  • Operator

  • Good afternoon, ladies and gentlemen. Thank you for standing by. Welcome to the Kinross Gold Corporation third-quarter operating results conference call. At this time, all participants are in a listen-only mode. Following the presentation, we will conduct a question-and-answer session. Instructions will be provided at that time for you to queue up for questions. (OPERATOR INSTRUCTIONS). I would like to remind everyone that this conference call is being recorded on Tuesday, November 22, 2005 at 1:15 PM Eastern time.

  • I will now turn the conference over to Tye Burt, President and Chief Executive Officer. Please go ahead, Mr. Burt.

  • Tye Burt - President, CEO

  • Thanks, operator, and good afternoon, folks. Welcome to our third-quarter operations update for Kinross Gold.

  • With us on the call here we have Scott Caldwell, Chief Operating Officer, Lars-Eric Johansson, our Chief Financial Officer, Ron Stewart, Senior VP of Exploration, Rod Cooper, our Vice President of Technical Services, and Tracey Thom, Director of our Investor Relations and Communications group.

  • Similar to the second-quarter conference call, this is an update on operations and events in the third quarter. That's, of course, due to the status of the review of our post-merger accounting for the acquisition of TVX and Echo Bay.

  • As you know, we have filed our preliminary unaudited '04 numbers and restated numbers for 2003. We expect to file audited 2004 year-end financial statements within the next two weeks. Then, of course, we will file the quarters of 2004 and 2005 in succession, along with all the other filings that are getting up-to-date. Then, of course, we will be able to send out our annual report and have a somewhat belated but still necessary annual meeting. We're looking forward to doing that in probably early January.

  • Well, we are up-to-date with our filings. We can't speak to any financial information beyond what was given in the press release that we made this morning. Of course, I would refer you to the Safe Harbor and qualifying statements at the end of the press release.

  • Let's turn now to the operational performance, and of course, we're pleased with the production numbers and performance of our operations this quarter. We are on plan through the end of Q3 with only a few sections, which Scott and I will speak to in sequence.

  • Q3 production was 4,000 and 6,000 ounces of gold equivalent. There were strong performances at Round Mountain, at Kubaka, offset some of the late start up at Refugio and the rockslides, which were minor pit occurrences at La Coipa. Our full-year production target remains at 1.6 million ounces of gold equivalent, and we are forecasting aggregate production costs of approximately 440 million for year-end, which would translate into about 274, $275 an ounce.

  • Energy costs and the pit wall event I mentioned at La Coipa have pushed our costs beyond what we expected at the end of the last quarter. Of course, we would refer you to the preliminary results filed for 2004 to reconcile cash costs to our actual P&L. Scott will speak to these numbers in a little more detail in the call.

  • From a health, safety and environmental perspective, we've had another strong quarter I'm happy to report. We had no notices of violation or spills at any of our sites, year-to-date. Round Mountain, for example, has achieved over 2 million work hours with little lost time accident. Our year-to-date lost workday frequency is about 1.2, which is well below the U.S. national average of 2.5. We're quite proud of that record and our folks are working hard to sustain it.

  • At Paracatu, we announced an ore reserve increase of approximately 56% over year-end reserves at 2004. We're pleased with this contribution to our overall results and as folks know and we announced earlier, we are currently working with SNC Lavalin on the engineering and capital cost budget for the project. We expect to release that late in Q1 of 2006. So, SNC Lavalin and Minerconsult of Brazil will be able to provide capital cost numbers I would say March of next year.

  • At Round Mountain, one of our other core assets, the pit expansion has begun its prestripping and ore is expected from that pit layback to contribute in Q4 of next year. The underground exploration developments drift is approximately 1,000 feet along know. We're expected to reach the drilling platform to get out that deep potential sometime in Q1 of 2006.

  • At Buckhorn in Washington, our draft supplemental EIS study has been published for public review as of the end of October, and the public comment period for the SEIS closes approximately 60 days from that date, or about 45 days from now. We are hoping, as we've stated previously, to begin construction of the Buckhorn mine next year. Of course, that will depend on closing the Crown Resources acquisition. We expect to proceed with the filing of the Crown offering documents as soon as we have completed our 2005 quarterly statements, so we expect that to proceed at approximately year-end.

  • At Refugio, the mine continues to crush and place ore on the leach pads and Scott will speak to that. While we have hit our 40,000-ton nameplate capacity fairly regularly, we're still looking to do that on a day in/day out basis.

  • At the Porcupine joint venture at Timmins, the bridge construction is complete for Pamour and the highway construction is almost done -- expected in Q1 of 2006.

  • Speaking broadly about the Company, our cash balances are approximately 80 million at this point. We have undrawn capacity on our revolver of a little under 40 million, approximately 38 million. We believe that's a reasonable level of capital availability, looking at our capital program.

  • Our exploration spending -- and Ron will speak to this a bit more in a minute. For the first three quarters of this year, are approximately 13 million, and we're on track to spend in the range of about 21 million for the full year.

  • On the CapEx side, about 112 million for the first nine months, and we expect to spend in the range of 165 on CapEx for the full year of 2005.

  • In summary, I would say we are very pleased with the operating results from the third quarter. We do wish to address the cash cost uptick at La Coipa, but at this point, we, of course, are only giving limited information on the full financial statements.

  • So I'd like to hand the operations part of the call over to Scott Caldwell. Scott?

  • Scott Caldwell - COO

  • Thanks a lot, Tye. As Tye mentioned, we're very proud of our continuing performance in the health and safety and environmental arena. You can see, from the press release, that our full-year guidance for production remains unchanged at 1.6 million ounces. The full-year total cash cost per ounce is now forecast to be approximately $275 per ounce. Capital spending for the full year is forecast to be approximately 165 million.

  • The capital costs for the full year have decreased really due to timing of expenditures, and you can see from press release primarily at Paracatu. Operating costs are under pressure from the obvious, the rising power, fuel and other commodity costs.

  • I'm also going to spend a minute now talking about La Coipa. Operating costs were, on a consolidated basis -- and obviously La Coipa itself -- were adversely affected during the quarter and for the entire year by lower-than-expected metal production and higher operating costs at the La Coipa mine. Really, the production shortfall, which is now forecast for the full year to be approximately 20,000 ounces and the operating costs increase, are a result of the rockslides that we mentioned in the press release. The ounces we talked to in the press release of 40,000 that may be lost in the Breccia Norte pit -- that's too 100% basis, just for reference.

  • If you look at La Coipa on a consolidated basis, the overall impact to Kinross is approximately -- the combination of loss of ounces and increased costs -- is approximately $4 an ounce or overall full-year forecasted total cash cost per ounce.

  • Strong performance at our operating sites, sites we control, really are allowing us to achieve our full-year production guidance, and that's across the board -- Round Mountain, Fort Knox, etc. -- so we will still achieve the 1.6 million ounce guidance.

  • At Refugio, I'm happy to report that, as Tye mentioned, the plant is performing well. The team has crushed and has placed approximately 4.8 million tons of ore on the pad since we began placing ore late June. Gold grade and the pregnant solution has increased tenfold since we began placing ore. The solution grade has risen from .04 grams per ton to roughly 0.4 grams per ton, so the plant is working, the tons are getting placed out there and so far month-to-date at November, we are averaging just around 50,000 dry metric tons per day placed on the pad, so running well and I'm really pleased with the performance of the plant. I think it's going to achieve the desired results.

  • In conclusion, despite dramatically increasing commodity prices, strength in non-U.S. currencies, the operating teams at the mines we control are doing a great job at controlling costs and achieving our production goals. That's all I've got, Tye.

  • Tye Burt - President, CEO

  • Thanks, Scott. I will ask Ron for a quick update on the exploration side.

  • Ron Stewart - SVP Exploration

  • Thanks, Tye.

  • As we've mentioned in our press release and at times mentioned earlier, our drill program at Paracatu has been a great success. The original plan that we submitted for drilling at Paracatu back in January was to complete about 30,000 meters of drilling largely on a target area defined west of Rico Creek. Around midyear, we recognized that this would be insufficient to define the reserves extent that we were seeing and we added another 20,000 meters to the program to complete some additional drilling along the northern margin of the pit and over in the northeastern quadrant, where we recognized opportunities to add reserves at depth. We expect to conclude the drill program in early December and then incorporate the remainder of all of the results of this drill program by early '06, so I'm fairly excited and enthusiastic about the additional opportunities still remaining at Paracatu on a go-forward basis.

  • In total around the Corporation, Kinross completed about 60,000 meters of drilling in Q3, bringing our total year-to-date figure to around 200,000 meters. We are forecasting an additional 50 to 60,000 meters of drilling through year-end in Q4.

  • The other main projects that we've executed on during the course of the year include the Round Mountain pit expansion, in-pit drilling campaigns at Fort Knox and Birkachan and exploration drilling on the La Coipa area properties, largely by MBO.

  • We've also (indiscernible) through our joint venture with Placer (ph) at Porcupine and Musselwhite being exposed to continual reserve replacement drill work on those joint ventures. So, in total around the operation, our opportunity to continue to replace reserves on a year-over-year basis has continued.

  • Throughout the second half of this year, it has been very exciting to start looking at opportunities for new exploration joint ventures around Kinross operations. To this point, we've added five new projects just in the back half of Q2 and Q3. We started drilling on one of those projects at Oretch (ph) over in Russia and through Q3, we've had some evidence of economic numbers from our early-stage drilling. This increase to our pipeline of exploration projects and the dial-up of our spending in pure exploration will extend into 2006, and I'm excited about the opportunities that I will be able to bring to the Company through this activity.

  • Thanks, Tye.

  • Tye Burt - President, CEO

  • Thank you, Ron.

  • A quick summary then, folks -- Q3 we think was very strong from an operations perspective in production. We're facing operating cost pressures, which we've illustrated and explained. We published preliminary financials this quarter with full audited numbers to file shortly. We're particularly proud of the performance at our operated mines and our margin per ounce. We have strong environmental, health and safety stats; performance is continuing. We have strengthened our Board even further with the additions of John Carrington and Catherine McLeod, two folks who we're very proud to have join the Company. We've added some 4.8 million ounces to our reserve base. We think, all in all, this was a terrific quarter and we'll look forward to following on in Q4.

  • Operator, I'd like to open it up for questions, please.

  • Operator

  • Ladies and gentlemen, we will now conduct a question-and-answer session. (OPERATOR INSTRUCTIONS). Tony Lesiak from UBS.

  • Tony Lesiak - Analyst

  • Good afternoon. Could you speak to perhaps some of the forecast -- I know you can't talk about the financials -- particularly some of the mines, La Coipa. You've indicated 20,000 ounces lower for the year. Is that on a 100% basis? Can you talk about the cash costs there?

  • Tye Burt - President, CEO

  • Scott, would you pick that one up, please?

  • Scott Caldwell - COO

  • Sure. The 20,000 -- there's two numbers that I spoke to. First off, the potential loss of ounces mentioned in the press release, that is a 100% number. The production shortfall for the year, the 20,000-ounce gold equivalent that I spoke to, that is to the Kinross share.

  • Then total cash cost per ounce, again for the full year, we are forecasting them to be dramatically higher than what we thought previously, a result of the shortfall in ounces your divisor went down and increased costs to repair these rockslides that have occurred there.

  • Tony Lesiak - Analyst

  • Can you give us a ballpark where they are at?

  • Scott Caldwell - COO

  • Let me get the year-to-date numbers here. They are sitting north of $300 an ounce, and we were hoping them to be something around 270 or 250 an ounce, so about $50 an ounce over year-to-date in our numbers. Now, those would be different from Placer's because the management fee, etc., right.

  • Tony Lesiak - Analyst

  • Can you comment on the fourth quarter -- how they might look in relation to what you've done year-to-date and maybe into 2006? (multiple speakers).

  • Scott Caldwell - COO

  • 2004, the fourth quarter basically similar to the previous three quarters. I don't expect -- in other words, it's spending issue to repair the remediation mine plans going on but our current estimates are that that won't be too high other than we may lose those 40,000 ounces. We won't know; that will be in 2006, 7, 8 and beyond. We won't know that until the work is done. 2006, we don't just have a finalized budget yet.

  • Tony Lesiak - Analyst

  • Can you comment maybe on what's happening at Kettle River? I know you've run out of ore there -- how much you think you're going to be able to get on in 2006, the remainder of the year this year, maybe talk about the final mine plan for Kubaka?

  • Scott Caldwell - COO

  • Sure. First, at Kettle River, you are correct; we are out of ore there and we went through a retrenchment starting this month, so Kettle River is no further production. There may be some residual production out of the mill but it's just cleanup and not worth talking about. Obviously, working on the Buckhorn permitting through the tool milling arrangement, so we're working on the permitting there. The draft -- well, I call it a supplemental environmental impact statement by the state, which is the controlling regulatory agency to (ph) Washington -- that document went out on October 28. It's a 45-day public review period, so permitting is on track. We are hopeful to begin construction mid to let's just say late second quarter/early third quarter of next year on the Buckhorn, which is a short development schedule. Should be mining ore, if we begin as per our plans, mining ore in late 2006, really appreciable production coming out in 2007 from Buckhorn.

  • Tye Burt - President, CEO

  • Scott, do you want to just speak about Kubaka?

  • Scott Caldwell - COO

  • Kubaka, we are still milling stockpiled ore from Birkachan. We will continue production. It looks now that we will continue to run the mill from the Birkachan ore, which by the way has been a pleasant surprise, i.e., we underestimated the grade, so that was some good news.

  • We will continue through Kubaka it looks now through the end of January of next year. We're looking at some other alternatives. We have some additional low grade stockpiles at Birkachan. Perhaps it will be economic with today's metal prices, so more hopefully to follow there. Anyway, we're working on the economics on these other Birkachan stockpiles.

  • Tye Burt - President, CEO

  • Thanks, Scott.

  • Tony Lesiak - Analyst

  • Thanks very much.

  • Operator

  • John Bridges from JP Morgan.

  • John Bridges - Analyst

  • You produce a lot of silver down in La Coipa, I seem to remember. With silver where it is, to what extent is that helping you in terms of profitability at least, counter the pit problems?

  • Scott Caldwell - COO

  • Well, this is Scott; I will take that. I talk -- the numbers I was bantering about there are gold equivalents, so we are converting the silver ounces into gold. But yes, we do produce a substantial number of silver ounces, but the silver and the gold track together, so this pit slope -- these rock failures we mentioned, although minor in nature, the pits are small and they are tight. It impacts the silver as well. So what's happening is we are having to feed or the operator is having to feed low-grade stockpiles, lower silver grades, lower gold grades, so silver production is impacted as well. We're certainly hoping it will be a deferral into 2006 and beyond, not a loss. But 40,000 ounces could be at risk on a 100% basis.

  • Tye Burt - President, CEO

  • I think we should be clear to state here, John and Scott, that we're still waiting for Placer to come forward, which I'm sure they will, with a full remediation plan and moving that forward. So, these are preliminary numbers.

  • John Bridges - Analyst

  • Are you booking spot prices on silver -- spot levels -- or is there hedging now on silver?

  • Tye Burt - President, CEO

  • Well, listen, we are not the operator but we are certainly not hedging any silver, no.

  • John Bridges - Analyst

  • (inaudible) had some silver hedges in my (indiscernible).

  • Sensitivity (indiscernible) -- do you have any sensitivity on those reserves to oil prices?

  • Scott Caldwell - COO

  • Rod, do you want to -- yes, we've run sensitivities to currencies, etc., other operating cost pressures -- no, I'm not sure we want to just go into the details of that.

  • Tye Burt - President, CEO

  • I don't think we have enough data yet from the go-forward, John, to really give you a full answer on that. Our overall corporate sensitivity, as I think I've said before -- you know, we get a $10 move in the oil price. You know, that hits us by about $4 an ounce in terms of production costs, so we use about 650,000 barrels of oil equivalent a year.

  • In terms of current operating spend in Brazil, you know, that would be about $40 million of our $450 million total operating spend. So you might triangulate from those two points.

  • John Bridges - Analyst

  • Okay. What's the situation with Kendall area? Is that still around? Because that had some high silver price reserves or resources at one stage, I seem to remember.

  • Scott Caldwell - COO

  • Yes, it did, but Kendall area has essentially been reclaimed. We don't tend to do anything with it.

  • Tye Burt - President, CEO

  • Sorry; it's ancient history, John, but -- (multiple speakers).

  • John Bridges - Analyst

  • I visited it once, so I just remember it. Anyway, thanks a lot.

  • Operator

  • Tony Lesiak from UBS.

  • Tony Lesiak - Analyst

  • Yes, I just wanted to talk about the Paracatu expansion. You've indicated in the press release that you're going from 18 million tons, which we knew, but you don't give us where you are going to. You know, we're looking at 35 or 50. What's the water situation look like there right now? Do you think you're going to able to bring it to the 50 million ton level? Because otherwise, you are looking at the difference between a 20-year mine life and a 30-plus year mine life.

  • Tye Burt - President, CEO

  • Well, Tony, we haven't specifically haven't addressed all of the details of Paracatu, because we plain simple just don't have them yet. So, Frank Murray, who is Scott's man in Brazil, is shepherding the SNC Lavalin and Minerconsult work. We won't have detail numbers on that until the end of Q1 of '06, but big, big picture, yes, we do 17, 18 million tons a year now. What we've authorized is a study of the 30 million ton throughput, which seems to be, at least first cut, optimal size for a Phase I. We do not yet know what the optimal size is for Phase II. It could be 50; it could be 60 million in terms of tons of throughput. But I think we would be safe to wait for the early returns from the engineers.

  • Tony Lesiak - Analyst

  • Okay -- (multiple speakers).

  • Scott Caldwell - COO

  • Excuse me, I might add, on the water issue, we have resolved our water issue. Clearly, the 30 million ton, if that's where the base case is, we have the water through a series of ideas/(indiscernible), that kind of thing. So we are in good shape on the water side.

  • Tony Lesiak - Analyst

  • Okay, and that's using a new pace tail (ph) and trying to get a little more water out of it?

  • Scott Caldwell - COO

  • No, it's actually just obviously water conservation. That's one of our initiatives everywhere but it's just a new thinking on how we deposit tails and where we deposit tails, so the water issue is resolved.

  • Tony Lesiak - Analyst

  • For the 50 to 60 million ton level, is that still possible, given the water situation?

  • Scott Caldwell - COO

  • Again, like Tye mentioned, we are in the process of working through that and it just really depends on where we go -- if we do a second phase expansion and then we will address the water issue beyond that.

  • Tony Lesiak - Analyst

  • Thanks very much.

  • Operator

  • Michael Vint (ph) from CIBC World Markets.

  • Michael Vint - Analyst

  • Yes, I was just wondering about the ounces at Paracatu. Those new ones, is there a higher strip ratio associated with those, or is it the same?

  • Tye Burt - President, CEO

  • Ron will speak to that.

  • Ron Stewart - SVP Exploration

  • Yes, there is some stripping associated with some of the reserve ounces on the expansion but a portion of the ounces are just deepening of the existing pit. I don't have the split in front of me but right now, as it is, the current reserve at year-end '04 had a 0 strip ratio. Dialing forward, these new ounces will have some stripping on a net basis for the entire project; it's still going to be fairly small.

  • Michael Vint - Analyst

  • All right. Also at La Coipa, I assume you're laying back one of the pit walls there? Are you reengineering the whole pit for a pit slope, or is it just like an isolated area, or --?

  • Tye Burt - President, CEO

  • I think, again, we should defer to Placer on that. I'm sure they will come forward shortly with their full plan. Maybe we can give a summary comment about what we know so far, Scott.

  • Scott Caldwell - COO

  • Yes, it's actually two small pits, Breccia Norte and La Corte (ph) Norte and it's a sector of each of these pits that we've had problems with and they are right now working on the ultimate solution and is it layback the whole wall? Is it layback just a portion, steepen a portion of it, flatten a portion of it? We really don't know yet, and they are in the middle of the engineering fix for this right now. We should have those results here shortly, so we're kind of waiting on that. But it's a sector of each of these two small pits.

  • Michael Vint - Analyst

  • All right, thanks.

  • Operator

  • (OPERATOR INSTRUCTIONS).

  • Tye Burt - President, CEO

  • Well, thank you, folks. Operator, can we wrap it up? I appreciate everyone's time and interest. Thank you.

  • Operator

  • Ladies and gentlemen, this concludes the conference call for today. Thank you for participating. You may now disconnect your lines.