Kinross Gold Corporation (KGC) 2008 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

  • Hello. This is the chorus call conference operator. Welcome to Kinross Gold Corp. fourth quarter and year end results 2008 conference call and webcast. As a reminder, all participates are in listen-only mode and the conference is being recorded. After the presentation, there will be an opportunity to ask questions. (Operator Instructions). At this time, I would like to turn the conference over to Mr. Erwyn Naidoo, Vice President Investor Relations. Please go ahead.

  • - VP, IR

  • Thank you, and good afternoon, ladies and gentlemen. Welcome to the Kinross Gold Corp. conference call to discuss full year and fourth quarter 2008 financial results. With us today we have Tye Burt, President and CEO; Tom Boehler, our CFO; and Tim Baker our Chief Operating Officer. I will remind you that the news release from earlier is available on the Kinross website, it's also been filed with SEDAR. Please note that certain statements may contain forward-looking information and that actual results could differ from the conclusions or projections in the forward-looking information. In addition we caution you certain material factors or assumptions may be applied in the conclusions or projections. Information about risk factors and assumptions are contained in our immediate release dated today and forthcoming management discussion and analysis for the same period as well as other regulatory filings in Canada and the United States. Now, I will turn over the call to Tye Burt, our President and CEO.

  • - CEO, President

  • Thanks, Erwyn. And thanks folks for joining us today. 2008 was a landmark year for Kinross, despite the tumultuous financial markets and global uncertainty and commodities. In 2008, our Company started up three new projects that are growing gold production while reducing our cost of sales and as a result, Kinross margins and cash flow grew substantially. At the same time our current operations provided solid performance and delivered on plan. In addition we have set the stage for the future by acquiring and advancing the next round of projects for Kinross future.

  • In 2008 we had first gold bars at (inaudible), the Paracatu expansion, and Kettle River Buckhorn following an ambitious capital program that began in 2006. Q4 production increased slightly over Q3 to 550,221 gold equivalent ounces while our cost of sales fell to $375 an ounce from $406 in Q3 as both Kupol, and Buckhorn reached full production.

  • On a by-product basis, cost of sales also fell in Q4 to $340 per gold ounce on gold production of 492,745-ounces as the Company's silver production was increased by contributions from Kupol. Q4 2008 cash flow per share before changes in working capital increased 240% from the fourth quarter of '07 to $0.34 a share despite an average realized gold price which dropped $2 compared to that period. Full-year 2008 cash flow before changes in working capital increased 80% over 2007 to $1.01 per share or $634.6 million. Full-year production rose to a Kinross record of 1.838 million gold equivalent ounces an increase of 16% from 2007 and in line with our guidance. Full year cost of sales was $421 per ounce below our Company guidance range.

  • Delivery on the expansion program had a significant effect on our operating results as the year progressed. From the first quarter '08 to the fourth quarter, production increased by 66% while while cost of sales fell by 21%. Margins increased by 33% to $436 per ounce for '08 while the average realized price increased only 23%, demonstrating Kinross's continued and significant leverage to he gold price. This margin increase was driven by the successful start up of Kupol and Kettle River Buckhorn. While there will be more opportunities to deliver better margins as the Paracatu expansion enters full production in Q2 the ramp up has been slower than planned as we resolved the start up issues typical for commissioning a complex 40 million-ton per year plant that will be operating until 2041.

  • The delay in ramp up to full production however does not impact the production in cost guidance that we gave earlier this year for the full Company. As previously announced the Company is taking a goodwill write down of $994.1 million or $1.51 per share in the fourth quarter. With that goodwill write down, full year loss was a $807.2 million or $1.28 per share. After adjusting for this and other items full year earnings would be $248.8 million or $0.40 a share. Including the goodwill write down fourth quarter reported loss was $968.8 million or $1.47 per share, and a gain after adjustments for the goodwill write down and other items quarterly earnings would be $56.8 million or $0.09 a share.

  • On January 21, 2009, we strengthened our balance sheet by executing an offering of common shares at US $17.25 a share. 24 million shares or 3.6% of shares outstanding were issued for aggregate proceeds of $415 million. Given the current global economic uncertainty we believe it was prudent to capitalize on that financing window, the issue replaced the cash used in the recent acquisition of the Lobo Marte deposits, and improved our balance sheet while reducing net debt. In summary, from an operating and financial perspective 2008 was indeed a landmark year at the Company. 2008 was in deed a land mark year at the company.

  • In the year, we also took key strategic steps to advance the next round of portfolio additions. We added to our pipeline of future projects by acquiring the Lobo Marte deposits in Chile and the Fruta del Norte deposit in Ecuador. Both of these projects play to Kinross strengths. Lobo Marte will benefit from our current operational abilities and experience in the Maricunga district of Chile, Fruta del Norte will benefit from our experienced designing, permitting and building new mines with a focus on responsible and sustainable mining practices. Progress has already been made to both projects since their acquisition.

  • At Lobo Marte we have assembled a project team and they have begun technical and prefeasibility work. This project adds 5.4 million-ounces of M&I gold resources and a further 0.5 million-ounces of inferred gold resource at grades that are more than double the grades that we are currently mining at nearby Maricunga. We plan to complete $3 million of infill drilling this year and complete a project prefeasibility study by years end. We already have road access to the site, access to water and the Marte ore body is exposed at surface which minimizes prestripping. On the current timetable we have targeted a contribution to the Company in late 2012. We will provide more detail on the project as we complete the next round of technical work. We are starting with excellent baseline technical data to begin that work and this will allow us to advance Lobo Marte quickly.

  • The Fruta del Norte deposit in Ecuador that we acquired in 2008 adds 13.7 million-ounces of gold and 22.4 million-ounces of silver to Kinross inferred resources. Of course the graded FDN at 7.23-grams per ton gold and 11.8 grams per ton silver makes this an attractive asset. As has been announced the new Ecuadorian mining law has now been passed. The provision of the new legislation are in line with our expectations when we agreed to acquired to deposit. We have now announced permitting discussions to complete an 8,000-meter infill drilling program using two drills that are currently onsite. If all goes according to plan we will be in a position to spend $45 million in Ecuador this year which includes a program that will upgrade mineral resources and support a prefeasibility study. Meanwhile, metallurgical test work that commenced in April of '08 is continuing.

  • At Cerro Casale a renewed prefeasibility study has been completed which updates prior assumptions and has identified a number of opportunities for enhanced economics. These assumptions and further technical work will be contained in a full feasibility study currently in progress with targeted completion in the third quarter of 2009. The two parties at Casale have agreed on all of the principle terms of the shareholders agreement governing the Cerro Casale joint venture. The agreement now reflects Kinross and Barrick Gold each owning a 50% interest in Cerro Casale. The agreement is expected to be executed by the Company and Barrick following a reorganization of the Cerro Casale corporate ownership structure.

  • The updated prefeasibility study at Casale led to a reduction of 833,000-ounces of proven and probable gold reserves based on reengineering and optimization decisions. The study will be released shortly of course, but will be superceded by full feasibility study later this year. We expect to make further decisions about Cerro Casale likely in Q3 of 2009.

  • Turning to reserves briefly overall in 2008 with the additions of new projects and through drilling and engineering existing mines we had a 1.95 million-ounces of proven and probable reserve, replacing 2008's depletion from production. After additions, depletions and divestitures Kinross' proven and probable reserves stand at 45.6 million-ounces of gold. We are also active adding resource ounces through exploration (inaudible) to build up our pipeline of gold mining projects. M&I ounces increased by 72% from 2007 to 19.1 million ounces of gold when we include the full acquisition of Lobo Marte which closed in January. Inferred resources increased threefold from 2007 to 21.3 million-ounces of gold largely through the addition of Fruta del Norte and Lobo Marte.

  • In closing, our successes in 2008 have Kinross entering '09 with eight operational mines driving our financial results with two expansion projects at current mines Paracatu and Fort Knox both of which will be fully operational this year, and we will advance several opportunities for further organic expansions at places like Paracatu and Maricunga We also have three high quality advanced stage projects in Lobo Marte, Fruta del Norte and Cerro Casale all of which are proceeding to feasibility. In 2009, looking forward as the Paracatu expansion reaches full production and Kupol and Buckhorn have their first full year of operations we expect production to increase a further 32% over '08 levels to 2.4 million to 2.5 million ounces at cash costs of $3.90 to $4.20 per ounce as previously announced. Having just completed building our latest projects, our construction teams are now focused on developing and building the next generation l mines for Kinross. Now I will turn the call over to Tom to discuss financial results and to Tim to talk about operating results before closing remarks.

  • - CFO

  • Thanks, Tye. This was a particularly telling quarter because there was only a $2 change in the realized gold price per ounce compared to the fourth quarter of 2007. So with no material effect on our results from changing gold prices, quarter-over-quarter, the impact of our growth strategy clearly comes through the numbers. During the fourth quarter, we sold approximately 611,000 gold equivalent ounces at an average price of $794 per ounce. This generated revenue of $484.4 million which was 72% higher than the fourth quarter of 2007. This was driven by an increase of 71% in the number of ounces sold quarter-over-quarter.

  • Fourth quarter cost of sales per ounce was $375. This was 11% lower than the fourth quarter of the prior year and 8% lower than the third quarter of 2008. The combination of a 71% increase in ounces sold and 11% decrease in cost of sales per ounce, drove our cost of sales margin to more than double quarter-over-quarter from $132 million in 2007 to $268 million in 2008 all as the realized price of gold remained constant.

  • Full-year attributable gold equivalent production was 1,838,000-ounces in line with our guidance while full year cost of sales was $421 per ounce better than our previous guidance. Adjusted fourth quarter earnings excluding certain items would have been $56.8 million or $0.09 a share compared to $40.9 million or $0.07 a share in the fourth quarter of 2007.

  • During the fourth quarter, an increase in depreciation, depletion and amortization expense had a significant impact on our net earnings. DD&A increased from $29.1 million or $0.05 a share in the fourth quarter of 2007 to $109.6 million or $0.17 share in the fourth quarter of 2008. This increase was largely related to Kupol which has relatively high DD&A per ounce and which may not have fully provided for in all earnings estimates. In the fourth quarter of 2007, DD&A averaged $82 per ounce sold compared to $180 per ounce sold in the fourth quarter of 2008. We would expect the 2009 depreciation for all of Kinross to be more in line with this past quarter as our new mines have come online with a higher asset cost base.

  • Fourth quarter cash flow before changes in working capital more than tripled to $222.4 million or $0.34 a share from $60.9 million or $0.10 a share in a corresponding period of 2007. As Tye mentioned earlier we wrote down $994.1 million of goodwill associated with the 2007 acquisition of Bema Gold. This is the first time that the Bema assets were tested for impairment. Our goodwill impairment accounting methodology was adopted in 2005 and last time we made an acquisition for which we recorded goodwill application of this methodology also resulted in the substantial impairment charge. Along with the goodwill charge, fourth quarter earnings include a charge of $63.9 million relating to past and respective prior years and I will explain that further in a moment. The $23.6 million investment impairment charge and an adjustment to our asset retirement obligation of $5.6 million. Fourth quarter also includes gains of $40.7 million related to foreign exchange, $17.2 million to derivatives and $3.7 million on asset sales.

  • Reported 2008 full-year earnings were a loss of $807.2 million or $1.28 per share. Adjusting for the fourth quarter items I mentioned together with the items disclosed in prior quarters, full-year 2008 earnings would have been $248.8 million or $0.40 a share. Full-year 2008 cash flow before changes in working capital was $634.6 million or $1.01 a share compared to $313.5 million or $0.56 a share for 2007. Full-year 2008 income and mining tax expense was $101.1 million on a loss before tax of $654.3 million. Adjusted for goodwill impairment our full year effective tax rate would have been 30%. We expect our full year effective tax rate for 2009 to be in the range of 28 to 32%. Also, as I mentioned earlier we recorded a $63.9 million charge related to 2003 and 2004 as a result of the tax assessment we received from Brazilian tax authorities. The assessment resulted from the denial of deductions taken for interest expense in years prior to our acquisition of 100% of Paracatu.

  • Capital expenditures for the year were 5% below our guidance at $714.7 million. This compared to $601.1 million for 2007. $15 million of the CapEx budgeted but not spent in '08 will be rolled forward to 2009. Liquidity at the Company has significantly increased with our recent financing. Our cash and short term investments balance at December 31, stood at $525.1 million. When we add the net proceeds from our recent equity offering and subtract the cash payment made in January to tech related to Lobo Marte our pro forma cash position would stand at approximately $880 million. On a similar basis, pro forma net debt would be approximately $68 million.

  • In 2009, we expect to make approximately $165 million of debt repayments, $149 million of which relates to Paracatu and Kupol financings. We have reduced our exposure to currency and oil prices by hedging approximately half of our currency and oil exposure. And with that I will turn the call over to our Chief Operating Officer, Tim Baker for a review of the operations and details about exploration.

  • - COO

  • Thanks, Tom. Let me first take you through our operating assets and then give you an update on the Paracatu and Fort Knox expansions.

  • The new Kupol mine in Russia, fourth quarter production increased 3% from the third quarter to 211,925 gold equivalent ounces, for Kinross' 75% share. On 100% basis, the mine processed 286,000-tons of ore at a grade of 28.13 grams of gold and 328-grams of silver. Gold recoveries remain steady at 95%. Also sales for the quarter was $211 per ounce. Kupol continues to meet all of our expectations. For 2009 the mine continues to produce according to plan. The (inaudible) is now in operation, one week ahead of plan and we are well advance of meeting our tracking schedule this year.

  • In Alaska at the Fort Knox mine, production compared to Q3 was down 24% at 77,133-ounces. This decrease was caused by low grades and lower throughputs due to factory oil. As a result, cost of sales were $492 per ounce in the quarter. We expect production rates in 2009 to continue at the same pace. Until the heap leach starts kicking in late 2009.

  • At (inaudible) mountain in Nevada our share of production was 54,489-ounces. This was due to planned lower grades and cyclically lower heap leach timed recovery. Primary (inaudible - highly accented language) for the reusable passes move in November and December, which also had some impact on recovery. That started up again in January as planned. Cost of sales was $530 per ounce which affects the increasing production cost of (inaudible) Mountain as grades and tons of oil continued to decline.

  • The new Kettle River Buckhorn mine in Washington state also began production in the fourth quarter. This low impact underground mine process 77,000-tons at 12.29-grams per ton. For the recovery of 88%, the mine produced 27,036 of gold at a cost of sales out $344 per ounce. Development continues on plan and we are pleased with the ramp up.

  • At Maricunga in Chile, the mine processed 3.92 million-tons at a grade of 0.82. Production for the quarter was 51,389-ounces which is slightly less than Q3 due to pad solution flow interruptions that have now been resolved. Cost of sales declined to $30 million and were slightly higher than the prior quarter on a per ounce basis at $594 per ounce. At the (inaudible) Chile production rose to 56,145 gold equivalent ounces, while cost of sales fell in the prior quarter to $536 per ounce. Due to higher grade oil coming from the (inaudible). In Brazil, (inaudible) production at 49,941 ounces at $478 per ounce. Recoveries reflect the lower coverage from the start up in the expansion plant. We continue to maintain about 81% recovery from the oil plant.

  • In our development project, the Paracatu expansion reached 60% mill throughput by the end of the year. The ramp up continues with throughput presently limited by (inaudible) grades that will be changed out mid Q1. We are pleased with the progress in the pit and are working hard on working through inevitable trials that occur when somebody (inaudible) a mill of this complexity and capacity. At the Fort Knox expansion in Alaska, construction is expected to resume in the spring with the start up of leaching operations scheduled for the third quarter of this year.

  • So in summary, the focus of 2009 will be completing the Paracatu and Fort Knox expansions and advancing Lobo Marte, Fruta del Norte and Cerro Casale. In addition, we are also focusing on further organic growth. We are currently evaluating opportunities to increase throughput and extend mine life at our current operations. With that, I will now turn the call over to Tye for his concluding remarks.

  • - CEO, President

  • Thank, Tim. To summarize, 2008 was a strong year for Kinross. We delivered on the expectations we set out achieve building new mines, improving production and more importantly increasing margins per ounce and cash flow per share while positioning the Company for the future by adding new products.

  • We lowered operating cost through the year, generated higher margins and strengthened the balance sheet. This places the Company in a very strong position to handle the volatility and economic uncertainty that began in 2008. We look forward to building upon these successes. As usual and as you can see in the webcast we have outlined key objectives for the year so that our progress can be measured against them. So far we have completed the Aurelian integration, closed the Lobo Marte acquisition, locked in a large component of input costs, raised new equity and replaced the gold reserves depleted from last year's mining. We will continue to keep working on this check list as the year proceeds. We remain on track to increase production further for '09 as we stated in our guidance we expect to produce 2.4 million to 2.5 million gold equivalent ounces at a cost of sales of $390 to $420 per ounce.

  • I'd like to say finally, that I am extremely proud of the efforts of all our employees who delivered excellent results in 2008s challenges operating environment. Thanks folks. I would now like to take questions.

  • Operator

  • (Operator Instructions). The first question is from John Bridges of JPMorgan.

  • - Analyst

  • Good evening, Tye, everybody. You put out a press release on the new Ecuadorian tax deal. I don't know if I have not been very attentively but is there any more detail related to that? The guidance was pretty broad.

  • - CEO, President

  • John, there is not. There is the usual discussion about tax and royalties that I think we outlined there, but they did not specify a number on the windfall profits tax other than to say that the number and the gold price and so on that relate to that windfall profit tax will be agreed and negotiated in the exploitation agreement that would be particular to each individual company. So wait and see on that part.

  • - Analyst

  • Okay. That makes me feel better. I was afraid I was missing something there. Cerro Casale, with the copper price where it is, is it really feasible at these metal prices?

  • - CEO, President

  • We used, in calculating our reserves we used a $7.25 gold price and $2 copper price. Obviously that's bosser today's spot copper price and I would say that the, based on the prefeasibility work that we have done with Barrick and the current technical view that it does have on those numbers positive economics but the key is to focus on the full feasibility study which we will be doing later -- or releasing later this year. We are still working on some of the technical side and concluding some processing options we think will optimize the economics better, and of course we are looking at ways that we can lock in some of these commodity prices. So, I would say wait for Q3 would be the best bet before we decide on the economics.

  • - Analyst

  • Okay. Thanks, Tye. I will get out of the line.

  • - CEO, President

  • Thank you. Thanks, John.

  • Operator

  • The next question is from David Haughton of BMO Capital Markets.

  • - Analyst

  • Hi, Tye. Very strong results coming out of Kupol. The production rate that we've got there was above, appeared to be above design. Is that sustainable?

  • - CEO, President

  • Tim?

  • - COO

  • No, it is going to -- we are getting slightly over the 3,000-tons a day through the mill. But obviously, the output from the mine is critical. We don't see that that is going to change much. The recoveries are slightly better than the design and the grade is more or less now settling in to where we expect it to be. So I don't see that it is going to continue.

  • - Analyst

  • What is the split of open pit versus underground?

  • - COO

  • I will have to get back to you on that one.

  • - Analyst

  • Okay. And still thinking about Russia relationship starting with [Poly], it's still early days, if this works favorably, the relationship, can you see you working with them on other projects such as Natoka?

  • - CEO, President

  • Early to say, David. Really what this look see, and I am picking my words carefully because it is a look see, we will spend the next six months, expending some technical work and doing some metallurgical looking at the project. If it makes sense in six months, we'd then enter a feasibility period of 18 months with them to see if we can jointly then agree on how the project will be developed, what the capital will be. We anticipate it will be a 51% Poly, 49%, Kinross project and we basically have two years to make a decision whether to go, no go.

  • So I can't that the project economics are well known to us now, they're not, that's why we are going to take this two year look at it and yes, I mean they're the largest gold producer in Russia today. It's a relationship that we consider to be a good one. Would we look at further projects? I am very happy with the waiting in our portfolio today, looking down the road two or three years as we get increased production in South America, North America, would we look at other additions there over the longer term? Sure we would but they got to make sense, they have to be economic and they have to make sense in the context of our overall portfolio.

  • - Analyst

  • Okay. You've had the write down of the assays, mainly around the Bema acquisition. Can you envisage going forward a write back of those assets?

  • - CEO, President

  • I wish the methodology worked that way but I will have Tom speak to that one.

  • - CFO

  • Not under the current accounting standards.

  • - Analyst

  • Okay. What about the exposure of a write down in Ecuador? Is that a potential going ahead on your methodology?

  • - CFO

  • Well, Aurelian was accounted for as an asset acquisition as opposed to a business combination. So, same thing with Lobo Marte, same thing with Crown Resources, when we acquire a single asset companies, there's no goodwill associated with the acquisition.

  • - Analyst

  • All right. So no write offs for FDN. I heard the discussion about the potential ramp up to 60% of capacity for Paracatu by year end. Can you just walk us through what you would expect quarter by quarter or half by half, whatever you feel comfortable with as far as how we might be looking at this ramp up?

  • - CEO, President

  • Tim, you want to tackle that one? I would say first half versus second half?

  • - COO

  • Yes, we'll hit, we reckon full capacity at, in Q2, and we'll be at full capacity for the rest of the year. So, they go from 60 to full, I hope by May that we're getting pretty close to full capacity.

  • - CFO

  • Now it probably won't be linear, David. So I am not sure we can say with precision until we actually are there. So if you assume 100% for the second half and 60%, call it what did you say, Tim, mid Q2, you are probably going to be in the right zone based on what we are seeing today.

  • - CEO, President

  • I'll tell you what is happening is we're a little bit of a step function, we get everything sorted out and it will jump up. That's the way it's going.

  • - CFO

  • Just to re-emphasize on that though. We gave individual country by country guidance and then we aggregate the guidance up. We aren't -- we are standing by the guidance we gave previously knowing what we know about that project and our other projects today.

  • - Analyst

  • All right. Thank you very much.

  • - CEO, President

  • Thanks, David.

  • Operator

  • The next question is from Anita Soni of Credit Suisse. Please go ahead.

  • - Analyst

  • Hi. Good evening, gentlemen. My question is with regards to the reconciliation of the non, of the other items in terms of write downs in Q4. I am just trying to reconcile page 3 to page 12 and I'm just wondering what the difference is between all of the items you have listed and the summation there at 6.5 million-ounces?

  • - CEO, President

  • Sure. Tom will tackle that. So you are talking about page 12 of the press release and page 3 of the press release.

  • - Analyst

  • Yes, it doesn't, the two paragraphs don't seem to add up to the same number.

  • - CFO

  • Well, yes. The items flow into different lines on the income statement. So, why don't I just tell you what they were and where they flow.

  • - Analyst

  • Okay.

  • - CFO

  • First is foreign exchange, and that of course is on the, in the table on page 12 that you are looking at. $3.7 million. Second is the gain on hedges, which is, which flows into that same line. So, there are a couple of lines there that relate to hedges and those will net your 7 million to 17.2 million. Third is the gain on sale of assets and you should find that number in your release. Yes, 3.7 on page 12. Then comes the Brazilian tax assessment. That's in three parts.

  • - Analyst

  • Okay.

  • - CFO

  • So there's one piece in other operating costs, $5.9 million. There's one piece in interest expense because there's an interest component. That's $37.3 million. And the third piece is in the tax provision which is $20.7 million that totals to $63.9 million. So that one is a little tricky to track through and we will be happy to go through it with you after the call if you would like?

  • - Analyst

  • I think so.

  • - CFO

  • And then there is the ARO adjustment which is in the accretion line of the income statement. And then we have got the impairments which are separately, separate.

  • - Analyst

  • Accounted.

  • - CFO

  • So that is how you got there and as I said we would be happy to.

  • - Analyst

  • I would appreciate a little more run through on the Brazilian taxing. That's the one that is confusing me there.

  • - CEO, President

  • Thanks, Anita. It is a tricky one to work through.

  • - Analyst

  • Just one more question on Paracatu. I know you have given a country by country break down but would you care to give a break down just in terms of a ballpark estimation on gold equivalent ounces for Paracatu this year?

  • - CEO, President

  • I think you can find that in the technical life of mine study so roughly a full year would be 550,000-ounces but on a guidance basis we don't do mine by mine.

  • - Analyst

  • 550 is for the full year though? It's at full capacity?

  • - CEO, President

  • That's life of mine.

  • - Analyst

  • Okay. All right. Thanks very much.

  • - CEO, President

  • Thank you.

  • Operator

  • The next question is from (inaudible). Please go ahead.

  • - Analyst

  • It is actually [Steven Kitney]. Gentlemen, I was just wondering if you could help us a bit. I apologize if this information is somewhere in the press release, but could you break out for us, for the quarter, the number of actual gold ounces and silver ounces that were produced as well as for the total for the year?

  • - CEO, President

  • Sure.

  • - CFO

  • Sure.

  • - CEO, President

  • So, we will do it in terms of ounces sold. So, total ounces sold for the quarter was 611,000 gold equivalent ounces. The actual gold ounces were 559,475. And the difference is silver. So, roughly 52,000-ounces of silver, of gold equivalent in silver.

  • - Analyst

  • Okay. That's using Kupol at 100%.

  • - CEO, President

  • That's 100% of Kupol, exactly.

  • - Analyst

  • Okay.

  • - CEO, President

  • For the full year, total sold is 1,889,000-ounces? And the gold component of that is 1,691,000-ounces. And the difference is the silver component.

  • - Analyst

  • Okay.

  • - CFO

  • A gain 100%.

  • - Analyst

  • Okay.

  • - CEO, President

  • So ranging between 8 and 10%. Of silver in those different numbers.

  • - Analyst

  • Okay. Thank you very much.

  • - CEO, President

  • Thanks, Steven.

  • Operator

  • (Operator Instructions). Our next question is from Mark Liinamaa of Morgan Stanley. Please go ahead.

  • - Analyst

  • Good evening, guys.

  • - CEO, President

  • Hi.

  • - Analyst

  • I know it is early day, but would you be able to put some brackets around how large your Lobo operation could be?

  • - CEO, President

  • Well, it is early days. So the short answer is no, but we can tell you that historically, this project had grades of 1.7. So 1.7-grams, you could imagine on a high altitude heap leach like this one, if the Maricunga is the guide, low 60% recoveries. We haven't finished the technical work that would give us a crushing size and throughput number yet. But you could again use Maricunga as a bit of a guide on that. I would say that is, the best on that would be to use Maricunga as a bit of a surrogate, double the grade, hold the recoveries and we'll give you more detail as we finish the feasibility work later this year.

  • - Analyst

  • Great. Thanks. Just from an industry perspective, with people's expectations for gold going up, are you seeing any change in how the industry is look at growth opportunities or are we still seeing the same limitations there?

  • - CEO, President

  • Growth opportunity is a great question. How do we look at gold, what I would say is the steady drum beat of acquisitions one might expect hasn't been as rapid as maybe some commentators were expecting. We have certainly seen an increase in the gold price: so so that would tend to encourage people to step up. But I think it is important to retain discipline on these things and it will depend on what valuation price and what valuation metrics one uses. In our case it is accretion to cash flow per share. Accretion to NPV. And we continue to see opportunities out there that fit that but the valuation differential which was so marked just a few months ago is gradually starting to change as some of the juniors and even some of the seniors raise money and start to fix their balance sheets on the one hand. On the other hand, permitting regimes are difficult and construction costs are still fairly high. So we have not seen a dramatic upsurge in new projects or companies that are are rapidly advancing them. So our outlook for gold on the supply side, that is from new projects is very positive given that we see production continuing to fall and supply of new projects continuing to be constrained. We contrast that to the suite of projects that we have in house that we are busy working on. We are in a little different situation than perhaps some other industry participants are.

  • - Analyst

  • Great. Thanks and good luck with everything.

  • - CEO, President

  • Thanks, Mark.

  • Operator

  • The next question is from (inaudible) of Silver Arrow Capital.

  • - Analyst

  • I would like to know something more about your production profile going forward. You, we looked at 1 million in 2008, 2.4 million, 2.5 million in '09. What are you forecasting for 2010 and 2011?

  • - CEO, President

  • We don't give guidance beyond the current year is the short answer. We have just started up these three projects and we won't give that guidance until we finish our budget process end of 2009 but it is reasonably safe to say starting up we don't see big declines from the new projects. And I would suggest perhaps looking at , there's some very smart folks publishing on our outlook. So I would suggest that secondary sources might be the best place to go for that?

  • - Analyst

  • Okay. And when I saw you last time you were mentioning also your focus on margin rather than volume. The cash costs have come down by 11% in the fourth quarter to 375. You forecasting 394.20 for 2009. Shouldn't those cash costs be lower considering the increase in volumes?

  • - CEO, President

  • That's a good question. The, we are being a bit conservative with that forward guidance, it has a series of assumptions that are spelled out in our January press release in terms of what those assumptions are. So, you for example with the higher gold price will have higher royalties, for example with the difference in oil price, that's going to have an impact and Paracatu with a slightly slower start up than expected will have some higher, some higher costs until it hits the full production level. So it will all reconcile, Q4 is not a bad guide to '09 with the adjustments that I just outlined.

  • - Analyst

  • Okay. Then you have moved into what is it, in Ecuador. Could Venezuela be on the horizon, say for example with (inaudible) because you also have I think somewhere a joint venture or something with (inaudible), no?

  • - CEO, President

  • We do have a recently announced, I would call it potential joint venture. That contemplates a deposit in the (inaudible) which is central Siberia. We haven't had any discussions with them about Venezuela, and candidly, Venezuela today is not on our priority list given our view of some of the political events there. So Venezuela from our perspective is not on our current list, no.

  • - Analyst

  • All right. Thank you.

  • - CEO, President

  • Thanks.

  • Operator

  • The next question is from Steve Butler of Canaccord Adams. Please go ahead.

  • - Analyst

  • Good morning, guys -- or afternoon. Where are we time wise. Steve Butler here from Canaccord, Tye, Tom, Tim. Ground Mountain looks to be a nice reserve addition there year over year. Were you successful in, because of the higher gold price in converting some ounces at Ground Mountain.

  • - COO

  • Yes, some basically what the change was?

  • - Analyst

  • Okay. Was it the particular, was it the gold, what was the area? It skips my memory? Gold Hill.

  • - COO

  • I don't think it was Gold Hill. It was in the main pit.

  • - Analyst

  • Okay. And then, on the other hand, Maricunga was fairly steady. It looks like reserves I guess at a minimum just barely replaced and the grade was maintained constant. Was there a resistance to lower cut off grade at Maricunga and what is the cut off grade at Maricunga?

  • - COO

  • The cut off grade varies according to the, our factory.

  • - Analyst

  • Okay.

  • - COO

  • It is a, I mean it is an economic decision based on the costs and the recovery obviously.

  • - Analyst

  • Okay.

  • - COO

  • But it will, it will, it is algorithm that we developed for it.

  • - CEO, President

  • But just to spell it out on Maricunga. This is a, there are much larger or much, lots of potential at Maricunga, it's got a fair bit of exploration, money being spent there this year, Steve. So there are large ore bodies on our property around the, around the current pits. So stay tuned for further developments there. It is one of the areas we are looking at for organic growth within the Company looking forward.

  • - Analyst

  • Okay. And then lastly, in terms of Kupol, obviously the focus last year or so or two or more has been on the construction efforts and not so much on exploration, stepping out and looking at reserve additions. What's the plan this year for looking at reserve increases at Kupol?

  • - CEO, President

  • We're going to be looking at about 12,000 meters of drilling there this year mainly focused on the North Pit the North extension and the main, the Central 650, 650 zone. So that will be about $0.25 million maybe a little more looking to replace resources and obviously reserves. We do have a couple of other conceptual targets in parallel with the current trend but we don't have a lot to say about those yet. On the Kupol West, project, joint venture, which we share with the B2 and the local government we will be looking to drill there maybe not too much, maybe 1700-meters over the course of the season to get a better handle on the area geology but we are just working out that program right now with B2.

  • - Analyst

  • Okay. Thanks, Tye.

  • - CEO, President

  • Thanks.

  • Operator

  • The next question is from John Tumazos of Very Independent Research. Please go ahead.

  • - Analyst

  • Good evening. Could you talk a little bit about the work to be done at Fruta del Norte? Aurelian did their drilling mostly in the second and third quarters of '06 and then stopped because of the country. And they found a great deal of gold in the short time. Could you just talk about how open it is and how much of the work this year will be infill drilling versus step out drilling versus regional exploration versus feasibility study? And congratulations on buying it.

  • - CEO, President

  • Thanks. Listen, just too give you, we haven't broken down all of that yet, but our overall spending program there for the year total assuming everything goes as planned on the permitting side would be order of magnitude $45 million. Of that about $25 million is going to be spread out across drilling, and supporting the prefeasibility work, the balance would be with respect to country, overhead and staffing in the country, within the, within the $25 million, rough estimate of a budget would be $10 million of actual infield drilling to convert those, inferred assets to M&I and ultimately to reserve. There has been a lot of drilling done on the site as you rightly point out, John. And technically we see the need to close that spacing so we can move this stuff into M&I and then we need to add the technical work which is going on in a parallel track as I explained to move it into the reserve category. Assuming we get the go ahead on the permitting which discussions as I mentioned earlier have started already, we get the go ahead on a reasonable basis we think it is about a three or four month drilling program to actually execute the infill program. We have two drills that we own on site currently on standby pending the permitting proceeding.

  • - Analyst

  • How much work might be done this year on step out and regional opportunities assuming all the politics are right?

  • - CEO, President

  • We don't have a lot of work planned on the step out side. To us we want to keep the main thing the main thing here which is moving ahead with permitting, drilling this up, moving the ounces in and getting the technical work wrapped around it. As we get that ball rolling with momentum, the team will dedicate in more time I would say 2010 time to looking at further expansion opportunities. We want to keep the main drive on getting FDN up to reserves and rolling forward on feasibility.

  • - Analyst

  • Thank you.

  • - CEO, President

  • Thanks.

  • Operator

  • The next question is from Heather Douglas of Thomas Weisel Partners.

  • - Analyst

  • Hi. Good evening I just had a couple of quick follow-up questions. First you mentioned that you have completed the prefeasibility for Cerro Casale and it is still in the works. But can you give us broadly what CapEx range we should be looking at because it has been quite a while since we've had an update?

  • - COO

  • Yes, well I just, I would say that one shouldn't get too focused on these prefeasibility numbers and the technical work that goes with that will be put out in in 45 days. We will have to finalize and publish that. My first suggestion would be focus on the feasibility work which will be released later this year in Q3. And if you want to have a look at the prefease scoping study so-called, that will be out in 45 days. Order of magnitude on the CapEx is going to be 3.5 billion, 3.6 billion for 100% of the project but again that is subject to change and to modification as we move to full feasibility and narrow in on the technical opportunities we see to optimize, to optimize the project.

  • - Analyst

  • Okay. Watch for that study. I did have a question about the Paracatu recovery as they were only 64% this quarter. When will we expect the new plant to get the targeted I think it is 79 or 80?

  • - COO

  • It is ramping up, the recovery now is getting up there obviously December was impacted by sounding out and putting out the cracks and building up inventory in various parts. So as the throughput goes up we also expect to see the recoveries going up. Certainly by the beginning of Q2 we should start seeing those numbers coming out then.

  • - CEO, President

  • The old plant which a is 20 million-tons order of magnitude is running a little above 80% in terms of its recoveries and it has not waivered on that. So, the new plant once it gets up running fully that would be the target.

  • - Analyst

  • Okay. So it is just the ramp up issues caused the recovery not to come through right away?

  • - COO

  • Yes, that's right.

  • - Analyst

  • Okay. And then last, a quick question, you mentioned about looking at organic opportunities at both Maricunga and Paracatu, just on another order of magnitude question, is this looking at 10 or 20% increases in production at these two operations?

  • - COO

  • That's a good question. We haven't got the work fully scoped yet, but just to give you an idea. We are one running in the new part of the mill at Paracatu, one sag mill and two ball mills. There is capacity you can see it in the milling structure on site for an additional ball mill to be put there. So that is order of magnitude. A 10% scale in addition to the current up scale but we are not focused on that, repeat not until we have got the current expansion fully up and running.

  • At Maricunga, as I mentioned earlier to Steve Butler, there are large ore bodies on our property around that site so the expansion there is potentially more significant relative to current production. Again it is going to be a wait and see until we finish some technical work where we're just starting now to look at where that could go. Early to speculate on that one yet. But certainly more substantial in percentage terms.

  • - Analyst

  • Okay. Good. Thank you.

  • - CEO, President

  • Thanks very much.

  • Operator

  • The next question is from David Christie of Scotia Capital.

  • - Analyst

  • Good afternoon, guys or good evening. Just quickly first on Fruta del Norte, on the negotiations you are having with the government, are these the negotiations to got towards production or are these just to start redrilling?

  • - COO

  • Currently they are to get the permits to start the permitting process which is still to be defined to start the permitting process to get the drilling permits, David. We have not yet got the technical work done that would backstop, let alone any IA that would backstop a discussion about production.

  • - Analyst

  • So at some point you have to sit done and negotiate exactly what the royalty will be and that kind of thing; right.

  • - COO

  • Absolutely. Right. What the royalty will be, what the tax rate is, what the rules of the game are for development, what the participations are for the communities and the like. That's to follow.

  • - Analyst

  • That won't happen until you have the feasibility study at the IA to submit?

  • - COO

  • Well, we might be able to move the discussions in parallel because the, and only being a bit cautious about that because the full regulations which underpin the current legislation have not been set yet. So,.

  • - Analyst

  • Right.

  • - COO

  • We won't know the exact process until those get finished later this year. Meantime, the main focus moving ahead on three tracks, the discussions on permitting, technical work and arming ourself for the met work that will backstop the feasibility.

  • - Analyst

  • One more question on that topic. Has the President stamped his approval on this new law?

  • - COO

  • Yes, he has.

  • - Analyst

  • Okay.

  • - COO

  • And in fact has spoken publicly about the new regime and the new, the new environment in the wake of the now over mandate.

  • - Analyst

  • Okay. Good. The other thing was just maybe a question on reserves. I don't see a sensitivity to your gold price change in the text. Can someone give me a sensitivity to gold price change for your reserves?

  • - COO

  • That's going to have to be a get back, I think, David. We don't have that particular sensitivity. Our gold price did increase slightly in calculating reserve this year to 7.25, but I think it was, I would call it primarily engineering but I don't want to speculate of the 1.9 million-ounces that we added organically. Wouldn't want to speculate how much of that is gold price but we will see if we can run some numbers and get back to you.

  • - Analyst

  • What was the price last year just for?

  • - COO

  • I believe it was 6.50.

  • - Analyst

  • Okay. Thank you.

  • Operator

  • We have a follow up question from Anita Soni of Credit Suisse.

  • - Analyst

  • Just three questions actually. Cerro Casale, I noticed that the copper price in the scoping study I believe was, or at least in the reserves was $2 per ounce. Is that what is going to be used in feasibility study going forward, $2 per pound.

  • - COO

  • $2 per pound. And that we will see what we use in the feasibility study going forward. That is our calculation for reserves. We will probably have to use the same, the same starting point but it depends on what the copper price does for the year because of course by the time we get to the end of the year the average copper price is bound to be, bound to be different. Hard to predict that in advance.

  • - Analyst

  • I thought you would have maybe closed it off earlier. That's why I was just wondering if that's going to -- you will wait until mid year to see what copper prices are going to be.

  • - CEO, President

  • Of course we have to agree with our partners. Both of those things have to, time has to pass, and the price will obviously move from where it is.

  • - Analyst

  • All right. And then just on the hedges, on FX and oil, can you let us know what those hedges involve, like particularly in oil, what price did you hedge it at?

  • - CEO, President

  • Tom will take that one just one second.

  • - CFO

  • Yes. We, the average price of our oil hedges is about $89 per barrel.

  • - Analyst

  • Okay. And that's you said 50% of our exposure that you hedged?

  • - CFO

  • Yes. The hedging, the 50% is made up of those hedges as well as the Kupol oil supply that we buy a year ahead.

  • - Analyst

  • Okay.

  • - CFO

  • So that's all built into our oil price sensitivity we have set out in the release and the guidance.

  • - Analyst

  • Okay. In terms of FX can you give us a quick idea--?

  • - CFO

  • Sure. Chilean peso, the average hedge price for '09 is $528 or 528 pesos per dollar. Canadian dollars, that's 125. The real is at 1844 per US dollar. Kupol is at 25 and that's it.

  • - Analyst

  • Okay. And then finally, on the Paracatu permitting of the tailings facility. At what point, do you really need the permit in hand before you can -- I mean the construction date is coming up quickly in Q2. So, when do you want to see these permits in hand and when do you actually need this facility constructed by?

  • - CEO, President

  • We are going to need the project constructed in the next 18 to 24 months. We are working on the permitting right now, ideally we want to start construction before the rainy season gets too bad. So, we will need this within the next two quarters.

  • - Analyst

  • Okay. All right. Thank you very much.

  • - CEO, President

  • I just want to correct one thing I said earlier in response to a question. And that was what was our 2007 gold price used in calculating our reserves, it was 5.50 and the resource was calculated at 6.25. That answer to an earlier question. We have got time for I think one more, two more question, operator.

  • Operator

  • We have a follow-up question from Steve Butler of Canaccord Adams. Please go ahead.

  • - Analyst

  • Yes, guys. Tom a question for you the total debt attributable to Kupol? I know that you've fully consolidated. So total debt attributable to Kupol please?

  • - CFO

  • $420 million.

  • - Analyst

  • 420, okay. Thank you very much. That's it.

  • - CEO, President

  • Thanks, Steve.

  • - CFO

  • Sorry, Steve.

  • - Analyst

  • Yes.

  • - CEO, President

  • We actually made a principle payment in December. So as of the end of the year, it would have been 380.

  • - Analyst

  • 380. Thank you very much.

  • Operator

  • There are no more questions at this time. I will turn the call back over to Mr. Burt.

  • - CEO, President

  • Thank you. In 2008 Kinross delivered on expectations we sat out to achieve, we built new mines, we increased productions and very importantly we increased our margins per ounce and significantly our cash flow per share. Even as we position the Company for the future by adding these new projects that we discussed, we lowered operating costs, generated higher margins and strengthened the balance sheet all in direct contrast to many other parts of the mining industry. This all places the Company in an extremely strong position to handle the volatility and economic uncertainty that began in '08 and we look forward to building further on those successes in '09. Thanks very much for your attention tonight, folks.

  • Operator

  • Ladies and gentlemen, this concludes today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.