Good afternoon, ladies and gentlemen. Welcome to Kinross Gold Corporation's third quarter financial results conference call. At this time, all participants are in a listen-only mode. Following the presentation, we will conduct a question-and-answer session. Instructions will be provided at that time for you to queue up for questions. (OPERATOR INSTRUCTIONS) I would like to remind everyone that this conference call is being recorded, and an archived recording will be available later today on Kinross' website. Please check www. kinross.com for further details.
I will now turn the call over to Mr. Jim Crossland, Senior Vice President, Government Relations and Corporate Affairs. Please go ahead, sir.
- SVP, Gov't Relations, Corporate Affairs
Thank you and good afternoon, ladies and gentlemen. I would like to welcome you to Kinross Gold Corporation's conference call to discuss the financial results for the third quarter of 2007. As mentioned, the third quarter news release is now available at kinross.com, and has been filed with SEDAR. This conference call is being recorded an archived. A caution to those listening, certain statements may contain forward-looking information, that our actual results could differ materially from conclusions or projections in that forward-looking information.
In addition, we caution you that certain material factors or assumptions may be implied in our conclusions and projections. Additional information about risk factors and assumptions are contained in our media release dated November 7th, 2007, and in our forthcoming management discussion and analysis for the same period, as well as our other regulatory filings in Canada and the United States.
I will now turn the call over to Tye Burt, President and CEO of Kinross Gold Corporation.
- President, CEO
Thanks, Jim. I will begin with an overview on Kinross, talk briefly about highlights of the quarterly, and the operations, and then finally tell you about the progress on our development projects. Tom Boehlert will provide details on financial results, and Tim Baker our COO, will provide operational and project reviews, as well as discuss exploration highlights.
First I would like to comment on the corporate activity that Kinross undertook in the last quarter, as well as discuss the Company's position to prosper in this gold price environment, where prices are now over $825 an ounce, levels not seen since 1980. Q3 was a very active quarter here at Kinross. Significant progress was made on the construction of our development projects, the Paracatu now 57% complete in terms of construction. Kupol 78% complete, and Kettle River - Buckhorn now at 59%.
These projects continue their consistent progress, and are on-track to drive growth and bring new low cost production to Kinross when they start up in 2008 next year. We have also progressed the rationalization and optimization of our asset base through asset sales in the swap, which as a result add some 250 million of additional cash to the Balance Sheet before year end. In our largest deal last quarter, Kinross entered into a swap agreement with Gold Corp. to sell our interest in the two Canadian mines that are not operated by us, that is Musselwhite, and the Porcupine Joint Venture.
We increased our ownership to 100% ,and became the operator at the La Coipa mine in Chile, as well as receiving from Gold Corp. 200 million in cash as part of that transaction. This swap moves Kinross further into the driver's seat by reducing the number of joint ventures where we are a partner but not the operator, giving us control over operational and financial decisions that affect us. The deal also removes two of the higher cost operations from our portfolio, adds cash to our balance sheet, and further enhances our presence in Chile's highly prospective Maricunga district, where we will now own two operating mines, as well as our interest in the Cerro Casale gold/copper development project.
.
- President, CEO
Turning for a moment to our third quarter operating results, Q3 saw record high gold prices with Kinross realizing a gold price of $686 an ounce, and reporting gold equivalent sales of 402,895 ounces at a cost of sales of $383 per ounce. We were not immune to the challenges facing our industry. These were created by cost pressures such as higher currency exchange rates, oil prices, consumables and labor costs, as well as higher royalties and taxes in a strong gold price environment.
The increase in Kinross cost of sales this quarter is largely attributable to higher costs at our two Canadian assets, the PJV and Musselwhite, the Julietta Mine in Russia where costs per ounce were higher than expected, and the Maricunga mine in Chile, where weather and operating delays caused lower production and gold sales. Tim will discuss these in more detail shortly. For a moment though, if we were to adjust Q3 financial results to reflect the asset swap that we announced with Goldcorp, backing out the results for the PJV and Musselwhite, and increasing our ownership stake in La Coipa to 100%, the pro forma cost of sales would have been about $30 per ounce lower this quarter.
As a result of our Q3, our full year 2007 guidance for production moves slightly down from 1.65 million ounces to 1.6 million ounces of gold equivalent production. At a cost of sales expected to be the range of 355 to $365 per ounce, up from the 340 range we talked about at the end of Q2. This is to reflect the higher exchange rates and input costs that we are experiencing at our current suite of assets including the Canadian mines, that are being held until the end of 2007. In other words, the changes to address these cost concerns are already in motion.
As previously stated, for 2008 and 2009, the start-up of Kinross' three development projects will increase gold equivalent production to 2.1 to 2.2 million ounces in '08, and 2.6 to 2.7 million ounces in '09. The net effect of the asset swap soon to close will lower gold equivalent production in both years by about 100,00 to 120,000 ounces, but will also bring Kinross' overall cost of sales per ounce down, as we shed our high cost lines and bring in new production from the projects. These new mines will be producing at a cost of sales lower than the Company's current average, allowing Kinross to show lower cost with rising production, thereby driving even stronger margins, and increasing our leverage to the gold price.
In other developments, we continue to advance the long-term lease process for the Kupol development project with the Russian administration. The necessary representative of the Chukotka Territorial Office has been appointed by the Federal Land Management Agency, and our management team is working closely with that office on the terms and conditions of the long-term lease. Once the lease is completed, the project lands are expected to be registered in the appropriate state register by the Federal Registration Service.
In addition, at the Cerro Casale project in Chile, we are continuing to progress the metallurgical build program that we have announced previously, and of course we see the bid announced by Barrick for Arizona Star, as another clear endorsement of a project we see as having tremendous potential. Next in September we announced an exploration joint venture agreement to conduct drilling and potentially earn up to a 70% interest on a very prospective new target in Mexico that has already shown good results. Ixhuatan is Kinross' first foray into this new country.
We also continued our disciplined streamlining of the Company this quarter through selling legacy mine sites, and resolving lawsuits inherited from the past. In conclusion, although costs for Q3 and the remainder of the year are higher than we anticipated, our operations continue to deliver good overall and year-to-date margins. We believe that we have entered into transactions that will change our portfolio composition. And the contribution of three new low cost projects beginning production next year, makes our outlook unique in its proximity, its impact, and its margin.
Now over to Tom Boehlert to talk about our financial results in more detail.
- EVP, CFO
Thanks very much Tye. Kinross reported net earnings of $39.4 million, or $0.07 per share for the third quarter, compared to $50.3 million, or $0.14 per share, reported in the third quarter of 2006. Earnings per share reflects a 68% increase in the average number of shares outstanding, as compared to last year, primarily as a result of the Bema Gold acquisition in February. Included in third quarter earnings, our non-hedged derivative losses of $10.2 million, net of tax, foreign exchange losses on the revaluation of foreign currency denominated future tax liabilities of $12.6 million, and a $9.5 million accrual for various potential legal liabilities.
These items were almost entirely offset by a gain of $30.7 million on the sale of our interest in Anatolia Minerals. During the quarter, Kinross sold 403,000 gold equivalent ounces at an average price of $686 per ounce. This generated revenue of $275.8 million, which is 23% higher than the prior year's quarter. The increase is a result of a 10% higher average realized gold price, combined with a 12% increase in the gold equivalent ounces sold.
Third quarter cost of sales was 383 per gold equivalent ounce, 10% higher than the $348 per ounce recorded in the second quarter of '07, and 19% higher than the $321 per ounce recorded in the same quarter in 2006. The increase over the second quarter, largely due to underperformance at our Canadian joint ventures, increased royalties as a result of higher gold prices, and weather and operating delays at Maricunga.
We also processed lower grade ore at Fort Knox in the quarter, as anticipated in our plan. We now expect our full year cost of sales per ounce to be in the range of $355 to $365 per ounce. Again, this increase is primarily the result of higher than forecast costs at our Canadian joint ventures, higher royalties, and increased costs at our Julietta mine. We expect that the effect of the swap transaction, together with the addition of production for our new lower cost mines, will allow Kinross to reduce overall cost of sale per ounce going forward, and move to a lower relative position on the industry cost curve.
Exploration and business development spending was $11.9 million in the third quarter, which is similar to the second quarter spending, and compares to $10.2 million spent in third quarter of 2006. For the full year, we expect to spend $55 million on exploration and business development. General and administrative expense was $16.2 million during the quarter, compared to 13.6 million in the third quarter of 2006. This increase is primarily the result of higher personnel costs, and the stronger Canadian dollar.
G&A is in-line with our second quarter 2007 expense, and consistent with our expectations post the Bema transaction. Third quarter income and mining tax expense was $12.8 million, versus $11 million in the third quarter of 2006. This represents approximately 23% of our pretax earnings, which is consistent with the statutory tax rates that we see going forward.
Kinross also recognized the foreign exchange loss of $9.9 million on net monetary liabilities of our non U.S. operations during the quarter. The impact is primarily the result of the strengthening Brazilian Real, the Canadian dollar, and Russian Ruble. This amount includes the $12.6 million that I mention earlier relating to the deferred tax liability.
Cash flow from operating activities was $83.7 million dollars, versus $85.8 million in the prior year's quarter. Capital expenditures were $185.2 million in the quarter, compared to $61.1 million over the same period in '06. Approximately 80% of the quarterly expenditures related to the Paracatu expansion project, the Kupol development project, and the Kettle River - Buckhorn development project. All three of these development projects are expected to begin operation next year. At the end of the quarter, our cash balance stood at $292.5 million, compared to $154.1 million in the prior year's quarter.
During the quarter, $9.3 million was received on the exercise of options, primarily relating to former Bema Gold employees. And $113.9 million was received on the net issuance of debt. Goldcorp's swap transaction will contribute $200 million to our cash balance upon closing.
Also subsequent to the quarter end, warrants acquired in the Bema transaction that were due to expire on October 22nd were exercised, adding approximately $37 million of cash to the balance sheet, and resulting in the issuance of approximately 8.4 million Kinross common shares. During the quarter the mark-to-market value on our non-hedged derivative contracts that relate to the Kupol project loan facility, had a net loss of $10.8 million. Our total Goldcorp sales contracts are equivalent to about only 2% of our gold reserves. We do not sell our gold forward, and these contracts were acquired on the acquisition of Bema Gold.
Also during the third quarter, Kinross entered into additional forward purchases of the Brazilian Real, in order to reduce our currency exposure on the Paracatu expansion projects. We now have approximately 69% of our forecast Real denominated costs to complete hedged, at an average exchange rate of 2.14 Reals to the dollar. This has reduced our expected increase in costs related to currency fluctuation from $46 million as estimated at the end of last quarter, to $40 million now. This reduction in exposure has been achieved even though the Real has strengthened over the period.
I will now turn the call over to our Chief Operating Officer, Tim Baker, for a review of the operations and details about exploration.
- COO
Thanks, Tom. In the third quarter, Kinross continued to make excellent progress on the construction of the development projects. Kupol and Paracatu remained on-schedule for production in mid-2008. The Buckhorn project later in the same year, consistent with the guidance we provided last quarter.
Operationally, cost of sales per ounce came in higher than predicted earlier in the year, and gold equivalent production was lower than budget, but higher than Q3 of 2006. Increasing cost from Q2 to Q3 is largely due to increased consumable costs, fuel, et cetera, foreign exchange, and price based royalties. Compounded by higher costs recorded at our Canadian joint ventures, and severe weather conditions and conveyor repairs at Maricunga, causing lost operating time and lower production.
Now for some details, starting with an update on our projects. At the Paracatu expansion in Brazil, construction is on-schedule with physical construction approximately 57% complete, which is up from 41% at the end of the second quarter. Capital committed or spent to-date is at approximately 81%. All major equipment has been received at the site, or is on schedule for delivery.
We have received preliminary environmental approval for the construction of the 230KB power lines, and are expected to receive final approval before the end of the year. Field work for the crusher and grinding buildings is well advanced, and the assembly of the bore mill has started. As I mentioned earlier, we are targeting a mid-2008 start-up of the expansion circuit.
The Kupol project in Russia is progressing well, and we are on-track to start the mill in mid-2008. Physical construction is approximately 78% complete, up from 67% announced last quarter. Capital committed or spent to date is at approximately 85% of budget. All major equipment has been installed, and the electrical work is in progress. Assay labs are complete, and the leach tanks installation is well advanced. The [wasilla] generators are undergoing testing.
Mine development is progressing well with 230,000 tons or ore already stockpiled from the underground and open pit. The final ship is arriving in the Port of Pevek as we speak, and that will successfully conclude all shipping through Pevek for this year.
The Buckhorn project continues on schedule for start-up in the second half of 2008, consistent with guidance updated during the last quarter. Physical construction is approximately 59% complete. 58% of the capital has been committed. The site earthworks are essentially complete. 100 feet of development at each of the three portals has been carried out. And construction of the water treatment plant is well advanced.
Significant permitting advances were made in the third quarter with a receipt of the water discharge permit, and approval for the plan of operations. The consolidated appeals process should start shortly, and we remain confident of the outcome. We now have all of the necessary permits and authorizations to complete construction of the haul road, and commence underground development. Meanwhile, we continue to work to upgrade the Kettle River processing facilities, and we finished construction of the assay lab.
Now I will briefly discuss the highlights of our key operations. At the Maricunga Mine in Chile, we mentioned in last quarter's conference call that extreme winter weather was causing operational shutdowns in the second quarter. These weather delays resulted in less ore being stacked on the leach pad in the second quarter, subsequently lower production in the third quarter. Production was 46,000 ounces in the third quarter, which is down from 57,000 ounces in the second quarter.
Mussel sales were $21 million for the mine, an 18% decrease from Q2. Lower gold sales at 45,000 ounces, and cost of sales per ounce to increase to $475. The third quarter, the challenges continued with an additional 4.5 days of lost operating time due to severe winter weather, and three days due to conveyor belt repairs. This will impact production in the fourth quarter, which is being considered in the guidance for the end of the year.
At Fort Knox in Alaska, Q3 gold production was ahead of plan, 86,000 ounces in gold sales, 93,000 ounces. Cost of sales per ounce was $338 per ounce, up 6% when compared with the second quarter, but lower than planned.
Higher revenue based royalties and higher consumable costs negatively impacted costs. We have received substantially all of the permits for the [leach] project. We are in the process of completing the necessary land transactions involving state and federal agencies for the [base level] pit expansion. The Round Mountain mine in Nevada had gold production and sales of 73,000-ounces during the quarter which was the plan though less than Q2, reflecting fewer tons processed. Higher consumable costs, higher royalties, less tons in the stockpile than planned, and lower sales due to lower through-put led to higher cost of sales per ounce of $340.
The Paracatu mine in Brazil had an excellent quarter, producing 5% more ounces than budget, at a cost that was only 5% higher than planned, and this was entirely due to the exchange rate. Cost production is benefiting from the aggressive continuous improvement program that has been carried out at the mine. On the exploration front, we have restructured the management of our exploration activities and combined them with our corporate development group under the leadership of Hugh Agro, Kinross' Senior Vice President of Strategic Development. Also, [Glen Masterman], who recently joined our Strategic Development group, Vice President, Exploration and Chief Geoscientist, after working in Mexico for over three years, manages our corporate exploration team.
Kinross is active on more than 25 exploration projects. Under the new structure, we continue to increase our emphasis on greenfield activities, while maintaining our focus on mine site exploration. The press release contains the highlights of what we have done in the exploration. I will mention a few here. At Round Mountain, the underground project has ended as there were insufficient results to warrant following with a standard underground mine. Attention is now focused on potential expansions of the existing open pit, as well as other targets on the Round Mountain property.
At La Coipa, we are conducting metallurgical test work from the gold/copper sulfates from the Ladera Farellon. We have also completed 5500 meters of drilling at Breccia Norte, and are evaluating the potential of additional oxide resource adjacent to that pit. Drilling continues at Cerro Casale, Fort Knox, and Kupol. And we have begun the first exploration activity at the Buckhorn development since 1988. We will give more complete information on our exploration results at the end of the year.
So in summary, although cost of sales in the quarter were higher than we anticipated, reflecting in large part the industry-wide cost pressures, and the weaker dollar, I anticipate that the changes in our portfolio of mines, our ongoing continuous improvement efforts, and further production at our three development projects will move Kinross to a much more favorable position on a cost curve, as we go forward in 2008 and beyond.
With that, I will now turn the call over to Tye for his concluding remarks.
- President, CEO
Thanks, Tim. Q3 saw Kinross continue to upgrade our asset base, selling higher cost mines on reclamation properties, while moving forward with lower cash cost projects, consolidating our ownership interests, and of course operating our mines, all while further strengthening the balance sheet. Although Q3 cost of sales are higher than forecast, they are in-line with other majors and they are a telling sign of the reality in our industry. Rising input costs, including stronger currencies compared to the U.S. dollar, as well as higher energy and employee costs.
The discipline changes we are making at Kinross today differentiate us among our peers. First, we are delivering on our plan for higher margin and cash flow, while focusing on excellence in explorations, exploration, environmental stewardship, and safety. We are relentlessly pursuing efforts to mitigate higher costs impact to the industry, and the the ongoing continuous improvement initiatives and energy savings programs Tim mentioned. Third, we are building low operating cost development projects to add growth, reduce our costs, and drive margin expansions for our investors, a key factor in Kinross' future. I would urge you to look at the latest pictures on our website. They give a good illustration of the progress we are making at those sites. And finally, continually upgrading our management and operations teams, to ensure we have the best talent leading our Company forward.
With our 43 million ounces of gold reserves, 97 million ounces of silver, 2.8 billion pounds of copper, a strong financial position in cash flow, our experienced management team and development projects that are looking at completion dates measured in months, not years, we believe we are firmly in the sweet spot of the gold industry, an industry that has seen metal prices at a 27 year high. As you can see by the actions we have taken over the quarter, we are willing to make the tough choices, and we intend to stay in that sweet spot. Operator, we would be happy to take questions now.
Operator
Thank you. Ladies and gentlemen, we will now conduct the question-and-answer session. (OPERATOR INSTRUCTIONS) Your first question comes from Mark Smith of Dundee Securities. Please go ahead.
- Analyst
Yes, hi, gentlemen. Could you just expand a little bit on how the leach project stands at Fort Knox, and just what sort of recoveries are you getting, when could you see it being implemented if at all, and what it would do to the strip ratio?
- President, CEO
We can't give too many of the details yet but why don't we give a good overview.
- COO
Essentially, I can't remember the cut off grade, I can get back to you with that. But it obviously opens up lower grade material. We have got the 404 permits from the Corps of Engineers, so we have got the necessary permits in Alaska, and we have started work on the stripping.
There is a possibility of some challenges to the permit, which will become apparent over the next few weeks. If that works out okay, there is not going to be an awful lot of construction that could be done during the winter season, so we would anticipate spending the time next summer constructing it, and starting to pile the material.
- Analyst
Just to help out, what sort of recoveries are we expecting in the leech?
- COO
We are looking at about 60 to 70% recovery on that.
- Analyst
Okay. So 60 to 70% recovery. I can assume you are going to basically cut the strip ratio in half or less?
- COO
I haven't got the numbers at my fingertips. I will get back to you with them.
- Analyst
Okay. Thank you very much.
Operator
Your next question comes from Tony Lesiak of UBS Securities. Please go ahead.
- Analyst
Good evening. Question on Round Mountain. Given that the underground does not look feasible now, and the potential pit layback likely, what mine life and production levels do you forecast for Round Mountain for the coming years?
- President, CEO
We are carrying life of mine there, 2018, so time remaining obviously to find what we need to find which is more higher grade material. And we are pretty careful and definitive in doing the underground study. There is definitely gold there. There is definitely some high grade gold there, just not enough to make bulk underground mining work out. That means pit layback, which is in progress for study now, and gold hill of course in the future. So time to find more ore, but we need to find some in the surrounding district as well to take it beyond that timeframe.
- Analyst
Do you see production dipping at all in the next few years?
- President, CEO
Yes. It will probably start moving down after about three or four years from today.
- Analyst
We should forecast similar production level to current for the next few years?
- President, CEO
It's up and down a bit depending on where we are in the lay back and the grade.
- Analyst
Okay. On Julietta you've seen the costs blow out there. Are you expected to get back into reserve grades in 2008, and maybe you can comment on the potential mine life there?
- COO
Yes. Some hope to find reserve grades. It is a stuff scrabble at the moment to find material. We have got a small extension that we are looking at, and we are going to keep around about the same grades is what we foresee.
- Analyst
As current, so lower than reserve grades?
- COO
Lower than reserve grade.
- Analyst
So the prospect of the [Eugenia] zone is a little less now?
- COO
Yes, it is not that good.
- Analyst
Okay. And if you could just remind me again the total CapEx numbers for the key expansion projects, Kupol, Paracatu, and Buckhorn as it stands right now?
- EVP, CFO
Sure. We discussed it on the call in the last quarter, the total costs for Kupol, which has come in at $705 million. Paracatu project we talked about last quarter as well, total amount is about 500 to $510 million, including the exposure as we calculated it to the local currency. And the Buckhorn project total project amount is about 92 to $100 million.
- Analyst
Thanks very much.
Operator
Your next question comes from Victor Flores of HSBC. Please go ahead. Mr. Flores, please go ahead.
- Analyst
Apologies, I was on mute. Now that you are talking about exploration and the focus on greenfields, I was wondering if you could make a couple comments on the Ixhuatan project, considering that there is a potential big payout there for Linear if you succeed. So you must quite like what you see.
- President, CEO
At this point we probably won't give much detail but we are going to be active or are active with two rigs, looking for a third. This looks to us to be a large [porforey] deposit. There are definitely three quarters of a million ounces of gold there shown today in terms of resource.
We see good showings for copper and moly, and we think the thing is going to get a lot larger. But it is going to take us a year of drilling to start seeing some steady results. We are also obviously doing some trenching and sampling right across the property. So beyond what Linear has disclosed to date, we are probably not in a position to say for a while, until we start getting drilling results. Very hopeful and excited about that deposit.
- Analyst
Okay. Great. Thank you so much.
Operator
Your next question comes from Haytham Hodaly of Salman Partners.
- Analyst
Quick question, just with regards to Kupol, wondering how is the construction process going there in terms of costs? I see that from your news release, you indicated you spent about 85% of the budget and completed about 78% of the work. What are you seeing in terms of escalating costs? Are you sourcing a lot of your required equipment, et cetera, internally or externally? With regards to doing business with Kupol, are you seeing anything different than what was being seen before when we were operating in the Kubaka mine?
- President, CEO
Couple of comments. On the CapEx, we updated that earlier this year and we were conservative in our outlook. As Tom said earlier, estimated about a little over 700 million which was up 100 from the previous Bema estimate. We try to take into account as best we could the higher shipping costs that we saw through this shipping season, with the global energy and shipping prices going up.
So we are standing on our guidance for CapEx there as we plan, and as we noted we're about 85% committed or spent today, so we think we can see the end pretty clearly, barring unforeseen changes from here. With respect to operating there, we did have a long experience as you mentioned Haytham with Kubaka, we ran Kubaka for 12 years. I can say that the environment, the political environment, the administrative environment is much more stable and predictable we see today, than we have seen in the past. So we are very positive about that. The regulators have visited consistently, doing their inspections over the course of construction, have been very pleased by what they have seen. We have a good relationship with the local administration. So we are thumbs up and full speed ahead with that, and still looking start up on schedule middle of next year. We are feeling quite comfortable with that.
As I mentioned in the comments, and in the press release, we have made good progress with the lease extension, and while it is not as fast as we would like, the wheels are turning, and the new administrator had been appointed, we are in dialogue and discussion with drafts going back and forth on the lease. We are feeling confident that is moving ahead.
- COO
The equipment is being essentially bought for the construction. Mostly what is left is labor costs and travel.
- Analyst
Okay. Thank you, that is a good answer. Maybe just one follow-up question on Cerro Casale. Obviously with the acquisition of Arizona Star, this puts this project back into the limelight where it has been out for quite some time. What do you see in terms of a potential development timeline for something like this?
- President, CEO
That will be something as so many other things that will have to be discussed with the partnership going forward. We are talking about a met drill program, we are the general manager of the project currently, and that program will take us into the new year. We think we will spend a fair bit of time in 2008 assessing how that technical data plays into the overall feasibility for the property. Obviously, we are very pleased with the way the metal prices are looking and so that's causing us to look at some of the economics on the project in an even more optimistic way.
So haven't made a decision yet. Of course we are pleased to see another endorsement as I say from Barrick Company that we respect, and our current operator partner with in Nevada. So we see the development table post feasibility, it is probably a two to three year build from there, depending on how fast you go with what we are thinking about currently, which is an early open pit, deep leach, followed by mill construction, so probably a [stetter] step in the saga but obviously we will have to discuss that with the partnership.
- Analyst
Thank you.
Operator
Your next question comes from Chantal Gosselin of Genuity Capital Markets.
- Analyst
Good afternoon. My first question is relating to Paracatu. The grade has been increasing since the beginning of the year. But the recovery has been on the decline. Is that related to possessing more sulfide ore?
- COO
It is related to processing more oxide ore. We moved into an area that we acquired recently, and developed reserves on called [Coral Banad] and on the margin of the pit it is slightly problematic. It's easy digging. It is soft ore. It goes through the mill pretty well. It has been a little bit challenging in terms of the recovery.
- Analyst
How long do you expect to be in that part?
- COO
I think we've got about 2 million tons left, so hopefully we will finish that by the end of the year. It kind of depends on the rainy season. It is a tough country when it is raining heavily, so we'll get out what we can, and the rest will come next year.
- Analyst
Okay. And at La Coipa, the production also half, I suspect it is mainly due to lower silver grade, but I don't know if you can elaborate a little bit on that?
- COO
Yes, they had some issues I think in August with filtration. The Puren ore is pretty tough, it is pretty fine, pretty high in clay content and they are managing it. They have to blend it with ore from Coipa Norte in the stockpile. So they have got that under control. But that had a bit of an impact in the quarter on that.
- Analyst
Your tonnage is the same, you haven't really reduced in tonnage processed. The grade is roughly the same on the gold side, and the recovery is also. So I have a hard time reconciliating all of that.
- President, CEO
Perhaps Chantal, we can have an offline discussion and get you some more detail and Irwin and Kim can give you the detail to work that through.
- Analyst
Okay. In Q4 are you expecting, are you going to be out of the high clay content, or how is that panning out in the future?
- COO
As I said they are managing it. They had a real good month in October. So we should be okay for the rest of the quarter.
- Analyst
Okay. Thank you.
- COO
Thank you.
Operator
Your next question comes from Barry Cooper of CIBC World Markets. Please go ahead.
- Analyst
Good evening. Tye, just wondering, what is your interpretation following up on another question here on Cerro Casale, with respect to the operatorship. You indicated that you are the operator there, and what I gather, although Barrick has a 51% interest, it is truly a 50/50 decision making process. What would cause you to let's say lose operatorship, or can you retain operatorship indefinitely?
- President, CEO
Thanks for the question, Barry. Listen, let me be clear. What is in place today between the two current partners, Kinross and Arizona Star is what I would call a summary joint venture agreement. It does designate Kinross as the general manager of the project as far as it goes.
It does not deal with the myriad of details, development construction, financing elements, that you would want to have in a major construction project like this one that is in a joint venture. So it is one of the many topics that are going to have to be on the table with the ultimate partnership there to sort. I would say that it is summary in nature, and doesn't deal with all the details that we will need to deal with going forward.
- Analyst
Okay. Good. Then on the second question here, has to do with your hedging of the Brazilian Real. You have allocated hedges towards the capital cost, but why not extend that into also hedging for the operating cost? What is the difference? Costs are costs. Why don't you have obviously had a view on the Brazilian. Why not extend that to do some other hedging to protect the operating costs?
- EVP, CFO
Hi, Barry. We have in fact done that. So during the third quarter, we bought $150 million worth of Real hedges forward, that stepped through the end of 2008. And that will cover about 59% of our total Real exposure in '08. That is both CapEx and OpEx. You know, we have made the decision to prioritize protecting the CapEx in the project.
But we also do have capacity in that hedging program to cover some of the OpEx for next year. That is an additional piece that we put on on the, in the sort of the subprime meltdown when the dollar came back very strongly, took the opportunity to put that on. As well as a Canadian dollar hedge which covers us through the end of this year at the rate of 106.
- Analyst
And if Brazilian rises, I assume that's 190 or something like that?
- EVP, CFO
In August, it came back to about, you know, 210, 215 range. So our average hedge or average cover for next year, which is $150 million U.S. committed at an average rate of 213.
- Analyst
Okay. Good timing.
- President, CEO
So philosophically, just to add to what Tom said, philosophically, no issue at all with hedging and the input costs, se we just need to see the opportunities to do it at a level we agree with.
- Analyst
Thanks a lot. That is all I had.
Operator
Your next question comes from Anita Soni of Credit Suisse.
- Analyst
Good evening. My question was the same as Chantal's I guess with regard to the silver grades at La Coipa. I thought the current pit was supposed to be one of the higher grade silver pits there. I am just wondering, I am reconciling it to be a lack of silver production. I am just wondering what is going on there?
- COO
Well, let's include you in the return on that.
- President, CEO
Let's be clear, Puren silver, we had give or take 30,000-ounces of gold equivalent. That is 1.6 million silver ounces, it was effectively a silver mine this past quarter. But we are not going to be in grades that are that good for too much longer, and we will be transitioning back to the other pits. Why don't we get back to you Anita and to Chantal with some detail on the grade reconciliation.
- Analyst
All right. Thank you.
Operator
Ladies and gentlemen, (OPERATOR INSTRUCTIONS) Your next question comes from [Mike Perkin] of Scotia Capital. Please go ahead.
- Analyst
Good eave thank. I just have one question regarding the Kupol project. I was just wondering when the reclassification of the project lands, when you expect that to happen?
- President, CEO
Well, Mike, it is a good question. We get asked regularly. But we haven't got a specific timeframe that we can share with you today. We can tell you we are in the very final stages of agreeing the lease terms, and getting the reclassification registered.
The office is now as we mentioned is now in place in Chukotka, and the Representative appointed to manage that office. So things are moving strongly as we had hoped. And while we can't predict it, I would hope it is in a matter of weeks or months, not longer than that. And we certainly do not expect it to impact any of the project timing.
- Analyst
Okay. Thank you.
- President, CEO
Thanks.
Operator
Your next question comes from Tanya Jakusconek of National Bank Financial. Please go ahead.
- Analyst
Yes, hi. I have two questions. First one is just on these, this 9.5 million of potential legal liability which you took in this quarter, and you said it is due to past lawsuits. What exactly is it, and is this the end of it or are we going to see something in Q4?
- President, CEO
It is the residual, you can see the lawsuit set out in our EIS, and our financial statements. Part of it is the [Reek Talenic] litigation, this is the last piece of that, and it's a hangover of course from Echo Bay days.
While we can't give details because we are in the final settlement discussions and settlement disclosure agreements, we are happy to say that Kinross today as a company in terms of this provision and our lawsuits as we know them is in great shape, better than we have ever been before, and we don't see any other major issues on the horizon from a litigation perspective. So it is the ongoing streamlining. We decided to take the charge this quarter because we're close on the settlement discussions and can't give detail.
- Analyst
So hopefully this is it for the legal spending. And then just a last question, Tim mentioned that with the sale of the Canadian assets and then Kupol coming in, and some of your other projects that your cost structure will be declining. If you kept everything, Tim, at the current exchange rate and fuel price, et cetera, et cetera, and sort of benchmark it versus your overall cash cost guidance of let's say 360 per ounce for this year, what are we looking as a decline in the cost structure? Are we looking at a $30 an ounce decline? Is that a fair?
- President, CEO
Tanya, I think to be fair to Tim here, we are in the middle of budget process right now. We will give our guidance on 2008 cash costs early in the new year, and I would obviously refer you to the numbers that we gave today, pro forma the swap, to give you a start on that.
And then secondly, to refer you to the feasibilities for in particular, Kupol and Paracatu, and the guidance we gave on cash cost numbers there, and I am sure you will be able to come, especially we know how good you are at that, you will be able to come very close to what we are seeing, and we will give you specific guidance in another month and-a-half.
- Analyst
I guess I will wait for that. We have our own costs that we forecasted. I just wanted to see if we were in the general trend. Okay. That is it for me. Thank you.
- President, CEO
Thanks.
Operator
Gentlemen, there are no further questions at this time.