Silvercorp Metals Inc (SVM) 2026 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

    Operator

  • Thank you for standing by. Good afternoon. My name is John, and I'll be your conference operator today. At this time, I would like to welcome everyone to Silvercorp fourth quarter and full year fiscal 2026 financial results conference call. (Operator Instructions)

    感謝各位稍候。下午好。我叫 John,今天將擔任各位的電話會議接線員。此刻,我謹代表公司歡迎各位參加 Silvercorp 2026 會計年度第四季及全年財務業績電話會議。(接線員指示)

  • I would now like to turn the conference over to Lon Shaver, President of Silvercorp. Please go ahead.

    現在我想把電話會議交給 Silvercorp 總裁 Lon Shaver。請開始。

  • Lon Shaver - Vice President

    Lon Shaver - Vice President

  • Thank you, John. On behalf of Silvercorp, I'd like to welcome everyone to this call to discuss our fourth quarter and full year fiscal 2026 financial results, which we released on Tuesday. A copy of the news release, the MD&A and our financial statements are available on our website and SEDAR+. Before we get going, please note that certain statements on today's call will contain forward-looking information within the meaning of securities laws. Additionally, please review the cautionary statements in our news release as well as the risk factors described in our most recent regulatory filings.

    謝謝你,John。我謹代表 Silvercorp 歡迎各位參加本次電話會議,討論我們於週二發布的 2026 會計年度第四季及全年財務業績。新聞稿、管理層討論與分析(MD&A)以及財務報表的副本可於我們的網站與 SEDAR+ 查閱。在開始之前,請注意,今天電話會議中的某些陳述將包含依證券法定義之「前瞻性資訊」。此外,請一併審閱我們新聞稿中的警示性聲明,以及我們最近期監管申報文件所述之風險因素。

  • So I'll start with the financial results for the quarter. We delivered another quarter of strong performance in Q4, which was highlighted by record revenue of $147 million, up 96% from last year. Cash flow from operating activities and free cash flow reached $90 million and $58 million, respectively, up 194% and 308% from last year. This performance was mainly driven by a 183% increase in the realized selling price of silver, which averaged just above $78 an ounce after smelter deductions. Silver accounted for 78% of our revenue in Q4.

    我先從本季的財務結果談起。我們在第四季再度交出強勁表現,亮點包括創紀錄的營收 1.47 億美元,較去年成長 96%。營運活動現金流與自由現金流分別達到 9,000 萬美元與 5,800 萬美元,較去年分別成長 194% 與 308%。此表現主要受惠於白銀實現售價上升 183%,在扣除冶煉費後平均略高於每盎司 78 美元。白銀在第四季占我們營收的 78%。

  • It's obviously a good time to be a silver miner, and these results show why Silvercorp remains a compelling investment. We're profitable, growing and still undervalued. Moving down the income statement. We reported an unadjusted net income of negative $700,000 for the quarter or negative $0.30 per share -- sorry, $0.03 per share, which reflected a significant $60 million noncash charge on the fair value of derivative liabilities. We have since removed the cash settlement option on our convertible notes, which reclassified the conversion feature from a derivative liability to equity and eliminated future fair value volatility that would flow through the income statement.

    顯然,現在是成為白銀礦商的好時機,而這些結果也顯示 Silvercorp 仍是一項具吸引力的投資。我們獲利、成長,且仍被低估。接著看損益表。我們本季未調整淨利為負 70 萬美元,或每股負 0.30 美元——抱歉,是每股負 0.03 美元,主要反映衍生負債公允價值的 6,000 萬美元重大非現金費用。我們其後已移除可轉換公司債的現金結算選項,將轉換特徵由衍生負債重新分類為權益,並消除未來將流入損益表的公允價值波動。

  • This will clear up this reporting issue going forward and simplify our financial statements. So removing these noncash and onetime items, our adjusted net income for the quarter was $59.3 million or $0.27 per share versus $14.7 million and $0.07 in the comparative quarter. As I mentioned, revenue was up 96%, while adjusted net income rose 303%, showing that we've been able to flow these higher metal prices through to the bottom line.

    這將在未來釐清此一申報問題並簡化我們的財務報表。因此,剔除這些非現金及一次性項目後,本季調整後淨利為 5,930 萬美元或每股 0.27 美元,相較於去年同期的 1,470 萬美元與每股 0.07 美元。如我所提,營收成長 96%,而調整後淨利成長 303%,顯示我們已能將較高的金屬價格有效反映至最終獲利。

  • Adjusting our operating cash flow for a positive $3 million impact from noncash working capital and backing out the Wheaton stream contribution that we showed in Q3, the Q4 operating cash flow of $87 million was a quarterly record. On the capital allocation front, during the quarter, we invested nearly $15 million at our Chinese operations and $13 million at the El Domo project in Ecuador.

    將營運現金流調整為納入非現金營運資金帶來的正向 300 萬美元影響,並扣除我們在第三季列示的 Wheaton 串流(stream)貢獻後,第四季營運現金流 8,700 萬美元創下單季新高。在資本配置方面,本季我們在中國營運投入近 1,500 萬美元,並在厄瓜多 El Domo 專案投入 1,300 萬美元。

  • Additionally, we made a cash payment of $92 million in late January for the acquisition of the Tulkubash and Kyzyltash Gold projects in Kyrgyzstan. As we embark on an aggressive growth strategy, our strong balance sheet will become increasingly important. We ended the quarter with a strong cash balance of $422 million, which does not include our investments in associates and other companies, which had a total market value of $275 million on March 31. Additionally, to add further liquidity, after quarter end, we secured a low-cost RMB term loan facilities totaling approximately $220 million, which further strengthens our financial position. To date, these remain undrawn.

    此外,我們於 1 月下旬就收購吉爾吉斯的 Tulkubash 與 Kyzyltash 金礦專案支付了 9,200 萬美元現金。隨著我們展開積極的成長策略,強健的資產負債表將愈發重要。我們在季末的現金餘額為 4.22 億美元,尚未包含我們對聯營公司及其他公司的投資;截至 3 月 31 日,該等投資的總市值為 2.75 億美元。此外,為進一步提升流動性,我們在季後取得低成本人民幣定期貸款額度,合計約 2.20 億美元,進一步強化我們的財務狀況。截至目前,這些額度仍未動用。

  • To quickly summarize the full year 2026 results, which just like the quarter were record-breaking across the board. Revenue reached $438 million, up 47% from the prior year, driven by a 72% increase in the realized selling price of silver over the year. Adjusted net income for the year was $151 million or $0.69 per share versus $75 million or $0.36 per share in the prior year. Our annual cash flow from operating activities was nearly $311 million. This was up 124% from $139 million in the prior year.

    快速總結 2026 全年業績:與本季相同,各項指標全面刷新紀錄。營收達 4.38 億美元,較前一年成長 47%,主要受全年白銀實現售價上升 72% 所帶動。全年調整後淨利為 1.51 億美元或每股 0.69 美元,相較前一年的 7,500 萬美元或每股 0.36 美元。全年營運活動現金流接近 3.11 億美元,較前一年的 1.39 億美元成長 124%。

  • Capital expenditures for the year were approximately $124 million, which is up from $87 million in the prior year, and this includes $75 million for underground development, equipment and facilities at our Chinese operations as well as over $46 million for construction at the El Domo mine. Nonetheless, we generated more than $181 million in free cash flow in fiscal 2026, and that's more than triple what we delivered in the prior year.

    全年資本支出約 1.24 億美元,高於前一年的 8,700 萬美元;其中包括我們中國營運在地下開發、設備與設施方面的 7,500 萬美元,以及 El Domo 礦山建設超過 4,600 萬美元。儘管如此,我們在 2026 會計年度仍產生超過 1.81 億美元的自由現金流,較前一年交出的成果增加逾三倍。

  • Now to quickly recap our operating results. As we reported last month in Q4, we produced approximately 1.5 million ounces of silver, nearly 2,500 ounces of gold, 14 million pounds of lead and 4 million pounds of zinc. And for the full year, we produced 6.8 million ounces of silver, 8,723 ounces of gold, 60 million pounds of lead and 22 million pounds of zinc.

    接著快速回顧營運成果。如同我們上月在第四季所報告,我們產出約 150 萬盎司白銀、近 2,500 盎司黃金、1,400 萬磅鉛與 400 萬磅鋅。全年方面,我們產出 680 萬盎司白銀、8,723 盎司黃金、6,000 萬磅鉛與 2,200 萬磅鋅。

  • Compared to last year, gold production increased 16%, while silver, lead and zinc production were down 2%, 3% and 7%, respectively. The decrease was mainly driven by lower head grades, reflecting higher dilution associated with an increase in shrinkage mining. Consolidated mining operating income came in at $254 million in fiscal 2026, with Ying contributing $240 million of that or 95% of the total. On the cost side, Q4 production costs averaged $78 per tonne at Ying, down 8% from last year. The improvement reflects a 43% and 2% increase in tonnes mined and milled as continued mine mechanization and greater use of that cost-efficient shrinkage mining method boosted productivity.

    與去年相比,黃金產量增加 16%,而白銀、鉛與鋅產量分別下降 2%、3% 與 7%。下降主要由較低的入選品位所致,反映因收縮採礦(shrinkage mining)增加而帶來較高的稀釋率。2026 會計年度合併採礦營運收入為 2.54 億美元,其中 Ying 貢獻 2.40 億美元,占總額 95%。成本方面,第四季 Ying 的生產成本平均為每噸 78 美元,較去年下降 8%。改善反映採礦與選礦處理量分別增加 43% 與 2%,在持續推動礦山機械化及更廣泛採用具成本效率的收縮採礦法下,生產力提升。

  • For the full year, production costs averaged $80 per tonne, which was below our Ying's annual guidance of $87 to $88 per tonne. Ying's cash cost per ounce of silver net of by-product credits was negative $1.03 in Q4 compared to positive $3.05 in the prior year quarter. The decrease was driven by an $800,000 increase in byproduct credits. For the full year, cash costs averaged $0.01 per ounce compared to $0.62 last year, reflecting a $10 million increase in byproduct credits. All-in sustaining production costs increased by 11% year-over-year at Ying to $130 to $4 per tonne in Q4, driven mainly by higher government taxes on increased revenue as well as higher sustaining capital spending on tunneling.

    全年生產成本平均為每噸 80 美元,低於我們對 Ying 全年指引的每噸 87 至 88 美元。第四季 Ying 的白銀每盎司現金成本(扣除副產品抵減)為負 1.03 美元,相較去年同期為正 3.05 美元。下降主要由副產品抵減增加 80 萬美元所致。全年現金成本平均為每盎司 0.01 美元,相較去年為每盎司 0.62 美元,反映副產品抵減增加 1,000 萬美元。Ying 的全維持性生產成本(all-in sustaining production costs)在第四季年增 11%,至每噸 130 至 4 美元,主要受惠於(應為:受影響於)因營收增加而提高的政府稅負,以及用於掘進的維持性資本支出增加所致。

  • For the full year, the all-in sustaining cost also averaged $134 per tonne, down 4% year-over-year and below Ying's annual guidance of $158 to $161 per tonne. On a per ounce basis, net of byproducts, Ying's all-in sustaining cost was $1,309 in Q4 and $1,149 for the full year, delivering strong margins amid higher silver prices. Turning to our growth projects. At Ying, we invested $29 million in fiscal 2026 for ramp and tunnel development and are budgeting $37 million this year to further enhance underground access and materials handling. This work goes hand-in-hand with our broader effort to expand mining capacity across all four licenses at Ying.

    全年全維持性成本平均亦為每噸 134 美元,年減 4%,且低於 Ying 全年指引的每噸 158 至 161 美元。以每盎司計(扣除副產品),Ying 的全維持性成本在第四季為 1,309 美元,全年為 1,149 美元,在白銀價格走高的環境下維持強勁利潤。接著談成長專案。在 Ying,我們於 2026 會計年度投入 2,900 萬美元用於斜坡道與隧道開發,並規劃今年編列 3,700 萬美元,以進一步提升地下通行與物料運輸處理能力。此項工作與我們擴大 Ying 四張採礦許可證整體採礦產能的更廣泛努力相輔相成。

  • We've now completed the permit extensions and capacity expansions for the four mining permits comprising Ying with total approved capacity increasing to 1.32 million tonnes per year. Now we're focused on completing the required production safety licenses. At SGX, the safety facility design has already been approved and construction is underway to support the capacity expansion. At HPG, the design has been reviewed by the Henan provincial government and is now awaiting final sign-off. At the TLP, LM and DCG licenses, the safety facility designs have been completed and submitted for approval.

    我們現已完成構成 Ying 的四張採礦許可證之許可展延與產能擴充,核准總產能提升至每年 132 萬噸。接下來我們將專注完成所需的生產安全許可證。在 SGX,安全設施設計已獲核准,且施工正在進行中,以支援產能擴充。在 HPG,設計已由河南省政府審查,目前正等待最終核准。在 TLP、LM 與 DCG 許可證方面,安全設施設計已完成並已提交審批。

  • At Kuanping, the satellite project north of Ying mine construction focused on ramp development to access the ore bodies. The project, which has a license to produce up to 200,000 tonnes of ore per year, has delivered some development ore in Q1 of fiscal 2027, which was shipped to Ying for processing. With the capacity expansions at the existing Ying permit areas in Kuanping, we will have total mining capacity of approximately 1.5 million tonnes per year. In anticipation of higher mine production at Ying, we're moving ahead with the construction of a new mill, the number 3 mill. Design and construction began in Q4 and with a total budget of $31.6 million.

    在寬坪(Kuanping),作為營礦(Ying)以北的衛星項目,其礦山建設重點聚焦於斜坡道(ramp)開拓,以進入礦體。該項目持有每年最高可生產20萬噸礦石的許可,並已於2027財年第一季度交付部分掘進礦(development ore),運往營礦進行加工處理。隨著寬坪現有營礦許可區域的產能擴張,我們的總採礦產能將約為每年150萬噸。為因應營礦更高的礦山產量,我們正推進新建選廠——3號磨礦廠(3號磨)。設計與施工於第四季度啟動,總預算為3,160萬美元。

  • It's expected to add 3,000 tonnes per day of milling capacity and be commissioned in Q1 fiscal 2028. Once mill number 3 is in operation, we plan to decommission the older mill number 1, which will leave Ying with a net effective milling capacity of approximately 6,500 tonnes per day, up from the current 4,000 tonnes per day. This will give us more capacity at the mill to process at a higher mining rate and still leave some excess capacity for future growth. We plan to release an updated mineral resource and reserve estimate along with an updated mine plan for Ying incorporating Kuanping shortly. Switching gears to Ecuador at El Domo, construction continued to ban in Q4 despite a heavy rainfall.

    預計將新增每日3,000噸的磨礦產能,並於2028財年第一季度投產。3號磨投入運行後,我們計劃停用較舊的1號磨,屆時營礦的淨有效磨礦產能將約為每日6,500噸,高於目前的每日4,000噸。這將使我們的選廠具備更高產能,以在更高採礦速率下進行處理,同時仍保留部分富餘產能以支持未來成長。我們計劃很快發布更新後的礦產資源量與儲量估算,以及納入寬坪的營礦更新礦山計劃。接著轉到厄瓜多爾的El Domo,儘管降雨量大,第四季度施工仍持續推進。

  • On the infrastructure side, we awarded contracts for three sections of external power lines and 3 substations to qualify Ecuadorian contractors, which have since received formal approval from SNL, the domestic power company. We also saw Klohn Crippen Berger mobilized to site to support construction quality assurance for the tailings storage facility.

    在基礎設施方面,我們已將三段外部輸電線路及3座變電站的合約授予符合資格的厄瓜多爾承包商,且已獲得SNL(國內電力公司)的正式批准。我們也看到Klohn Crippen Berger進駐現場,為尾礦庫(tailings storage facility)的施工品質保證提供支持。

  • In parallel, we continue to strengthen on-site capacity with a regional workforce of 372 people as of March 31. Key infrastructure milestones were also achieved, including the completion of the ore shed and continued progress on process plant earthworks and site preparation, supported by ongoing blasting and leveling activities. And importantly, we signed the definitive mining contract with CRCC 19 in February.

    同時,截至3月31日,我們持續強化現場能力,區域勞動力規模達372人。多項關鍵基礎設施里程碑亦已達成,包括礦石棚(ore shed)完工,以及在持續爆破與整平作業支持下,選礦廠土方工程與場地準備工作持續推進。更重要的是,我們已於2月與CRCC 19簽署最終採礦合約。

  • The contract were mobilized to site immediately and has transitioned into active construction, including access road development to the open pit and initial stripping of that open pit area. We spent approximately $60 million on construction through March 2026, which represents about 21% of our updated budget of $284 million.

    合約方隨即進駐現場並已轉入實質施工階段,包括通往露天礦坑的道路開發,以及該露天礦坑區域的初期剝離(initial stripping)。截至2026年3月,我們在建設上已支出約6,000萬美元,約占更新後2.84億美元預算的21%。

  • At the Condor project in Ecuador, we plan to develop two 1,500-meter long exploration tunnels into the Camp and Los Cuyes deposits to support underground drilling and advance exploration and resource definition. To move forward, we required an environmental license and water permits. The water permits have been approved by the relevant government authorities.

    在厄瓜多爾的Condor項目,我們計劃在Camp與Los Cuyes礦床內開發兩條長1,500米的勘探隧道,以支持地下鑽探並推進勘探與資源量界定。為推進該工作,我們需要環境許可與用水許可。用水許可已獲相關政府主管機關批准。

  • Technical reports for the environmental license were also completed and submitted to the relevant government agencies for review. The environmental impact study for the Condor project has been approved by the Ministry of Energy and Mines. We're now actively engaged in formal consultation with directly impacted communities. This is the last step required to secure the small-scale mining license, which we're targeting for Q2 fiscal 2027. Once received, we'll then commence development of those underground access tunnels into the 2 deposits.

    環境許可所需的技術報告亦已完成並提交相關政府機構審查。Condor項目的環境影響研究已獲能源與礦業部批准。我們目前正積極與直接受影響社區進行正式諮詢。這是取得小規模採礦許可所需的最後一步,我們目標是在2027財年第二季度取得。取得後,我們將開始開發通往兩個礦床的地下進入隧道。

  • And this access we would expect to use if and when we transition to a mining operation once we receive the appropriate permits for this and the necessary surface infrastructure. Turning to Kyrgyzstan. In late January, we acquired a 100% interest in Chaarat ZAAV for $92 million. This is the Kyrgyz entity that holds the Tulkubash and Kyzyltash Gold projects. This is an important step in our strategy to build a more globally diversified producer with added exposure to gold's strong fundamentals.

    而一旦我們在取得相應許可及必要地表基礎設施後轉入採礦營運,預期將使用這些通道。接著談吉爾吉斯斯坦。1月下旬,我們以9,200萬美元收購Chaarat ZAAV 100%權益。該公司為吉爾吉斯實體,持有Tulkubash與Kyzyltash金礦項目。這是我們打造更具全球多元化的生產商策略中的重要一步,並可增加對黃金強勁基本面的曝險。

  • Subsequent to year-end in May, we successfully completed the next step by converting ZAAV into a joint venture company with Silvercorp owning a 72% interest in acting as operator and Kyrgyzaltyn, the state-owned gold company holding the remaining 30%. At the same time, the Kyrgyz government issued a new mining license, extending the validity of the mining period by 30 years to June of 2062, for which we made a $60 million payment, which had been previously agreed.

    在年末之後的5月,我們成功完成下一步,將ZAAV轉為合資公司,由Silvercorp持有72%權益並擔任營運方,吉爾吉斯斯坦國營黃金公司Kyrgyzaltyn持有其餘30%。同時,吉爾吉斯政府核發新的採礦許可,將採礦期有效期延長30年至2062年6月;為此我們支付了6,000萬美元,該付款此前已達成協議。

  • Together, these projects give us the opportunity to apply our mine building expertise and financial strength to unlock value through a phased development approach, starting with the fully permitted Tulkubash project, followed by Kyzyltash. Since we announced this deal, we've been actively advancing Tulkubash. Our focus is on updating the bankable feasibility study, adapting and localizing engineering designs and continuing surface work and site preparation to move the project towards construction with initial pre-stripping targeted for Q2 fiscal 2027.

    綜合而言,這些項目使我們有機會運用礦山建設專長與財務實力,透過分階段開發方式釋放價值:先從已完全取得許可的Tulkubash項目開始,之後再推進Kyzyltash。自我們宣布此交易以來,已積極推進Tulkubash。我們的重點是更新可融資可行性研究(bankable feasibility study)、調整並在地化工程設計,以及持續進行地表作業與場地準備,以推動項目邁向建設,並以2027財年第二季度進行初期預剝離(pre-stripping)為目標。

  • We look forward to providing further updates on our development plans for Tulkubash in the near future. Last but not least, earlier this week, we filed an application to list our shares on the Hong Kong Stock Exchange, something we expect to occur later this year. Our rationale is that such a listing will give us the opportunity to present the Silvercorp investment case to a new audience of investors, one that has shown itself to be receptive to mining stocks in general and in particular, to profitable global growth-oriented companies.

    我們期待在不久的將來就Tulkubash的開發計劃提供更多更新。最後但同樣重要的是,本週稍早我們已提交申請,擬將公司股份在香港聯合交易所上市,預期將於今年稍晚完成。我們的理由是,此類上市將使我們有機會向新的投資人群體呈現Silvercorp的投資主張;該群體已展現出對礦業股整體、尤其對具獲利能力且以全球成長為導向的公司之接受度。

  • And with these comments, I'd like to open the call for questions, operator?

    以上是我的說明,接下來我想開放提問,接線員?

  • Operator

    Operator

  • (Operator Instructions)

    (接線員指示)

  • Joseph Reagor, ROTH Capital Analyst.

    Joseph Reagor,ROTH Capital分析師。

  • Joseph Reagor - Analyst

    Joseph Reagor - Analyst

  • Thanks for taking the questions and congrats on a strong finish to the year. I guess, first thing, I mean, we're pretty far into your fiscal Q1 already. Is there any color you can give us about how things are going? Is everything according to plan? And is there any onetime maintenance or anything we should be aware of?

    感謝讓我提問,也恭喜你們在年度末有強勁表現。我想,首先,我是說,我們現在已經進入你們的2027財年第一季度一段時間了。你們能否提供一些近況,說明目前進展如何?是否一切按計劃進行?以及是否有任何一次性維修或其他我們需要留意的事項?

  • Lon Shaver - Vice President

    Lon Shaver - Vice President

  • First off, thanks, Joe, for joining your question. No, nothing notable that is worth reporting.

    首先,謝謝你,Joe,參與並提出問題。沒有,沒有任何值得報告的重大事項。

  • Joseph Reagor - Analyst

    Joseph Reagor - Analyst

  • Okay. And then on this third mill for Ying, when do you expect that to start contributing production? And essentially, I believe it's replacing what mill number 1, right? So like what's the total capacity going to be when everything is said and done?

    好的。那關於營礦的第三座磨礦廠,你們預期何時開始對產量做出貢獻?而且基本上,我相信它是在替換1號磨,對吧?所以最終全部完成後,總產能會是多少?

  • Lon Shaver - Vice President

    Lon Shaver - Vice President

  • Yeah, Once we've built mill number 3 and decommissioned mill number 1, we're looking at around 6,500 tonnes per day of milling capacity. We expect to commission mill number 3 roughly a year from now in Q1 fiscal 2028. And then as it comes on stream, we look to ramp down and then eventually decommission. It's not going to sort of happen instantaneously, but we'd look to just switch over and shut down mill number 1 after that.

    是的,當我們建成3號磨並停用1號磨後,我們的磨礦產能大約是每日6,500噸。我們預期大約一年後、也就是2028財年第一季度讓3號磨投產。之後隨著它逐步上線,我們會逐步降載並最終停用。這不會瞬間發生,但我們會在那之後完成切換並關停1號磨。

  • Joseph Reagor - Analyst

    Joseph Reagor - Analyst

  • Okay. And then I mean, obviously, there would be a significant increase from your current planned milling rates. How should we think about that extra capacity? Should we expect an updated mine plan to come out where it shows what percentage of that capacity you're going to actually use?

    好的。那我想,顯然這會比你們目前計劃的磨礦速率有顯著提升。我們應該如何看待這些額外產能?是否可以預期你們會發布更新的礦山計劃,說明實際會使用其中多少比例的產能?

  • Lon Shaver - Vice President

    Lon Shaver - Vice President

  • Yeah, with the report that I mentioned that will give detailed mine plans for each of the mill now seven at Ying and with Kuanping, eight mines that are going to be ramping up with obviously, these permit expansions. And then as we get the safety production licenses validated, forecast will factor in growth from each of those, and you can see how that tonnage will be used by mill number 2 and number 3 going forward.

    是的,我提到的那份報告將提供詳細的礦山計劃,涵蓋目前營礦的7座礦山,以及加上寬坪後的第8座礦山;這些礦山將在許可擴張下逐步提升產量。接著,當我們完成安全生產許可的核驗後,預測將納入各礦山的成長,你也可以看到未來這些噸位將如何由2號磨與3號磨加以消化。

  • Joseph Reagor - Analyst

    Joseph Reagor - Analyst

  • All right, I'll look forward to that. I'll turn it over.

    好的,我很期待看到。我把時間交回去。

  • Operator

    Operator

  • (Operator Instructions)

    (接線員指示)

  • This concludes the question-and-answer session. I would like to turn the conference back over to management for any closing remarks.

    問答環節到此結束。我想把電話會議交回管理層作結語。

  • Lon Shaver - Vice President

    Lon Shaver - Vice President

  • Okay. Well, great. Thanks, operator, and thanks for everyone for joining us today. If anyone did have or does have any further questions, happy to address that through calls or e-mails going forward. And we look forward to catching up next time on our Q1 fiscal 2027 results in early August.

    好的。非常好。謝謝你,接線員,也謝謝各位今天參與。如果有人有或之後還有任何進一步問題,我們很樂意透過電話或電子郵件持續回覆。也期待下次在8月初就我們2027財年第一季度業績再與各位交流。

  • Have a great day, everyone.

    祝大家有美好的一天。

  • Operator

    Operator

  • today's

    今天的