  • Good morning, and welcome to Hut 8's third quarter 2026 financial results conference call. Joining us today are our CEO, Asher Genoot; and our CFO, Sean Glennan. Following the presentation, we will open the line for questions. This event is being recorded and a transcript will be made available on our website.

    早安,歡迎參加 Hut 8 2026 年第三季財務業績電話會議。今天與會者包括我們的執行長 Asher Genoot,以及財務長 Sean Glennan。簡報結束後,我們將開放提問。本次活動將進行錄音,逐字稿將公布於我們的網站。

  • In addition to the press release issued earlier today, our full quarterly report on Form 10-Q is available at hd.com on our EDGAR profile at sec.gov and on our SEDAR profile at sedarplus.ca. Unless otherwise indicated, all figures discussed today are in US dollars. Certain statements made during this call may constitute forward-looking statements within the meaning of applicable securities laws.

    除今日稍早發布的新聞稿外,我們完整的季度報告(Form 10-Q)可於 hd.com、sec.gov 上我們的 EDGAR 檔案,以及 sedarplus.ca 上我們的 SEDAR 檔案查閱。除非另有說明,今日討論的所有數字均以美元計。本次電話會議中的部分陳述可能構成適用證券法所定義的前瞻性陳述。

  • These statements reflect current expectations and are subject to risks and uncertainties that could cause actual results to differ materially. Certain key risks are detailed in our Form 10-K for the year ended December 31, 2025, and our other continuous disclosure documents. Except as required by law, we assume no obligation to update or revise any forward-looking statements.

    這些陳述反映我們目前的預期,並受風險與不確定性影響,可能導致實際結果與陳述存在重大差異。若干主要風險已於我們截至 2025 年 12 月 31 日止年度的 Form 10-K,以及其他持續性揭露文件中詳述。除法律要求外,我們不承擔更新或修訂任何前瞻性陳述的義務。

  • During the call, management may reference non-GAAP measures such as adjusted EBITDA. We believe these metrics alongside GAAP results provide valuable insight into our performance. Reconciliations of GAAP and non-GAAP results are included in the tables accompanying today's press release available on our website.

    在本次電話會議中,管理層可能會提及非 GAAP 指標,例如調整後 EBITDA。我們認為,這些指標與 GAAP 結果一併觀察,能為我們的表現提供有價值的洞見。GAAP 與非 GAAP 結果的調節表已包含於今日新聞稿隨附的表格中,並可於我們網站取得。

  • I'll now turn the call over to Asher.

    接下來我把電話交給 Asher。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Thank you, Mark, and good morning, everyone. Over the past year, we have contracted 949 megawatts of IT capacity under long-term AI data center leases with our Pasta investment-grade companies, representing approximately $27 billion of contracted revenue, realizing that revenue and the returns that we underwrote against it requires three disciplines.

    謝謝你,Mark,各位早安。過去一年,我們已與我們的 Pasta 投資等級公司客戶,透過長期 AI 資料中心租賃合約簽訂 949 兆瓦的 IT 容量,對應約 270 億美元的已簽約收入;要實現該收入以及我們據以承作的回報,需要三項紀律。

  • First, the quality of the power and the contracts that we originate. Second, our execution in delivering what we have contracted and third, our rigor in financing. Those are the three principles we outlined for investors in May. And my remarks this morning will address each in term origination, delivery and financing. Sean will then review the results in detail.

    第一,是我們所取得的電力與合約的品質。第二,是我們在交付已簽約內容上的執行力;第三,是我們在融資上的嚴謹度。這三項原則是我們在 5 月向投資人提出的。而我今天上午的談話將分別就案源取得、交付與融資加以說明。接著 Sean 會詳細回顧本季業績。

  • Before I turn this quarter, I want to step back to the premise behind all three measures because it explains why we sequence them in that order. AI is delivered as software, but it is produced by physical infrastructure, power, land, transmission, buildings, cooling, equipment and the people who operate them. The next generation of compute will be constrained not only by chips, but also by that infrastructure. And of everything that infrastructure requires, powers a scarce input.

    在我進入本季內容之前,我想先回到這三項衡量背後的基本前提,因為它解釋了我們為何以這樣的順序來安排。AI 以軟體形式交付,但其產出仰賴實體基礎設施:電力、土地、輸電、建築、冷卻、設備,以及操作這些設施的人員。下一代運算的限制不僅在晶片,也在這些基礎設施。而在基礎設施所需的一切之中,電力是一項稀缺投入。

  • That is why we are a power first company. the input that is hardest to secure is the one we secure first. We developed the discipline of building within that constraint in Bitcoin mining, which required us to operate power dense compute to manage cooling and uptime and to procure and build quickly. AI is the largest opportunity we have yet encountered to apply that same discipline.

    這就是為什麼我們是一家以電力為先的公司。最難取得的投入要素,就是我們優先確保的要素。我們在比特幣挖礦中培養了在此限制下建置的紀律:需要運行高功率密度運算以管理冷卻與正常運作時間(uptime),並且要能快速採購與建置。AI 是我們迄今遇到、可運用同樣紀律的最大機會。

  • Securing power, however, only earns the right to build, converting it into contracted revenue depends on how efficiently we build, and that is the second part of what defines Hut 8. I'm convinced that the infrastructure behind AI can be built better than it is being built today. faster at a lower cost and without compromising on quality. Many of today's data centers resemble natural blocker programs, remarkable engineering, a complex, expensive slope to deliver.

    然而,確保電力只是取得建置的入場券;要把電力轉化為已簽約收入,取決於我們建置的效率,而這是定義 Hut 8 的第二個面向。我深信,AI 背後的基礎設施可以比現在建得更好。更快、成本更低,且不犧牲品質。當今許多資料中心看起來像是「自然阻塞」式的專案:工程令人驚嘆,但交付路徑複雜且昂貴。

  • And frankly, this is the mold that Regabatin Beacon Point Phase I follow. This approach makes sense when the buildout is small, but will not work at the multi-gigawatt scale at which I expect honey to build. Our future builds before I start with a different question, what each system must do and how it should be designed and delivered a thinking bills from there with the aim of improving speed and cost efficiency with quality held as a constant, not the variable.

    坦白說,Regabatin Beacon Point 第一期就是遵循這種模式。當建置規模較小時,這種做法合理;但在我預期 Hut 8 將建置的多吉瓦(multi-gigawatt)規模下,這種方式行不通。我們未來的建置會從不同的問題出發:每個系統必須完成什麼、應如何設計與交付;並以此為起點展開思考,目標是在把品質視為常數(而非變數)的前提下,提升速度與成本效率。

  • We have done this before, Vega, a Vicor mining facility, we designed in-house with direct liquids a chip cooling was built in under six months. We believe we can apply the same approach to our future builds, and we believe that our ability to rethink builds to be more cost efficient in shortened delivery times while maintaining quality through innovation will differentiate HUD with customers. With that as context, I will turn to the quarter beginning with origination, which is where the power is secured.

    我們以前做過:Vega,一座 Vicor 挖礦設施,由我們內部設計,採用直接液冷的晶片冷卻方案,在六個月內完成建置。我們相信可將同樣的方法應用於未來建置;我們也相信,透過創新重新思考建置方式,在維持品質的同時提升成本效率並縮短交付時間,將使 HUD 在客戶面前形成差異化。在此背景下,我將從案源取得開始回顧本季,因為電力是在此階段被確保的。

  • For investors origination is a measure of whether we control sufficient pallet on terms that support attractive commercialization opportunities to continue converting our pipeline into leases comparable to those at River Bend and Beacon Points. We originate through three channels, and we advanced each throughout the quarter.

    對投資人而言,案源取得衡量的是:我們是否以支持具吸引力商業化機會的條件,掌控足夠的電力容量,從而持續把管線轉化為可比於 River Bend 與 Beacon Point 的租賃合約。我們透過三個管道進行案源取得,本季三者皆有推進。

  • The first is front of the meter greenfield development. Our pipeline now includes more than 6.4 gigawatts under diligence and under equity. Capacity under exclusivity, the stage at which we have secured a defined path to ownership increased by approximately 1.3 gigawatts during the quarter as existing projects advance and new projects were originated.

    第一個管道是表前(front of the meter)的綠地開發。我們的管線目前包含超過 6.4 吉瓦,處於盡職調查階段並在股權架構之下。處於排他性(exclusivity)階段的容量——亦即我們已確保明確的取得所有權路徑的階段——在本季隨著既有專案推進與新專案取得,增加約 1.3 吉瓦。

  • PL alone does not answer the question investors ask most often about that pipeline, which is how geographically diversified is it? This quarter, we are providing a breakdown of our front-end the meter greenfield pipeline by geography. The largest shares are in MISO, PJM and Sure. Less than 5% is in ERCOT. That distribution reduces our regulatory and price exposure in any single market.

    但僅有管線規模並不能回答投資人最常問的問題:這條管線在地理上有多分散?本季我們提供表前綠地管線按地理區域的拆分。占比最大的區域在 MISO、PJM 與 Sure。ERCOT 低於 5%。這樣的分布降低了我們在任何單一市場的監管與價格曝險。

  • It does not, however, diminish the value of our existing Texas interconnect, which we believe has become more valuable as Arcos revised interconnection process has lengthened the time required to secure approvals for new interconnections.

    然而,這並不會降低我們既有德州併網資產的價值;我們認為,隨著 Arcos 修訂後的併網流程拉長了取得新併網核准所需時間,我們的資產反而更具價值。

  • The second channel is behind the meter development. which allows us to unlock power and accelerate delivery where traditional grid time lines are constrained and which builds on years of experience developing and operating such projects. We are actively evaluating opportunities across our campuses. Consistent with our disciplined approach, however, we do not include that capacity in our reported development pipeline until a contract is executed.

    第二個管道是表後(behind the meter)開發。這使我們能在傳統電網時程受限之處釋放電力並加速交付,並建立在我們多年開發與營運此類專案的經驗之上。我們正積極評估各園區的機會。不過,依循我們一貫的紀律作法,在合約簽署之前,我們不會將該容量納入對外揭露的開發管線。

  • River Bend illustrates that point. Beyond the current phase under construction, we continue to develop the site. We have cleared 184 acres for campus expansion and are advancing site preparation now. So that construction can begin promptly once the next phase commercialize and approvals are secured.

    River Bend 就說明了這一點。除了目前正在施工的階段之外,我們仍持續開發該基地。我們已清理 184 英畝用於園區擴張,並正推進場地整備。以便在下一階段完成商業化並取得核准後,能立即開始施工。

  • The third channel is corporate development in which we acquire powered assets. Our approach here is the one that produced Beacon point where we secured the power, underwrote the site on Bitcoin mining as its initial use and applied our greenfield development capabilities to advance the site and convert it into an AI data center campus. This quarter, corporate development yield another opportunity as we entered into a definitive agreement to acquire from affiliates of Poland to energized data center sites in West Texas with up to 230 megawatts of utility capacity upon full energization subject to final power approvals and infrastructure development.

    第三個管道是企業發展(corporate development),也就是我們收購已通電的資產。我們在此的做法,正是促成 Beacon Point 的方式:我們先確保電力,以比特幣挖礦作為初始用途對基地進行承作評估,並運用我們的綠地開發能力推進基地,將其轉化為 AI 資料中心園區。本季,企業發展帶來另一項機會:我們已與 Poland 的關聯方簽訂最終協議,收購位於西德州的兩處已通電資料中心基地;在完成全面通電後,公用事業容量最高可達 230 兆瓦,但仍須取得最終電力核准並完成基礎設施開發。

  • Second, delivery. Each lease we sign obligates us to deliver capacity by a contracted date and the lease revenue begins only on delivery. For investors, delivery is, therefore, the measure of whether the capacity we have contracted begins generating rent on the date to which we committed, and it is our central operating priority. Construction at Regabatin Beacon Point Phase 1 remains on track to meet our delivery targets and both projects are funded entirely at the project level.

    第二,交付。我們簽署的每一份租賃合約都要求我們在合約約定日期前交付容量,而租賃收入僅在交付後才開始計入。因此,對投資人而言,交付是衡量我們已簽約的容量是否能在我們承諾的日期開始產生租金的指標,也是我們最核心的營運優先事項。Regabatin Beacon Point 第一期的施工仍按計畫推進,以達成我們的交付目標,且兩個專案皆完全在專案層級完成資金籌措。

  • At River Bend, more than 1,200 people are on site. Structural steel, roof decking and building foundations are complete on all four data halls. The slab at Data Hall 1 is also complete, and the remaining three Data Halls will follow through year-end. Roofing and precast wall panels have also been installed at Data Hall with the remaining halls expected to follow through by mid-December, reducing the exposure of inferior electrical mechanical work to weather-related disruptions.

    在 River Bend,現場有超過 1,200 人。四個資料機房(data hall)的結構鋼、屋面樓承板與建築基礎均已完成。資料機房 1 的地坪板(slab)也已完成,其餘三個資料機房將在年底前陸續完成。資料機房的屋面與預鑄牆板亦已安裝完成,其餘機房預計在 12 月中旬前跟進,從而降低較低階的機電工程暴露於天候造成干擾的風險。

  • We expect to energize a substation in phases and equipment installation has done in Data Hall 1, starting with Vertiv IT power skids and smart run overhead modulars. At Beacon Point Phase I ground improvements are approximately 95% complete, building foundation work and underground utilities installation are underway. The steel erection is scheduled to begin this month. We have also begun foundation work for the substation. For Beacon Point Phase 2 civil design in surveying are underway.

    我們預期將分階段為變電站送電(energize),且資料機房 1 已完成設備安裝,先從 Vertiv 的 IT 電力滑橇(power skids)與智慧母線上方模組(smart run overhead modulars)開始。在 Beacon Point 第一期,地盤改良約完成 95%,建築基礎工程與地下管線(utilities)安裝正在進行中。鋼構吊裝預計於本月開始。我們也已開始變電站的基礎工程。至於 Beacon Point 第二期,土木設計與測量作業正在進行。

  • We also amended the Beacon Point Phase 2 lease with our customer, extending its term from 15 to 17 years. The extension serves both parties. For our customer, it secures capacity over a longer horizon, which reflects the durability of demand for power. For Hut 8, it adds two years of contracted revenue for lenders to underwrite, which should help offset potentially higher financing costs as we look to finance Phase 2.

    我們也與客戶修訂了 Beacon Point 第二期租約,將租期由 15 年延長至 17 年。此延長對雙方皆有利。對客戶而言,這可在更長的時間範圍內鎖定容量,反映出對電力需求的持久性。對 Hut 8 而言,這為放款人提供額外兩年的已簽約收入以供承作(underwrite),在我們為第二期籌措融資時,有助於抵銷可能較高的融資成本。

  • The amendment applies to Phase 2 only. Phase 1 remains on its existing terms and the construction and financing framework for the campus is unchanged. Delivery also depends on the support of the communities in which we build, which we treat as a precondition of development rather than as an obstacle to be managed. River Bend demonstrates what is required to conserve power first approach into a real project, power, transmission, land, construction partners and community alignment would come together in the right order. That is what more than 300 investors, analysts, media, government stakeholders and community members saw when they visited River Bend last month.

    本次修訂僅適用於第二期。第一期仍維持既有條款,園區的施工與融資架構亦未改變。交付也取決於我們建設所在地社區的支持;我們將其視為開發的前提,而非需要被「管理」的障礙。River Bend 展示了將「先節電(conserve power first)」的方法落地到實際專案所需的條件:電力、輸電、土地、施工夥伴與社區共識必須以正確順序到位。這正是上月超過 300 位投資人、分析師、媒體、政府利害關係人與社區成員參訪 River Bend 時所見證的內容。

  • I joined Governor, Jeff Landry of Louisiana and leaders from Anthropic, Entergy Louisiana, Broadcom, Ferdman Jacobs to discuss the future of American AI infrastructure, and those discussions reach one conclusion, demand, supply, delivery and policy are inseparable. Sound technical plans matter, but durable products are built transparently in partnerships with the people who live and work nearby.

    我與路易斯安那州州長 Jeff Landry,以及來自 Anthropic、Entergy Louisiana、Broadcom、Ferdman Jacobs 的領導者一同討論美國 AI 基礎設施的未來,而這些討論得出一個結論:需求、供給、交付與政策密不可分。健全的技術規劃固然重要,但能長久的產品必須以透明方式,與在地生活與工作的民眾建立夥伴關係共同打造。

  • In Louisiana, that partnership has taken specific form. We are investing approximately $60 million in a new water well and nearly 8 miles of water infrastructure. None of which will be used to cool a data center and which will be transferred to the parish at no cost for local taxpayers and can serve more than 4,000 households and 200 local employers. We also made a $10 million payment in Luitaxes, bringing tax revenue to West Bellician Parish 1 year earlier than it otherwise would have arrived, supporting local government, schools and law enforcement including $7,000 stipends for school employees in each of the next two school years and payments up to $8,000 per eligible share of office personnel.

    在路易斯安那州,這種夥伴關係已具體落地。我們正投資約 6,000 萬美元建置一口新水井與近 8 英里的供水基礎設施。這些設施不會用於資料中心冷卻,並將無償移交給該郡(parish),不增加當地納稅人負擔,且可服務超過 4,000 戶家庭與 200 家在地雇主。我們也支付了 1,000 萬美元的 Luitaxes,使 West Bellician Parish 的稅收比原本可能到位的時間提前 1 年,支持地方政府、學校與執法部門;其中包括在未來兩個學年為學校員工提供每人 7,000 美元津貼,以及向符合資格的辦公室人員每股最高支付 8,000 美元。

  • A beacon Point in Texas. The commitments differ in form, but not imputable. We are funding the electrical upgrades that our campus requires that those costs are not shifted to residential rate payers, and the campus users closed loop pooling design to minimize local water demand. Across both phases, we anticipate approximately 1,900 construction jobs and more than 200 permanent positions supported by partnerships with local educators and workforce organizations.

    在德州的 Beacon Point。承諾的形式不同,但並非不相干。我們將出資進行園區所需的電力升級,確保相關成本不會轉嫁給住宅用戶(rate payers);同時,園區使用者採用封閉迴路的池化(closed loop pooling)設計,以將當地用水需求降至最低。跨兩個期別,我們預期約可帶來 1,900 個施工工作機會,以及超過 200 個長期職位,並透過與在地教育機構與勞動力組織的合作來支持。

  • We make these commitments because we believe a successful project must create lasting value, not only for our customers and shareholders, but also for communities that host it. We uphold this philosophy by investing in the infrastructure, workforce and partnerships that allow our projects and the communities around them to grow together.

    我們做出這些承諾,是因為我們相信成功的專案必須創造長期價值,不僅是為客戶與股東,也為承載專案的在地社區。我們透過投資基礎設施、勞動力與夥伴關係來落實此理念,使我們的專案與周邊社區能共同成長。

  • Third, financing. For investors, how we finance our projects is a measure of our ability to limit risk to the parent balance sheet and avoid dilution for existing shareholders. Two of the main questions we've been asked this quarter is directly to that point. How are our current builds progressing? And might we need to issue additional equity to support them?

    第三,融資。對投資人而言,我們如何為專案融資,是衡量我們能否將風險限制在母公司資產負債表之外,並避免稀釋既有股東權益的指標。本季我們被問到的兩個主要問題,正是針對這一點。我們目前的建置進度如何?以及我們是否可能需要發行額外股權來支持這些專案?

  • The answers are straightforward. We remain on schedule, and we do not expect to issue additional equity to support River Bend or Beacon Point. River Bend and Beacon Point Phase 1 are funded through completion with investment-grade project bonds of $3.25 billion for River Bend and $4.25 billion for Beacon Point Phase 1, each nonrecourse to Hut 8. We were able to raise investment-grade financing for both projects through a comprehensive approach to risk mitigation.

    答案很直接。我們仍按進度推進,且不預期需要發行額外股權來支持 River Bend 或 Beacon Point。River Bend 與 Beacon Point 第一期的資金已足以支應至完工:River Bend 以 32.5 億美元投資級專案債券融資,Beacon Point 第一期以 42.5 億美元投資級專案債券融資,且兩者皆為對 Hut 8 無追索權(nonrecourse)。我們能為兩個專案取得投資級融資,源於一套全面性的風險緩釋方法。

  • Operating in Bitcoin mining taught us how quickly markets can change. and inflation and interest rate expansion are present realities. We cannot control the market, but we can control we secure in advance in how we contract. We work from first principles to understand what every component must do and what is your cost. At River Bend and Beacon Point Phase 1, all long lead equipment has been ordered and all major contracts have been signed. Locking in the largest components of costs ahead of further market movement.

    比特幣挖礦業務的經驗讓我們了解市場變化可以有多快。而通膨與利率上行是當前的現實。我們無法控制市場,但我們可以控制我們如何提前鎖定,以及我們如何簽約。我們從第一性原理出發,理解每個組成要素必須完成什麼,以及其成本為何。在 River Bend 與 Beacon Point 第一期,所有長交期設備均已下單,且所有主要合約均已簽署。在市場進一步波動之前,先行鎖定最大宗的成本構成。

  • Risk mitigation extends beyond procurement. Our principal Equipment and Construction Partners, Verdan Jacobs are investment-grade counterparties. Comprehensive insurance coverage is in place at both sites, providing an additional layer of protection against covered losses that could affect the projects and in turn bondholders, and the triple net lease structure makes tenants responsible for operating expenses, taxes and insurance, which further supports this framework.

    風險緩釋不僅限於採購。我們的主要設備與施工合作夥伴 Verdan Jacobs 皆為投資級交易對手。兩個場址均已配置完整保險保障,為可能影響專案、進而影響債券持有人之承保損失提供額外一層保護;此外,三重淨租賃(triple net lease)結構使承租人負擔營運費用、稅負與保險,進一步支撐此架構。

  • A measure of the strength of our financings is that both bonds have traded well in the secondary market. That matters because capital has become scarcer across today's markets and we believe scarcity produces a flight to quality. Investor interest in future issuance remains strong. In a tighter market, we believe contract quality and the flexibility to access multiple debt capital markets gives us a competitive advantage.

    衡量我們融資強度的一個指標是:兩檔債券在次級市場的交易表現都相當良好。這很重要,因為在當前市場環境下資本變得更稀缺,而我們相信稀缺會帶來資金向高品質標的集中(flight to quality)。投資人對未來發行的興趣仍然強勁。在更緊縮的市場中,我們相信合約品質,以及能彈性進入多個債務資本市場的能力,將賦予我們競爭優勢。

  • And as we evaluate financing for future projects, we will start from first principles with a clean slate, taking the lowest cost of capital and the highest free cash flow yield on a risk-adjusted basis. How we originate, how we deliver and how we finance also answers the most direct question investors ask. What will drive the stock. We believe execution is how we create long-term shareholder value. We do not manage to the daily share price, we managed the delivery of Reverend and Beacon Point into the conversion of our pipeline into contracted projects because those are the outcomes within our control.

    而在我們評估未來專案的融資時,我們將以全新起點回到第一性原理,在風險調整後的基礎上,追求最低資金成本與最高自由現金流殖利率。我們如何開發、如何交付、如何融資,也回答了投資人最直接的問題:什麼將驅動股價。我們相信,執行力是我們創造長期股東價值的方式。我們不以每日股價為管理目標;我們管理的是 River Bend 與 Beacon Point 的交付,以及將我們的管線轉化為已簽約專案,因為這些結果在我們可控範圍之內。

  • The same long-term focus governs how we allocate capital. Every decision is evaluated against a single criteria, whether it creates long-term shareholder value. Alongside investing in growth, that criteria allows us to opportunistically create shareholder by repurchasing our shares, and we believe the stock trade at a discount to intrinsic value. We have acted on that conviction since last quarter by repurchasing approximately 3.3 million shares for approximately $250 million funded with about 3,100 Bitcoin from our balance sheet.

    同樣的長期聚焦也主導我們如何配置資本。每一項決策都以單一標準來評估:是否能創造長期股東價值。在投資成長之餘,該標準也使我們能在機會出現時透過回購股份來為股東創造價值,且我們相信本公司股票目前以低於內在價值的折價交易。自上季以來,我們已基於這項信念採取行動,回購約330萬股,總金額約2.5億美元,資金來源為我們資產負債表上的約3,100枚比特幣。

  • The repurchase met our criterion because we believe our shares do not fully reflect the value of the revenue we have contracted and the power capacity that we control. funding it with Bitcoin rather than with cash, preserve liquidity and continued the reduction in parent level Bitcoin exposure that we described in February. Underneath those measures is a simple proposition, we are builders, and we believe the AI era will award the company that bring power and compute online faster, more cost efficiently and without compromising on quality. That is the company we are building.

    這次回購符合我們的標準,因為我們相信股價尚未充分反映我們已簽約的營收價值以及我們所掌控的電力容量。以比特幣而非現金作為資金來源,可維持流動性,並延續我們在2月所說明的降低母公司層級比特幣曝險的作法。這些措施背後是一個簡單命題:我們是建設者,我們相信AI時代將獎勵那些能更快、更具成本效率、且不犧牲品質地把電力與算力上線的公司。這正是我們正在打造的公司。

  • The revenue we have contracted will be realized the way it was secured by starting with power, underwriting carefully, preserving flexibility and delivering. Those principles govern the three measures I have described and those measures are how we expect to be judged in the quarter's end. We believe they are the foundation of an enduring generational business at the intersection of Energy & Technology.

    我們已簽約的營收將以其取得時所依循的方式來實現:從電力著手、審慎承作、保留彈性並交付成果。我所描述的三項措施皆由這些原則所主導,而這些措施也將是我們預期在本季季末被檢視的方式。我們相信,這些是位於能源與科技交會處、可長可久的世代型企業之基石。

  • With that, I will turn the call over to Sean.

    接下來,我把電話會議交給Sean。

  • Sean Glennan - Chief Financial Officer

    Sean Glennan - Chief Financial Officer

  • Thanks, Asher. The financial story this quarter has four main components. First, the operating platform remains resilient. Revenue was $71.1 million for the third quarter compared with $83.5 million in the prior year period, while adjusted EBITDA increased to $33 million from $30.5 million. That result reflects the contribution from additional operating capacity and a disciplined approach to costs. Despite the sale of the Power North portfolio in February, a decline in average revenue per Bitcoin mined and the planned runoff of business are no longer central to our strategy.

    謝謝你,Asher。本季的財務故事有四個主要組成部分。第一,營運平台仍具韌性。第三季營收為7,110萬美元,較去年同期的8,350萬美元下降;但調整後EBITDA由3,050萬美元增加至3,300萬美元。此結果反映新增營運產能的貢獻,以及對成本採取紀律性的管理方式。儘管2月出售Power North投資組合、每枚比特幣挖礦平均收入下降,以及業務按計畫縮減,這些已不再是我們策略的核心。

  • Second, the GAAP result was heavily affected by the fair value remeasurement of digital assets. We reported net income of $189.5 million of which $131.1 million was attributable to Hut 8. That result included a $413.8 million gain on digital assets, reflecting the increase in the price of Bitcoin during the quarter. Help investors assess operating performance alongside these price movements, which supplement our GAAP results of adjusted EBITDA, a non-GAAP measure and our segment results. Adjusted EBITDA should be considered together with and not a substitute for GAAP net income.

    第二,GAAP結果受到數位資產公允價值重新衡量的重大影響。我們報告淨利為1.895億美元,其中1.311億美元歸屬於Hut 8。該結果包含4.138億美元的數位資產收益,反映本季比特幣價格上漲。為協助投資人將營運表現與這些價格波動一併評估,我們在GAAP結果之外補充揭露調整後EBITDA(非GAAP衡量指標)以及分部結果。調整後EBITDA應與GAAP淨利一併考量,而非取代GAAP淨利。

  • Third, we continue to maintain cost discipline even as we scale the company. While we are making major investments to scale them to the company we want to become, we are doing so judiciously. The rigor around spend decisions has not changed since I started two years ago when the company was in more of a start-up phase. Compared with the prior year period, G&A, excluding stock-based compensation per megawatt of development pipeline has declined even as our development pipeline has nearly doubled.

    第三,即使我們擴大公司規模,仍持續維持成本紀律。雖然我們正進行重大投資以擴張至我們希望成為的公司樣貌,但我們會審慎為之。自我兩年前加入、當時公司仍較偏新創階段以來,對支出決策的嚴謹程度並未改變。與去年同期相比,即使我們的開發管線幾乎倍增,扣除以股份為基礎之薪酬後的每兆瓦開發管線G&A仍已下降。

  • And last, but arguably most important, the balance sheet and capital position of the company remains strong. We have fully funded two construction stage projects. We have ample liquidity to meter obligations until our data centers begin generating cash flow and that liquidity is now further supported by the $1.07 billion revolving credit facility that we closed in September, which provides low-cost, flexible, nondilutive capital. And we have confidence in the availability of capital for strong projects underpinned by robust contracts and thoughtful risk mitigation.

    最後,但或許最重要的是,公司資產負債表與資本部位依然強健。我們已為兩個建置階段的專案完成全額資金到位。在資料中心開始產生現金流之前,我們擁有充足流動性以履行各項義務;而這項流動性如今又進一步獲得9月完成交割的10.7億美元循環信用額度支持,提供低成本、具彈性且不稀釋股權的資本。對於由強健合約支撐並具周全風險緩釋措施的優質專案,我們對資本可得性充滿信心。

  • Let me walk through the operating business. Compute revenue was $68.4 million in the third quarter compared with $70 million in the prior year period. Headline revenue was broadly stable because the decline in average revenue per Bitcoin mine was largely offset by an increase in Bitcoin Mine, reflecting additional operating capacity at Vega and the reenergization of Thrum Hiller. That result demonstrates the enterprise's ability to scale revenue across a range of external environments.

    我先說明營運業務。第三季算力(Compute)營收為6,840萬美元,去年同期為7,000萬美元。整體營收大致持平,因每枚比特幣挖礦平均收入下降,基本上被比特幣產量增加所抵銷;這反映Vega新增營運產能,以及Thrum Hiller重新通電啟用。此結果展現企業在各種外部環境下擴大營收的能力。

  • Compute cost of revenue increased to $28 million from $22 million primarily because we were operating more capacity and incurring the associated electricity costs. The increase track the increase in production, not a deterioration in operating efficiency. The important point is that we are producing more Bitcoin from a larger operating footprint, again, demonstrating the ability to scale in a cost-conscious manner. AI cloud revenue also increased during the quarter as new customer contracts came online. That growth was partially offset by the sale of the traditional cloud business in August.

    算力營收成本由2,200萬美元增加至2,800萬美元,主要因我們運轉了更多產能並承擔相應的電力成本。此增幅與產量增加相一致,並非營運效率惡化。重點在於,我們在更大的營運版圖下生產更多比特幣,再次證明我們能以重視成本的方式擴張。本季AI雲端營收亦隨著新客戶合約上線而增加。該成長部分被8月出售傳統雲端業務所抵銷。

  • Power. Power revenue was $1.3 million in the third quarter compared with $8.4 million in the prior year period. The decline was primarily the result of the sale of the Far North portfolio in February. It is therefore a portfolio composition effect, not a deterioration in the remaining our business. which generates revenue primarily from managed services contracts, digital infrastructure.

    電力(Power)。第三季電力營收為130萬美元,去年同期為840萬美元。下降主要源於2月出售Far North投資組合。因此這是投資組合組成變化的影響,而非我們剩餘業務的惡化。其營收主要來自受管理服務合約與數位基礎設施。

  • Digital Infrastructure revenue was $1.4 million in the third quarter compared with $5.1 million in the prior year period. The decline primarily reflects the termination of the Vega colocation agreement after American Bitcoin exercised its purchase option for the miners of website, together with the customer churn in the legacy GPU infrastructure business.

    數位基礎設施(Digital Infrastructure)營收第三季為140萬美元,去年同期為510萬美元。下降主要反映:在American Bitcoin行使其購買選擇權、買下該場址的礦機後,Vega機房代管(colocation)協議終止;以及傳統GPU基礎設施業務的客戶流失。

  • The current digital infrastructure results do not yet reflect a contracted lease revenue from River Bend and Beacon Point. That revenue begins when the relevant capacity is delivered. The financial model is therefore moving through an intentional transition. The legacy revenue base is no longer the main growth driver. While the larger contracted infrastructure revenues remain tied to delivery milestones.

    目前的數位基礎設施結果尚未反映來自River Bend與Beacon Point的已簽約租賃收入。該收入將在相關產能交付後開始認列。因此,我們的財務模型正處於一個有意為之的轉型過程。傳統營收基礎已不再是主要成長動能。而較大規模、已簽約的基礎設施收入仍與交付里程碑連動。

  • Adjusted EBITDA was $33 million compared with $30.5 million in the prior year period. We use this measure to evaluate operating performance after excluding the effect of fair value remeasurement of digital assets and other onetime or noncash items.

    調整後EBITDA為3,300萬美元,去年同期為3,050萬美元。我們使用此指標來評估營運表現,並排除數位資產公允價值重新衡量的影響,以及其他一次性或非現金項目。

  • As always, adjusted EBITDA should be considered alongside GAAP results. not in place of them. Reported general and administrative expense was $99.6 million compared with $25.9 million in the prior year period. approximately $64.7 million of this quarter's G&A was stock-based compensation, including the effect of onetime long-term incentive awards. The quarter also included professional fees and approximately $6.2 million of incremental salaries and benefits as we added people to support energy origination, corporate development and other growth functions.

    一如既往,調整後EBITDA應與GAAP結果一併考量,而非取而代之。一般及行政費用(G&A)報告數為9,960萬美元,去年同期為2,590萬美元。本季G&A中約6,470萬美元為以股份為基礎之薪酬,包含一次性長期激勵獎酬的影響。本季亦包含專業服務費用,以及因增聘人員以支援能源案源開發、企業發展及其他成長職能而增加的約620萬美元薪資與福利。

  • Excluding noncash costs, the cash G&A was $34.8 million, which compares with $24.8 million last quarter and $19.5 million from a year ago. We do not view all of that spending as recurring corporate overhead. A meaningful portion reflects the cost of building the organization required to originate, finance, construct and operate multiple large campuses in parallel. At the same time, the cash component is real, and we are holding those investments to a clear standard.

    扣除非現金成本後,現金G&A為3,480萬美元,較上季的2,480萬美元及去年同期的1,950萬美元增加。我們不認為其中所有支出都屬於經常性的公司管理費用。相當一部分反映為建立組織所需的成本,以便同時承作、融資、建置並營運多個大型園區。同時,現金支出部分是真實存在的,我們也以明確標準來要求這些投資。

  • They must support one or more of the following outcomes over time, more high-quality power origination, faster project conversion a lower cost of capital, better execution or stronger operating leverage. The balance sheet requires an important distinction between corporate liquidity and project restricted capital. At September 30, 2023, we had approximately $156.9 million of cash, $3.6 billion of restricted cash and cash represents, and $2.8 billion of restricted short-term investments.

    它們必須隨時間推進並支持以下一項或多項成果:更高品質的電力資源開發、更快的專案轉換、更低的資本成本、更佳的執行力或更強的營運槓桿。資產負債表需要對公司流動性與專案受限資本作出重要區分。截至2023年9月30日,我們約有1.569億美元現金、36億美元受限現金及現金等價物,以及28億美元受限短期投資。

  • The restricted balances are principally proceed from the River Bend and Beacon Point financings. Eldon project accounts for construction, debt service reserves and other specified project purposes. They are not excess corporate cash. Hut 8 also has about 1,361 unencumbered Bitcoin on the balance sheet as of November 1. The company had approximately $7.6 billion of consolidated loans, not cable and other financial liabilities.

    這些受限餘額主要來自 River Bend 與 Beacon Point 的融資款項。Eldon 專案的帳戶用於施工、債務償付準備金及其他特定專案用途。它們並非公司層級的多餘現金。截至11月1日,Hut 8 的資產負債表上另有約1,361枚未設質押的比特幣。公司約有76億美元的合併貸款、票據及其他金融負債。

  • Approximately $7.5 billion of that amount relates to the River Bend and Beacon Point project financing. Those obligations to a project subsidiaries are secured by the applicable project assets and accounts and our nonrecourse to Hut 8's parent company.

    其中約75億美元與 River Bend 與 Beacon Point 的專案融資相關。這些對專案子公司的義務以相應的專案資產與帳戶作為擔保,且對 Hut 8 母公司為無追索權。

  • Each project is designed to service its own debt from its own contracted lease cash flows. The quarter also included $105.5 million of interest expense and $51.8 million of interest income. The interest expense reflects the construction period carried on the River Bend and Beacon Point financings. The interest income was generated by investing unused project pros and restricted short-term investments to partially offset that carry. We accepted that construction period interest cost because the projects are fully funded upfront.

    每個專案的設計皆是以其自身已簽約的租賃現金流來償付其自身債務。本季亦包含1.055億美元的利息費用與5,180萬美元的利息收入。利息費用反映 River Bend 與 Beacon Point 融資在施工期間的利息資本化/結轉成本。利息收入則來自將未動用的專案資金與受限短期投資進行投資,以部分抵銷該結轉成本。我們接受施工期間的利息成本,因為這些專案在一開始即已全額到位資金。

  • The parent level financing architecture is separate and quite simple. In September, we added a $1.07 billion senior secured revolving credit facility to support corporate liquidity, development need and letters of credit. No borrowings were outstanding under that facility as of September 30, 2026. This facility gives us committed capacity without requiring us to draw debt before we need it. We also simplified the parent capital structure during the year.

    母公司層級的融資架構是分開的,而且相當簡單。9月,我們新增一項10.7億美元的優先擔保循環信用額度,以支持公司流動性、開發需求及信用狀。截至2026年9月30日,該額度項下並無任何借款餘額。此額度讓我們在不必於需要之前就動用負債的情況下,仍可取得承諾的可用額度。我們也在本年度簡化了母公司資本結構。

  • The CO2 note converted into equity, a corn-based facility was refinanced with the Bitcoin collateralized Dalkon x term loan at a lower coupon and the remaining TCRC secured promissory note was repaid in October. We are also planning to retire a Falcone term loan edible to maturity in April 2027.

    CO2 票據已轉換為股權;一項以玉米為基礎的融資安排已以比特幣作為擔保的 Dalkon x 定期貸款進行再融資,票息更低;其餘的 TCRC 擔保本票已於10月償還。我們也計畫在2027年4月到期前,償還一筆 Falcone 定期貸款。

  • The objective is straightforward, maintain parent level flexibility as financing to the asset that generates the cash flow and avoid using corporate equity where project-level capital is available on better terms. During the quarter, we sold approximately 954 Bitcoin or $74.8 million and used those proceeds to repurchase 953,802 shares for $74.7 million. Subsequent to quarter end, we repurchased additional shares under the $250 million program.

    目標很明確:維持母公司層級的彈性,讓融資對應到產生現金流的資產,並在專案層級資金能以更佳條件取得時,避免使用公司股權。本季我們出售約954枚比特幣(約7,480萬美元),並將所得用於以7,470萬美元回購953,802股。在季末之後,我們亦在2.5億美元計畫下回購了更多股份。

  • In total, we repurchased approximately 3.3 million shares for approximately $250 million funded with approximately 3,100 Bitcoin. Those repurchases converted a portion of the strategic declines into equity head of price, we believe does not reflect the contracted revenue and power capacity controlled by the company. They also continue the reduction of the parent level exposure that we have described previously.

    合計而言,我們以約3,100枚比特幣資助,回購約330萬股、金額約2.5億美元。這些回購將部分我們認為未能反映公司所掌控之已簽約收入與電力容量的策略性折價,轉化為股權的上行空間。同時也延續了我們先前所述、降低母公司層級曝險的作法。

  • Our Board has also authorized an increase in our share repurchase program from $250 million to $1 billion. We view this as a long-term program that gives us the flexibility to act when opportunities arise over the coming years. We will be patient and judicious in how we deploy it, that we maintain liquidity to run our business and pursue opportunistic growth.

    董事會亦已核准將股份回購計畫由2.5億美元提高至10億美元。我們將其視為一項長期計畫,使我們在未來數年出現機會時具備採取行動的彈性。我們在部署上將保持耐心與審慎,以確保維持營運所需流動性並追求機會型成長。

  • Stepping back and these should evaluate Hut 8 through three layers. The first is the solid footing of the current operating platform. For the quarter demonstrated increased bitcoin production, a growing AI cloud contribution and adjusted EBITDA above the prior year period despite lower revenue. The second is the contracted infrastructure platform, where River Bend and Beacon Point are being funded and delivered through project-level structures tied to long-duration customer commitments. The third is the development platform where we are advancing however, opportunities while preserving flexibility on the application, the customer and the financing structure.

    退一步看,投資人應從三個層面評估 Hut 8。第一層是現有營運平台的穩固基礎。本季展現比特幣產量提升、AI 雲端貢獻成長,且儘管營收較低,調整後 EBITDA 仍高於去年同期。第二層是已簽約的基礎設施平台,River Bend 與 Beacon Point 正透過與長期客戶承諾綁定的專案層級架構取得資金並交付。第三層是開發平台,我們在保留應用、客戶與融資結構彈性的同時,推進多項機會。

  • Our financial objective is not to maximize headline growth at any cost. It is to convert scarce power into financeable, contracted infrastructure while protecting parent level liquidity and limiting unnecessary dilution. If we execute against that standard, the financial profile should evolve from a business with Bitcoin driven volatility and construction period carry toward one with a larger base of contracted infrastructure cash flows.

    我們的財務目標不是不計代價地追求表面上的最大成長。而是將稀缺電力轉化為可融資、可簽約的基礎設施,同時保護母公司層級流動性並限制不必要的稀釋。若我們依此標準執行,財務輪廓應可從一個受比特幣驅動波動與施工期間結轉成本影響的業務,演進為擁有更大規模已簽約基礎設施現金流的業務。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Before we transition to Q&A, let me address what is likely to be the first question. The outcome of the governor's race in Texas and its implications for Beacon Point. We reset the election outcome and the support -- and support the governor elect in a hostess called for legislative guardrails. We also expect Texas to remain a business-friendly state and recognize the benefits that data centers bring to global communities through tax revenue and jobs. As we discussed earlier in the context of Beacon Point and River Bend, our focus is on building responsibly with local communities in mind, a commitment that we believe aligns with Governor hoses objectives.

    在進入問答之前,讓我先回應一個很可能是第一個問題。也就是德州州長選舉結果及其對 Beacon Point 的影響。我們尊重選舉結果,並支持當選州長在一份聲明中所呼籲的立法護欄。我們也預期德州仍將是對企業友善的州,並認同資料中心透過稅收與就業為全球社區帶來的益處。如同我們先前在 Beacon Point 與 River Bend 的脈絡中所討論,我們的重點是在兼顧在地社區的前提下負責任地建設;我們相信這項承諾與州長的目標一致。

  • We do not believe the results change the outlook for Beacon Point, which as a late-stage project is well positioned. For Beacon Point Phase 1, our baseload designation remains subject to Governor Abbott audit. We believe we are well placed in that process and anticipate an unconditional classification on December 17. And which will provide a clear path to energizing the full gigawatt at Beacon Point with 700 megawatts expected in the first quarter of 2027.

    我們不認為選舉結果會改變 Beacon Point 的展望;作為後期階段專案,它具備良好條件。就 Beacon Point 第一期而言,我們的基載(baseload)指定仍需接受 Abbott 州長的審核。我們認為在該流程中我們處於有利位置,並預期在12月17日獲得無條件分類。這將為 Beacon Point 全部1吉瓦的送電提供清晰路徑,預計2027年第一季可先上線700兆瓦。

  • With that, happy to take questions.

    接下來很樂意回答問題。

  • Operator

    Operator

  • (Operator Instructions) Ryan Gravett, UBS.

    (接線員指示) Ryan Gravett,瑞銀(UBS)。

  • Ryan Gravett - Analyst

    Ryan Gravett - Analyst

  • Ash, I did want to just follow up on your closing remarks there, just given the election outcome last night. Anything you can share in terms of various other permits required for both Phase 1 and Phase 2 at Beacon Point. And then maybe one for -- anything you can share in terms of expected timing for project financing at Phase II of Beacon Point? And if the election outcome changes that time line at all?

    Ash,我想就你剛才的結語追問一下,考量昨晚的選舉結果。你能否分享 Beacon Point 第一期與第二期所需的其他各項許可進度?另外也想問——你能否分享 Beacon Point 第二期專案融資的預期時程?以及選舉結果是否會對該時程造成任何影響?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Thanks for the question, Ryan. In regards to the build, we're primarily focused on the December 17 time line. When we think about TCQ, when any permissive diesel generators, there are paths to be able to design around that use the best system as an alternative back source. And so those are the kind of the primary focuses for us as we continue to progress and develop the project.

    謝謝你的提問,Ryan。就建設而言,我們主要聚焦在12月17日的時間表。當我們考量 TCQ、以及任何許可的柴油發電機時,我們有一些路徑可以在設計上繞開,改以最佳系統作為替代備援電源。因此,這些就是我們在持續推進與開發專案時的主要關注重點。

  • Sean, I'll pass it to you.

    Sean,我把問題交給你。

  • Sean Glennan - Chief Financial Officer

    Sean Glennan - Chief Financial Officer

  • Yes. So we -- the sort of timing that's right in front of us doesn't really change the -- we expect to get back from the audit results on December 10th and then have those be finalized on December 17th. And those remove largely the sort of remaining items ahead of us to get going on the financing for Beacon Point 2. There are a lot of different ways that we can see to finance that. Obviously, we've addressed the -- and tapped the investment-grade bond market.

    是的。所以我們——眼前這個時間點其實不會真正改變——我們預期會在 12 月 10 日收到審計結果回覆,然後在 12 月 17 日完成定案。而這些基本上會移除我們在推進 Beacon Point 2 融資前所剩的大部分待辦事項。我們看到有很多不同的方式可以為此融資。顯然,我們已經處理了——並且也已經切入投資級債券市場。

  • And we think there are a number of other avenues around that exists too. So we feel really confident about the ability to get that done. In our minds, the path is the same as it was before. And so we look forward to executing on that.

    而我們也認為除此之外還有若干其他可行的途徑。所以我們對完成這件事的能力非常有信心。在我們看來,路徑和之前一樣。因此我們期待把它落地執行。

  • Operator

    Operator

  • Eric Luebchow, Wells Fargo.

    Eric Luebchow,富國銀行。

  • Eric Luebchow - Analyst

    Eric Luebchow - Analyst

  • I'm curious, given everything going on in terms of higher labor costs, more upfront investment in the site in terms of utility deposits. What are you seeing in terms of your build cost, not just for Beacon Point and River Bend. But as you look at your power pipeline today, are you seeing build costs move into the low to mid-teens on a dollar per critical load megawatt basis? And do you think that you have enough pricing power to kind of maintain or even improve your development yields as you build out the next phase of your pipeline?

    我想請教,考量到目前發生的一切,包括更高的勞動成本、以及在場址端需要更多前期投入(例如公用事業押金)。你們在建置成本方面看到什麼變化?不只是 Beacon Point 和 River Bend。就你們目前的電力管線(power pipeline)來看,你們是否看到以每「關鍵負載」兆瓦(critical load MW)計的美元成本,建置成本已經走到低到中十幾(low to mid-teens)的水準?另外,你們是否認為你們有足夠的定價能力,能在建置下一階段管線時維持甚至提升你們的開發收益率(development yields)?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Appreciate the question, Eric. I'll answer that in three parts. Part one is origination. Part two is the development in EPC and Part three is the commercialization and lease rates. For Part one, in regards to origination, you're right, a lot of utilities now ask for more upfront collateral kayak payments to make sure that the infrastructure upgrades or energy supply that's committed to doesn't affect rate payers. And we've been supportive of that since day one, and that's the same structure that we've had at River Bend and Beacon Point in paying for those QIAGupgrades and any collateral that's necessary.

    謝謝你的問題,Eric。我會分三個部分回答。第一部分是案源取得(origination)。第二部分是開發與 EPC。第三部分是商業化與租賃費率。第一部分,關於案源取得,你說得沒錯,現在很多公用事業公司會要求更多前期擔保品/押金付款,以確保已承諾的基礎設施升級或能源供應不會影響用戶費率。我們從第一天起就支持這樣的作法,而在 River Bend 與 Beacon Point,我們一直採用相同的結構來支付那些 QIAG 升級以及任何必要的擔保品。

  • And so as we continue to develop our approach remains similar, which is we don't put large development capital at risk in the pursuit of commercialization. We stay disciplined in the origination process. which makes it difficult, more difficult to originate, but we found opportunities where we are able to do so, able to bring customers along for the process with us and be able to continue to develop the sites that have -- that we have conviction in. As our balance sheet continues to grow, we obviously will be working on more sites across our pipeline.

    因此,隨著我們持續開發,我們的方法仍然類似:我們不會在追求商業化的過程中,把大量開發資本置於風險之中。我們在案源取得流程上保持紀律。這會讓案源取得變得困難、更加困難,但我們已找到一些機會,能夠做到——能夠讓客戶在過程中與我們一起推進,並且能持續開發那些——我們有信念的場址。隨著我們的資產負債表持續成長,我們顯然也會在我們的管線中推進更多場址。

  • As you see this quarter, we had another 1,300 megawatts of sites go from energy under diligence to energy under exclusivity, which means we're diving deeper into those sites. We're spending more resources in developing those projects. And so we really think about it as a percentage of overall development capital as we continue to scale that we can increase to develop those sites.

    如你在本季所見,我們又有另外 1,300 兆瓦的場址,從「能源盡職調查中」轉為「能源排他性(exclusivity)中」,這代表我們正在更深入地投入這些場址。我們在開發這些專案上投入更多資源。因此,我們會把它視為整體開發資本的一個比例;隨著規模擴大,我們可以提高這個比例來開發這些場址。

  • But we are spending, call it, hundreds of thousands or single-digit millions up front in these developments and not tens of millions or hundreds of millions of dollars, really when the collateral requirements come, we're deeply engaged with the end user during those moments in time. In regards to everyone has heard labor rates have gone up, you have supply chain rates that have changed.

    但我們在這些開發上前期投入的金額,大概是數十萬美元或個位數百萬美元,而不是數千萬或數億美元;真正到了需要擔保品的時點,我們會在那些時間點與終端用戶深度互動。至於大家都聽到的,勞動費率上升,以及供應鏈費率的變化。

  • And as we've continued to build over the larger of a decade here, the focus has been how can we control our destiny. Well, we can't control our macro conditions of overall capital markets of overall cost of labor equipment, etc. What we can control is how do we design the infrastructure to be able to drive additional efficiency to try to offset those changes and those increases that you had mentioned.

    而在我們過去十多年持續建置的過程中,重點一直是:我們如何掌控自己的命運。我們無法掌控宏觀環境,包括整體資本市場、整體勞動與設備成本等等。我們能掌控的是:我們如何設計基礎設施,以提升效率,來盡量抵銷你提到的那些變動與上升。

  • And so if we can ruthlessly focus on learning from the build that we have today, designing from first principles driving efficiencies in the design, which ultimately drive efficiencies in the supply chain and equipment you need to purchase, which ultimately drives efficiencies in the construction and the amount of hours we need to construct a data center those are things that are in our control and that we have conviction and confidence that we continue to build towards.

    因此,如果我們能夠極度專注於從現有建置中學習,從第一性原理出發做設計、在設計上推動效率提升——而這最終會帶動供應鏈與所需採購設備的效率——進而帶動施工效率,以及我們建造一座資料中心所需的工時;這些都是我們可控的事情,也是我們有信念、有信心會持續推進的方向。

  • So that is our offset against these macro conditions that you mentioned, and I chatted about earlier in my prepared remarks on how want to build a scalable, repeatable model like the Raptor photos of the Tesla engine that I'm sure many people have seen during Iteration one, two and three are SpaceX versus kind of a bespoke build every single time that is expensive and costly and time intensive. And then the last one is in terms of lease rates.

    所以,這就是我們用來對沖你提到的那些宏觀條件的方式;我也在先前的準備稿中談到,我們希望建立一個可擴展、可重複的模型,就像很多人看過的那種——以 SpaceX 的 Raptor 引擎照片為例——在迭代一、二、三代的演進,而不是每一次都做客製化建置,那樣既昂貴、成本高,也很耗時。最後一部分是租賃費率。

  • We've always approached the market from a perspective of signing leases that we believe are fair and kind of middle of the fairway market from a lease rate perspective and our shareholders and our investors have been happy with the structuring and the returns on those deals. So the way that we think about it is if market costs on average across the industry go up, therefore, lease rates would move in proportionately with that because many folks work on a more yield on cost basis.

    我們一向以這樣的角度切入市場:簽訂我們認為公平、且在租金水準上大致位於市場中段的租約;而我們的股東與投資人也一直對這些交易的架構與回報感到滿意。所以我們的想法是:如果整個產業的市場成本平均上升,那麼租金也會按比例上調,因為很多同業是以「成本收益率(yield on cost)」為基礎來運作。

  • And so we'll charge market-based rents, meanwhile, focus on driving ruthless efficiency within our execution EPC stack to construct and hold costs on construction, which could, in turn, actually increase the yield on products that we're developing, if revenues go up and we're able to maintain costs.

    因此,我們會收取以市場為基礎的租金;同時,專注於在我們的執行與 EPC 體系中推動極致效率,以控制建造成本——如此一來,如果收入上升而我們能維持成本,反而可能提高我們正在開發產品的收益率。

  • Operator

    Operator

  • Bryan Baratian, ROTH Capital Partners.

    Bryan Baratian,ROTH Capital Partners。

  • Bryan Baratian - Equity Analyst

    Bryan Baratian - Equity Analyst

  • I have to two. One is as we -- in the face of the election and looking to what I think is one of the most interesting things is River Bend expansion, where you have a gap of IT capacity to expand there. How can we think about what the structure looks like with regard to ultimate counter party.

    我有兩個問題。第一個是,當我們——面對選舉並展望未來時,我認為最有意思的事情之一是 River Bend 的擴建,因為你們那裡有一段 IT 容量的缺口可以擴張。我們該如何理解在最終交易對手(counterparty)方面的結構會長什麼樣子?

  • I know the River Bend site Day, the Head of Computed Anthropic was there, and it all seemed very positive. But would we expect to see similar to your other leases the same level of investment-grade equity support that was both across River Bend and Beacon Point with different tenants? Or like how are you thinking about structuring that?

    我知道 River Bend 場址日(site day)時,Anthropic 的計算(Compute)負責人有到場,看起來一切都很正面。但我們是否會預期,像你們其他租約一樣,會有同等程度的投資級股權支持(investment-grade equity support),而這在 River Bend 與 Beacon Point、不同承租戶之間都有出現?或者你們是如何思考這樣的結構安排?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Is there a second one? Or you want me to --

    還有第二個問題嗎?還是你想要我——

  • Bryan Baratian - Equity Analyst

    Bryan Baratian - Equity Analyst

  • Yes, you can start with the first, and then I'll do the second, it's separate.

    是的,你可以先從第一個開始,然後我再問第二個,是分開的。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Okay. Sounds great. We're very excited for and we have been for quite some time in her so with the market. There's been a good amount of work that has been done believe that there's actually more than a gigawatt of gas available on the pipelines that run through the property and have been working towards being able to actualize and realize the continued expansion of that campus. When we look at the commercialization, obviously, I can't speak to any deals that we haven't announced yet.

    好的。聽起來很好。我們對此非常興奮,而且我們已經有相當一段時間都很興奮,並且也與市場保持密切互動。我們已經做了相當多的工作;我們相信穿越該物業、在其上運行的管線中,實際上有超過 1 吉瓦的天然氣可用,並且一直在努力推進,以便能夠把該園區的持續擴張真正落地、實現。至於商業化方面,顯然我不能談任何我們尚未公告的交易。

  • But we continue to stay focused on the credit quality of our -- and offtake relative to the investment in CapEx and the capital we ultimately need to raise we're pretty open. I was on a call with a non-AI lab, non-investment-grade counterparty yesterday, someone we admire a lot in the business that they've created, we were open. We said, look, it's very hard for us to tell our shareholders and our Board to go and build infrastructure for folks that don't have the credit that supports the ability to bring on the financing that we brought on historically to be able to build and execute these projects at scale.

    但我們仍持續聚焦於我們的信用品質——以及相對於資本支出(CapEx)投資與我們最終需要籌資的資本而言的承購方(offtake)信用狀況;在這方面我們相當開放。我昨天與一家非 AI 實驗室、且非投資級的交易對手通話;我們非常敬佩他們所打造的業務,我們也很坦率。我們說,坦白講,要我們去告訴股東與董事會,為那些信用狀況不足、無法支撐取得融資能力(而這正是我們過去能夠取得融資、以便大規模建置並執行這些專案的基礎)的客戶去興建基礎設施,對我們來說非常困難。

  • And so I don't want to speak to any deals that aren't announced yet, Bryan, but overall, maintaining balance sheet, maintaining credit profile of our cash flows continues to be a core focus of the business and 1 that shareholders have asked us for as well.

    所以,Bryan,我不想評論任何尚未公告的交易,但整體而言,維持資產負債表的穩健、維持我們現金流的信用特徵,仍然是公司業務的核心重點之一,也是股東同樣要求我們做到的。

  • Bryan Baratian - Equity Analyst

    Bryan Baratian - Equity Analyst

  • Awesome. And the next one is, as we think about the existing footprint of opportunities that you have, I know American Bitcoin is running north of 400 megawatts of capacity. I guess in the face of the election that happened today, -- how are you? Or if you can provide any color on thinking about potential brownfield opportunities as it relates to the existing footprint there? Or is the focus just going to continue being on greenfield development?

    太好了。下一題是,當我們思考你們現有的機會版圖時,我知道 American Bitcoin 的產能已超過 400 兆瓦。我想在今天選舉結果出爐的情況下——你們怎麼看?或者你能否就現有版圖相關的潛在棕地(brownfield)機會提供一些看法?還是說重點將持續放在綠地(greenfield)開發?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • When you look at our pipeline that we've announced the development pipeline is almost 8 gigawatts with a total of about 8.6 gigawatts in terms of our overall pipeline overview. That is one out of four buckets of the ability to commercialize and realize additional TCV. That bucket is our greenfield origination bucket. The second one we have is the behind-the-meter generation bucket, which I chatted about more so in your first question in River Bend and other sites that we have.

    就我們已公告的開發管線來看,開發管線接近 8 吉瓦,而整體管線概覽約為 8.6 吉瓦。這只是我們能夠商業化並實現額外總合約價值(TCV)的四個「桶」之一;這一桶是我們的綠地起案(origination)桶。第二桶是表後(behind-the-meter)發電桶,我在你第一個問題時已談到,例如 River Bend 以及我們其他場址。

  • The third one is M&A through our corporate development team. There continues to be very interesting opportunities and growing opportunities in a world where capital becomes more constrained and flows to proven operators. And then the fourth is brownfield opportunities as well on existing campuses. So we continue to look at all four of those, continue to originate across all four which gives us a strong conviction that outside of the publicly disclosed pipeline with three other pipelines with dedicated teams looking at opportunities there.

    第三桶是透過我們企業發展團隊進行併購(M&A)。在資本變得更受限、資金更傾向流向已被驗證的營運商的環境下,仍然存在非常有趣、且持續增加的機會。第四桶則是既有園區上的棕地(brownfield)機會。因此我們持續同時檢視這四個方向,也持續在四個方向上進行起案,這讓我們有很強的信心:除了已公開揭露的管線之外,另外三條管線也都有專責團隊在尋找相關機會。

  • Operator

    Operator

  • George Sutton, Craig-Hallum.

    George Sutton,Craig-Hallum。

  • George Sutton - Analyst

    George Sutton - Analyst

  • Asher, I found it interning that your energy capacity under diligence came down, but your capacity under exclusivity went up. Can you just give us a sense of -- that just sounds like a more focused way to go to market. Is that the way to read that?

    Asher,我覺得很有意思的是,你們在盡職調查(diligence)中的能源容量下降了,但在排他性(exclusivity)下的容量卻上升了。你能否讓我們理解一下——這聽起來像是更聚焦的市場推進方式。可以這樣解讀嗎?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • That's exactly right. The way to think about our pipeline, it's a funnel. You start top of funnel more wide. And as you get deeper and deeper in more resources get allocated more time gets committed to sites. We closing the aperture.

    完全正確。理解我們的管線可以把它想成一個漏斗。漏斗頂端會比較寬。當你越往下走,就會投入更多資源、對場址承諾更多時間。我們正在縮小口徑。

  • And so at every stage, the requirements get higher and higher as we continue developing those sites. And so we have kind of clear guardrails before projects pass from 1 stage to another, and we dedicated additional resources to it. So you see a transition from capacity and the diligence exclusivity through quarter-over-quarter.

    因此在每一個階段,隨著我們持續開發這些場址,要求都會越來越高。在專案從一個階段進入下一個階段之前,我們有相當清楚的護欄(guardrails),並會投入額外資源。所以你會看到容量在「盡職調查」與「排他性」之間,呈現季度對季度的轉換。

  • George Sutton - Analyst

    George Sutton - Analyst

  • Just one quick question on -- when we watched you bill Vega. That was just simply a better mousetrap at the time really shortening delivery times and lowering costs. When you look at the application of these kinds of principles to the AI development. Can you just give us a sense of how significant can those deltas be in your view and maybe looking out a couple of years?

    再快速問一題——當我們看到你們建 Vega 時,那在當時基本上就是更好的解決方案(better mousetrap),能大幅縮短交付時間並降低成本。當你把這類原則應用到 AI 開發上時,你能否談談在你看來這些差異(delta)可能有多大,或許展望未來幾年?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Very significant we've done more than a couple of hours in recent months at Vega sharing our design lost in abilities. It's actually pretty interesting because before we started building a River Bend and Beacon Point, we had self-engineered designed a lot of our own infrastructure in GC all of it.

    非常顯著。我們在最近幾個月已在 Vega 花了不只幾個小時,分享我們的設計經驗與能力。其實很有意思,因為在我們開始建 River Bend 與 Beacon Point 之前,我們就已自行工程化、設計了大量自有的基礎設施,在 GC(此處依原文縮寫)方面也是全部自建。

  • So Vega that campus you not only see the first principle of design pathology, but you see the components in which we designed and contract manufactured everything from tight skids to the PDU, the switch gears and so forth. As we enter the AI space, the big thing that we were building was credibility for end-user tenants to trust that we can build this infrastructure stack.

    所以在 Vega 這個園區,你不僅能看到第一性原理(first principles)的設計方法論,也能看到我們設計並委外代工的各個組件,從成套模組(skids)到 PDU、開關設備(switchgears)等等。當我們進入 AI 領域時,我們當時在做的一件大事,是建立可信度,讓終端租戶相信我們能建置這套基礎設施堆疊(infrastructure stack)。

  • So we hired some of the largest GC equipment suppliers in the world to help build that credibility and help execute. As we've executed for these end users, we've built that credibility. And in those discussions, we started talking about our origination where we came from the capabilities that we really haven't been able to tap into on these projects because we haven't been able to use first principle, it's design from the ground up how this infrastructure stack would work.

    因此我們聘請了全球最大的幾家 GC 設備供應商來協助建立這份可信度並協助執行。隨著我們為這些終端用戶完成交付,我們也建立了這份可信度。在這些討論中,我們開始談到我們的起源(origination)——我們從哪裡來、以及我們其實一直沒能在這些專案上充分發揮的能力,因為我們一直無法用第一性原理、從零開始(from the ground up)去設計這套基礎設施堆疊應該如何運作。

  • And so opened a slew of conversations as people think about this capacity as people think about this capacity on earth and space, how do you drive more efficiency, more speed, and so there is a next chapter there, George, that I alluded to in my prepared remarks, but we believe the skill sets and the philosophy that we built in a world where we were able to build infrastructure without constraints will be coming to light as well.

    因此也開啟了一連串對話:當人們思考這些容量、思考地面與太空(earth and space)的容量時,如何提升效率、加快速度;所以這裡確實有下一個篇章,George,我在事先準備的發言中也提到過。我們相信,我們在一個能夠不受限制地建置基礎設施的世界裡所建立的技能組合與理念,也將逐步展現出來。

  • Operator

    Operator

  • Ben Sommers, BTIG.

    Ben Sommers,BTIG。

  • Benjamin Sommers - Analyst

    Benjamin Sommers - Analyst

  • I wanted to just ask a bit about the capacity that you guys moved under exclusivity, says that you're looking across multiple regions there. So anything you want to highlight in particular regions of interest as we expand the power portfolio?

    我想稍微問一下你們轉入排他性(exclusivity)之下的那部分容量;看起來你們是在多個區域同時推進。所以在我們擴大電力資產組合(power portfolio)時,有沒有你特別想強調的重點區域?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Yes. So when you look at the overall pipeline, 1 big asset we've received from investors was the understanding the pipeline and the makeup of that pipeline, we share the megawatt numbers, but we didn't share how many sites those were. We didn't share what regions they were kind of made up of. And so as you look through the disclosure this quarter, we shared kind of the ag size per site.

    有的。當你看整體管線時,我們從投資人那裡得到的一個重要回饋是:希望更理解管線以及管線的組成。我們分享了兆瓦數,但沒有分享那代表多少個場址。我們也沒有分享這些場址大致分布在哪些區域。因此在本季的揭露中,我們分享了每個場址的大致平均規模。

  • We also shared the makeup of what ISO those sites are. And I think for most people that will see that we're very diversified the thing that causes that diversification is we actually have teams dedicated to different regions to specialize in those regions and to dive deep within them as well. As we continue to scale, we have our greenfield origination team. We have our corporate development team.

    我們也分享了這些場址分屬哪些 ISO(獨立系統營運商)。我想多數人會看到我們的分布非常多元;促成這種多元化的原因是,我們確實有團隊分別負責不同區域,專精於各自區域並深入耕耘。隨著我們持續擴張,我們有綠地起案團隊。我們也有企業發展團隊。

  • And so we're looking at projects across the board. And as we think through the election cycle yesterday as well, diversification, I think, is increasingly important to be able to navigate through any policy or market volatility that may come up, and we feel confident that, that diversification today.

    因此我們是在全盤尋找各類專案。而且當我們也回頭思考昨天的選舉週期時,我認為多元化變得愈來愈重要,才能因應可能出現的任何政策或市場波動;我們對目前的多元化配置感到有信心。

  • Operator

    Operator

  • John Todaro, Needham & Company.

    John Todaro,Needham & Company。

  • John Todaro - Analyst

    John Todaro - Analyst

  • And congrats on a quarter down here. I guess just going back to Texas and the election in your comments around ERCOT in the December approval schedule. Just wondering if you could frame up the confidence in that Maimi would be -- maybe it gets pushed out and you get new directives from a governor but you guys are obviously closer in Texas and with those regulators. So just wondering on the framing of ERCOT confidence for the December approvals.

    恭喜你們在這裡交出一個季度的成績。我想回到德州以及選舉,還有你們在評論中提到 ERCOT 與 12 月核准時程。想請你們說明一下對於該項(Maimi)在時間上可能——也許會被往後推、或因州長而出現新的指令——你們的信心如何;但你們顯然更貼近德州、也更貼近那些監管單位。所以想請你們談談,對於 12 月 ERCOT 核准的信心基礎是什麼。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Going into the elections, we spoke to a lot of our consultants and lobbyists in regards to the different outcomes of the election how is effective. I think the thing that is really important is from day one, we've focus on building responsibly. And so even when the audit process came out, we were confident there because we had already answered the questions from the PUC that came out that were voluntary.

    在選舉前夕,我們就選舉可能出現的不同結果及其影響,與許多顧問與遊說人士進行了交流。我認為真正重要的一點是,從第一天起,我們就專注於負責任地建設。因此,即使審計流程結果出來時,我們也很有信心,因為我們先前已經回覆了PUC提出的、屬於自願性質的問題。

  • Similarly here, we believe the mindset is not don't build net new investments into the state, but more so, how do we build responsibly. And so based on the current progress and being a very mature project that's financed, and the ways in which we're building, we feel confident in working with the governor elect and anything that she needs in terms of continuing to progress and invest into the state.

    同樣地,在這裡我們認為心態不是「不要在州內進行全新的淨新增投資」,而是「我們要如何負責任地建設」。因此,基於目前的進度、這是一個已融資且非常成熟的專案,以及我們的建設方式,我們有信心與當選州長合作,並在她需要的任何方面,持續推進並在州內投資。

  • Operator

    Operator

  • Patrick Moley, Piper Sandler.

    Patrick Moley,Piper Sandler。

  • Patrick Moley - Analyst

    Patrick Moley - Analyst

  • So I just had one, Asher, you said that your -- you felt the shares didn't fully reflect contracted revenue and controlled power. So could you maybe just share how you frame intrinsic value internally? Is that an NOI multiple? Is it some of the parts or something else? And then at what point do you think you could look to fund repurchases with cash or the revolver rather than Bitcoin given that the stack has -- I think it sits a little under $700 million now.

    我這邊只有一個問題,Asher,你提到你覺得股價沒有完全反映已簽約的收入與可控電力。你能否分享一下你們內部如何界定內在價值?是用NOI倍數嗎?是分部加總(sum of the parts)還是其他方法?另外,鑑於目前資本結構——我想現在大概略低於7億美元——你認為在什麼情況下,你們會考慮用現金或循環信貸(revolver)來資助回購,而不是用比特幣?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Thanks for the question, Patrick. So it is really a triangulation on intrinsic value because many people look at the company and value it differently. So the first methodology is we look at the sum of the parts. -- what are the two, three contracts that we've announced across the two projects. So that's River Bend, Beacon Point 1, Beacon Point 2. What is both the net present value of those contracts are doing but also how do we think about the tap rates in different market scenarios that we'll be able to sell those products and what they should be trading at. So that's existing projects.

    謝謝你的問題,Patrick。我們對內在價值的判斷其實是「三角定位」(triangulation),因為很多人看這家公司、估值方式都不同。第一種方法是看分部加總。也就是我們在兩個專案上已公告的兩到三份合約是什麼。包括River Bend、Beacon Point 1、Beacon Point 2。我們會看這些合約的淨現值(NPV)是多少,同時也會思考在不同市場情境下,我們能以什麼「承購/接入費率」(tap rates)去銷售這些產品,以及它們應該以什麼水準交易。這部分是既有專案。

  • Then we have conviction over the funnels that we have, whether that be the greenfield funnel that we disclosed publicly, the behind the meter funnel, the corporate development funnel, the new opportunities we're looking at in the brownfield funnel as well. And so that creates the kind of growth of where we believe the company can go and we apply a discount factor to different products at different stages.

    接著,我們對手上的各種「漏斗」(funnel)也有信心:不論是我們已公開揭露的綠地(greenfield)漏斗、表後(behind the meter)漏斗、企業發展(corporate development)漏斗,或是我們也在評估的棕地(brownfield)漏斗中的新機會。這些構成了我們認為公司可成長到的方向,而我們會對不同階段的不同產品套用折現因子。

  • And so if we look at -- I mean, where we're trading today, we're not even trading at the value of all three agreements, needless to say, even two of our contracts. And so we believe that we're trading even -- I mean, today, even more so compared to when we were in the 70s, a discount to the value of the existing agreements if they just come online and start operating on these triple-net structures.

    因此,如果看——我是說,以我們今天的交易水準來看,我們甚至沒有交易到三份協議的價值,更不用說其中兩份合約了。所以我們認為,如果這些既有協議只是上線並開始在這些三重淨(triple-net)結構下運營,那麼我們目前的股價——我是說,今天相較於我們在70多美元時——對既有協議價值的折價更大。

  • Then we have all the growth that we have in plan and put aside gigawatts that we have in our pipeline nearing 10 gigawatts of opportunities even for to execute another one or two sites that would increase the value of the company substantially. And so that's how we've thought about intrinsic value of the company. Now as we think about kind of what stage we're at in the market and how do we think about shareholder buybacks.

    此外,我們還有所有已規劃的成長,以及我們管線中接近10吉瓦的機會所預留的容量;即便只再執行一到兩個站點,也會大幅提升公司的價值。這就是我們思考公司內在價值的方式。接著談到我們目前所處的市場階段,以及我們如何看待股東回購。

  • The market has obviously had some negativity over the recent weeks. And so even though we may be trading under intrinsic value, we are focused now to make sure that we maintain capital preservation and optionality because there might be interesting buying opportunities that never came up before because things were too expensive.

    市場在最近幾週顯然出現了一些負面情緒。因此,即便我們可能低於內在價值交易,我們現在的重點是確保維持資本保全與選擇權,因為可能會出現一些以前從未出現過的有趣收購機會——過去是因為東西太貴。

  • And so we don't plan to continue to buy aggressively as we want to reserve that cash. In our revolver, we also don't plan to use a revolver share buybacks. Really, we thought it was a really nice way to respond to investors over the last twi years, which the main question we had around balance sheet was how long do you plan on holding Bitcoin for? You're an AI company now you don't get value for your Bitcoin at all. Why to hold on the balance sheet.

    因此我們不打算繼續積極買回,因為我們希望保留現金。至於循環信貸(revolver),我們也不打算用它來做股票回購。我們認為,這其實是過去兩年回應投資人的一個很好的方式;因為大家對資產負債表的主要問題是:你們打算持有比特幣多久?你們現在是一家AI公司,但市場完全沒有給你們的比特幣任何價值。為什麼還要把它留在資產負債表上?

  • And as we looked at where the markets were relative to our share price in Bitcoin price, frankly, we had a lot more conviction in the depreciation of our stock relative to where Bitcoin Price was as well. And so we swapped exposure from Bitcoin to Hut 8 shares and initiated those buybacks.

    當我們比較市場狀況、我們的股價與比特幣價格時,坦白說,我們更有信心的是:相較於比特幣價格,我們的股票被低估(折價)的程度更大。因此我們把曝險從比特幣換成Hut 8的股票,並啟動了這些回購。

  • Operator

    Operator

  • Logan Hannan, Northland Capital Markets.

    Logan Hannan,Northland Capital Markets。

  • Logan Hennen - Analyst

    Logan Hennen - Analyst

  • Just one from us today. Can you provide some additional color around the new 230 megawatts acquired in West Texas in regard to how you're thinking about that opportunity? And maybe clarify where that site sits in Bath and the remaining permits and approvals needed there?

    我們今天這邊只有一個問題。你能否就你們在西德州新取得的230兆瓦,補充一些你們如何看待這個機會的細節?另外也請釐清該站點在Bath的位置,以及那裡還需要哪些剩餘的許可與核准?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Happy to do so. So we were part of a bankruptcy. It was kind of a day job in 2022. We were part of many bankruptcies where we acquired assets during the downturn in the crypto market and we were able to acquire many infrastructure projects, whether that be full acquisitions, taking on managed services agreements or being planned for as to spin out new companies like Ionic. And so it was a very informative journey in our lives and when we were part of this bankruptcy auction, it was a little bit of a day job who back then, we grew almost 10 times during that period of time as a company.

    很樂意。所以我們當時參與了一個破產案。那在2022年算是我們的「日常工作」之一。在加密市場下行期間,我們參與了許多破產案並收購資產,因而能以較低成本取得許多基礎設施專案;不論是完整收購、承接代管服務協議(managed services agreements),或是規劃分拆成立像Ionic這樣的新公司。因此那段經歷對我們而言非常有啟發;而在參與這次破產拍賣時,也有點像回到當年的日常工作——當時我們公司在那段期間幾乎成長了近10倍。

  • And so building during market downturns, we see as really interesting opportunities to grow because things are really cheap. It's never as ideal to build when things are expensive. It's always much more exciting to build at a lower cost basis. And so I think this was the first opportunity in the market that allowed for that. We've been patient. We felt like at some point, the opportunities like this would come up and one of them did come up. So we pursue that opportunity.

    因此在市場低迷時建設,我們視為非常有趣的成長機會,因為東西很便宜。在昂貴的時候建設從來都不是最理想的。以較低的成本基礎去建設總是更令人興奮。所以我認為這是市場上第一個允許這樣做的機會。我們一直很有耐心。我們覺得總有一天會出現這樣的機會,而其中一個確實出現了。所以我們就追求了這個機會。

  • That site is located -- those two sites are located within driving distance of our Salt Creek campus in West Texas. You have sites there in power for the bigger mining sites that were there that are energized right now that are energized, they don't have miners there that were hashing because through the bankruptcy, those hosting clients left. And so we visited those sites last week, and we are working through the closing conditions now and look to close by end of the year.

    那個站點——那兩個站點——位於西德州,距離我們在Salt Creek的園區在可駕車到達的範圍內。那裡有一些為更大型礦場配置的電力站點,目前已經送電(energized);它們已送電,但現場沒有礦機在運算(hashing),因為在破產程序中,那些代管客戶已經離開。因此我們上週去現場看過,現在正在處理交割條件,並希望在年底前完成交割。

  • Operator

    Operator

  • Richard Choe, JPMorgan.

    Richard Choe,JPMorgan。

  • Richard Choe - Analyst

    Richard Choe - Analyst

  • I just wanted to ask, like, as you've gone through this deal with a leading AI company, how is the change orders and the engineering change? And how has Hut kind of been able to maximize your ability to address those needs because I think the ability to build these large-scale AI data centers is underappreciated. I'm just wondering the challenges that you've been faced with and how you've handled them?

    我想問的是,當你們與一家領先的AI公司推進這筆交易時,變更單(change orders)與工程變更(engineering change)的情況如何?Hut是如何最大化你們滿足這些需求的能力?因為我認為市場低估了建造這些大規模AI資料中心的能力。我想了解你們面臨了哪些挑戰,以及你們是如何處理的?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • I appreciate the question, Richard. I'll answer that question from two mindsets. Current status quo of the products we're building and net new approach towards building that I've talked about a bit on this Q&A in the prepared remarks. And I'll go through a little bit of a kind of flow chart of the different areas in which you move through them. So the first thing is a change order comes in. And that change order may be driven by insurance need, be driven by customer needs, whatever it may be.

    感謝你的提問,Richard。我會用兩種思維來回答這個問題。一是我們目前正在打造的產品現況;二是我在這次 Q&A 的事先準備發言中稍微提到的、對於建置方式的全新作法。我也會用一個類似流程圖的方式,帶大家走過你會經過的不同環節。首先,是收到一份變更單。而這份變更單可能是因保險需求、客戶需求或其他任何原因所驅動。

  • And if you look at the say, like, River Bend, there are a lot of counterparties involved, right? Our ultimate -- our tenant is fluid stack then you have entropic as the end user. You have Broadcom and Google, who are part of kind of the credit profile. We have Jacobs as RGC. There's subcontractors Verde. So there's a lot of parties in the mix in here. So any change order kind of have to run through the system and through all of these various parties in many instances.

    如果你看例如 River Bend,會牽涉到很多交易對手,對吧?我們最終——我們的承租方是 Fluidstack,然後 Entropic 是終端使用者。Broadcom 和 Google 也屬於信用概況的一部分。我們有 Jacobs 擔任 RGC;也有像 Verde 這樣的分包商。所以這裡面牽涉的參與方非常多。因此,任何變更單在很多情況下都必須在系統內、並在這些不同參與方之間逐一跑完流程。

  • And so the first question is, when a change order comes in, is that a change order that is necessary or not is the first question, right? So there's a discussion around what is the ultimate thing that is trying to be solved for? And is this the best way to solve for it or not? The easy thing is say, okay, you gave me a tenant change order -- this is the time the schedule impact that we've received from Jacobs, here you go. Thank you and want to pay it or not.

    所以第一個問題是:當變更單進來時,這份變更單是否「必要」?這是第一個問題,對吧?因此會先討論最終要解決的核心問題是什麼。以及這是不是解決它的最佳方式。最簡單的做法是說:好,你給了我一份承租方的變更單——這是我們從 Jacobs 收到的工期影響與時程衝擊,給你。謝謝,那你要不要付、要不要買單。

  • We think that starts on a very big creep situation where things creep up because you just take it for gossip. And so we start with kind of challenging the first principle, working together across all of the partners and saying, what is the ultimate that we're solving for? And is there a more efficient way to do it without impacting scheduling costs. because ultimately, scheduling costs, if we didn't do that, just get passed through to the tenant, but we want to drive infrastructure coming online as quickly as possible.

    我們認為那樣會導致非常嚴重的「範疇蔓延」情況,因為你只是照單全收,事情就會一路膨脹。所以我們會從挑戰第一性原理開始,與所有合作夥伴一起協作,去問:我們最終要解的是什麼?是否有更有效率的方式,在不影響工期成本的前提下完成?因為最終工期成本如果不這樣做,就只會被轉嫁給承租方;但我們希望盡可能快地讓基礎設施上線。

  • So then if we get to a place where a change order is necessary, whether it be change in requirements, change design, whatever maybe that causes that, then the question is, what can we do to be able to minimize the impact of that change order? And once you get to that final kind of answer, everyone's aligned on this is the changeover that's necessary and this is the impact that it has, then there's kind of a slew of questions that arise.

    接著,如果我們確認某個變更單是必要的——不論是需求變更、設計變更或任何導致該變更的原因——那下一個問題就是:我們能做什麼來把這份變更單的影響降到最低?一旦你走到最後的結論、所有人都對「這就是必要的變更」以及「它會造成的影響」達成一致,接下來就會出現一連串的問題。

  • The contracts currently have it so change orders need to be paid back in cash, reimbursement cash the impact applies to the lease kind of peruse whatever the impact is and you get a fee on top of that for managing the process. There's obviously increasing questions from end users, which is, hey, can you rentalize this rather than it being just a CapEx reimbursement that we pay for, can you rentalize this or not?

    目前合約的設計是:變更單需要以現金方式償付,也就是以現金報銷;其影響會反映到租約中,基本上依照影響內容去處理,並且你會因管理流程而在其上收取一筆費用。當然,終端使用者也提出越來越多問題:也就是,嘿,你能不能把它「租金化」(rentalize),而不是只把它當作我們要支付的資本支出(CapEx)報銷?你能不能租金化?

  • So I think when you think about that, there's really kind of multiple ways saying about that. One is there ample ability within the budget to be able to rentalize it, that is within the financing guardrails that we have built forwards and the continues that we've put in place of.

    所以我認為,當你思考這件事時,基本上有幾種不同的看法。第一個是:在我們既有的融資護欄(financing guardrails)之內、以及我們已建立並持續遵循的各項限制之下,預算是否有足夠空間可以把它租金化?

  • So the great, you get more yield on the capital stack that you have. The second is if that doesn't exist, can you use external capital or additional kind of funding in order to do so and we've seen that in other parts of the market as well. And if you look at it from an individual investment, depending on what kind of yield on cost has agreed to on the rentalization it could be really interesting depending on your balance sheet position, your willingness to take on that return on investment.

    如果可以,那很好,你在既有的資本結構(capital stack)上就能取得更高的收益率。第二個是:如果不存在這樣的空間,你是否能使用外部資本或額外資金來達成?我們也在市場其他部分看過這種作法。若從單一投資案角度來看,取決於租金化所同意的成本收益率(yield on cost),在你的資產負債表狀況、以及你願意承擔該投資報酬的意願之下,這可能會非常有吸引力。

  • Obviously, right now, we're investing into these projects and have pretty good structures, LTCs and so forth. And so that bar is pretty high. But overall, that's how we would think about in bucket 1, which is kind of the current regime with many counterparties and really these bespoke unique solutions. And there's a lot of engineers involved in people have different opinions and kind of drive and that causes design changes.

    顯然,就目前而言,我們正在投資這些專案,而且有相當不錯的結構、LTC(貸款成本比)等等。因此門檻是相當高的。但整體而言,這就是我們對第一個桶(bucket 1)的思考方式:也就是在目前這種制度下,存在許多交易對手,且多半是這些量身打造、獨特的解決方案。而且會有很多工程師參與、大家有不同意見與推動方向,進而造成設計變更。

  • The second bucket is going back to kind of first principles, Vega and so forth, which is what is the thing that we're trying to solve which is bring on reliable compute at speed and at scale. And so there is a second kind of camp in which we've been having a lot of discussions around, which is -- can we get a line from a leadership perspective within Hut 8 or tenant end users, etc, that we align on the thing that we need to build. And if we're able to build it really quickly, we don't allow for that many changes along the way because those are the things that really slow down in Hill project.

    第二個桶則是回到第一性原理、Vega 等等:也就是我們要解決的事情是什麼?答案是以速度與規模導入可靠的運算能力。因此我們一直在大量討論的第二種路線是——我們能否在 Hut 8 或承租方終端使用者等的領導層角度,先把要建的東西對齊一致。如果我們能非常快速地建置,那我們就不允許在過程中出現那麼多變更,因為那些才是真正拖慢整個專案的因素。

  • And in that scenario, I mean, you're building much more like a SpaceX where you're building speed, you don't have as many cooks in the kitchen making decisions and you have kind of a set thing that everyone is aligned on upfront and then you sprint at getting that infrastructure stack online.

    在那種情境下,你的建置方式更像 SpaceX:追求速度,不會有那麼多「廚房裡的廚師」一起做決策;而是事前就把一個固定的目標讓所有人對齊,然後以衝刺的方式把那套基礎設施堆疊上線。

  • And so Richard, I hope that was helpful. I'm walking through kind of like status quo of the industry? And then how do you actually bring those in, so then you're not on call talking about kind of those impacts? And then it requires a certain type of partner philosophy and conviction and confidence in the ability to build the first principles.

    所以 Richard,希望這些對你有幫助。我是在走過一遍產業的現狀(status quo)是什麼樣子?以及你要如何把這些納入流程,讓你不需要在電話上一直討論這些影響?而這需要某種合作夥伴的理念、信念,以及對以第一性原理建置能力的把握與信心。

  • Richard Choe - Analyst

    Richard Choe - Analyst

  • That's great. And honestly, I think the problem is people don't realize how this is a problem at scale that you need to engineer for and everyone just thinks it's easy to build, and it shows the level of detail that is needed to deliver this amount of capacity at scale.

    很棒。而且老實說,我認為問題在於:人們沒有意識到,當規模放大時,這會是一個你必須事先工程化設計的問題;大家都以為建置很容易,而這也顯示出要在規模化情況下交付這種容量所需要的細節程度。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • I'll give you an example. If we go a little bit more granular, we had a request to change some of the lineups because there was a different chipset in design that was going in. And at first, when we kind of asked for those requests. -- the thing that came back was the impact on schedule and costs that we believe was too high. And so we really go deep with our equipment vendors and GCs.

    我舉個例子。如果我們再更細一點,我們曾收到一個請求,要因為設計中要導入不同的晶片組,而調整部分配置(lineups)。一開始,當我們提出這些請求時,——回覆給我們的是:我們認為其對工期與成本的影響太高。因此我們就和設備供應商以及總承包商(GCs)深入探討。

  • We said, what is driving this? Because if everything is passed through as a developer, we can just pass it through the end user and say, this is -- you asked me for a change order, this is what we got back and this is a change. But as we think about like the importance is trying to bring on compute quickly, and we can't do this across all the board, but there we -- the big reason was having to go and change basically the cable trade that have to pull more cable across the facility in the short months we're able to get them into the actual TPUs.

    我們問:到底是什麼在驅動這件事?因為如果作為開發商一切都只是轉嫁(pass-through),我們完全可以轉嫁給終端使用者,然後說:這是——你要求我做一份變更單,這是我們收到的回覆,這就是變更。但當我們思考重點在於要快速導入運算能力時——我們不可能在所有事情上都這樣做——但在那個案例裡,主要原因是必須去變更基本上是電纜工種(cable trade)的作業:他們得在場區內拉更多電纜,才能在短短幾個月內把它們接到實際的 TPU 上。

  • And so we looked at it, we said, okay, why do we have to actually increase the size? What did you go reengineer all of those skis, why do we have to increase the sizing? Is there a way to do that in the field. So we're able to save on schedule and cost. And we're able to reduce that cost impact by over 90% by just challenging and focusing on how do we engineer this in a better way.

    因此我們檢視了這件事,我們說,好,那為什麼我們實際上必須增加尺寸?你為什麼要回去重新設計所有那些滑雪板,為什麼我們必須把尺寸加大?有沒有辦法在現場做到這件事。這樣我們就能在時程與成本上節省。而且只要提出質疑並專注於如何用更好的方式來工程化,我們就能把這項成本影響降低超過90%。

  • And so Richard, many of those situations come across alongside large builds and being able to navigate and manage through those with your end users and a diverse is critical.

    所以,Richard,許多這類情況都會伴隨大型建置案出現;而能夠與你的終端使用者以及多元的利害關係人一起穿越、導航並加以管理,是至關重要的。

  • Operator

    Operator

  • Chris Brendler, Rosenblat Securities.

    Chris Brendler,Rosenblat Securities。

  • Christopher Brendler - Analyst

    Christopher Brendler - Analyst

  • I just wanted to see if there was -- any way to think about Louisiana versus Texas, given the election results. No change with the governor in Louisiana. I know that it seems like a very supportive community when we were down there last month. But how should we think about your sort of future expansion plans in relation to the election results?

    我只是想看看,鑑於選舉結果,有沒有什麼方式可以思考路易斯安那相對於德州。路易斯安那州州長沒有變動。我知道上個月我們去那裡時,看起來那是一個非常支持你們的社群。但就選舉結果而言,我們應該如何看待你們未來的擴張計畫?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Asher GenootExecutive

    Asher Genoot(高階主管)

  • For the folks that had the opportunity to come to our River Bend first-look ceremony, the governor was there, the local community was there. We're very proud of the relationships that we've built and the support that we've garnered throughout the state, and the adoption we've had in Hoda's ability to build responsibly. And so we're big fans of Louisiana. We were before people even focus and looked at Louisiana, we were left out of rooms two, three years ago when we talked about Louisiana.

    對於有機會參加我們 River Bend 首次亮相典禮的各位,州長在場,當地社群也在場。我們對於一路以來建立的關係、在全州獲得的支持,以及大家對 Hoda 以負責任方式建置能力的認同,感到非常自豪。因此我們是路易斯安那的忠實支持者。在大家甚至開始關注並看見路易斯安那之前,我們就已經支持;兩三年前當我們談到路易斯安那時,我們甚至被排除在一些會議室之外。

  • There's a lot more focus today, but we continue to double down and focus on the state and are very proud of the work that we've done and are excited to continue to invest in continued growth in the state as well.

    今天外界的關注度高了很多,但我們仍會加碼並聚焦在這個州,對我們所完成的工作感到非常自豪,也很期待持續投資,推動該州的持續成長。

  • Christopher Brendler - Analyst

    Christopher Brendler - Analyst

  • And then just a quick follow-up on the sort of buyback/capital needs question. free understand the balancing act there, but how do you view the current bitcoin balance in relation to the cash needs? And it just feels like not quite the right time to me to be sort of leading into a buyback. So -- just love a little more color on how thinking about your cash vision over the near term given market conditions.

    另外針對回購/資本需求的問題再快速追問一下。我理解其中需要權衡,但你們如何看待目前的比特幣部位相對於現金需求?而且對我來說,現在似乎不是很適合去主導啟動回購的時點。所以——希望你能再多補充一些,在市場環境之下,你們近期期現金規劃的思考。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • Really appreciate the question. I'll start with the buyback itself and talk about our liquidity position. So in regards to the buyback, we've increased the buyback not necessarily to buy immediately, but to hold that optionality when we first announced a $250 million buyback that was almost two years ago or so at this point. And we really only initiated that in the recent quarter. And so we just sat on that opportunity.

    非常感謝這個問題。我先從回購本身談起,再談我們的流動性狀況。關於回購,我們提高回購額度不一定是要立刻買進,而是要保留這個選擇權;我們第一次宣布2.5億美元回購大概是將近兩年前。而我們其實直到最近一季才真正啟動。所以我們只是把那個機會先放著。

  • So similarly here, expanding the buyback is less around we want to go buy billion shares immediately. As I mentioned, kind of liquidity and being able to invest in opportunistic moments is critically important and especially in these market conditions.

    同樣地,這次擴大回購,並不是因為我們想要立刻買進十億股。如我提到的,流動性以及能在機會出現時進行投資至關重要,尤其是在目前這樣的市場環境下。

  • So we don't expect to go in immediately go buy shares off the back of this increase, but rather just leave it on the shelf as an additional tool that we have. our overall liquidity, if we think about on the parent level and across the projects, is over $7.7 billion, and that's across our Bitcoin, the cash we have, the restricted cash we have on the project level that finance those projects, and the revolver that we put in place as well in the availability along that revolver.

    因此,我們不預期會在這次提高額度後立刻進場買股,而是把它先放在架上,作為我們額外的一項工具。若從母公司層級以及各專案整體來看,我們的總流動性超過77億美元,包含我們持有的比特幣、現金、專案層級用於融資的受限制現金,以及我們設置的循環信貸(revolver)與其可動用額度。

  • So we are excited and confident with that access to that capital that we have on our balance sheet and our bank accounts. We also have zero recourse debt at this point on our balance sheet as well. And so the increase of the share buyback is to have on the shelf and not to implement immediately because we believe that cash will be king as we navigate through this current volatility.

    因此,對於資產負債表與銀行帳戶上可取得的資金,我們感到振奮且有信心。此外,目前我們的資產負債表上也沒有任何追索權債務(recourse debt)。所以,提高股票回購額度是為了先放在架上,而不是立刻執行,因為我們相信在穿越當前波動時,現金為王。

  • Operator

    Operator

  • Nick Giles, B. Riley Securities.

    Nick Giles,B. Riley Securities。

  • Nick Giles - Analyst

    Nick Giles - Analyst

  • Maybe just a question for Sean. Curious on how the way you're approaching structuring any future debt deals has evolved since your last raiser. Can you just give us a sense for some of the alternatives you're exploring or any kind of features of a debt offering that you might be considering today that weren't as logical, say, six months ago?

    也許給 Sean 一個問題。我很好奇,自從你們上一次募資之後,你們在規劃任何未來債務交易的架構方式上,有哪些演進。你能否讓我們了解一下,你們正在探索的一些替代方案,或是你們今天可能會考慮、但例如六個月前還不那麼合理的債務發行特徵?

  • Sean Glennan - Chief Financial Officer

    Sean Glennan - Chief Financial Officer

  • Yes. Thanks, Nick. Appreciate the question. So look, I don't think we actually view how we approach financing any differently from the way we did the last two. We start with a clean slate every single time.

    是的,謝謝你,Nick。感謝這個問題。我想我們其實並不認為在處理融資的方式上,和前兩次有任何不同。我們每一次都從零開始、以全新的角度出發。

  • We say, what is the asset we have, what are its attributes and what do we think is the financing that it deserves. We obviously also take a look at the market environment, how are different markets performing, where is their most depth of capital where do we see the most liquidity and best pricing. And then we also think about what's going to increase the free cash flow yield of these projects on a risk-adjusted basis as we talked about in the prepared remarks.

    我們會問:我們擁有的是什麼資產?它有哪些屬性?我們認為它應該配得上什麼樣的融資。我們當然也會看市場環境:不同市場表現如何、哪裡的資本深度最大、哪裡的流動性最好、定價最有利。然後我們也會思考,如何在風險調整後的基礎上,提高這些專案的自由現金流殖利率,正如我們在事先準備的講稿中所談到的。

  • So I don't think the approach actually changes at all. Looks like everything we do at the company from a first principle perspective. We have been preparing for the financing for Beacon Point 2, which I think is kind of what you're alluding to for a while. And we have, I think, really great solutions that we're going to bring to bear. Some of those might involve things we've done before, but they don't necessarily but we've been working pretty tirelessly to make sure that we have a great path.

    所以我不認為方法論本身有任何改變。這看起來就像我們公司做任何事情一樣,從第一性原理出發。我們已經為 Beacon Point 2 的融資準備了一段時間,我想這就是你所暗示的部分。而且我認為我們會拿出非常好的解決方案。其中一些可能涉及我們以前做過的事情,但也不完全是;我們一直非常努力,確保我們有一條很好的路徑。

  • I think we've got a lot of kudos for the prior financing we've done, and we're not resting on our laurels. Like we have a very, I think, clear path on what we want to do, how we want to finance and that is going to -- a couple of things aren't going to change. One, recourse to the parent. And two, we're going to try to minimize as much refinancing risk as we can.

    我想我們先前做過的融資獲得了很多肯定,但我們不會躺在功勞簿上。我們對於要做什麼、要如何融資,有一條非常清晰的路徑;而且有幾件事不會改變。第一,對母公司不追索(non-recourse)。第二,我們會盡可能把再融資風險降到最低。

  • So again, approach doesn't change. I think some of the instruments and tools we use might, but we'll keep that for the day when we finally -- we do announce our financings because we don't want to obviously fall on any transactions.

    所以再次強調,方法不變。我認為我們使用的一些工具與手段可能會變,但我們會留到最終——也就是我們正式宣布融資時再談,因為我們顯然不希望影響任何交易。

  • Operator

    Operator

  • Dillon Heslin, Lucid Capital Markets.

    Dillon Heslin,Lucid Capital Markets。

  • Dillon Heslin - Analyst

    Dillon Heslin - Analyst

  • On the Beacon Point Phase 2 lease amendment from 15 years to 17 years. Could you just provide a bit more color on how you're looking at that? Like it seems like you mentioned higher financing cost. Is that an interest rate look through? Or is that a potential combination of like both the flowing into a higher bond stuff that you need and less interest rates? And does that still mean -- like that to your amendment still doesn't eat into any of the extensions, correct?

    關於 Beacon Point 第二期租約修訂,從15年延長到17年。你能否再多提供一些你們如何看待這件事的細節?例如你提到融資成本更高。那是指利率層面的考量嗎?還是可能是多種因素的組合,例如需要發行更高票息的債券,以及利率水準等?另外,這是否仍然代表——也就是說,你們的修訂仍然不會侵蝕任何延展選項,對嗎?

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • That's right. That's exactly right. It doesn't lead into any of its extensions and really it was a holistic discussion over the site. And I think there's a big question that folks have asked, which is if there are changes in market conditions, how does that -- how do the tenants respond to that? And at the end of the day, the data center costs are still relatively small to the overall compute economics and the value of those economics. And so for us, I think this is a signal and a sign that whether it be through tenure rates, etc, that tenants understand market conditions and are willing to support to make sure infrastructure gets built.

    沒錯。完全正確。這並沒有延伸到任何後續擴建,實際上那是一場針對該場址的整體性討論。我認為大家一直在問一個很大的問題:如果市場狀況發生變化,租戶會如何反應?歸根結底,資料中心成本相對於整體運算經濟性以及其價值而言仍然相對較小。因此對我們來說,我認為這是一個訊號與跡象:無論是透過租期費率等方式,租戶都理解市場狀況,並願意支持,以確保基礎設施得以建置。

  • Operator

    Operator

  • Brett Knoblauch, Cantor Fitzgerald.

    Brett Knoblauch,Cantor Fitzgerald。

  • Brett Knoblauch - Analyst

    Brett Knoblauch - Analyst

  • I just want to hit on Texas one more time. Obviously, kind of the outcome we were expecting. When we read through maybe the incoming governor stands on data centers. It doesn't feel like you'd actually like super against them. It's not a hard line, no data centers.

    我想再談一次德州。顯然,結果大致符合我們的預期。當我們讀到可能即將上任的州長對資料中心的立場時,感覺她其實並不是非常反對。這不是那種強硬立場、完全不要資料中心。

  • It seems like she is in line with the rest of the country and once kind of center operators that pay for grid infrastructure, order infrastructure to save rate payers, local communities to have kind of a say in what's happening. How different do you view the Texas landscape today versus yesterday? Is it more of the same. Should we assume that most tenants now are going to be looking outside of Texas. Just any additional color would be helpful. Really appreciate it.

    看起來她的立場與全國其他地方一致,也就是希望資料中心營運商為電網基礎設施買單、投入基礎設施,以減輕用電戶負擔,並讓地方社區對正在發生的事情有一定的發言權。你如何看待德州今天相較於昨天的環境有多大不同?是否大致一樣?我們是否應該假設多數租戶現在會轉而在德州以外尋找?任何補充說明都會很有幫助。非常感謝。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • I agree with you, Brett. We believe that this infrastructure is an American initiative, it is not right or left. And which over side you're on, making sure that citizens don't get impacted in their day-to-day lives in terms of their energy, their water, their status quo of their lifestyle is critical. And the way that we've been building has been in that -- with that mindset and that approach, right?

    我同意你的看法,Brett。我們相信這項基礎設施是美國的倡議,不分左右派。無論你站在哪一邊,確保公民在日常生活中不會在能源、用水以及生活方式的既有狀態上受到影響,都是關鍵。而我們一直以來的建置方式,就是以這樣的心態與方法來進行,對吧?

  • If you look across the states in our development pipeline, I mean, there are states before last night that had Democratic leaders within those states, and we've continued to explore and continue to push forward on those developments of those projects because we believe we have a program that's focused on building responsibly.

    如果你看我們開發管線中各州的情況,我是說,在昨晚之前就有一些州由民主黨領導,我們仍持續評估並持續推進那些專案的開發,因為我們相信我們的計畫是以負責任的方式建置為核心。

  • And so as a result, in Texas, we don't actually think this changes much of what the governor elect is looking to do because we're very supportive to make sure that citizens are protected while America is building this critical infrastructure. And so we're excited to work alongside her and her administration to make sure that Texas can lead the front as well in terms of building the infrastructure and having these investments going to the state responsibly. So my perspective is similar to your spread, and we continue to focus on that foundation regardless of people have asked for it or not.

    因此在德州,我們其實不認為這會大幅改變當選州長想要推動的方向,因為我們非常支持在美國建置這項關鍵基礎設施的同時,確保公民受到保護。所以我們很期待與她及其政府團隊合作,確保德州也能在基礎設施建置方面走在前端,並讓這些投資以負責任的方式落地到該州。所以我的觀點與你大致一致,我們也會不論外界是否提出要求,都持續專注在這個基礎之上。

  • Operator

    Operator

  • That concludes our question-and-answer session. I will now turn the call back to Asher Genoot for closing remarks.

    問答環節到此結束。我現在把電話交回給 Asher Genoot 作結語。

  • Asher Genoot - Chief Executive Officer, Director

    Asher Genoot - Chief Executive Officer, Director

  • As we have built this business, we've always understood that periods of rapid infrastructure growth come with volatility. And there will inevitably be peaks and troughs driven by both broader macroeconomic conditions, but also industry dynamics. And what has always mattered to us is building a business that cannot only withstand these cycles, but also continues to grow and execute through them. And that is why we've been so deliberate in strengthening our balance sheet structuring our business thoughtfully and building a foundation design for long-term success.

    在我們打造這門業務的過程中,我們一直明白,基礎設施快速成長的時期往往伴隨波動。而且不可避免地會出現高峰與低谷,這既受更廣泛的總體經濟環境影響,也受產業動態影響。對我們而言一直最重要的是,打造一家不僅能承受這些循環,還能在其中持續成長並執行到位的企業。這也是為什麼我們一直非常審慎地強化資產負債表、周全地設計業務架構,並建立一個為長期成功而設計的基礎。

  • So as I shared last quarter, our excitement and conviction in the business we are building remains as strong as ever. We know there will be challenges along the way, but we're confident in our ability to navigate through them, overcome them and emerge stronger. And I reminded our team in our last town hall with Warren Buffett's famous observation that the market is a voting machine in the short term and a weighing machine in the long term. We can't control short-term market conditions, but we can control how we execute, how we allocate capital and how we build this company.

    因此,正如我在上一季分享的,我們對正在打造的這門業務的興奮與信念依然一如既往地強烈。我們知道一路上會有挑戰,但我們對自身穿越挑戰、克服挑戰並變得更強的能力充滿信心。我也在上一次全員大會上提醒團隊,引用華倫・巴菲特的名言:市場在短期是投票機,長期則是稱重機。我們無法控制短期市場狀況,但我們可以控制我們如何執行、如何配置資本,以及如何打造這家公司。

  • And our focus remains on what has always mattered most, executing on our commitments delivering for our customers and building a business that can compound value through every market cycle. We believe the opportunity ahead of us is extraordinary, and we remain as committed as ever to realizing it. Thank you all for being with us today.

    而我們的重點仍然放在一直以來最重要的事情上:履行我們的承諾、為客戶交付成果,並打造一家能在每一個市場循環中複利累積價值的企業。我們相信眼前的機會極為非凡,我們也一如既往地致力於將其實現。感謝各位今天與我們同在。