Harmony Gold Mining Company Limited (HMY) 2013 Q1 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

  • Good morning, ladies and gentlemen, and welcome to the analyst conference call for the Harmony Gold Mining Company Limited first-quarter financial year 2014 results. (Operator Instructions). Please also note that this conference is being recorded. I would now like to turn the conference over to the Financial Director, Mr. Frank Abbott. Please go ahead, sir.

  • Frank Abbott - Financial Director

  • Good morning, ladies and gentlemen. We are very happy with the past quarter. Our production was higher, much higher, 12%. And this was the second consecutive quarter that we increased our production. And that also resulted in lower unit costs.

  • I would like to hand it over for any questions to you. Thank you.

  • Operator

  • (Operator Instructions). Adrian Hammond, BNP Paribas.

  • Adrian Hammond - Analyst

  • Morning, gentlemen. I have a couple of questions. Firstly, the exchange of mining rights with Sibanye, what -- can you give us an indication what the extension to the life is or the reserves? And as well, do you foresee any impact on production and costs?

  • Frank Abbott - Financial Director

  • Thank you, Adrian. I'm going to ask Graham to answer that question.

  • Graham Briggs - CEO

  • Hi, Adrian. Yes, the mining rights areas that we exchanged are two areas. And those areas are areas that we can't access as Joel and Beatrix can. The other areas are areas that Beatrix can't access but we can. So that's where the logic comes in that.

  • The other areas, we've got another area which is really an area that we've agreed a royalty, where Joel will mine the ground which originally belonged to Beatrix and pay a 3% royalty.

  • Again, the big issue here is that these pieces of ground haven't been developed, so they are still in a resource status. There is some surrounding information, but the areas haven't been developed. They haven't got raised lines or anything in them, any infrastructure. So exactly what size the ore body may be, what grade it is is still not really fully determined.

  • The potential for Joel is that what was going to happen between mining the upper part of the ore body and completing the decline, fully developing the decline, there may have been a dip in production. That will now not happen. And as to extension of life, obviously we'll have to see once we develop it fully.

  • Adrian Hammond - Analyst

  • Okay. Thanks for that, Graham. Just two follow-up questions then. What -- the improvements at Bambanani, are those grades sustainable? And for Frank, what are your all-in costs for the quarter, please?

  • Frank Abbott - Financial Director

  • Graham, if you could do that one.

  • Graham Briggs - CEO

  • Yes. The Bambanani one, still more to go on the production there. Grades, I think in estimates, are around about 11 grams a tonne for the whole of the shaft pillar. So that is the sort of intent. So no problem with the grades. There's probably a little bit of an overachievement this quarter, but we're going to get some fluctuations around the 11 grams a tonne. But I wouldn't expect them to be huge. But it's part of the pillar, so that's the way forward. But we will increase the production once the entire system is going and the decline system is working as well.

  • And I'll hand back to Frank on the all-in sustaining costs.

  • Frank Abbott - Financial Director

  • Yes.

  • Adrian Hammond - Analyst

  • No, the all-in total cost for the quarter, please.

  • Graham Briggs - CEO

  • All-in cost total. We haven't got that number for you, Adrian. But again, if I can just talk on Frank's behalf and he can correct me, if you take the all-in costs for the Company, what you then need to add back in there is the exploration in PNG, any cost on Wafi-Golpu and what else? That's it.

  • Adrian Hammond - Analyst

  • Great. Thanks, chaps.

  • Graham Briggs - CEO

  • So we have given the all-in sustaining costs, but the all-in costs aren't that is much different.

  • Frank Abbott - Financial Director

  • Any further questions?

  • Operator

  • Andrew Byrne, Absa Capital.

  • Andrew Byrne - Analyst

  • Hi. Good morning, gents. Two questions, if I may. The first one is around the corporate and exploration spend. If I look what the expenses in the first quarter versus what you're looking for the full year, it looks like you've got some quite significant cuts still to make. I think if I add up the corporate, social and exploration, they've actually gone up 10% year on year. Are you questioning those targets even at this early stage? And what are the actual practical measures that are going to cause those numbers to drop off over the next four quarters?

  • And then just finally as well, could you maybe talk through your thinking on liquidity and your capital structure at the moment? How do you see that evolving over the next 12 months?

  • Frank Abbott - Financial Director

  • Thank you. So just on the question of exploration expenditure, if you look at the past two quarters, you could see that we've reduced the exploration expenditure from ZAR219m to ZAR142m. And we are going to reduce that further in the next few quarters.

  • On the social investment expenditure, that is not going to reduce in the next few quarters. And I don't have the updated figure for you there.

  • And then your question was on --?

  • Andrew Byrne - Analyst

  • And so basically saying are you still happy with your cost reduction targets for the year on corporate spend and exploration?

  • Frank Abbott - Financial Director

  • Yes, we are. You can note, if you look at the line of corporate and other expenditures, that there has been a reduction in the current quarter. We plan that expenditure to reduce in the next few quarters.

  • Andrew Byrne - Analyst

  • Okay.

  • Frank Abbott - Financial Director

  • If you look at the income statement, page 10 in the quarterly booklet, you can see that our exploration -- our corporate expenditure has reduced from ZAR127m to ZAR108m.

  • Andrew Byrne - Analyst

  • Okay. And then with regard to the balance sheet and liquidity for the Company as it stands at the moment, can you talk us through how you see that evolving over the next 12 months? How do you see that playing out?

  • Frank Abbott - Financial Director

  • Yes. Our debt levels are still -- our net debt levels are still very low. We're talking about a debt level of -- a net debt of about ZAR870m. And we don't foresee a problem. We are paying for all our capital expenditure out of our working cash flow. I do not see any problems or any change in that in the next 12 months.

  • Graham Briggs - CEO

  • Sorry, can I just add to that? We would see our debt levels reducing as we build up more production. And so that's where we are. We don't see anything that has huge demands on cash or anything like that. Wafi-Golpu, I think we've given all the information out there. The expenditure levels, I think, for this year were planned at $100m or thereabouts and probably similar for the year after that.

  • So there's no huge expenditure coming out. And some of our business units, as you can see, need to improve still. So we would see our debt levels -- our net debt levels declining and becoming positive.

  • Andrew Byrne - Analyst

  • Okay. Sure. Thanks a lot and best of luck.

  • Operator

  • (Operator Instructions). Patrick Mann, Deutsche Bank.

  • Patrick Mann - Analyst

  • Good morning, gentlemen. Just two quick questions. The 3% net revenue royalty at Joel, can you just confirm that that would only be on the two portions that you acquired from Sibanye?

  • And then the second question is in terms of grade, the 4.79 for 2014, is that a year-end target? Just looking at where you're sitting versus that target, you've still got about 5% to go. Is that a year-end target or do you think you'll be able to average that across the entire year? Thanks.

  • Graham Briggs - CEO

  • Thanks, Patrick. I'll take those, if you don't mind. The 3% royalty is on the areas that we got that didn't swap. So there's a swap of ground between Joel and Beatrix, and that's swap for swap. No change in -- no cost, in other words, neither royalty or any other way. We've got some further area from Beatrix which we, as Joel, are going to mine. And that is where the 3% royalty applies.

  • Patrick Mann - Analyst

  • Thanks.

  • Graham Briggs - CEO

  • And it was negotiated 3%. So you can ask me as long as you want, I can't really give you a good scientific answer for the 3%.

  • Then on the grades, the grade is intended to be an average for the year. And it is skewed a little bit towards the end of the year. And the reason for that skewing is that our bigger production units have the higher grades. So there are areas like Kusasalethu, which is building back into its normal production with higher grades, Bambanani with more tons at a higher grade and so on. So that's where the skewing of the grade is.

  • Patrick Mann - Analyst

  • Thanks very much.

  • Operator

  • Allan Cooke, JPMorgan.

  • Allan Cooke - Analyst

  • Thanks. Good morning, Graham. Good morning, Frank. Good quarter. Two quick questions, if I may.

  • The first goes to productivity initiatives. And I know you guys were involved with Robbie Lazare in talking about [Simbesi] initiatives at the Chamber level. But we know that Sibanye at [Q3] shaft is going ahead and trialing different work programs, different shift rosters, to look to see if they can improve productivity. Are you guys thinking about a similar projects, trialing or piloting similar things at any of the shafts or mines in Harmony? That's the one question.

  • And then the other question is during -- more recently or during the quarter we saw Newcrest comment that if Hidden Valley couldn't be turned and made free cash flow-positive, the mine may be shut. It's a JV there. What is your thinking around Hidden Valley currently, please?

  • Graham Briggs - CEO

  • Thanks, Allan. I'll take those if it's okay with Frank. On the productivity front, Allan, we've got quite a bit of experience of different work shifts. You'll remember in end of 2007 when we actually stopped ConOps because it simply wasn't working. We were paying the penalty of the sort of -- to get the arrangement in but weren't getting extra production.

  • ConOps, however, did work in certain areas. It worked well on, as an example, 8 shaft in Evander. I don't know whether they're still working on ConOps there, but it worked well there. And that's simply more a situation of the physical conditions and I guess the sort of type of operation that we work.

  • We work ConOps on some areas. Target, for instance, we have been working ConOps on the -- where the massive production can happen. The rest of the operations we haven't because it simply hasn't worked.

  • So it's really more operational-specific. The one thing that you do have to do in ConOps or any productivity issues where you are working more shifts, in other words, trying to work seven days a week on a blasting basis, so you really have to get the workforce behind you. We are looking at other ways of productivity. And so we are -- we're actually seeing some success in our productivity numbers.

  • On Newcrest Hidden Valley, I guess the plan around Hidden Valley, as we guided, was that we would have a breakeven year at about $1,400 an ounce. Now during the last while there has been a weakening of exchange rates, both PNG kina as well as the Aussie dollar. So I think in dollar terms, that is likely to be a little bit lower -- sorry, the production of Hidden Valley is likely to be a bit lower.

  • Frank Abbott - Financial Director

  • The cost.

  • Graham Briggs - CEO

  • The cost, yes. Sorry. Allan, there's been a lot of changes. You can see those changes quarter on quarter. The production is looking much better. They've still got some more cost issues and they need to drive the cost down a bit more. I don't think we've seen the full implementation of what's happening with the crusher and the belts. That's really only effectively been running for a quarter. And there were some teething problems. So I don't think we're at that decision stage yet.

  • We will be visiting, Frank and I, will be visiting Hidden Valley again in November and we'll have a look at that operation. But we are not yet at that stage at Harmony that we are going to shut that down.

  • I don't know what the context was when you first asked that question, but sure, any operation that is going to run at a loss for any extended time should either get shut or sold or somehow restructured. And we've gone the restructuring route at Hidden Valley.

  • Allan Cooke - Analyst

  • Thanks very much, Graham. I don't want to ask too many more questions because other people -- it's a short time, other people need to get a chance. But sometime if -- when there is time, if you could just let us know the types of projects and initiatives that you guys are working on to improve productivity, that would be helpful.

  • Thanks, Graham. Thanks, Frank.

  • Frank Abbott - Financial Director

  • Sure. Thank you.

  • Operator

  • Chris Nicholson, RMB Morgan Stanley.

  • Chris Nicholson - Analyst

  • Morning, guys. I guess my question is really around your guidance for this year. I know at the beginning of this year you were targeting 1.3m to 1.4m ounces with production at this quarter. I think it's fairly well understood some of the initiatives on operation that you're looking at to get your production up to those levels for this year. But costs do seem a little bit sticky, only down 6% in this quarter. Are you still comfortable with the ZAR270,000 to ZAR300,000 a kilogram that you were targeting at the beginning of this year?

  • Graham Briggs - CEO

  • Yes. I guess, let's go to the guidance first, Chris, while Frank thinks about some of the cost numbers that you've thrown out.

  • The guidance we had is 1.3m to 1.4m; you're absolutely right. If you take this quarter's production, multiply it by four, I think you get 1.27m. I think I've already told you a little bit about it is focused a lot more on the back end with Bambanani improving its production, Phakisa, as well as Kusasalethu. But, having said that, we are not going to chase the answers just for the answer's sake. We're going to chase margin and productivity. If there's some areas in an operation which are losing us money or costing us money, we're going to shut them down.

  • So I'm not going to get to the end of the year and apologize for not getting 1.3m-plus ounces. We'll be focusing on productivity and margin. So that's what we'll be doing.

  • As far as the costs go, this quarter there were some additional costs which are unusual for a quarter, Frank, electricity and there was labor increases.

  • Frank Abbott - Financial Director

  • That's correct. Because of the winter tariff and also because of [lease pay] provisions, we probably have ZAR100m cost which will not repeat next quarter. If we look at slide 11 of the presentation, we tried to show all-in sustaining costs. If you look at the operating cost level there, you see there's been 8% reduction quarter on quarter. And if we look at the all-in sustaining cost, which is the bottom line there, there's been a 14% reduction in unit cost. So we are actually quite pleased with the progress that we've been making in gold -- increase in gold production and also in reduction in costs.

  • Graham Briggs - CEO

  • Thank you. Yes, Chris, so if I can just add to Frank, we're very pleased that we've been looking at not only increase in production but also saving costs. And to see that ZAR66,000-plus per kilo reduction in cost is quite, we think, pretty good. We're quite chuffed with that.

  • Chris Nicholson - Analyst

  • Sure. Thanks, guys.

  • Operator

  • (Operator Instructions). Adrian Hammond, BNP Paribas.

  • Adrian Hammond - Analyst

  • Hi, guys. Just a follow-up here. The problems at Doornkop and Masimong, you mentioned at Doornkop something happened with the mine mix and you're having problems with volumes in Masimong, though we know that you're expecting improvements there after you complete the ore-pass systems. So can you just expand a bit on that, please?

  • Graham Briggs - CEO

  • Sure. On Masimong, yes, we've had a little bit of a tough couple of quarters. This quarter will be better and we'll see better improvements next quarter, back into probably where it should be.

  • Yes, the ore-pass was repaired. There was a bit of mixing of ore and so on. But the production levels have not been good at Masimong. So that was a bit of a disappointment through the quarter.

  • On Doornkop, the focus really at Doornkop has in the last while been increasing production from the south reef and making sure that we do everything right at the south reef. We've had some production coming through on the kimberley reef, which is fairly low grade. And we're busy assessing that at the moment. It would probably be better for us to focus more of our efforts on the south reef, in which case Doornkop should be able to get 5 grams a tonne out of that recovery.

  • So there is -- there's a lot of focus on some of these operations, Adrian. Just to give you an idea where the focus is, and you can have a look at slide 13, we've talked a little bit about Hidden Valley. Kusasalethu should be back into its normal production. Phakisa is obviously in buildup, but we will see that improving. In fact it's well within the target that we set already. Target 3 is really a case of doing more development in the base reef and increasing that. We've chatted a bit about Doornkop, Masimong. The other one that's improved quite a bit quarter on quarter is Tshepong, and I'm expecting more production from there in the next quarter.

  • So if you take those sort of areas, looking at the top -- sorry, the right-hand 50% of our production, that's where the big focus is during this quarter.

  • Adrian Hammond - Analyst

  • Thanks very much.

  • Operator

  • (Operator Instructions). Gentlemen, it appears that we have no further questions. Do you have any closing comments?

  • Graham Briggs - CEO

  • Yes. Okay. I will close it quickly. Thanks, Frank.

  • I think it's a very pleasing quarter. As you all know, we've spent lots of money on some shafts and declines and so on during the past. They're now getting into production. We're seeing some of the buildup. We've certainly focused a lot on cost saving, but also looking at productivity and increase in gold production. And that's led obviously to a much better profit margin. More work to be done, as usual, but there's some pleasing results.

  • I think if you have any detailed questions for Frank on the financials, please don't hesitate to find him or contact him through Marian. Thank you very much.

  • Operator

  • Thank you very much, sir. Ladies and gentlemen, on behalf of Harmony Gold Mining Company Limited, that concludes this morning's conference. Thank you for joining us and you may now disconnect your lines.