Harmony Gold Mining Company Limited (HMY) 2009 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Graham Briggs - CEO

  • Good morning, ladies and gents. If we can get going. I'm pleased to give you the results for the quarter end of June, as well as the year ending June, and Frank Abbott will give you the financial side and I'll treat you to the rest.

  • I think it's pleasing to say that the Company is in good shape. We've achieved a lot of our aims that we set out to during the past two years. And we're really set to go forward and move forward from here on. So, I'll take you through quite a bit of the strategy and what we are about.

  • There's the Safe Harbor statement, I've no doubt that you've read it. If you haven't please do read it. We'll go through the strategy. I will talk about safety. No matter what is said about safety it remains number one priority in the Company, all the operations are really focused a great deal on safety and it remains certainly one of my biggest concerns as well. There have been some great successes in this but there have also been some failures. We'll talk about the operational performance, financial overview, really where we are for growth and what tomorrow's gold looks like and then the investment case of Harmony.

  • So, some of the highlights for the quarter. 5% improvement on LTIFR. So, this is really the leading indicator of safety. We've done well in this lost time incidents and this has really been gratifying. We are debt free. We repaid the ZAR1.7b convertible bond. We repaid our Nedbank loan. We have ZAR2b in cash. Production has been fairly stable. There are some ups and downs but it's fairly stable.

  • Most operations did show some improvement, pleasing to get improvements from our growth projects. We have got a two year wage agreement that was settled about a month ago now. The planning for the next year is completed, what we do do is fairly detailed for the next year. Moderate detail for the three years and then we do do life of mine plans so all the financials get tested on our life of mine plans. Hidden Valley did produce gold in the quarter and, as we speak, the mill is turning and Newcrest got their 50% in the joint venture, in the Morobe joint venture.

  • For the year obviously a record highest profits of ZAR2.9b. We've got a healthy balance sheet, as I said before. Improvement in headline earnings. We met a lot of our strategic objectives. We have made quite a lot of promises in that area and we've achieved most of them. We really are positioned for growth. We've got a good growth pipeline and we'll show you those.

  • We have lots of exploration opportunities. In Papua New Guinea we are doing some further exploration but we're also doing some exploration and progressing some of our assets in South Africa and we do declare a dividend. And there'll be more of that later.

  • We're really at that bar, the vertical bar June 2009, just beyond that. We set ourselves our targets to get to that point. We did say we'd be focusing on our growth. We've continued to spend lots of money on our organic growth projects. We've continued to spend a huge amount of money on ongoing development and we'll see the benefits and be in position to grow from those as we go forward. We're now really on the focus of increasing the number of ounces we output during the next few years.

  • On the left hand side this is what we said. We said we're creating an outstanding company, generating sustainable earnings, and able to fund future dividends and growth. And on the right hand side, I've got several of those things of where we've said we'd achieve and what we've achieved on that.

  • I think on safety, we'll deal with that a little bit later, but we continue to focus on safety.

  • We have increased our executive management and I'd like to introduce you to three people that are here [Hannes Meyer], our financial director designate. I wouldn't mind if you just stood up, Hannes, and then we can everyone can see your face. Melanie Naidoo-Vermaak, if you could stand up. Melanie is here really to pursue our environmental issues and our environmental strategy. We've been fairly low key on environment and Melanie will hopefully up that ante for us. Thanks, Melanie. And Leon Le Roux. Leon has been with us for some time, he's internal appointment, focusing on the engineering issues, all the insurance issues and the risk issues associated with those.

  • On generating sustainable earnings we've cleared our debt, we've done two successful transactions which generated money, and we've done two successful capital raisings. We've declared our dividend, our first dividend for five years. So, we are intending to show you that paying a dividend is a sign of a healthy company.

  • A lot of operational focus in the last two years and this is probably where we need to still spend a great deal of time, getting costs down, getting production up. We've got lots of opportunities and I'll take you through some of those opportunities, as well as Rand Uranium and Newcrest.

  • On safety, our actions plans have been in place for some time. Really we've rolled out a behavioral based safety strategy and that really is interpreted by each of the operations to suit that operation. We've recognized safety achievements and obviously the negative is there is some stick to the negative safety performance. There's a lot been said in this quarter, last quarter or so, about criminal mining. I don't dwell on that too much but there's been a lot said in the press about criminal mining.

  • The lost time one is I would like to focus everyone on that. I think that is a remarkable achievement, getting below a rate of 10, unfortunately there were nine fatals in the quarter, mostly in April. April was a difficult month because of the public holidays but as well as safety. But, there's been a dramatic improvement and a lot of the leading indicators on safety.

  • On ops performance this little schematic will show you that good safety often comes with good production and often comes with better R/kg costs. The one area here that is a little bit unfair is Kalgold. Kalgold remember mined the last of its D zone pits during the last quarter and therefore the grade drop is planned and so the costs obviously went up because of the grade drop. But, Kalgold is doing well on its new plan.

  • This is the total for the June quarter. A 1% increase in gold production, 2% from underground, a 5% increase in underground tonnage. Unfortunately, a grade decline mainly due to those shafts Tshepong, Masimong, Bambanani, Evander and Virginia. And a 6% increase in operating costs. The electricity, as Frank will show you a little bit later, is hurting us quite badly with respect to our percentage of our total costs. All of those resulted in a 4.5% increase in R/kg costs.

  • A big change in this quarter was obviously the Rand gold price we got, down to ZAR245,000 to ZAR246,000 a kilogram. Capital expenditure was in line with our planning. But, a increase in development meters as well as capital meters. The operating costs results for the June quarter several things one should obviously focus on here, gold produced is only the 1.1% up. There's a dramatic change in the U.S. dollar per ounce here mainly a factor of the exchange rate. You can see the strengthening of the Rand there from ZAR9.92 to ZAR8.42, 15% improvement. I guess negative for us but improvement in the Rand exchange rate.

  • Underground operations for the June quarter. Several notes there along each of those shafts. Bambanani, good safety and increase in gold production. Doornkop is commissioning the operations well. The reef/waste now splits. Rock winder now operational down to 132 level. So, we continue to meet our targets there.

  • Elandsrand is performing much better, much better on safety, and production in line with our expectation. A good performance from 7 and 8 Shafts in Evander, much poorer production from 2 and 5 shafts. And 2 and 5 Shafts are going to require a fair amount of attention from [Allvein] to either improve those or restructure those operations. Joel had a good safety and good gold production. Phakisa, excellent safety and also meeting its targets with respect to commissioning everything there. And the real drive there is to get all the development done. There have been a few negatives on some of the structure in Phakisa but we'll continue to drive that development.

  • Tshepong had a very difficult April with some safety stoppages, also had some multiple fatal and reduced gold production from Tshepong. Target's improved both in safety as well as production. And Virginia had good safety but lower gold production, mainly a grade issue there from Virginia.

  • This is the underground operations and you can see the recovery grade is the negative there, the biggest negative, down from 4.65 to 4.5. Hopefully, we'll recover that during the quarters that come.

  • On surface operations, Kalgold I've spoken about, mining from its satellite pits. Evander surface sources, we're now putting some surface sources through in Evander plants, mainly clean up from the old Lesley plant and Phoenix the tailing through treatments improved gold production there.

  • The surface operations in total, the gold is down and that's mainly because of Kalgold from the previous quarter when they were still mining D zone to now. But, quite a satisfactory result from all the surface operations.

  • This is the percentage profile for the financial year 2009. Virginia is still number one. You'll see that in future quarters Phakisa and Doornkop in the lower 2% and 3% will come round the circle, probably in 100 degrees in the next couple of years.

  • This is the operational results for the year, June 2008 versus June 2009. 8.7% down on the previous year, obviously continued to focus on restructuring and looking at operations, making sure every operation is profitable. Good increase obviously in the Rand gold price there from ZAR190,000 a kilogram to just over ZAR251,000, call it, a thousand rand a kilogram. Big impact on costs though, nearly 21% up in unit costs.

  • I'd like to hand over to Frank for the financial overview.

  • Frank Abbott - Interim FD

  • Thank you, Graham. This is extracts from our income statement for the quarter. Our revenue reduced by 11%, this was mainly due to a 16% reduction in the gold price. Our production costs went up by 5%, ZAR40m was because of the winter tariffs for electricity. The month of June we paid winter tariffs and then also stores consumable costs.

  • Amortization and depreciation went up by ZAR240m, and the main reason for this was the Mount Magnet. We reclassified, the way we treat Mount Magnet from held for sale to continuing operations and it meant that we had to put through amortization for two years which is ZAR290m.

  • Fortunately, this was offset by a reversal of the impairment that we had on Mount Magnet for the same amount. So, impairments are lower with that amount. Now, impairments are impairments, we did our impairment exercises at the end of the financial year, we did the impairments on our Virginia operations, Evander and Target, offset by this ZAR290m credit from Mount Magnet.

  • Exploration expenditure, ZAR24m in South Africa and the balance is international. Our net profit of ZAR238m and our headline earnings of ZAR0.107 is enhanced by reversal of our deferred tax during the quarter because of the impairments and lower tax rates.

  • This is extracts from our income statement for the year 2009 versus 2008. You can see that our revenue went up 20% and this was because of the much higher gold price achieved in the current year compared to the previous year. Our production costs went up by 10%. This is total cost and this is both on electricity, labor and also consumable stores. Amortization and depreciation increased with the once off charge of ZAR230m and also because of certain areas that are now in production and we are starting to depreciate those assets.

  • Impairments of ZAR484m, I mentioned that on the previous slide. Corporate expenditure increased and this was because of salary increases but also because of the cost that we allocate to corporate cost change over this financial year.

  • The exploration expenditure, ZAR289m, ZAR223m of that was spent in Papua New Guinea and a little bit in Australia. Other income and expenditure really includes a ZAR900m profit we made on the sale of Hidden Valley and the profit from discontinued operations of ZAR1.2b includes a profit on the sale of Rand Uranium.

  • Our net profit was ZAR2.9b and our headline earnings was ZAR0.262, which is more than double what it was the previous period.

  • This is just to look at our balance sheet over this financial period. We started off with a debt of ZAR4b, cash of ZAR400m, so we had a net debt position of ZAR3.6b. We received money from the Rand Uranium transaction, from the Hidden Valley proceeds. We did the shared capital raising and we also did capital expenditure and then we had operating profit of (inaudible) costs and that left us with this next cash position of, well cash position of ZAR1.9b, and a net cash position of about ZAR1.6b.

  • If we look at wages and electricity increases. In the coming we gave 9.23% increase to all our workers, that's what it works out to. And if we look at the coming quarter that will be additional ZAR100m in wages and in addition to that we would have a leave liability once off calculation of ZAR35m in the coming quarter.

  • If we look at electricity costs that used to be ZAR170m per quarter, with this 34.6% increase it's gone up to ZAR230m and then we've also got winter tariffs of ZAR40m per month for the winter months, June, July, August and September.

  • Our profit margin, the red line is the Rand gold price that we achieved, the blue line is our cash costs, the yellow is the operational CapEx, and then we've got on top of that the growth CapEx. You can see that we had a much higher profit margin last quarter than this quarter but we still managed to earn sufficient to pay for all our capital.

  • This is our cash operating profit over the last five years. And this is our headline earnings over the last five years. You see that grew from ZAR0.126 to ZAR0.262 a share.

  • This is our capital expenditure for the past quarter. You look at the June quarter, we spent ZAR1.1b. Fortunately, the ZAR400m in Hidden Valley was spent by our partners on our behalf. Compare that to the ZAR1b that we spent in the March quarter and our year to date was ZAR4.4b and we forecast that in the September quarter we will also be spending ZAR1.1b.

  • Thank you, Graham.

  • Graham Briggs - CEO

  • Thanks, Frank. So, I'd like to just take you through a little bit of our positioning. On Hidden Valley, Newcrest now have achieved the 50% stake in the Morobe joint venture and remember that the Morobe joint venture not only includes Hidden Valley but also Wafi Golpu and the exploration region.

  • Hidden Valley did achieve its milestone of producing some gold during June. The plant is now running through the commissioning process, being commissioned on mineralized waste, I think is what the guys call it, and we'll see the results of that going forward. But, obviously we need to make sure that all the equipment works according to plan.

  • There is a what we call a debottlenecking process and this is really just maximizing the throughput in the plant and so that will happen during next year.

  • Around Hidden Valley there are several exploration regions, the one that they've been focusing on of late has been Yafo. There's some drilling results there on the plan. Really the focus has been on Yafo, which is very similar to Hidden Valley, and Hidden Valley has got some very good grades, sorry on the Hamato pit. Hamato pit's got some very good grades and it looks like a similar structure. So, that's got potential of adding grade to the Hidden Valley process.

  • In the Wafi Golpu area several areas of focus here. Kesiago is the gold copper porphyry, which we've got the first sniff of, but a lot of drilling is required there. There's also been some focus on the northern part of the diatremme. The diatremme sits in this region here. So, in this area and up towards the north on these areas. This is really turning out to be a province with copper porphyrys, copper gold porphyrys, as well as gold deposits. So, we can look forward to seeing some exciting things happening here in future.

  • On exploration in general, the Evander South exploration continues, that will finish off in probably four or five months time and then we'll process the results of that. The rigs will probably move to Poplar, we need to do some more drilling at Poplar. Again, a fairly shallow to medium depth deposit there. Twistdraai and Evander 6 shafts, we've got a JV there and that's making progress with some drill site proposals. Really what we are discovering on Evander is that there's huge potential there but we need to understand the whole potential.

  • Drill rig on Joel North, no results for you there yet, but that's happening. Further development on Tshepong, looking at the extension of the B reef. As you know, Masimong gets quite a lot of benefit from the B reef and so there's a big focus on Tshepong to grow that.

  • St Helena 10 shaft, this was a shaft which was really not mined at all in the years gone back. If you remember the 10 shaft suffered from a big methane explosion during its sinking or equipping operations, and this is many years back. We're looking at the potential of that and it's looking very encouraging. And then lots of PNG exploration.

  • As far as the ore reserves go, this is the year on year comparison, last year with this year. We put the negatives and the positives there. So, basically it goes from 50.5m ounces down to 48.2m ounces. Not really a concern, quite a few changes. Obviously, the minus is the mining for the past year as well as the equity change in Papua New Guinea. And then there are some geology changes there, mainly those are Target and Elandsrand. And then increase in surface sources and then the other adjustments are really quite a number of mines that have positive adjustments there.

  • And the parameters also worth noting at the bottom. A gold price of ZAR225,000 a kilogram used for the reserve declaration.

  • This is our production build up and I think what you need to keep in mind is that 2.2m ounces in 2012 is our target.

  • We won't pursue this target if we have to restructure things but that is our target. And you'll see how we build that up. You will also see in that build-up that there are several operations, there's a note on the bottom, which have increases to it. But there's also productivity increases. But I'm trying to give you some sort of detail, some sense of the detail, on how we build up to 2.2m ounces from where we are at about 1.55 ounces, which is the number before the adjustment for Rand Uranium.

  • This is our project pipeline. Quite an impressive pipeline. Several on the left, there, are the Doornkop, Phakisa's, Tshepong, and so on, that we are building up from production getting going at the moment, including Hidden Valley.

  • And, then, the near-term ones. You'll see the ones with stars, there, they're not in our declaration because the deal has not yet been completely signed, but they are some near-production targets and the detail of them. But several exciting projects, St. Helena is but one of them.

  • And then, in the red section, quite a number of ounces, there, with the medium term, maybe some of them will be a bit longer term, but included in there, Wafi, Golpu, and the like. Quite an impressive pipeline of projects we have.

  • Just to update you on the Pamodzi Gold Free State assets. This is the first time we've given the information on the purchase price, ZAR405m, and I've converted that at a gold price, there, of ZAR9.33. You can use your own numbers, of course, but I'd use that to give the price per ounce that we're paying for Pamodzi Gold Free State assets. $24 an ounce reserve and just over $2 for the resource.

  • This reserve is not a reserve that we, as Harmony, have signed off on. We actually believe that the reserve is probably higher than this, probably closer to 2.5m ounces/3m ounces. However, we haven't been able to spend a lot of time on auditing and really signing off on that. We have used the previous stated reserve.

  • It's really been accepted by the unions and the IDC of the preferred creditors. It's now got to get a process through the courts, and so on, and, hopefully, that will happen during the next few weeks.

  • Rand Uranium. We have not said much about Rand Uranium. It is operating as an independent Company. It's got its own Chief Executive, John Munro. The partnership between ourselves and the other partners are working well. We are 40.0% owners, there. It's producing in the region of 220,000 ounces of gold per annum at a cash cost of around ZAR185,000 a kilogram. At the moment, what his happening is there's a big investigation going on, on the oil reserves, looking at both the gold and uranium, and looking at the joint cut-off possibilities there.

  • The definitive feasibility on the uranium plants continues, it should be finished by the end of the year, and that's really looking at a 450,000 tonne per month throughput. Most of that oil will be coming from the Cooke Dumps but they'll also be all coming from underground. So, that's looking very optimistic and I guess it's a case of what sort of uranium price you plug in to your models, there.

  • The investment case for Harmony. I think we've got a good story to tell. We have achieved what we set out to do during the last two years. We have had a few setbacks. We've got to focus a lot more on gold production, on getting costs down. But from proposals that we set forward two years ago, we've really achieved what we set out.

  • We've done a lot of development, all in line with plan. Flexibility has improved and this will certainly be where we have disappointments and operations we'll have alternative stops to go to, which is going to be great news.

  • We'll continue to restructure if we need to do for profitability and for cash flow purposes.

  • We continue to be unhedged. We have a strong management team. With the three additions it's going to be good news. We can certainly manage everything we have and we offer shareholder returns. Obviously, hopefully, we'll have a share price appreciation in the next while but we're certainly going to offer dividends.

  • I think your Company is debt-free. It continues to focus on growth projects and to fund cash -- fund these growth projects with our cash. We are bullish on gold, as rightfully we should be in a gold mining company. And, now, we're rewarding the shareholders with a ZAR0.50 dividend.

  • Thank you very much, ladies and gents. Free to answer any questions. We have a roving mike, Esha has it here. And maybe Frank could come to join me in answers.

  • Sorry, I'm getting good feedback from what's happening at the summit, or whatever, so --. Any questions?

  • Graham Briggs - CEO

  • Steve.

  • Steve Shepherd - Analyst

  • Thanks. Good morning, Graham and Frank. And congratulations on the dividend. It's probably going to -- surprised a few people, perhaps, that dividend declaration.

  • Graham Briggs - CEO

  • Yes, I didn't -- we said we weren't going to pay one for the end of June but then we -- our shareholders persuaded that it would be great and we did pay a dividend.

  • Steve Shepherd - Analyst

  • Graham, one of the things, I think, that's been concerning us all has been the head grade or the yield relative to the declared ore reserve grade. Could you talk to us a little bit about that, going forward?

  • And specifically, I'm looking at your development results, here, and I see that Doornkop -- it's not many meters, admittedly, 112 meters, that's 623 centimeter grams per tonne, wouldn't be economic to mine, would it?

  • Graham Briggs - CEO

  • Yes, I think that -- maybe Jaco, how about you coming to answer the question on the grade. And I'm not handing him a curveball, here, but I think you need to grab the mike. And Jaco does do the explanation on our ore reserves and our development grades. The part of the discussion, obviously, is around the hoisted grades from Doornkop being so low still because we have had a mixture of the waste and the reef. And similarly that's happened in a lot of our development areas. Jaco.

  • Jaco Boshoff - Reserves & Resources

  • Shall we talk about Doornkop specifically, Steve? Or do you want a general --? Okay. If we finish Doornkop first and then we can maybe go to the Company.

  • At Doornkop, as you know, we were battling with getting the development meters in the last quarter because the infrastructure isn't in place -- wasn't in place during the last quarter to actually get the meters where we wanted to get them. So what we've seen is just a little bit of on-lift development and, unfortunately, that was in some of the lower and poorer grade areas.

  • The reserve grade for Doornkop is round about 1,000 centimeter grams per tonne on the South Reef and from the drilling results and from the areas that we are busy moving into with our development, we are quite comfortable that we're going to get to those grades.

  • What we actually see is some good grades coming from the South Reef (inaudible) at this stage. And with the Kimberley Reef mix and South Reef picking up, the grade is improving. And we're also separating waste from Doornkop. At Doornkop, the idea is to build the exploration platforms and then Joel and build up in (inaudible). So we're going to get those grades, we believe.

  • If you look at the Company, Steve, there's been a lot of shafts in the last quarter where you actually see good grade improvements like Elandsrand and Doornkop, Joel, etc, etc. On the shafts we have seen the negative variances. It was mostly as a result of not being able to mine the areas that we had in the plan, so it's more of a mixed issue.

  • If we talk Tshepong, the problem at Tshepong is that the decline area, and we've talked to you guys about that, we are slightly getting those decline areas available for mining. So we are currently mining in Tshepong on the edges of the dry grade (inaudible). So there's been a bit of overmining in the lower grade areas as opposed to being able to mine in the high-grade areas, which would rectify itself over time.

  • In the Virginia operations, together with the lower mining grade, also as a result of a few flexibility issues of back break on one of the shafts. We also had a plant cool factor issue which we are busy sorting out.

  • At Evander, it's more of a (inaudible) issue where we couldn't get the screen meters that we planned and with the waste dilution the grade went down.

  • Masimong isn't really an underperformance, it's down quarter-on-quarter, but it's actually delivering above its plan, at this stage.

  • So, I guess, from a grade point of view with some specific shaft issues. The same at Bambanani, we had the fire areas so we couldn't get into the high-grade areas and mine the volumes that we planned.

  • If you look at the reserve grade, Steve, there is a lag between being able to deliver on the reserve grade and what we are declaring because of the timing issue. For example, at Bambanani we first need to get into the shaft below and mine those high-grade areas to be able to mine to the reserve grade. The reserve grade captures the whole of the Life of Mine plan. I think that's, hopefully, an answer for you.

  • Graham Briggs - CEO

  • Thanks, Jaco.

  • Any other questions? I think it's Johann, is it? Yes.

  • Johann Steyn - Analyst

  • Yes, thanks, Graham. Johann Steyn from Deutsche Bank. I've just got two questions on slide number 38 and it's again the growth profile of Harmony.

  • First of all, thank you very much for the detail provided on how you're actually going to get there. It's good to see that there's a plan.

  • The first question is in terms of CapEx. What CapEx will be required to deliver this profile?

  • And, then secondly, I think we would have liked to see, maybe, a red block, in there, that says something like realities of gold mining, which highlights what you would deduct for safety stoppages, which would -- what would you deduct for lower grades expected, all these kind of things? Because, as we know from past experiences and as I'm sure you will agree, things doesn't always go according to plan.

  • Graham Briggs - CEO

  • Thanks, Johann. Yes. I guess the way the guys addressed the planning was to actually incorporate the reality with their planning. Although we don't plan for big safety stoppages, we do plan based on the reality of the existing year. So there's a lot of reality plans into these plants and maybe Tom would like to talk about that, and while he's getting the mike, I'll just carry on talking about the cost of the improvements, here.

  • I think a lot of the costs are in our capital plans. The Hidden Valley, Doornkop, Elandsrand, all that capital is included in our capital costs. In fact, all of these costs, here, are included in the -- including the one that says other, is included in all our capital plans. So, the cost is included in our schedules.

  • Tom, do you want to talk about our planning, the reality of it versus the reality of life?

  • Tom Smith - COO, South Region

  • Thank you. If you look at our planning, we went through a rigorous planning process, this year. We started off last year. This time around we've upped that. What we've done in our planning, if you look plan-on-plan, year-on-year, we've slightly dropped our plan but slightly up on the performance of last year.

  • The other area where we also got some depth if you talk on sea stoppages or anything like that, most of the operations is now stopped on conops. If you are in a conop situation you've -- the stoppage during the week there's no time to make anything up. With all our operations on non-conops, we do make up, sometimes, over weekends if there was a problem during the week. But we're comfortable that the plans that we've put forward, now, is achievable plans and we start to see it, already, in the first quarter of this new year.

  • Graham Briggs - CEO

  • Johann, some of that planning is incorporated. You see there's two areas, the other and as well as the performance improvements. Those are things that we'll get to grips with during the next few years.

  • Allan?

  • Allan Cooke - Analyst

  • Hi Graham. Hi Frank. It's Allan Cooke from JP Morgan. Could you just perhaps indicate, if you have an idea, in terms of percentage, shifts lost or production, what safety related production stoppages cost in the 2009 financial and in the last quarter?

  • And, then also, just to talk -- you did give us an indication of what will happen with electricity increase and the wage increase coming through the September quarter, could you just talk to us with guidance on the near term in costs -- in terms of costs, rand per kilo or rand per tonne, and what indications there will be, there?

  • And, then, just to look at the impairments that were done at the end of your calendar year. You've highlighted Evander 2 and 5 Shafts, are there other shafts that you're looking at restructuring, given what's happening with costs, what's happening with safety-related production stoppages to your production?

  • And then, also, in light of the rand, which has been fairly strong, I know it's weakened recently but what will the stronger rand do? If we go to ZAR7.0, ZAR7.50 what will that do to your business?

  • Graham Briggs - CEO

  • I'll ask Frank to answer the impairment one, if that's okay.

  • Let me try and answer the number of shifts, and it's not something we keep a record of but, over the last year, we would -- and there's stoppages not only because of fatals, I need to point that out, so serious accidents also attract a stoppage. And there were probably about 25 stoppages over the last year. Each of those stoppages would have probably taken three shifts, on average. Some are a little bit less and some are a little bit more. So that's the extent of the numbers of stoppages that we have safety related. It's a large number and I guess it's something we continue to work on. We don't announce every stoppage. It's not something that we do do. We do announce every fatal, but we don't announce every stoppage. So that's a large number.

  • Frank, would you like to talk about the impairments?

  • Let me just talk about the electricity a little bit. Electricity is a big number during this next quarter, mainly because the whole quarter is actually on winter tariffs. So that ZAR40m per month is -- applies to this quarter and then into the quarter after that it just affects, really, the first month of the quarter. Similar to this last quarter, we've only had one month of winter tariffs.

  • Between the electricity increase would add up to how many rands per kilogram?

  • Unidentified Company Representative

  • It's 42 on a standard quarter.

  • Graham Briggs - CEO

  • Yes.

  • Frank Abbott - Interim FD

  • It's ZAR40,000 per month. So if we multiply that --.

  • Graham Briggs - CEO

  • ZAR40m.

  • Frank Abbott - Interim FD

  • Sorry, ZAR40m per month. We multiply that by three, you're looking at ZAR120m. And if we are reproducing at 11,500 kilograms, you can work out what the additional cost will be, per kilogram for the electricity.

  • Allan Cooke - Analyst

  • Is that just for winter?

  • Frank Abbott - Interim FD

  • Yes, this is for the winter. Yes, yes, this is additional cost. But as you -- in the fourth quarter we've already had one month of ZAR40m included. You can only work with two months, now, say, 40 times two, plus the additional ZAR60m, which is the increase from ZAR170m to ZAR230m for the current quarter. And in -- that's the end of the winter tariffs, is now winter tariffs in the next quarter.

  • The impairments, in our notes you'll see what are being impaired. We impaired at Virginia and we impaired at Target and at Evander.

  • We looked at all the Life of Mine models of all operations, and we -- there was -- we needed to do an impairment test. We discounted that at 9.3% in real terms and if that did not come -- if that value was lower than our cutting value, we impaired the balance. So, at this stage, we do not see any impairments on any of the other operations.

  • Graham Briggs - CEO

  • Thanks, Frank.

  • Allan Cooke - Analyst

  • It's the cost guidance. If we take (multiple speakers).

  • Graham Briggs - CEO

  • Sorry, it's cost guidance. Allan, I'm sure you can do the figures with what we've given you.

  • Allan Cooke - Analyst

  • Okay, thanks.

  • Graham Briggs - CEO

  • The wages are there. It's about 5.2% on the total costs. We've given you a lot of detail on the electricity.

  • Frank Abbott - Interim FD

  • The wages is ZAR100m per quarter.

  • Graham Briggs - CEO

  • Yes. Wages is ZAR100m per quarter.

  • Any other questions? The mike's coming your way. There you go.

  • Justin Brown - Media

  • Justin Brown from Business Report. Just wanted to find out what is your final costs for Hidden Valley? And just want to find out what's your plans for Pamodzi Free State because I notice on your chart you've got plans to get some gold production. It's look like, from the Pamodzi plant as well as the Pamodzi Free State dump? Thanks.

  • Graham Briggs - CEO

  • Yes. Maybe Frank can think about a final capital cost. You want the capital cost for Hidden Valley, is that it? Yes, and it's difficult moving targets, again, because of exchange rates but maybe we can find that for you.

  • I think, on Pamodzi Free State, what we've done is we've separated the parts of the asset, there, to try and give you an indication of what we would do. So we've indicated that the Steyn pillar is one area that we'd focused and clearly we'll try and incorporate that in with the Bambanani operations to mine that pillar. It's one of the high-grade pillars, as well, in the Free State being the old President Steyn 2 shaft.

  • We would have a clean-up operation on the plant, so the plant we wouldn't recommission. It is an old filter plant, we would extract the gold on that.

  • That's how we've separated the assets to give you an indication of where we would mine and what we would do with those assets.

  • Unidentified Company Representative

  • (Inaudible) Johannes (inaudible).

  • Graham Briggs - CEO

  • Johannes, can you give us a grand total for the capital of Hidden Valley?

  • And a lot of these movements, I don't know if you can explain, some of them are increases in capital and some are exchange rate issues.

  • Johannes van Heerden - CEO, South East Asia

  • Yes, Graham. As we previously mentioned, the number previously quoted for the Hidden Valley capital project was about AUD605m. Now the total cost that we ended up would have escalated about ZAR900m, in rand terms. The reason why we're referring to the exchange rates is the Newcrest buy-in was based in US dollars, and the US dollar and the Aussie dollar had significant movement during the quarter or during the buy-in period. So, we actually as Harmony enjoyed the benefit of the movement between the Aussie and the US dollar, which offset some of these project increases. And therefore the total number probably would equate to about AUD750m but partly attributable foreign exchange differences would probably be AUD40m of that.

  • Graham Briggs - CEO

  • Thanks, Johannes.

  • I think Johannes has given you the number of AUD730m, pick your exchange rate. And they've been dramatically different over the last six months, or so.

  • Any other questions?

  • Excellent. Well, thank you very much. I'm surprised that there were no more financial questions. Frank, you've been saved.

  • Thank you very much and enjoy your day.