Operator
Welcome to the Kinross Gold Corporation's conference call for the first quarter of 2008. I would like to remind everyone that this conference call is being recorded and an archived recording will be available today on Kinross's website. Please check www.kinross.com for further details.
I'll now turn the call over to Mr. Erwyn Naidoo, Vice President, Investor Relations, please go ahead.
- VP IR
Thank you and good morning, ladies and gentlemen. I would like to welcome you to Kinross Gold Corporation's conference call to discuss the financial results of first quarter of 2008. With us today we have Tye Burt, the President and CEO,Tom Boehlert, CFO, and Tim Baker, our COO. Also remind you that the news release from last night is available on the Kinross website and has been filed with SEDAR. I caution those listening that certain statements may contain forward-looking information and that actual results could differ materially from the conclusions or projections in that forward-looking information. In addition, we caution you that certain material factors or assumptions may be implied in our conclusions or projections.
Additional information about risk factors and assumptions are contained in our media release dated May 6, 2008, and forthcoming management discussion analysis of the same period, as well as other regulatory filings in Canada and the United States. Also like to remind you that Kinross will have its annual general and special meeting of shareholders today taking place in Toronto at the Design Exchange on Bay Street. Those who wishing to listen in can join us by webcast by the Zinger website at www.kinross.com. Now I'll turn the call over to Tye Burt, President and CEO.
- President & CEO
Morning, folks, and thanks for joining us today. I'll give you a quick rundown of Q1 highlights, while Tom and Tim will give a review of financial and operational results. First an update on our three construction projects. We are pleased to announce that the Kupol development project in Chukotka the Russian Federation has begun operations this week as planned. Mining continues to ramp up and the mill is churning as of today. Project construction began in late December, 2005 and we expect to see the first gold and silver production this month with the mine reaching its full 3,000 tons a day capacity later this year. Paracatu expansion remains on schedule to begin commissioning in July this year with component testing proceeding as we speak. At our Kettle River - Buckhorn project in Washington State, production continues and we completed a settlement recently that dismisses all the remaining permitting appeals for the project.
This mine continues to be on schedule to start commissioning as well, starting up in October of this year. Finally Fort Knox we've revised our scheduled production from Heap Leach project forward to the middle of 2009 from the end of that year and moving a portion of the CapEx into 2008. Summary, excellent progress on all three of our new mines and our construction project at Fort Knox. Tim will give you a few more details on that shortly. Turning now to Q1 of '08, first quarter production for Kinross was entirely from our existing suite of mines, the three projects don't begin contributing until Q2, Q3, Q4. Production in Q1 was 331,784 ounces, slightly below forecast and sales were 356,864 gold equivalent ounces at a cost of sales of $455. We realized an average gold price of $929 per ounce, $4 above spot, and metal sales for the quarter were $330 million up 34% from the same period last year.
These cost of sale numbers that I mentioned are before a onetime $6.1 million purchase adjustment relating to the acquisition of the remaining 50% of La Coipa in Chile. That took place in December, '07. The impact of that adjustment increases our reported first quarter cost of sales by $17 to $472 per gold equivalent ounce. This is an accounting adjustment that only applies to first quarter results and will not continue into the other quarters. I mentioned production was slightly behind budget due to delays and changes in the originally planned mine sequencing, which resulted in mining or processing rather lower than planned grades at some of the operations. Each of Fort Knox, La Coipa, Round Mountain, and Maricunga had a particular issue to manage. At La Coipa it was a minor pit slide that required using stockpiles that were slightly lower grade.
At Fort Knox we had to bring some lower grade harder ore forward, which combined with rising power costs underlines why the Heap Leach project is so important to us up there. Round Mountain had problems with the primary crusher, which required substitution of lower grade stockpiles and Maricunga, while hit its production targets, had additional contractor expense for repairs. The crusher compounded with higher peso. But these are short-term challenges that are not expected to continue into subsequent quarters and we anticipate the operations will catch up during the year. As a result our '08 production guidance remains unchanged. Cost of sales in Q1 were higher due to industrywide cost pressure such as higher royalties from the gold price, energy prices and unfavorable movements FX.
For the full year our average cost of sales is now expected to be in the range of $385 to $395 and we provide this slightly higher to reflect actual first quarter results and higher than initially expected costs, which we expect during the remainder of the year. Tom will talk more about the assumptions and the way we've calculated that guidance in his section. Turning to financial results, net income for the quarter was $70.9 million, which translates to $0.12 a share. As we discussed last year, shares issued to acquire Bema in 2008 were mildly dilutive to our per share metrics til the Kupol project begins contributing, which it will going forward. Our cash position at March 31st was $889.5 million, putting Kinross in an excellent position to fund the CapEx we expect to incur during the remainder of 2008 from the combination of cash flows and existing cash balances.
Summarized results in the first quarter revenues were up largely due to the gold price. Operations were slightly below budget. Costs escalated, but production guidance remains the same. New projects are coming on in time with the first one starting today. But as we progress through the year we'll be announcing start-ups and gold pours at each of Kupol, the Paracatu expansion and Kettle River - Buckhorn. We'll also be building the Fort Knox [Apiddleback] and Heap Leach. Heap Leach in advancing the Casale deposit in Chile, while drilling our exploration targets and hoping to grow, expecting to grow reserves and resources. 2009 will be the first full year at Kupol Paracatu and Kettle River - Buckhorn. We also expect to see some additional production for Fort Knox, meaning that our '09 production again remains intact at 2.5 million to 2.6 million gold equivalent ounces for the year.
While the gold mining industry has seen successively higher gold prices over the last decade, permitting and construction challenges, operational difficulties, and cost pressures have caused global mine production to decline with no signs of this trend abating in the near future. With mine supply declining and industrywide cost pressures increasing, we continue to see Kinross, with its suite of development projects near completion, moving directly against these industry trends. Key message has been delivering disciplined growth and we're committed to doing just that. Let me turn the call over now to Tom Boehlert and Tim Baker to provide some financial and operating results, then I'll make a few closing remarks and open the call for questions. Tom.
- CFO
Thanks very much, Tye. 2008 first quarter net earnings were $70.9 million or $0.12 a share compared to $68.5 million or $0.16 a share reported in the first quarter of last year. These earnings include a $11.9 million gain or $0.02 a share relating to the sale of our Kubaka mine, which we built and successfully operated in Russia for 10 years. During the quarter Kinross sold 357,000 gold equivalent ounces at an average price of $929 per ounce. This generated revenue of $330.2 million, which is an increase of 34% over the prior year's quarter. Quarterly sales were higher than production due to the sale of inventory produced in the fourth quarter of last year and sold in the first quarter this year. The increase in revenue quarter-over-quarter is a result of a 43% increase in the average price of gold realized and 6% fewer ounces sold.
Cost of sales per ounce was $455 in the first quarter, before a $6.1 million incremental inventory charge related to acquisition purchase accounting at La Coipa. Cost of sales per ounce was $472 including the charge, so the $17 impact. We sold all the remaining marked up inventory from La Coipa in the first quarter. After this adjustment, our cost of sales per ounce was about $50 higher than had previously been forecast. Approximately $20 of that $50 increase relates to changes in currency, exchange rates, oil prices, and higher royalty payments resulting from higher gold prices. And that variance is consistent with the sensitivity information that we disclosed at the beginning of the year. The remaining $30 of the $50 variance relates primarily to various mine operating factors and higher consumable costs, which Tim will get into further. We expect that our average cost of sales per ounce will be between $385 and $395 for the full year of 2008.
This range is $20 higher than the previous forecast. Approximately $13 of that $20 increase is due to incorporation of first-quarter actual results, including the fair value inventory impact, as well as actual foreign exchange royalty and oil prices in the first quarter. And the remaining $7 of the $20 increase relates to higher operating costs, primarily at Maricunga as a result of lower grades, and increased maintenance-related costs, and higher expected costs at La Coipa related to the repair of the pit fall failure that occurred in the first quarter. I'd like to just take a minute to review the way we've laid out our cost of sales guidance for the year. In order to provide transparency into our costs, we've broken our guidance down into two parts. The first part relates to what we expect our costs to be assuming certain base foreign exchange rates, oil, and gold prices.
We provided those base rates and price levels at the beginning of the year and we've reiterated those -- those base rates and prices in our news release. The second part of our guidance is sensitivity information that we provided relating to foreign exchange rates and gold and oil prices, which give an indication of what the impact on our costs might be. Actual foreign exchange rates and gold and oil prices vary from those base levels as we set them out. Our hope is that this two-part guidance will allow people to estimate our costs using their own foreign exchange and gold and oil price assumptions, which may differ from those base rates that we set out. In the outlook section of our release, we give an example of how this might work. And the example uses an assumption of $850 gold for the remainder of the year and $115 per barrel of oil.
We've said in our sensitivities that for each $10 change in the price of oil, our cost of sales per ounce would be impacted by about $4. And the base oil price we used, our guidance, was $80 per barrel. We've also said in our sensitivities that for each $100 change in the gold price our royalties will change and have an impact of about $6 per ounce over the course of the year. So, as I said, the base assumption we used on the oil price of $80 and we've said our previously base gold price was $700. In our example in our release, we increased the oil price from the base price of $80 to $115 per barrel and we increased the gold price from $700 to $850 an ounce,and run those changes through those sensitivities, it would give--it would result in an increase in our cost of sales for the remainder of the year of $19 an ounce.
So if one thought that the gold price is going to be $850 and the oil price $115, then one might adjust our guidance by $19 an ounce for the full year. So this is how we've come at the issue of how these external prices and indices impact our costs and hope it provides greater transparency into our cost breakdown. So moving on, exploration and business development expense were $11.9 million in the quarter, versus $7.9 million in the prior year's quarter. Of the $11.9 million $8.6 million related to our exploration activity. General and administrative expense was $23.2 million during the quarter, compared to $14.7 million during the first quarter of 2007. The year-over-year increase is primarily related to higher personnel costs. This is a result of an overall increase in labor costs, the addition of about 22 head office employees over the course of the year, and an increase in performance-based compensation.
Income and mining tax expense for the quarter was $24.9 million on earnings before tax of $101.7 million, an effective tax rate of 24.5%. This compares to $19.2 million on earnings before tax of $88.2 million during the first quarter of last year. We expect our full year effective tax rate to be in the range of 28% to 32% and that approximately 90% of our tax provision will represent taxes payable. Kinross recognized net foreign exchange losses of $17.4 million from translation of our foreign currency denominated assets and liabilities, primarily deferred tax liabilities and translation of our Canadian dollar cash balances. We also recognized $22.4 million of derivatives gain. The combination of these two items and the fair value inventory charge mentioned earlier contributed less than $1 million to our net income for the quarter. First quarter cash flow from operating activities was $76.3 million compared to $90.2 million for the corresponding period in 2007.
Working capital changes increased our cash flow in the first quarter of last year by 8.--by $5.8 million, but decreased our cash flow by $22.8 million in the first quarter of this year. So, if you adjust for the working capital impact, cash flow from operations would have actually increased quarter-over-quarter by $14.7 million. Capital expenditures were $190.5 million in the quarter compared to $69.7 million over the same period in 2007. The bulk of the CapEx, of course, related to our Paracatu, Kupol, Fort Knox and Buckhorn projects. We've increased our expected capital expenditures for 2008 to approximately $752 million from $685 million. This increase relates to several investment initiatives, including moving $35 million in an capital forward from 2009 to accelerate the completion of the Fort Knox project, provision of $12 million for Cerro Casale feasibility work, the advanced purchase of mobile equipment at Paracatu, $10 million, and $10 million to purchase a fuel transport fleet at Kupol as opposed to subcontracting for the service as we had previously planned.
I just want to be clear that the overall 2008, 2009 Fort Knox project budget remains unchanged at $175 million, we just moved some of the CapEx forward from '09 to '08. As we complete the Kupol and Paracatu projects, we will provide final capital amounts related to each. In the case of Kupol, we continue to track budget fairly well. In the's case of Paracatu, we expect we may be over the project budget by 5% to 8% depending on final costs to complete and actual foreign exchange rates. As we discussed on our last call we completed our convertible note financing in January, which saw Kinross raise approximately $450 million by selling senior unsecured notes which are due in March of 2028 and bear interest at 1.75%. The notes have an initial conversion price of $28.48, which was a 40% premium to our closing stock price at the time of issue.
And as Tom mentioned earlier, in the first quarter we paid a $0.04 dividend per share on our common stock. It is our intention to pay dividend on a semi-annual basis going forward. At the end of the quarter Kinross' cash and short-term investment balance stood at $889.5 million compared to $561.2 million at the beginning of the quarter. And we had approximately 30% of our Brazilian real and 60% of our Russian ruble exposure hedged for the balance of the year. Now I'll turn the call over to our Chief Operating Officer, Tim Baker, for a review of the operations and details about exploration.
- COO
Thanks, Tom. First I'll discuss our development projects, the key drivers for our growth. At Kupol up to three years of construction in very challenging remote arctic conditions, we're proud to report that our team has commenced commissioning a plant. Project is on schedule and budget. Open pit and underground development continues. Roughly 430,000 tons of ore grading nearly 17 grams per ton, stockpiled at surface ready to feed the mill. Based on the current ramp up schedule, we expect to mill an average of 1500 tons per day in May and reach full production capacity of 1,000 tons per day in October. Our annual general meeting presentation, which will take place at 10:00 a.m. today, contains many recent pictures. Encourage you to have a look at the presentation available on our website. The progress made on the project is very impressive and something our team is rightfully proud of.
Kinross full of share product -- Kinross share of full year production at Kupol expected to be approximately 365,000 to 390,000 gold equivalent ounces at a cost of sales of $235 to $245 per ounce . Paracatu expansion in Brazil was 89% complete at the end of the quarter. Crushing, conveying and stockpiling circuits are all near completion. Commissioning of these circuits is expected to begin this month. All mining equipment is on site. The six trucks and the load are now running. Electric shovel is currently being assembled and be ready in June. Project is on target to begin commissioning in July. Including production from the expansion, full year production at Paracatu is expected to be approximately 305,000 to 335,000 ounces this year, at an expected average cost of sales of $390 to $400 per ounce based on the key assumptions outlined in our release. Tye mentioned earlier, Kettle River - Buckhorn completed a settlement whereby all permitting appeals have been dismissed.
Production is approximately 90% complete. Water treatment plant is operating well and mine development has commenced above the upper and main portals. Progress, initially slow with limited headings is now picking up. As we develop more space we'll bring on a contractor to speed this up further. Workers recommence on the [Horo] construction and this will be ready by September for all haulage. Project is expected to commence gold production in October, issuing approximately 25,000 to 30,000 ounces this year at an average cost of $290 or $300 per ounce. Fort Knox Heap Leach and phase seven expansion has been moved to an accelerated schedule. This results in us advancing $35 million of CapEx originally planned for 2009 to 2008 and will bring production from the Heap Leach forward six months to mid-2009. Turning to first quarter results from our operational mines. Tye mentioned earlier, mine sequencing and other issues resulted in lower production. Our costs were higher than expected.
Let me describe those impacts and the efforts we have undertaken to resolve them in more detail. The Maricunga first core production was over budget by 4,000 ounces. Our cost of sales per ounce were higher than budget. This is due to higher than expected input costs, such as fuel and energy, as well as higher maintenance and contractor costs, launch repairs, compounded by the exchange rate. All workers required to improve the reliability of the plant, which is impacting ongoing costs at Maricunga. Performance of the mine has been affected by the real challenge of finding good contractors. Round Mountain had a slow start to the year with further maintenance issues with the primer crusher for the reusable pad. These issues have now been resolved. Mine time was adjusted to allow the re-mining of final stockpile stacking on the dedicated pad.
We'll catch up with the shortfalls over the remaining months of 2008. La Coipa was negatively impacted by a slide in late January in the La Coipa Norte pit, blocked the ramp to the pit. Access has been restored and mine plans adjusted and we will be close to budget by the end of the year. Fort Knox is another mine that got off to a slow start to the year. Mining from the west wall where the ore is slightly harder, recovery is complicated by the presence of molybdenum. However, that material will be mined out shortly and the pace will pick up through the course of the year. The production is expected to be back on budget by year-end. Paracatu had a very good quarter, being 5% over budget. 43,236 ounces produced. The ore was harder than planned, the throughput was down.
However, recovery was higher than the last time we processed this ore, effect significant improvements in the metallurgical process effective over the last year. Overall, costs were uncharacteristically high during the quarter, due to the confluence of high input prices, foreign exchange, changes in mine sequencing, maintenance issues at Maricunga. Summary, while we are not pleased with the operational results in the first quarter, they are being addressed. Production will be made up during the remaining quarters, costs brought under control. Our 2008 guidance remains unchanged. I'm very pleased with the progress we've made at the projects, where all three remain on track to begin adding to our production for 2008. With that, I'll now turn the call over to Tye for his concluding remarks.
- President & CEO
Thanks, Tim. Q1 2008 gold price was strong. Revenues were up substantially. Our operations had some short-term operational questions, which we've now answered and set us back slightly. Guidance for production for the balance of the year remains on track for production. Big picture, the projects are also all on track and Kupol mill started up on schedule this week. We're looking forward to better costs and growing production for the balance of the year. And I should say today we hope to see you at our annual general meeting at the Design Exchange where formal proceedings will start at about 10:30. Thank you for your attention, we'll take questions now. Operator.
Operator
(OPERATOR INSTRUCTIONS) And your first question comes from Anita Soni, Credit Suisse. Please go ahead.
- Analyst
Hi, good morning, I just had a question with regard to the leverages that you published. I think I went over this with Erwyn last night but I'm not quite sure what the resolution on that is. When I calculate the 115 per barrel and the 850 per ounce the gold used in your example I get to $23 worth of leverage instead of the $19. I am just wondering if that either a -- should be apportioned for the rest of the year or is that the full year run rate for this $6 and $4 you have in (inaudible) four.
- President & CEO
I'll ask Tom to speak to the example.
- CFO
Sure, that is correct. It needs to be apportioned. So sold 356,000 ounces in the first of 357,000 first quarter, out of, say, 1.9, so that's about 81% or 82% of our sales left to go. But if you multiplied your 23 by that factor, you would come to the 19.
- Analyst
Okay. (inaudible)
- CFO
Yes, that's a full year count. That considers the full year with one quarter behind us.
- Analyst
Sure. Okay. And then on La Coipa, you had an issue with the, I guess, it was the Puren pit. How long is that going to take to remediate that and when will you be back to that pit?
- President & CEO
It was the (inaudible) and Tim will speak to that one.
- COO
We've essentially finished mining stage one of Paren. We have got some ore stockpiled yet. But the issue was at the Norte pit and we are back in there mining at the moment.
- Analyst
Okay. You're already--when did that occur, in April or in May?
- COO
Yeah, we got back in early April.
- Analyst
Thank you very much.
- President & CEO
Thank you.
Operator
Your next question comes from David Stein, Cormark Securities, please go ahead.
- Analyst
The one question that I had sort of outside the operational results. There has been, I guess, some concern over this law that Putin passed before he stepped down on strategic industries in Russia which basically covers everything including mining. I was just wondering could you -- all the news reports that I read have been very light on details and I'm just wondering if you can comment on if there are any potential impacts to Kinross?
- President & CEO
Sure, this is the subsoil law which has been in the works for some years now. It has not reached final passage in the Duma but it expected to be soon. Really we weren't surprised. It hasn't changed in substance from what we've seen in draft. It does designate all the strategic minerals, as you might expect, uranium, titanium, and the like, oil and gas, of course. And it does include gold for strategic deposits as requiring majority Russian ownership if there are deposits that are found or developed going forward. Kupol is not one of those deposits grandfathered under the legislation and so our ownership there is 75% with a local partner at 25% is just fine.
And the other factor, of course, is was the deposit discovered using state dollars and developed and the fact is this was -- this deposit was developed by Bema originally and its partner and Kinross going forward and for the last year. So we're feeling very competent. We were not surprised by the final passage of legislation. As I said , it's been coming for a while. And we'll look for new deposits. We continue to be enthusiastic over what is happening in Russia. But if they're going to be large ones, of course one will have to have a partner. So in our strategy looking forward we have several joint venture opportunities and potential there, so if it is a big deposit and you're lucky enough to find and develop a big one, of course we'll require a partner.
- Analyst
So that includes grass roots discoveries that you make going forward, or is it only if the work was done by the prior Russian or U.S.S.R. geological survey?
- President & CEO
All strategic deposits will be required to comply going forward, so grass roots or those found using Russian dollars, the way we understand it today.
- Analyst
Okay. Thank you very much.
- President & CEO
Thank you.
Operator
And your next question comes from Mark Smith, Dundee Securities. Please go ahead.
- Analyst
Yeah, I have two questions, actually, the first one is quite easy. Can you give me an idea of when commercial production would start at Kupol and Buckhorn? And what is the projected commercial production for each of the projects for the year, rather than the production for the year?
- President & CEO
Let us just be clear on the sequence of events here, because commercial production is a bit of a term of art. First, we have start-up, which is where we are today with Kupol. That is the mill turning and of course mining has been going on for quite some time. Second will be full commissioning, which is going to take us a month or two to reach commissioning and then commercial production, legal definition or financial definition will follow that. So Kupol it is a pretty quick ramp-up. We've given pretty specific guidance in the press release as to what we expect for tonnage throughput and production for the year. So that's got our calculations behind in that.
- Analyst
Yeah, sorry, Tye, it is just difficult to, with the up figure number you gave us, it is difficult for us to assess what proportion of that full production is actually allocated to expense costs rather than capitalized costs, which would actually occur when it goes commercial.
- President & CEO
Tom.
- CFO
Yeah, our policy on shifting from capitalizing to expensing occurs very early in the -- in the start-up of the mine, so really as soon as we begin producing any material amount of gold and silver for sale, we will start expensing the costs.
- Analyst
Okay. Fine. That's good. Okay. And then maybe you could just remind me for the base case scenarios for the impact on cost of sales, what were the currency assumptions?
- President & CEO
In the press release, Tom, you want to speak to those, specifically on the peso, real and the ruble?
- CFO
Sure, the real was 1.75 reals per U.S. dollar, the Chilean peso is 530 and the ruble was 25.
- Analyst
All right. Thank you very much.
- President & CEO
Thanks, Mark.
Operator
Your next question comes from Victor Flores, HSBC, please go ahead.
- Analyst
Thanks, good morning. Listen, I realized that mining is a tough business in any given quarter if you have a large portfolio. You can have operating issues as you did during the first quarter, but it strikes me that the mines where you had issues, La Coipa, Round Mountain and to a certain extent Maricunga, are all what you would call more mature operations. I'm just wondering if you're not starting to get to the point where because these assets are more mature, you're going to have more issues. Or is this really just a one-up bad quarter?
- President & CEO
Well, you got to take them individually mine by mine, Victor. Of course, when you align those up as they lined up unfortunately in Q1, it ticked down. As you say, we have a portfolio, so Paracatu had a good quarter and that provided a bit of an offset. Of course, in sort of order of age, Round Mountain is a mature mine and it is not growing production from here, it's only got four or five or six years of mine life left. We're working hard to find other ways to optimize that. But we had a crusher which went down for 26 days in the quarter and set us back. At this gold price there is more low grade around that pit, so we're working hard to find the -- to find some longer-term opportunities there. When you look at Maricunga, it has got a lot of years of mine life left. As you know, there is lots of ore in surround Pancho and the surrounding ore bodies.
So this is one which due to a combination of factors, particularly the hard -- the difficulty we are experiencing finding good maintenance workers and consistently available maintenance workers at that altitude, because we're running 40,000 ton a day throughput mine at above capacity at full blast and of course we hit its tons and ounces this quarter. So now we have to tune it up to get to the costs. So that's just, as you say, comes with operating a mine. La Coipa, as you know, we just took over operatorship there, based on the swap that happened -- that closed in December. So it was our first quarter at the helm. We're transitioning out of Puren and into the Coipa Norte pit and that is a fairly steep pit wall and we regularly have small slides. This didn't sterilize ore, it delayed access to a portion of the pit and it happens. So of course you got to watch mine life, but I wouldn't call these any particular symptom, I would call it an individual occurrences at each mine. And it sometimes lines up in a quarter, it did this one.
- Analyst
Fair enough. I realize this isn't an easy business. And that takes me to my second question which you may also feel is a bit unkind. But -- and I don't mean to not show appreciation for what you're doing at Kupol and with the expansion of Paracatu and solving all the problems at Buckhorn and getting all three projects up and running this year. The question is, what next?
- President & CEO
Well, we don't think that is unkind at all. That is the question the whole industry is facing today. We're looking at 70% growth and production from '07 to '09. We don't think anybody else among the majors has that kind of opportunity today. And the first one started up. So '09 is going to be the first full year. We're looking at over 2.5 million ounces and we're on guidance for that. So what next? Well, we've, as folks know, we mentioned briefly we have the Cerro Casale project 49% that we own and share with Barrick. We're making good headway on the joint venture discussions with Barrick. We have appointed a feasibility manager. We're working hard to process the metallurgical drill results and look at the impact that that has on costs and opportunities to optimize the currently permitted older feasibility studies.
Casale is a big ore body, our share 11 million ounces, 3 billion pounds of copper, and that's -- but realistically that is three to four years out there by the time we finish feasibility and start construction. What next will be a function of what can we find with our pretty aggressive exploration efforts. We are continue to go look for optimization opportunities. I would see those, for example, at Maricunga, where we have long mine life and opportunities to increase throughput as we refine our plan and develop more ore bodies on our property. I would see opportunities to take Paracatu even further. We are not going to get into any detail, yet, but this is a 35-year mine life. We have actually made provision to increase throughput beyond this third expansion. So, that is in our future to be discussed. And we'll start working on those things. But I got to say, for this year, our focus entirely on getting a great suite of projects up and running.
And then after that we have Fort Knox that kicks in. The other expansions that we will look at that I mentioned, Casale beyond that. And, of course, there is always the opportunity where we're seeing a lot of stuff lobbed our way in terms of juniors or development projects that are hung up. And I think as a sector, as you know, some of the junior companies, one mine companies are struggling a bit with their development profile and capital needs. I think there is lots of opportunity internally. Externally, of course, we'll take it one by one and we have, as you might imagine, a very active corporate development initiative right now. We also have a series of apple seed investments. We are very pleased with the progress that our partners at Victoria Resources, for example, are making in Nevada. We have got another one going with Consolidated Puma with a platinum palladium project in western Russia and a few more waiting in the wings to roll out over the next couple of months. So a multiple series of sources for what's next.
- Analyst
Excellent. Thank you.
- President & CEO
Thanks.
Operator
And your next question comes from Steven Butler, Canaccord Adams, please go ahead.
- Analyst
Good morning, guys. Question first for Tom. Tom, did you guys deliver into any hedges? I don't think you did. In the first quarter there is a Maricunga hedge and I assume that is maybe applicable for the rest of the year.
- CFO
That's right. The only metal hedges for the year are the Maricunga hedges that we acquired from Bema. We did settle a 18,000 ounces or so in the first quarter.
- Analyst
You did?
- CFO
Yeah.
- Analyst
Okay. That was in your numbers. Okay. Secondly, I guess, couple things for Tim. Tim, I don't know which mine you were referring to when you talked about the west ore in the moly and lower grade. Was that was Fort Knox or Round Mountain?
- COO
That was Fort Knox.
- Analyst
Fort Knox. Okay, thank you. Not much discussion on Julietta in terms of the cost. I know it is not a long-lived asset as we have the reserves right now, guys. But any discussion on Julietta? It was a pretty high cost creep there and anything that can get the costs back down there?
- COO
Julietta, as you know, Steven, is a relatively short life, short mine life project from here. It sits on the right-hand edge of what I call our strategic map, which is costs expected in production and then production size on the X axis. It is relatively high cost, declining production from here. So we're thinking about a number of options for Julietta going forward. Believe me, it has been a terrific entry point for -- it was an entry point for Bema, has been a good operation for us. But in the, what I would call the twilight years, unless we find more exploration ground around it or unless we find a strategic alternative for it, stay tuned to this channel.
- Analyst
Okay. And last one, again on La Coipa, not again, on La Coipa you referred, I think, in the release to higher costs at La Coipa throughout the year versus maybe your previous plan or your original plans. Is that obviously still some ongoing issues there or stripping ratios to changing the pit wall angle, what is the extra explanation for higher costs at La Coipa?
- President & CEO
Tim will take that one?
- COO
It is the usual excuses of foreign exchange and high commodity costs compounded by the fact that we need to spend an additional $6 million on stabilizing the pit.
- Analyst
Okay. Thanks, Tim.
Operator
And your next question comes from Terence Ortslan, TSO & Associates. Please go ahead.
- Analyst
On Cerro Casale there was some studies done by [Palation] in the older days, I don't know what came out of it at the end of the day, for the concentrate leaching which kind of changed the economics of the whole project. Any more merit to consider that, any more further work has been done on that.
- President & CEO
Terry, we haven't finalized our feasibility plan or our overall program at Casale. But I will say this, we're looking very hard at an early stage to pick up the oxides on surface there and at our annual meeting we'll show a little graphic of those oxides. But looking at ways to optimize recoveries through leaching the surface oxides and then of course at the same time building a mill to process the deeper ores. That has not escaped us, it is a good thought and it is on our radar screen in a big way. It goes to sequencing, timing and capital spending, so we are trying to optimize the NPVs that we would achieve by doing that and it is in the works.
- Analyst
Thanks, bye.
Operator
And your next question comes from Barry Cooper, please go ahead.
- Analyst
Yeah, good morning, everyone. Just wondering on the stockpiles at Kupol, just how they are grading and how do they grade relative to what you thought they were going to be in terms of a reconciliation both within the pit and underground, because I imagine there's a combination of both underground and open pit, are there, is that correct?
- COO
Yes, there is. The grades are pretty well where we expect them, slightly less than 17 grams a ton gold and I think it is 167 grams a ton of silver. So, yeah, where we expect them to be. What was the second part of your question?
- Analyst
I was just wondering whether there was any positive or negative reconciliation in what you were doing in the mining versus what you had planned from the drilling?
- COO
Not yet. I mean, obviously, the proof of the pudding will be when we get the ore through the mill and confirm reconciliations. But it looks to be from something we've done and it is a pretty intensive something that the grades are coming in as per the model.
- President & CEO
I think you may have heard, Barry, in Tim's comments that we're well over 400,000 tons now stacked ready to go into the mill.
- Analyst
Right. That's a good buffer to have for starting off there. And then a question for Tom relating to -- with commodity prices up, I'm just wondering how you wound up with a derivative gain on your hedges there?
- CFO
The gain relates to the Kupol hedges, the silver and gold hedges. And the methods that we use for hedge accounting isolates the changes in the absolute price levels, so they -- that runs through the balance sheet. It doesn't run through the income statement. And goes through OCI. But the one thing that is not isolated in our hedge accounting is the effect of a change on the -- on the shape of the forward curve of gold. So if the forward curve shifts, the impact of that shift flows through our P&L. And that's what happened. The forward curve flattened during the quarter, because of the quite dramatic reduction in U.S. dollar interest rates relative to the gold lease rates. And we took the full impact of the economic -- of the flattening of that curve in the first quarter. If you would like to go through that in detail, I would suggest maybe we do that off-line.
- Analyst
Right. Okay. Sounds complicated enough that it does deserve a separate discussion. Then just confirming when you did the inventory adjustment at La Coipa, that really had no effect on your P&L, that $6 million presumably, even though you're increasing your costs by $17 an ounce. That really has got nothing to do with the P&L, is that not correct?
- CFO
Well, what happens is -- it is part of the purchase accounting. So when we bought La Coipa we had the fair value of all of the assets and liabilities that we bought, including inventory. So we have to write up the inventory to the fair value, which is basically the price of gold less whatever cost it is to refine it and transport it. So for those ounces we wrote them up to about $830 an ounce in our inventory. So they're sitting in our inventory.
- President & CEO
At closing.
- CFO
At the beginning of the year at $830 an ounce. And then we take them out of inventory and sell them and that $830 an ounce flows directly through our cost of sales. So that $6.1 million is in our cost of sales number. So it has a direct P&L impact.
- Analyst
Okay. So that's different than what other companies are doing at this point in time where they've changed the accounting standards as of January 1st, where inventory changes are impacting cost of goods sold on a per-ounce basis, but not being run through the P&L?
- CFO
There was another inventory standard that came into effect at the beginning of this year that is not related to this issue, to this purchase accounting issue on the La Coipa acquisition.
- Analyst
Right. And then final question, the $147 million in short-term investments that came up, what are those in?
- CFO
Those are with banks, those are in accordance with our investment policy and they're short-term because when we entered into them they were greater than 90 days. I think they're probably less than 90 days now. But since they were greater when we entered into them, that is the category they fall in, and we do that because we get another 40 or 50 basis points of yield, but the credit behind the -- the counter-party is of the same credit as the counter-party as we would keep our regular cash balances with.
- President & CEO
Let's just reiterate. We don't have and are not going to have exposure to asset-backed commercial paper and we were very fortunate in not having exposure there.
- Analyst
Right. Okay. Thanks a lot.
- President & CEO
Thanks, Barry.
Operator
And your next question comes from Greg Barnes, T.D. Newcrest, please go ahead.
- Analyst
Just pertaining to Barry's point then on the La Coipa inventory charge. Should we be backing out that $6 million from your cost of goods sold then to get an adjusted EPS number?
- CFO
Yes. What we did was, to make it very clear, we certainly backed it out of our cost of goods sold per ounce when we showed it on an adjusted basis. Right?
- Analyst
Yes.
- CFO
In the EPS this is a purchase accounting item that you have to take your own view on. It's not a--it's not money we spent, cash we spent on inventory but then ran through P&L. It was what they call a fair value bump in inventory.
- President & CEO
Which does run through the P&L.
- Analyst
Okay.
- President & CEO
If you want to get to -- we can't give you accounting advice, Greg, of course, but what I would say if you want to get an operating number you have got to take it out.
- Analyst
Right, exactly. And we are going to see a similar charge going through the rest of the year, I assume, are we?
- CFO
No, we sold all of that inventory in the first quarter, so we're done with that.
- Analyst
That is a onetime event, then?
- President & CEO
Correct.
- Analyst
Very good. Another question on the income statement. Equity losses in associated companies, $5.7 million, what is that.
- President & CEO
Go ahead.
- CFO
That is -- that relates to our investment in commodities, which was acquired from Bema. And we equitied account for that investment along with two other investments on our balance sheet. And the loss that flowed through in the first quarter related to our share on an equity accounting basis of commodities hedge losses. During the quarter we reduced our ownership interest to 13% from I think it was 28% previously. So we will no longer be accounting for that investment on an equity basis and we'll be marking that investment to market, but running that mark to market through our OCI not our income statement going forward.
- Analyst
So that number is going to disappear as well.
- CFO
That is another item that you won't see any longer.
- President & CEO
Just to be clear, we have a portfolio of equities, about $140 million roughly security portfolio of junior investments and commodity is one of the larger ones. And as Tom says no longer equity accounted.
- Analyst
Just one further question too on Cerro Casale. You mentioned you are going to do some more metallurgical evaluation work. Is that on the surface oxide, the leach potential, or are you looking for something different in the sulfide.
- President & CEO
Just a brief answer on that. The drilling is done. We're working on testing to look at, for example, the opportunity to use high pressure grinding rolls versus a straight sag mill and ball mills, so it would apply to some all the sulfides and maybe some of the oxides, not much.
- Analyst
So you're not seeing any deleterious elements in there or any problems.
- President & CEO
Tim.
- COO
No. Part of the intention was to confirm the distribution of the elements and it's done that and we have a pretty good handle on it and it's -- we now know it's -- they are confined to a small portion of the ore which obviously make our mine [pounding] a lot easier.
- Analyst
What is confined to a small portion of the ore?
- COO
Like most of these ore bodies there is trace amounts of arsenic and a couple of other things, and those are confined to one very small portion of the ore body.
- President & CEO
That is not what the metallurgy is focussed on. I think, Greg, it is focused on things like steel prices going through the roof. Do we want to have a sag and ball mills that we have to feed steel to all the time or are we better to take the capital up front to put in fresh in place the high pressure grinding rolls and not have to feed steel to it on an ongoing basis. So those are much bigger decisions, I would say.
- Analyst
Fair enough. Thank you.
Operator
Your next question comes from Tanya Jakusconek, National Bank Financial. Please go ahead.
- Analyst
Hi, maybe a question for Tom. Just on the balance sheet, just some of your thoughts now you've got your convertible senior notes and maybe just what you're intending to do with the Kupol debt and perhaps a hedge book.
- CFO
Well, the first -- the first order of business is to get Kupol through commissioning and to therefore change the profile from a creditor's perspective.
- Analyst
And that will be done hopefully when you go commercial, right?
- CFO
That is exactly right. And we have that and will continue to evaluate potential refinancing options and so on. As you know the hedge book is tied to that financing.
- Analyst
Yes.
- CFO
And--
- Analyst
With your positive view on gold would that not be something you would want to perhaps eliminate?
- CFO
It is a possibility. I think we have to look at it as a package in terms of how we could refinance it. How could we -- should we continue to do it locally as we have -- as we've done it now, or would we do it as part of a corporate financing and what is the trade-off of reducing the hedge position against the type of financing we could do.
- Analyst
Can you just remind me of what the mark to market is of that hedge book?
- CFO
Yeah, it is about $389 million.
- Analyst
A negative 389.
- CFO
Yeah. We put it on at about 150, as I recall, when we did the acquisition.
- Analyst
Yeah, okay. Okay. So we'll, I guess, stay tuned for something this year on this.
- President & CEO
Yeah, I mean obviously, Tanya, it was put in place by Bema. Much different credit situation than Kinross. I think, as Tom says, we'll be looking at all our options there.
- Analyst
Okay. Thank you.
- President & CEO
Thanks.
Operator
And your next question comes from Mark Smith, Dundee Securities, please go ahead.
- Analyst
I guess you can blame this question on Greg Barnes. It is for Tom. Just on the inventory charges, 6.1 million, how many gold equivalent ounces are related to that.
- CFO
13,000 in Q1.
- Analyst
13,000 in Q1. And when you calculated the 455 without the $17 additional, was that 13,000 ounces in a denominator event?
- CFO
Yes, it was.
- Analyst
So we can't really have both, can we?
- CFO
Well, we calculated the cost of sales, as on all of our ounces sold, as if there had been no bump.
- Analyst
But the $17, when you add the $17 to the 472, you're including that 13,000 ounces and you got to pay the costs for actually extracting those?
- CFO
Yes, I guess the point is -- .
- President & CEO
The cost of extracting them, I think as Tom mentioned , is the full cost.
- Analyst
That is also in the inventory charge, right?
- CFO
So, Mark , the only thing we backed out was the bump part. So, they were--they were on--they were on the books at, I don't remember exactly the numbers, say 390, which was the accumulated costs. Right? We bumped it up by $6.1 million to $830 an ounce, so we backed out the 6.1, right? But we didn't back out the 390, which would represent the cost of our other--of our other ounces produced at La Coipa.
- Analyst
No, no, I understand. But does the $6.1 million inventory charge include the costs of actually building up that inventory in the first place?
- CFO
The $6.1 million is in excess of the cost.
- Analyst
Okay.
- CFO
Incremental--
- President & CEO
Bump.
- CFO
Bump. It is the incremental piece. Therefore, we took out the incremental piece. We didn't take out the ounces. So the ounces are reflected really at their original cost in our cost of sales on the adjusted basis.
- Analyst
All right. All right, thank you. Fair enough, guys.
- President & CEO
Thanks. Folks, we have our annual meeting in -- shortly so we take another question or two and then we are going to have to wrap it up.
Operator
And your next question comes from Steven Butler, Canaccord Adams, please go ahead.
- Analyst
Guys, just to follow up. As you're going through the numbers and if you have a stockpile of 17 grams or so and 170 grams silver or so at Kupol, I'm just a bit concerned about your guidance for Kupol. I assume it is your 75% share, maybe that is the first thing to clarify because if I go with 1500 tons per day to start and going up to 3,000 tons per day by the end of the year, I struggle to get up to your 365,000 to 390,000 ounces. Thanks.
- President & CEO
It is reflecting our 75% ownership and not the 100%. And secondly, we thought about that and of course the guidance reflects that. So, we're going to be up at our full throughput capacity I would say Q3 and continue to run that high-grade ore.
- Analyst
Okay. So any grades better than 17 grams potentially hitting the books or hitting the statements this year?
- COO
What the 17 grams that we have is what we have stockpiled. I can't , to be honest, I can't remember what the forecast is, but we worked it out, that is the number we get to.
- Analyst
Okay, thanks very much, guys.
- President & CEO
Folks, I think we are going to have to wrap it up and move on to our AGM. Thank you very much for your attention this morning. I hope you'll join us across the street at formal start 10:30. Appreciate your confidence and support.
Operator
Ladies and gentlemen, this concludes your conference call today. Thank you for participating. Please disconnect your lines