Dog sales of zinc in concentrate were 39,000 tonnes, which was in line with our guidance and total cash unit cost of USD 0.61 per pound reflect higher treatment charges and the higher cost of inventory for sale related to the lower 2020 production volumes. And Trail was impacted longer than planned annual zinc roaster maintenance, which is now behind us. Looking forward, Red Dog's shipping season commenced on July 19, and our Q3 sales guidance for Red Dog zinc in concentrate is 180,000 to 200,000 tonnes.

  • For 2021, we expect higher production at Red Dog. We've increased our full year zinc and concentrate production guidance range by 20,000 tonnes to 605,000 to 630,000 tonnes. And we've lowered our full year net cash unit cost guidance range by USD 0.05 per pound to USD 0.35 to USD 0.40 per pound.

  • We've also lowered our full year refined zinc production guidance range for Trail by 10,000 tonnes to 290,000 to 300,000 tonnes due to lower availability of quality zinc concentrate feed sources and the longer than planned roaster maintenance shutdown during the quarter.

  • Turning to our steelmaking coal business on Slide 12. And if you all remain on mute, that would be appreciated. In the second quarter, sales were 6.2 million tonnes, in line with our guidance range and our average realized price includes around 2 million tonnes of sales to Chinese customers similar to the first quarter at high CFR China prices. And just as a reminder, the CFR China prices are around $314, $315% a tonne.

  • And our Elkview operations set a new all-time quarterly production record, thanks to the expansion that we did last year. Adjusted site cash cost of sales were CAD 64 per tonne, which was at the high end of our guidance range as anticipated and CAD 4 per tonne lower than a year ago. Our transportation costs of CAD 42 per tonne were above our full year guidance range, which was expected and higher than a year ago as a result of higher fuel surcharges and tariffs. And as I mentioned earlier, wildfires are currently impacting our operations in B.C., rail services have been disrupted, which is expected to negatively impact our third quarter sales volumes our annual production volumes and annual transportation costs in steelmaking coal.

  • Our third quarter steelmaking coal sales are now expected to be reduced by 500,000 to 800,000 tonnes, and we expect 5.7 million to 6.1 million tonnes of sales in the third quarter. We will continue to prioritize available spot sales volumes to China, which is expected to continue to result in favorable price realization.

  • We continue to target 7.5 million tonnes of sales to China in 2021, and that is unchanged from previous guidance. Our annual production guidance range has been lowered by 500,000 tonnes to 25 million to 26 million tonnes. And we have increased our annual transportation cost guidance range by CAD 3 per tonne to between $39 and $42. Again, it is important to view this cost increase in the context of current steelmaking coal prices, which have risen by $100 during the quarter.

  • We have not increased our adjusted cash cost of sales guidance for the full year. However, upward pressure on input cost due to cost inflation and the impact of the B.C. wildfires are expected to result in costs coming in at the higher end of the range. In the second quarter, our steelmaking coal business unit delivered an adjusted EBITDA margin of 41%. And in the third quarter, we expect our financial performance to reflect the sharp increase in prices that occurred in the latter half of Q2.

  • Slide 13. As I indicated earlier, our Neptune port project is in the ramp-up phase. And since the first steelmaking coal was unloaded using a new double railcar number on April 19, we've continued on fully commissioning the double dumper and then moved on to the site-wide ramp-up. August and September are anticipated to be big months for train handling and vessel loading. We are seeing excellent train handling times at Neptune with the combination of the double and single dumper indicating that the terminal will be capable of processing in excess of 18.5 million tonnes per annum.

  • Terminal throughput paused for the first 2 weeks of July as a result of the rail disruption due to wildfires. This should not affect the site-wide ramp-up and the pause gave us the opportunity to complete preventative maintenance.

  • Slide 14 shows a photo of the new indexer for the double dumper which is used to position advanced trains in the dumper. And you can see the drive system and the arm that comes down between the cars, which is world-class technology.

  • Slide 15 shows the largest cape-size vessel ever loaded at Neptune Terminal, which is 300 meters long and loads up to 200,000 tonnes, and a bunch of us went to see it and climbed up on it and watched the loading. It was very exciting. We're really pleased to see the project move into the site-wide ramp-up phase as Neptune is a key component of our long-term, low-cost and reliable supply chain for our steelmaking coal business. And to see more of the latest progress at our Neptune upgrade project, we have posted our latest quarterly photo gallery with our quarterly conference call materials in the Investors section of teck.com, with a link to it in our Q2 press release.

  • Turning to our energy business unit results for the second quarter, which are summarized on Slide 16. Our realized price and results reflect a material improvement in Western Canadian Select prices compared with Q2 last year. However, this was partially offset by higher unit operating costs and lower production due to operational issues in the mine. There has been a slower-than-planned ramp-up of contract overburden stripping as well as challenges around managing groundwater inflow from deep subsurface aquifers. And subsequent to the end of the quarter in July, we encountered additional challenges that will require mining at shallower mine slope than planned, resulting in lost ore and the need for additional overburden stripping. The ramp-up to two-train operation has therefore been delayed until 2022.

  • As a result of the operational issues and the mining challenges, we have lowered our 2021 production guidance range by 2 million to 4 million barrels to 6.8 million to 8.1 million barrels for the year. We've also increased our 2021 adjusted operating cost guidance range by CAD 12 per barrel to $40 to $44 per barrel.

  • And with that, I will pass over to Jonathan for comments on our financial results.

  • Jonathan H. Price - Senior VP & CFO

  • Thanks, Don. I will start by addressing the details of the second quarter's earnings adjustments on Slide 17. The most significant adjustment is a $44 million in environmental costs on an after-tax basis. This primarily relates to a decrease in the rates used to discount our decommissioning and restoration provisions for closed operations due to a tightening of our credit spreads. Share-based compensation expense was $24 million in the quarter and commodity derivatives were $20 million.

  • After these and other minor adjustments, bottom line adjusted profit attributable to shareholders was $339 million in the quarter, which is $0.63 per share on a diluted basis.

  • Now the changes in our cash position during the second quarter are on Slide 18. We generated $575 million in cash flow from operations, which is a significant increase compared with $300 million a year ago, reflecting higher commodity prices. We spent $1 billion on sustaining and growth capital, including $666 million on QB2, $138 million on the Neptune port upgrade project and [$203] million in sustaining capital.

  • Capitalized stripping was $175 million, primarily related to the advancement of pits for future production at our steelmaking coal operations. This was higher than a year ago, primarily due to decreased stripping activities in Q2 2020 as a result of COVID-19. Debt proceeds net of repayments on our USD 2.5 billion project financing facility for QB2, were $272 million in the quarter, and we also drew a net $337 million on our USD 4 billion revolving credit facility. We paid $77 million in interest and finance charges and $26 million in respect of our regular quarterly base dividend of $0.05 per share. After these and other minor items, we ended the quarter with cash and short-term investments of $312 million.

  • And now turning to our financial position on Slide 19. We've maintained our strong financial position with current liquidity of CAD 6.1 billion, including our current cash in the amounts available on our USD 5 billion of committed revolving credit facilities. USD 3.5 billion is available on our USD 4 billion facility that matures in Q4 2024, and our USD 1 billion sidecar that matures in Q2 2022 remains undrawn.

  • Both facilities do not have any earnings or cash flow-based financial covenants, do not include a credit rating trigger and do not include a general material adverse effect borrowing condition. In fact, the only financial covenant is a net debt to capitalization ratio that cannot exceed 60%. And at June 30, that ratio was 27%. Of our USD 2.5 billion limited recourse project financing facility for the QB2 project, we have drawn USD 1.8 billion as of June 30, of which USD 224 million withdrawn in the second quarter.

  • Antamina entered into a new USD 1 billion term loan agreement in July, of which our 22.5% share would be USD 225 million if fully drawn. The loan is nonrecourse to us and matures in July 2026. We have no significant note maturities prior to 2030 and investment-grade credit ratings from all 4 credit rating agencies.

  • Importantly, we have significant potential for EBITDA generation from current steelmaking coal prices. Every USD 50 per tonne increase in the quarterly index lagged by 1 month is estimated to increase our annualized EBITDA by almost CAD 1.5 billion.

  • With that, I will pass it back to Don for closing comments.

  • Donald R. Lindsay - President, CEO & Director

  • Thanks, Jonathan. In closing, we remain focused on our copper growth strategy and on delivering strong operating results and strong free cash flow in the current favorable commodity price environment. We believe Teck is one of the best positioned companies globally to capitalize on the strong demand growth we see for copper with one of the very best copper production growth profiles in the industry.

  • Accelerating copper growth is the cornerstone of our strategy. In the process, we expect to continue to reduce carbon as a proportion of our total business, while continuing to produce the high-quality steelmaking coal required for the low carbon transition. We're also continuing to strengthen our existing high-quality low-carbon assets through our RACE21 technology and innovation program, which is harnessing cutting-edge technologies to drive a step change improvements in productivity, efficiency, safety and sustainability.

  • At the same time, we strive to maintain the highest standards of sustainability and safety and operational excellence in everything we do. And we have a leadership team with the right mix of skills and experience to deliver on our strategy.

  • And with that, we'd be happy to answer your questions. Like many of you, most of us are on phone lines from home or other locations. So please bear with us if there is a delay while we sort out who will answer your questions.

  • And with that, operator, over to you.

  • Operator

  • (Operator Instructions) And the first question is from Orest Wowkodaw from Scotiabank.

  • Orest Wowkodaw - MD & Senior Equity Research Analyst of Base Metals

  • Nice to see the solid progress at QB2. I was just curious. Did I hear correctly that you're now able to take the headcount up from 10,000 approximately up to the planned 12,000? And then I'm wondering if that is the case, how we should think about the COVID-related escalation costs at QB2? I mean they were $50 million higher this quarter. Is that -- I'm just wondering if we should anticipate those coming down materially. Any color would be very helpful.

  • Donald R. Lindsay - President, CEO & Director

  • Okay. Thank you, Orest. And I see you've done it again, getting first in line, well done. So the first part of your question, the answer is yes, that too, but I'm going to turn it over to Red Conger for details. Red, over to you.

  • Harry Milton Conger - Executive VP & COO

  • I appreciate the question. We are absolutely aggressively increasing the headcount at site. We're going to 3 to a room as Don had mentioned. So that had been a constraint up until now. And as we're able to change the work rules associated with all of that, the protocols, et cetera, we're going to have less and less effect from the pandemic that you saw in the second quarter. So the better we can manage all of that and then the higher vaccination rates, et cetera, then the less additional COVID expenses we will have. So we're very optimistic that we've seen the peak of those protocols that we've had to take that have affected cost and productivity.

  • And just to add one 1 thing to Don's comments earlier, he showed a picture of the pipeline, the small one for the concentrate, the big one for the water. One of the things that our team has done to keep us on schedule during this unprecedented second quarter that we just came through, we've -- when people were poured off and we have those problems that Don described, we reconstitute the crews to keep working on the most critical items. And so in that particular photo, the most critical item is the water pipe, not the concentrate pipe. We've got to get the water pipe complete, so we can do commissioning, hydro testing, et cetera. and we can finish the concentrate pipeline later. So that's just one example of how our team has flexed and responded during this and now with more headcount on site, more consistent work crews, et cetera, we can do that work in parallel, again we had originally planned to do.

  • Orest Wowkodaw - MD & Senior Equity Research Analyst of Base Metals

  • Just to clarify, so are you allowed to take the head count up to the maximum plan sort of peak levels now?

  • Harry Milton Conger - Executive VP & COO

  • Here's the way we should about it. Don mentioned different sale projects. So we are now setting up work plans for the remainder of the construction that take into account all of the things that have changed since we made the plan just 3 or 4 short months ago.

  • And so that plan will have the maximum employment levels possible that we can deploy, take advantage of every workfront possible, and that may be a slightly different head count than what we had cited earlier. And with good effort and a little bit of luck, it could even be higher than what we had planned before with it. For sure, it will be the maximum amount of people that we can deploy. Again, I'll just remind you some of the forward-looking things that the team has done. When we added the extra camp space when the pandemic first hit, that now allows us to do some different things with 3 to a room. And like I said, we're going to take full advantage of all of that and be very creative with these work plans.

  • Orest Wowkodaw - MD & Senior Equity Research Analyst of Base Metals

  • Okay. And just finally, any guidance you can give us, Red, on sort of a run rate of COVID cost increases moving forward as you ramp up?

  • Harry Milton Conger - Executive VP & COO

  • Orest, the forecast that we've provided you now is our very best estimate of what we think it's going to be at completion.

  • Orest Wowkodaw - MD & Senior Equity Research Analyst of Base Metals

  • What that [150] is to completion, that's not just a catch-up?

  • Harry Milton Conger - Executive VP & COO

  • No, we're -- the forecast that we have given you, we believe, will be the total cost at completion.

  • Operator

  • The next question is from Matthew Murphy from Barclays.

  • Matthew Murphy - Analyst

  • Just a follow-up on that last one. The 600 million estimate, how much of that would have been realized to date? And how much are you leaving for the rest of the project?

  • Harry Milton Conger - Executive VP & COO

  • Yes. Matthew, the lion's share of that has not been incurred. So those are our estimates of how this is going to be played out.

  • Matthew Murphy - Analyst

  • Okay. Okay. So yet -- mostly yet to be realized. Okay. And I'm just wondering, when you talk about the 60% complete, that's physical progress. And from here on? I mean, how does the pace of the project compared to your original pre-COVID budget?

  • Harry Milton Conger - Executive VP & COO

  • Yes. So that's total progress for the entire project to 60% number. So that includes engineering and everything. And again, just to reiterate what Don said, the pace of this will be different here forward than it has been. So we intend to increase the pace of construction completion. And a good example of that, Matthew, the second quarter that we just completed was the best pace project to date. That was our best quarter for construction completion to date. And we intend to continue to beat those -- this third quarter that we're in now will be better than the second and we'll get a peak here in the fourth quarter, fourth quarter the early next year.

  • Operator

  • The next question is from Greg Barnes from TD Securities.

  • Greg Barnes - MD & Head of Mining Research

  • I'm going to go back to you again, Red. Just on the pace of completion, obviously, there's a critical point to get the project done by second half of next year. Just easy numbers, you have to achieve about 3% to 3.5% completion rate per month from August on. Does that sound about right? And I guess, what was the number for Q2?

  • Harry Milton Conger - Executive VP & COO

  • Well, (inaudible) the way to think about it. What we've been able to do is maintain the critical path through the grinding lines on schedule. So again, just using that same example I used on the 2 pipelines a minute ago. when we had all of these report of issues, quarantine issues, critical personnel not present, particularly in the last quarter. We made sure that we reconsisted, reconstituted crews to do everything possible on the critical path.

  • So those about critical path through the grinding lines has maintained the schedule. And so now when I mentioned increasing headcount, other work fronts that we can open up, et cetera, that will be picking up those other pieces that we very appropriately deprioritized, if you will, during these challenges. So it's not just what is the percent complete? Because like you said, that's kind of a mathematical thing. This has all been very targeted at, okay, we're going to get the first grinding line of the concentrator running in the second half of 2022, and the second one right after that, and that's the program. That's how we're doing it. And that's why we're making such a big deal about keeping the critical path on schedule.

  • Greg Barnes - MD & Head of Mining Research

  • Okay. So maybe this is a bit unfair, Red, but what is the target completion date for the first grinding line then?

  • Harry Milton Conger - Executive VP & COO

  • Second half of 2022.

  • Greg Barnes - MD & Head of Mining Research

  • Don, can I switch back to you. Just the pace of inflation that you're seeing, cost inflation on consumables, reagents equipment. From what you're seeing, is this cyclical? Or is it -- or is there a structural element of this going on?

  • Donald R. Lindsay - President, CEO & Director

  • I would say it's cyclical. I mean as I said in my comments that there's -- the source of this is the underlying increase in different commodities that make up things. So steel and fuel oil, of course, driven by your WTI price. The kind of cost that I would think of in the structural category might be, for example, if you had labor agreements that we're locked in for several years at numbers that were a dramatic change. And the good news is we've just settled at our 2 largest mines for 6 years in a reasonable range, higher than last time, the workers benefit. But in a way that we think will be quite productive and [have stability] for 6 years. So -- the short answer I would say is cyclical.

  • Greg Barnes - MD & Head of Mining Research

  • Well, you're not too concerned about 2022. I know it's early but you're not too concerned about higher costs at this point next year?

  • Donald R. Lindsay - President, CEO & Director

  • Not really because we'll still be benefiting from the investments that we made at Elkview starting down Cardinal River, Neptune running at full capacity at that stage, which is a significant benefit. So those are strong positives that should help balance the increases in other inputs.

  • Operator

  • The next question is from Lucas Pipes from B. Riley Securities.

  • Lucas Nathaniel Pipes - Senior VP & Equity Analyst

  • While it is tempting to continue to ask questions on QB2, I'll try to switch the topic. First, on met coal, one is kind of shorter-term question and then my follow-up will be a longer-term one. But in the short term, when I look at your year-to-date production figures, sales figures. It looks like a midpoint of guidance is baking in a ramp-up in the second half of the year. And is that a kind of stretch goal given what's going in the province? Or do you have a pretty good line of sight to get to those levels set?

  • Donald R. Lindsay - President, CEO & Director

  • Yes. It's a good question. I'm going to ask both Réal Foley and Robin Sheremeta to give an answers -- the overview. If you -- we have to take that into the context with what the dramatic effect of the wildfires in the last 2 or 3 weeks, and that's a big factor, and we're not completely through that yet. So can anyone's guess when that will be past us. But Robin, why don't you start?

  • Robin B. Sheremeta - SVP of Coal

  • Sure. And just to reiterate that the wildfires are certainly causing us some uncertainty.

  • I mean, on the bright side, as we came into this period, we actually had considerable room at the sites. Logistics was strong through the first half. So we were able to move most of our clean coal to port. So that gives us some flexibility to get through this period. We can't run as fast when we're running to ground. So as we stockpile, we have to slow production rates down a little bit. But the majority of our shutdowns are behind us now. There's some left to go in Q3, but we're well over half done through the maintenance process here through the first half. So we're in really good shape from an operational point of view. It's really just a matter of what kind of logistics constraints we see going forward now with rail. But we're in good shape to hit our new guidance range of 25 to 26.

  • Donald R. Lindsay - President, CEO & Director

  • Thanks, Robin. And Réal, do you want to add any market color for the second half of the year?

  • Réal Foley - SVP of Marketing & Logistics

  • Yes. Happy to do that, Don. So yes, Lucas, we're continuing to see the market really strong, whether it's demand in China, and they have their own supply issues with both domestic mines in Mongolia and on markets outside of China, demand is extremely strong as well. Steel prices are running at record levels. Steel production, hot metal production is back to pre-pandemic levels. So we're continuing to see strong demand across the board for our products.

  • Lucas Nathaniel Pipes - Senior VP & Equity Analyst

  • Very helpful. all for your perspective. On my follow-up, I mentioned a longer-term question on the met coal market. And we -- in the past, it seemed like we -- seems like a lifetime ago, we spent more time thinking about what is a reasonable met coal price. And Don, as you kind of survey that market from both the supply and demand vantage point. What's your view today, what is a reasonable price to underwrite as you do your internal planning or in conversations with investors?

  • Donald R. Lindsay - President, CEO & Director

  • Yes. So we always start and say, well, where has it been in the last 10 or 12 years, and the average price is actually in the 170, 180 range, depending on whether you're using an inflation-adjusted number or not. In today's pricing terms, it would be 180. And then what's going to happen in the next 10 years on supply and demand. And it's pretty clear that there are constraints on investment in new supply and not just capital providers' willingness to provide capital but also permitting issues. And we've seen it right here in Canada where recently a project proposal even though they've done all the hard work for 6 years and so on, but it was turned down, and we've seen the same in Australia as well.

  • So I have a view that there'll be less supply, but roughly the same demand. And the reason why we say that is -- while each of us has been bombarded in the last year or so with research reports, 2 or 3 weeks on green steel and hydrogen-based technologies and so on, it's pretty clear that it's going to take a long, long time for that to have a meaningful impact on the total volume of steel produced globally.

  • And remember, it's about a 2 billion tonne market and the kind of investment it would take to make a material impact on that size of industry is trillions of dollars. And we just don't think it's going to happen for quite a while. So meanwhile, our core customers in Japan and Korea and China and India are seeing strong demand. India's steel industry, of course, is planned by the government to basically triple in the next 10 years. So we think that the outlook from a price point of view is actually quite strong.

  • We've thankfully seen the recirculation in the market that we had the disruption between China and Australia and that whole issue. And it took a while to sort that out in the global markets, but it seems to have done that now. So it's much more stable for an Aussie FOB price. And I think we can collect the cash now and see some stability. There's always going to be volatility in commodity market and steelmaking coal is no exception. But for our planning purposes, we're at the higher numbers. And we're not planning to grow our steelmaking coal business either, right? So -- and we don't see that happening at our major competitors. And new projects is just difficult to permit. So I think supply is going to be tight, if that helps.

  • Operator

  • The next question is from Carlos De Alba from Morgan Stanley.

  • Carlos De Alba - Equity Analyst

  • Great. So on the coal production, we heard about the temporary mining ban this weekend in B.C. So I wonder if that adds any additional incremental risk to coal volumes in the third quarter or if that is, in a way, already incorporated in your latest guidance? And on the cost front there, but related to the water treatment, so we saw an increase of 100 million per year expected between 2021 and 2030. What drove that? And what should we expect going forward? And then finally, I guess on the other end of the core business, Neptune. To what extent is Neptune helping you offset the higher coal transport cost? Because we also read in the release that you expect to see a little bit reduced throughput through Neptune, and that is contributing to the higher cost transportation guidance.

  • Donald R. Lindsay - President, CEO & Director

  • Okay. I think we'll give the first 2 parts of the question to Robin Sheremeta, and I believe the last part for Réal Foley or yes, I guess, Réal Foley.

  • Robin B. Sheremeta - SVP of Coal

  • Thanks, Carlos. Just on the first question around production, pretty much the same answer I walked through the -- really, we've got to get through this fire situation and see how we come out the other side, but we've tried to reflect that in the guidance of 25 to 26. So we did reduce the guidance by about 0.5 million. So that's pretty much the issue on water treatment. The main reason for the increase in water CapEx over the period of '22 to '24 is really just a change in project time lines. So we're advancing some water treatment strategies as a result of consultation and some that can actually enhance our mine planning options. So just for an example, Elkview, phase 3 of the SRF that we've got there. We've advanced that from '25 to '23. So we pulled that in earlier, and that supports potentially lower cost boiling options over that time period. So it's really just a shift in the time line on those developments.

  • Réal Foley - SVP of Marketing & Logistics

  • All right. And Carlos, your question on Neptune. So the increase in the transportation cost is really due mainly to the forest fires in B.C. So as a result of this, the train service to Vancouver was completely halted for over 2 weeks. And it's starting to come back to normal now.

  • So what we did during that period is we diverted trains and vessels to Ridley Terminals in order to continue delivering our coal to market. The fact that we have capacity through the 3 West Coast ports actually allowed us to do that, and to capture the high pricing that we see in the market now with above 200 and CFR China above 300. And overall, when you look at Neptune, yes, the site is ramping up. It is doing well. We're expecting that by the end of Q3, we'll be running at above 18.5 million tonnes of capacity. And as such, delivering the cost savings that we're expecting to see going forward for the long term.

  • Operator

  • The next question is from Abhi Agarwal from Deutsche Bank.

  • Abhinandan Agarwal - Research Analyst

  • I have a couple of questions, please. The first one is on Neptune. As Réal just mentioned, the transportation costs for the second half have been impacted by the ongoing wildfires. But post that, once the situation has normalized, is it fair to assume that transportation costs stepped down over the course of next year to the lower end of the CAD 35 to CAD 40 per tonne range?

  • Donald R. Lindsay - President, CEO & Director

  • Go ahead, Réal.

  • Réal Foley - SVP of Marketing & Logistics

  • Yes. So if you look at the previous guidance that we had was at 36 to 39. For this year, we're expecting to be at least in that range for next year and possibly lower as the volume going through Neptune will be much higher than what we would have seen this year. To put this in perspective, we're expecting volume through Neptune this year to still be somewhere around the 13 million to 14 million tonnes range. Next year should be about 18.5 million tonnes. So we will see the benefits of the fact that Neptune is in the cost of throughput as opposed to commercial rate that we're paying at other ports.

  • Abhinandan Agarwal - Research Analyst

  • Got it. The next one is also on the steelmaking coal division. Can you give us a bit more color on the growth CapEx and the stripping CapEx increase at the -- for the division? And regarding the RACE21 CapEx uplift, is it possible for you to quantify the quantum of improvement in productivity and the reduction on costs going forward?

  • Donald R. Lindsay - President, CEO & Director

  • Robin, over to you.

  • Robin B. Sheremeta - SVP of Coal

  • Just want to -- I think you were talking about capitalized stripping. On the first part of the question. Just not simply a -- again, it's just the timing of mine sequence activities. So on occasion, we mine in higher strip ratio areas and it sets us up for future production. So that's really just the change in capitalized stripping. And then I apologize, what was the second part of your question was around quantifying RACE21 benefits?

  • Abhinandan Agarwal - Research Analyst

  • Yes.

  • Robin B. Sheremeta - SVP of Coal

  • I mean, it's a little difficult to give you a quantification and any kind of specifics because it's across a broad -- very broad range of initiatives. So I can tell you that everything that we have invested from the capital side is leading to actually quite short term and strong economic benefit. And maybe the one way to illustrate it is we've maintained our cost guidance despite a number of different inflationary pressures with fuel and things like that and some of the reduction in production. And yet, we're still seeing strong cost performance. And I think when you roll all that up, that's in a large part, a reflection on the RACE21 initiatives that are in play right now. So we are seeing good response on those, but I can't break that down into any kind of detail for you.

  • Donald R. Lindsay - President, CEO & Director

  • What I would add on that one is at the beginning of RACE21, we were reporting the incremental EBITDA gains quarter-to-quarter, but it became difficult to do that during -- first of all, the COVID effects, having to take some pretty dramatic actions in the initial stages of the pandemic and then the volatility of the prices. And so we're really focused on all the different projects themselves, and we will report on the incremental benefits at year-end at the commodity prices at that time, so you can get a good feel through for the value that is brought to the table. But suffice it to say that people have been pretty excited by the progress we've made.

  • Operator

  • The next question is from Brian MacArthur from Raymond James.

  • Brian MacArthur - MD & Head of Mining Research

  • Can I just go back to the capitalized stripping on the coal that's up $105 million this year. Is that you're just being proactive because you have to ramp back production because of the sales, and you're trying to get ahead of the game and that will benefit us next 2 years? Or is there anything structurally really changed? Because I thought we sort of got the stripping down to a lower level. If you could just elaborate on that? And second, Don, I don't know if you can make any comments on project satellite.

  • Donald R. Lindsay - President, CEO & Director

  • Sure. Robin, you go ahead, and I'll come back on satellite.

  • Robin B. Sheremeta - SVP of Coal

  • Yes, you bet. There's nothing structural has changed. We're still operating right around that 10:1 strip ratio. And really, the situation, we are a little lower on production. We've got strong raw coal inventories. And so this allows us to do stripping in areas that don't release as much coal at the front end, but are going to set us up very strongly over the next couple of years. So it's really just shifting some of the stripping around.

  • Brian MacArthur - MD & Head of Mining Research

  • Can we expect -- I mean, that will be one of the things that just sort of offsets, I assume, cap or cost inflation going forward? Is that sort of how you're looking at it right now?

  • Robin B. Sheremeta - SVP of Coal

  • Well, just any time you can you can get ahead on stripping to some extent and set yourself up with that kind of flexibility on the mine planning side is -- it just puts you in a much stronger position in the future. So we have that capability, and it's allowed us to make that kind of move.

  • Donald R. Lindsay - President, CEO & Director

  • Okay. And then back on satellite, which we're really internally starting to think a bit more as a copper growth division. Satellite, of course, has 5 projects. And on top of that, we have QB3 and [View]. And so in the last major investor conference, we did publish some details and IRRs and NAVs and so on, on the key projects. So if you look in the appendix of our IR presentation to get those. We divide it into near-term, medium-term and longer-term options.

  • The 2 near-term ones, of course, are Zafranal and San Nicolás. And on Zafranal's case, as we've said before, we needed to wait to see how things landed in Peru. We now know that Castillo is President, and we still need to wait to see as his cabinet gets appointed and confirmed. So we don't think we'll be in a position to move forward in whichever direction probably until the fall sometimes as we see how things go in Peru. We own 80% of that project. One thing for sure is that if we partner in some way that we'll be doing it, in such a way that we retain an interest in that copper exposure, whether it's by taking back shares or selling less than 80% or that sort of thing. But that project -- that process is all ready to go, but it's also clear that you can't start it yet until Peru gets a little further along in their transition.

  • And then San Nicolás, obviously, you'll see the numbers in a very high-quality project. We've had a lot of interest. It's very exciting, and we're sorting that -- sorting through that now dealing with different parties and their proposals. So you'll see more of that in the second half of the year.

  • And then QB3 as well, we're making good progress there. And I would hope that we would be reporting to the market that will have narrowed the options for that project and give some more detail on it between now and at the end of the year as well. So you could see incremental decisions on all 3 of those between now and the end of the year.

  • And I think, Fraser, if I'm not mistaken, that's the last question. We're past the hour.

  • H. Fraser Phillips - SVP of IR & Strategic Analysis

  • Yes. Don, you can give some closing remarks if you would like to.

  • Donald R. Lindsay - President, CEO & Director

  • Okay. I do want to draw people's attention that we will be holding our Annual Investor and Analyst Day. It will be a virtual session on September 21, so please mark the date in your calendar and we look forward to you joining us. And we will send out the date notices shortly and a press release with further details will be issued closer to the date.

  • And just as a final comment, I have to tell you that last week, Red and I visited 5 of our sites, and we were at the port the week before, and we took a number of people with us. And I can only say I wish all of you could have been with us to see the exciting projects that are going on. We have so much talent, so many really bright, hard-working people who are so passionate about what they're doing. It was just inspiring to be there, and see all the progress we're making. So we hope to share that with you on Investor Day, and we look forward to speaking with you on September 21. Thanks very much, everybody, for joining us today. Bye now.

  • Operator

  • The conference has now ended. Please disconnect your lines at this time, and we thank you for your participation.