  • Welcome to the Ramaco Resources Second Quarter 2023 Earnings Conference Call. (Operator Instructions)

  • I would now like to turn the call over to Jeremy Sussman, Chief Financial Officer. Please go ahead, sir.

  • Jeremy Ryan Sussman - CFO

  • Thank you. On behalf of Ramaco Resources, I'd like to welcome all of you to our second quarter 2023 earnings conference call. With me this morning is Randy Atkins, our Chairman and CEO, Chris Blanchard, our Chief Operating Officer.

  • Before we start, I'd like to share our normal cautionary statements. Certain items discussed on today's call constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements represent Ramaco's expectations concerning future events. These statements are subject to risks, uncertainties and other factors, many of which are outside of Ramaco's control, which could cause actual results to differ materially from the results discussed in the forward-looking statements.

  • Any forward-looking statement speaks only as of the date on which it is made. And except, as required by law, Ramaco does not undertake any obligation to update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise. I'd like to remind you that you can find the reconciliation of the non-GAAP financial measures that we plan to discuss today in our press release. This can be viewed on our website ramacoresources.com.

  • Lastly, I'd encourage everyone on this call to go on to our website and download today's investor presentation under the events calendar.

  • With that said, let me introduce our Chairman & CEO, Randy Atkins.

  • Randall W. Atkins - Founder, Chairman & CEO

  • Thanks, Jeremy. Good morning to everyone and thanks for joining the call. We have a lot to cover this morning since we last spoke in May.

  • First, during the second quarter, we announced 2 potentially transformative milestones. In early May, we disclosed that our Brook Mine near Sheridan, Wyoming may contain the largest known unconventional deposit of rare earth elements in the United States.

  • In late June, our tracking stock, which we call CORE Resources, began trading under the ticker symbol METCB and will pay its first dividend next month.

  • As an aside, CORE, stands for Carbon Ore-Rare Earth, which describes some of the unique asset classes included in the stock. We felt that these assets might trade above levels of a typical operating coal company, because of a combination of a lower risk profile on the fixed income side, combined with a higher potential return profile from assets like rare earth.

  • CORE is now trading roughly 65% higher than when issued. At a roughly 16x EV to EBITDA multiple and with over a 6% yield. This compares to METC shares, which still trade in line with our CORE peers at around 2x to 3x EV to EBITDA.

  • And overall, the issuance of the tracking stuff is increased our combined market cap of these 2 stocks by about $120 million or almost 30%. It goes without saying, that we are gratified with the support investors have shown for this security in the early (inaudible).

  • To expand on the REEs front, earlier this week, we reported that our Board had approved development mining to start on our Brook Mine project this fall. Our initial efforts will be to recover larger quantities of material that we can chemically analyze to determine the most effective processing separation and recovery techniques.

  • This first step does not require large levels of spend, which we had budgeted at $2.5 million over 2 quarters. This is significant on many fronts. But most importantly, because this is the first new rare earth mine in the U.S. in decades, actually starting the mine.

  • A number of other projects, basically all involving REEs found in hard minerals are in various states of prospecting or testing. But we are not aware that any has been permitted.

  • Having taken 8 years to permit the Book Mine, we can attest that permitting is no easy step. It provides us an ability to materially be further down the runway in terms of moving the project into reality.

  • We also noted that our current rare earth target -- exploration target is up 50% from our initial estimates, and may be over 1 million tons of TREOs. We expect this target size may increase as we continue more quarrying and chemical analysis.

  • But even at this size, it seems to contain many decades of REEs supply to satisfy almost all current domestic demand. Based upon our ongoing work with Weir and NETL, we believe that almost 30% of the deposit contains magnetic REEs. These are the particular elements that are critical to both defense electrons, as well as the energy transition for wind and solar.

  • From limited samples of quarrying, we've also found large quantities of the 2 recently banned minerals by China named gallium and germanium. We're currently doing larger scale testing, specifically on those 2 minerals, and we'll include results in our next update.

  • As a reminder, today, almost all our REEs are imported from China, we hope to be the only completely both made in the USA brand in the industry.

  • Lastly, we have engaged recently a number of consulting groups specializing in REEs assessment, separation and recovery technologies. This includes a well-known group in this space called SRK Consulting. Together, these groups along with an NETL will enable us to complete an initial economic analysis and prefeasibility study. We hope to have initial findings report before year end, and will provide some guidance on the economics and timing of developments.

  • Now turning to our core net coal operations. This past quarter, the whole industry faced a number of combined challenges. We saw continued price declines, overall softer market conditions, steel prices, hitting lows and ongoing inflationary pressures.

  • In our investor presentation on the website and accompanying this quarter's earnings on Page 14, we compared how the public groups have reported so far. Earnings from all our peers have clearly reflected this difficult environment.

  • For all reported metallurgic coal companies this quarter, EBITDA fell on average 42%. We fell 38%. Average peer group mine cost increased by 4%, the same as Ramaco. In general, this was a tough quarter all around. We do not want to make excuses. But I would also note that this quarter, we were again plagued by non-performance by our rail partners.

  • In the month of June, both Norfolk Southern and CSX failed to deliver over 80,000 tons of contracted shipments, which was over 10% of tons sold during the quarter. This set us back $11 million of EBITDA, which rolls forward when they performed in July.

  • On the pricing front, U.S. high-vol A indices averaged 25% less in the second quarter compared to the first. Today, prices are down another 10% from the second quarter.

  • The same time U.S. saw inflation of almost 5% in the second quarter. While this is down from a year ago, it has continued to put pressure on the supply chain. These pressures are of course, not specific to Ramaco.

  • I would point out, however, that when you see margin depression across the industry, Ramaco's first quartile low mined cost profile, combined with our limited ARO exposure, puts us in a strong relative position.

  • On the marketing front, we have now contracted 3.1 million tons or 95% of our '23 forecasted production. Of this amount, over 70% or 2.2 million tons is fixed price business at an average net back of $188 per tons. The balance is priced against a floating index.

  • Today, we have roughly 400,000 of uncommitted tons remaining to place before year end, and 900,000 of committed, but unpriced tons.

  • While worldwide benchmark pricing continues in a summer seasonal low, our strong contracted position somewhat insulates Ramaco a bit more than those in our peer group with larger open positions.

  • Looking at the second half of '23, we see some positive company specific catalysts on the horizon. The first section of the Berwind Mine continues to increase current production. The second section is set to begin production before the end of the month. Similarly, production from the Maben surface and high wall mines continue to grow in line with expectations.

  • In late July, after a shakedown period, the Elk Creek prep plant reached full processing capacity of 3 million tons, up 50% from its former nameplate of 2 million tons. Finally, by the fourth quarter we should be running at over a 4 million ton per year annualized production and sales rate.

  • In the coal space, as we all know, we cannot control price. But we can arguably control production growth and company specific costs.

  • As mentioned, in the back half, we look forward to an increase in both net production and processing throughput capacity. As a result, we hope to see costs come down, both by being spread across a larger number of produced tons, as well as by taking some affirmative cost control measures, which Chris will comment on.

  • On the Brook REE front, we look forward to starting our development mining in a few months. We are positioning ourselves to try and take advantage of this unique opportunity and look forward to updating everyone as this potentially transformative project unfolds.

  • And with this mine, as time goes by, we hope to position ourselves as both a growing low-cost net coal as well as rare earth producer.

  • With that I will turn the floor over to the rest of the team to discuss more details on finances, markets and operations. So, Jeremy, please start with a rundown on our financial metrics and markets.

  • Jeremy Ryan Sussman - CFO

  • Thank you, Randy. As you know that the second quarter was challenging across the board to the industry as a whole, as everyone has no doubt already heard from our peers. In fact, I would point to Slide 14 that shows our closest peers so Q2 EBITDA declined by over 40% on average versus Q1, having missed consensus by over $30 million on average.

  • Our second quarter net income of $8 million was down $18 million from the first quarter of 2023. Diluted EPS of $0.17 with down $0.40. Adjusted EBITDA fell to $30 million versus $48 million in Q1.

  • As noted in our press release, Q2 net income EPS and adjusted EBITDA were negatively affected by $9 million, $0.19, and $11 million, respectively, due to rail transportation nonperformance issues. Roughly, 85,000 tons that were contracted to ship during the last weeks of the quarter, were pushed to July by CSX and NS.

  • Relative to first quarter metrics, the largest variance was on unrealized price, which fell 12% to $163 per ton. U.S. high-vol A indices averaged 25% less than Q2 compared to Q1.

  • Currently, prices to-date in Q3 are down more than 10% from the Q2 average. Overall production of 876,000 tons in Q2 was a quarterly record, up 5% compared with Q1 due to new mines ramping production. Total sales volume of 715,000 tons was down 6% compared with Q1, due again to the aforementioned transportation issues.

  • Company produced cash mine costs were 4% higher than in Q1. The increase in costs was largely due to continued inflationary pressures, as well as the inventory build on the back of rail issues. Specifically, cash cost per tons sold of a $109 came in much higher than cash cost of production of a $103 per ton.

  • Looking ahead, we are adjusting our 2023 guidance with an expectation that Q4 will be much stronger than Q3, with sales, it will annualize to over 4 million tons in Q4. Naturally, that is expected to have a strong positive impact on both lower cost and stronger cash flow as we work down inventory.

  • For Q3, sales are expected to be 700,000 tons to 900 1000 tons. While we are not in the business of predicting pricing, if indices remain at current levels for the duration of Q3, we'd anticipate realized pricing to fall roughly 12% to 15% from first half levels of $174 per ton.

  • Our solid contracted book certainly insulates us from a portion of the decline in index pricing. We'd also anticipate Q3 cash costs to be similar to Q2 levels and then declining in Q4 as sales volume increases.

  • For full year 2023, production guidance is updated to 3 million to 3.5 million tons from 3.1 million to 3.6 million tons, driven by the idling of our Triple S mine due to market conditions. This will drop production by roughly a 100,000 tons. Given the limited mine life of Triple S, anticipated production beyond 2023 is relatively unaffected by this action.

  • 2023 sales guidance is updated to 3.1 million to 3.6 million tons from 3.3 million to 3.8 million tons, still representing an almost 40% increase versus 2022 sales.

  • 2023 cash costs are now expected to be a $102 to a $108 per ton, up from $97 to $103 per ton, largely due to the combination of continued inflationary pressures and higher than anticipated costs during the ramp up phase at our borrowing complex.

  • Lastly, we now anticipate a lower 2023 CapEx of $60 million to $70 million versus $65 million to $80 million previously. As Randy noted, a major highlight for us this past quarter was that our tracking stock, core resources, Ticker METCB began trading in late June and has enjoyed a strong market reception.

  • The Board recently approved the payment the initial core dividend in Q3, which is based on Q2 results. Clearly, we were disappointed with fact that we weren't able to ship 85,000 tons due to transportation issues. If these had shipped as contracting, the tolling income that our core resources dividend is based upon, would have been materially higher.

  • While this concludes my financial remarks, I'm now going to give a brief sales and marketing update quite. Quite challenging market conditions in Q2, Jason and his team continued to do an excellent job placing tons into both new and existing customers.

  • The majority of near term demand continues to center around Asia, where netback pricing is typically lower than in our more traditional market.

  • As you probably know, the annual domestic contracting season is upon us with most of the domestic steel mills out for tender for calendar 2024 contract. Given that we are in the midst of these negotiations, we are not going to comment on any specifics here.

  • In terms of the overall market, while demand remains relatively tepid, I would remind everyone that supply also remains quite subdued. Global coal CapEx remains just a fraction of what it has been historically. Given increased financing, permitting, and overall ESG challenges, barriers to entry into the coal states have never been higher.

  • In addition, we have seen a number of high cost operations around us either close or cut their workforce materially resulting in lower production. Interestingly, this is occurring when Australian pricing has generally remained between $200 and $250 per metric ton over the past few months.

  • We believe the cost curve has become meaningfully steeper in recent years on the back of strong global inflation. Indeed, A number of higher cost operations are currently underwater even at today's prices.

  • Amid this supply/demand backdrop, we will look to continue to execute on new sales as we grow production.

  • With that said, I would now like to turn the call over to our Chief Operating Officer, Chris Blanchard.

  • Christopher L. Blanchard - Executive VP & COO

  • Thank you, Jeremy. As both Jeremy and Randy had noted, our -- 2 of our largest milestones in our multiyear growth progression largely ended in the second quarter and will be completed a 100% this quarter.

  • As we discussed on our last call, the idled Berwind mine restarted development mining last quarter. The first section has progressed according to our projections and slopes down into the Pocahontas #4 Seam in early July.

  • Final slope work is ongoing and will be completed during August, and this mine will move out of development mode. At that time, the section will have reached the heart of the reserve area and we will also be moving on to our fee coal position to further reduce our costs there.

  • We have also begun the redeployment of manpower and equipment to start the second production Berlin section, which will also be ramped up during the third quarter. This section will start in the full Pocahontas #4 Seam and will not have any development mining, just typical production ramp up period.

  • Supporting the Berwind mine, we also completed 2 exhaust ventilation shafts during the second quarter. We completed all of the fan upgrades, which we believe eliminates any future risks of lightning related ignition similar to the one off back which occurred last July.

  • As the Berwind Mine continues to ramp its production, we will look for opportunities to take advantage of its geologic and logistical advantages. This may involve further rationalizing higher cost production and moving manpower and equipment to the Berwind mine as additional mining areas become developed and available.

  • Turning to Elk Creek, the upgrade to the preparation plant is largely complete in June. While we were finishing some of the last forward item on the on the upgrade, the full capacity fee rate has been reached and the plant balanced. It ran through its ramp up and conditioning stages during June and early July.

  • While that plant upgrade ended up being delayed by over 2 months due to equipment delivery delays, during month of July, we managed to hit our full processing budget on a raw tons per day basis as well as total raw tons for the month.

  • Going forward, we expect that mine production and processing capabilities at Elk Creek will be more evenly matched and that we will begin to work through the inventories of raw coal on the property and monetize them.

  • Equally important from a cost perspective, the Elk Creek mines continue to produce well and the upgraded plant throughput will eliminate downtime and this shifts the stockpile levels. It should also eliminate substantial trucking and re-handling costs associated with inventory in the raw coal, which we did during the first half of 2023.

  • Lastly, the Maben surface and highwall mine began production last quarter and is now fully staffed and fully ramped. We have seen favorable mining conditions thus far and production has exceeded our original projections.

  • The coal quality has also been as good as anticipated. With the 3 largest growth projects in '23 largely in our rearview mirror, we are pivoting the growing production of our existing mines and optimizing and reducing our mine costs.

  • We're working hand in hand with our rail and transportation partners to increase streamline coal deliveries alongside the ramp up at these complexes.

  • We expect to be producing a approximately a 4 million to 4.5 million clean ton per year production rate as we enter 2024 and look to position ourselves as amongst the lowest cost pure play and metallurgical producers.

  • This now concludes management's prepared marks. Now I'd like to return the call to the operator for the Q&A portion of the call. Operator?

  • Operator

  • (Operator Instructions) And our first question comes from Lucas Pipes with B. Riley.

  • Lucas Nathaniel Pipes - MD, Senior VP & Equity Analyst

  • My first question is on pricing in the current market environment. Jeremy, if I heard you right, you mentioned that pricing would be down 12% to 15% from first half levels if current prices hold for kind of the remainder of the year?

  • And I guess, I could back into it, but wasn't able to do it so quickly here on the call. But kind of what does this assume for net debt prices on kind of unpriced tons for the remainder of the year?

  • Jeremy Ryan Sussman - CFO

  • Thanks, Lucas. So first, just late correction is, so that would be the Q3 netback. I'd say there's a couple of things going on there. As we mentioned in our, prepared remarks, demand right now is certainly strongest in Asia compared to elsewhere. And so I'd say, first and foremost, that assumes that's where a good chunk of the spot tons go.

  • Secondly, in terms of our, our contracted position, we've got a very nice contracted book. I'd say, it's a little bit more weighted, both in terms of volume and certainly price on the high side towards Q4 versus Q3. So I'd say those are sort of the nuances in there.

  • But I would point out that obviously, even a low double digit percentage decline in realized pricing in Q3 is certainly better than what the index currently would point you if we were selling everything against the index. So I'd also say that does point to, certainly having relatively strong contracted position.

  • Lucas Nathaniel Pipes - MD, Senior VP & Equity Analyst

  • That's helpful. And, Jeremy, can you remind us kind of what the, netback price would be on average in today's environment?

  • Jeremy Ryan Sussman - CFO

  • So, look, I mean if you're talking flat to the index, I mean, let's call it for a high-vol AB, that's about a $200 a ton index. So, if you're getting kind of flat to the index, that's 140-ish on new business. Again, you're going to have to take some degree of the freight differential in Asia.

  • So kind of depending upon where freight rates are, you can certainly put that on top of any -- or you back it out, I should say, from any index, right?

  • Lucas Nathaniel Pipes - MD, Senior VP & Equity Analyst

  • Got it. My second question is about the rare earth opportunity and, 2 questions there. The first is in terms of the initial assessment and economic analysis, when would you expect that to be completed? Good to see that you hired, contractors on that front.

  • And the $2.5 million that you're allocating towards the mine's startup, what sort of equip -- I assume that's going towards equipment, but maybe that's wrong. And if it is equipment, is that mobile equipment, plant, property final equipment. You know, just a little bit of color on where the $2 million would go to, to get a little bit of a sense of the development cadence?

  • Jeremy Ryan Sussman - CFO

  • Sure. So I think, to answer your first part of your question, the economics and -- of this project are basically largely derived from the process and separation techniques. As you know, rare earth is measured in parts per million, at least in the sense of coal.

  • So, we have to determine what exactly is going to be the appropriate processing technique. That will happen, on a sort of sequential basis as we basically analyze larger amounts of material. We'll get a pretty good sense of that, particularly as it relates to the chemical qualities of some of the material, whether it's ionic or not, which has a large determination processing approaches.

  • I would say within -- we give ourselves probably less than the 6 month period to get some good initial results, but I would say I would expect probably more like a 9 month period before we would get really definitive results.

  • And as far as the mining is concerned, I'm going to let Chris speak to that. But, really, most of the spend is not on equipment per se because we may start on some of that with contractors. Chris, go ahead.

  • Christopher L. Blanchard - Executive VP & COO

  • Right. So thank you, Randy. And, Lucas, that $2.5 million will start being spent probably in early October and then run through, into the first quarter of next year. But it's largely on development CapEx, putting in the sediment control, roads, to the permitted area for the initial pit.

  • It will also include the excavation of small area in the, initial permitted areas for the testing and larger bulk samples that Randy has referenced.

  • Operator

  • And our next question comes from Nathan Martin with the Benchmark Company.

  • Nathan Pierson Martin - Coal and Railroads Senior Equity Analyst

  • Maybe I'll start with you guys mentioned you idled the Triple S mine due to market conditions there. We've seen some other metco mine idlings analysis, I think, Jeremy, you referred to in your prepared remarks.

  • But if U.S. indices kind of stay at these levels, as you pointed out, they've been kind of moving in the opposite direction from Asian indices, at least here to start the quarter. Do you think we could see more idling?

  • Again assuming most of these are related to inflationary pressures within seen on costs. So, It would also be great to give your thoughts on where you think the price of that marginal ton is today?

  • Jeremy Ryan Sussman - CFO

  • Yes. It's a great question, Nate. So, I mean, clearly, with the $200 high-vol AB average, the fact that you're seeing idling or layoffs and whatnot tells you that the cost curve has moved materially higher. So the answer is we're already seeing, certainly some mine either get idled or see their workforce reduced. And I think that'll continue.

  • I mean, keep in mind a number of probably high cost operations are being propped up by a strong 2023 contract book that rolls off, obviously, at the end of this year. And we'll see what '24 pricing looks like.

  • But again, I'd say in the absence of some of those stronger contracts, you'll certainly see some mines that have been around sometime probably idle.

  • And I'd also remind you that from our perspective every one of the mines that we have, not in place before 2017. So, obviously, having a newer fleet of mine certainly is -- puts us in a very, very good relative position as Randy pointed out on the overall cost curve.

  • So at least from our perspective, like, Triple S is a one off. And (technical Difficultly] was put in place largely as a precursor to our Berwind operation.

  • We actually did that after the Berwind mine went down, if I recall. So that, essentially, we will be moving manpower and equipment from Triple S into the Berwind sections.

  • Nathan Pierson Martin - Coal and Railroads Senior Equity Analyst

  • I mean, maybe related to your costs, specifically, compared to the $109 you guys reported, where do you think your cost per ton would have been in the second quarter had you been able to ship those roughly 85,000 tons that slipped to July? Is that the $103 per ton cost of production, I think you mentioned.

  • And you also said you expected 3Q costs, to be roughly flat quarter-over-quarter, should we be using that cost of sales of $109 as a base, or the cost of production of $103 just to be clear there?

  • Jeremy Ryan Sussman - CFO

  • No. It's a good question, Nate. So, I mean, we shipped, 715,000 tons, and, obviously, we produced about 150,000 tons more. So I'd say have we shipped the, 85,000 tons, our cash cost of sales would have been pretty darn close to that, one of $103 number, maybe not exactly, but within a $1 or $2 of that figure.

  • And as it relates to Q3, I would I would use the $109 cost of sales. Keep in mind, you've got a couple of things going on. Obviously, you've got the vacation week which increased costs. But as both Chris and Randy referenced, Berwind is clearly first section will be finished, in development mode. Later on this month, the second section will begin to ramp. So, really, by the time you hit Q4, I mean the -- we expect Berwind, at least with the 2 main sections to be running sort of on a normal operating basis.

  • So by the end of the year, I would expect our costs to be sort of at or below $100 to ton, and that's probably the exit rate I would use into next year, all else equal.

  • Nathan Pierson Martin - Coal and Railroads Senior Equity Analyst

  • Very helpful. And maybe just one more on the on the tons that slipped. The 85,000 should I assume those were all export? And then maybe could you kind of share the domestic export split in the quarter and then maybe what that looks like in 3Q, 4Q?

  • Jeremy Ryan Sussman - CFO

  • Sure. Yes. I mean, it was a combination of domestic and export, probably leaning a little bit more on the export side. You know, when I think about our sort of domestic export split, this quarter was probably our heaviest domestic quarter, call it about 50-50. And recall, Q1 was in that kind of third domestic 2/3 export range.

  • Obviously, there's still some spot sales to be had in the second half of the year. And certainly, I would assume that majority of those go export. With that assumption, domestic will probably be in call it, let's say, 40% range in the third quarter.

  • And then as we exit the year above, a 1 million tons shipped in the fourth quarter domestic will be down to, about a 1/3 of our shipments with certainly the majority going export.

  • Nathan Pierson Martin - Coal and Railroads Senior Equity Analyst

  • And then, and finally, maybe, do you guys lowered your CapEx guidance for full year '23 down to $60 million to $70 million. Looks like you've already spent $48 million in the first half, so obviously, that wouldn't imply a meaningful falloff in the second half. So just it would be great to get your thoughts there on cadence and CapEx.

  • Jeremy Ryan Sussman - CFO

  • So from a high level, and I'll turn it to Chris. So from a high level, Nate, obviously, you're correct, it implies $15 million to $20 million in the back half of the year, obviously, versus almost $50 million in the first half.

  • We've spent really over the last 18 months a lot of money getting the Elk plant from 2 million to 3 million tons, and the Berwind mine in development to where basically there's 2 sections in the mine. And by the end of the third quarter, those 2 sections will be producing at a sort of a normalized run rate.

  • So, I'd say we've always sort of had a much heavier cadence first half versus second half. But Chris, you want to expand a little bit on the updated guidance?

  • Christopher L. Blanchard - Executive VP & COO

  • Yes. So, most of it is just the completion of major projects and then sort of the delay or deferment of some other spending on mine like Triple S that are higher cost profile.

  • But with the Berwind Mine, the Berwind plant and the Elk Creek plant projects behind us, and we have one project that's a little bit delayed due to permits at Elk Creek on our clean coal piles. That's really what's driving the lower CapEx for the rest of this year.

  • Operator

  • That does conclude the Q&A portion of today's call. I would now like to turn the call back over to Randall Atkins for closing remarks.

  • Randall W. Atkins - Founder, Chairman & CEO

  • Again, I'd like to thank everybody for joining us here today, and we look forward to catching up with everybody in the fall. Take care.

  • Operator

  • That does conclude today's teleconference. You may all now disconnect.