  • Operator

  • Hello. This is the conference operator. Welcome to the Kinross Gold Corporation's first quarter 2009 results conference call and Webcast. As a reminder, the conference is being recorded. After the presentation, there will be an opportunity to ask questions. (Operator Instructions). At this time, I would like to turn the conference over to Mr. Erwyn Naidoo, Vice President Investor Relations. Please go ahead.

  • - VP IR

  • Thank you, and good afternoon, everybody. Welcome to the first quarter results call for Kinross Gold. With us today, we have Tye Burt, President and Chief Executive; Tom Boehlert, our Chief Financial Officer; and Tim Baker, our Chief Operating officer. Just a reminder that certain statements we make today may contain some forward-looking information and actual results could differ from those conclusions or projections. And we caution you that -- to our risk factors and assumptions in our media release dated May 5 and forthcoming management discussion and analysis for the same period, as well as other regulatory filings, in both Canada and the United States. Now, I'll turn the call over to Tye Burt, President and Chief Executive. Go ahead, Tye.

  • - President, CEO

  • Thanks for joining us today. I'll review some of the first quarter highlights and give an overview of our next series of growth projects, while Tom and Tim will review the financial results and operations for the quarter. Kinross quarterly numbers reflect the positive impact of our growth strategy to date. Gold production increased by 59% overall and our cash costs decreased by 11% relative to the first quarter of '08. We achieved record revenue, with an increase of 61% versus the same quarter last year. And record cost of sales margins, despite the slightly lower gold price in the quarter. This doubled our cash flow per share before changes in working capital relative to the prior year.

  • First quarter production is expected to be lower than the remaining three quarters of '09, as the Paracatu ramp up is still in progress and will reach 100% by the end of the second quarter. Production from the Newport Nox heap leach will start in Q3 and begin to contribute fully in the fourth quarter of this year. As a result, our '09 guidance remains unchanged for year at 2.4 million to 2.5 million ounces, with a cost of sales per ounce at $3.90 to $4.20. And our underlying assumptions that drive those costs also remain unchanged from our January release. I particularly want to take this opportunity to thank our employees for their dedication and hard work, which has resulted in these very strong results. And I appreciate their outstanding safety records in this quarter.

  • Now, I'd like to give a little more detail on our ongoing strategy to improve the portfolio and add value to our pipeline of projects for future growth. First, the organic growth opportunities within existing mining operations. We began to evaluate the expansion of throughput at Maricunga late in 2008. There, Kinross has 16.5 million ounces in gold reserves and about 2.3 million ounces of resources. We completed an initial scoping study that indicated the economic viability of doubling production at site. And we expect to complete a pre-feas study by the end of '09, that will evaluate expanding and optimizing the current plant, as well as adding a second crushing plant.

  • Second, at the La Coipa mine in Chile, we have doubled the size of our land package over the last year to 98,000 hectares. And we recently completed an agreement with our partner at [Companera Maneta] La Coipa, which allows us to drill the perspective claim blocks, which are in the vicinity of the mine. We've approved drill programs at a number of high value targets to identify ore that will be processed at the La Coipa mill. So, with exploration moving forward at La Coipa, the evaluation of the Maricunga expansion and pre-feas work Lobo-Marte, and the full feasibility study nearing completion at Cerro Casale; the Maricunga belt in Chile is a core focus for future growth here. In Brazil, we are evaluation a further expansion at Paracatu that would involve installing a third ball mill along side the new circuit. Those new plant foundations were designed to accommodate another mill and we'll provide an update on this later in the year.

  • Turning now, to our future projects, the next round of large scale growth from Kinross. In January, we closed the second part of the Lobo-Marte transaction, which sees us now owning 100%. A scoping study is underway and is scheduled to be complete in June. We've applied for the permits to complete the $3 million drilling program planned for this year and expect to receive those permits shortly. This drilling will facilitate the metallurgical necessary for the pre-feasibility study. We expect that work -- that study to be completed by year end of '09 and that will drive the development time line. We're also exploring the benefits of potential synergies with the neighboring La Coipa operation, including the viability of processing high grade ore from Lobo-Marte at the La Coipa mill. This has the potential to accelerate the start up for production from this project.

  • Moving to Ecuador, we continue to work with the government and local communities to advance the Fruta del Norte project. We've completed and submitted a revised environmental management plan and expect to receive shortly all of the necessary permits and acknowledgements to proceed with our 2009 drilling program. There are two drills on site ready to be deployed for the 12,000 meter drilling plan, once the permits are obtained. This drilling campaign is aimed at upgrading the resources and supporting a pre-feasibility study, as well as stepping out on some highly prospective district targets. We're pleased with the passage with the passage of the new mining legislation in Ecuador and are looking to developing this deposit as an example of responsibility mining in action.

  • Finally, in March, we issued a technical report on the Cerro Casale project in Chile. I discussed it on the last conference call. This study updated the previous '05 capital cost pricing with mid-2008 capital numbers, bringing the estimated construction capital to $3.6 billion on a 100% basis. Of course, we'd expect costs to improve from there in this environment and with optimization work now in progress. The pre-feasibility study also revealed opportunities to further optimize the project and capital requirements for consideration in the final feasibility study, which is expected at the end of Q3. At that time, a determination will be made with our partner on how to proceed.

  • Other events this quarter include our investment to acquire a 9% indirect interest in the Diavik Diamond Mine in the Northwest Territories at Canada. And related, a 19.9% interest in Harry Winston. We think this investment of $150 million was an excellent opportunity to buy a stake in one of the best diamond mines in the world at a significant discount to underlying potential value. It was a small but tax effective and accretive investment for Kinross. It does reflect a commitment to invest in value generating opportunities. It does not take away from our continued focus on our core business in gold.

  • In summary, the first quarter saw Kinross continue to benefit from the growth plan we began three years ago. Our new mines allowed us to lower our costs and deliver higher margins on increased production, despite slightly lower average gold prices for the quarter. The remainder of the year will be focused on completing the Paracatu and Fort Knox expansions and advancing our next round of growth projects. I'd like to turn the call over to Tom Boehlert and Tim Baker to provide financial and operational results. and then, I'll make some closing remarks. Tom?

  • - CFO

  • Thanks, Tye. This was another telling quarter because there was only a 3% decrease in the realized gold price per ounce compared to the first quarter of 2008. So with no material effect on our results from changing gold prices quarter-over-quarter, the impact of our growth strategy again clearly show through the numbers. During the first quarter, we sold approximately 591,000 gold equivalent ounces at an average price of $897 per ounce. This generated revenue of $532.7 million, which was a 61% increase over the first quarter of 2008. The increase was driven by a 65% increase in ounces sold over the same period last year. The first quarter attributable cost of sales per ounce was $419, which is 11% lower than the first quarter of last year.

  • During the quarter, the impact of lower oil prices and weaker foreign currency rates was largely offset by higher gold price related to royalties. This is consistent with our guidance on sensitivities, which takes into account our oil and currency hedges. Despite a 3% drop in the average gold price, the combination of a 65% increase in ounces sold and the decrease of 11% in the cost of sales per ounce, our cost of sales margin continued to expand. Margins grew by 5% to $478 per ounce when compared to the first quarter of 2008. First quarter earnings included foreign exchange gains, which would have been -- earnings would have been $70.9 million or $0.10 a share excluding those gains, compared to $58.8 million adjusted for certain items or $0.10 a share for the first quarter of 2008.

  • During the first quarter, an increase in depreciation, depletion and amortization expense had a significant impact on net earnings. DD&A increased to $111.2 million or $0.16 a share in the first quarter of 2009, from $37.8 million or $0.06 a share in the first quarter of 2008. This increase was largely related to Kupol and Buckhorn, which had relatively high DD&A per ounce. We would expect depreciation for the remainder of the year to be in line with this quarter in the range of about $190 per ounce sold. Net interest expense totaled $15.6 million, compared to net interest income of $3 million in the first quarter of last year. This $18 million change resulted from the fact that we are no longer capitalizing interest to the Paracatu or Kupol or Buckhorn projects and we are earning lower yields on our cash deposits.

  • Consolidated earnings were reduced by $26.1 million, representing the 25% minority interest in Kupol, not owned by Kinross. First quarter cash flow, before changes in working capital, doubled quarter-over-quarter, to $215 million or $0.32 a share, from $99.1 million or $0.16 a share in the prior year. Liquidity at the Company has been significantly increased with the financing announced earlier in the first quarter. We raised net proceeds of $396 million through an equity offering of common shares that closed on February 5. And today, Kinross filed a preliminary shelf prospectus qualifying up to $1 billion of securities. While we don't currently plan to use -- to issue securities in the near term, maintaining a shelf prospectus would allow Kinross to more readily access capital markets in the future.

  • Our cash, short term investments and available credit provided liquidity in excess of $900 million at the end of the first quarter, and net debt stood at $175.8 million. We reduced debt by $28.6 million in the first quarter and we expect to make $166.2 million of scheduled debt repayments during the full year. Our full-year forecast for production, costs and expenditures remain unchanged from the guidance previously announced. As we mentioned previously, we expect to spend approximately $45 million on the development of FDN this year. And about $30 million of that amount is expected to be expensed through other operating expense in our statement of operations. We plan to expense approximately $8 million of development expense related to Lobo-Marte. So that's a total of approximately $38 million of development expense for the year, which will run through our statement of operations.

  • And our sensitivities to gold price and oil prices and foreign exchange remains the same at $5 per ounce for a 10% change in foreign exchange; $5 per ounce for $100 move in the gold price, from our assumption of $750 at the beginning of the year; and $2 per ounce for every $10 per barrel change in the oil price from our original assumption of $75 per barrel. And these sensitivities take into account our oil and foreign exchange hedges. I'll now turn the call over to our Chief Operating Officer, Jim Baker, for a review of the operations and details about exploration.

  • - COO

  • Thanks, Tom. Putting people first is one of the primary Kinross values. We had a significantly improved safety record at our operations in the first quarter on our technology efforts of our employees and contractors around the world.

  • Now, I'm going to take you through the highlights from our operating assets and provide an update on our expansion projects of Paracatu and Fort Knox. I will ask you to look at the final page of our press release, which has our usual mine by mine summary for each of the key metrics, such as production, grade, costs and depreciation. I'll discuss the high level results on a country by country basis, consistent with how we give our operational guidance.

  • In Chile, the Maricunga and La Coipa operations, produced 123,000 gold equivalent ounces at a cost of sales of $467 per ounce. This was a 14% increase in production and a 17% decrease in costs from Q4 2008. Pounds crushed at Maricunga were less than planned due to a conveyer belt change and repairs to a tertiary crusher. However, the plant is operating normally now. La Coipa had a great quarter, with better than planned mill throughput and recoveries. Costs at Maricunga benefited from lower energy costs. And the decrease in cost of sales at La Coipa of 27% can be largely attributed to impact in Q1 2008 of the fair value of inventory costs, resulting from the acquisition of the remaining 50% of the project in late 2007 and the benefit of the weaker Chilean peso.

  • In Brazil, our operations at Paracatu and Crixas produced 84,340 ounces, at a cost of sales of $628 per ounce. When compared to Q4 of 2008, production increased by 17%, however, costs also increased by 55%. Costs at Paracatu increased as we incurred close to fully loaded operations costs but produced below capacity as expansion ramps up. Once the expansion is at full capacity, these costs should normalize. The Paracatu expansion is producing towards full capacity. And the ramp up has been challenging, with numerous adjustments needed to bring the circuit into balance, combined with some equipment failures such as the bearings on the crusher. The team has responded very well to the challenges and we have seen good gains in throughput and recovery, achieving for limited periods 5,000 tons per hour through the plant and over 80% recovery. The focus now is to finalize the upgrades that to need to be done, continue to improve the availability and fine tune the plant to push production and recovery. We are confident that we're on track to be be operating at 100% capacity by the end of Q2.

  • In the US, at our operations of Fort Knox, Round Mountain, and Kettle River-Buckhorn, attributable production was 126,701 ounces, down by 20% when compared to Q4 of 2008. Cost of sales were $516 per ounce in the quarter. Fort Knox experienced lower grades this quarter, with ore being mined from a transition zone at the ore interface. This, combined with the break down of the primary crusher in February, resulted in decreased production and an increase in costs of 37% from the fourth quarter of 2008. Grades and recovery have returned to more normal levels in the second quarter.

  • 29,000 of meters drilling are planned at Fort Knox, targeting additional [assets] in the northwest sector of the pit, phase eight. And the deep phase six and seven extensions on the southwest side of the pit and in the south wall. The heap leach project at Fort Knox is now gearing up construction activity with the onset of spring. And the plan is to commence placing low grade [M1] mine ore on the leach pad as planned in Q3, with leaching starting soon after. The Kettle River-Buckhorn Mine, in its first full quarter of production, has met expectations and continues to ramp up to full production. Also exploration at Buckhorn has been very encouraging. Final results from the 2008 program continue to confirm the existence of a similar scar and deposit below the existing orebody. Work continues to target deeper repeats of the Buckhorn deposits.

  • At the Kupol mine in Russia, first quarter production decreased by 9% from the fourth quarter of 2008 to 192,842 gold equivalent ounces, for Kinross' 75% share, reflecting the present grade of the orebody, which is as planned. The mill and mine are operating extremely well. Cost of sales for the quarter was $228 per ounce. Kupol continues to perform according to plan. The exploration team at Kupol will focus on the T1 target about 400-meters north of the present orebody. This is being drilled to determine the potential extension of the main tunnel. Preliminary indications are promising.

  • We continue to focus considerable effort on further organic growth, evaluating opportunities to lower costs, increase throughput and extend mine life at our current operations. Particularly, the possibility of expanding production at Maricunga. Also during the quarter, our exploration teams were active on 21 mine site and greenfields projects, drilling more than 11,000 meters. As I mentioned previously, exploration results have been very positive at Kettle River and La Coipa, which allows us to drill the prospective claim blocks in the vicinity of La Coipa. With that, I'll now turn the call back to Tye for his concluding remarks.

  • - President, CEO

  • Thanks, Tim. With the new projects now in operation, Kinross benefits from higher production, reduced cost of sales and increased margins. These results and those of 2008 have put the Company in a much stronger financial and operational position within the industry, and gives us an excellent platform from which to launch next phase of growth for Kinross. 2009 represents the commencement of that next phase. Even as we complete our current projects, we're transitioning our proven project development teams to aggressively develop the next round of opportunities that exist within the Company.

  • As always, I'd like to end with our 2009 key objective slide to serve as a report card on how the year is progressing. We're proud of what we've accomplished but there's much to come. Look for continued progress from the Company in '09 as the Paracatu expansion reaches full capacity during this question, th Fort Knox heal leach finished construction in Q3 and contributes in Q4. We announce regular updates on the progress that we're making on our mine optimizations and development projects. The scoping study at Lobo-Marte will be completed in June and drilling will begin to support the pre-feasibility. The final feasibility study at Casale gets completed in the third quarter, one that should reflect project optimizations and current building costs in Chile. Finally, we continue to advance the FDN project In Ecuador, with the expected completion of an infield drilling campaign to upgrade resources in support of pre-feasibility study. With that, I'd like to say thanks and open the call up for questions, please, operator.

  • Operator

  • Thank you, sir. We will now begin the question-and-answer session. (Operator Instructions). Our first question today comes from Steven Butler of Canaccord Adams.

  • - Analyst

  • Well, good afternoon, Tye, Tim, Tom. Tye, maybe you can start by maybe clarifying the -- on Kupol, the grandfather status of Kupol in the context of it also being the clear and strategic mineral deposit? And on that same vein, the strategic mineral deposit in Russia, what does it actually mean when it comes to future dealings, if any, on that asset? Thanks.

  • - President, CEO

  • Good question. We had a number of questions on that, given that the strategic deposit release list was released. I'd like to make this really, really clear because there are some misconceptions out there. The Strategic Investment Law and Kupol's inclusion on the strategic deposit list was expected and it was disclosed by us previously that we expected that. So it's no surprise that it's on the strategic deposit list. However, not an issue for us, as Kinross is current 75% ownership and operation of the Kupol mine is under Article 16 of that Strategic Investment Law. And I'll quote, "The law does not apply to transactions concluded prior to its enactment." So of course, that applies to our acquisition and indeed Bema's acquisition of the deposit in the first place. So, we're very confident in that view. The law is quite explicit on the point. And we've had that reinforced by our Russian lawyers and the Ministry itself. So, I hope that clears up the misconception that was out there. Steve, sorry, what was your second question?

  • - Analyst

  • Well, as it would pertain to -- I'm not sure what strategic mineral deposit means to tie in the context of -- if a future transaction was done on this asset, could it be at the rubber stamping approval of the Russian Federation for the sale of Kupol to be done or the sale of Kupol exploration licenses A and B to be done or whatever?

  • - President, CEO

  • Sure. With respect to the Kupol deposit itself, if we wanted to buy more or indeed sell some to a third party, or our partner the Regional Government there of Chukotka, wanted to sell because it's on the list, they'd need to get the consent of the Russian Federation body that deals with those consents. A parallel example would be Investment Canada here in Canada. But that is a new legislation, there have been an applications already. We note, that a couple of western mining companies have already proceeded through and gotten the consents they needed for ownership changes there. So, we have no reason to believe that they wouldn't be sympathetic to an application, should that ever arise. We don't have any reason to expect it will right now.

  • - Analyst

  • Okay. Thank you. Last question or two, Tye and maybe for Tim. Paracatu production and costs, how are they looking in April? Tim, if you can comment on the ramp up a bit, again, we see the fairly low recoveries. But as you said before, maybe that's customary with stop and start of the mill. So can you give us a sense -- I see the higher tons processed in the quarter but you still remain confident, a sense of how things may be progressing through April?

  • - COO

  • Well, we're certainly confident, we are beginning to hit our target tonnages. For instance, on Friday, we had 110,000 tons through the plant. And we are hitting our recovery targets. So long as we keep the plant stable, the recovery comes with it. So, it's really ramping up well and we continue to be confident that it's going to get there.

  • - Analyst

  • What about the comment about the potential of adding a third ball mill but would that -- is that something that you're contemplating now the context of maybe lower than expected recoveries in this phase or any comments there?

  • - COO

  • No, the original plant was designed with space for three ball mills and on the possibility that we would add an extra ball mill as the ore gets harder to maintain the throughput. So, that's a normal course evaluation as we go forward.

  • - Analyst

  • Okay.

  • - President, CEO

  • Steve, we should add that it's -- we've made the note in the press release and I mentioned earlier, we are confident in that ramp up and we are not changing our overall guidance for production and costs, nor are we changing them for Brazil. So, all on the plan.

  • - Analyst

  • Okay. Last one, sorry. Tim -- or I should say, Tom, for you, the total debt associated with Kupol, total debt with Kupol at the end of the quarter if you have it, short term and long term?

  • - CFO

  • Yes.

  • - Analyst

  • That's it for me. Thank you. Thanks, guys.

  • - CFO

  • So, total debt related to Kupol, short term, over the next 12 months is about $110 million to $115 million of scheduled repayments. And we currently have -- there was a reduction of debt during the curious of the quarter. The IFC provided a tranch of debt, $25 million subordinated tranch, and they also received warrants on Kinross -- or on Bema's stock at the time it was done. They converted those warrants during the course of the quarter. So that tranch no longer exists and it was extinguished. And in respect to the bank facilities, we have at the end of the quarter, $360 million million drawn. So, $210 million to $215 million is current and the remainder is not current.

  • - Analyst

  • So sorry, $360 million in total, Tom?

  • - CFO

  • $360 million in total.

  • - Analyst

  • Okay. Thank you. That's it for me, thanks.

  • Operator

  • The next question comes from John Bridges of JPMorgan.

  • - Analyst

  • Hi, everybody. Going back to Paracatu, you mentioned the permitting issues and you saying your annual information form that, if you don't have a permit by the end of April, then you go into plan B. Could you give us a bit of information on plan B?

  • - COO

  • Yes, obviously we're -- we feel that we remain on track to get the installation license and the [new study exam] and we're saying by the end of May, we should be able to do that. Plan B, obviously, to examine options. We have a couple of them, one is, obviously, an additional lift to our existing exam. The second one is to advance the construction in the [Bandarinas] Valley Dam, which is already part of the mine plan. We already have the EIA approved for it.

  • - Analyst

  • Would that fit in with continued production and the continued buildup or would that defer that?

  • - COO

  • Yes, it's within the plan, it satisfies our needs for turning space and water capacity, either/or.

  • - Analyst

  • So, you'd still be able to follow this buildup, even if you didn't get the permit?

  • - COO

  • Yes. That's right.

  • - Analyst

  • Okay. And just, don't want to be Monday morning quarterback here, but you had a few mill problems, conveyer belt problems, that sort of thing. Just wondered if you were happy about the preventive maintenance programs and that sort of thing that you've got in operation?

  • - COO

  • Good question. Yes. In most of our mills, we are in pretty good shape. We've some identified and we've actually initiated a very serious maintenance program across the organization to bring the laggards up to shape. So, we're moving ahead well with that program.

  • - Analyst

  • Okay. And then, maybe a geology question, the Poncho deposit at Maricunga, what can we expect from that in terms of sort of throughput, gold and silver grades? Is it sounds like that's going to be a feature of that operation for a few years.

  • - COO

  • It's pretty similar to what we've got in the Verde pit. Obviously, as we get into it, we -- it's an oxide cap, which gives us higher recoveries initially. And then, as we work our way down through it, the recoveries decline slightly. But we won't see significant differences from we're getting in Verde, both in terms of grade and recoveries.

  • - President, CEO

  • And then to be clear, it's Tye, to be clear, the expansion that I mentioned is not Poncho. We are not going beyond. So basically, the Poncho pit is in the current mine plant. It's going to be about 25% of the feed to the mill this year and then that will transition to 100% of the feed by '12. And then, we're looking at continued extraction from that pit, even as we're now studying these -- the big upgrade, which would be drawing from a separate pit, if I can say it that way.

  • - Analyst

  • Okay. What's the life of this Poncho pit then? Just order of magnitude.

  • - COO

  • It depends how fact we mine it.

  • - Analyst

  • Okay.

  • - COO

  • It just, 40,000 to 50,000 tons a day takes us through I think until 2021, thereabouts.

  • - Analyst

  • Okay. It gives you a bit of stability there. Okay. I'll get out of your way. Thanks for that.

  • Operator

  • The next question comes from Barry Cooper of CIBC.

  • - Analyst

  • Yes. Good day, everyone. A couple of things. Tim, could you just elaborate a little bit more about the recoveries at Paracatu? Is there something different in the ore that -- while I assume there's nothing different in the ore. So I'm just a little perplexed as two quarters in the row, the throughput seems to be ramping up but no change in the recoveries there.

  • - COO

  • Yes, don't forget it's a flotation plant and flotation plants require stability to achieve the optimum recovery. And what's happened is we've worked our way through tying in the instrumentation and the controls and understanding the plant and how it operates. Is that -- certainly in the early days there was a tendency for everything to be dumped, so you would end up with empty tanks and then you'd start the mill up again and you would ramp up the recovery. That's been sorted out and we're really getting pretty consistently good recoveries, over 70% on a day by day basis. And when we get stability in the plant, we're getting over 80%. So it's a fine tuning process. I'm certainly feeling pretty good about the recoveries. And the plant is going to do everything that we designed it to do and a little bit more, is our assessment. The key is absolutely the plant's stability.

  • - Analyst

  • Right. Okay. Then, in the kind of introductory remarks but not on this call and the CEO commentary, Tye, you talk about some exploration results at La Coipa, as well as Kupol, possibly extending the life of the operation. And then, when I got to the page on the exploration results, I didn't really see anything other than what you are planning on doing. What have you actually done to suggest that maybe you've got something there to extend the life of the operations?

  • - President, CEO

  • Well, at La Coipa, really it's a program, Barry, that we've commenced and the joint venture that allows us access on an accelerated basis to the district that is right around La Coipa Norte and pit. So, the drilling results are not in yet. At Kupol, we are finding, with our drilling there, some early results. We had one hole there in the north pit, which extends the potential. We had 12 meters at 6.5 grams and 100 grams of silver. So, it's early going. We don't want to do any arm waving but we're quite excited about what we're seeing there. And then, we have some very good targets off to the west. And I'm sure our partners B2 will be talking about the potential out there. And then, the final one would be Kettle River, where we've had some assays back on our first 10 holes or so, which are showing this new mineralized scarring below the existing deposit. So, we're getting some good veins at good widths, we had at a meter of about 0.5-ounce. So, we're getting good showing but probably shouldn't just pop it out drill hole by drill hole. We'll put it together and finish the assays, finish the work and talk more about it in Q2, Q3.

  • - Analyst

  • All right, okay then. On Kettle, when say below, how much below are you referring to there?

  • - President, CEO

  • I don't have the exact drilling distances but as we had hoped and will be accessible through the current shafts and [addits.]

  • - Analyst

  • Right, so basically, within mine infrastructure then.

  • - President, CEO

  • Yes, that's right.

  • - Analyst

  • Okay. Good enough. Thanks.

  • Operator

  • Our next question comes from Paul Burchell of Dundee Securities.

  • - Analyst

  • Good afternoon, gentlemen. A couple of questions. First of all, just maybe some further on the depreciation. It's understood that the increase over Q1 of last year is largely due to the new projects but I also note that Paracatu and La Coipa also saw some pretty big pumps in the depreciation charge against them. Paracatu, I imagine, is involved with the -- is due to the expansion. But I was wondering if you might be able to provide some details as to why La Coipa's went up?

  • - CFO

  • Sure, it's Tom. Paracatu is as a result of the expansion. La Coipa is as a result of increased investment in La Coipa over the past year or 18 months. So, bumping up the basis of the PP&E and therefore, driving up the depreciation rate a little bit. We do expect that overall, the depreciation on a per ounce sold basis will be in the range of about $190 for the year. And I think we said that at the outside of the year.

  • - Analyst

  • Yes, you did.

  • - CFO

  • And of course, over the course of the year, the mix will change a little bit but I wouldn't expect it will vary significantly quarter to quarter.

  • - Analyst

  • Okay. Thanks. And secondly then, Tye, you mentioned with the Diavik acquisition, the tax benefits that may come with that. I was wondering if you might be able to elaborate on that and quantify if possible?

  • - President, CEO

  • I'll ask Tom to speak to that. Obviously, that's part of the rational behind the direct interest in the partnership or indirect interest in the mine rather. And Tom, maybe you want to just give an order of magnitude, speaking to our tax loss positions?

  • - CFO

  • Yes, even before we get into tax losses, we have G&A in Canada that we don't have any revenue to deduct it against. So, we don't -- in our analysis of the Harry Winston transaction, and using the price curve we use, which was a very conservative one. From a Kinross' perspective, we began to generate taxable income after the underground expansion is completed, in a couple of years. And we simply applied that to our G&A burn rate. So, we figured on a relatively conservative basis, that it would have an NPV value in the $20 million to $25 million range.

  • - Analyst

  • Okay. Great. Thank you very much.

  • - CFO

  • And of course, if the income of Harry Winston exceeds that, we can offset further G&A and use the tax losses.

  • - Analyst

  • Okay. Thank you very much.

  • Operator

  • Your next question comes from Haytham Hodaly of Salman Partners.

  • - Analyst

  • Thanks, operator. l'll just follow up with one of the previous questions on the $190 per ounce sold. That would be based on a consolidated basis, correct, not on an attributable basis?

  • - CFO

  • Yes, that's correct.

  • - Analyst

  • Okay. And then the guidance of 2.4 to 2.5 is also on a consolidated, correct?

  • - CFO

  • No, that's on a net basis, that's Kinross attributable share.

  • - Analyst

  • So, that's attributable? Fair enough. Maybe another question. Just on the 12 to 12.5 million ounces of silver that you're expecting for this year, I'm assuming most of that's La Coipa and Kupol. Could you just break down what you're expecting for each of those, roughly?

  • - President, CEO

  • It's -- I don't have the number right to hand, Haytham, but by far most of it is from Kupol. Only -- now, that we're out of [Peren] at La Coipa, there's not much silver there. I would guess there would only be a couple million ounces. Let us get back to you with the precise number.

  • - Analyst

  • Sure. That would be great. Next question, maybe just some housekeeping. Under other liabilities, you have $600.7 million on the balance sheet, just curious, how much of that is derivatives, how much of that is asset retirement and how much of that is other category? A question for Tom there.

  • - CFO

  • Give me one second here.

  • - Analyst

  • You bet.

  • - CFO

  • The break down is reclamation $240 million, derivatives is $172 million, and other long-term liabilities of about $190 million. And that includes various tax contingencies. For instance, the tax contingency we announced the fourth quarter of last year.

  • - Analyst

  • Okay. Maybe just one last question then. A number of options warrants, just looking at your new shares outstanding, must have been exercised to reflect the new number of shares at the end of March. After you account for the shares issued for the financing and the Lobo-Marte acquisitions, I think I get just over 5 million. That would assume that some of the warrants then were exercised. Do you have, can you give us a guidance on which ones were exercised, roughly?

  • - CFO

  • Sure. We started the quarter with 660 million shares. We had the Lobo-Marte acquisition, which was 5.6 million. We did the equity offering, which was 24 million. And some options and so on, maybe another 1.5 million. And then, we had the IFC warrant conversion of 3.8 million shares. So, that gets us to roughly 695 million shares at the end of the quarter.

  • - Analyst

  • Okay. That's perfect. Thank you.

  • - President, CEO

  • Haytham, it's Tye Burt. Listen, I've got to correct what I said earlier. It's roughly split between La Coipa and Kupol, as we've got La Coipa production back up a bit in our budget and outlook. It's about 50% and 50% silver from La Coipa and Kupol. The total is about 12 million, maybe a little less than that.

  • - Analyst

  • Excellent. Thank you.

  • Operator

  • The next question comes from David Stein of Cormark Securities.

  • - Analyst

  • Thanks. Good afternoon, guys. The first question is on Maricunga. I was wondering if you could just maybe give some more details about the expansion and whether, how much -- are you looking at increasing the production, in terms of the tonnage, more than doubling it, so that you can take on lower grade? Or is it just a simple doubling it, same-grade equals double the ounces?

  • - President, CEO

  • David, it's Tye. Listen, we have not finished our study work there yet but as we currently contemplate it, it would effectively be a more efficient mirror image of the current three stage crush that we have at Kupol. So effectively, more of the same ore at roughly the same grade, maybe a little below a gram. And a new heap leach the to handle that ore. So, when we say double, we say a similar size, call it 40,000 ton plant and same throughput, same recoveries, same ore, just more of it. But we should be -- by the time we finish our feasibility work, we'll have some numbers to put with that in terms of capital costs. That's of course what we're studying now.

  • - Analyst

  • Okay. Great. And then --?

  • - President, CEO

  • Sorry, and just for the record, as we look at Lobo-Marte, it's effectively more of the same, only significantly higher grade. So this is -- when we look at the ore we see in the Maricunga district and our particular expertise we're building up, that's why we get pretty excited about the experienced leverage that we get moving one operation to the next. So at Lobo-Marte, it would be a bigger version of the same kind of program.

  • - Analyst

  • Okay. Great. And then, staying in that part of the world, can you give any details on this new La Coipa agreement, if you did find something and wanted to mine it, what would be the split of the economics?

  • - COO

  • I can't remember the details of the agreement but obviously, it would be advantageous to both sides. There's got to be an advantage to us putting it through our mill and displacing other ore. But I don't have the details.

  • - President, CEO

  • Let us get back the you on that, David. This is a drill stage project that we share jointly with our partner there. And we now have an agreement to move ahead with the drilling program but let us get back to you with more details on the agreement.

  • - Analyst

  • Okay. Great. And then last question, I noticed in your -- in a recent presentation that you've got, you're looking at high pressure grinding for Cerro Casale. And based on the scoping study or the pre-feasibility study and what you said earlier on the call, it sounds like it needs a little help, a little bit of optimization to get it over the hump. Can you elaborate on that or any other things that you are doing there to improve the economics?

  • - President, CEO

  • Just a quick and I'm going to let Tim jump in here. One of the purposes of a pre-feas study is to identify opportunities to optimize in the feasibility study. High pressure grinding rules of course are one, fairly new technology but require more steel up front. So that up front is more capital but don't require a lot of steel fed to them through a like ball or SAG mill over the life of the mine. So that -- the balancing act and the implication for steel costs is one. Another optimization opportunity would be trucking concentrate versus pipeline concentrate and pipeline route, if we go the pipeline directions. So looking at ways to optimize that.

  • And then of course, there's the whole sequencing question, which we're examining and the like. So, the final thing I'd say about the difference between that pre-feas study and the final feasibility, is the pre-feas brought mid '05 capital estimates done by Bema and Arizona Star, and at the time Placer, forward to mid '08. So we used mid '08, which would have been a peak for capital spending costs. And then of course, at the time, we were publishing the study, we had to use relatively current copper and gold prices, which are below where they are today. So, triangulating and getting the appropriate intersection of those variables, we think, is going to really make a difference to the returns from the project. Tim, do you want to add anything to it?

  • - COO

  • No. Clearly, high pressure grinding rolls have certain advantages in terms of steel costs and power costs. And that's the advantage thats being evaluated in the feasibility study.

  • - Analyst

  • Okay. Great. That's what I thought about the '08 costs. So, that's great. Okay. Thanks a lot.

  • Operator

  • The next question comes from Victor Flores of HSBC.

  • - Analyst

  • Thanks. Thanks. Good afternoon. I have a couple of questions with respect to operations and then one on Fruta del Norte. Do you expect the lower grades at both Crixas and Fort Knox to continue into the second quarter or later in the year? Or is this a situation where, at both operations, you hit a bit of a wobble with the grades in the first quarter?

  • - COO

  • Fort Knox, no. We're back into expected mine -- not expected but sort of more normal grades. We're back into the main part of the orebody and we -- it's going to continue like that for the rest of the year. So, April was right on target. At Crixas, also it's picking up. It's not going be as good as it has been past. Obviously, as we are mining different parts of the orebody but it's -- that was the reason for expansion, was to get more tons through to keep the production level.

  • - Analyst

  • Okay. Great. Thank you. And then just with respect to Fruta del Norte, have there been any indication as to when the regulations will actually be out? Or are you planning on drilling maybe on the basis of some dispensation that the Ministry has provided to get back to work, even though the regulations aren't finalized? And then secondly, at what point do you think you'll begin the actual negotiation with the government regarding the fiscal regime?

  • - President, CEO

  • Yes, just Victor, to address the first point, we have received written confirmation that we are facilitated going back to work. As we said earlier, we have filed the environmental documents that are required to get the permits. And notwithstanding the deregulations, which are still being drafted, the government and both Ministries are working closely with us to move forward with the drilling permits. So, I would consider that to be the sign of a willing and responsible group of bureaucrats working to move this thing forward. We expect -- without being able to pin a date because of course the process isn't -- is fluid right now. We expect to be back to work there in the next 30 to 60 days, drilling. We have two drills mobilized on site, ready to go to work. We have a 12,000 meter program planned and that's for infill. And then, we've got a couple of pretty interesting targets around site that we want to work on.

  • Our whole program for the year, we'd expect to spend about $10 million on exploration, maybe $25 million on development costs, generally and wages. And another $5 million or $10 million in CapEx and G&A. So overall, on the track we're on, we would expect to spend $40 million or $45 million there this year. We are receiving lots of support from the government and are quite enthusiastic.

  • As to the final fiscal regime, we don't know yet. Obviously, the numbers that were in the mining legislation were what we said in the last quarter, what we expected, but the exploitation development agreement, which must follow, has not been commenced yet. Negotiations on that have not started. I think that will be a six to 12 month process from here. And again, it will depend a bit on what the regulations say as they proceed. So, we don't have, obviously, a detail on what that's going to look like. That's to follow.

  • I will say this though, President Correa re-elected two weeks ago with a strong majority. A good relationship developing between Canada and Ecuador, as evidence by the meetings between Correa and Prime Minister Harper a couple of weeks ago at the Latin American conference. Lots of expressions of confidence and desire to move forward with the Canadian relationship, as well as with Canadian mining companies in Ecuador. So, we're feeling very positive on the environment and the cooperation we're getting.

  • - Analyst

  • Excellent. Thank you very much.

  • Operator

  • The next question comes from David Haughton of BMO.

  • - Analyst

  • Yes. Thank you. Tye, you ran through a few numbers there on FDN, which I presume ties back to the comment earlier that we could expect some $35 million to $40 million expensed in relation to FDN and Lobo. Is that correct?

  • - President, CEO

  • I would say the numbers that I quoted were with respect to Ecuador as a whole. Obviously, related to FDN. And the Lobo numbers are going to be about $10 million in aggregate, in that part of Chile. About $3 million of the $10 at Lobo-Marte will be in drilling. The balance in technical, feasibility, support, G&A.

  • - Analyst

  • And at what point would you start capitalizing some of these expenses?

  • - CFO

  • We begin capitalizing when we have 2P reserves. So, I just did want to emphasize the point that I made earlier, which is that we have put out numbers for FDN, $45 million. But probably about $30 million of that will run through our income statement, the remainer is in our exploration budget. And probably about $8 million of expense this year on Lobo-Marte will run through our income statement in our other operating costs line.

  • - Analyst

  • Okay. Thank you. At Maricunga, you had a comment in your MD&A having a look at refractory ore. And I just want to get an understanding as to what that means going forward?

  • - COO

  • That's within mine plan, the orebody is upside, zoning down into mixed ore, zoning down into more [sofitic] ore and obviously, the more sofitic, the more refractory it becomes. Our studies and the actual proof of the pudding, is that the recoveries we're getting are what we expect to get, depending on where we're at in the orebody. And once they drop below a certain level, then it's not ore anymore.

  • - Analyst

  • Okay. Does that have an implication for a potential sulfide orebody sitting below what you're stripping now?

  • - COO

  • No, there certainly indications that the orebody extends down in depth but it doesn't suggest that we're going find a huge new orebody. It's what we've got and we know that there's potential to expand it.

  • - Analyst

  • Okay. At Kettle River, the throughput was quite like in comparison to what we would have thought name plate capacity was. When can we expect to see the production getting back up or throughput getting back up?

  • - COO

  • It's the River should ramp up through the course of the year as ore becomes available from the underground. And we are right on schedule year-to-date. The plan has always been that we would run about 1,000 tons a day, on average, through that plant, which is what we feel is the capacity of the Buckhorn Mine to produce on a daily basis.

  • - President, CEO

  • But it's constrained by the mine not the plant. The mine has, clearly, excess capacity.

  • - Analyst

  • Okay. And circling back to Paracatu. With the potential of the third ball mill, is that simply to maintain throughput at current levels as the ore gets harder or is there potential for increased throughput?

  • - COO

  • The potential is that the name plate capacity of the belts and everything is about just over 40 million tons a year. And how do we maintain the milling capacity to match the rest of the capacity? And so, that's obviously, one of the possibilities as we understand this mill is the -- what is the actual total capacity of the plant? And as we're getting operating experience, we're beginning to see some reasonable numbers in terms of throughput per hour, that we can accommodate. So it would be -- the original intention was to maintain capacity. There is -- we have to evaluate the capacity to put more tons through.

  • - President, CEO

  • And to be clear ,that 40 million is the new plant, in addition to the 17 million, 18 million-tons of annual capacity ore plant.

  • - COO

  • Right.

  • - President, CEO

  • So it would be a potential incremental step up, from the perspective of move some of the late years of a 33 year mine life and move it forward.

  • - Analyst

  • Okay. And now, going back to Fort Knox, you made a comment that the heap leach is looking ready to be stacked third quarter by year end. What kind of stacking rate per annum are we looking at here?

  • - President, CEO

  • David, would you just repeat that, what kind of what rate?

  • - Analyst

  • What kind of stacking rate would you anticipate once you get up to full production.

  • - President, CEO

  • I think it's --.

  • - COO

  • Can we get back to you? I have to confirm that number. I can take a educated guess but I can't remember for sure.

  • - Analyst

  • Okay. I've got a guess.

  • - COO

  • And this is in the feasibility study, which is --.

  • - President, CEO

  • It should be public in the feasibility study but we'll get back to you with the detail.

  • - Analyst

  • All right. I just wanted to see if you'd any change of mind from feasibility compared to the mining and --?

  • - President, CEO

  • No, not yet.

  • - Analyst

  • Okay. All right. Thank you very much.

  • Operator

  • The next question comes from Mark Liinamaa of Morgan Stanley.

  • - Analyst

  • Hello. With -- regarding acquisition interests, given the strength of your longer term projects, is it fair to say that anything that was on your radar screen would be closer or nearer production in the gold area, kind of to fill in maybe the flat spot, post the existing projects you're working on? Thanks.

  • - President, CEO

  • Mark, if we understand the question, it's; Are these projects long -- are our current suite projects longer term? And I would say, that is the case for the big projects. So Lobo-Marte, FDN, Casala, would be in the 12, 13, 14 range. In my comments, we're looking at ways to get at some of the earlier high grade surface material at Lobo-Marte. We think we could do that as early as '11, 5 million to 10 million-tons of high grade oxide sitting there at the surface, which could be trucked to the La Coipa mill. And that's grading 2.2, 2.3-grams. So based on our recovery experience and the existing mill there, we think that could be very attractive and get that, what you called the flat spot, quite nicely.

  • And then, I mentioned the incremental step ups at Paracatu and Maricunga. So, we think there is a potential to drive lots of growth from our existing projects, which would kick in at the front end of the bigger project pipeline. With respect to acquisition opportunity, look, from our perspective, it isn't about filling in a particular smoothing point. It's about value and creating the right economic incentive and accretion for investors. So, if we can find the right deal, whether it's near term, long term or medium term, we would pull the trigger, assuming there's value creation there. So, it's in our portfolio, like all mining portfolios of depleting assets and you can't time it as perfectly as you'd like, of course. If we what we do over the next few years, build up a pile of free cash flow, I'm not going to be too alarmed by that because we've got a lot of CapEx to fund over the next five years.

  • - Analyst

  • That's great. If you did use your shelf capacity, that you're going through the process of putting in place, can you comment on --?

  • - President, CEO

  • Yes, just the shelf --.

  • - Analyst

  • The way, just quickly, debt or equity preference or how you might think about that?

  • - President, CEO

  • Yes, look. We filed $1 billion shelf, that is just we think the sign of being a mature potential issuer. It's there to accommodate what our financing needs are in the future. And whether it's debt or equity will depend on the deal, of the need or the timing. Today, we have a balance sheet that's heavy in cash. And in this kind of environment, with the kind of CapEx that we're looking at, I'm quite happy with where that sits. So, we don't have plans to issue currently.

  • As we look at ways of funding our future CapEx, we wanted to have the advantage of the speediness, which an SEC shelf facilitates in terms of access to debt or equity markets. So, I don't want to predict how it will go. I can say that -- the financial side of me says, we don't want to have a lazy balance sheet. So, we're looking at ways of deploying our current cash flow and our current cash on these capital programs most efficiently. And if we need to access, for a particular deal, then of course, we'd cross that bridge when we came to it. So I wouldn't take the shelf filing as a signal. I'd take it as a sign of maturity in terms of our our disclosure and our filings and our desire to have access to as many different markets when and if we need it.

  • - Analyst

  • That's great. Thanks and good luck with everything.

  • Operator

  • Our next question comes from Anita Soni of Credit Suisse.

  • - Analyst

  • Just most of my questions have been answered but I just have a question with respect to your tax rate. Did you guys provide guidance for this year in terms of what your effective tax rate would be?

  • - CFO

  • Yes. We provided some information at the beginning of the year.

  • - Analyst

  • It was 30%, right.

  • - CFO

  • When we forecast 28% to 32%.

  • - Analyst

  • Yes, and it came in a little bit lower this quarter?

  • - CFO

  • We did come in a little bit lower in the first quarter. But I wouldn't -- it's somewhat a function of gold price. As the gold price is higher, some of our permit differences get diluted. But at this stage, I think that's still a pretty good range to use.

  • - Analyst

  • And then, on your oil price sensitivity I missed the last one. Was it $2 you said per ounce or $10?

  • - CFO

  • Yes, the oil sensitivity is $2 per ounce per $10 move in the oil price.

  • - Analyst

  • And the base was?

  • - President, CEO

  • Sorry. What was the question, Anita?

  • - Analyst

  • Sorry, the base that you used for oil price assumption for the current forecast, what was that?

  • - CFO

  • $75.

  • - Analyst

  • $75.

  • - CFO

  • And we've moved down from there. We had a little bit of a benefit in the first quarter. We had a little bit of a benefit on currency as well. And the third sensitivity we give is the impact of gold royalties as a result of changes in gold price. Of course, during the first quarter, the gold price was up compared to our starting point of $750 per ounce. So that was a combination of those things resulted in no big impact on costs the first quarter.

  • - Analyst

  • Okay. And then, just in terms of the -- could you give us what the silver price was for the quarter?

  • - CFO

  • I'm sorry, I --.

  • - President, CEO

  • Realized gold price?

  • - Analyst

  • Realized silver price.

  • - President, CEO

  • Silver price?

  • - Analyst

  • Yes.

  • - CFO

  • Yes, I can. This might take me a minute.

  • - Analyst

  • And I have one further question.

  • - CFO

  • Sure, why don't you ask that?

  • - Analyst

  • On the construction of, did you call it the Bandarinas Dam at Paracatu? Did you say that it was permitted, both from a construction standpoint and an environmental standpoint or just one or the other?

  • - President, CEO

  • I didn't hear the question was, Bandarinas area for future tailings and permitting at what stage?

  • - COO

  • It's we have the EIA and we have to get the, what's called LI, which is the insulation license.

  • - President, CEO

  • So, environmental permit in place, construction permit to follow.

  • - Analyst

  • Okay.

  • - President, CEO

  • The land acquisition mainly done.

  • - Analyst

  • So it's essentially the same --?

  • - President, CEO

  • I'm sorry.

  • - Analyst

  • It's essentially at the same permitting stage as the other area that you were looking at for the tailings facility?

  • - COO

  • It's a little bit behind but it's not affected by the other issues.

  • - President, CEO

  • But let's be clear, our alternate plan here, of course, which we can commence immediately, is adding a further lift to the current dam.

  • - Analyst

  • And how much capacity was that at?

  • - President, CEO

  • I beg your pardon?

  • - COO

  • That will add another -- that will add a year's capacity depending on how much of a lift we put on it.

  • - Analyst

  • One year's capacity.

  • - COO

  • Which would bring us -- give us time to get the Bandarinas finalized and moving.

  • - President, CEO

  • So just to be clear, as we said earlier, we do not expect these issues to interfere with production plans and the expansion for the future.

  • - Analyst

  • Great. And then, just one housekeeping thing. On Paracatu, the ramp up rate that you're going to, in tons per annum right now, is what, 58 million?

  • - COO

  • I still can't hear you. Can you say that again.

  • - Analyst

  • Sorry. Must be something wrong with my phone. You're ramping up to 58 million tons per annum, at this point, at Paracatu?

  • - President, CEO

  • Yes.

  • - Analyst

  • Okay.

  • - COO

  • That's both plants combined.

  • - Analyst

  • Yes.

  • - President, CEO

  • Okay, Tom.

  • - CFO

  • Anita, the realized silver price was $12.62.

  • - Analyst

  • Okay. Thank you very much.

  • Operator

  • The next question comes from Greg Barnes of TD Newcrest.

  • - Analyst

  • Thank you. I think this has gone long enough. All of my questions have been answered. Thanks, Tye.

  • Operator

  • And the final question comes from David Christie of Scotia Capital.

  • - Analyst

  • Like Greg, almost all of my questions have been asked. I'll just ask, 2010 production, do you have any guidance you can take a stab at there?

  • - President, CEO

  • No ,David, as you could probably guess, our habit is not to give production out there at this point for the year ahead. But look, we think we're going to -- that will be our first full year for the Paracatu expansion. And it will be our first full year for the Fort Knox expansion. And the first fully ramped up year for Buckhorn. So, I think you can draw the line from here to there without us having to give the guidance.

  • - Analyst

  • Yes, we can do the math. And just on Paracatu and Buckhorn, so it should be a gradual ramp up of both those things through, is that the sort of the plan or is --?

  • - President, CEO

  • Well, I think we've said is that we should be hitting 100% for Paracatu by the end of Q2. And we also --.

  • - Analyst

  • So that's at the 12,000 tons and getting up to the 80% recovery kind of thing?

  • - President, CEO

  • From a 12,000 tons -- sorry from a -- on a daily basis, we're talking an annualized of 40 million --.

  • - Analyst

  • Yes, okay.

  • - President, CEO

  • From the new plant and 17 million from the old plant. And then at Buckhorn, we should be as planned. So, none of our guidance is any different today than it was in January. So, we're on track for the full year.

  • - Analyst

  • Perfect. Thanks, guys.

  • Operator

  • There are now no further questions. I'll turn the call back over to Tye Burt for any closing comments.

  • - President, CEO

  • Yes, just a concluding comment. We're quite plowed with the growth in production, cash flow and our results for the quarter. We're looking forward to significant additional value as we build this next wave of growth projects. So, thanks for your attention today, folks and your support over the quarter. Thank you.