Graham Briggs - CEO
Good morning ladies and gentlemen. A warm welcome from us at Harmony. In front I have, from my right, Frank, Mashego, Alwyn, Tom and Bob and there are a few other executive managers as well who'll be prepared to answer any questions you have afterwards. Greetings from the Board, and a very apt slide to start off with. Gold, it's an exciting place to be. And may I continue to encourage you to get your daughters and sons to get married and buy lots of gold.
You've all seen this before, and it's the latest one with the 2007 date on it. Just to go through some of the highlights for the quarter. Total cash operating costs were down by just over 8.0%, operating profit up by 43%. Elandsrand, which was a real problem in the quarter and we lost quite a lot of gold from that operation, is repaired and back into production. We signed an agreement, which was well in the press, on the Randfontein assets, establishing a new uranium company. The auditors have reviewed our financial results for the six-month period ending December 2007. We have short-listed PNG partners and they're going through their due diligence process and site visits as we speak. And all operations have the new order mining rights.
Safety. There was a regression in our safety for the quarter, and it's, I think both with the Elandsrand issue, and certainly the one-day strike by NUM, gave us all something to focus on. And hopefully there's going to be more diligence and more focus on safety during this quarter. The quarter we're in is looking much better.
The Group operating results, and these are Continuing operations. A -- the main loss of gold again was due to the Elandsrand. And could I just highlight the cash costs, they're virtually flat at ZAR133,000/kg. Cash operating profit went from ZAR314m to ZAR450m. This is the profit by the Underground segments, South African. The only operations in Continuing are all South African now. And that was ZAR345m, and, from surplus ZAR104m, bringing the total to ZAR450m.
This is in imperial and U.S. dollars. You can see that there was actually a strengthening of the rand during this quarter and hence the effect of higher cash costs in dollar-per-ounce terms. Otherwise, the figures are very similar obviously to the previous slide.
Quarter-on-quarter, the profit variance. You can see the ZAR315m at the top of last quarter was a negative volume, again mainly due to Elandsrand. There was a working cost improvement, recovery grade was slightly down, and of course the gold price helped us in rand terms. And the net variance is ZAR135m.
Let's go through the operational review. You'll see that there are some changes in the pack and the changes in the reporting. Previously, we were reporting Quality, Growth, Leverage and International. We're now reporting by operation. The projects that have been -- we're spending lots of capital in the last few years on our -- being developed as mines. Between now and 2010 they're in build-up phase, so it's right to report them as they come in. The new mines and our bigger mines are the bulk of our reserves as well. And operations classified -- or for sale, are obviously classified as Discontinued operations.
The South African Underground operations, highlights and lowlights. Phakisa produced its first gold. Really, it's more of getting everyone [sloping], so there were only 18kg that came out of that operation, ready from the [Mt. Nyala] shaft, but it's starting its first gold. Elandsrand repaired and delivered one month's full production, not quite one month's full production, about 98,000 tons out of the quarter, which is probably just between three and four weeks of production. Target, Bambanani and Joel showed improvements in their performance. And we phased out Conops at Masimong.
On Surface, both Kalgold and the throughput at Phoenix, that's the [Siplus] plant in the Free State, had good performance. Phoenix is really at maximum capacity, at 525,000tons. Every now and then the guys try and squeeze a bit more tonnage through that, but it's really at maximum capacity.
This is very profitable, gold, these days, if you keep your plant costs down. The costs, at ZAR85,000/kg, are pretty good.
The shot of part of the love of my life is Hidden Valley. The camera's -- behind the camera is the Hidden Valley pit, where they've started stripping. The shot is of the Slimes Dam and the plant sites. But this is going well and it's still on schedule for March next year, to deliver gold.
The Discontinued operations, these are the South African ones. And within that is the whole of the Randfontein, so the Cooke shafts as well as the Cooke plant, the Orkney operations, which are managed by Pamodzi Gold, and St. Helena, which was closed and is on care and maintenance, which -- last blast there was during November.
Discontinued operations, and these are the Western Australian operations. They had an excellent last quarter. The sale has gone through, with all the conditions precedent on South Kal has been met and that has gone through. In Mt. Magnet, they had a good quarter and a very safe ending. The mine actually closed during December and the last tonnages will go through the plant in January. But they had an excellent closure there, as they stopped.
Some of the exploration that the guys are doing in Papua New Guinea. This is a porphyry that we've discovered, about 2.0km from the [Goldpru] deposits. It's another porphyry. Some really exciting results that are coming out of these deposits. Both these -- or, sorry, all three of these holes have intersected great values. And the four rigs that are busy drilling on that, some of those that visited these operations recently would have seen some of the rigs. But some excellent results coming out of Papua New Guinea.
I'd like to hand over to Frank Abbott to give us some of the Financials.
Frank Abbott - Acting Financial Director
Thank you Graham. This is our income statement for the September quarter versus the December quarter. Our cash operating costs have been down by ZAR115m and our cash operating profit went up to ZAR450m. This is on the Continued operations, not on the Discontinued operations. Exploration expenditure, all of that is in PNG. Interest paid increased to ZAR138m. We made a profit on Discontinued operations of ZAR175m and then we also made a profit, this is a reversal of impairment costs last year, on Mt. Magnet, which we are now also selling, and giving us a net profit of ZAR46m for the quarter.
This is our balance sheet. At the end of December 2007, our cash balance reduced to ZAR425m. During the quarter, we had ZAR800m of capital expenditure and we also reduced our payroll -- not payroll, our accounts payable, by ZAR500m. The other current assets which have increased by ZAR500m, that's with the sale of the Randfontein assets. We moved the Randfontein fixed assets into the other current assets. That's about ZAR500m. If we go down and we look at our borrowings. That's our long-term borrowings, reduced by ZAR2.0b, but that's really moved into current liabilities, because those borrowings are due within 12 months.
And if we look at the --
Graham Briggs - CEO
Shoot, what's happened now?
Frank Abbott - Acting Financial Director
No idea.
Unidentified Company Representative
That's because there's no power.
Graham Briggs - CEO
Can we just go through the --
Unidentified Company Representative
Yes, just go through the booklet and I'll just try and fix this. There's the right connection here.
Graham Briggs - CEO
Don't worry, let's go through this.
Unidentified Company Representative
Okay.
Graham Briggs - CEO
Sorry ladies and gents, let's just go through to the booklet. And let's go to slide 20, which is the capital expenditure. You'll see that the capital expenditure went up to just over ZAR800m and most of the increase from the previous quarter, of ZAR675m, was the Hidden Valley mine in Papua New Guinea.
Slide 21 is a truck, also from Papua New Guinea, busy building plant sites and the like.
And if I can just go to 22. It recaps a little bit on the agreement between Pamodzi Resources Fund and ourselves, that we retain 40% in net assets, and that we have identified the Newco Directors and the Newco Chairman.
Slide 23 is the Cooke Dump and this is where that business, the action started on that business. Remember that there are 40m pounds of uranium oxide in that dump and there, obviously, lots of potential in the Underground operations. But that's the core of the uranium potential, going forward.
On slide 24, corporate restructuring. Generally, the executive management were very busy during the quarter. We changed the mining structure back to a more traditional approach of mine captains and shift bosses, from our previous structure. We had a large number of services that were centralized. We decided to re-look at that and we decentralized a lot of our services. We stopped Conops, as I said before, on Masimong. We continue to evaluate Conops and the other operations. St. Helena was put on care and maintenance during the quarter. And Evander 7, you've heard about the sill breakthrough from about probably six months ago. That's more extensive than was thought, so we've downscaled Evander 7.
Slide 25 gives you some idea of the numbers of people that have been moved around during the quarter, and it's nearly 10,000 people that were moved around during the quarter. There was a reduction of 2,000, just over 2,100 people, both from voluntary retrenchment and natural attrition. There's a reduction of contractors. And that brought the total reduction to almost 5,000 people. The numbers in the decentralization reduced employees by about 700. Closing St. Helena, of course, we had to move 650 people there. Most of those people were moved to Phakisa. And Phakisa and Doomkop are net gainers of people going forward as they start building up in their production.
The PNG partnership is going well. As I said, we've got a shortlist of potential suitors, and we are hoping to announce that shortly. It will probably be in April, I was hoping the end of March, but it will probably go into April.
Slide 27. I just want to illustrate that I think gold is a great place to be at the moment. I've tried to illustrate something there, and I'm not known for my predictions on anything on the costs, as you know. But let's assume that the last six months at ZAR133,000/kg is replicated in the next six months at ZAR133,000/kg. I'm certainly hoping that our cost-consciousness and our obsession about costs is going to improve that situation. We also have obviously a focus on grade and mining, so hopefully that situation will improve.
But the gold price during the last six months was ZAR163,000/kg. At the moment, it's somewhere around ZAR223,000/kg. That's a huge margin, going from ZAR30,000/kg to ZAR90,000/kg. And remembering, Harmony, this next six months, will produce close to 17 tons of gold per quarter, you can do the math there. I think it's an exciting place to be. There's lots of challenges. We're facing those challenges and we're tackling them head-on. But it really is a good place to be.
Slide 28. We're looking at the future. We need to continue to focus on safety performance. It's core to what we do. We now know and understand very well, that safety affects everything we do, including the bottom-line, and we have to get the focus on safety and we have to improve those numbers.
Harmony is certainly going to focus on the longer-life operations, both those operations that are coming into production and the operations we already have. We're going to have to investigate ways and means of recapitalizing and changing our short-life mines into something with more potential. Those operations do have potential, we've been spending our capital on the better assets. Spending capital on those, especially in these high gold prices, is got some huge potential. They will remain high-cost, but we need to look in ways -- investigate ways of recapitalizing them.
We're going to try and expand the pipeline. This year, as you know, is our biggest year of capital expenditure, at just over ZAR4.0b. Next year will be less, but we need to continue to look at the pipeline and continue to grow that.
And really looking at what we're doing in Papua New Guinea. We're going to look hard at trying to use partnering as a process of expanding internationally.
Ladies and gentlemen, sorry for the slide show, but open to any questions. Let's just see if we can get hold of a microphone.
Martin Kremer - Analyst
Hi, I'm Martin [Kremer], [Mining BP]. Graham, you haven't made any mention of any -- or we haven't had any laments about the power situation. And what is the position with that? You are on 90% power. What is it going to do to that forecast, your 17 ton per quarter you spoke about? Is that curtailed because of power, and how much are you losing because of power? Or are you rising to the occasion?
Graham Briggs - CEO
Yes, the power situation has certainly been topical. How we've approached that is really to face it head-on and look at all possible ways and means of planning and reducing electricity. And we have obviously been in the process of restructuring already, and the power issue of four weeks ago, or whenever it happened, I think it was about four weeks ago, exacerbated that and really got our focus to it.
We have cut out some of the higher cost operations, and that I referred to, Evander 7. Really, we had probably six months of mining to go there. We brought that forward. We continue to mine at Evander 7, but really it's depletion of the higher grade areas in that shaft. It's a bit of a process and it will take time to reduce.
We've probably reduced about 3.0% of our power, just from being more economical and really looking at areas of potential savings. And then we have stopped mining in the southern portion of Bambanani, the sub-shaft, low grade and high cost area. And we continue to look at restructuring.
So, all in all, we're using 90%. I think Harmony has been playing its part in the power saving, so we are using 90% and we are controlling our power fairly well. And we are doing our own distribution, if you like, making sure that we don't overshoot the mark.
So in general terms, I think that it is going to affect output, certainly in this quarter, because of the disruption of four days. So there's going to be a slight reduction in gold. But at the same time, we're bringing Elandsrand back into operation, full operation, this quarter. So there'll be a bit of a balancing trick. Last quarter, remember that Elandsrand was only operating for roughly a third of the quarter.
17 tons from total operations is about it. We think we've probably lost about 800kg. It's very difficult, when you look at the pipeline effect of mining, to actually understand how much you've lost, but we believe we may have lost about 800kg due to that power stoppage.
Alan Cooke - Analyst
Hi Graham, it's Alan Cooke from JP Morgan. Just -- and I haven't had time to look at the results in detail just yet, because they were not supplied. In terms of the --
Graham Briggs - CEO
That was a jibe at me trying to get it out earlier. Thanks Alan, okay.
Alan Cooke - Analyst
In terms of all the restructuring you've done in the quarter. What was the cost of that? And you're still restructuring. Will there be further costs in the March quarter?
And then also, I noticed your [receipt bill] prices averaged ZAR163,000/kg. That was a bit below the spot average. Was there a reason for that?
Graham Briggs - CEO
I'd like to ask Frank to answer the last one. I think the restructuring costs, you will see in the financials, there's ZAR75m costs below the line there for retrenchments. We've got a voluntary agreement with the unions on retrenchments. We continue to use voluntary and we will certainly allow for some costs going forward into the next quarter for that, if there's an uptake.
The loss of -- the costs, really. in moving people and the like, is not easy to quantify. There's a lot of disruptions around that. But it's not easy to quantify and really we haven't tried to quantify it. So the only cost that's really quantified is the retrenchment costs.
Frank, would you like to try and give us an answer on the gold price?
Frank Abbott - Acting Financial Director
Yes. Can you hear me? On the gold price, it's just the way it came out. We've got volatility in the rand-dollar, volatility in the gold price. And you've got certain days when you actually get dollars for the gold, and certain days when the dollars get converted to rand. So I think that maybe we were just not that lucky on the gold price. But there's no other reason why. It should be representative of the average price over the quarter.
Alan Cooke - Analyst
And, sorry, just the last one. In terms of your costs, unit costs, on the restated basis, were pretty flat at about ZAR133,000/kg. And you're saying, 'well maybe, or hopefully, we can maintain that'. Was there any non-recurring savings in that ZAR133,000 of the December quarter, or any adjustments there? Just so that we can get a feel. Because everyone else is battling with unit cost inflation, typically 15% per annum, and clearly, you guys are turning things around and restructuring, so there is an impact there. How much of that is sustainable, how much of that is once-off?
Graham Briggs - CEO
I think this -- It's very difficult to actually look at our costs and understand that fully, as you appreciate, because the costs that we've taken out during the quarter, we don't see the benefits of that cost. We will see the benefit of that cost, going forward. So we expect improved costs, going forward.
But, non-recurring items, Frank?
Frank Abbott - Acting Financial Director
I don't -- I can't give you answer on that Graham.
Graham Briggs - CEO
Okay.
Muneer Ismail - Analyst
Graham, hi. It's [Muneer Ismail] from Deutsche Bank. Maybe for Frank, on the balance sheet and cash-flow. If you can just chat about cash-flow first. You said accounts payable of ZAR500m over this quarter. It's a big swing of course, in your working capital. I'm just trying to understand.
Is that the problem to suppliers, giving the error we saw in the accounting system? Is this you flushing it all out now and getting clean? Or is it -- typically in December, you guys pay salaries earlier and there are a whole bunch of funnies which we're going to start in the March quarter? I just want to understand your ZAR500m is going to come back in this March quarter, or is it -- is that payments to suppliers?
Frank Abbott - Acting Financial Director
Thank you. I think 50% of it is because of salaries being paid early in December and the other 50% is really reducing our creditor balances. I think that's a permanent situation. I don't think you would -- it won't come back.
Muneer Ismail - Analyst
So it's 50%-50%?
Frank Abbott - Acting Financial Director
Yes.
Muneer Ismail - Analyst
It won't come back? Okay. The second question on your balance sheet. You spoke about debt moving to short term. ZAR1.8b, I think that's the net bank facility? Refinancing that, is that an option, is that an easy option? Will you look to come to market possibly and raise some money?
Frank Abbott - Acting Financial Director
I don't think it's going to be necessary. If the money for -- when we sold the Randfontein uranium assets, we can then receive about ZAR2.0b for that in May-June this year. So I don't see that it will be necessary to refinance the loan.
Muneer Ismail - Analyst
And then, lastly just a funny one. Looking at the income statement, there's a provision for doubtful debt. Can you just explain what happened there?
Frank Abbott - Acting Financial Director
Yes. In April last year, we sold houses at (inaudible) to someone and we haven't been receiving the money, so we've just written off the debt.
Unidentified Audience Member
Graham. (inaudible). Could you elaborate on what you mean by recapitalizing your short terms loans?
Graham Briggs - CEO
The best way I can describe that is to use the Randfontein uranium deal as an example. I think Harmony had shown its interest in uranium and the potential of those assets. But at the same time we had all the capital expenditure, we haven't got the capital to reinvest in those assets.
So by doing the Randfontein deal was a smart way of still staying involved in it, at 40%, but it being the entity enabling it to get some capital into both the uranium plants and -- . The uranium plant and all the capital is probably going to be in order of ZAR2.4b, ZAR2.5b, going forward. Clearly, that's not something we can afford. But we still want to remain exposed to uranium.
So that's a possible way of looking at it. There are people out there who are very bullish about gold, as we are. The -- some of the shorter-life assets have fairly high costs, it's ZAR160,000/kg or thereabouts. But at the gold price of ZAR220,000/kg-plus, it can make good business. And there are opportunities in those assets of extending the life and what it will require is some capital investment.
So that's a possible way of looking it -- forward. It's not something that we've finalized, it's just one of the ways that we'll look at it.
Steve Shepherd - Analyst
Two questions here, please. It's Steve Shepherd, JP Morgan. One is for Frank, and I'm sorry to keep harping back to the costs here, but maybe if we could ask this question in a different way.
You've shown your gross costs, well, your cash operating costs, at ZAR1.652b for the December quarter, I think Frank, and down from ZAR1.8b in September. Could you give us some kind of idea the sort of numbers we should be thinking about, in terms of rand billion, maybe for the March quarter, just a ballpark? That's my first question.
And my second question would be for you, Graham, please, on the grades. You reported 5.07 Underground grade in the September quarter, 4.87 in December. Could you -- would you be able -- you've done an awful lot of changing around so you leave us with a lot of guesswork. Could you possibly help us with getting a handle on more or less where the March South African Underground grade would be?
Graham Briggs - CEO
Sure.
Frank Abbott - Acting Financial Director
Thank you Graham. On a previous slide we showed that we replenished about 2,000 people, or left employment. And then there were another 2,800 contractors that actually terminated their contract with us. So we're talking about 4,000 -- no, 5,000 people. And if we take that labor cost out of our total costs, that would be more than ZAR100m. So my best forecast would be that it would be, of the ZAR1.6b that we've spent this quarter, less ZAR100m, for the coming quarter. So would make it ZAR1.5b.
Graham Briggs - CEO
On the grades. I think one of the biggest effects of the grade, and I haven't gone through operation by operation, I'm sure that some people will, there were some operations slightly negatively affected. Tshepong for instance had a bit of a hiccup in the grade. But one of the biggest effects was really the Elandsrand issue again, on the grade. So the variance is not something that I'm concerned about for this last quarter. And we're really aiming at improvements in the grade, longer term, by the structural changes that we've done, through to the mining structure. That focus will be more focus on good production, keen mining and of course safety. So we're working on the grade, it's still aiming at what we should be aiming at, somewhere around the 5 plus grams a ton.
Shane Hunter - Analyst
Yes, hello. Shane Hunter from Barnard Jacobs. Just a question either for Bob or for Frank and it's to do with your projects. We've seen over the last few quarters that the project overall cost has been going up quarter-on-quarter. So I was just wondering when you were going to be happy with the final estimate, or do you think there could be still some more increases in those capital costs?
Graham Briggs - CEO
Maybe before Bob comes in, I can just talk about Papua New Guinean capital.
Shane Hunter - Analyst
What?
Graham Briggs - CEO
(inaudible) capital.
Shane Hunter - Analyst
Okay. The main one I was looking at was from the SA projects. We've seen -- all of those, the final amount has been going up with each of your estimates.
Graham Briggs - CEO
Bob can answer that.
Bob Atkinson - Operations Director of Growth Projects
Yes, thank you. It, I suppose, was a timing issue, that both Doornkop and Phakisa got into this highest rate of spend simultaneously. We are now at that level where both projects are busy with the [access] development. And really, what we start to see, going forward now, is as it tails down, that capital starts to come off from next year onwards. But the current level of spend is really what we're going to see for the rest of this year, yes.
Graham Briggs - CEO
The big capital blowouts in most projects these days is when you've got infrastructure, stainless steel equipment, concretes, piping work, electrical work. Most of our South African projects are in the development phase, so although there's some steelwork in the rails and the like there, we're not expecting big blowouts on any of our capital. But, for instance, the capital on the Randfontein, on Newco, that's a plant that needs to be built. We don't know what the costs of steel are going to be going forward so that's the best estimate we've got at the moment.
Shane Hunter - Analyst
Actually, correctly, what I was asking was not what you're spending in each of the quarters, it's your final estimate overall for the project once it's actually been completed. And we've seen that number has been going up quarter-on-quarter, as if there's more things coming into the project, or some of the costs are escalating. So it's not what you're spending quarter-on-quarter, it's actually the final amount that I'm asking you about.
Bob Atkinson - Operations Director of Growth Projects
Okay, yes, sorry. I think there, with the -- we've seen the numbers that went through to the new business plan. That's really mainly due to escalation in things such as steel and stuff like that, the commodity -- the various commodity prices are affecting those projects. And so really that's just a change of scope that updates, updates on that. That's the latest calculation for this year of what we believe those projects will end up costing.
Graham Briggs - CEO
In some of these long projects, one has to look at when they were released and where they are now. Because the change in accounting, obviously looking at development, ongoing development, that is now capitalized, as opposed to before it may not have been capitalized. It all depends on the age of the project.
Sorry, there's a question --
Justin Vern - Analyst
[Justin Vern] from [Pasishaport]. I just wanted to find out how many partners have been shortlisted at your Papua New Guinea operation?
Graham Briggs - CEO
I'm told by the advisors I shouldn't say anything but it's a handful.
Justin Vern - Analyst
So, five.
Graham Briggs - CEO
I didn't say five, I said it's a handful.
Justin Vern - Analyst
I just want to clarify, you said ZAR4.0b CapEx this year. Would that be for the year to June?
Graham Briggs - CEO
Yes, the financial year I'm talking about, yes.
Justin Vern - Analyst
Okay.
Graham Briggs - CEO
Next year it drops down to, I think about ZAR2.6b is it?
Frank Abbott - Acting Financial Director
No, ZAR2.5b.
Graham Briggs - CEO
ZAR2.5b.
Justin Vern - Analyst
Okay, thanks.
Graham Briggs - CEO
Talking financial years.
Unidentified Audience Member
Graham, on the issue of skills. We had a presentation from a platinum company yesterday and they were really lamenting the skills situation to such an extent that they felt the industry as whole, plus Government, should deal with it. And they spoke of having to pay retention bonuses and difficulty in keeping staff, and that costs, in fact, in retaining people were spiraling out of control. You don't seem to have an issue with that. You're laying off people and you're saying you're going to have improved costs, completely opposite scenario.
Graham Briggs - CEO
Skills is certainly a problem in South Africa. We have certain areas where we have skills shortages. In our restructuring for instance, where we've had engineering skills available, I can assure you this, the rest of the organization has gobbled them up.
So skills is certainly a problem. We're working on it, we continue to look at retention and those sort of issues. But sometimes the companies themselves are their worst enemies because they're all talking against each other. And the guys are now very mobile. 'If I don't like working for this company, six months, I can go somewhere else and get a slightly higher salary'. It's an issue and, really, engineering is one of the areas where there's a shortage, and artisan level is another. But generally, there are some skills shortages. But the one thing that we are trying to do in Harmony, and I don't think we've arrived yet, is to create some excitement back in the Company again, so that people will want to work for us.
Unidentified Audience Member
Here's a cheeky question.
Graham Briggs - CEO
I'm waiting for the cheeky question.
Unidentified Audience Member
It's Frank really, for Frank. Come on then Frank. Are you going to stay or are you going to go?
Graham Briggs - CEO
Frank's not going to answer that.
Unidentified Audience Member
Please stay.
Graham Briggs - CEO
Frank is doing an excellent job at the moment. We are obviously right on top of our financials. We're still working through the whole IT issue. But there's a whole army of people, clever guys with thick glasses and CAs, degrees and all sorts of things, helping us and doing a lot of manual work. And hence that's how we've been able to get the auditors to review our results.
We will give you an update, but Frank is still going to make sure that the Company is in good hands before he departs, if he departs. I've got the CEO of [ARM] here, so I've got to be careful what I say.
Thank you very much ladies and gentlemen, I think that's it. If the press would like to chat to me, then I'll be standing at the front here. And please ask any of the operational guys questions. Thank you very much for coming.