使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Operator
Good morning and welcome to the Harmony Gold third quarter financial results. (OPERATOR INSTRUCTIONS). Please note that this conference is being recorded. I would now like to hand the conference over to Graham Briggs. Please go ahead, sir.
Graham Briggs - CEO
Thank you. Good day ladies and gentlemen. Thank you for joining us on the call. Excuse my husky voice. With me is Frank Abbott, who'll be capable of answering any financial questions in the question time, and Amelia is with me as well, and she'll take note of any questions there may be. So if we can't get any answers we'll get them back to you.
I'm hoping that you've all got the presentation in front of you and I'm going to work through it. Slide number two is obviously the Safe Harbor statement. Well worth reading and I have a slide talking about some of that.
Slide number three, the highlights of the quarter, which is quarter three and for our year -- financial year 2008. Headline earnings are ZAR0.42 per share for continuing operations. A sound improvement in cash operating profit to [ZAR828.11m]. Total SA underground grade steady at just over 4.8 grams per ton. Total cash operating costs, pleasingly our cash costs -- our costs came down, that will be our operating costs. And obviously another note that you're well aware of is the Newcrest partnership in PNG.
Slide number four, our safety slide. A pleasing downward trend on that safety performance. Safety performance has always been a huge focal area these days. We continue to do a lot of hard work on the safety and that is evidenced, and you'll see in the quarterly booklet that we have done some more work on safety. But it remains a huge focal area.
Slide number five, Group operating results. Kilograms down, mainly due to the tonnage, and I'll take you through that detail. A big difference, obviously, in the rand per kilogram from 169,500 to 225,500. Both gold and exchange rates, of course, changed during this quarter quite dramatically. Cash costs from 133,000 to 145,500 and cash operating profit from ZAR450m to ZAR828m.
In slide number six the segmented rate down there of SA underground, Surface, International, note here that there's no gold in continuing operations coming from offshore or [fellow] production.
Slide number seven is the U.S. and imperial. A very tricky thing to look out for is the dollars per ounce. And there's a drop in dollars per ounce cash cost. That's mainly due to the exchange rate.
Slide number eight is the quarter-on-quarter cash operating profit variance. So for last month -- last quarter, rather, the end of quarter at ZAR449.8m, and the change in volume negative to the value of ZAR269m. Working cost improved positively so there was a low working cost of ZAR147m. Recovery grade negatively affected by ZAR78.6m and the gold price positive at ZAR579m. The total variance there is a positive ZAR378m, giving us the cash operating profit in March at ZAR828m.
Go to slide number 10, really some details on the Underground operating results, the details of operation by operation are on the website, so this will just capture some of the main elements of that.
Loss of production in mainly tonnage from Christmas break, we had a crazy 10-day Christmas break, something which we shouldn't repeat again. And we had the power disruptions, five days of power disruptions, and around five days of lower power supply at around 80% building up to 90%.
We terminated Conops at two more of our operations. Last quarter we did Masimong, this quarter we did Elandsrand and Tshepong. And Doornkop when we got to dire outages we decided to try and catch up a little bit of our capital. Our capital is slightly behind on Doornkop. So we spent 18 days not producing at all in that operation but actually catching up on capital. So we tried to convert some of the standing time, if you like, on the power disruptions to productive capital time.
Elandsrand a big improvement, obviously after a very low base going back to the accident in October. Masimong delivered some impressive cost reductions after that restructuring that happened last quarter. And Bambanani we changed from a high grade to -- sorry, from a fairly high tonnage to a higher grade, low tonnage producer. And that was really because Bambanani is really one of our most expensive and uses a lot. Excuse me.
On the Surface operations on page 11, really the only operation that's been affected ongoing on the power is Kalgold, because on domestic grid. However, over the weekend, when power outages stopped, that probably won't occur any more. And the grade, which basically is slightly down at Phoenix from previous quarter of 0.17 to 0.13.
On the discontinued operations, that's slide 12, this is a slide with a map of changes on it. If you look at kilograms produced, last quarter at 4,689, this quarter at 1,985. The contributors to the drop there, obviously Australia. It had last 56 kilograms of gold produced in the quarter and that's [down] a bit. The previous quarter I think it produced about 1,900 kilograms.
Randfontein slightly down on tonnages because of seasonal and Eskom factors and slightly poor grade from Randfontein. And then Orkney was only reported for roughly two months of the quarter. It reported until February 27. So that's the main essence of the changes in discontinued operations.
I'd like to hand over to Frank now, on slide number 14. Over to you, Frank.
Frank Abbott - Acting Financial Director
Okay, if we turn to slide 14, these are extracts from our income statement. And this is (inaudible) for the last quarter. And as you can see the cash operating costs that's reduced by ZAR150m. Our cash operating profit went up to ZAR828m. We -- this production expenditure (inaudible) to ZAR55m. The profit from discontinued operations, due to the profit made of ZAR100m on the sale of the Orkney shafts just a few months ago. We've got a net profit of ZAR345m. And our headline profit per share, this is on the continuous operations, ZAR0.42.
Turning to page 15, our balance sheet as at the end of March 2008. The increase in our non-current assets is due to the capital expenditure during the quarter. Our cash at the end of March was ZAR346m. Our other current assets reduced and that was because of the sale of the Orkney shafts a few months ago. If we go down to non-current liabilities, borrowings ZAR1.9b, includes the ZAR1.7b convertible bond. And if we look at current liabilities, borrowings of ZAR2b is the loan from Nedbank. Our other current liabilities of ZAR2b has increased with our tradition for that sort of quarter.
If we turn to page 16, that's our capital expenditure, you'll see that our capital expenditure increased fro ZAR808m to ZAR845m. The big increase was from Hidden Valley where we've increased our capital expenditure to ZAR324m for the quarter.
We turn over to page 17, just a summary of where we stand with our IT financial systems. We've made good progress with reimplementation of ERP system. All our people are getting trained and we are performing the necessary checks and balances. We are very confident that we will have a clean bill of health at the end of financial year '08.
If we turn to page 18, I'll just give you to Graham.
Graham Briggs - CEO
Thanks, Frank. Turning to 18, I've got a little bit of information about the U.S.A. class action. We've been made aware of this because we got to hear about it from a great Internet service. We've retained some U.S. lawyers for advice. We'll deal with preliminary matters. Obviously our lawyers will prepare a motion to dismiss, but as yet we actually haven't been served formally, so there's probably still a long way to go in that.
Page 21 gives a bit of the Harmony ounces profile -- sorry, page 20. Newcrest, some detail on Newcrest there. In essence, Newcrest acquired 30% at the -- and they paid us $180m. And that therefore puts the value on the PNG assets at $600m, 30% of $600m being the $180m.
There's the reimbursement, which is a reimbursement on the expectation that we would have paid $130m worth of capital in the period from January 1 to June 30, and therefore 30% of that is $45m. That's how those figures come. And then the further farm-in to get to 30% implies that Newcrest would farm-in another $300m, and remembering that this is not for Hidden Valley but for the entire PNG [quality] gold [through], and including exploration.
So, at slide 21, a bit of a profile there of Harmony's different assets. You'll notice that some of the assets have already been taken out to the years seven and eight. And that would be the Orkney assets and the Western Australia assets. But there's a growing profile going forward as our new mines come on stream.
On slide 22, this is really to answer a bit of a question which I've been getting asked about on development, and I've given you a bit of history of development in the graph on the left. You can see that there's a declining graph of developing meters. And at the bottom I've given some reasons for what has been happening here on the restructuring [pace].
Bambanani, the closing down of the southern portion, and Bambanani eventually getting restructured down from 110,000 down to just below 50,000 tons, or figures virtually half of the development there. So there's a big change in development on Bambanani.
Evander 7 scaling down and decline, and scaling down of Evander 7 [stoking] completely. Doornkop, we obviously suffered a little bit for the pace of the decision to stop for 18 days to equip. And then a hiccup which happened in Tshepong and Elandsrand, really coming through. Elandsrand, obviously goes back a little bit further to the December quarter. Tshepong the hiccup in Conops there, but we'll regain that during the next quarter. And then, of course, Orkney not reported on development from September.
On the right-hand graph you can see the sort of ratio between meters. Remember there has been a drop in square meters. So development is certainly getting the focus and it will be one of our objectives later on in another slide is to get it back to 35 kilometers of development.
On slide 23, build up Rand Uranium. The Randfontein assets. Conditions precedent we're proceeding, progressive with those. There's the capital injection of ZAR1.9b. We're hoping that all these conditions will be achieved during June. John Munro has been appointed as Chief Executive Officer. He's in the seat already and started work on May 5. Harmony continues to retain 40% of the stake in that new entity.
On slide 24, just to give you a little bit of an update on where we are in our restructuring. As you can read, during March came to the end of our restructuring. Further reductions in labor are unlikely at the large numbers that you've seen before. Shedding and closing of high-cost operational areas has all been completed. There are some area still that are operating at cost. We'll continue to monitor those areas but they're relatively minor.
We are really getting our operations on a sound footing. All operations will be profitable during this quarter after their capital expenditure. And we continue to look at ways of extending the lives of our short-life operations, mainly those are in the Virginia area. We have several mines there but they are fairly short-life. But remembering that we have a large infrastructure but a lot of resource, so we're certainly looking at ways of extending those.
And looking at our projects, underground and surface projects, and if you turn the page over to 25, looking at Evander South, one of our areas in Evander which has got good potential and we need to do some more drilling there. We've got tenders out and hope to be starting this quarter.
St. Helena, tailings re-treatments. The feasibility there is complete, and we continue to look at that and to see we all have to understand that as well, but it looks very feasible in the feasibility process.
Project Phoenix is operating at just over 500,000 tons per month. The plan is to get up to 1m tons per month. And then we're also looking at the scoping study, basically, of streaming the ore flow from Tshepong, Phakisa and Masimong, which have a big high uranium content.
Onto slide 28 -- 26, sorry, looking increasingly relevant now that everyone's settling down after the restructuring. Strengthening of our balance sheet with inflow of money coming from Newcrest partnership as well as the Pamodzi Resources Fund and Randfontein partnership. There's still a major focus on cost control, but we're really turning now to productivity now that all this restructuring is done.
I think that gold prices, plus ZAR200,000 per kilogram, provides Harmony huge and great growth options, and soon I've prompted you there may be some shareholder dividend.
Thank you very much, ladies and gentlemen. I think we can turn over to questions.
Operator
(OPERATOR INSTRUCTIONS). Our first question comes from Muneer Ismail of Deutsche Bank. Please go ahead.
Muneer Ismail - Analyst
Hi Graham. Morning Frank. Two questions. The first one just on some production guidance, maybe for the next quarter. It seems as though you stabilized a lot of things. You got rid of the Conops. You seem to have rationalized your workforce down. What's the thought going forward on 95% power? Can you give us some guidance on both production and costs going forward?
Graham Briggs - CEO
Yes, thank you for that question. I'm still very cagy on providing some guidance going forward, but the quarter that we've just had was one of those quarters where we had a horrific January because of all the issues. February was better and, of course, March was great. If we had three Marches, we'd have had a very good quarter, but even if we just try and spend a rand per kilogram, all things staying equal, we should have rand per kilogram somewhere between [35] and 130. So that sort of gives you something of an idea on what we're flagging.
Muneer Ismail - Analyst
Okay. Maybe for Frank, a breakdown on that ZAR150m saving that we saw. I expect a bulk of it is that 1,400, 1,500 jobs that went. Is there anything else in there that we're not aware of?
Frank Abbott - Acting Financial Director
No, I think a portion of it is because of the lower volume, but I think ZAR100m is sustainable going forward.
Muneer Ismail - Analyst
Sorry, your current cost level is sustainable going forward?
Frank Abbott - Acting Financial Director
Yes.
Muneer Ismail - Analyst
Okay, all right. And then Frank, just on the balance sheet, with the cash coming in, just remind us, you did speak to this earlier at an analyst meeting, just remind us again what the intention is with the cash coming in from both the Uranium and the Papua New Guinea sale. That'll come in in the June quarter, if I remember correctly, and just tell us how you hope to restructure the balance sheet post that.
Frank Abbott - Acting Financial Director
Yes. If you look at our data you'll see that we've got short-term debt of ZAR2b with Nedbank and we will be looking at repaying that. And then the other data we have is the convertible bond, which is by next year, or June next year. And they will be now posting [fines at back] at this stage, and will have cash available to buy that back if it doesn't convert.
Muneer Ismail - Analyst
Brilliant. That's about all on the cost side. Thanks guys.
Frank Abbott - Acting Financial Director
Thank you.
Operator
Thank you. Our next question comes from Matthew Hill of Mining Weekly Online. Please go ahead.
Matthew Hill - Media
Good morning. Just three quick questions. First, would you be able to give us some sort of guidance on what grades you'll be looking at in the fourth quarter? We saw a reduction in the previous quarter, in the March quarter.
And then, Graham, you said that soon shareholders will be asking about dividends. What answer will you be giving them should they ask you?
And then, okay, actually my last question has been answered, so it's just those two.
Graham Briggs - CEO
Matthew, yes grades. Underground operations, Matthew, we will be expecting grades just below 5 grams a ton. Hopefully a little bit better than this quarter, which was 4.81. I think last quarter was 4.87. So just below 5 grams a ton from Underground.
The Surfaces grades really are highly dependant on the monitoring of [signs then]. And as last quarter was slightly lower, we would expect slightly higher, probably about 0.15 or so on the Surface lines.
The Kalgold affects the Surface grades a little bit as well. It's in the tiny space on the (inaudible). But with increase in gold price we're obviously looking at a lot of the other zones there. In fact we started mining on some of the other zones. So that's the grade question.
I think the dividends, yes good question, I plugged that point into the Board the other day and got the Board thinking about that. So I haven't got an answer for you yet.
Matthew Hill - Media
All right. Would you say there's a strong possibility of a dividend being paid out in this financial year?
Graham Briggs - CEO
No, not this financial year. It's fairly unlikely this financial year. Remembering that the sort of cash coming into the Company will be, during this quarter, if we meet all those conditions precedent, but we've restructured now so we're looking in a much more healthy situation than we were 10 months ago.
Matthew Hill - Media
All right. Great. Thank you.
Operator
Thank you. Our next question comes from Shane Hunter of BJM. Please go ahead.
Shane Hunter - Analyst
Sorry, good morning gents. Just a question really from the income statement, just some detail there. You've got a cost there for ZAR24m there for the care and maintenance of the shafts. I just wondered are they going to be ongoing or, say for how long for? And what is the plan around all of those shafts that you've now actually shut down?
Frank Abbott - Acting Financial Director
Yes, if I can answer the first question. These are generally included in there, which is abnormal, which is because of the restructuring we have done at Bambanani. So going forward it's not going to be at the ZAR24m, it's going to come down to ZAR10m to ZAR14m. And Graham can maybe answer the second part of the question.
Graham Briggs - CEO
Yes. Shane, we continue to look at all those operations that have been put on care and maintenance. The last six, seven months has been a dramatic change in gold prices and so on, so we have got a project actually looking at all those operations and to see what sort of potential there is and what we should be doing about it.
A little bit difficult and early days to give some opinion on what we should be doing there. But at the moment that's the sort of ongoing cost which, in the short term certainly, we have to include as one of our costs.
Shane Hunter - Analyst
Okay, fine. Thank you.
Operator
Thank you. (OPERATOR INSTRUCTIONS). Our next question comes from Allan Cooke of JP Morgan. Please go ahead.
Allan Cooke - Analyst
Good morning Graham, good morning Frank. Just quickly if you could just clarify are you guys at 90% of power, or 95%, just following on on Muneer's question?
And then I just want some color, if you don't mind, on CapEx for the June quarter, especially at Hidden Valley, given the deal with Newcrest. What will your CapEx look like in the June quarter?
And then finally, if you could give us some color on the grades, Uranium grades that you're looking at at Tshepong, Phakisa and Masimong, in terms of run-of-mine gold tailings, and tailings dams, the potential there? Any updates on working being done in Free State on the Uranium [dumps]?
Graham Briggs - CEO
Right, let me try and get those, if I don't get them all just remind a bit. Let me start off with the power. Essentially we are operating at about 90% of our previously consumed power during the sort of monitoring period of the previous year. There's been very little clarity from an executive level as to exactly what that amount is. So it's been a bit of self-policing, if you like. But we continue to use that amount of power which is basically the 90%.
Our need for power, Allan, are the growth projects growing forward. So Doornkop, Phakisa, those operations require more power in the future and that's where our request through to Eskom has gone, is that those operations need more power in the future. So we haven't pushed for the 95%, to get 95% now.
What we require is as those projects are building up, and they are building up as from now, is that we'll be requiring more power in the future. So that's where are negotiations are going with Eskom. So we've essentially restructured using now, we don't include even to the 90%. We're using the right amount of power for our restructuring plan.
On the Uranium grades for those operations. Early days, but it looks like at about 195 grams a ton from those operations, that's Tshepong, Masimong and Phakisa. A little bit early days on the Phakisa ore because we're only doing a little bit of months scoping there. But essentially we've -- that ore body should be very similar to Tshepong. So it's quite handsome grades there. We're obviously trying to understand how to stream those, a case of bringing them through a dedicated [mill service] and actually streaming the tailing.
Ideally you would actually do it the other way round. You'd put it through the Uranium plant first and then put it through gold plants, but we'll have to see what we can do there. So that's why we're trying to understand that part.
The tailings operations, I think in total I think we have something 1b tons of tailings in the Free State. Also tailings obviously in Evander and elsewhere. We have drilled all our tailings dams. In fact, they're still being drilled a bit more it's actually the [Dilcol] tailings dam. The [Dilcol] tailings dam actually is a fairly slightly higher grade, and at about 0.34 I think at the moment. And we also need to understand the metallurgy of that tailings dams as well.
But in the Free State we understand quite well and that's why we're sort of pushing ahead with understanding the [5%] growth of the Phoenix project to 1m tons, (inaudible) to 2m tons.
On the CapEx. The CapEx this quarter will really essentially be for Harmony's accounts, and remembering that in the deal that $45m is really repaying 30% of the CapEx between January 1 and [32]. So capital amount estimates, I'm not sure if we actually have it, but it should be something similar to this last quarter. Just let me ask Frank if he knows.
Frank Abbott - Acting Financial Director
It's [ZAR1.2b].
Graham Briggs - CEO
ZAR1.2b?
Frank Abbott - Acting Financial Director
Yes, for the fourth quarter.
Graham Briggs - CEO
For the fourth quarter.
Frank Abbott - Acting Financial Director
Yes.
Graham Briggs - CEO
Are you looking at that total capital?
Frank Abbott - Acting Financial Director
Yes.
Graham Briggs - CEO
ZAR1.2b.
Allan Cooke - Analyst
Thanks very much.
Operator
Thank you. Our next question comes from Steve Shepherd of JP Morgan. Please go ahead.
Steve Shepherd - Analyst
Thank you. Good morning Frank. Good morning Graham. May I please draw you to the comment you made on Evander South. I'm just looking at the numbers that you've got published here and it appears that it's a 6.9m ounce resource in total with a probable reserve of 2.1m ounces of gold. That was published in your last annual report. The first question would be is there any more information than that available?
And then I'd like to ask you, if I may Graham, what sort of channel width are you looking at in Evander South? Number one. Number two, how far below surface is this ore body? Could you give us some indication of the depth there?
And then could you talk to us about timing of inventory upgrade? Could you give us a bit of an indication how long the drilling program is going to last?
Then I've got another question after that, but maybe that's enough for now.
Graham Briggs - CEO
Thanks Steve. Good morning. Yes, Evander South is quite an appealing project. What we had there was actually a prospecting permit but we didn't have permission environmentally to disturb the surface. We've recently got that permission. So we now are capable of starting the new drilling program.
Depth below surface is starting off right below the (inaudible), so it starts of at about, let's say, 200 meters below surface and then extends down. So it's a fairly shallow mine. Our thinking is that the Evander South, in fact, may be not be dissimilar and actually connect up with the Poplar area, but we just -- there is no drilling in that area and that's part of what we need to do, is to focus on it.
At the moment the information that you've got, and that was published in the annual report, is exactly that, it's the most that we have. So this drilling program will obviously enhance that information. So around 2m ounces of reserve or a probable reserve, and then a fair amount of resource.
Steve Shepherd - Analyst
The channel width, Graham? I'm interested in the channel width.
Graham Briggs - CEO
The channel width, is sort of fairly typically [Kimberly] type [reef] of around 20cm to 30cm, in that area.
Steve Shepherd - Analyst
20cm to 30cm. So your head grade, according to the reserve statement, would be fairly, well, 4.75 grams per ton I think it says here doesn't it?
Graham Briggs - CEO
It's somewhere between --.
Steve Shepherd - Analyst
4.75 it says here on page 61 I think.
Graham Briggs - CEO
Steve, I was going to give somewhere between 4.5 and 5. Yes.
Steve Shepherd - Analyst
Okay. So that's the published number of the reserve grade which is what you should see come out at the head is 4.75 gram per ton for a mine, which looks quite substantial, I guess. That ore body looks quite substantial.
Graham Briggs - CEO
Yes.
Steve Shepherd - Analyst
And it's very interesting here you say you think it joins up with Poplar because that could be very interesting, I guess. Okay, well thanks for that.
Now the second question I wanted to, also on an ore reserve vein if I may. Could we talk about the mine call factor? I recall when you started I think you indicated to the market that you were running 6 points below the Group's long-term average in terms of mine call factor and that you were going to try and address this. And I wondered where you were on that.
And also, if I recall, I think your Underground reserve grade in South Africa was like 5.5 grams a ton wasn't it? And you're obviously mining 10% or so below that. Could you talk to that issue as well please?
Steve Shepherd - Analyst
Steve, yes, we're still below where we should be mining in grade and we still have a mine call factor problem. And part of the mine call factor problem is a people's problem. You know, when you're dealing with mining discipline of keeping things clean, keeping the surplus controlled, making sure you're mining in the right areas etc., etc. And part of that we hope, certainly in changing our mining structure, will be addressed.
We changed our mining structure during this quarter and I guess the guys haven't really settled in to it. So I think we've still got a fair amount of work to do on our mine call factor.
Steve Shepherd - Analyst
Can you give us some specifics, Graham? I mean what is the long-term average mine call factor? And more or less where are you at the moment, do you think?
Graham Briggs - CEO
It depends operation to operation, Steve. I think Elandsrand is still suffering from a mine call factor problem, more than a lot of the other operations, whereas Tshepong in the last quarter has had a better mine call factor problem. The -- it really depends operation to operation and almost management area to management area. But, in general, I think yes, we're probably still 0.6 or so below.
Steve Shepherd - Analyst
So 6 points -- percentage points was what I understood. Did I misunderstand that Graham because it's obviously a very important number this isn't it, it goes straight to revenue doesn't it, so --?
Graham Briggs - CEO
Yes, 6% is probably, what sort of points, 0.3 or 0.4 of a gram. Yes, that's about it.
Steve Shepherd - Analyst
Well I don't think it costs you much to get that does it, if you can get it right, if it costs you anything at all?
Graham Briggs - CEO
Yes, if you get it out, well obviously it's good for safety as well because it gets all your things -- so in fact there's zero cost to improving that. One needs to do that.
Steve Shepherd - Analyst
I hope you can give us some progress on that in the coming quarters because, as you said, changing your structure may help with that, I guess. So it's a very important number for Allan and I, that, and we'd like to, if you wouldn't mind giving us progress reports on that in the future.
Graham Briggs - CEO
Sure Steve. We'll do that.
Steve Shepherd - Analyst
Thanks guys.
Graham Briggs - CEO
Thank you.
Operator
Thank you. Our next question comes from Charlotte Matthews of Business Day. Please go ahead.
Charlotte Matthews - Media
Hello. What has been your total number of retrenchments so far now the whole process has completed?
And secondly, once you've defined your further Uranium potential, are you necessarily going to inject it into Rand Uranium?
Graham Briggs - CEO
Charlotte, hi. Yes, I think total number of retrenchments are just below 6,000 and that's for the whole process. From now on, in fact, we will probably be employing more people and that's because of the buildup at Doornkop and Phakisa mainly.
But our employment figures will obviously change when the Randfontein deal happens, then our employment figures change again by about 4,300 people, because that will go into --there's that many people involved in those operations. So it remains an area of change. But as far as retrenchments, it's not something we're planning any more. There maybe the odd one or two in different areas, but certainly no significant retrenchments like we've had before.
As far as the Uranium assets, yes I guess we need to understand exactly what we have in [used] Uranium, and what the potential. But if Rand Uranium is going to be successful then it's also going to need to grow. And we have 40% of that so it would be in our interests as well. So it's not necessarily a slam dunk, but it's something we will certainly look at fairly closely.
Charlotte Matthews - Media
Thank you.
Operator
(OPERATOR INSTRUCTIONS). We have a question from Tessa Kruger of Mineweb. Please go ahead.
Tessa Kruger - Media
Hi Graham. Just a quick question. You mentioned that you're in a much more healthy position now and that the Company has achieved much stability. What is the next phase of focus for Harmony then? And what are the growth prospects that you have mentioned?
Graham Briggs - CEO
Yes, I think firstly we have these fairly large number of Surface operations. Now the Phoenix project, as an example, produces gold at around, I think, ZAR90,000 a kilogram. The gold price at 200 -- or plus 200 of course there must be huge potential in that and, as I said, we have 1m tons of slime in the Free State. But we also have slime in other areas. So on Surface there's quite a lot of surplus potential.
In Kalgold, that is a an operation that I think was going to probably die in these last few months. But, again, with the increase in the gold price there's quite a lot of potential on some of the (inaudible) bodies there and we're looking at those.
Underground, certainly in the Free State, quite a few of those operations have low life -- short life, probably one, two, three year part life, depending on which operation you're on. And certainly they would have been threatened under the previous gold price scenario. Now with a substantial resource they will never be -- you know they will always produce gold at a fairly high cost of somewhere around ZAR150,000 to ZAR170,000 a kilogram. But at these gold prices they can be very profitable so we'll continue to look at those.
The Underground virgin-type projects, if you like, are the ones we were talking about with Steve. Evander South, Poplar, and even Rolspruit. So we will be doing quite a bit of work in the Evander area on those projects and see which one is feasible. It's a case of really looking at them all together, in fact, and understanding which is the better one to push forward. Certainly the Evander South one, that's a relatively shallow mine, not too dissimilar from the Great Basin Gold Burnstone Project, also a shallow operation, is obviously looking quite attractive.
Operator
Our next question comes from [Dio Van Ransberg] of [Think24].
Dio Van Ransberg - Analyst
Hi Graham. I was just wondering, three short questions. We have these vague reports from Papua New Guinea about the site there being attacked. And I'm not exactly sure what happened there. Could you clarify that?
And second, at Rand Uranium, last time at the presentation there it wasn't certain where the new mine dump, aggregate mine dump would be placed. And I'd heard there's major opposition coming from communities in that area as to the proposed sites.
And third, could you just clarify the number of fatalities this quarter at Harmony's mines.
Graham Briggs - CEO
Right. Let me try and -- sorry I'm just jotting down notes here. PNG and the labor issue that you heard there, what happened on -- it was actually May 1. There was a skirmish between the local landowners and the highlanders. In PNG we have an agreement with basically all the parties, including the PNG Central Government, and we look at local hires first, and if don't find the right people we can sort of spread the net. And that spreads further problems through the areas, through the districts, through the province, and then to other provinces.
So there was a disagreement between the highlanders which come from the Hagen area and the local landowners. They managed to get three people in hospital with cuts and bruises and the like. Since then the guys have sat down and chatted and talked and they're getting back to work again now. So there was an issue there. What we did as management was we sat down the fights and got everyone to cool down and really to try and understand their issue. So it's an issue that's beyond our control, but I guess we've got a few learning points out of that one.
On the Randfontein dump, that dump, to my last knowledge, still remains an area of going through a lot of the environmental understanding, technical studies and the like. With these dumps you have to do a great amount of environment stuff, including geotechnical drilling and the like. You don't just dump it and that's where the process is. And I'm sure that it's also part of the getting the local communities to comment and everything. I really can't give you an update further than that.
Fatals during the quarter amount a number of 6. I hope that answers all the questions.
Dio Van Ransberg - Analyst
Yes. Thanks a lot.
Operator
Our next question comes from Muneer Ismail of Deutsche Bank. Please go ahead.
Muneer Ismail - Analyst
Sorry Graham, I should have asked this up front. Just trying to understand, what we've seen on those gold prices, we still have elevated levels of rand gold price, ZAR210,000 plus per kilogram. But we have said the fickle nature of the gold price, both the dollar gold price and the rand gold price have come down from recent highs -- record highs.
Now the concern, I'm just trying to understand from the strategy point of view, how does Harmony think about these marginal operations? You mentioned that there's no further restructuring. You're probably going to see steady, you know, nothing else going on to clear maintenance. But the risk is -- how do you plan -- what sort of rand gold price are you planning at? And how do you consider the future if we have a situation where, as the gold price is proving it's very fickle and there is an opportunity for possibly the rand to strengthen or even the gold price to come lower. I'm not sure, but I just want to try to understand, are your guys basing things in spot planning or are you planning at a decent rand gold price that factors in this kind of risk?
Graham Briggs - CEO
Yes, thanks. A very interesting question. It depends where we debate these things. I guess we are sort of crazy [globals] and therefore we don't believe that the rand's going to pot and the world's in a shambles it will be very good for the gold price but, at the same time, we've got to keep control of our costs. But that's the sort of -- what we dream about not when we let sense prevail.
[We're] planning to gold price going forward. I'm actually looking at ZAR180,000 a kilogram on planning going forward. So with respect to short-life assets, the intention would be to invest capital which has quick return. So development capital which can give you the quickest return does not -- starting a new shaft on operations, taking a (inaudible) and developing an area to mine at 3.5 grams to 4 grams a ton and actually (inaudible).
Muneer Ismail - Analyst
Okay. So you would take tactical decisions on CapEx for these [moves] on shafts. Do you then still hold your finger pretty close to the switch when it comes to switching them off in case we do have a desperate situation on the rand gold price?
Graham Briggs - CEO
We're certainly going to have to do that, and that's where it's going to affect. So that's an area that, other than places like [Epso] where we've obviously taken a long-term decision on a different gold price. But when it comes to development on a Merriespruit, Harmony 2, [Brands], those sort of operations, then we need to be able to switch off that capital as quickly as we turn it on.
Muneer Ismail - Analyst
And then just, sorry, you always get asked this question, but you know, for Frank, what's the story? When do we get a decision on whether Frank's permanent or if there's a replacement coming in for Frank? What sort of timing on that decision? Is it until the IT system's up and running, Frank or --?
Graham Briggs - CEO
Yes, it's -- sorry I'm going to answer it for Frank if you don't --.
Muneer Ismail - Analyst
Sure.
Graham Briggs - CEO
Yes, certainly until we've got a clean bill of health on our financials, so that takes us through to the end of this financial year. And I think the Board is quite comfortable with that. Now to get that sort of system up and running, it's really going to start getting up and running in August and our financials I think will be September. So I'm relying on Frank to [do this].
Muneer Ismail - Analyst
Brilliant. I won't ask the question next quarter then. Cheers guys.
Operator
Gentlemen, we have no further questions. Would you like to make some closing comments?
Graham Briggs - CEO
Thank you very much. Yes, thank you very much ladies and gentlemen for joining the conference call. I think it's been an interesting quarter, tough, but we've met our objectives from a restructuring point of view. I certainly think we're in a position now to forge ahead. We've got a new foundation for really looking at a sort of improvement in morale, in productivity and the like.
Thank you very much. And feel free to contact us if there are any other questions. Thank you and goodbye.
Operator
Thank you. On behalf of Harmony Gold, that concludes this conference call. Thank you for joining us. You may now disconnect your lines.