  • Operator

  • Good morning. And welcome to the Harmony Gold Conference. All participants will be in listen-only mode. There will be an opportunity for you to ask questions at the end of this morning's presentation. (OPERATOR INSTRUCTIONS). Please note that this conference is being recorded. I would now like to turn the conference over to Graham Briggs. Please go ahead, sir.

  • Graham Briggs - Acting Chief Executive

  • Good morning, ladies and gentlemen. Thank you very much for joining us on this conference call to give you the September 2007 quarterly results. I have with me Frank Abbott and he will be taking us through a portion of the presentation on the financials.

  • I'll be taking us through slide by slide. So, initially, I'll start on slide one, go to slide two for our Safe Harbor Statement and then I shall start reading on slide three. The highlights for the quarter.

  • Really, the total cash operating costs were down by 12.5%. Admittedly, that's off a very low base. South African underground grades improved to 5.14 grams per tonne. And gold production was up by 12.8%.

  • We have finished our internal due diligence on our assets. And I'll talk a little bit more about that in the presentation.

  • We've progressed substantially on our Uranium strategy at Randfontein. And we've got some significant exploration results in Papua New Guinea.

  • On slide four, our safety performance. It has been a quarter where there has been a lot said about safety, and especially in the gold mines. Our graph is generally trending down. And I can assure everybody that we're still working very hard on our safety. And we're quite proud of our safety records in several operations which are doing very well. We continue to work hard on that subject, though.

  • Go to slide five on the Group operating results. Kilograms increased from 14,126 to 15,940. And the revenue in Rand per kilogram totaled slightly up on the previous quarter. Exchange rate virtually flat. Cash costs down from nearly ZAR149,000 to just over ZAR130,000 per kilogram. And that gave a cash operating profit in the quarter of ZAR411m.

  • If you can go to slide six. You've got a breakdown in slide six of the different groupings and assets. Quality, Growth, Leverage and Surface. And you'll see there's a significant increase in the quality, a poorer performance on growth, better performance on leverage and surface operations as well, coming back to the total of nearly ZAR411m.

  • On slide seven, that's the imperial of the same slide that we've just been through with respect to total gold produced. Top right-hand corner, 512,000 ounces.

  • Let's move onto slide eight. Eight shows the quarter-on-quarter cash operating profit variance, starting and commencing at the previous cash operating profit for June 2007, at ZAR33.8m. The variance is all positive. Volume at ZAR131m. Working cost at nearly ZAR26m. Recovery grade ZAR143m. And the gold price at ZAR76m. Giving a net variance of ZAR376.8m and the total cash operating profit balancing back to the ZAR410.6m.

  • I'd like to take you through the operational review. Moving onto slide 10 is the Quality assets. Underground tonnes slightly lower, and that was mainly due to targets.

  • On Tshepong the grade improved to 6.1 grams per tonne. Evander also improved, mainly at Eight Shaft and the Randfontein grades were up by 25%.

  • Slide 11, the Leveraged results. The overall performance has seen improvement in Leverage. And Bambanani was the big feature there. That was back into full production and was in production for two months of the quarter.

  • Production from Orkney is now reported as discontinued operations. So it's not included in these results. It's been excluded from both June and September.

  • Growth projects on slide 12. Elandsrand contributed a lot of the kilograms. But Doornkop is slowly getting South Reef and they've a fair improvement from -- at South Reef and it's showing improvements as we go forward.

  • On South African Surface operations. Surface-operation tonnage has improved greatly, and now we're at full capacity on the Phoenix Project at about 500,000 tonnes a month, at what used to be the (inaudible) plant. So Surface tonnage is up at 2.5m tonnes here. And grade is slightly down and that's mainly due to the slime going into that plant.

  • Kalgold also had a good performance this quarter and that was mainly due to water availability. So that increased throughput. The working costs in rand per kilogram terms is slightly down, almost flat.

  • The Australian assets. These assets, we've sold the South Kal assets, it's still represented in these figures. And the Mount Magnet is up for sale. The last month that we should be reporting any Australian results is January 2008. So we'll report it for another quarter and a bit. Generally a fairly poor performance, less kilograms produced.

  • Slide 15 is just a note. There was a press release out on Elandsrand and the effect of that. People are coming back to that shaft at the moment, going through all the safety checks and so on. It does take a while to get back into the surface entrance -- sorry, into the underground operation. And certain stands have been started. The cooling has commenced. But after such a long period of being idle, there will have to be a lot of safety checks in all the working places. Expecting production to commence during November -- early part of November. Full production will probably be later on in November.

  • I'd like to hand over to Frank Abbott to give us the financial review.

  • Frank Abbott - Acting Finance Director

  • Thank you, Graham. If we look at slide 17, that's our income statement for June quarter versus September quarter. We see that our cash operating profit has increased to ZAR411m, compared to ZAR34m the previous quarter.

  • We've made a loss from Gold Field's shares of ZAR459m. And that results in a net loss for the quarter of ZAR577m, compared to ZAR653m the previous quarter.

  • If we look at the headline loss, where we needed to strip out the Gold Field shares, our headline loss was ZAR176m for the quarter, compared to ZAR530m the previous quarter.

  • I'll then go to slide 18 which is our balance sheet. Now the things that have changed in our balance sheet during this quarter is that we sold the Gold Field shares. We were released of the guarantee that we gave to the ARM Empowerment Trust. But we borrowed ZAR2b from Nedbank. And we paid back some of our shorter-term debt.

  • If we go through the balance sheet, you'll see under current assets, our investments in financial assets, so (inaudible) included in the financial assets the previous quarter, was the Gold Field shares of about ZAR1.4b and also the ARM Trust of ZAR1b. Now that Gold Field shares have been sold, and the ARM Trust is now -- we've been released of that guarantee and therefore we don't show that as investment anymore.

  • If we look at the next slide, that's our cash and cash equivalents. That increased to ZAR1.5b. If I go lower down, under non-current liabilities, you'll see our borrowing went up by ZAR2b, and that's the money we borrowed from Nedbank. If we go down lower, under current liabilities, you see that our short-term borrowings have been repaid.

  • And if we turn over to the next slide, that's slide 19, you will see the capital expenditure. The June capital expenditure was ZAR810m. This is for both operational CapEx and project CapEx. Our actual expenditure for September quarter is ZAR721m. But you've got to add another ZAR120m to that because we sold some bids in Australia of ZAR120m, which reduces the -- it from ZAR840m to ZAR721m.

  • If I go to slide 20, that's the Nedbank loan. We got this loan facility from Nedbank. The value is ZAR2b. We've got to pay this back December 2008. And the terms we got it on was Jibar plus 2.75%. Thank you. Graham?

  • Graham Briggs - Acting Chief Executive

  • One more thing. Don't forget the accounting system.

  • Frank Abbott - Acting Finance Director

  • We've completed the IT audit. And the findings conclude that our new IT system was implemented too quickly. We didn't allow enough time for proper training and for proper implementation.

  • We believe that it could take another five to six months to fix that before we can do this, all the efficiencies out of the accounting system that we should be doing. What are we doing? At the end of every quarter we're taking a proper stock to ensure that we do not mistake our figures and rebalance that to our manual reconciliation. We do manual checks continuously. And we are confident that the current figures are accurate. Thank you. Graham?

  • Graham Briggs - Acting Chief Executive

  • Slide 22 is a nice photograph of a monorail and a conveyor belt. I think that one is at Tshepong at the D Plant. That's aptly it's been labeled The Journey. So I'd like to give you a little bit on our journey over the last quarter.

  • On slide 23, I'll give you some feedback. We have finished due diligence on all our operations. We did strengthen the executive management. We've done a full review of Conops. In Conops, mixed results. We have some operations which have not benefited at all from Conops. We are now trying to improve that situation. If we don't get improvements, we'll deal with it in this quarter.

  • Capital expenditure from our original budget has been reduced. But we've not cut any capital which affects production build-up. But the capital cutback, if you like, has been off the production units. And Frank has highlighted to you about the accounting system.

  • On slide 24, really a pictorial on what we're talking about in Back to Basics. We've really been looking at everything core and taking away as much of non-core things that we can. But it's really focused on planning, on the production units shaft by shaft. We've had teams go round to the shafts, do re-planning exercises, due diligence, revisiting them a week later, revising the plan. And we now have plans that we believe we can achieve.

  • Going forward, we're obviously going to do fairly intensive reviews, monthly reviews and the like. We are busy looking at our services. As you all know, we have shrunk in the last three years and our services haven't shrunk in parallel with that. So we are dealing with those issues. They do involve negotiation with unions and -- but that area needs to be handled properly. There is a huge focus on cost control and analyzing the details. Hopefully we're all doing it safely. And what we also really have as one of the items on all the operations is that they have to be profitable after the operating CapEx.

  • Flip the page over to page -- to slide number 25. Talking about Randfontein Uranium. I think we've had significant progress on understanding our Uranium potential in Randfontein.

  • We have appointed advisors and we got a strategic review of that and looking at different ways of optimizing that value. We have basically converted nearly 40m pounds of uranium oxide on the Cooke Dump to probable reserve status. And in parallel with that, we have now are declaring nearly 41m pounds of uranium oxide for Cooke 3 underground operations. So we've got a deeper understanding of that asset.

  • Slide 26 is a good photo of the Cooke Dump. This is included just to show you what that dump actually looks like. I think about 80m tonnes of slime there.

  • On the Cooke Dump, slide 27, we have, as I've said, we've got now a reserve status on that. So we understand the economic potential of it. And in that, we've used the standard processing metallurgical route. There is, however, a strategic link between the underground uranium potential and the Cooke Dump. And, really, looking at joint-pay limits to see how they could decrease the cut-off and increase the life of Randfontein operations.

  • Slide 28 is a bit of vision for our international operations. We've added significant value at Papua New Guinea. We would hope to grow further in that region. But we are looking at partnering. And, really, this partnering to try and grow in that area and allow us to diversify a little bit of country risk and build further critical mass.

  • Slide 29 is just a recap of what we have in Papua New Guinea. And I'll just take you through it, slightly. In gold, we've got total reserves of 4.2m ounces. That's mostly at Hidden Valley and then some at Golpu. Total resources at 15m ounces.

  • The copper figures are there, as well as silver and molybdenum. That's roughly about 50m equivalent ounces of gold. The prices at which the value there, we've listed.

  • On slide 30, that is a slide showing some drill holes at Nambonga North. This area is located about two kilometers northwest of Golpu. It's a first exploration of an area that we were targeting of a geochem anomaly, both with a magnetic high and also EM conductor. It gave some spectacular results of 5.6 grammes per tonne gold, 4.3% zinc, 54 grammes per tonne silver and 1.2% lead.

  • And as the second hole has been drilled, and although we've got some early indications of some good values there, we haven't actually got the values back from the Assay lab. So we will declare those once we get them back. But -- excuse me. In general, it's looking very similar to what we doing at Golpu.

  • On slide 31 we've initiated this introduction of the partners to the PNG assets. And that's Hidden Valley, Wafi/Golpu and the exploration.

  • Our key goals, really, are to generate development of this large asset base. We need to achieve some sharing of capital and development costs. And also we'd like a partner, obviously, with some complementary expertise. The -- our preferred approach is now, really, looking at a partner across all the PNG assets and with us retaining a 50% equity interest.

  • We're hoping with this process we can actually introduce the partner in the first half of calendar year 2008.

  • The next six months. And this is the final slide I have. We will continue with the Back to Basics approach, focusing on all cost reductions. We've got a lot of work to do on our costs. And we intend achieving our plans as we've got them. We're hoping that everyone will measure us on our declining cash cost. As I've said, we've got a huge focus not only on the cost but also improving the production units.

  • We're hoping that we will crystallize the value at Randfontein in some way, both at the Gold and the Uranium.

  • We'll progress the Papua New Guinea partnering progress -- process. And we'll continue with a strategic review of all our operations.

  • Thank you, ladies and gentlemen. That's it. And I think we can open ourselves for questions.

  • Operator

  • Thank you very much, sir. (OPERATOR INSTRUCTIONS). Our first question comes from Justin Brown of Business Report. Please go ahead.

  • Justin Brown - Analyst

  • Good morning. I just wanted to find out -- I've just got a few questions, please? When -- any idea when you could -- Harmony could return to profit?

  • My second question. You just mentioned, Graham, that you've cutback your CapEx. I just want to know finally on which areas that cutback has taken place?

  • And the third question, any disposals other than the Randfontein asset? Thank you.

  • Graham Briggs - Acting Chief Executive

  • Thanks, Justin. Can I ask, maybe, Frank to try and answer the first question? When do we return to profitability?

  • Frank Abbott - Acting Finance Director

  • Well, Justin. The coming quarter, I think, we're going to see a reduction in our total costs. But we are going to be affected by the (inaudible) kilograms that we're not going to produce during this quarter because of the incident. I think we will be making profit soon.

  • Graham Briggs - Acting Chief Executive

  • Justin, we're trying to stay away from the promises. Pardon me. We're certainly working hard at our costs. We have a quarter just behind us. We -- because we stopped contractors and consultants and the like. That often crystallizes payments so that payments -- everyone wants to catch up on their last two invoices and the like. And so there's some upside in our costs coming in this forthcoming quarter. But we will continue to work hard on reducing our costs. Unfortunately that will be reducing some of our service personnel. But we need to cut that cost. So I hope that answers your question on profits. I can't give you a date. I'm sorry about that.

  • Justin Brown - Analyst

  • Okay.

  • Graham Briggs - Acting Chief Executive

  • On the CapEx. The biggest single reduction in CapEx is in Papua New Guinea on the Hidden Valley project. And that was -- there was really two reasons for that. One is that there was a huge commitment for this year of ZAR1.8b. And that's been reduced to about, I think, ZAR1.36b. And -- so just over ZAR400m reduction.

  • Two reasons. We obviously we wanted to try and spread the load when we were faced with the capital expenditure. But one of the precipitating events was that (inaudible) is in a pipeline of -- a production pipeline that people ahead of us had issues with their law on welding. So that law delayed for four months. And really that's what happened there. So production on Hidden Valley has been delayed to March 2009.

  • On the rest of capital. Really, it's minor capital that we've cut out of the budget. I don't know, Frank, is there anything else you want to add on capital?

  • Frank Abbott - Acting Finance Director

  • Yes. The question was disposal of CapEx. Let's just talk about (inaudible).

  • Graham Briggs - Acting Chief Executive

  • Disposals. I think the disposals -- Randfontein is certainly -- we are evaluating all the options there. So disposal may be one of those options. We're hoping to clarify that, certainly in this forthcoming quarter.

  • What we did say is that we wouldn't dispose of anything until we'd done the review. We've now done the review. There are certain operations which are not making the grade. We're going to deal with those in going forward. But they, potentially, may be up for sale.

  • The one area, for instance, that's not making the grade is St Helena. There's a large transfer of people from St Helena onto operations that need labor. But we will have to review that in this quarter. But, really, the disposals, we're not looking at a disposal strategy of bit by bit. And we will have to continue that review -- strategic review of all of our operations.

  • Justin Brown - Analyst

  • Okay. Thanks.

  • Operator

  • Our next question comes from Martin Creamer of Mining Weekly. Please go ahead.

  • Martin Creamer - Analyst

  • Good morning, Graham. Congratulations on starting to bring your costs down. Just -- there seem to be two problem children that I would like you to deal with them. Give us some idea of what you're plans are. The one is the Target operation. How are you going to bring that to better account? And also the Conops. We thought that Conops was working well. You say they've problems. And does that mean you may actually cease with Conops in certain operation?

  • Also, just on your frills that you've cut out, could you give us a list of the frills that you've cut out? And also, with particular reference to the Harmony of tomorrow, what has happened to HOT?

  • Graham Briggs - Acting Chief Executive

  • Great. Thanks, Martin. Let me try and get through these in sequence. Yes. Target. The main issue at Target is really one of equipment availability. We've got some old equipment there. It wasn't replaced and some of those productivity hours are down below 40% of some of those units which is incredibly poor. And that's really impacting on production very badly.

  • We have put an order for some new equipment. Unfortunately because of the booming mining market, equipment availability is not something you can go into the showroom and get it, as you know, there's a fairly long delay. The first LHD will, in fact, come through in February.

  • We have since, though, boosted some of our maintenance labor on there. We've got a new engineer in there and -- to assist with that. And we're getting better productivity at the moment. But it's not where we want it. So unfortunately it's going to be a little bit of a journey on that one, with production not where we would prefer.

  • On Conops. Harmony's got a fairly mixed bag on Conops. We have some operations which are fully on Conops. And Tshepong is one of those which is fully on Conops. And it has worked reasonably well on Tshepong.

  • We have other areas which are partially on Conops. So not every operation is on Conops. We have some operations, and probably the poorest production unit on Conops is Masimong.

  • There we introduced Conops. And there was absolutely no benefit at all and what we're doing is we're trying to fix up before we see if we actually have to pull the plug on Conops on that operation. It's not a decision we'll make with -- on sort of a knee-jerk decision. So we've done all the evaluation. It's under close scrutiny. If we don't see improvements in the very short term we will change that back to a normal operation.

  • But Conops has been implemented sporadically in the Company. And in some shops it's actually only on half operations. Mostly people have been avoiding putting Conops into pillar-type operations where there's a slightly different safety risk.

  • On the floors, the floor that we've been cutting back in, it's always nice to have margin. The consultants that we've had, giving us various bits and pieces of advice, we've stopped those. We've cut back a lot on labor hire. My estimate is we've probably reduced about 2,000 to 2,500 people in labor hire during the quarter. And we have been cutting back on the things that do not make sense in our current area we're in.

  • And that would include what we'd call HOT, the things that you referred to, the Harmony of Tomorrow, which was all about not really mining issues, as such, but about all sort of things other than mining, we've cut and that department is no longer.

  • There are things like Harmony improvement platform which was run as a sort of central and decentralized. We've cut out the central so Harmony improvements are now on the operations and they're focusing on operational improvements as opposed to think-tanks in corporate offices.

  • Thanks Martin.

  • Martin Creamer - Analyst

  • Thank you very much. That was very comprehensive. Thanks a lot, Graham.

  • Operator

  • Our next question comes from Allan Cooke of JP Morgan. Please go ahead, sir.

  • Allan Cooke - Analyst

  • Morning, Graham. If you could just talk briefly, I know you're still looking at them, but talk about the options or talk around the options at Randfontein and at Cooke 3 in particular because you're now talking about underground and surface, so not just the surface dumps, and you're talking about gold and uranium as a package and not just uranium as a split. Could you talk around perhaps the options in terms of including underground and surface resource there, and gold and uranium as a package as a whole? That's the first question.

  • And then also this quarter you've restated your account and you've split out the continued and discontinued operations. Perhaps, Frank, if you could just give us an indication, it's the Orkney shafts and the Oz ops that are being sold. When will those sale processes be finalized, more or less? When do these come out of the accounts?

  • Graham Briggs - Acting Chief Executive

  • Good, Allan. Thanks a lot. Yes, our negotiations on Randfontein. I guess the way I've seen it is that we commenced with those negotiations, discussions at Randfontein, really focus on the Cooke dump. And we didn't have full information about Randfontein. We know clearly discussions are taking place. The exclusivity that we're in, all we've had a hook back into the underground potential in the words of let's see how we can optimize the underground potential.

  • That discussion was not truthful and we soon got the advisors helping us on that, but we've also been assaying, sampling underground and had independent, competent people looking at that who have been assisting us with declaration of the resource.

  • Now, if you obviously try and do the figures on this, we don't have a good handle on it with respect to the uranium economics, if you like, going forward on underground. But if you have a plant, uranium plant in this region, obviously there is a huge advantage on looking at the uranium potential as sort of a supplementary economic take off in some way.

  • The biggest single issue at Randfontein is that the gold and uranium ratio is not always constant, so you get areas where there's high uranium, but not high gold. On rest of the other parts [at Rand], there's a good correlation between gold and uranium. You could see that, for instance, if you were screening the uranium and gold separately, then if you were a gold miner focusing on the mine, you may give the guys in the uranium plant fairly low grades and they may not get full benefit of that.

  • So we're really trying to understand as well, as to which is the way to take this forward. There are many options. Obviously an outright sale is a possibility. But understanding the full potential of that asset is what we're getting it to now, but there are many other ways of looking at potentially joint venturing or partaking with some other company in some way, lifting it separately. I think there are many options there.

  • The one thing it needs to get built, and obviously capital requirements of that asset going forward would be to build a uranium plant if it was to go into that. So our thinking is getting a little bit more refined. We're evaluating those different options and hopefully we'll be able to come up with a final option that we select during this quarter.

  • On the discontinued operations, I can just talk a little bit about the sales and then if you've got an accounting question, I think Frank can answer it. The Orkney assets are going through condition of preference. One of those conditions is the new license. But from September 24 they've been operating that asset and they've got an agreement, basically a contracting agreement with us, taking over that asset.

  • The other discontinued are really the Australian asset. South Kal has been through conditions precedent with the Dioro deal. We're hoping that'll be concluded during early November. There have been obviously, again, conditions precedent take a little bit of time.

  • There's also nickel sales there that's similarly going through the same conditions precedent, although hopefully that'll happen in November.

  • Mount Magnet is up for sale. And we're expecting the final offer during the next week, in fact, from that asset. So we have made the decision to shut down those operations and that's why we have that date of January 2008 for the last production.

  • I hope that answers your question, Allan.

  • Allan Cooke - Analyst

  • Thanks very much, Graham.

  • Operator

  • Our next question comes from Muneer Ismail of Deutsche Bank. Please go ahead.

  • Muneer Ismail - Analyst

  • Morning guys. Hi. Just two questions. The first one is around Elandsrand. Graham, I'm not sure if it's for you or Frank, but looking at insurance, is there the benefit of having insurance on that? Is it still under investigation as to whether this was a maintenance issue? And what's going on there with Elands? I just want to know if we're going to get some sort of insurance possible positive coming out of this.

  • And then for Frank, just looking at comfortable levels of EBITDA, if you were to think of possibly partnering by Q1 of the calendar year '08 on Papua New Guinea, I guess that means less CapEx demand on your side. But what would you be comfortable with as an EBITDA level for the firm, U.S. dollars and rand? Could you give us an idea of what's required to basically match CapEx to what you face through this process?

  • Graham Briggs - Acting Chief Executive

  • Yes. Let me try and answer the part of the Elandsrand that I can answer with respect to Elandsrand, the incident and the event itself. Quite a rare event. You know what happened, what caused the accident was the compressed air pipe. It's a fairly rare size of compressed air pipe in the industry, very large ones, 700mm. Had a thin wall on the side of the shaft, so this part of the pipe that was on the side of the shaft. And this in fact blew the pipe away, the force of the pipe actually rupturing blew the pipe away from the wall and that's what created the break in the wall.

  • That's now -- most of that shaft repair work is done. The fans and the refrigeration was switched on about three days ago. And the investigation is still continuing. In that accident we're obviously including the health and safety committee as well as the DME in that thing.

  • Standard process in the industry is not to measure pipe thicknesses in vertical pipes. It does happen on horizontal pipes. And generally what happens if there's any debris in pipes, they tend to wear on the bottom of pipes so they get rotated. But that doesn't happen in vertical pipes.

  • We have got some people looking at the fluid dynamics, if you like, of the pipes at that particular point. So that continues to be investigated and we're hoping that certainly we'll have the findings before the guys are back in full production in November.

  • I'll hand over to Frank on the insurance.

  • Frank Abbott - Acting Finance Director

  • We believe that our insurance claim will be paid. We haven't included that in our figures. And we will be working with our assistants in the next few weeks to put our claim in as soon as we know when and what the total loss is for the incident. So we do expect that we will be paid for that. And our insurance covers us on both in outstanding costs, the costs and also for the profit we would have been making.

  • Muneer Ismail - Analyst

  • Okay. Good, good.

  • Frank Abbott - Acting Finance Director

  • In EBITDA, I've got our CapEx and expenditure if we were to partner (inaudible). It's not to have to spend all the capital at even value would be in the region of -- our total capital right now is about ZAR4b for the year. And if you take the ZAR1.4b off from given value, that gives you ZAR2.6b. And our EBITDA figure, ZAR2.6b so that we can pay all our capital.

  • Muneer Ismail - Analyst

  • Okay. All right. Great stuff.

  • Graham Briggs - Acting Chief Executive

  • If I can just add to that, we would always see, if we did partnering in PNG, there would also be a reduction in exploration expenditure as well as anything on feasibility that isn't in the figures at the moment in Wafi Golpu.

  • Muneer Ismail - Analyst

  • Can I just assume you guys are fairly well advanced on partnering? If you're talking first quarter of '08, it sounds like it's quite well on its way.

  • Graham Briggs - Acting Chief Executive

  • We've done all our homework. And I guess we haven't -- we've got a list of partners that have approached us. Those discussions are -- came on basically driven by the bankers and advisors in Sydney. But it's fairly well advanced. But we haven't actually got to the point of talking to individual partners. We're still at the selection stage.

  • Muneer Ismail - Analyst

  • Brilliant. Okay. Thank you very much. Good luck guys.

  • Operator

  • Our next question comes from Steve Shepherd of JP Morgan. Please go ahead.

  • Steve Shepherd - Analyst

  • Morning guys. A few questions here. Some straightforward ones. Could you update us on the startup and full production at Hidden Valley is the first one?

  • The second one is that you, Graham, said when you started in the job that you felt the mine core factor at the South African mines was some 6 percentage points below the long-term history. Could you just tell us what progress you've made on restoring your mine core factor?

  • And I'm sure you won't answer this one but I'm going to ask anyway, could you give us some sort of indication of where you feel the steady state production would be with Elandsrand included for the continuing operations in terms of kilograms per quarter?

  • And you've mentioned in the past that you're not comfortable with the front line management structure in terms of your coaches and that you were considering restoring that to a more traditional model. Could you tell us your latest thoughts on that?

  • And finally, and this one I'm sure you won't answer, can we have any linkage between the shaft pipe accident in Elandsrand and Conops in context of there being limited maintenance time in that shaft? That's it.

  • Graham Briggs - Acting Chief Executive

  • Thanks, Steve. Yes, good morning to you. Let me try and go through them and I'm going to try and answer all these questions.

  • So Hidden Valley startup is March 2009. It reaches -- and the mining is actually commenced several months ago so we've been stripping and mining and building dumps. Generally that's going quite well. There's, as you know, you've been there and seen the rain and so on, difficult conditions. But that's the startup date. It reaches full production within the two months after that. Drilling continues in both Hidden Valley pits and in [Wafi] pits and there's some upgrades in the [river] that we're expecting during the next while.

  • Mine core factor has certainly been an issue that has been focused on, as has everything really in the reviews of trends. Some areas have shown an improvement already in numbers of square meters swept and so on. But it's very difficult in the last quarter to see any effects of that. I'm hoping that that will continue to be a focus and we'll see the longer-term benefits.

  • Kilograms per quarter is, and this is the one that you said I wouldn't answer, but I think I must try and answer it, I think we should be in the region of somewhere closer to 18 tonnes of gold per quarter.

  • Steve Shepherd - Analyst

  • That's for the continuing operations, Graham, is it?

  • Graham Briggs - Acting Chief Executive

  • That's for the continuing operations, so excluding Orkney and Australia. So that's our target. And I'm sure that will probably come back to haunt me that one, if I'll say to you in the future.

  • Coaches, what we've done there is yes, we have commenced discussions with the union on reverting to a more traditional mine captainship boss approach. Those discussions have taken place. There've been several meetings. We're making some progress. But when you're dealing with those sort of discussions, it does take time so I'm hoping that we'll progress a bit further. I guess in a lot of these issues there's always frustration from our side that we don't get to our results quicker. But we're working hard on that.

  • The link with Conops and the accident in Elandsrand. We've actually an excellent link with Conops and safety in Elandsrand. Conops actually improved safety in Elandsrand. So the safety in Elandsrand since they introduced Conops actually improved.

  • The maintenance in the shaft was really not a problem. Obviously there's been a good look at all the information. That shaft did particularly well in our last audit. We do regular audits, as you know, on operations, and it includes the shafts. That shaft did particularly well in the last audit. So it's a very safe and very sound and a long-life production unit and obviously it's been getting a lot of press.

  • There's no link between the accident and Conops. As I said before, pipe thicknesses, the vertical shafts traditionally do not get measured and therefore this is a fairly rare event and I guess we'll have to wait for the full investigation to come out on that. But certainly in our minds that shaft has been maintained well. It gets investigated and looked at and inspected on a regular -- there's been a lot in the press which is simply not true. The linkage between Conops and the accident is just not there.

  • Steve Shepherd - Analyst

  • Thanks. Can I just ask one short one? The safety issue's been in the media a hell of a lot. Could you just tell me how you view this? How's the relationship with the DME? How do you see this issue being progressed because clearly stopping deep level stopes is a dangerous thing to do? How do you see this safety issue developing in the future?

  • Graham Briggs - Acting Chief Executive

  • It's a tricky one because I think that -- I think the gold mining industry, and certainly Harmony in the last while, can be fairly proud that it's doing a lot of things in safety. We are active on safety. As you know, when we have serious accidents, we are the ones that normally stop operations, but we don't normally stop the whole operation. We stop the area or the region or if it's in the shaft obviously we make sure that -- you know, those events are checked out on all our operations.

  • So typically, you don't try to get to one those issues where it was claimed in the media that the minister stopped the mines. In fact, we stopped the mines because we didn't have a shaft to go back. We knew it would take somewhere between three and six weeks to get it fixed and that's, in fact, what happened. You know who stops the mine and what happens.

  • But in any event, Steve, if you start stopping deep-level operations for a week, it takes you a week or maybe longer to get back. If you stop it for a month it can take you a long while because you've certainly got all -- you have to -- there's a lot of cooling. It takes you about a week and a half, maybe even two weeks in some of the deeper operations to actually get cooling into every place. So it becomes even more unsafe if you stop the continuous cooling and continuous safety checks.

  • So it is an issue. I guess if only the crime and the traffic would get the same treatment as us, then we may see some changing trends in those industries as well.

  • Steve Shepherd - Analyst

  • What I was really trying to get at, Graham, is the relationship as constructive as it always was in the past, in your view, with the DME or is -- I mean this is a difficult question to answer, I know, but is it a constructive process, in your view, that's going on at the moment?

  • Graham Briggs - Acting Chief Executive

  • I think we try and get as much out of these things as possible, Steve. And there are some very good technical guys in the DME. So we do get the benefit of that. So I think what you see in the press and what actually happens on a particular investigation is completely different. The guys, the technical guys in the DME give good value and do assist us. So there's good combinations there. That's completely different to the sort of PR.

  • Steve Shepherd - Analyst

  • Thank you.

  • Operator

  • (OPERATOR INSTRUCTIONS). Our next question comes from Shane Hunter of BJM. Please go ahead.

  • Shane Hunter - Analyst

  • Yes. Good morning. In fact all the questions I had have already been asked. But I just wanted to confirm one of them, and that was to do with Hidden Valley. Just to confirm as you said, though, that you're going to get the full production will be March, April, May. Would that be the 4m or so tonnes through the plant at that stage?

  • Graham Briggs - Acting Chief Executive

  • Hi Shane. Yes. the full rate production of Hidden Valley is 4.2m tonnes through the plant per annum. And yes, that's gets from the early thing goes through straight away because we'll have a good stockpile. So it starts up in March '09 and then gets up to full production within a couple of months.

  • Shane Hunter - Analyst

  • Okay. Good. Thanks.

  • Operator

  • (OPERATOR INSTRUCTIONS). Gentlemen, we have no further questions. Would you like to make some closing comments?

  • Graham Briggs - Acting Chief Executive

  • Thank you very much, ladies and gents, for joining us. I think obviously if you have further questions you know how to contact us. And thank you very much for your time and your questions.

  • Operator

  • On behalf of Harmony Gold, that concludes this morning's conference. Thank you for joining us. You may now disconnect your lines.