Harmony Gold Mining Company Limited (HMY) 2011 Q1 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Graham Briggs - CEO

  • Good morning ladies and gentlemen. It gives me great pleasure to give you the results for the quarter ending September 30. It's been quite a pleasing quarter, a lot of action as usual from Harmony, but fairly pleasing. This is the Safe Harbor statement and I advise you to read that at your leisure. This is the agenda I'm going to talk to, briefly about strategy and then go into some operational results, talk a little bit about the financials and Hannes is going to help me here and then we'll conclude. So a fairly short agenda.

  • Our strategy, you'll remember that we want to create is a sustainable company that is actually able to fund its own growth as well as fund dividends. And that's the core of our strategy and there's various legs and I'll take you through some of those legs as we go through the presentation.

  • First, let's go to growth in ounces. This is really one of those areas that we've been focusing, spending a lot of capital on in South Africa, focusing on those projects and building those projects up. It does take a long time to get a South African operation into full production.

  • This is the graph from Doornkop and you can see that there's a nice trend to that graph. There's an increase, the third quarter increase there, but there's a general trend of increase. The last bullet point there talks about Merriespruit 1. We've managed to transfer 13 crews from Merriespruit 1 into Doornkop. They'll be going into the faces after a period of training and so on. And then they should be productive closer towards the end of this coming quarter, but we'll certainly see the results in the next quarter. So Doornkop is building up with increases in grade and increases in production.

  • Kusasalethu had an increase in gold output. You'll see that the tonnes and the grade are slightly in differing there, but that's because of waste tonnage. Every now and again we do pull out waste with the reef so it does affect tonnage and grade. But one has to look at the gold production, so increasing gold production there from Kusasalethu.

  • Phakisa, a similar graph to Doornkop, increasing production. Unfortunately, it was affected in September by the fatalities with the proto teams. But a pleasing trend to Phakisa and that trend will continue as we go further forward.

  • I want to talk about exploration. Everyone knows how I excited I am about PNG, Papua New Guinea. And it's really tremendous and you'll see that drill is really working in the mists of the Papua New Guinean jungle.

  • So we're going to talk about exploration, one of the legs of our strategy. And this is Wafi/Golpu. You'll notice that it is a gold and copper system. It's not a single deposit. There are several larger portions of deposit. Wafi is gold only and then gold, copper in Golpu and Nambonga. On it is the section where the latest borehole was drilled and it gave some phenomenal results, and you can see that it's extending further to the north. You can see our targets also on that. So at the moment 644m tonnes, our target is greater than 1b tonnes. So we've got some large targets here from an exploration point of view and hopefully this is heading towards the 60m ounces, as opposed to the 39m ounces at the moment.

  • Just to try and plot it on a scale, this is looking at projects in various regions, mainly in the South East Asian region there. You can see that the bottom scale is copper, the left hand scale is gold. And you can see that Wafi/Golpu plots very strongly on both those scales at around about 0.8 grams a tonne gold and 0.8% copper. The other projects are mainly clustered around about the 0.4 to 0.5, both gold and copper. So this has really grade on its side and it's growing. And this is the growth that we can see here, this 799 meters at 1.9% copper, 1.4 gram a tonne gold, is quite phenomenal in one of these deposits. And it's extending to the north so it's growing.

  • The dotted line is I guess an ambition here, where we think that this will grow to. If we just look at the current boreholes that we're drilling, the infill and the extensions looking north, it's certainly going to be a world-class copper/gold mine.

  • Looking at potential production and again these are -- this is project information that's coming from various different companies and our information comes from the concept study. You can see that we target, we're targeting in excess of 800,000 ounces per annum and we're in the region of 150 tonnes of gold per annum -- sorry, it's 1,000 tonnes of gold per annum. So it's again world-class on production statistics as well.

  • So just going to the operations and you know that we've been talking about productivity and efficiency, so I just want to talk about some of these projects.

  • This is Hidden Valley. We've now commissioned Hidden Valley. It's growing in production. The recoveries are improving, the throughput is going through. And it will grow and improve in its cost as we go forward. It's a case of settling down the metallurgical plant, and making sure we get the silver and the gold recoveries. So we'll see this improving.

  • Tshepong, very static production. We've got the grade back to close to 5 grams a tonne, but you can see the production quarter on quarter has been fairly steady, despite some losses in times there, of shifts. But it's very static and very pleasing production.

  • Masimong, again in the last three quarters managed to improve. The improvements here really come from grade and it's a B reef, basal reef mix. Every now and again we don't have quite the number of panels in B reef. It's a very erratic reef but it does add significant grade. And a very pleasing result from Masimong, yet again the best cost per ounce produced in Harmony.

  • This is a slide of Merriespruit 1 and this has got a long history. This operation was originally bought from Anglovaal in 1977. We have now closed the shaft and are transferring most of the people into other operations. And I've mentioned the 13 crews that have gone into Doornkop.

  • On safety, and not a good quarter from a fatality point of view. A lot more work still to be done. But the guys have done a lot of work and it's showing in the lost time incidents, it's showing in a lot of our graphs. Unfortunately, the six fatals of course, of which five happened in one Phakisa operation. So a lot of hard work from all parties, not just Harmony, not just management, but it's the one area where all of us agree that we need to improve is safety.

  • Cost increases. You know about the cost increases; they've been well advertised. Two main areas. The increase in salaries come July 1, that was a 7.5% increase in salaries. And this is the financial effects, ZAR26m on salaries and also holiday leave allowances, an increase there. That you can see as a once-off. And then electricity and water, mainly, electricity cost increases, not only winter tariffs but obviously an increase over the whole of the base of the quarter, as opposed to the previous quarter, it wasn't in for the whole of the quarter. And then Hidden Valley now on the whole quarter of production, as opposed to last quarter just measuring over the two months.

  • I think we're in a healthy financial situation, and obviously we're very pleased about Wafi/Golpu and it's a world-class deposits.

  • When it comes to the Mining Charter, there will have been some recent news on that. Harmony is on its targets for almost entirely all those measurables and some of them, it exceeds them. For instance, in equity, we have 40% equity. In our management, we don't have them in every category and that's where we need to do some hard work. And there's a whole lot of measures that we're really pleased about. Despite the negative press about the Mining Charter and about the mining industry, Harmony is doing very well on all its objectives.

  • Operational results, they decreased by 2.9% when it comes to gold production and the grade is fairly steady at 4.68 grams a tonne. Operating margin of just over 20% and operating profit of ZAR652m.

  • Go through some of the details, the slight down in production top line there and you can see that gold sold went up a bit. And that obviously happens in the fluctuating amounts that we get out of the plants quarter on quarter and depending on the lock up in the previous quarter. The gold price slightly down at -- by 2.8% down to ZAR287,000 a kilogram. You can see the US dollar price doing very well of course. And operating cash costs mainly due to the slight down in the gold production, and the downs in the gold production, mainly Joel, where we fixed up the bottom of the shaft and also at Bambanani because of grade.

  • Underground operating results and this is where you can see the 4.3% down really due to those two main operations. And also the rest is all in balance, I think there. You can see the exchange rate at ZAR7.31. Of course this quarter it looks like it's going to be closer to 7 or maybe even a little bit below 7, the way it's tracking at the moment.

  • Surface operations still had a steady quarter. Surface operations you'll remember is Kalgold, the tailings operations at Saaiplaas plant, Phoenix as we call it and then a whole lot of dump operations, mainly feeding the central plant in the Free States, as well as topping up, if there's any space at the other pants. So that's where the tonnage come from there, and of course Phoenix had a pleasing quarter getting its full tonnage.

  • Hidden Valley, this is the quarter that you see on Hidden Valley. So you can see that the rand per kilogram is static, but that will be improving as they get their recoveries up and the throughput at constant levels. I was there about four weeks ago. Very pleasing work that they're doing there and I'm very excited about what's going to happen there in the future.

  • I'd like to hand over to Hannes now, just to do the financials.

  • Hannes Meyer - CFO

  • Thanks Graham. Good morning. If you look at the income statement quarter on quarter, revenue was up slightly due to the increase of gold sold. Cash operating costs, that was up about ZAR240m and that was as expected. ZAR50m of that Hidden Valley being a full quarter, electricity about ZAR130m and then some labor increases as well in this quarter.

  • I think the next line there that I want to talk about is employment termination and restructuring cost. That relates to the restructuring of Harmony 2 and Merriespruit 3 shafts. With that we opened the Company up for voluntary retrenchment and some other restructuring or termination costs we incurred as well throughout the Company.

  • Exploration expenditure up quarter on quarter. Of that ZAR99m, ZAR80m relates to Papua New Guinea. That's really as we increase our expenditure in terms of drilling and feasibility studies in that part of the world.

  • A big line item there, gain on financial instruments, ZAR311m. ZAR273m of that relates to the Wits Gold option. That's a 40% option that we have or that we still have to get back into the Wits Gold area. Wits Gold made us an offer of ZAR275m for that option and we carry that as a financial instrument. We have to mark to market the value of that instrument.

  • Taxation decreased quarter on quarter, mainly the deferred tax. Last quarter we had a huge deferred tax charge and that related to our annual life-of-mine plans that we went through and rate assessments which didn't occur in this quarter again.

  • So, all in all, a headline earnings were ZAR0.33 for the quarter, and if we exclude that termination and restructuring costs, gives us an adjusted line item there of ZAR0.52 per share.

  • Next slide, I'll just skip through the US dollar side.

  • If I go to the balance sheet, balance sheet pretty much no change quarter on quarter. Debt started at ZAR1,190m and ZAR13m less at the end of the quarter. Cash basically no change on the quarter.

  • So if we look through it, cash flow from operations and other items, just over ZAR1b there, so -- sorry, ZAR941m there. Capital ZAR750m. Of that cash flow in operations we have some inflows from Mount Magnet. So there was about ZAR280m inflow from that so that helped to offset some of the capital expenditure. You can see again there exploration as we continue to investing in our growth in especially Papua New Guinea. And restructuring costs in line with our strategy as we've optimized the asset portfolio and moved some of these crews to some other areas where we can add more value.

  • So at the end of the quarter we're ending up with net debt of ZAR405m, still a healthy balance sheet and room for additional debt should it be required.

  • Thank you. Graham.

  • Graham Briggs - CEO

  • Thanks, Hannes. Just some graphs quickly before I make some concluding comments. Rand per kilogram price graph there. You can see that that's the red line, down a bit quarter on quarter. And of course the gold price in dollars per ounce. And also the exchange rate, that's the green line going down, getting stronger there. And this quarter as I've said, we've seen it below 7 for quite a bit of the month of October.

  • Some bullet points on Harmony and we have been doing some excellent exploration in Papua New Guinea, got some great teams there. That has to be a highlight for those guys there. They're working hard on it and you can see from what Hannes has said, we're spending a lot of money there.

  • Wafi/Golpu and I use Barry Sergeant's words here, find of the century. It's certainly world-class deposit. It has potential of being in the top 10 of copper/gold porphyry deposits when it gets into production. So that's certainly, if you don't remember anything else, that's one thing I would like you to remember.

  • Hannes does point out the low debt. Our debt despite the cost increases in this quarter, despite some production hiccups mainly at Joel and Bambanani, you can see that our net debt figure is constant. So that's a very good result.

  • The next point, the bullet point four there is talking about building low-cost and high-grade mines. And Doornkop and Phakisa, I showed you the graphs there. They're building up and they'll build up in future. Those mines are going to be great mines. Hidden Valley is building up. It's going to be a great mine with a long life.

  • I think the management team's still very focused on where we want to be long term. This is not a short-term strategy and we've got some exciting possibilities, both in Papua New Guinea as well as the operations here in South Africa. And we do plan to be a dividend payer, a regular dividend payer.

  • Thank you very much, ladies and gentlemen. Now I'd like to ask you if you have any questions. There is a microphone that's roving, so if you can just put up your hand.

  • Allan Cooke - Analyst

  • Morning Graham. It's Allan Cooke from JP Morgan -- and Hannes. If I could just ask a couple of questions. Next quarter will we have further restructuring costs coming through or is that ZAR78m this quarter the last to come through?

  • And then you spoke of your balance sheet. How much headroom do you have in terms of your debt capacity? How much debt would you feel comfortable with, especially with an eye to financing further the CapEx, your CapEx at Wafi/Golpu?

  • Hannes Meyer - CFO

  • Hi Allan. Look we've announced the closure from Merriespruit 1, early in this month -- sorry, not this month, early in October. So that -- so we'll probably incur another about, probably if I have take a guess, another ZAR70m for this quarter in terms of restructuring and retrenchment costs. We're fortunate that we're able to transfer quite a number of the people, as Graham said earlier, 13 crews to Doornkop. So that helped reduce that liability as well.

  • And then in terms of the headroom, Allan, I'm probably comfortable with another ZAR1b or so of debt. It's not -- it wouldn't worry me to add another ZAR1b of debt to the balance sheet.

  • I think we're funding a lot of the CapEx already from our existing operations. And then if we look forward at Wafi/Golpu, that's still, the big capital is about four years out still. And Graham showed that Doornkop and Phakisa, those operations are building up and project capital really coming to an end there. So I think at that time when we do need to spend that big money, we've got our operations producing and generating quite substantial free cash flow.

  • Graham Briggs - CEO

  • Any other questions? Here's one.

  • But Allan, I think our shareholders actually like us with a little bit of debt. They like us to sit on the edge of our seats every now and again -- while we're just waiting for the mic' to get there.

  • Martin Creamer - Media

  • Hello. Martin Creamer from Mining Weekly Online. You have closed several shafts. Did you have any bids for those shafts? Are there any others who want those shafts or (technical difficulty) periods for those shafts?

  • Graham Briggs - CEO

  • Yes, Martin, there are always people that are prepared to bid and put some money forward for shafts. The difficulty is always that there are liabilities attached to these shafts. And one has to be careful that you actually do a transaction, that's number one, doable, and number two that's clean.

  • We've taken the ownership of all the liabilities, rehabilitation and so on and that's quite a large cost. Most of these are funded through the rehabilitation funds, so it's not a financial issue to us. But the problem is that if somebody else takes over those operations, they take a long time to transact through various things, mineral rights transfer and so on. And also one has to be sure that the company that takes them over is financially able to take on the burden.

  • Unfortunately there are no bottom feeders, if you like, in South Africa that can take over that burden. And therefore, the sort of people that want to get involved are not financially capable of taking on the operation. And certainly we want to make sure that if that does happen, it happens very safely and therefore it doesn't tarnish the record even further. So it's very difficult to find buyers for these assets.

  • Martin Creamer - Media

  • And at what gold price would you consider reopening them or would you not ever consider reopening them?

  • Graham Briggs - CEO

  • Martin, it's obviously a play between the gold price and the costs. I think what you've seen from most of the Virginia assets is around about 3 gram a tonne, 2.83 gram a tonne. So one has to do the number around those things. The ore bodies really are depleted and although there's probably a lot more tonnage at that sort of scale, 2.5 to 3 grams a tonne, you have to get your costs right. So it's a play between the gold price, the costs and obviously the grade, there's nothing we can do about it.

  • All the good grade is taken out of that deposit. And that's why I talked about we took over this operation in 1977, which is a long time ago, from a previous operation that was struggling. We've managed to get many, many years of good life out of these assets, but the ore bodies are really depleted.

  • Martin Creamer - Media

  • And a follow-up question, if you could just give us an update on President Steyn. Is it meeting your expectations or will a target date come forward?

  • Graham Briggs - CEO

  • There are some highs and lows around President Steyn. The highs is what we now call Target 3, which is Lorraine 3 shaft. It's -- there's some details in our quarterlies on that. Really the bottom of the sub-shaft was in a very poor condition and we've decided to re-establish the bottom of the shaft. That decision and the time to try and fix the bottom took a little bit longer. But we're very pleased with the direction it's taking and I can foresee that it's going to have many years of good life when we get into it. So we've been spending a lot on infrastructure and part of our capital has been going in there.

  • President Steyn 2 shaft has been a little bit disappointing. We've been look at some pillars and mining those pillars. That's been a bit disappointing. We're really focusing more on the shaft pillar and that will come into its own when we mine the Bambanani shaft pillar as well. Probably mine both of those shaft pillars using the infrastructure of what used to be called West shaft, Bambanani West shaft.

  • And the plant clean up just continues. It's part of our surface operations.

  • Steve Shepherd - Analyst

  • Morning Graham. Morning Hannes. Steve Shepherd, JP Morgan. You spent a little bit of time explaining the strategy and I see there's been some interesting developments in the junior space. I'm thinking about Goliath Gold. Could you talk just a little bit, Graham, about where you see the core operations in South Africa, maybe where Evander, maybe Joel, Poplar, [Rollspruit] sits in this and how you might take that forward into the future?

  • And then also could you just on a separate subject tell us if there's any more interesting news from other exploration in PNG?

  • Graham Briggs - CEO

  • Yes, I think as a gold company in this sort of environment you have to continually look at restructuring, look at your business and trying to get best value for shareholders. And you can see that in the quarterly we talk about two transactions basically we did. One was with Taung Gold and the other with Wits Gold. Now those are assets which I think add value in any financial models anyway. So we'll continue to look at those things.

  • And one of our assets, which is Evander has got an exciting production future but it's got a lot of resources. And therefore it's got lots of potential. But again it probably doesn't have any value in the shareholder book and therefore we have to look at ways and means of getting full value for Evander.

  • So generally we have to clean up our portfolio a little bit and try and get value for these assets that are at zero value. In fact some analysts, they've got negative values on these things. So we have to continue to do that.

  • In Papua New Guinea we are exploring and drilling at Mount Hagen and the other deposit, Amanab, is going through exploration. These areas are both very exciting areas and got good potential. We do talk a little bit about the results of those but there's nothing really earth shattering at the moment. It's a case of, in the last eight or nine months now the guys are really working it up. Amanab had very little drilling done so it's a case of doing all the stream sediment sampling and really getting crews on to the ground and start looking at the rocks. And then we've done some geophysics as well. So there's a lot of the early-stage exploration happening in those areas.

  • Exploration in the JV still continues, with extensions to that sort of transfer fault along through the Wafi goldfield still one of the main focuses. And then there's a bit of focus around, in and around Hidden Valley on looking for higher grade deposits and extensions to that life. At the moment Hidden Valley looks like it has a life of 14 years. That's up considerably from when I first started there which was only six years. It had a six year life at I think 2.5m tonnes at year. So it's growing and the exploration guys are all having nibbles of success but nothing really we can bank at the moment.

  • Steve Shepherd - Analyst

  • Just to follow up, if I may, Graham. You, obviously you and your partners are working feverishly on Wafi/Golpu and you've given us an early indication of $3b wasn't it? Or something like that for the CapEx. While you obviously haven't finished drilling by any means, can you give us a little bit of an update on your thinking on the timing and perhaps on the method of funding eventually?

  • Graham Briggs - CEO

  • Yes, the timing side is a case of a lot of things are happening simultaneously. There's drilling happening along the line of the future decline, what we call the exploration decline. There's no doubt that it will be converted into permanent infrastructure. There's drilling in the Golpu deposit that we're reporting and during the quarter three good holes there which we report the intersections of. This year we have planned for about 47,000 meters of drilling in Wafi/Golpu area and we have a similar amount planned for the next financial year. Access road needs to be going to the portal area and then we need to start going that decline during this financial year.

  • Our timing is still that towards the end of next year, this is the calendar year 2011 that we'll have the pre-feasibility done. Everything looks very positive on this deposit and there's no show-stoppers as yet. And then we'll go into the feasibility study and from that feasibility study into build. And we've got first production still labeled at 2016.

  • Funding is -- I think Hannes touched on funding a little bit. We're looking at about $1.5b for our portion. Our South African capital will be well down by then, so we'll see that the production from South Africa and the cash generating ability of our projects will help. This sort of deposit at those sort of grades is not going to be an issue with funding. It's very fundable and it's not something that concerns us now.

  • But I guess what we will do during the next, probably in the next six months or so or maybe towards the end of the pre-feasibilities is actually show people the way that we're thinking of funding these things. So probably towards the end of 2011, I'm talking calendar year 2011. It's really not an issue that worries us now because everything we have in the pre-feasibility and feasibility, we believe we can fund. There's no problem for the next few years.

  • Any other questions? Thank you very much. As I said, we were very pleased with our quarter. The costs, of course going forward there's some costs which are coming down for next quarter, the winter tariffs, the once off on things like leave pay. So we'll see reduced costs. We'll see the production continuing to improve at a lot of our projects. So we're looking forward into this quarter for another great quarter. Thank you very much for coming.