  • Graham Briggs - CEO

  • Morning ladies and gentlemen. Thank you very much for coming to the quarterly results presentation. This is the -- for the quarter ending December 31. A lot of conflicting schedules today with the start of Indaba, so we'll be punctual and get through it fairly rapidly. But please don't hesitate to give some questions at the end of it.

  • Safe Harbor statements, which I have to bring to your attention. This is the presentation in a nutshell. We'll be talking about the strategy, talk about growth answers, a lot of emphasis on exploration. You will have seen that during the last few quarters we have upped the ante on exploration, roughly spending about ZAR100m on exploration per quarter these days. We'll talk about operational efficiency, those areas that we need to make sure we have in all our operations. We'll look at developments during the quarter. And that's really the quarter in a nutshell. Hannes will help me with the financial overview and then we'll conclude.

  • This is a lot about what Harmony is about these days, a new plant here, Hidden Valley in the distance, 5 kilometers away from the plant, really is starting to perform very nicely. And this is one of the future generations of mines in Papua New Guinea.

  • Our strategy, we've told you before, we'll keep telling you, and it's really about creating a sustainable company, something that does have free cash flow. We have changed quite dramatically in the makeup of our assets over the last while, focusing a lot more on geographic diversity, and this is where the exploration efforts are honed in, doing a fair amount of exploration in Papua New Guinea. But a lot of what we've done during the last while is really commissioning the assets that we've started building and those are really in the commissioning phase now, but also improving on our quality assets and make sure that we get -- optimize the portfolio.

  • This is a photograph of Doornkop and you will notice that there's one thing on the slide that's very dramatic, and that of course is lots of blue sky. Doornkop, quarter-on-quarter results, a massive improvement on Doornkop, 19% improvement there in gold production. And you can see quarter on quarter it's really growing. There's a nice trend line there. And the cash costs declining by 8%.

  • This is where we transferred 12 crews from Merriespruit. This is stoking crews. They only started working towards the end of the quarter so we haven't seen the full benefit of that. And just a little note on Merriespruit 1, you'll remember that there were 3,400 people to be displaced at Merriespruit 1. Out of that, around about 400 were retrenched and the other 3,000 were transferred into various other operations.

  • So nice build-up in Doornkop, aiming at the financial year 2013 target there of roughly 200,000 ounces per annum, annualized.

  • Another one of our performers is Phakisa again, building up nicely. It took a little bit of a step back in September. That was an accident that we had in that quarter. But you can see that there's better production there, 34% improvement in production. And now the grade is also showing, so the development is paying off. This is where the guys are doing a lot of development to open the ore body. And of course, increasing, or improving cash costs there by 25%. Again heading for the region of 220,000 ounces, annualized on the financial year 2013.

  • Hidden Valley, excellent quarter from Hidden Valley. You've seen these results. We had earlier release on it. Again, this is a great performance at Hidden Valley and the percentages there, all much better than they were the previous quarter. Still not at full production though and this quarter shows -- this slide shows those results.

  • You can see that what has been happening is the plant has been commissioned. We've now got through a lot of those teething problems in the plant. Gold recovery is up at 86%, silver recovery is up nearly 63%, and so getting to their targets and planned recoveries. You can see the gold grade. The ore body has been performing very well. You haven't heard us doubt the ore body at all so it actually performed slightly better than anticipated during this quarter and the previous quarter.

  • The area that we need to work on is, however, the throughput. This is planned at 4.2m tonnes per annum. At the moment, annualized production going through there is only 3.4m tonnes per annum so a lot more work to be done on throughput. And this is all around the mining and moving the ore to the plant.

  • So a good performance from Hidden Valley and this is going to be a great mine going forward.

  • Talk a little bit about exploration. And these sort of rocks is what our geologists go crazy for in Papua New Guinea, really showing some great mineralization. This is the tenement portfolio. The hatched area, focused around two areas, and that's Hidden Valley. You can see the tenements around there, quite a bit of exploration. I will go into some of the exploration detail. And then Wafi-Golpu. And this is really in relation to this transfer structure around Wafi-Golpu and call it 3,200 square kilometers of exploration tenure in that hatched area. The one on your right bottom in that hatched area is what we call Morobe Coast tenements. And there's some work, but it's all early phases there.

  • And then outside of that we have as Harmony 100% about 8,000 square kilometers of exploration tenure. That's a large amount. The two grey areas are being explored as we speak and the Mount Hagen area is the one where we've done some drilling as well. So a lot of potential. And remember this is the belt, the mobile belt, where, towards the left of the screen, is where Grasberg is, which is simply one of the biggest copper/gold mines in the world.

  • Just to recap a little bit of that, Harmony 100% 8,000 square kilometers, Mount Hagen, and there's some prospects within that. And then Amanab projects, and that's right near the border, the Indonesian border. Within the 50% joint venture with Newcrest, a fair amount of tenure. Wafi-Golpu's structure is getting a lot of attention, not only Wafi-Golpu, but the whole transfer structure. Waterfall and Kulang are in the region of Hidden Valley. Really a lot of focus on a area within about 10 kilometers of that plant, for obvious reasons. And then Morobe Coast is getting some attention as well.

  • This is a interesting slide in that we are struggling a little bit in updating you all the time with the new information that's coming. So you can see the dashed area is the Wafi -- sorry the Golpu deposit, as we knew it, but it is quite out of date already. You can see that the ore body is extending really to the north, northwest. And some of those intersections that we have, if you took a look at 347, nearly 800 meters at 1.9% copper, 1.43 gram a tonne gold. That is a phenomenal, phenomenal intersection in anybody's language.

  • If you look at the other borehole, which is about 100 meters further north, nearly 600 meters at 2.03% copper and 1.65 gold. This ore deposit is no doubt going to be upgraded within the next six months. Hopefully within the next quarter we'll have some sort of upgrade on the resource.

  • As we're stepping out, there's a further borehole, WR377. That's another 100 meters to the north. That is also mineralized. So you can see that this deposit is really getting much bigger. And if you just sketch in the areas there you'll see that this thing's moving well beyond the 500m (sic -- see documentation) tonnes that we declared, and there's probably closer to 750,000 tonnes.

  • A schematic long section. You can see where the boreholes actually intersect the page, towards the bottom there, of Golpu, WR377, in yellow. But you can see that the targets, we really focused on this target, and the geologists are doing great work. I'm sure they're fighting about who is going to use the next rig up there. Everyone wants to drill and these are just tremendous intersections.

  • The pre-feasibility is in progress. That is going well and those are the targets that we're testing. A little bit difficult at this stage to put targets down on what we're actually testing because, as you can see, with every new borehole new information and therefore it's going to challenge us on where we're going. But it is getting to a point probably during the next quarter, maybe two quarters, where we'll actually have to fix some things so they don't start moving. So we'll have to fix tonnages and things like that to really get the pre-feasibility done. What a great problem to have, an ore deposit of this nature growing like this, simply one of the best in the world.

  • And this slide indicates that. This is a slide then, we haven't got the credits there, but Bank of America - Merrill Lynch put it together for us, looking at some producing assets, some feasibility-stage projects and some early-stage projects, and looking at them in the worlds of copper and gold grades. So copper grade on the axis, on the vertical axis, and gold on the bottom. Golpu, as we declared it in the resource, sitting way out on the right. And way out on the right is good because it's the highest-grade gold and of course, as you go up, it's higher grade. So we're dealing with roughly 0.8 gram a tonne gold, 0.8% copper, and it's beating all the other projects in the world.

  • The big daddy there, Grasberg, next to it, but Golpu's going to get bigger. It won't be as big as Grasberg of course, but it's certainly getting bigger. And it's really starting to stand out as the world-class gold/copper project in the world.

  • A lot of questions on funding so we'll talk a little bit about funding. But this is as we have it early stage and this is really from the scoping study, roughly $3b to build a mine like this. 50% of that is our share. And remember this is a target which may move depending on what happens with the size of the mine and the various pre-feasibility stages. So towards the end of the calendar year, but probably early in next year we'll have better figures on the capital estimate.

  • How would we finance it? By then we'll have some of our great mines in South Africa producing some nice cash. But even besides that, a good project is easy to fund and Wafi-Golpu is a good project and I've shown you that on a previous slide.

  • But if you look at something like copper financing, if you take the production scenario here, and even out of our third of our 50%, you want to do a five-year copper loan forward sale, you can raise $1b. Remember, this is a high-grade deposit with lots of copper. You can also look at some sort of commercial debt or bonding, bond, a convertible or conventional bond. But funding is not a problem that we worry about. This is just an indication of the sort of things that we're thinking about as far as funding goes.

  • A interesting photograph here of an overland pipe conveyor. This conveys the ore from, basically from the Hidden Valley pit towards the -- to the processing facility, about 5 kilometers. I think it's indicative of the sort of things that Harmony is doing these days, new technology, different areas of new technology. I think a lot of people probably label us as having old mines, but this is simply not true anymore. Doornkop sinking the shafts, getting down, equipping those shafts, this is new stuff, new areas.

  • If you go to Phakisa, you will find a Rail-Veyor. Now Rail-Veyors unheard of in a lot of areas, but this is how we transport our ore. Fairly new, breaking technology. Again in Phakisa you'll see ice plants, ammonium ice plants on surface. We drop ice down the shaft. This doesn't happen elsewhere. So there's a lot of new technology that we are using in Harmony these days.

  • One of our sterling producers, Tshepong, steady state. It's simply the most profitable operation we have, and the guys there are doing a great job. You do get small fluctuations that happen on these mines, grades and tonnes and whatever, but that's fairly small fluctuation so this is a steady, steady producer.

  • Masimong, you'll remember that several years ago this was one of our real problem children. Management here and [Hannes Borgman's] certainly done a great job in keeping this and getting this mine where it is. The best lowest-cost producer in Harmony, at ZAR160,000, call it ZAR169,000 a kilogram. Again, you do get fluctuations. This is what happens in the ore body, B reef and basal reef they're mining here. But the guys on this operation are doing a great job.

  • If we look at the quarter, I've got to talk about safety. A lot has been said about safety. You're looking at a longer-term graph here, quarterly graph. This is LTIs frequency rates per 200,000 hours worked. And you can see the trend there. This trend will continue as we go forward, better safety, and this will lead to better final results. Fatalities have been a blot on our copy book and we had four fatalities this quarter. We would like to go through several quarters at least where we don't have to report any fatals. But the guys are doing some very good work on this area and we'll continue to show improvements in our safety performance.

  • Things that have been in the press these days, Watut River litigation in Papua New Guinea. The photograph really tries to capture what we're about here. So this is the only tailings, engineered tailings facility in Papua New Guinea. This litigation is not about pollution. It's about sediments and sediment control. So when we were starting to build the mine, there was a fair amount of sediment that went down the river. We're now into engineered waste dumps and you can see that the tailings dam has always been engineered.

  • There's a lot of communication in with the communities and there has been some compensation paid. This is where sediment has been over the gardens near the river. But remember that in Papua New Guinea, landslides occur so this is not the only source of sedimentation. But this is not a something that needs to be brandished on the front page or anything like that. The guys are doing some great work on control of the sedimentation in this area.

  • The Group operating results, top line, you'll see 4% negative there on gold production. The negatives for the quarter were three operations really, Kusasalethu, 467 kilograms down and that was due to the accident that we had in that shaft. The second operation was Merriespruit. We closed that shaft prematurely. We had a plan for the whole of this financial year. And then the other disappointment for this quarter was really Bambanani, also a negative. If you look at those three operations, about 880 kilograms down, negative on those three operations. So despite the good performance from some of our other operations, that was negative.

  • But you'll see if you look at the detail of some of the costs, and this is what a lot of it is about, that we are able to control our costs. Even when we do have things happening on operations, if you look at the operational costs, for instance, on Kusasalethu, you'll see that we managed to reduce our costs, because we did have this issue and therefore we were able to control it.

  • I guess the exchange rate is quite a big mover here, a 6% change in the exchange rate, negating that 12% improvement in the dollar gold price.

  • Underground operations, really this, the comments I made about the operations really applies to this slide. The small variation grade is not a concern. The grade is going to be improving as we go forward. I guess the planning for this quarter is something around about 4.7 plus grams a tonne, so we are moving the grade up as we get the better results from places like Doornkop and Phakisa.

  • Surface operations, fairly steady on some of the surface operations. A little bit of negative happens in these surface operations when you have lots of rain. It does affect the throughput because it affects the SG of the tailings, for instance, you get through. We also had issues around Joel Plant so we couldn't get all the throughput there. But basically a fairly steady quarter on surface operations.

  • Hidden Valley, we've talked about. Good performance from Hidden Valley, better grade and you saw that on the feed grade. And of course getting their cost and getting the throughput, meant that there was a 15% improvement in dollars per ounce here, 20% improvement if you look at it in rands per kilogram.

  • I want to hand over to Hannes to give us some of the financials.

  • Hannes Meyer - Financial Director

  • Thanks Graham. I'll take you through the income statement and bit of the balance sheet for the past quarter.

  • If we look at the income statement, revenue down by ZAR90m quarter on quarter as a result of lower production, which resulted lower gold sales, offset by a higher gold received price. Cash operating costs down by about ZAR220m, ZAR230m there and I'll take you through the cost savings we had during the last quarter. Royalties up a little bit on the quarter, as a result of the higher operating profit. You can see operating profit up 33% quarter on quarter.

  • Employment termination and restructuring cost, that's coming down as we come towards the end of the process that we went through in closing a number of these shafts. You can see that's ZAR54m this quarter. In the next quarter there will still be some costs coming through, but that's really the end then of our restructuring process.

  • The big credit there is the insurance credit, ZAR179m. That's an insurance scheme that we had. It came to an end now, a three-year scheme that came to the end of that period. Our engineers did some good work on the operations. We had lots of savings and then less claims as well. So we had some funds left in that scheme and that came to as a credit now in this quarter.

  • Exploration expenditure, it's ZAR76m there. It looks like it's a reduction, but we've capitalized some of the exploration costs and I'll touch on that. So exploration, we work on roughly ZAR100m of cash outflow per quarter. ZAR76m we've expensed in this quarter.

  • Again, on financial instruments, last quarter ZAR311m. We had the big mark-to-market on the Wits Gold option. This quarter ZAR78m. That's really linked to our environmental trust funds that we've got in an equity-linked instrument and because of their market performing, we've got the benefit in our environmental funds being worth more, also helping to offset some of the gap that we've got in terms of the liability and funds available.

  • All of that relating to headline earnings of ZAR294m for the quarter, ZAR0.69 per share.

  • That's just in dollar terms.

  • We go to the cash cost, the decrease, ZAR225m. ZAR147m of that is due to electricity. That's a quarter now without winter tariffs. And then you'll also see some of the restructuring efforts now coming through and savings quarter on quarter. So we had ZAR33m benefit there, as a result of not operating on Merriespruit operations anymore. So we've got some reduction in terms of labor and other consumable resource items.

  • Look at the balance sheet, during the quarter we signed additional ZAR750m debt facility with Nedbank. We've drawn ZAR500m of that facility and we repaid ZAR90m of the existing facility.

  • So if you look at the net debt, we started off at ZAR405m net debt beginning of the quarter. Cash flow items ZAR633m (sic -- see presentation) from the operations. Capital expenditure now ZAR70m more quarter on quarter as we planned and you'll see it always in the second quarter of the year, a bit more capital expenditure than the previous quarter. Talked about the exploration earlier. That's about ZAR100m going into exploration efforts. And restructuring efforts then decreasing now quarter on quarter. Leaving us with a net debt of ZAR750m at the end of the balance -- end of the quarter.

  • Cash items, ZAR37m available and ZAR550m of debt facilities still available to Harmony.

  • Thanks. Graham.

  • Graham Briggs - CEO

  • Thanks Hannes. Just to conclude, estimate for this year, and this, without you doing all the maths, adds up to about 1.45m to 1.5m ounces for the year. But you can see that the next two quarters are really going to be better than the quarter we've had and so we're looking forward to some good gold-production numbers coming out in the next while, mainly of course from some of our growth assets.

  • I think the successes that we can bank, and this 'closed non-profitable operations', it looks like a one-line throwaway. We've closed lots of operations during the last few years. And for those of you who like to dabble in the finances, you have to look at operations like Virginia. Virginia operation I think last quarter had a loss of something like ZAR36m. Hannes can either give me the nod or not. And this quarter a profit of over ZAR40m. That's a massive turnaround by doing what we're doing and that's really been happening throughout the operations.

  • Again if you look at total production for the last three years you'll see in the region of 1.45, in that region, of production. Yet we've closed all these operations, which means that we've actually been replacing that production from these new assets, which are not at full production. They are not at the cash costs they should be because as they build up we'll get more and more production teams. But right now those guys are fully staffed with all the service personnel, all the people in the shaft and so on. So we'll get increased production from these new operations. They're quality operations. They're no doubt going to be some of the best gold-mining operations in South Africa.

  • A lot of our capital is behind us. We're still spending considerable amount of capital. And we've maintained that expenditure over the last three years, even though closing down and having to borrow some money to support this. But these operations are definitely going to pay us back handsomely in the future.

  • Hidden Valley, just a great mine, lots of potential there. Over 500 -- sorry, over 5m ounces of resource in that and I think we've declared about 2.6m, so a lot more ounces. And you've -- you'll probably hear and Greg's here in the audience so if you want to ask him on what we're drilling and doing at Hidden Valley, please feel free.

  • Wafi-Golpu, it's just growing. Quarter on quarter it grows and we're looking forward to that declaration. I'm sure the declaration won't last long before it's out of date again. So it just keeps growing.

  • Management teams, I've stressed a little bit in management teams. So when we look at a place like Masimong, we've got a good team there, good control of what's happening. And let me tell you, the guys are really focused, experienced and wanting to give and deliver the results that the shareholders want.

  • Thank you very much ladies and gentlemen. I'd like to open myself for any questions. But we really are in a position now where I think we are an exciting investment for anyone investing in gold.

  • Are there any questions? Mandy? Sorry, just -- thanks. It's still not working.

  • Mandy LaGrange - Analyst

  • I'll try this one.

  • Graham Briggs - CEO

  • Yes.

  • Mandy LaGrange - Analyst

  • Hello?

  • Graham Briggs - CEO

  • Yes.

  • Mandy LaGrange - Analyst

  • Mandy LaGrange from Investec. In Papua New Guinea with Hidden Valley what is the constraint on the throughput at the mill? Is it actually the feed or is it something within the processing plant that's constraining it to the 3.4m tonnes at the moment?

  • Graham Briggs - CEO

  • Yes, Mandy, this is all about mining really and mining sequences and exposing more ore body and getting that sort of flexibility so that you've got multiple fronts to get that feed through. And it's also been a little bit about the new technology, the crushers, getting all the ore material to the plant as well. So while the guys have done good work on the metallurgical plant, it's really feeding and mining is the area. But as we've been exposing more ore, getting the waste down, getting rid of the overburden, things are improving. So that's really where the constraint is at the moment.

  • Mandy LaGrange - Analyst

  • Okay. And what timeframe do you think you estimate that you're going to start improving that?

  • Graham Briggs - CEO

  • Yes. I think we'll see better throughput during this quarter coming out and after that we'll see it even improve. But I would expect that we'll probably get closer to our target of 4.2 annualized by the first quarter of next financial year. So sometime after June, in this June/September area, we'll start getting full throughput.

  • Mandy LaGrange - Analyst

  • Okay. And then on Wafi-Golpu, just can you give us an indication of your thinking? This is -- I think a lot of us have been convinced that this is fantastic assets and it's got the potential to continue to grow and grow and grow. There's also got to be a point where you're thinking, well, we've got to stop considering the growth potential and actually taking it into development.

  • Graham Briggs - CEO

  • Yes.

  • Mandy LaGrange - Analyst

  • Can you just run us through the thought process from both sides of the JV because there may be one party that's wanting to just expand this into a huge Grasberg-type resource, but actually the reality is you also want to bring it into production?

  • Graham Briggs - CEO

  • Yes. I think that is going to happen during the quarter that we're in right now where we will start putting some sort of firm boundaries down. Because otherwise the mining guys, all the rest of the guys are going to get so frustrated with these moving targets. So we're going to have to somehow put down firm parameters, if you like, for the pre-feasibility guys. Otherwise we're not going to get there. It's going to keep being a moving feast, if you like.

  • Yes. We've failed dismally in being able to close this ore body off, which is good news, but we have to put those firm boundaries down. Otherwise we're all going to get frustrated. And there's quite a lot of technical guys, both on the ground, looking at consultancies and so on, if you look at all the geotech work and the metallurgical studies and so on. So it's not only the resource declaration.

  • And then the issue around the resource as you can see it growing, but remember it's going to be growing in the inferred category. We need to get it into indicated category to get it into reserve statement by the end of the year. So we have to come back again now that we've got these 100 meter step-outs and we're going to have to put 50 meter step-outs in. So we have to fill in boreholes as well. So it's -- we can let the geologists go crazy and find more, but we actually have to bring them back and rein them in, and get them better information. Otherwise we won't be able to declare that properly.

  • Mandy LaGrange - Analyst

  • And just lastly, in South Africa you mentioned the problems at Kusasalethu, but Evander also strikes me that your costs are in excess of ZAR300,000 per kilogram. Are there any particular issues that we should be aware of? And what are your expectations in the remainder of this financial year for Evander?

  • Graham Briggs - CEO

  • Yes. Evander, we went through a massive change in Evander when we closed the two -- the three operations, actually, Evander 7, 2 and 5 shafts. And basically, we re-looked at Evander 8 shaft and the whole ventilation system. We've been doing a lot of work on the ventilation system. And then focused really on the high-grade part of the decline. What we needed to do to get there was a little bit of time. So we're mining some of the upper deposits and some in the decline while we get the ventilation all done.

  • It's going well. The project's on speed. So if you look back at what we were estimating, it's virtually on schedule. But financially I guess quarter on quarter, there's not much improvement, but you will see that coming through in the next few quarters. So the grades will start improving as we get more cool air into those working places. If you look at the development details in the quarterly books, you'll see that there's some good development results coming out of that. So it's a case of we're spending some money there to get that operation right.

  • Mandy LaGrange - Analyst

  • Thank you.

  • Brendan Ryan - Media

  • Brendan Ryan, MiningMx. Graham, could you explain this ZAR179m insurance credit some more please? Was that a policy or are these contingency funds that are being paid back in?

  • Graham Briggs - CEO

  • Brendan, I'm getting the professional to do that.

  • Hannes Meyer - Financial Director

  • Brendan, it's a three-year scheme and we've now entered into a five-year scheme. And it works basically like a sort of out-bonus scheme so we put the money in, we estimate the losses on we're going to incur. So we put each year and it was over ZAR200m that we put away each year into the fund. At the end of the three years, we look at it and say how much did we claim, what is the benefit then. We actually had less claims so we did a lot of work on the operations with the engineers in terms of IMIU compliance and actually getting to a better stage and better claim record. So at the end of this three-year period, when we closed off this fund, we had some funds available still left in that pool or fund and we got that back now as a credit at the close out.

  • Brendan Ryan - Media

  • So it's an internal fund?

  • Hannes Meyer - Financial Director

  • It's managed externally. So it's managed externally, but we do put funds away into it. Yes.

  • Brendan Ryan - Media

  • So am I being simplistic in calling it a contingency fund?

  • Hannes Meyer - Financial Director

  • Yes. In the future, that's the way we'll do it now, is putting it away internally as an internal management -- managed fund. Still externally managed, but ring-fenced for Harmony's purposes. Yes.

  • Brendan Ryan - Media

  • Thanks.

  • Graham Briggs - CEO

  • Any other questions? Ladies and gentlemen thank you very much for coming and enjoy your day.