Operator
Good morning, ladies and gentlemen. Welcome to the Kinross Gold Corporation's fourth quarter and 2007 year-end financial results conference call. (OPERATOR INSTRUCTIONS). I would like to remind everyone that this conference call is being recorded, and an archived recording will be available later today on Kinross' Web site. Please check www.Kinross.com for further details. I will now turn the call over to Mr. Erwyn Naidoo, Director Investor Relations.
Erwyn Naidoo - Director, Investor Relations
Thank you. Good morning, ladies and gentlemen. I'd like to welcome you to the Kinross Gold Corporation conference call to discuss the financial results for both the fourth quarter and the full year of 2007. On the call with us today we've got Tye Burt, President and Chief Executive, Tom Boehlert, our Chief Financial Officer, and Tim Baker, our Chief Operating Officer.
A reminder that the news release from last night is available on the Kinross Web site and has been filed with SEDAR, and I caution those listening that certain statements may contain forward-looking information, and that our actual results could differ materially from the conclusions or projections in that forward-looking information. In addition, we caution you that certain material factors or assumptions may be implied in our conclusions and projections. Additional information about risk factors and assumptions are contained in our media release dated February 21, 2008, forthcoming management discussion and analysis for the same period, as well as our other regulatory filings in Canada and the United States.
Now I'll turn the call over to Tye.
Tye Burt - President and CEO
Thanks, Erwyn. Folks, thanks for joining us this morning. Tom and Tim will give a full rundown of the financial and operational results, but let me first recap some of the highlights for the year.
In 2007, Kinross operations performed extremely well and were in line with our guidance, producing 1.6 million gold equivalent ounces, an increase of 8% from 2006 levels, at a cost of sales of $368 per ounce, also in line with our previous guidance. For the fourth quarter, gold equivalent production was 384,598 ounces, at a cost of sales of $419 per ounce. And if you adjust it to reflect the asset swap we closed with Goldcorp for the sale of Musselwhite and PJV at quarter-end, that cost of sales would have been about $20 lower, with production of approximately 361,000 ounces at a cost of sales of $395.
For the full year, Kinross had record revenues of $1.1 billion, up 21% year-over-year, thanks to strong performance at our operations and a rising gold price. Net earnings were $334 million, or $0.60 a share, which included a onetime gain as a result of that asset swap with Goldcorp, and a few other items. If you took out those adjustments, overall earnings were up approximately 22% year-over-year.
Full-year cash flow from operations was $341 million, an increase of 17% from the prior year, as we benefited from higher gold prices and higher production.
The associated cash balance, combined with other transactions during the year, has Kinross entering 2008 with the strongest balance sheet in our history, with cash of 551 million at the end of '07, up about 3.5 times year-over-year. Combined with the convertible note issue that we did last month, we're well-positioned financially to pay down debt, complete construction at our development projects, and look at other growth opportunities. In short, 2007 was a milestone year for Kinross, and I would like to recap a few more of the highlights.
We're particularly proud of the accomplishments and hard work of our employees, who did an excellent job delivering operational results on target, as well as the significant progress that was made at our development projects. All accomplished while never losing focus on the key objectives of employee health and safety, where we had an excellent record during the year. Our corporate development team continued the optimization of our portfolio, as PJV and Musselwhite were traded for the other half of the La Coipa mine, plus a payment of 204 million in cash. The Kubaka mine in Russia, which was at, of course, a very late stage in its mine life, was sold, as well as other nonstrategic equity investments.
Our exploration and engineering team has delivered on reserve replacement, adding 4.8 million ounces of gold to the proven and probable reserve table. Kinross started the year with 27.9 million ounces of gold, and added ounces both organically and through acquisition, ending the year with 46.6 million ounces, [67]% higher than year-end '06, and made additions, of course, to our silver and copper reserves.
As mentioned earlier, we significantly advanced our three development projects, which will begin contributing to production this year, 2008, driving growth in production while lowering our cost of sales. Completion time for these projects is now measured in months, not years.
We are pleased to report that the Paracatu expansion in Brazil is on schedule for start-up in July with construction now 80% complete, and on budget with 85% of the total capital spent or committed.
Kupol construction in Russia is 91% complete, and will begin commissioning in May. That project is also on budget, with 89% of the preproduction capital spent or committed. As previously disclosed, we've reclassified the land there and executed a long-term lease agreement, granting Kinross surface rights until the year 2024.
The Buckhorn mine in Washington State is also 80% complete and expected to commence gold production in the fourth quarter this year, targeting October. The mine is also on budget with 60% of capital spent or committed.
Kinross continued to plant seeds for future growth through entering into a number of relationships and joint ventures with some of the best young exploration companies in the business. These would include, for example, Victoria Resources, a Kinross-sponsored company with excellent prospects and drill results in Nevada; Linear Gold, where we share the Ixhuatan property and where drilling is continuing with some very encouraging results; B2 Gold, which of course is ramping up exploration efforts in the outer lands around Kupol in Eastern Russia.
And yesterday we announced plans to begin an expansion at the Fort Knox mine in Alaska. This will expand or extend mine life by five years to 2018, and double remaining life-of-mine production. The fully permitted project is a low-risk way to add ounces in our medium-term profile through a brownfield expansion.
In Chile, we completed core drilling and are continuing met test work at the Cerro Casale gold copper development project. We are in the process of negotiating a more definitive shareholder agreement to govern the joint venture there. We will have more to say about that at the quarter end.
In January '08, amidst choppy financial markets, Kinross successfully completed a $460 million convertible note financing with a 1.75% coupon rate, convertible at a share price of US$28.48, a 40% premium on the day we did the financing. We're very proud of this financing. It allows us to refinance existing debt, in addition to strengthening our balance sheet.
Yesterday Kinross declared a $0.04 per common share dividend, a first in the Company's history, and a milestone that we're proud to achieve. In 2008, we expect to achieve further milestones as we embark on our next growth phase with production starting up at the three projects, and production will climb 60% from '07 through '09 as cash costs decline.
In summary, Kinross enters 2008 in a very strong position, both operationally and financially, as we're continuing to execute on our strategy for delivering disciplined growth to our investors.
Let me now turn the call over to Tom Boehlert and Tim Baker to provide financial and operational results. I will make a few closing remarks, and we'll open the call for questions. Tom?
Tom Boehlert - EVP and CFO
Thanks very much, Tye. Kinross reported fourth-quarter net earnings of $173.1 million, or $0.29 a share, compared to $41 million, or $0.11 per share reported in the fourth quarter of 2006. Fourth-quarter earnings include net income of $132.2 million, or $0.22 a share, relating to the closing of the asset swap transaction with Goldcorp, the sale of the Bell Creek mill, currency translation losses on our foreign -- on our future income tax liability, as well as a year-end valuation adjustment to our asset retirement obligations.
Full-year 2007 net earnings were $334 million, or $0.60 a share, compared to $165.8 million, or $0.47 a share for the full year of 2006. Of course, our earnings per share have been impacted by the 69% increase in the number of shares outstanding over the course of 2007, related primarily to the Bema acquisition in February of last year.
During the quarter, Kinross sold approximately 356,000 gold equivalent ounces at an average price of $796 per ounce. This generated revenue of $281.4 million, which is 22% higher than the fourth quarter of 2006. The increase is a result of a 29% increase in the average realized gold price, offset by a 5% decrease in gold equivalent ounces sold. We sold 28,000 ounces less than we produced in the fourth quarter, so we expect to benefit when we sell that inventory in subsequent periods.
Fourth-quarter cost of sales was $419 per gold equivalent ounce, 9% higher than the $383 per ounce reported in the fourth quarter -- in the third quarter of 2007. The increase over the third quarter is largely due to underperformance of PJV, higher maintenance and lower recoveries at Fort Knox during the quarter, and higher maintenance with lower production at La Coipa.
Exploration and business development expense was $15.2 million in the fourth quarter. For the full year 2007, Kinross spent $47.3 million, which was below our forecast of $55 million, primarily as a result of lower-than-expected expenditures in Russia and a transition in our exploration leadership team during the year.
General and administrative expense was $22.2 million during the fourth quarter, compared to $13.7 million in the fourth quarter of 2006, and $69.6 million for the full year. Full-year G&A expense exceeded our forecast by $9.6 million, primarily as a result of higher performance-based compensation accruals in the fourth quarter, legal costs relating to the settlement of various claims, and higher consulting costs.
Fourth-quarter income and mining tax expense was $24.7 million, versus $6.2 million in the fourth quarter of '06. The sale of PJV and Musselwhite was sheltered from income tax, reducing our effective tax rate. But we did record an approximately $9 million tax provision in the quarter related to hedging gains in Brazil, increasing our effective tax rate. For the full year 2007, the Company reported income and mining tax expense of $73.8 million, compared to $25.9 million in 2006.
Fourth-quarter cash flow from operating activities was $72.8 million, compared to $91.2 million the corresponding period in 2006, and 2007 full-year cash flow from operating activities was $341.2 million, compared to $292 million for all of 2006.
Capital expenditures were $184.9 million in the quarter, compared to $65.3 million in the same period in 2006. Full-year capital expenditures were $601.1 million, which were lower than the previously forecast amount of $660 million for the full year, because certain expenditures occurred later than anticipated, primarily at Paracatu. So as a result, a $60 million difference will be carried forward into 2008. The combination of this timing carryforward and the finalization of costs for the Fort Knox project have increased our 2008 capital expenditure forecast to $685 million, from $600 million.
We currently have approximately 55% of our remaining Brazilian reais-denominated Paracatu project CapEx hedged at an exchange rate of about BRL2.14 to the US dollar.
At the end of the year, Kinross' cash balance stood at $551.3 million, compared to $292.5 million at the end of last quarter, and $154.1 million at the end of 2006. During the quarter, we received $174.5 million and issued 18.5 million common shares upon the exercise of warrants and options, and the exercise of options related primarily to former Bema Gold employees.
Our long-term debt increased by $474.2 million over the course of 2007, to $564.1 million at the end of the year. As Tye mentioned, we issued $460 million of convertible debt in January, which has increased our cash balance, and we intend to prepay $50 million of our term loan with the proceeds.
I will now turn the call over to Tim Baker, our Chief Operating Officer, for a review of the operations and details about exploration.
Tim Baker - EVP and COO
Thanks, Tom. I'd like to start off by congratulating all Kinross employees and contractors on an excellent year in safety and environmental management, and for the great production results.
Operationally, full-year production was in line, and cost of sales per ounce was at the high-end of the range of the revised guidance that we provided when we released our third-quarter results. Fourth-quarter gold equivalent production was 384,598 ounces, just 2% higher than production in the third quarter. Full-year production of 1,589,321 ounces was 8% higher than 2006. In Q4, cost of sales of $419 per ounce compared to Q3 cost of $383. For the full year ending 2007, cost of sales was $368 per ounce [versus] $319 for the full year ending 2006.
In 2007, Kinross made excellent progress on the development projects. As mentioned earlier by Tye, the start-up of these projects is now just months away.
At the Paracatu expansion in Brazil, construction is on schedule, with physical construction approximately 80% complete. Thus the primary crusher is installed, final steps in assembling the [wrap around] motor for the SAG mill are being taken, and the float cells are in place. As mentioned earlier, we are targeting a start-up of expansion in July. Forecast 2008 production for the combination of existing facilities in the expansion, 305,000 to 335,000 ounces at an average cost of sale of $390 to $400 per ounce. We expect this cost to decrease to an average of approximately $345 to $355 per ounce by the fourth quarter of this year.
The Kupol project in Russia is now 91% complete. We're targeting mill start-up in May, which is less than three months away. (inaudible) completion is now proceeding. Winter road is in full swing, two weeks ahead of schedule on this, and we're optimistic we'll have all our supplies on-site by April. We're forecasting Kinross share of gold equivalent production at Kupol in 2008 with a partial year of operations to be 365,000 to 390,000 gold equivalent ounces at an average cost of sales on a co-product basis of $235 to $245 per ounce.
Buckhorn surface construction is on schedule and is just over 80% complete. Underground development is proceeding. The project is targeted to commence gold production in October, as per last month's guidance. The mine's contribution to 2008 production is expected to be 25,000 to 30,000 ounces at a cost of sales of $290 to $300 per ounce.
Now I will briefly discuss the highlights of our key operations.
At Fort Knox, production was 11% lower and sales were 26% lower than Q3 due to unbudgeted mill downtime in November, lower-grade material being processed, lower recovery as a SAG pebble conveyor was used to start stockpiling pebbles for the heap leach liner protection. For the year, Fort Knox production was 1.5% more than 2006. Cost of sales for the quarter of $403 per ounce reflect increased commodity costs and lower sales. However, for the year, at $344 per ounce, we're 5% over budget, which is well within industry norms.
After a lot of hard work by the team, it was very satisfying earlier in the week to receive final approval from our Board of Directors for the phase 7 pit expansion and the construction of the heap leach project at Fort Knox. Both projects have received federal and state permits. The phase 7 push-back extends the pit to the west. The heap leach allows us to treat lower-grade ore and, obviously, gives us greater flexibility in managing the ore flow from the mine. The combination of the phase 7 push-back and the heap leach is largely responsible for the increase of 1.2 million ounces of proven and probable gold reserves at Fort Knox.
This expansion will result in gold production being extended to 2018 and increases life-of-mine production to 2.9 million ounces of gold. Annual production is expected to average approximately 370,000 ounces a year, at a cost of sales of $390 per ounce [in the] five years once production from the heap leach kicks in in 2010. Total capital for the expansion is expected to be approximately $270 million and includes the construction of the heap leach facility, waste stripping [per layback], five additional 240-ton haul trucks, and the delivery of an additional 31-cubic meter hydraulic shovel later this year.
With the recent addition of the 1.2 million ounces of 2P reserves, the go-ahead for the two projects, and the $6 million drilling program that we are undertaking this year in the pit, I am really excited about the potential at Fort Knox. This mine has been a cornerstone for Kinross. We have an excellent team in place that I'm confident will deliver great results for many years to come.
Maricunga Q3 production of 60,266 ounces is slightly less than budget reflecting the impact of a tough winter. Work continues on improving maintenance practices and preparing for the next winter. The go-ahead has been given to spend $7 million on building a new camp at a lower elevation, which will significantly improve living conditions. Increase in reserves of 1 million ounces to a total of 6.4 million ounces highlights the potential of this site. Costs of $489 per ounce for the quarter and $447 per ounce for the year reflect increased commodities, the exchange rate, contractor activity to improve plant reliability, especially during winter.
Round Mountain had a strong year overall, and managed through Q4 reusable pad crusher issues and delays accessing dump leach material from the stockpile [pending this] need of a permit. Production was 14% less than planned for the quarter, but 5% over plan for the year. The reusable pad crusher will be shut down later in the year as planned, to be moved to allow mining of the ultimate pit. Excellent costs of $353 per ounce for the quarter and $316 per ounce for the year are the result of a lot of hard work improving efficiencies in a very tight operation.
Paracatu had a great year. Production of 47,426 ounces was 4% higher than Q3, and for the full year of 174,987 ounces, slightly more than 2006 production. Cost of sales was $373 per ounce -- 12% higher than 2006, almost entirely due to the exchange rate. Great success has been achieved using Six Sigma methodology to increase recovery and drive down costs.
Yesterday we also released our December 31, 2007 mineral reserve and resource statement. A full table detailing gold, silver and copper reserves and resources can be found attached to yesterday's release, which is posted to our Web site. A few of the highlights are --
Year-end 2007 proven and probable reserves were calculated using a gold price of $550 per ounce, and a silver price of $10 per ounce. Net of depletion and divestitures, Kinross 2P gold reserves increased to 46.6 million ounces. At the beginning of 2007, Kinross had 2P reserves of 27.9 million ounces. The acquisition of Bema Gold added 17.4 million ounces. During the year, the combination of exploration and engineering added 4.8 million ounces of gold. 1.8 million ounces were removed due to production depletion. This was further reduced by 1.7 million ounces by the net effect of the asset swap with Goldcorp.
In summary, we're pleased with 2007 results of the operations and are powering ahead with the three development projects. With that, I'll now turn the call over to Tye for his concluding remarks.
Tye Burt - President and CEO
Thanks, Tim. I reiterate that we believe 2007 was a heck of a year at Kinross. Production, cash flow, earnings, reserves, all up and poised for significant growth again this year and next. We made some excellent changes to our portfolio and moved all three construction projects into the final phase inside the 20 yard line. The cash balance and balance sheet are exceedingly strong, and to deliver a dividend to shareholders, we think, increases returns again.
Thank you for your attention this morning, folks. We're now happy to take questions.
Operator
(OPERATOR INSTRUCTIONS). John Bridges, JPMorgan.
John Bridges - Analyst
First, thanks for not trying to report yesterday. It was a pretty tough day. Could we get a little bit more detail on the heap leach project there, or are you filing some 43-101 for it shortly?
Tim Baker - EVP and COO
We have to file within, I think, 45 days, so there will be more detail there.
John Bridges - Analyst
What sort of cost structure are you looking at for those answers?
Tim Baker - EVP and COO
It's right about, I think, $0.93 for the heap leach.
John Bridges - Analyst
So that's placement leaching cost.
Tim Baker - EVP and COO
That's just the leaching cost; that's without the mining cost.
John Bridges - Analyst
And the mining cost would be in line with the rest of --?
Tim Baker - EVP and COO
It will be slightly more than that [because it's] a little bit of a haul around the hill. So nothing too bad. (multiple speakers) recovery rate of about 64%. I think that's something like 150, 140 million tons that we're looking at for the pile.
John Bridges - Analyst
Would recovery be very seasonal? I suspect it would be.
Tim Baker - EVP and COO
I think this is going to be key to it, and obviously, our experience at Maricunga, where the winter is pretty tough, too, key to this is to make sure that we get the drip lines buried and don't let anything stop pumping. Obviously, the recovery pond is underground; all the pumps will be underground; the pipes will be heat traced. Our expectation is it will continue to produce during the winter, with -- there will be a slight fluctuation (multiple speakers)
John Bridges - Analyst
Okay. There seems to be a lot of lower-grade material in that part of the world. Does this open up a lot of blue sky for other projects like this?
Tim Baker - EVP and COO
Obviously, it does. If we can make this one work, it certainly expands our horizons. We've got significant low-grade stockpiles at Fort Knox, and this is, obviously a key reason for doing the project. Let's get this one going and we'll look at the rest.
Tye Burt - President and CEO
We, obviously, have a big land position there, John. And phase 7 is, obviously, the seventh expansion at Fort Knox. So we're hopeful that we will continue to drive growth in the area. Now that we've got permitted a way to treat the low-grade, that brings other ideas into range, though. but appreciate the question.
John Bridges - Analyst
On Kupol, what -- can we expect some high-grade material to start with in the first few years of operations there?
Tye Burt - President and CEO
It's all high-grade.
Tim Baker - EVP and COO
[It's great], we've got about 380,000 tons stockpiled already and the grade's running about 18 grams a ton. So it's pretty good stuff. As we get into the Big Bend area underground, the grade picks up. And also, the open pit is pretty special, too. So (multiple speakers)
John Bridges - Analyst
So Kinross is the new low-grade gold miner. Sorry, low-cost gold miner. High-grade, low-cost. Tye, where do we go from here? With all these projects coming to fruition, where do we go from here?
Tye Burt - President and CEO
Obviously, one of the things we're working very hard on right now is moving Casale forward into a decision mode. Job one -- get those three projects delivered. And now we're adding Fort Knox to that, so our construction guys are going to be busy right through 2010. Then Casale -- again, we can't predict what our decision is going to be there, but very optimistic. With a new strong partner like Barrick and the plan we have, these kind of metal prices look pretty attractive. So that's moving forward.
We've been putting a big push -- in case anyone hasn't noticed the change -- big push in exploration; new management structure; new approach to our exploration projects; new focus in some of our core areas and some new greenfield areas. So excited about the way Ixhuatan is looking; excited about some of the things that are happening with our joint venture partners in Nevada, as well as Mexico and Brazil. So that kind of organic growth, I hope, is going to be feeding our pipeline.
As to what's beyond all that, just stay tuned for further developments. We've got a lot to do to get done what's on our plate right now, and a fair bit in the pipeline.
John Bridges - Analyst
Do you want to say just a word about this renegotiation of the contract with the shareholder agreement at Cerro Casale?
Tye Burt - President and CEO
We don't have anything much to say there yet. Obviously, we know the folks very well at Barrick. They're pros. They have lots of experience with joint ventures, as we do. And we're already in a joint venture. So we anticipate pretty seamless work getting that done, and I think it's a good, solid partnership in spirit and in practice as we're moving forward with the drilling and prefeasibility work. More to say on that shortly, I hope, as we finish the negotiation.
John Bridges - Analyst
Thanks, guys. Well done.
Operator
Tony Lesiak, UBS Securities.
Tony Lesiak - Analyst
Just a couple quick questions on Kupol here. Have you changed your mindset on the open pit versus underground component of the reserve?
Tye Burt - President and CEO
No, we haven't.
Tony Lesiak - Analyst
So the original fees, in terms of how much open pit ore, is still valid?
Tye Burt - President and CEO
It is. And in fact, on development, both at the open pit and at the underground working phase is well ahead of schedule with the big stockpile. So I don't think change is the right word; maybe accelerate is a better description, Tim?
Tim Baker - EVP and COO
Yes. It's certainly well ahead. We're in good shape for the start-up in May. (inaudible) let's see what this mill will do for us.
Tony Lesiak - Analyst
Can you talk to the stockpile that you currently have there?
Tye Burt - President and CEO
I think Tim explained that about 380,000 tons are stockpiled, running 18 grams or so in the stockpile, another couple hundred grams of silver on average. So that will be the downstroke that we use to get the mine kicked off. And as we mentioned, ahead of development schedule with both the pit and the underground, so you never know. Obviously, it's a start-up and it's in a remote spot, but all signals are green and looking very good for start-up.
Tony Lesiak - Analyst
I was hoping to get an update as well on the resource picture at Kupol. I noticed you just published the reserves. Can you talk to the M&I and maybe the inferred resources at Kupol?
Tim Baker - EVP and COO
Not a lot has changed over the course of the year. We've been focused on filling in some detail in the southwest zone, and that's where we're at. The real big focus has been on the construction side in getting the mining part of it done. So we're going to kick in with more drilling this year. So nothing new.
Tony Lesiak - Analyst
Is the view now that the old Bema numbers on the inferred and M&I side are going to be upgradable to the reserve category at some point over the next couple years?
Tye Burt - President and CEO
We don't want to speculate on that, but we're pushing hard to -- or we will be pushing hard in '08 with our Minex exploration, especially in the north extension target area. So I would just say, rather than speculate, we would rather wait until we see those drill results. They're looking good. We've got some good intercepts that are a little deeper and a little higher grade. So I would just say stay tuned.
Tony Lesiak - Analyst
Finally, on La Coipa, can you maybe elaborate on where you are with the sulfide project, and any other initiatives in the region?
Tim Baker - EVP and COO
We're doing the prefeasibility study in a moment. With the reserves -- new reserves in, that gives us a solid basis from which to go. We've sent samples out for metallurgical testing. It's a work in progress. It's, obviously, a high priority. And by the end of the year, we'll have a better feel for what we're going to do there.
Tye Burt - President and CEO
We've also got -- you mentioned outside of La Coipa as well. We're working at a couple different sites there, Pantanillos and others. So again, I would say as we move through the quarter, start to get some drill results and some assays back, I would say by Q1 or, maybe latest, Q2, we'll have more to say what's happening. Pretty intensive drilling for us in the area over the next quarter.
Tony Lesiak - Analyst
How much are you spending there this year?
Tye Burt - President and CEO
Overall drilling expenditures in Chile -- hang on one second here as we get that specific number. It will be about -- I don't have it handy. We'll get back to you on that. It's at least $14 million in the area, which you could split up probably 2 million at Maricunga, $3.5 million at La Coipa, and then another $5 million or $7 million in surrounding area. Total, give or take $15 million.
Tony Lesiak - Analyst
Thanks so much.
Operator
David Stein, Cormark Securities.
David Stein - Analyst
I was wondering, first of all, why the difference between the sold and the produced ounces in the quarter?
Tom Boehlert - EVP and CFO
That relates primarily to Fort Knox and La Coipa. And Fort Knox was just the fact that the shipment took place too late toward the end of the year to get credit for the revenue in 2007. So that was about 12,000 of the ounces. And of course we just took over the La Coipa operation. And there was some inventory left over (inaudible) left there at the end of the year as well.
David Stein - Analyst
Also could you -- what's the book value of the Omolon asset? So we can calculate a (multiple speakers)
Tom Boehlert - EVP and CFO
(multiple speakers) you're curious about the gain or loss?
David Stein - Analyst
Yes. For the first quarter.
Tom Boehlert - EVP and CFO
That's not yet finalized, but I would say in the 10 to $15 million range.
David Stein - Analyst
So that will be pretty immaterial?
Tye Burt - President and CEO
It's small in the scheme of things.
David Stein - Analyst
You did address G&A in your introduction. Q4 over Q3 it was a lot higher. I'm just wondering how much of the increase is going to be assisting going forward, or are we going to sort of go back down to normal levels?
Tom Boehlert - EVP and CFO
We've given our forecast for '08 at $80 million for the full year. Fourth quarter '07 was over what we had expected as a result of the performance compensation, as I mentioned earlier. And that was the primary driver there. So, no change in terms of the outlook for 2008 as far as the guidance we've given previously.
David Stein - Analyst
Okay, and then just following up on one of the earlier questions, what is the nature of the renegotiation with Barrick on the agreement? Do we expect the ownership to change in Cerro Casale, or the ownership percentages? Or what exactly is expected there?
Tye Burt - President and CEO
What we have right now is a joint venture agreement which is very summary and does not address all the details and long-term nature of the relationship and what the actual construction plan would be. In fact the summary deal is between Bema and Arizona Star. So the original one did not contemplate where we are today, which is two major partners moving forward with a big program and a big plan.
So the nature of it, get the budgeting and capital spending and approval process in place, get the management in place -- all the things you would see in a typical development JV. We're in dialogue with them right now. Both of us are experienced at doing it. I don't want to predict what the outcome is going to be, but let's just say we expect it to be just as fair and as equitable as one would expect between two friendly parties determined to move a project forward.
David Stein - Analyst
Perfect. Thanks a lot. That's all I have right now.
Operator
Catherine Gignac, Wellington West Capital Markets.
Catherine Gignac - Analyst
I may have missed part of the early part of the call, so I apologize. Paracatu, you had a substantial increase in ounces in the reserve statement, and some of it is movement from measured indicated into reserves. Could you talk about where the additional ounces came from?
Tim Baker - EVP and COO
Obviously, the price made a difference, and we've extended some ore ounces on the northeast corner of the pit in drilling that we did last year.
Catherine Gignac - Analyst
So the northeast end of the pit from additional drilling that you have done. Okay.
Tim Baker - EVP and COO
That's right. So right on-site.
Catherine Gignac - Analyst
And similarly, with Refugio -- or, sorry -- Maricunga. Obviously, you've got a 100% interest in that now. The increase, was it -- again, on the reserves and measured indicated -- from only the increase, or was there additional drilling done there and additional material moved into reserves and resources?
Tim Baker - EVP and COO
It was mostly from price and a reevaluation of the process there. Not a lot of drilling was done at Maricunga this year.
Tye Burt - President and CEO
So really taking the (inaudible) results, Tim, and reengineering them to reflect the higher gold price.
Tim Baker - EVP and COO
Yes.
Catherine Gignac - Analyst
So it does have (inaudible). Okay, great. And in terms of the $60 million that you're looking for, expenditures this year, the bulk of that is mine site work in exploration?
Tye Burt - President and CEO
It's roughly 50/50 Minex versus greenfields, which, as I mentioned earlier, reflects renewed focus and direction for the exploration group, down from what we have historically done the last couple of years, two-thirds Minex, one-third greenfields. More emphasis on the greenfields. We've made some terrific additions to the team, and the team is performing spectacularly well.
So we're feeling quite revitalized in the group and with the plan to drive forward. So we've got some exciting stuff happening both in Chile, Mexico, Russia, and in some of our joint venture partnerships. A bit of a new direction, and quite a lot broader in terms of greenfields.
Catherine Gignac - Analyst
New avenue for growth, or a refocused avenue for growth. And hopping over to financials, tax rate guidance for 2008.
Tom Boehlert - EVP and CFO
We are working to finalize that at this stage. I think what I would propose is to give you more detail on that on our next conference call. We are working to optimize a couple of different organizational structures within the Company. I think it will go up. The effective tax rate for '07, if you discount -- if you take out, for instance, the gain on PJV and Musselwhite, which had no tax effect, would have come in at around the 25% range, which is what we had suggested at the beginning of '07. So I think it will go up from there. We are using up tax benefits and we are bringing online new projects, and I can give you more clarity on that as we move forward here.
Catherine Gignac - Analyst
With some of the adjustments you did, and the asset sales and swaps, and that sort of thing, I'd just be curious how your tax pools have changed, and how much that's going to impact this year and years going forward.
Tye Burt - President and CEO
Stay tuned as we'll come out with better '08 guidance as we finish some of the tax planning initiatives.
Catherine Gignac - Analyst
Thank you very much.
Operator
Mark Smith, Dundee Securities.
Mark Smith - Analyst
Just to follow-up on the Fort Knox questions. Could you give me some idea of what the strip ratio is now?
Tim Baker - EVP and COO
It essentially stays at about 1 to 1.
Mark Smith - Analyst
Can you -- the mining cost. Where is that sitting right now? Can I get a feel for that? In terms of it going up where would it be now?
Tim Baker - EVP and COO
$1.50.
Mark Smith - Analyst
Just in terms of the scheduling, presumably, the leach facility has to last longer than the feed does to the plant. So does the plant close before the leach feed is done?
Tim Baker - EVP and COO
No. I think it will -- the production from the leach [extends], obviously, beyond the plant.
Mark Smith - Analyst
They just don't want to charge you for running a plant when you don't need to, right?
Tim Baker - EVP and COO
There's, obviously, optimizations that we can do. The beauty of the heap leach is it allows us to sort of balance off the plant with the heap leach and maximize the throughput. I think the plant shuts down a little bit sooner. I think we shut the plan down about 2015, and the heap leach carries on through to 2018.
Tye Burt - President and CEO
There'll be more detail in that 43-101.
Mark Smith - Analyst
I figured that. I just wanted to get a quick gleam on it. The second question is -- we haven't talked for a while about Gold Hill and the future of Round Mountain. Can you give us some insight about where your thinking stands right now there?
Tim Baker - EVP and COO
It's still on the books. We're still working towards doing the permitting. We've got a very detailed process happening right now at site. Our expectation is it will start producing in 2011, and it carries on through, I think, until 2014, 2015. It's still in the plans.
Mark Smith - Analyst
I presume that would require an entirely new set of pads and so on and so forth that would be closer to Gold Hill and some distance away from Round Mountain. And during that period you'll have closed the on-off pads in the mill? There's not an awful lot of high-grade there to put through the mill.
Tim Baker - EVP and COO
To be honest, I'm not sure of that detail. Can I get back to you on that?
Mark Smith - Analyst
Sure. That would be great. Thank you. That's it for me. Thanks.
Operator
Victor Flores, HSBC.
Victor Flores - Analyst
Just coming back to the heap leach at Fort Knox, could you give us a sense of what the average grade is of that material, and how many tons you're planning on putting on the leach every year?
Tim Baker - EVP and COO
I can tell you the cut-off grade, 0.065. It's about 0.35 grams per ton and I can convert that to (inaudible) for short termm. But that's the average grade.
Victor Flores - Analyst
Thanks. Can you give us a sense of how many -- of that 140 million tons or so that you're putting under leach, how many are you going to do a year? That's roughly 14 -- sorry -- roughly 14 million tons if it's a 10-year project?
Tim Baker - EVP and COO
It's going to be over five years, so 15 million.
Tye Burt - President and CEO
Probably 25 million tons per year. About 150 million tons under leach in total.
Victor Flores - Analyst
Great. Thank you. Just turning to Brazilia, you're planning on beginning the commissioning in July, which is great. How long do you think that's going to take?
Tim Baker - EVP and COO
We've got a three-month ramp-up period.
Victor Flores - Analyst
So by the fourth quarter, we'll have a good idea of how things are going there.
Tim Baker - EVP and COO
Yes.
Victor Flores - Analyst
Finally, a question on the dividend policy. It's great that you're giving some money to shareholders via dividend, but you're still consuming a fair amount of cash. You've had to issue a convertible this year, and there's probably a fair amount of capital coming with respect to Cerro Casale, and you're investing more in the exploration side of the business. Could you just share with us what the thought process was with respect to the dividend?
Tye Burt - President and CEO
A couple of things. One, the gold price was through our budget in 2007, so we had some additional cash from operating that we thought was prudent to share with our investors. Point two, Kinross was the last of the majors to implement a dividend, and we think it's a sign of the maturity of our company today and the confidence we have in our operations and our profile going forward.
We thought it prudent to start that additional return to investors, and at a conservative level, so that, as you say, we leave room for capital expansions and capital spending that we have on the books. So all in all, an effort to demonstrate our maturity and our confidence and to continue adding to shareholder returns.
Victor Flores - Analyst
Those are all my questions. Thank you so much.
Operator
Chantal Gosselin, Genuity Capital Markets.
Chantal Gosselin - Analyst
My first question is related to the cash -- the cost of sale in 2008 that you guided at 365 to 375. Could you just again clarify that includes the royalties and production tax?
Tom Boehlert - EVP and CFO
It includes the royalties and production tax. We put in our assumption there the cost -- or the price of gold that we're using, and with a sensitivity. So, the base price of gold that we assumed was $700. And for every $100 increase in the price of gold, our cost of sales goes up by $6. So you can use that as a guidance to calculate the impact there.
Chantal Gosselin - Analyst
The other question is just following up on Tony's question on the reserve resource at Kupol. I noticed that the reserve grade declined by 11%, I think, from Bema days. Could you just comment on that? Is it a revised mine plan that declined the grade, or --?
Tim Baker - EVP and COO
(inaudible) did mine plan, and based on their experience and what they were seeing underground, they increased the dilution from, I think, 21% to 30%. That was the primary driver of that.
Chantal Gosselin - Analyst
How much are you planning to spend in exploration (inaudible), a world-class deposit. I'm assuming that you really want to drill the extension of the deposit, right?
Tim Baker - EVP and COO
Yes. We have the number here. I can't remember off the top of my head. About 7 or 8 million, I think.
Chantal Gosselin - Analyst
Just lastly, on the tax structure in Russia, could you remind us how it works? Because next year you'll be fully up and running at Kupol, just to get a sense of cash tax and deferred tax.
Tom Boehlert - EVP and CFO
The -- there's a 24% tax rate in Russia, so the operating company will be taxed at that rate, and I imagine that will be pretty much our effective tax rate as well. The hedge book is not -- is not domiciled in Russia. So while we have had losses in the hedge book that we assumed from Bema, we won't -- we don't expect at this stage to get a full deduction against our operating income at Kupol. So that could have some effect. But again, that's one of the items that I'd like to provide more clarity on as we go forward here.
Chantal Gosselin - Analyst
Presumably, you can recoup your capital before starting to pay cash tax in Russia? Are you fully taxable like cash tax at 24% (multiple speakers)
Tom Boehlert - EVP and CFO
24% cash tax -- it's not a production sharing arrangement with our partner. They're a 25% -- they own a 25% interest in the project. We do have the ability to recoup the capital costs related to that 25% owner before dividends get paid out to the shareholders. So that's our kind of capital recovery mechanism.
Chantal Gosselin - Analyst
Okay. But from a tax perspective, can we just model that you are recovering your capital before starting to pay cash tax in Russia for your 75% interest obviously?
Tom Boehlert - EVP and CFO
I don't believe that's the case.
Chantal Gosselin - Analyst
So you will be fully taxable right at the beginning?
Tom Boehlert - EVP and CFO
We'll have depreciation expense.
Tye Burt - President and CEO
And interest expense.
Chantal Gosselin - Analyst
Okay. Thank you.
Operator
David Christie, Scotia Capital.
David Christie - Analyst
Most of my questions have been answered, but just let's go to the exploration there for a minute. You're going to spend $50 million. How much of that is expensed versus capitalized?
Tom Boehlert - EVP and CFO
The bulk of it is expensed.
David Christie - Analyst
Can you split it up for me, based on sort of geography a little bit?
Tye Burt - President and CEO
Give or take $15 million in the Andes, so that's Chile; roughly $8 million to $10 million in Brazil; $10 million in North America; as I said a minute ago, $7 million to $10 million in Russia; and then another $10 million in (inaudible) kind of spread around in Mexico, Ecuador and other places. So overall budget about $50 million. Obviously, there's been -- with the sale of Porcupine and Musselwhite we get a significant refocusing just by definition geographically. So we're quite excited about the opportunity here now.
David Christie - Analyst
Is there anything we -- any projects you guys are excited about that we don't really know about? It's been a long time since we've had a Kinross exploration day.
Tye Burt - President and CEO
I'd urge you to look at our next couple of quarters as we start getting some of the results back. We'll be tracking that, obviously. Linear put out an interesting press release a few days ago, talking about some of the results at Ixhuatan. We're not in the habit of popping out individual drill results as a senior, so it will be bunched together with our quarters, of course. But I would watch the press releases from -- have a look at the press releases from some of our partners.
David Christie - Analyst
Good stuff. Thank you.
Operator
(OPERATOR INSTRUCTIONS). [Elizabeth Ventura], [Gem] Acquisition Management.
Elizabeth Ventura - Analyst
I just wanted to ask about the Gil [tract] and Fort Knox. I understood that you might possibly be expanding into the Gil tract.
Tye Burt - President and CEO
It is not our current plan in Gil to expand there. We have -- the expansion plan at Fort Knox as announced does not include that ore body. In fact, we wrote it out of reserves two years ago. So as part of an overall district exploration, I would say possible, but certainly in the longer-term future, if at all.
Elizabeth Ventura - Analyst
Thank you.
Operator
David Christie, Scotia Capital.
David Christie - Analyst
One other thing. Just wanted to know -- you said the strip currently at Fort Knox is (inaudible). What will be the strip of the expanded pit for the heap leach?
Tim Baker - EVP and COO
(inaudible)
David Christie - Analyst
Total strip, the pre-strip, plus the --
Tim Baker - EVP and COO
Including the stock pile rehandling it goes to about 0.7.
David Christie - Analyst
Okay. Thanks.
Operator
Mr. Burt, there are no further questions at this time. Please continue.
Tye Burt - President and CEO
All I have to say, ladies and gentlemen, is thank you for your attention this morning. We think we had a great year and are proud of the results. We look forward to seeing you at upcoming conferences and visits. Thank you.
Operator
Ladies and gentlemen, this concludes our conference call for today. Thank you for participating. You may now disconnect your lines.