  • Operator

  • Good morning. My name is Julieanne and I will be your Conference Operator today. At this time I would like to welcome everyone to the ORMAT Technologies Second Quarter Earnings Conference Call. All lines have been placed on mute to prevent any background noise. After the speakers' remarks there will be a question and answer session. (OPERATOR INSTRUCTIONS)

  • I would now like to turn the conference over to Marybeth Csaby of KCSA Strategic Communications. Please go ahead.

  • Marybeth Csaby - IR

  • Thank you Julieanne. Hosting the call today are Dita Bronicki, Chief Executive Officer, Yoram Bronicki, President and Chief Operating Officer, Joseph Tenne, Chief Financial Officer, and Esmidar Lavy, Vice President of Corporate Finance and Investor Relations.

  • Before beginning, we would like to remind you that information provided during this call may contain forward-looking statements relating to current expectations, estimates, forecasts, and projections about future events that are forward-looking as defined in the Private Securities Litigation Reform Act of 1995. These forward-looking statements generally relate to the Company's plans, objectives, and expectations for future operations and are based on Management's current estimates and projections of future results or trends. Actual future results may differ materially from those projected as a result of certain risks and uncertainties. For a discussion of such risks and uncertainties please see Risk Factors as described in the annual report on Form 10-K filed with the Securities and Exchange Commission on March 2, 2009.

  • In addition, during this call statements that may be made include financial measures defined as non-GAAP financial measures by the Securities and Exchange Commission such as adjusted EBITDA. This measure may be different from non-GAAP financial measures used by other companies. The presentation of this financial information is not intended to be considered in isolation or as a substitute for the financial information prepared and presented in accordance with GAAP. Management of ORMAT Technologies believes that adjusted EBITDA may provide meaningful, supplemental information regarding liquidity measurement that both Management and investors benefit from referring to this non-GAAP financial measure in assessing ORMAT Technologies' liquidity and when planning and forecasting future periods. This non-GAAP financial measure may also facilitate Management's internal comparison to the Company's historical liquidity.

  • Before I turn the call over to Management, I would like to remind everyone that a slide presentation accompanies this call and can be accessed on ORMAT's Website at www.ormat.com under the Events Calendar link found in the Investor Relations tab.

  • With that said, I would like to turn the call over to Joseph to review the quarter's financials. Yoram will provide an update on operations and following Dita's remarks, we will open the call to questions.

  • Joseph, the floor is yours.

  • Joseph Tenne - CFO

  • Thank you Marybeth and good morning everybody. We are including certain financial highlights of the Company's Statement of Operations and balance sheet in our earnings release and in the accompanying slides.

  • I would like to begin with a review of the main issues that affected our financial results, starting with slide four. For the second quarter of 2009 total revenues were $100.2 million, a 24.9% increase from revenues of $80.2 million in the second quarter of 2008.

  • As you can see on slide five, in the second quarter of 2009 the product segment had significant contribution with record quarterly revenues of $39.7 million as compared with $18.4 million for the second quarter of 2008. Most of the increase in revenues was derived from EPC contracts for the construction of two large geothermal projects in Nevada and in New Zealand.

  • With regards to our electricity segment, on slide six, despite the strong growth in total generation in the second quarter that was up 14% year over year, total revenues in the electricity segment declined slightly due to the expected reduction in Puna revenues resulting from lower oil prices and ongoing construction at Puna.

  • Moving to slide seven, the Company's gross margin was 28% compared to 28.7% in the same quarter last year. Gross margin for the electricity segment was 25.8% compared to 32.8% in the same quarter last year. The decrease is mainly due to a decline in the average revenue rate per megawatt hour, from $87.00 in the second quarter of 2008 to $75.00 in the second quarter of this year. On the cost side, the decrease in gross margin is due to timing of certain maintenance costs in order to ensure higher availability during the summer.

  • In the product segment, gross margin was 31.3% compared to 14.9% for the same quarter last year. This increase is attributable to a high volume of revenues, a different product mix, and to this year's global decrease in commodity prices.

  • And on slide eight, net income for the second quarter was $16 million or $0.35 per share basic and diluted, as compared to a net income of $12.1 million or $0.28 per share for the second quarter of 2008. The increase in net income was primarily attributable to a $2.5 million increase in operating income, $0.4 million decrease in interest expense, and $3.9 million increase in foreign currency translation gains. This was partially offset by a $1.9 million increase in income tax provision and half a million dollar decrease in income attributable to a sale of equity interest and $0.8 million decrease in interest income.

  • As shown in slide nine, adjusted EBITDA in the second quarter of 2009 increased 10.7% to $32.3 million as compared with the same quarter last year of adjusted EBITDA of $29.8 million. Adjusted EBITDA includes consolidated EBITDA and the Company's share and operating income and depreciation and amortization totaling $1.2 million and $1.3 million for the second quarter of 2009 and 2008, respectively, related to the Company's unconsolidated 50% interest in the Mammoth Complex in California.

  • Turning to slide ten, as of June 30, 2009 the Company had cash and cash equivalents of $46 million compared to $34.4 million as of December 31, 2008. We derived $55.3 million from operating activities during the first six months of 2009. Borrowing activity included the first disbursements in the amount of $90 million of the Olkaria Project finance, $42 million from the Amatitlan Project financing and $20 million from using revolving credit lines with banks.

  • On the usage side, $147.6 million of cash used to fund capital expenditure and $27.5 million to repay long term debt to our parent and to third parties. Our total outstanding debt as of the end of the second quarter of 2009 was $537 million and will be repaid as presented in slide 11.

  • Moving on to slide 12, on August 5, 2009 ORMAT's Board of Directors approved a payment of a quarterly dividend of $0.06 per share pursuant to the Company's dividend policy which starts an annual payout ratio of at least 20% of the Company's net income, subject to Board approval. The dividend will be paid on August 27, 2009 to Shareholders of Record as of the close of business on August 18, 2009. The Company expects to pay a dividend of $0.06 per share in the next quarter.

  • And now, let me turn the call over to Yoram.

  • Yoram Bronicki - President and COO

  • Thank you Joseph and good morning everyone. I would like to start on slide 14 with the operational highlights for this quarter.

  • Our total U.S. and international generation for the quarter was up 14% to about 811,000 megawatt hours. The year-over-year increase in our generation is a result of new plants that commenced Commercial Operation and improved performance in some of our existing power plants. For the first six months of the year, total generation was up 18% to about 1.7 megawatt hour.

  • Now for an update on our drilling activity in the existing power plants, we have completed the drilling and tie-ins for the new wells in Heber and Amatitlan and successfully brought both facilities very close to their design capacity.

  • Turning to slide 15, since our last call we have been working to resolve the injection challenges in our North Brawley Project. Throughout the quarter we have been redrilling our injection wells using a completion that we believe is far less susceptible to long term damage from (inaudible) solids in the geothermal brine. We expect this work to continue through the third quarter.

  • In parallel we have continued to test different methods to remove large quantities of sand from the geothermal brine. Based on those results we are now sourcing and installing these control devices throughout the brine system and expect to control our total flow within the next four months with the plant ramping up gradually starting in October.

  • With respect to our construction activity, by the end of 2010 we plan to add between 72 and 84 megawatt of generating capacity for both geothermal and recovered energy power plants as you can see in the accompanying slide.

  • Work continues on the eight megawatt expansion of our Puna plant. We made significant progress with the Hawaii Electric Light Company on the PPA for the additional power, completed our civil work and started redrill program of three wells. We expect the well field work to continue into the fourth quarter of 2009 and if we reach agreement on the PPA in the third quarter, the plant could be in Commercial Operation in 2010. It is noteworthy that the Reedville work that affects generation would be completed in the third quarter.

  • On the East Brawley Project we believe that we have resolved the permitting issues that have been delaying us. We continue the equipment fabrication and drilling and we are implementing the design changes based on the North Brawley learning. We expect completion in late 2010.

  • As for our long term project, we are proceeding with the development of the new projects listed on slide 16. These projects are expected to add between 151 and 168 megawatt. On the Sarulla Project, the negotiations of certain amendments including an adjustment to commercial terms of the Power Purchase Agreement are progressing but we cannot estimate the completion date. Active financing efforts will start after these amendments have become effective.

  • As we have mentioned before and as is shown on slide 17 there are four main factors that will determine ORMAT's and the geothermal industry's growth rate. Land position and the success rate in exploration are key and we are continuing to focus our efforts on these crucial factors.

  • In the last quarter we have strengthened our land position, securing new leases covering approximately 3,700 acres of federal and private land in Nevada and California and we continue to seek new prospects domestically and internationally.

  • Moving to slide 18 for an update on our exploration activity, of the sites that we have conducted early phase field work on, three have proven to be likely candidates for exploratory drilling. The exploration for two of these sites was planned to begin earlier this year but has been delayed due to the slow permitting process. Additionally, based on the studies we have completed, initial exploration activity is planned on four new sites. Subsequently we continue the validation process of our additional lands.

  • Let me now move to slide 19 in the products segment. This quarter was heavily influenced by the product segment which shows the year-over-year growth of 115%. While we are pleased to see revenue at these high levels, we do not expect the revenues from this segment to continue at this volume in 2010, particularly as we come close to the end of the year.

  • Unlike the electricity segment, the long term forecast of the revenues from this segment is less certain. A number of factors contributed to this such as the timing of new orders, the execution of each project which often vary from period to period.

  • Thank you and I would like to turn the call over to Dita.

  • Dita Bronicki - CEO

  • Thank you Yoram. Before I open the call for questions let me start with slide 21 and talk about the regulatory development.

  • First, the tax credit and ITC grant, as we've discussed in previous calls, the Stimulus Act gives companies the option to forego production tax credit or investment tax credit and receive a cash grant from the U.S. Treasury that will function as an offset of the initial cost of the project. The recently issued guidance gave more clarity on how to apply and obtain this grant. The grant is a cash payment of 30% of eligible costs that qualified developers can receive even if they are not taxpayers. The important aspect is that the cash grant can also be claimed on all of the intangible drilling cost at a geothermal project, meaning that between 90% and 95% of the project costs will be qualified for cash grant. Receiving the cash grant can improve significantly the returns of the project.

  • As we mentioned in the last call we plan to claim the cash grant for the North Brawley Project which is a project that was built at the time when construction costs peaked. For subsequent projects we will evaluate PTC versus ITC on a case-by-case basis.

  • Second is the loan guarantee program. There are two Department of Energy loan guarantee programs available to renewable energy projects. One, called Section 1703 which is under the Energy Act of 2005 and the second, called Section 1704 under the Stimulus Act which guarantees up to 80% of the loan. To be eligible for 1705 program, projects must begin construction by the end of September 2011 and must create new jobs.

  • We have already filed an application for a loan guarantee for our East Brawley Project under the old program and were advised that we were short-listed. We are now preparing applications for Carson Lake, Jersey Valley, and McGuiness projects.

  • And finally, the direct funding -- we submitted applications for six exploration grants and for one additional EGS grant under the DOE's Innovate Technology loan guarantee program. The grant for exploration will enable us to accelerate implementation of new methods of exploration. There is of course no assurance that all of our applications will be approved.

  • Looking at our financing activity on slide 22, we were able to raise additional project financing and corporate loans of over $80 million. We entered into a project financing loan of $42 million to refinance our investment in the Amatitlan Geothermal Power Plant. The loan was provided by TCW Global Project Funds II, Limited. We entered into a six year loan agreement and an eight year loan agreement of $20 million each with financial institutions and we expect to enter into a term sheet for long term financing of our North Brawley Project in the coming weeks.

  • Looking at our capital expenditure requirements on slide 23, we plan to invest during the rest of 2009, $133 million for enhancement of existing power plants and development and construction of new projects. In addition, our capital expenditure budget for our manufacturing activity is approximately $2 million for the rest of 2009. We also expect to invest $15.4 million in exploration during the rest of 2009.

  • To recap, we have in place the capital resources more than necessary to fund our capital requirement of about $150 million.

  • If you turn to the final slide, slide 24, I'll provide you with the revenue update guidance for 2009. Following our second quarter earnings results we are increasing our guidance for 2009. We expect our total revenue to increase to between $388 million (sic - see Press Release) to $400 million. With the delay in the Commercial Operation of North Brawley, we expect our 2009 electricity segment revenues to be between $252 million and $260 million. We also expect additional revenues of approximately $9 million from our share of electricity revenues generated by Mammoth that is accounted for under the equity method.

  • With regard to our product segment, we are increasing our guidance for 2009 revenues and expect them now to be between $130 million and $140 million.

  • Before opening the call to questions I just want to say that over the past several years we have worked prudently to build a strong foundation for our goals and to capture the significant opportunities that lie ahead. We totally believe that are in a great position to achieve sustainable growth well into the future and we are excited about opportunity before us.

  • One correction that I misspoke, the total revenue guidance is between $382 million and not $388 million as I erroneously said, and $400 million.

  • With that, I would now like to open the call to our investors. Operator, please?

  • Operator

  • Thank you. (OPERATOR INSTRUCTIONS)

  • Your first question is from the line of Ben Kallo with Robert W. Baird.

  • Ben Kallo - Analyst

  • Hi, good morning. I had a couple questions on Brawley specifically. For the, you mentioned ITC was going to cover more of the project than originally you had anticipated. What was the total cost for that project? Can you give us that number?

  • Dita Bronicki - CEO

  • It's in the order of $300 million.

  • Ben Kallo - Analyst

  • Okay great, and then when you're filing the application for that cash grant, does it matter what level the power plant is producing at or is it just on nameplate capacity?

  • Dita Bronicki - CEO

  • The application for the grant can be applied once the project is placed in service and placed in service means generation of a certain level of electricity and readiness of the project for operation. So you cannot file an application before you've completed construction and you are ready for operation but the calculation of the grant is based on cost and not on performance.

  • Ben Kallo - Analyst

  • Okay great but you mentioned also you're working on financing for that power plant and you said that you'd have something in the next couple weeks but that assumes that would happen before Commercial Operation?

  • Dita Bronicki - CEO

  • The commitment, the documentation, can certainly have been before, yes.

  • Ben Kallo - Analyst

  • And that's something that you could release to the public? When that occurs, you'll put out a press release on that?

  • Dita Bronicki - CEO

  • When we sign the commitment?

  • Ben Kallo - Analyst

  • Yes.

  • Dita Bronicki - CEO

  • We typically don't do it when we sign commitments but we will consider it in this case.

  • Ben Kallo - Analyst

  • Okay, could you also comment on what the market looks like for new PPAs considering a drop in electricity prices, how much that's affecting the demand for green power?

  • Dita Bronicki - CEO

  • I can share with you ORMAT's personal view. I'm not sure it's correct or not correct but our view. Even though we are reading about a decline in electricity demand especially in California, also in Nevada we see some decline in the increase in the demand we don't expect it to impact green power because all utilities that I'm aware of are far away from reaching their RPS target and especially the California utilities have signed hundreds of megawatts that I think they know will not come online when expected and I'm talking especially about the solar thermal projects. So their appetite for green power has not changed despite a decline in electricity demand.

  • Ben Kallo - Analyst

  • Has pricing stayed stable?

  • Dita Bronicki - CEO

  • The next question is what will happen to pricing? The big increase in the California MLP prices last year came from two factors. One was the high gas prices, natural gas prices and the second is that the cost of the GHG, greenhouse gas emissions, started to be factored into the long term price of electricity. While gas prices are today very low, probably at the lowest for several years, if you look at the forward-looking curve of gas prices it is increasing and actually not very long into the future. So even though at least we do not expect gas prices to come back to their levels of last year, we certainly don't expect them to be as low as they today. On the other hand, there are people who believe that the price which will be factored into electricity prices in the years to come for GHG is going to increase from what it was last year. So I'm not sure it's going to stay at the levels of last year but we don't expect a very steep decline.

  • Ben Kallo - Analyst

  • Okay, considering that you expect some increase in electricity prices, how are you handling your PPA negotiations? Are you prolonging them since you do have the financial stability to do that versus the smaller guys out there developing projects, or are you waiting to see until electricity prices increase and then sign PPAs?

  • Dita Bronicki - CEO

  • Depending what electricity price is at stake, if we have a price that we feel comfortable with we would push. If we think that the price is not as good, maybe we will stall.

  • Ben Kallo - Analyst

  • Okay and my final question may be for Yoram. Permitting seems like it's a bottleneck here and could you talk about anything in legislation, if there is anything that is happening that could maybe facilitate an increase in the permitting process?

  • Yoram Bronicki - President and COO

  • I think maybe it's not exactly in the legislator, but it is more maybe on the government side of things, whether it's state or federal and I think broadly speaking that it makes little sense for the government to have all these stimulus plans if, or stimulus money if it cannot be put into work because the permitting process lags behind and I think that we're certainly trying to make the involved entities aware of that issue and that a small investment in providing priority or funding to the relevant agencies could release a lot of work and put a lot of that stimulus money into work. But of course we can offer our opinion and suggest how things can be done. We have no control over the decision and how much of say, the BLM's time is dedicated to geothermal compared to all the other activities that compete on its resources and on the time of its people.

  • Ben Kallo - Analyst

  • Okay, thank you very much.

  • Operator

  • Your next question is from the line of Timothy Arcuri with Citi.

  • Seth Tennant - Analyst

  • Hi guys, it's Seth actually. I just wanted a little further details on the product segment here. Can you kind of given an outlook for, it looks like backlog came down a little bit here, what the outlook is for kind of the remainder of the year and just kind of some expectations around where the revenue -- and I know it's going to be bumpy and lumpy but what the outlook is there?

  • Dita Bronicki - CEO

  • The backlog is $117 million. We estimate our revenues for the total year to be what we said in the guidance so clearly we are going to start the year with whatever we have today with the lower backlog, potentially lower backlog than last year and this is why we say that we do not expect the high volume of products of this year to repeat itself this year with several factors which may change it. If stimulus money is going to be really released faster, then some of the developers who have projects on their drawing board may release their projects and we might get a piece of that action. Not all that action, but a piece of that action.

  • If solar moves to the next stage faster than what we expect it today, it will have a very big impact on our product segment. Things may change and this is what we always say about the product segment. It is less predictable. The electricity segment is predictable. We knew that the revenues this year are going to be lower than last year because we knew that oil prices which were so low in the first quarter are going to have a long term impact on the rates in Puna but our generation was predicted and 14% increase in our generation is the growth in the electricity segment. In the product segment it's less predictable.

  • Seth Tennant - Analyst

  • What's the kind of timing for completion on Blue Mountain and Centennial?

  • Dita Bronicki - CEO

  • Blue Mountain is virtually complete. I mean, those are in press releases issued by Blue Mountain. The plant has been undergoing testing but the construction is virtually complete. Centennial will go until the middle of next year I believe.

  • Seth Tennant - Analyst

  • And then just one last quick question, I was curious about your thoughts in terms of the, your cash balances here. With where the stock has gone at this point, is there any consideration for maybe shoring up cash balances and funding there with some equity in the near future or not?

  • Dita Bronicki - CEO

  • I can never say ahead of time when there will be a circumstance that will justify another equity offering but the way our balance sheet is today, very low leverage, it makes most sense to continue to fund with debt than with equity.

  • Seth Tennant - Analyst

  • Alright, thank you.

  • Operator

  • Our next question is from the line of Paul Clegg with Jefferies.

  • Paul Clegg - Analyst

  • Hi, thanks for taking my question. I'm trying to understand the gain from equity sale at the OPC level for tax equity that runs through the income statement. Basically, which facility is that going to fund and how should we think about that type of gain as an item on your income statement going forward? Should we see any more of that type of impact for the rest of this year for example?

  • Joseph Tenne - CFO

  • This is, the amount of the gain is dependent on the tax benefit that we get and this is accelerated depreciation and PTC. Now in the future, in this year, there shouldn't be a big change but in the future, once accelerated depreciation is utilized then it will go down of course because it will be only PTC.

  • Paul Clegg - Analyst

  • Okay can you say how much of it then in this quarter was actually cash, of the gain?

  • Joseph Tenne - CFO

  • Cash to the investors? Nothing.

  • Paul Clegg - Analyst

  • Nothing, okay so it's really just an accounting. And on CapEx, it was a little bit higher than what we were looking for and I think you're holding CapEx guidance flat for the year but you're also looking at a delay at North Brawley so I was wondering what the, what's (inaudible) over there that would result -- you know, we would think that with a delay in North Brawley you might have somewhat lower CapEx.

  • Dita Bronicki - CEO

  • The lower CapEx is not resulting from North Brawley. On the contrary, North Brawley has a cost increase because we are dealing with the sand issue and the well completion issue. The reduction in the CapEx for this year is coming from a delay in East Brawley. As Yoram mentioned there is the permitting delay and the lessons learned from North Brawley, a combination of both which delayed East Brawley and a delay in exploration which is probably the most helping one because the delay in exploration is coming from the delay in getting permits to explore this site and this means that at the start of construction of the project, they are supposed to be built and the results of those explorations might also be delayed.

  • Paul Clegg - Analyst

  • Okay thanks very much.

  • Operator

  • Your next question is from the line of Emily Christy with RBC Capital Markets.

  • Emily Christy - Analyst

  • Hi, good morning, just a couple of clarifications first. With the electricity segment revenues going from 87 megawatt hour to 75, is that all attributable to Puna?

  • Yoram Bronicki - President and COO

  • A lot of this is Puna and there is also the phenomenon that we described in the past which is the rates on some of our newer PPAs are not as high as older PPAs and as we bring more new PPAs or we brought more PPAs, the dates to say, 2005 to 2007, 2008, the combined rate is reduced but Puna is really the biggest factor.

  • Emily Christy - Analyst

  • Okay and in terms of North Brawley, you're going to start the ramp up October. When do you expect that to be operating at full capacity?

  • Yoram Bronicki - President and COO

  • The fine line in my statement that we hope to control all the brine flow in four months meaning that we'll have full brine capacity and therefore full generation.

  • Emily Christy - Analyst

  • Okay and one other question. There's been some consolidation among some of the smaller geothermal entities, also some new technologies being installed by your competitors. I'm just wondering what at this point your view is of the general competitive landscape and at this point if any of these entities might be big enough for you to buy?

  • Yoram Bronicki - President and COO

  • I think it was slide 17 that we listed what we thought were the biggest factors affecting growth and I'd say that the first two are you need to have land but you also need to explore it and actually approve, turn acreage of empty land into actual resource and I think this is where one can hope that the smaller entities that have land position truly have resource under those lands but it's far from being certain and even after you have resource, there is the question of whether you can economically develop it. And so I think that probably for the entities that are, if they do this of their own free will then probably for them it works well but I think that until they have actually proven their properties they remain just prospects and it takes a lot of effort to actually prove it. It's not even one discovery well to prove that indeed you have 30 megawatts. So to say if land was, or the value of land is highly dependent upon what work was actually done on it and as you can see in BLM lease sales, it goes from a few dollars an acre to maybe thousands of dollars an acre, depending on what is there and that's our view on the land positions of other players.

  • As far as new technologies, there is a -- of course we have a view in that it's true if somebody owns the keys to a technology that is unique then it could be better for that company than when there is a multitude of players but the advantage that we offer is our equipment, we don't sell technology. We sell a solution and a product and one that is well tested and has been running for 20 years and for an operator, that should be a great comfort and a great differentiating factor. A lot of the other players have started pretty much where we stopped 20 years ago and if you take a close look at this I think that it's telling quite a lot.

  • Emily Christy - Analyst

  • Okay, thank you very much.

  • Operator

  • Your next question is from the line of Noah Howler with Barclays Capital.

  • Noah Howler - Analyst

  • Hey everyone, thanks for taking my question. My first one is around the loan guarantee program and the chatter that's going around about $2 billion that was earmarked initially for the program going over to the Clunkers. I wasn't sure if you guys had any additional color that you could give us around what you're hearing and how that changes the outlook a little bit longer term?

  • Dita Bronicki - CEO

  • I'm not sure to what position that goes back to Clunkers you are talking about?

  • Noah Howler - Analyst

  • It appears that in the House bill that was going to funnel $2 billion more dollars over to the Cash for Clunkers program for the autos, that that $2 billion was going to come from the money that was going to go for the renewable loan guarantee program.

  • Dita Bronicki - CEO

  • I don't know. If it's $2 billion, the total loan guarantee estimate that was issued when the Stimulus Act was enacted was $60 billion so I don't know. I'm not familiar with it but I don't know that it will have any impact.

  • Noah Howler - Analyst

  • Okay and then just kind of one other one, it seems that the effects from foreign currency transactions and translation has been kind of, flips back and forth. Can you just give us a little bit more color around the biggest drivers that move that and what we can best watch to have an idea how it's going to move quarter to quarter, year to year?

  • Joseph Tenne - CFO

  • It's very difficult to estimate it and the reason for that is it most relates to the fluctuation of the dollar against the Israeli currency where our manufacturing operations are and it depends on how we hedge it and the results of the hedge. The accountant's reason for debt is that we are not considering it a hedge for accounting purposes because of the very complicated write-up so it might change from quarter to quarter and we cannot expect that the dollar is strengthening and devaluating against the Israeli currency. And also part of it relates to a loan that we have in New Zealand. The impact this quarter was not so much but it's also, we gave a loan to a New Zealand company in New Zealand dollars and it depends also on the valuation of the U.S. dollars over the New Zealand dollars, one against the other and it seems this company's functional currency is New Zealand dollar, then the impact is immediately in P&L.

  • Noah Howler - Analyst

  • Okay, that's everything, thank you.

  • Dita Bronicki - CEO

  • Thank you.

  • Operator

  • Your next question is from the line of Angie Storozynski with Macquarie.

  • Angie Storozynski - Analyst

  • Thank you. I have three questions. Starting from the product segment, the $117 million in backlog, when would that be realized? Is that just for 2010 or beyond?

  • Dita Bronicki - CEO

  • No, there is nothing beyond 2010.

  • Angie Storozynski - Analyst

  • Okay, now the two projects, the Blue Mountain and Centennial that contributed so highly to the second quarter, where are these projects -- I mean, I'm just basically trying to realize if the fact that the backlog is coming down and that coincides with lower commodity prices. Are you seeing less of a demand for your product because the commodity price environment has changed? Is there any link between these two?

  • Dita Bronicki - CEO

  • The simple answer is no. There is no linkage between commodity prices and demand for a product and by the way, we are starting to see an increase in commodity prices in the last few weeks.

  • Angie Storozynski - Analyst

  • Could you disclose the total amount you applied for in the federal funds, so all these applications for loan guarantees and the, I think the drilling program?

  • Dita Bronicki - CEO

  • I prefer to disclose it once we are approved. I prefer to disclose once we know what was approved.

  • Angie Storozynski - Analyst

  • Okay and lastly I just want to go back to the question about PPAs and you were saying that you don't see any increase in appetite for PPAs and that State renewable portfolio standards are far to be fulfilled but especially in California we're seeing utilities assigning PPAs with solar companies we're hearing that the compliance, especially with California, RPS would be on a "best effort" basis and so not necessarily you would need to have the capacity in place to be compliant with the standard. How do you think that may impact your growth prospects in the State?

  • Dita Bronicki - CEO

  • From everything we hear and feel from the Utility, they are taking seriously their RPS targets and are making every effort to fulfill it so I don't think it will reduce the demand for renewable energy.

  • Angie Storozynski - Analyst

  • Okay thank you.

  • Yoram Bronicki - President and COO

  • And I'd like to add another thing. I think that there's a, one should recognize that it's not enough to fulfill the capacity requirements but also the Utilities would need some renewable energy to be of a base load nature which is geothermal and there's only so much that can be taken as an intermittent solar on the grid and as it becomes more sizeable in the California energy mix then actually there is more need for renewable energy like geothermal which is base load.

  • Angie Storozynski - Analyst

  • Okay thank you.

  • Operator

  • Your next question is from the line of Brian Shore with Avondale Partners.

  • Brian Shore - Analyst

  • Good morning everybody, just a couple quick questions. Most of ours have been asked already. I guess first on the power side and particularly on margins and cost, can you guys sort of walk through a little bit more, in more detail why they were a little bit more depressed than usual this quarter and then your expectations for margins on the power side, on the back half of the year?

  • Yoram Bronicki - President and COO

  • I think that actually costs have not varied that much. We have, on the operational side we have fairly good cost control and the variances there are not huge so the margin has been largely determined by rates that have changed and I think that that's the way that you should look at this. Of course it's not always a plant with favorable rates and having to do a redrill program now had an impact on us but if you take the reverse look at it saying that this redrill work had to be done then it's probably a good thing that we have done most of it during times of rather lower rates than higher rates. The fact that this happened in quarters that are traditionally strong quarters for us puts a spotlight on it but that's just the way that it is and so I wouldn't -- we always want to do better. It's always better to have better PPAs rather than weaker PPAs but all in all, I don't think that there was anything dramatic that happened on the power side.

  • Brian Shore - Analyst

  • Okay so the maintenance that you guys talked, that was mostly at Puna?

  • Yoram Bronicki - President and COO

  • There's maintenance across the board. We always have some maintenance that is done in preparation for the peak period. We try to do a lot of this in the fourth quarter and in the first quarter because this is when ambient conditions are the easiest but there is some that is done on second quarter and is reflected in that but that's not -- it is true and within, I would say within a dollar or two per megawatt hour in operating cost. It's not the big picture. The big picture is just a very different mix of rates for this quarter and then some lower generation because of work and other issues that affect our total net megawatt hours and since the number that we disclose is an average number, or comes out as an average, this is how we see it.

  • Brian Shore - Analyst

  • Okay that's helpful, and then I guess just following up real quickly on North Brawley, you guys mentioned doing redrilling as well as some of the solid content issues, the sand issues. Can you sort of walk through I guess maybe on the redrilling side, what's precipitating that?

  • Yoram Bronicki - President and COO

  • Yes, if you imagine a system where the production wells produce sand and fairly substantial quantities of sand. We're talking dozens of pounds per hour of sand that is being produced by each well. Then clearly that sand won't be missed on the production zone but if it gets into an injection zone, it's not the greatest thing to have because you're basically, it's as if you were pouring sandbags into your injection well and intuitively, you would understand that this would cause grief. And so first we're trying to get the sand out of the hot water as best we can to reduce the number of bags that we pour into the injection well. But then once the sand is in the injection well, we need to design the well in a way that the clean out process would be the most efficient so that whatever sand did make it into the well could be taken back out and won't be stuck between the well bore and the reservoir because once it gets out of the casing or out of the liner, it's very hard to pull it back out and this requires a slightly different completion in the injection zone itself, moving from slotted liner to a solid liner with perforations is less susceptible. So that's -- it's fairly standard solutions and each carry -- slot liner has its advantages and it allows for higher injectivity. On the other hand it's not as easy to clean, at least not in our situation but that's fairly standard.

  • Brian Shore - Analyst

  • Okay that's helpful and then just lastly, moving I guess over to the East Brawley Project and I guess two things here. One, can you maybe shed a little light on where you are in the permitting process there? I know you mentioned some improvement, maybe a little bit more color there. And then just verify I guess that the issues that you're seeing at North Brawley and the delays at North Brawley aren't necessarily, you don't expect those to impact the timing I guess, or more so the operation of the East Brawley Project.

  • Yoram Bronicki - President and COO

  • I'll start with the second question. The issue that we had is mostly -- removing sand from water is something that doesn't require breakthrough in technology. The problem that we have is that the type of water, the temperatures and the pressure that we work in on the geothermal side is not what you'd typically have in commercially available water treatment systems. We're just too hot for that and so the problem that we have is that as we're experimenting or trying to fine tune different control devices, we can't enjoy anything that is off the shelf and everything is special order so it's really a development project that in an ideal case should be done before you build your full fledged facility and this is very unfortunate in the case of North Brawley but whatever is done there would be applicable for East Brawley and on East Brawley, we have the time. Looking at the completion at the end of 2010, we would have the time to special order almost anything to deal with it and this is why we don't think that -- let me put it this way, we think that we understand that the issue is the sand. We know that sand can be removed and therefore we don't see this as being on the critical path for East Brawley.

  • As for the permitting side, as we described in our last call what was keeping us from moving ahead and getting our permit were some of the water issues in the Imperial Valley and based on everything else that we know, this problem seems to have been solved.

  • Brian Shore - Analyst

  • Okay great, that's very helpful. Thanks a bunch guys.

  • Operator

  • Your next question is from the line of Brian Yerger with Erica (ph) Advisors.

  • Brian Yerger - Analyst

  • Thanks for taking my call. I just had a question about, revolving around the new technology and competition that's emerging out there. What is your outlook and kind of your approach on the recovered energy market in the U.S.? Are you seeing projects that are just too small for you guys to focus on and that would I guess apply both for the products and the electricity side.

  • Yoram Bronicki - President and COO

  • The first answer is we don't see any project as being too small for us to focus on, or almost. But I would say that the factor that would change recovered energy generation in North America is more, having more States that would accept this for what it is which is really the nearest thing to renewable energy because energy efficiency is as important and may be as a much lower hanging fruit. The reality is that recovered energy generation is not viewed by many of the States that actually have the, if you like, the resource. The ones that have waste heating being, or heat being wasted, or these States don't recognize that as an RPS type technology and therefore it doesn't necessarily get the right treatment and in that sense, a four megawatt or a five megawatt project would always be at a disadvantage compared to a 100 megawatt base load project, REG project. So if you treat the two the same, it's hard to get them to expand quickly. What we think is that they should not be treated the same and that REG project should enjoy better rates comparable to the other renewable technologies and we also think that in the foreseeable future this would happen because CO2 is an issue.

  • Brian Yerger - Analyst

  • Okay so let's move away from the RPSs and for a second and just look let's say, an enterprise, a corporation that has some waste heat that may or may not, and I guess this is a question for your guys, that may or may not be suitable for your technology because we're seeing some lower temperature technologies coming out, are those the type of opportunities that you would go after or are you just kind of letting that portion of let's say, the emerging business, be left to the competition right now?

  • Yoram Bronicki - President and COO

  • If an enterprise has available waste heat, that's certainly interesting for us.

  • Brian Yerger - Analyst

  • Okay, on the products side obviously.

  • Yoram Bronicki - President and COO

  • Either product or electricity side. We're very flexible in our business model. By the way, waste heat is generally not low temperature. It's generally higher temperature than geothermal.

  • Brian Yerger - Analyst

  • Okay so you wouldn't have any problems obviously on the technology side. Okay, that's all I had, thank you.

  • Operator

  • Ladies and gentlemen we have time for one or two more questions, and your next question is from the line of Jessie Pichel with Piper Jaffray.

  • Unidentified Participant - Analyst

  • Hi, this is Mishou (ph) for Jesse Pichel. Thanks for taking my questions. Can you give us some color on whether the growth margin is sustainable? Do you anticipate any impact from the recent trend of commodity prices?

  • Dita Bronicki - CEO

  • I think we have said from the beginning of the year that the gross margins which we are seeing in the product segment are not planned to continue or not intended to continue in the years to come. They are a consequence of changes in commodity prices but they are not expected to continue in the years to come.

  • Unidentified Participant - Analyst

  • Great, that's very helpful, thanks.

  • Operator

  • Your final question is from the line of Patrick McGlinchey with Sidoti & Company.

  • Patrick McGlinchey - Analyst

  • Good morning, just a couple follow ups on that product segment, with regards to the guidance increase, was that strictly a result of accelerated timeframes of construction and deliveries?

  • Dita Bronicki - CEO

  • Sorry, can you say it again?

  • Patrick McGlinchey - Analyst

  • I'm sorry, with regards to the guidance increase on the products side of the business, was that strictly a result of accelerated timeframes of construction of the projects and accelerated delivery times of turbines and whatnot?

  • Dita Bronicki - CEO

  • Yes, but not necessarily turbines. Turbines we control but other components. Certainly delivery times have been shortened this year because of some lower economic activity and we have benefited and accelerated (inaudible).

  • Patrick McGlinchey - Analyst

  • Okay and then just with the backlog now at $117 million with the guidance, I guess we're implying back half of somewhere between $53 million and $63 million. If we were to assume that the backlog would be realized over the next 12 months, are we looking at something similar in the first half of 2010 as the second half of 2009, somewhere in the $55 million to $65 million range?

  • Dita Bronicki - CEO

  • We don't have yet a guidance for 2010 and I would defer it to our next or the following call, please.

  • Patrick McGlinchey - Analyst

  • Is it safe to assume that the backlog should be realized over 12 months?

  • Dita Bronicki - CEO

  • Not more than that because it's all to say, 2010 and probably it will be realized, this backlog, before then, 2010.

  • Patrick McGlinchey - Analyst

  • Okay great, thank you.

  • Operator

  • Ladies and gentlemen this concludes the Q&A portion of today's conference call. I'll now turn the call back over to Management for any closing remarks.

  • Dita Bronicki - CEO

  • My only remark is thank you for the lively and interesting conversation. I hope it clarified things for you as it did for us. Thank you.

  • Operator

  • Thank you all for participating in today's conference call. You may now disconnect.