Welcome to the Liberty Energy earnings conference call. (Operator Instructions)
Please note this event is being recorded. I would now like to turn the conference over to Anjali Voria, Vice President of Investor Relations. Please go ahead.
Anjali Voria - Vice President - Investor Relations
Thank you, Nick. Good morning and welcome to the Liberty Energy third-quarter 2026 earnings conference call. Joining us on the call are Ron Gusek, Chief Executive Officer, and Michael Stock, Chief Financial Officer.
Before we begin, I would like to remind all participants that some of our comments today may include forward-looking statements reflecting the companyâs view about future prospects, revenues, expenses, or profits. These matters involve risks and uncertainties that could cause actual results to differ materially from our forward-looking statements. These statements reflect the companyâs beliefs based on current conditions that are subject to certain risks and uncertainties that are detailed in our earnings release and other public filings.
Our comments today also include non-GAAP financial and operational measures. These non-GAAP measures, including EBITDA, adjusted EBITDA, adjusted net income, adjusted net income per diluted share, adjusted pre-tax return on capital employed, and cash return on capital invested, are not a substitute for GAAP measures and may not be comparable to similar measures of other companies.
A reconciliation of net income to EBITDA and adjusted EBITDA, net income to adjusted net income and adjusted net income per diluted share, and the calculation of adjusted pre-tax return on capital employed and cash return on capital invested as discussed on the call are available on our investor relations website.
Ron Gusek - President, Chief Executive Officer, Director
Good morning and thank you for joining us for our third quarter earnings call. Libertyâs completions trajectory has improved meaningfully from early year cyclical lows.
Third-quarter revenue of $1.2 billion and adjusted EBITDA of $142 million reflected strong operational execution and modest price increases, partially offset by drilling-related delays and cost inflation headwinds. During the quarter, we delivered significantly lower fuel costs for our customers.
Record natural gas substitution of over 60% of the total fuel consumed by our fleets provided annualized fuel savings equating to over $1 billion for our customers. This achievement reflects continued investment in natural gas-fueled equipment and a concerted focus on the digital intelligence layer that drives meaningful operational optimization of equipment and widens the performance gap amongst industry frac fleets.
In power, we are excited to share that LPI entered into a strategic development agreement earlier this week with a leading Frontier AI lab and a dedicated infrastructure platform for 1.2 gigawatts of integrated power services at data center campuses. The agreement includes a significant prepayment of capacity fees and targeted execution of the first energy service agreement contract for approximately 500 megawatts by December 2026.
The agreement also establishes a phased energization schedule from Q4 2027 through Q1 2029 and includes the substantive commercial terms for the additional long-term ESAs. The agreement marks the culmination of months of work on engineering and design between our teams, defining the integrated power architecture tailored to the generation, power quality, reliability, and dynamic AI load requirements.
We are expanding this relationship and are already working together to advance additional projects across other sites, including gas supply, interconnection, permitting, and construction planning. We continue to advance the capabilities of our integrated power platform for increasingly sophisticated on-site power systems. Reliable power at this scale requires more than generation alone. It requires seamless coordination across generation, controls, customer load, and the broader electric grid.
Building on the extensive modeling, Hardware-in-the-Loop, and integrated system validation conducted within our own facilities, we recently completed advanced grid integration testing with the National Laboratory of the Rockiesâ Controllable Grid Interface, connecting LPIâs physical generation assets and Tempo controls to a synthetic grid modeled on a specific real-world electric system in the Southern US, replicating its relevant characteristics and operating behaviors.
While traditional grid studies can rely on modeled representations of both the grid and generation assets, this testing went a step further by pairing the representative grid model with LPIâs actual generation hardware and controls, allowing us to evaluate how our physical system responds under realistic grid conditions. The testing demonstrated grid operability and expected changes over the life of an islanded to grid participating project. It also validated our control methodology and compliance with applicable IEEE standards while defining the performance characteristics of our generation assets to further inform system modeling and optimization.
Together, these results advance our ability to reliably coordinate on-site generation with the broader grid, including capabilities such as peak shaving. This work builds on our trusted relationship with NLR and provides another important step in translating our integrated power architecture into the flexible, reliable solutions required to serve increasingly complex, large-scale customer loads.
We are building a durable portfolio across completions and power, anchored by the principles that have long defined Liberty, a relentless focus on our customers, continuous technology innovation and disciplined execution.
In completions, these capabilities have helped our customers improve performance and economics year after year, and we are applying that same approach in power as we develop differentiated solutions to meet the increasingly complex objectives of technology customers. These dual investments are strengthening our competitive advantage and expanding our market opportunities, positioning us to generate strong returns through cycles.
Earlier this week, we announced an 11% increase in our quarterly cash dividend, reflecting confidence in our strategy and a continued commitment to delivering long-term shareholder value. Global oil and refined product prices strengthened during the third quarter as the ongoing conflicts in the Middle East and Ukraine continue to impact markets.
While flows through the Strait of Hormuz partially recovered, Gulf exports remain vulnerable to operational disruption, sustaining a risk premium in crude oil prices. Renewed attacks on energy infrastructure have exacerbated refined products shortages, with low diesel inventories emerging as a critical constraint. Elevated maritime freight costs and longer trade routes have further compounded these pressures, increasing delivered crude and product costs. Expectations for a prolonged supply disruption and an eventual replenishment of strategic petroleum reserves have sustained the oil risk premium and lifted forward prices.
North American natural gas fundamentals remain more balanced as strong summer power demand was outpaced by record production and ample inventories. Disruptions to Qatari gas supply have also increased reliance on US LNG, including replacement cargoes required to fulfill existing customer commitments. Longer-term, LNG exports and growing power consumption from AI and data center developments are expected to drive significant demand growth.
Against this backdrop, producer well economics have strengthened meaningfully with a more constructive forward curve, providing attractive 2027 oil hedging opportunities and enhancing E&P revenue visibility. These improving fundamentals further reinforce already tight frac market dynamics, where modestly higher completions activity has absorbed much of the industryâs available capacity.
Ongoing fleet attrition, equipment cannibalization, and industry underinvestment have constrained supply, particularly in next-generation equipment with compelling gas arbitrage economics. Increasing completion intensity and complexity also favors scaled providers with integrated services and advanced digital technologies.
Together, these dynamics are supporting more durable frac markets and continued improvement in service pricing. As AI accelerates demand for compute capacity, infrastructure developers are increasingly leveraging co-located integrated power solutions for data center campuses and other large load sites to address growing community considerations around power costs, availability, and other concerns.
Beyond accelerating energization timelines and enabling tailored energy configurations, co-location can reduce pressure on existing grid infrastructure and limit the need for costly transmission investment, helping mitigate impacts on local ratepayers and communities. Libertyâs partnerships broaden the capabilities we can bring to these projects, combining our power services with complementary technologies and infrastructure solutions, including hybrid power systems, advanced energy management, and waste heat recovery.
Over time, this integrated approach creates opportunities to address overall energy efficiency while providing customers greater flexibility to address environmental and community priorities specific to each site. Todayâs announcement with the Frontier AI lab underscores the strength of our integrated power platform and its ability to advance our customersâ broader strategic objectives. Our relationship has been built on trust, collaboration, and a shared commitment to advancing AI infrastructure at scale.
Over the past year, we have built a strong foundation spanning power design and architecture, power quality and load management, testing and validation, and long-term operations needed to support this project and others like it. We are excited to support a growing base of customers seeking reliable, high-performance power infrastructure for data centers and other industrial applications.
As global energy consumers place greater emphasis on secure, reliable North American energy supplies, our disciplined investment in leading-edge digital and equipment technologies through cycles expands our competitive advantage and increases our market opportunities over the coming years. Strong customer engagement and strengthening market fundamentals provide a more constructive outlook as we close out the year and look ahead to 2027.
Looking forward, we expect fourth quarter weather and holiday seasonality to be partially offset by continued strength in demand, including activity deferred from the third quarter. We are proud of the Liberty teamâs continued focus on ingenuity, innovation, and execution. We are well-positioned today to serve the demand for energy services in the years ahead.
I will now turn the call over to Michael to discuss our financial results and outlook.
Michael Stock - Chief Financial Officer, Treasurer
Good morning, everyone. The third quarter was defined by exceptional operational execution, driving solid financial results. The third quarter of 2026 revenue was $1.2 billion, relatively flat with the prior quarter. Results reflected strong utilization and a modest pricing uplift, partially offset by drilling related delays as drilling crews work to replenish customer well inventory following accelerated completions in the second quarter.
Third-quarter net loss of $39 million compared to net income of $43 million in the prior quarter. Adjusted net income of $10 million compared to $14 million in the prior quarter, and excludes $49 million of tax-affected unrealized loss on investments and transaction and other costs. Fully diluted net loss per share in the third quarter was $0.24 compared to net income per share of $0.26 in the prior quarter.
Adjusted net income per diluted share was $0.06 compared to $0.09 in the prior quarter. Third quarter adjusted EBITDA was $142 million. General and administrative expenses totaled $69 million in the third quarter, compared to $67 million in the prior quarter, and included non-cash stock-based compensation of $5 million. Excluding stock-based compensation, G&A increased $3 million, primarily due to increased compensation and other corporate overhead.
Other expense items totaled $69 million for the quarter, inclusive of $63 million of unrealized fair value losses on non-core equity investments and interest expense of approximately $6 million, which included $2 million of non-cash amortization of costs associated with our convertible bond issuances earlier in the year. Third quarter tax benefit was $10 million.
We expect tax expense rate in the remainder of 2026 to be approximately 24% of pre-tax income and do not expect to pay material cash taxes this year. We ended the quarter with a cash balance of $119 million and net debt of $1.2 billion, primarily consisting of senior convertible notes issued in the first quarter. We have no balance drawn on our revolving credit facility other than $30 million of letters of credit outstanding.
Total liquidity at the end of the quarter, including availability under the credit facility, was $669 million. Third quarter uses of cash included capital expenditures and cash dividends. Net capital expenditures and long-term deposits was $622 million, which included approximately $450 million in power generation deposits and other investments in power generation, digiFleets, capitalized maintenance spending and other projects.
We also returned approximately $15 million to shareholders through cash dividends. Earlier this week, the board declared an 11% increase in the quarterly cash dividend to $0.10 per share. Todayâs announcement with the Frontier AI lab represents a meaningful step forward in advancing Libertyâs power strategy.
The substantial capacity fee prepayment for the 1.2 gigawatts solidifies customer commitment to the development process. This structure provides greater commercial alignment and supports accelerated execution to deliver power at scale.
Iâd like to revisit how weâre funding the significant growth opportunities ahead of us. Our strategy is built around three pillars that are designed to maintain financial flexibility while securing long lead items that are necessary to meet our customersâ strategic objectives and deploy power infrastructure at scale. First, our core business generates strong free cash flow, providing an important source of capital to support growth.
Second, we opportunistically accessed the convertible market earlier this year, raising approximately $1.3 billion in gross proceeds at 0% coupon. Both offerings were upsized amid strong investor demand, and the capped call structures increased the effective conversion prices to approximately $65 and $72 per share, respectively. This capital enabled us to invest early in long lead equipment and position ourselves to meet the deployment timelines that our customers require.
Third, weâre advancing non-recourse project level financing strategy designed to recycle capital as projects progress. Our pipeline continues to attract strong engagement from a diverse group of capital providers, including project finance banks, dedicated infrastructure funds, and private credit markets. We expect project level financing to launch in early 2027 as projects advance.
We are energized by the customer partnership we shared today and the incredible progress that the Liberty team and our power partners have achieved to date. We look forward to what we can achieve together in the coming years.
I will now turn it back to the operator for Q&A, after which Ron will have some closing comments at the end of the call.
Operator
(Operator Instructions) Arun Jayaram, JPMorgan.
Arun Jayaram - Analyst
Good morning, team. Ron, in terms of the competitive dynamics, there are clearly several players, including Liberty, that are providing behind-the-meter solutions. This agreement that you described in the press release looks to encompass the entire molecule to megawatt lifecycle. I would love to see if you could talk about what are the key differentiators at Liberty that helps you secure what looks to be kind of a landmark agreement for LPI.
Ron Gusek - President, Chief Executive Officer, Director
Good morning, Arun. I think you have summarized it very, very nicely. I would use the words of our customer when they went ahead with giving us notice that we were going to execute this landmark agreement that expressed the amount of trust they have built in Liberty over the time we have been working together. That trust is built upon, I think, a very strong foundation.
That really is a function of all of these capabilities that we bring to the table. The hyperscalers and parties that are looking to build this generation to find co-located power, of course, are also new to this world. They have typically in their history, relied on the grid to provide power, and now they are finding themselves in a little bit of a different space, and they are looking for strong partners who can make that transition as seamless as possible for them.
To make this the ability to stand up a data center as effortless as possible. We recognized that early on and so have been incredibly focused on building a strong foundation that includes all of the components that are necessary to deliver success in this space.
That includes everything from, as you noted, the gas molecule and the interconnection that is required there, maybe the contracting exercise with the gas through the design, construction, and operation of not just a power plant, but also a complex balance of plant that incorporates power quality systems designed to meet the highly volatile load requirements that come with the data center.
Ultimately, as we noted on the call today, allow us to integrate with the grid down the road. Managing not only the requirements of our hyperscale customer and their data center load, but also the strict requirements that come with being connected to the grid. The ability to synchronize with that and meet the voltage and frequency constraints that are necessary to keep our grid up and running.
To layer on top of that, the commercial intricacies that come with that, the ability to interact with the grid from a commercial standpoint, to leverage the attributes that that brings to the table. As you think about all of those capabilities and then built on top of a strong supply chain packaging capabilities that ensure deliverability, you see in Liberty an organization that I would argue is unrivaled in the space.
As a result, I think weâre seeing strong trust and a real vote of confidence from our customers in that regard, and ultimately leading to an agreement of this sort of scale.
Arun Jayaram - Analyst
Great. In my follow-up, Ron, sounds like weâre going to have to wait till December to understand maybe more details on the first ESA. I was wondering if you could give us maybe some broad thoughts on the potential duration of this award, maybe speak to the credit quality of the Frontier AI lab, and the ability of this award to unlock the project financing opportunities for Liberty, which Michael described in his prepared remarks.
Ron Gusek - President, Chief Executive Officer, Director
Yes. First to the question about the counterparty. Of course, weâve said very clearly that we are only going to do business with high-quality counterparties that have a strong financial position that allows us to access the necessary financing we require to build out this power business at scale. You can trust that the counterparty is somebody that allows us access to the financing we have been talking about and our path forward for project level dollars there to go ahead and execute on this.
As far as the term, it doesnât look any different than we have suggested in the past. This is a 15-year, would contemplate a 15-year term for the ESA with a renewal opportunity on top of that. As youâve noted, certainly once we get to that place where weâve executed on this, weâll be in a position to provide further details.
Operator
Stephen Gengaro, Stifel.
Stephen Gengaro - Analyst
Thanks for taking the question. Two, the first, maybe following up on Arunâs questions. Can you talk a little bit about the capacity prepayment and the nature of that, and how we should be thinking about that over the next several months and quarters?
Michael Stock - Chief Financial Officer, Treasurer
Steven, the prepayment is significant. When we think of significant, we think in the terms of hundreds of millions of dollars. It is a prepayment of capacity fees that will be amortized over probably the first five years of the contract, therefore will be a source of cash for that period of time and will certainly execute before the final ESA is paid.
Stephen Gengaro - Analyst
Okay. Thanks, Michael. Then on the legacy pressure pumping business, can you talk a little bit about the sort of pricing dynamics and you mentioned the massive amount of money youâre saving customers, and how is that playing into sort of the pricing that youâre able to push for? Or is it more just a matter of supply demand and kind of a stairstep of price as the market tightens? How do we think about kind of you getting paid for the massive amount of savings youâre bringing to the table?
Ron Gusek - President, Chief Executive Officer, Director
I would say there are a couple of things that you would think about there. First of all, it guarantees or effectively guarantees the utilization of that particular fleet. As you think about the opportunities that you have going through a very challenged environment like we did for the last couple of years, you have this concept of last fleet standing.
Libertyâs utilization remained very strong for all of our fleets through that entire period of time as a function of a couple of things. Number one, the service quality we bring to the table, but certainly number two, the level of technology that we bring to the table. Fleets like that remain in high demand through ups and downs. We have that underpinning demand that is always there. Those fleets tend to be more resilient from a pricing standpoint.
Even when we go through an environment like we did over the last two years, the pricing that we get for the digi assets tends to be more resilient than you might find for a diesel fleet, where we might find a little more competition in the space, and as a result, a little more price competitiveness and a bit more of a dynamic environment.
The dual-fuel assets tend to sit somewhere in the middle there. The nice thing about an asset like that, and the arbitrage opportunity from a fuel standpoint, is that it allows us an opportunity to have a conversation with a customer about a pricing change without meaningfully changing the economics of their wells.
In other words, if we can move them from a diesel fuel fleet to a natural gas fuel fleet, enabling maybe $50 million a year in annualized savings given the arbitrage as it sits today, we can ask for the price required to earn us a return on that invested capital.
Weâve always said we want less than a three-year cash-on-cash payback. And they can get fuel savings, we can get a price increase, and itâs a win-win situation for both teams. In an environment like this, where there is, of course, very strong savings opportunities for them, itâs an opportunity for us to go back to them and have a conversation about price. There, of course, are still limits to that. The market is the market, and we live inside of that market.
While I believe we always earn a premium to many of the players in the space, there is still a limit beyond which we cannot go in. Weâll continue to work pricing upwards over the coming quarters, given the strength in the market, and certainly with a particular focus on those fleets that are enabling those savings for our customers.
Operator
Scott Gruber, Citigroup.
Scott Gruber - Analyst
So congrats on the deal. It would seem pretty logical that securing the first ESA under a larger development agreement would obviously ease the path to future ESAs. How do we think about timing of those additional ESAs to build to the 1.2 gigawatts deployed by 2029? Given that there has been pushback at certain data center sites, how do you think about working with this hyperscaler and their array of projects, and your ability to pivot capacity if there is pushback at certain sites and still secure those ESAs in a timely fashion to facilitate the proposed energization schedule?
Ron Gusek - President, Chief Executive Officer, Director
Scott, you got a lot of things to unpack there, but I am going to try to get through them all. If I miss something, donât hesitate to come back on that.
Scott Gruber - Analyst
Yes, sir, appreciate it.
Ron Gusek - President, Chief Executive Officer, Director
Starting with the first part of that, further ESAs. We have talked about the fact that we have a number of projects that we are advancing in parallel with one another, that our top eight projects represented significantly more than the 3 gigawatts of generation that we had available. Those conversations continue to progress at pace.
We remain excited about those opportunities as well, and certainly we will continue to update the market as we make meaningful strides on those and have something that is worthy of bringing to you in the form of a press release or something like that. We remain excited about those opportunities and certainly continue to see those advance.
I tend to agree with your sentiment that making an announcement around 1.2 gigawatts being tied up on top of the previous reservations we have maybe adds a little incentive to move ahead, recognizing that weâve got a limited amount of capacity.
As far as the potential concerns out there around some sites being able to move ahead or not, weâve talked about the means by which we can build some insurance, for lack of a better term, into our business. That involves a couple of things. First of all, we like multiple legs on the stool from a customer standpoint. We have aimed to be engaged in conversation and ultimately advance potential projects with a number of end customers, a number of hyperscalers.
Recognizing that at any one time, somebody could have a change in sentiment, and we want to make sure that is not something that would have a meaningful impact on our business. At the same time, we have also worked to make sure that we have access to a range of sites in a range of states and range of counties inside of those states to ensure that no one decision in a particular state or in a particular locale could impact our business.
So for example, even in this conversation, this deal that we have announced here today, there is a front-running series of sites for that in a particular locale, but we have a couple of backup opportunities identified that we could pivot to. Theyâre in different states and would allow us to, well, maybe with a slight delay, still have the project move ahead. Weâve worked hard to build that into our world so that regardless of how things play out over the coming weeks and months, we have the ability to advance this business confidently.
Scott Gruber - Analyst
I appreciate all that color. Then a quick one. There was a recent permit filing for a project in Wyoming called Buffalo Run. Is that one of those separate projects with a separate customer that you referred to? The ultimate capacity looks larger, but appears separate, or is it contemplated within this agreement? Any color you can provide on that project since the permit hit recently.
Michael Stock - Chief Financial Officer, Treasurer
I can take a little bit of that one, Scott. As you know, weâve been working on this. People know that weâve been working on this Wyoming site for a while, and weâve just initiated the large load permit. That permitting timeline is generally between about a 16 to 18 month period of time. This really rolls into our plan of weâre building a pipeline of projects and potential plants that go all the way into the 2030s, right? The earliest that that project would probably start to execute is the back end of 2028 into 2029 and into 2030.
As we go through the permitting process, the data center partner on there will sort of refine down its marketing with the hyperscalers. We will partner with a final hyperscaler and then potentially move forward on that side.
But this is part of what weâre doing now, is weâre building a pipeline for the next decade, for a multi-gigawatt non-geographic specific IPP. We are working on near-term projects, as youâve seen with the 1.2 gigawatt, with very quick and early determinations and moving to ESAs, to these larger, longer term projects that are setting us up into the 2030s.
Operator
Josh Silverstein, UBS.
Josh Silverstein - Analyst
Yeah. Good morning, guys. I wanted to see if you can help us match up the capacity you have coming in with the deployment schedule for the 400 megawatts Vantage deal and the 1.2 gigawatts here. Are you guys now kind of looking out to 2029 for the remaining capacity deployment, or do you still have some room for 2027 and 2028?
Ron Gusek - President, Chief Executive Officer, Director
Look, we still have some room for 2027 and 2028 deployment. We started taking delivery of generation early, and so weâve put ourselves in a strong position to be able to meet the needs of some folks who do want to stand up power beginning as early as the back half of next year.
From a ramp standpoint, we do have in our inbound supply chain capacity still to allocate for the last part of 2027 and ramping through 2028. Certainly engaged in conversations to put that to work at this point in time.
Michael Stock - Chief Financial Officer, Treasurer
Yeah. The vast majority of what weâre working on, as well as that sort of early stage, is really the late 2028 and through 2029, the last gigawatt or so, just a bit over a gigawatt, thatâll come energized in 2029. Yeah, those conversations are now moving further and further along. The conversations regarding the late 2027, early 2028 are very far advanced.
Josh Silverstein - Analyst
Got it. On this 1.2 gigawatt announcement, once the initial 500 is signed, how do you expect the remaining 700 to be covered? Does it come in one single ESA? Is it in multiple contracts? Why in multiple agreements versus just one big one for the 1.2? Thanks.
Ron Gusek - President, Chief Executive Officer, Director
That is really about the way that they tend to build data centers. What we find is that these tend to be a very phased approach, and so while you hear these very large numbers on sites, whether it is the 1.9 gigawatts in Wyoming or these sites that are all gigawatt plus in scale, the buildings tend to be building blocks of maybe 300, 400, 500 megawatts of IT load at a time.
The ESA is directly attached to a single building in this case. So what you are going to see is that as our customer stands up subsequent phases of this, the next building, there will be an ESA associated with that, and we will attach the appropriate megawatts to that. So you will see this happen over a couple of phases, building by building, site by site.
Michael Stock - Chief Financial Officer, Treasurer
Yeah. Just a little color on that. That allows for efficiency in permitting and efficiency in financing.
Operator
Marc Bianchi, Cowen.
Marc Bianchi - Analyst
Hey, thanks. I just wanted to go back and clarify something. I think, Ron, that you mentioned on when the question was asked about the prepayments. I think you said hundreds of millions of dollars, and that applies to the 1.2 gigawatts.
First question is just one, correct me if that is wrong. Then the second question is, when would you anticipate to see that prepayment occur? Is that something that happens in the near term, or is it sort of ratably as these ESAs get across the finish line?
Ron Gusek - President, Chief Executive Officer, Director
No, you characterized that correctly. It is hundreds of millions of dollars against the 1.2 gigawatts. As Michael said, that will be ratably applied to the capacity payments over the first five years of the contract, and we would expect receipt of that in the near term. It is not contingent on execution of the ESA.
Marc Bianchi - Analyst
Got it. Thanks for that, Ron. Then, maybe just switching over to the frac side of the business. I guess another earlier question had kind of discussed that you have got some better than market pricing in your existing fleet because of the quality of service and the ability to have a lower cost fuel.
How should we externally think about the leading edge pricing moving higher and how that could ultimately translate into a material increase in your EBITDA level? Do we need to see a 10% or 20% increase in market prices and then that shows up in EBITDA sometime in the middle of 2027? Or maybe just talk to us about the progression there.
Ron Gusek - President, Chief Executive Officer, Director
Yeah. Certainly, the market has gotten to a stronger spot, I would say from my standpoint as we look out into 2027, to a position where I think weâre confident that the market will be supportive an upward trajectory for pricing.
I mentioned in my remarks the strength of the forward curve now. We had been challenged through much of this year with a situation where front-month oil price was quite strong, but the forward curve fell off relatively rapidly, that there just wasnât that ability to lock in strong economics through 2027 and even out into 2028. But in the last few weeks, weâve really seen a strengthening of the forward curve. Weâve got 2027, I think, up above $85 through the end of the year now and up above 70, maybe even above 75 through 2028.
That helps us in that it gives us confidence around our E&P customersâ outlook and their confidence around their financial returns for activity in the coming year. As a result, I think, puts us in a stronger position around being able to go out and continue to look for price increases on a quarter-by-quarter basis.
Now, of course, we donât move pricing for all of our fleets at the same sort of rate. In some cases, that could happen as frequently as quarterly. In some cases, itâs more of a semiannual or annual event. Weâll work through those case by case, customer by customer.
But yes, I would say, sitting here today, feeling more confident about our ability to go and get some additional price as we head into 2027. I would say that we expect to continue to face inflationary headwinds, particularly on the labor side of things.
Weâve seen input costs climb this year as a result of the tariff situation and also the cost of things like fluids. Obviously, we use a lot of oil and lubricants and things like that. Theyâve climbed pretty meaningfully. But labor is going to be a big one in the coming years. Trucking, weâre feeling that as well. So weâre going to be working to pass that through and then on top of that, seek to add some additional margin to our bottom line.
Operator
Alexa Breno, Goldman Sachs.
Alexa Breno - Analyst
Thank you. Good morning, team. Appreciate you taking our question. I think yesterdayâs update was positive on the power side. Can you just talk a little bit about what needs to happen now between yesterdayâs announcement and then a final contract execution? What are some of the remaining milestones? How much of this is in your control versus maybe the customers or other parties?
Michael Stock - Chief Financial Officer, Treasurer
Yeah, Alexa, I can take a little bit of that. All the major commercial terms are agreed upon. We are now in the final legal drafting of the ESAs, and we are getting into the site-specific portions that affect the contract. Those are the things that need to finalize at the moment, and they take a little while.
We are at that point where we have the trust. We have enough of the major terms for a standard ESA, I would say, for the whole 1.2 gigawatts, that basically becomes rinse and repeat. Once we finalize this first ESA, really the lift for the second or third or fourth with this client will be relatively light and only be site-specific after that.
Alexa Breno - Analyst
Okay, that is very helpful. Then just an update on financing. You talked a little bit about conversations there. As you just move towards a contract on the power projects, how much upfront capital should we think about being committed? Will we get financing updates along with the contract or any color on how we should think about it?
Michael Stock - Chief Financial Officer, Treasurer
Yeah. I think what weâre doing there is weâre obviously negotiating these ESAs in concert with our financial advisors, and as we are moving now, even prior to the ESA, we are accelerating the financing conversations with our financial advisors and the capital sources to try and accelerate that financing as much as possible after the signing of the ESA.
Now, it still does take a while. That can be anything from eight weeks to three to four months, depending on the type of financing and ownerâs engineerâs reports and other bits and pieces. But I think weâre accelerating that by doing the pre-work, and I think we can have that financing in place in relatively short order after the signing of the ESA.
Operator
Keith Mackey, RBC Capital Markets.
Keith Mackey - Analyst
Hey, good morning, and thanks for taking my question. Michael, you mentioned the core business generating strong free cash flow. Wondering if you can help us unpack the quarter a little bit more in that respect. So how much of the EBITDA was associated with the frac business versus CapEx and potentially how we should think about that going forward a little bit further as well?
Michael Stock - Chief Financial Officer, Treasurer
Yeah. As we look at things over the year, really, Keith, obviously capital moves in quarter and quarter. EBITDA moves, is a solid upswing at this present point in time. We will have reasonably strong free cash flow as we have gone through this year, even while we are reinvesting in the base business for digiPrime.
We had positive free cash flow from the base business this quarter. We have had it every other quarter. The same going into next year, where I think we will have a good, solid free cash flow from the completions business, even while reinvesting in our digiFleet.
Keith Mackey - Analyst
Okay, got it. As you think about Q4, sounds like we need to be thinking about a seasonal decline. Can you give us any context around the magnitude of where we think Q4 should shake out from an EBITDA standpoint?
Michael Stock - Chief Financial Officer, Treasurer
As we have kind of previewed, you are going to see, we always see a holiday slowdown. Again, if you are finishing a pad just before Christmas, people like to give the people time off around the Christmas holidays, et cetera.
You see the onset of winter weather. That is offset by the fact that we have strong commodity prices and we are not seeing any budget exhaustion or anything of that like this year. I think our customers are going to drive through the end of the year in their completions programs. You would expect that you would have a slightly smaller than normal seasonal breakdown for Q4.
Operator
Saurabh Pant, Bank of America.
Saurabh Pant - Analyst
Ron, Mike, apologies if I missed this, but did you update on the CapEx number for this year? I think it was $1.5 billion last quarter, if that number is still the same. Just correct me if Iâm wrong, the way Iâm thinking about financing is, you would get this prepayment relatively soon, Iâm assuming before the end of the year, by the time the ESA is announced or not announced, right? Thatâs imminent.
Should we think that is enough of a bridge financing and then when the ESA comes, youâll put that into a project finance and we donât need to worry about financing, right? Is that the right way to think about that?
Michael Stock - Chief Financial Officer, Treasurer
Iâll unpack that a little bit. Yes, our CapEx guide for the year is still intact. Weâre not changing that. Yes, we are going to be receiving a significant prepayment of capacity fees that will be booked onto the balance sheet as deferred revenue, and will be a significant source of cash for the fourth quarter. Yeah, we donât anticipate needing to access further financing in the fourth quarter.
Saurabh Pant - Analyst
Okay, fantastic. No, Mike, thatâs very clear. One in terms of just the 1.2 gigawatt deal. How should we think about profitability? Are we still thinking high teens unlevered IRR, 1.7, 1.75, in terms of CapEx? Is this along similar lines?
Ron Gusek - President, Chief Executive Officer, Director
Yeah. Nothing has changed there. We continue to target those high teens rates of return on the invested capital. The ultimate capital deployed on any given project is just going to be a function of the complexity of the balance of plant. Weâve got the base generation that will be a part of any project we do, and then youâre going to find on the very simple end of things where we might have a basic commercial or industrial project, a much lower multiple on the cost of generation to get us to total deployed capital.
On the other end of that scale, for a very complex inference data center with a volatile load profile, youâre going to see us push up to those higher numbers that head up towards two times the cost of generation for full deployment of the facility. So weâll be able to give you some color on that on a case-by-case basis as we start to announce ESAs and some specifics around individual projects.
Michael Stock - Chief Financial Officer, Treasurer
The amount of the CapEx does not dilute the earnings. I will reiterate that a couple or 3 times today. The high teens is on all of our capital deployed. We are still targeting approximately that somewhere between around 5 times cash on cash payback for the capital.
So sometimes if itâs a longer-term contract, if itâs a 20-year contract, that might move out towards the 6-year mark. The 15-year, weâre at that 5. So again, just to reiterate, when we undertake extended scope for a client because we are the good partner that we are for them, we do not dilute our capital returns.
Saurabh Pant - Analyst
No, that makes a ton of sense, Mike. Risk and return and capital intensity go all hand in hand. So thank you. Thanks for that clarification. Iâll turn it back.
Operator
Derek Podhaizer, Piper Sandler.
Derek Podhaizer - Senior Research Analyst
I just want to follow up on Saurabh Pantâs question, just about the mechanics behind the financing. It sounds like the significant prepayment will be your source of cash to kick off this initial 500 MW. How do we think about the mechanics and the steps to then drop the project into an SPV project level financing when you do execute that ESA, as far as potentially refinancing some financing or just trying to work through the mechanics and how we think about that once the ESA and the SPV are set up.
Michael Stock - Chief Financial Officer, Treasurer
Right. Let me just clarify. The $300 million is not specific to this project. It is a form of commitment from the client for the whole 1.2 gigawatts, and yes, it is a source of cash for the corporation for the quarter. The corporation undertakes long lead time item spending that was initially funded via convertible bonds in the first quarter of this year.
As we sign the ESAs, those assets are then dropped down or purchase contracts are then dropped down into a dedicated SPV, and that SPV undertakes project financing at that level and then reimburses the corporation for money spent up until that point. We will have a significant amount of equity in those SPVs. We are probably targeting of order around 20% equity and about 80% debt at the SPV level.
Therefore, you will see that cash recycle back to the corporation being reinvested in long lead time items to generate more projects in the future.
Derek Podhaizer - Senior Research Analyst
Great. Thank you very much. That was super clear. I appreciate that. I guess switching over to frac, just curious about the conversations as we progress into 2027, thinking about activity and pricing. A lot of your customers have been pretty quiet as far as what they are expecting for next year. Strip is sitting at 85, and I imagine there is some hedges that have been put into place. You have talked about your opening remarks, the enhancing of E&P revenue visibility.
Earlier this week, a big peer of yours called for North America to be flat with no recovery in US fracs. Just would love to get your comments on how we should start thinking about 2027 and maybe the different moving pieces and levers, if we could think about a real recovery in frac or if it is just too early to tell from right here.
Ron Gusek - President, Chief Executive Officer, Director
Look, I would say I am not going to say we are headed back to mid-cycle economics or anything like that next year. That would be a step too far. That said, the increase in rig count has ultimately supported an increase in demand for frac equipment, probably of order 15 to 18 incremental frac crews, and that has led to a relatively tight frac market. There is not capacity sitting around looking for work to complete.
Our calendar is full. I think you will hear from our peers probably over the course of the coming weeks that their calendars are full and utilization remains strong. That puts us in a position to look for modest pricing increases quarter-on-quarter. I would have told you maybe a quarter ago that I was not sure that the fundamentals were there or clarity was there around 2027 yet.
Now, as we have noted, we have seen the forward curve strengthen. That hedge opportunity is there. I think we have confidence in our customersâ economics for the coming year, and I think that provides us a backstop for continuing to seek some modest additional price increases over and above the inflationary impacts I expect we are going to continue to feel as we work our way through the tail end of this year and into 2027.
Many of those conversations are going on right now. We are in RFP season. We have gotten through many of those, but not complete at this point in time. Still got a little more work to do before we have the complete picture for 2027. Be able to give you that outlook on the next call.
Operator
Eddie Kim, Barclays.
Eddie Kim - Analyst
Congratulations on the agreement announced yesterday. Just curious if thereâs any concern on the timing of that ESA potentially getting pushed out to early 2027 in light of data centers now being a political headwind, or if your confidence level on that ESA by December is pretty firm at this point.
Ron Gusek - President, Chief Executive Officer, Director
Look, I would say that while we canât predict what the future holds here over the coming weeks and months, at this point in time, weâre confident around our ability to get there. There doesnât, at this point, appear to be an issue with finalizing that before the end of the year.
As weâve said, even in this case, we have made sure we have contingency options in place in the event something were to happen with the primary sites such that we could pivot to another site. That might introduce a modest delay if we were to have to do that, but weâve built those contingencies in to make sure that we can navigate whatever potential headwinds might come our way.
Eddie Kim - Analyst
Understood. Just shifting over to pressure pumping. You mentioned drilling-related delays in the third quarter. Just wondering if you could provide some more color on that. Is it just the pace of drilling has slowed down, or does it speak more to your completions operations just being so efficient that you are bumping up against the rigs at this point? Just curious if you expect this dynamic to linger for the upcoming quarters, or if this was really isolated to 3Q?
Ron Gusek - President, Chief Executive Officer, Director
I think this was a bit of a unique set of circumstances. We went through a situation where coming out of Q1 and headed into Q2, utilization jumped up pretty meaningfully across the broader industry. That incremental activity was driven by uncompleted inventory. We had this swath of wells out there that were waiting for a frac crew to come and work on them. That allowed us to accelerate activity levels pretty quickly and have a meaningful runway in front of us.
But with the efficiency of our world these days, we worked through that inventory pretty quickly. You saw rig count come up, but ultimately, it meant that we were chasing rigs. In a couple of particular situations, we actually did catch up to the rig, and it meant some space on our calendar we had not anticipated.
It pushed a little work into the subsequent quarter. I do not view that as a regular occurrence. Typically, we are in a position where we have got a bit of breathing room between us and the rig, or we have some other option to move the fleet to. In this case, we got caught without either of those, and so we had a bit of an impact on the quarter. But I would call it a bit of a singularity rather than something we should expect to carry on.
Operator
Jeff LeBlanc, TPH Research.
Jeff LeBlanc - Equity Analyst
I wanted to see if we could revisit your progress on securing the full 3 gigawatts by 2029, and if thereâs been any incremental capacity since the Caterpillar announcement that was disclosed in the 10-Q.
Ron Gusek - President, Chief Executive Officer, Director
No. We are very confident that we have the 3 gigawatts available to us to execute and have energized by the end of 2029. We havenât added or announced any additional capacity on that. Obviously, we continuously work on supply chain and continuously work with our data center partners, who in some ways are looking for earlier generation. We are exploring partnerships and potential ways to satisfy their growing need for power. But nothing else has been announced or committed to.
Operator
Dan Kutz, Morgan Stanley.
Daniel Kutz - Analyst
Hey, thanks. Good morning. I just wanted to come back to the fourth quarter outlook. I think Keith had asked a question on that. I just wanted to dive in a little bit deeper there. If you look historically, and I think that you guys have commented that fourth quarter top-line seasonality is normally maybe a mid, high single-digit decline.
Do you think that given the dynamics that you described, maybe low single-digit decline could be a better bogey for this fourth quarter? Or do you think that thatâs too optimistic? How do you think about the associated decremental margins for this quarter? Thereâs obviously different factors that you guys have highlighted, some cost pressure, but then any incremental pricing traction that helps new decremental margins. Do you think low single-digit revenue decline is too optimistic? How would you characterize incremental margins or decremental margins relative to normal levels for this quarter? Thanks.
Ron Gusek - President, Chief Executive Officer, Director
Look, I would say we are not prepared to give a specific. It is not going to be quite as meaningful as we would typically experience in a normal year, given some of the activity that is pushed, given the strength of demand from the privates. We have definitely got some tailwinds from that regard, but will not commit to a specific number there.
Daniel Kutz - Analyst
Yep, fair enough. Then maybe just, Michael, I think you alluded to the fact that the plan is to continue investing in incremental digiPrime assets, at least at the replacement level. But how do you think about that in the more near term as you are how do you think about capital allocation towards digiPrime investments relative to the pretty substantial capital requirements to build out the power business?
Michael Stock - Chief Financial Officer, Treasurer
We are very bullish on both sides of our business. Our completions business has very strong returns, and we will continue to build that over the next decade. The same on the power side, where we do not find ourselves to be capital limited at this point. We have access to many forms of capital to help build that business, and we are going to build a long and lasting decades-long business in the power sector.
Again, we are very much about building long-term businesses that we can grow over time. So we are not looking for maybe the quickest hit, the quickest return. We are going to continue to invest through the cycle in both power and completions and grow the business over the next 20 years.
Ron Gusek - President, Chief Executive Officer, Director
Dan, as you can imagine, there are an awful lot of hands up for next-generation equipment in this particular environment, just given the arbitrage between diesel and natural gas. We have, I think, as Michael alluded to, always been clear that this is a both/and, not an either or.
We have spent 15 years building an immense amount of trust and strong relationships with our customers on that side, and we will continue to support them with leading-edge technology and the service quality that we are well-known for. That will mean we will continue to invest in next-generation technology at a cadence that is reasonable and appropriate for the market.
And certainly at this point in time, we have got a lot of asks for it, so we will work to find a balance between the demand that we have there and the cadence at which we are prepared to continue to build that equipment.
Operator
John Daniel, Daniel Energy Partners.
John Daniel - Analyst
Hey, guys. Thanks for having me. Ron, just to follow on to Derekâs questions, but on the core business and recognizing you are in the normal RFP season, but how would you characterize that customer urgency to secure fleets for next year? And really just trying to understand what has happened the last two to three weeks with respect to inbound calls versus maybe what you were seeing in Q3.
Ron Gusek - President, Chief Executive Officer, Director
Look, I would say, while we didnât see it move forward as early as it has in some past years, weâve had some situations where I think our next yearâs RFP season happened in the summertime. We are through a good number of those conversations.
We already know the homes for most of our fleets for 2027. I would say that in some cases, there wasnât even an RFP for that. The trust and strength in the relationship has meant that our customers have just chosen to carry on with us moving into next year, recognizing thereâs probably a conversation around price to be had. But beyond that, committed to having Liberty at the table. We have a few more of those to wrap up, but I think weâre most of the way through that at this point in time.
John Daniel - Analyst
Okay. You might not have the math in front of you on this question, but if you had to guess, and Iâll underline guess, whatâs the minimum price increase range you think you would need to just simply cover inflationary costs? And ballpark is fine. Just trying to understand the magnitude.
Ron Gusek - President, Chief Executive Officer, Director
Gosh, I donât know that I know that answer off the top of my head.
John Daniel - Analyst
All right. Fair enough. Well, thatâs all I got. Thanks for including us. Unless you got --
Ron Gusek - President, Chief Executive Officer, Director
John, maybe Iâll add one thought to that. I would say that we have probably offset much of that now. If you thought about some of the increases that were driving that. I would say tariffs were one of them. Weâve seen an increase in fluids as an example, so lubricants and things like that. That stuff is mostly stabilized now. We got a pretty steep increase through the middle of this year, and weâve settled in on that. Weâre going to be dealing with labor inflation, as I noted, but I think weâve got an outlook on that and are being a little proactive around that. I think weâve covered a lot of that. Then layer on top of that, some ability to offset those things, mostly through technology and innovation.
If you think about the deployment of digiPrime and what weâve seen there in terms of component longevity through the deployment of that asset, and then also leveraging of AI as a software monitoring tool on top of that, weâre able to blunt some of those impacts somewhat, mitigate what we might have felt in a more traditional fleet going forward.
I think all of those things together, weâre probably in not too bad a spot headed into next year. Weâll continue to keep an eye on it. Particularly labor and trucking, I think, are the two weâre going to see out in the field directly influenced by the whole data center build.
Operator
Thank you. I will now turn it back to Ron for closing remarks.
Ron Gusek - President, Chief Executive Officer, Director
America stands at an inflection point. The same nation that led the world through the Industrial Revolution, the Digital Revolution, and the Shale Revolution, is now entering a new era of unprecedented energy demand. Artificial intelligence, advanced manufacturing, data centers, reshoring of industry, and continued economic growth are all increasing the need for affordable, reliable energy, and modern infrastructure.
The challenge before us is straightforward. If we want to remain the worldâs leading economy, we must ensure that we can produce and deliver the energy that powers it. This should not be a partisan issue. Americans will continue to debate climate policy, environmental priorities, and the composition of our future energy mix.
Those discussions are important and necessary. Equally important are the concerns raised by local communities about how energy infrastructure is developed and its impact on the places they call home. These concerns deserve to be taken seriously.
Successful projects are built not only with engineering and capital, but with trust, transparency, and meaningful engagement. Yet acknowledging those concerns cannot become an excuse for inaction. The reality is that the US needs more energy infrastructure. We need new generation capacity. We need transmission. We need pipelines. We need storage. We need the infrastructure required to support both traditional and emerging energy resources.
Put simply, we need to build. Too often, however, our conversation devolves into a choice between unrestricted development and outright opposition. Neither approach offers a durable path forward. A moratorium mentality may postpone difficult decisions, but it does not solve the underlying challenge. Americans will still need affordable electricity. Businesses will still require reliable power. Communities will still depend on the economic opportunities that energy development can create. The question is not whether demand will exist.
The question is whether we will meet it responsibly and proactively or react to shortages, rising costs, and declining competitiveness after the fact. What America needs today is not less scrutiny, but more certainty. We need decision-making processes that are transparent, rigorous, and efficient. We need policies that encourage investment while respecting community interests.
Most importantly, we need leaders willing to focus on solutions rather than stalemate. Throughout our history, the United States has succeeded when we confronted challenges with confidence rather than retreat. From railroads to highways, from rural electrification to the internet, each generation invested in the infrastructure that made future prosperity possible. Energy is the infrastructure challenge of our generation. Regardless of political affiliation, we should be able to agree on a fundamental principle. A growing nation requires a growing energy system.
The path forward will require compromise, innovation, and cooperation, but it must start with a shared commitment to build the infrastructure necessary to secure Americaâs economic future, strengthen its energy security, and improve the lives of the people who depend on it every day. The greatest risk is not disagreement. The greatest risk is allowing disagreement to prevent progress.
Thanks very much for joining us on the call today. Enjoy the rest of your day.