Gold Fields Limited (GFI) 2018 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

  • Good morning, ladies and gents, and welcome to the Gold Fields 2018 Annual Results Presentation. Before we get started, just a quick bit of housekeeping, fire exits top corner and the front door here. If you have to use them, please do so in a calm manner and meet out at front of the building. So today on stage we have Nick Holland, our CEO; and Paul Schmidt, the CFO. Nick will get up and give a quick presentation and after that, we'll open up for questions and answers. Thanks.

  • Nick?

  • Nicholas John Holland - CEO & Executive Director

  • Thank you very much. Good morning, everybody. Once again, happy new year well it's a bit late to be saying happy new year. I think we should just recognize, first of all, the tragic events in Brazil. You've seen the accident with potentially up to 300 people who've lost their lives. We've also had 84 fatalities in the mining industry in South Africa 2018. Could we just stand several moments of silence, please.

  • Thank you very much. All right. So the front page there is, we feel quite appropriate to show you that Salares Norte, a discovery in Gold Fields, has completed a feasibility study during the past year. This area here, we can feel the crisscross tracks of trucks. This is Brecha Principal, which is the highest grade portion of the total reserve. This is around about a 500-meter complex. This is standing on the hill looking down. It's very interesting landscape. The border with Argentina is on the other side of these mountains over here, 4,500 meters up in Northern Atacama Desert. That's -- we have to go where the gold is, and there is a lot of gold over here. We'll talk about it a little bit more later on.

  • All right. So what are the key issues? I don't want to blind you with too many stats and numbers. You can read the book to your leisure to get all of that. Key issues are South Deep went through a major restructuring during the course of 2018. We went through a process, which is known as a section 189, Labor Restructuring Process under the Labor Relations Act, and we unfortunately had to retrench up to 1,100 employees and around about 400 to 500 contractors in that process. That was on the back of retrenchments that were done at the beginning of the year.

  • We believe we needed to rightsize the operation. And given that South Deep had not achieved production targets over a long period of time, I think everybody knows that, and that's why we respond. So we've rightsized the cost base to where we sit today in terms of production to the run rate we had, pretty much before the restructuring kickoff. And that's meant that around about ZAR 800 million a year has come out of our operating cost base and around about ZAR 400 million a year out of our capital base. And that's going to put us in a much better position to, first of all, stand the operating losses, but also to focus on short-term delivery. We've severely constrained our footprint. We've taken out a lot of the low-grade areas in the old, scattered mining part of the mine. If you can recall, in the old days when South Deep was conventional, we used to destress above and below the ore body and then develop in and mine it. So that's not what we're doing now. We're actually distressing on reef and opening up the ore body and mining a bulk nonselective process. So we want to move more towards that into the future.

  • So a tough process. Fortunately, no one was killed. I thought at some point we might have fatalities. Because there was a lot of industrial accident sabotage, trading centers being burnt down, et cetera, but fortunately, we got through that. First time we've done something like this at South Deep. So I do believe this will set us up to have a new start on the asset.

  • Tarkwa also a major year for them because they've moved away from contract -- from owner mining rather to contract mining. I'm amazed that we got through that without any hiccups. Production came in slightly ahead of guidance for the year, so the teams did a great job. And we've done that really to reduce our cost base, given that Tarkwa was extremely sensitive to cut-off grades. And given the fact that we just couldn't keep sustaining the high rate of increases that the contractors were -- that the employees rather were looking for. So -- and this is the model that's pretty similar now to what you'll see other mining companies doing.

  • Damang outperformed significantly over the year. We're ahead of plan on the project, which is really good news, and they're looking for another really good year ahead. Gruyere slightly late. What I can say is that, as we speak today, we're probably about 93% complete, so we're getting close. The outstanding work is really electrical and piping. All of the stuff we need is on-site because obviously, this is over 1,000 kilometers from Perth. It's a fairly remote site on the eastern boundary of the Yilgarn. So a long way to go, but we're getting close to that now and really is a first-class operation. I'm sure, at some point, we'll be arranging a trip for people to see that.

  • Asanko, we bought 45%. In Asanko, why did we do that? Well, first of all, it's in a country we know well, Ghana, been there for 25 years. We see a very prospective gold share. We see significant potential on Esaase and particularly into the future.

  • Salares Norte, feasibility finished. I'll talk about that. Cerro Corona, we've extended mine life, and we're looking to do that again. That's pretty important because it's one of our lowest-cost producers. It's consistently outperformed. And just last year alone it made a $114 million of bottom line cash on the back of just over 300,000 ounces of gold equivalents, so really a super operation that's served us well.

  • Balance sheet. We've taken some strain off the near-term liquidity by rolling out a term loan on the same terms, but we'll talk about financing later.

  • Dividend, of course, let's not forget that. Even though it's been a more modest year from an earnings perspective, we still pay the dividend. If we look at our track record over the last number of years, we've continued to outperform our cost guidance, and we've done it again for this 6th year in a row. This year, we were slightly off in the production, but I guess, in the context of South Deep, really losing 4 to 5 months really of production, I suppose, to come within 4% of the original guidance is not a bad outcome overall, and we've got to give thanks there to the international ops who've come to rescue there.

  • Looking at our cash. So if we look at the mine cash flow, this is what we like to show people is where is the money made, where does it go. You can see the mines in the group last year made $334 million. If you add back South Deep, that figure is somewhere around about $480 million. So the international mines made about $480 million, very similar to what was made in the previous year from the international ops. And how did we put that to work? We've got the Damang investment of $125 million. We've got some modest South Deep capital. We've got obviously the Gruyere project. This was always going to be the peak year 2018 on the project spend, and it's proved to be, but at the same time, we're getting closer to the finishing line. Salares, here's all the money on the studies and further infill drilling to prove up the ore body. Also some district exploration drilling as well to look for the next Salares around the area we're in. Obviously, interest on our debt and that takes us to about $132 million. So I think it's worth putting into context that over the last 2 years, we've spent over $600 million on growth, and we funded about 80% of that from internal cash flows. $134 million has been our net leakage. Paul and I knew this was going to be the case. In fact, it could have been worse, but this is now putting us in a very strong position to bring these projects through. And you'll see later that our capital spend in 2019 is going to come down significantly, our production is going to go up and that will have a beneficial impact on all of the metrics.

  • You can see over here, here's the capital. The green is the project capital at the top here, the blue is the sustaining. You can see that project capital picked up a lot over the last 2 years, not coming off. Sustaining is also coming down a little bit as well. We're looking at a significantly reduced capital spend, as we said it would be, in 2019.

  • The balance sheet, as we mentioned, we turned out that loan. What that means is that in 2020, we have a significant amount of maturities. We got $850 million net on the bond at the end of '20. And we've also got some other loans around the group. We have an Australian loan that also matures in that period. And as Paul has indicated to some people outside, we will be looking to refinance the bond and potentially also the semi-guided facilities during the course of '19 so that we can push this out. We don't envisage a huge problem with that. We have had an upgrade in our credit rating last year, which has helped us. Obviously, the market has got to play ball, but maybe the comments about the Federal Reserve of late are going to help us to do that. But it's not just turning out the debt, we've got to bring down the debt.

  • We've invested heavily into projects. Now we got to show some of the cash flow coming back, bring down the debt, pay some high dividends to shareholders on the back of high profits and leave something for working capital and other things that we might need.

  • Hedging. We made some good money on hedging last year, generated realized gains of over $50 million, which helped to underpin the big capital spend that we had. We're doing the same in 2019. I don't think that you should read into this now, but this is going to be a recurring fee, and certainly we would be extremely nervous to be going out long, because it's a guessing game beyond even 6 months here. So we've locked in really all of the Aussie production at a weighted price of just under AUD 1,800 for the year. And there's upside potential on most of that as well in terms of the collar structures. We've also hedged just over half of the production forecast on South Deep at ZAR 617,000 and that was compared to our planning price of ZAR 525,000. So that will certainly help us and particularly given that our guidance on South Deep is just under 200,000 ounces at all-in cost of about ZAR 610,000 a kilogram. As you can see, putting hedges in on that sort of level is going to help to underpin that performance.

  • So looking at the group then. Overall, our production for the year 2.04 million ounces. That is better than the previous updated guidance, we've given of about 2 million ounces. So we're able to get to almost 40,000 ounces more in the end, which is great. I think if you look at the Americas over here, you can see why the life extension is important, $699 all-in cost, 314,000 ounces making of $114 million of cash. We look at West Africa. Before the project, $149 million of cash. And of course, Australia, making almost to a $200 million of cash, U.S. dollar terms for the year. So on Aussie dollar terms, that translates to almost AUD 300 per ounce of bottom line cash flow. If you compare that against the other Australian producers and we've done the analysis, we look pretty good. And this is where some of the cost reporting, I think, is a bit distorted. And others will say that their cost is a lot lower than us. But in fact, they don't make any more cash than us. And as I think there is definitely changes in how people -- differences, changes and how people define their cost, what is above the line, what's below the line, et cetera.

  • We all know cash is king. If we make the cash, the cash will tell you it's there or it's not there. Again, South Deep, of course, a very difficult year on the back of the restructuring, but we've reset the base. We've knocked our cost down a lot.

  • So reserves. This is the approved numbers. We don't have the mineral reserve and resource supplement ready yet that will go out with the annual report at the end of next month.

  • But I think importantly, the takeaways for me is that we've put back a lot of what we mine in terms of total gold reserves, which is the 0.5 million ounce difference, that's a big takeaway. The second big takeaway is that on the international operations, we're now sitting with about 20.5 million ounces made up of these 3 blocks over here: 7.5 million ounces in the Americas, 6.5 million ounces Australia, similar number in West Africa. And if you look at that in the context of what we said that the international mines, we believe, can sustain about 2 million ounces a year for 10 years. We've got 20 million ounces reserve to back it up. And remember, there is no Asanko in here yet. Asanko's numbers will come in the second half of 2019.

  • We have taken a downgrade on South Deep. There's a 4.6 million ounce reduction. And their reserves, so on an attributable basis, if you take out the minority interest to BEE deal, it's just on 30 million ounces compared to 34 million ounces.

  • And that's really 3 areas. We've taken a more conservative view on our mining recovery factors in our slopes. So that's knocked out around about 1/3 of that reduction. We've worked on a higher cut-off grade. North of Wrench, we've taken from about 3.8 to about 4.1 grams a tonne, which is meaning that essentially we will go for the better grade stuff. And that's a function of the fact that the production build-up has not been honored over the last few years. We've taken a more conservative view. Notwithstanding the fact that we've dropped the cost significantly. And then, we've also put in some geotechnical losses. We've seen that there is a number of dykes and faults across South Deep, 2 in particular that we've encountered. There's been a Grey Ghost dyke and the Fargo faults. We found that we've needed to put bigger bracket pillars around those dykes. We know that they exist through the ore body, and we've taken a conservative view using what we know in the areas where we have to bracket as a proxy. We've applied that across the ore body and that has knocked another 1/3 out as well. Whether or not that translates into reality in time, we'll see. But I think the team have adopted a cautious approach to that. We've had this audited as well as just so that when you see the R&R report, we've had it externally reviewed this year, that's a robust process. So these numbers are not just our own internal numbers, these are numbers that external parties believe are achievable.

  • Right. So what is the global growth or exploration highlights? And what we try to do instead of giving you a whole bunch of slides with intersections and various colors of different lithologies, we're just going to give you some brief highlights. So if you look at Australia, Granny Smith, we've grown the resource by 4.5 million ounces since we bought it. Reserves by over 2.5 million ounces. We're sitting here now at about 2.3 million ounces of reserves but we're sitting with about 8 million ounces of resource. We've got to start converting more of that resource to reserve. So the focus now will be more on the infill drilling over the next couple of years, particularly as we look to convert portions of 135, 2.5 million ounce block and eventually, 150 into reserves. But certainly, there's significant potential out of Wallaby still ahead of us.

  • We're looking outside of Wallaby, because strategically, we have a 3.5 million tonne per annum plant, but we're only putting through about 1.7 million tonnes a year. That we can find more to put through the plant by looking at opportunities around us, that'd be great.

  • I'm afraid it's a long gamble. I'm not going to be able tell you the next year or the year after, we'll find stuff. But I think we should work on the next 5 years, and hopefully, we'll have something that will come in to supplement Wallaby.

  • At St Ives, Invincible continues to grow. We've got over 2.5 million ounces to find in Invincible. We're seeing that Invincible continues at depth. It continues on strike. We've now got Invincible South that we're developing into, and we got Invincible Far South that we're into, and we got multiple anomalies, visible gold intersections on the 30-kilometer speedway trend that runs through the lake.

  • We're also doing something different. We're going back to the old mined areas. Victory was a large complex that was mined, around about 10, 15 years ago. And what we've down there is we've done a seismic survey to identify structures that are very similar to the structures that we mined. That will enable us to target framework drilling, get a better color in those areas and I think we'll find more. The best place to find gold is where you've mined gold. So we're not done in this area. And I'm really excited about the fact that we did the joint venture with Lex solicited company, so that's added another around about 1/3 to our land package to the east. And we're seeing very similar kind of structures, shear zones, which host a lot of the ore bodies in St Ives. As you know, most of the ore bodies at St Ives are found on the 3 parallel shear zones that run through the property. We're seeing anomalies like this replicated in the Lex property. So whole bunch of framework drilling is going on there. I think we're going to find a whole lot of new targets for us in the future.

  • Agnew. I really thought Agnew was going to be a dead duck a couple of years ago, and now I think it's going to be a fantastic mine for us for the next decade. Why? Well, a lot of focus and a lot of exploration. The more you explore, the luckier you get. And certainly, they found a analog to Kim, called Waroonga North, which is 500 meters away. The beauty is we can use a lot of the same infrastructure to get in here and that's extending further down and laterally.

  • Redeemer, which again is an old pit we mined. We back folded it and then we found an offset to Redeemer underground and that's starting to grow to between 0.5 million to 1 million ounce deposit. I'm hoping that we'll get an inferred resource of sorts declared at the end of this year.

  • New Holland continues to give. In Ghana, remember the Tarkwa is a palaeoplacer style ore body. Simply put a whole bunch of stack conglomerate reef packages on top of each other, very similar to the Wits Basin. What you know about the Wits Basin, keeps going.

  • Similar here. We're seeing around 3 to 5 kilometers of additional strike and total strike length of all of the pit series probably of the order of 12 to 15 kilometers. That gives you an idea. Tarkwa's been a 20 million-ounce ore body for us so far. It's truly one of the premier ore bodies on the globe. So I'm very pleased that Tarkwa, got a mention when Barrick and Randgold mentioned their deal, we got a mention, so good to be recognized by somebody else. Great mine. I'm pretty sure this is going to be around for a long time.

  • Damang. There is further extensions to the north of Amoanda. I've got a slide and also we still have a potential to go deeper. Asanko, I've talked about, is really about getting Esaase further up the curve, but also starting to drill the targets in the area. They've only explored around 7% of the land package, and we're seeing some good intersections on ground that we picked up.

  • Peru, we need to go beyond 2030. We think we can. We've got a study now going on for 2040, and we should have some results on that towards the end of the year.

  • Right, so I'll go through this reasonably quickly. ESG highlights. Regrettably, we have 1 fatality at South Deep during the year. With that said, though, we had our best out of South year across the group at 24% improvement on our total injuries across the group, so that is the best performance for the company. And if you look at these injury rates now, they're probably about 60% better than what they were 4 to 5 years ago.

  • We are spending a lot of time and effort on host communities, particularly in the areas of procurement and local jobs. And let me just talk about tails dams. Obviously, this is a major risk for the mining industry and one that is on our radar. We've had all of our tails dams reviewed. There is a guideline from the International Council of Metals and Minerals. We are a member of that. We're one of the few companies that is a member in this country, one of the few mining companies to be had certified against that. If you recall the dam failure in Brazil, it was a decommissioned upstream dam. Essentially, those are dams where you build a dam on top of tailings.

  • Okay. We only have one active upstream dam, which is Granny Smith that we're watching very carefully. The rest of our dams are downstream, which essentially also means we use the topographical contours around you to provide the base and the stability. That's good news. And then the other thing is Salares, of course, we'll have very little moisture in it because it will be dry stacked tailings. I do think the landscape on tails dams is going to change. I think you might find that upstream dams could be outlawed. I think over time -- and I'm part of the ICMM Counsel along with 30 other mining CEOs across the globe. We do want to move away from conventional wet tailings over time. And I think that program will get more impetus on the back of -- not just the accident in Brazil, but there was a previous one in Brazil. And then there was obviously one in Canada prior to that as well.

  • The other thing that's really good to see is, we're able to use old pits for tailings. And we're doing that in Australia at the moment, and we'll be doing that also at Cerro Corona, that's part of the life extension exercise. And at South Deep, we're actually mining the old tails to put through the plant to create some backfill while we get the underground arisings into equilibrium. That's another way of getting rid of the liability. But watch that space.

  • So approaching the inflection point. 2019, we believe is going to be a positive year in the context of all of the work we've done over the last 2.5 years. Our project capital comes down by half, as you can see here, from $290 million to $143 million. We expect the business to turn cash flow positive in the second half, particularly as Gruyere comes into production as we see Damang ramp up as well. So that's certainly going to help us. And as their capital comes off significantly after the first half of the year or so. All of those things come together.

  • Gruyere first gold, as I said, quarter 2, and we start getting into the Saddle area of Damang in a big way even in quarter 1, never mind quarter 2.

  • Salares. We have to work through the EIA process, Environmental Impact Assessment. That's going to take us at least until the middle of next year. If all goes well and we get approval, we could start building the project after the winter of 2020, which essentially would be around about October. That's not far away. In the scheme of our business, it's actually credibly close.

  • I've talked about the -- how the global portfolio, how the regions are now getting to critical mass. You look at the top companies around us outside of maybe the 2 big ones now that have emerged, you're a good company with that kind of number even without [SART].

  • Also on Damang, I think very quickly that picture tells all the stories. This is the western wall. This is the eastern wall. You can see it's come down a lot. This water at the bottom here will be pumped out. So for those of you who got to the mine for a visit at some point in the future, you'll see a very different Damang from what you see today. And the bulk of our mining will be around these areas. We will take these down and get down to that center point. And of course, it's still open at depth. We haven't found the bottom of this particular ore body.

  • So what's good about 2019 is our guidance, 218,000 ounces, which is up about 40,000 ounces from this year. Importantly, all-in sustaining below $800 as the grades go up, all-in costs down $400 an ounce -- $1,100. The project capital of about $69 million to be spent.

  • So we're looking at the unconstrained. There is at least 2 million ounces here. There is a resource of over 4 million ounces remaining. That's I think conservative. And on Amoanda, which is on the same trend, Amoanda is on the same trend, it's just up to the north. We are seeing further extensions, and I can show you here. So there is a cross-section. We finished mining that pit. We're mining that pit. We'll be getting into here. We're seeing further extensions over here. And you can see, if you look at our plan view, there is pit 5 over there. We've done some drilling there, that looks promising. Done some drilling there, drilling to be planned here.

  • That whole area there is about 1.2 kilometers of strike, which is longer than what the whole pit is. This is given us somewhere around about 300,000 to 400,000 ounces. There is potential here for the same again over time, which is not in our numbers.

  • On Gruyere, you can see a picture at the bottom there, a lot of the plant construction points. There is the tails dams in the background. These circulars tails dams are not unique to us. It's quite a commonly used methodology in Australia. So we're getting close, as I mentioned. Our total forecast on the project is AUD 621 million. If you look by the end of the year, we've spent most of that. We're getting close to the end of this spend. We're still good for that number. As we speak, and as I say, we'll look to finish the project and ramp up in the second half of the year.

  • So we've given guidance of around about 118,000 ounces from total project basis, of which our share is around about 59,000 ounces for ourselves. So the remaining project capital there AUD 129 million. That's 100% basis out of the AUD 621 million. As you can see, we spent about 80% or so by the end of the year.

  • Remember, it has a 12-year life, we've up the production to 300,000 ounces a year. And we'll obviously do that because we've put in a ball mill that had spare capacity. So we're taking the annual throughput from 7.5 million tonnes a year to 8.25 million tonnes a year. And at the same sort of grades, that will give you higher production and it will come in with cost of just over AUD 1,000. And bear in mind, the spot price today is AUD 1,800. That's not a bad -- almost $800 an ounce margin on this project with significant upside potential in the resource and inventory around us. So in early there. Downer have started mining, which is the contractor that we're using. They've done all the initial strip, and they've already stockpiled about a 120,000 tonnes of ore. I think when we do commission a plant, the ramp-up hopefully will be reasonably quick.

  • All right. Salares. I've mentioned a lot of this already. The feasibility study was finished. Brecha Principal and Agua Amarga, again, there's that photo again of Brecha Principal. Agua Amarga is just to the back here of it.

  • So what are we looking at, 11.5-year life? Maiden Reserve declared 21 million tonnes at 5.1 grams. To get a 5-gram open pit anywhere in the world is unique. And normally open pit are like between 1 and 2 grams if you're lucky. This is 5 grams.

  • We've got a silver credit, which good and bad. Good in the sense that it gives us a higher equivalent gold reserve of 4 million. Bad in the sense that we have to put in a separate process flow to capture that, otherwise we'll suppress the gold recoveries. So it's Merrill Crowe process. Your classic sink precipitation, commonly used in the industry, been around for years. And then the tails from that go through a conventional carbon and pulp process. And then filtered compressed tails and then on to the tails dams which is built on the west. The west would be the base. Dam on that lined with sufficient bundles all around it. And it's probably overengineered. I don't think it's going to be a big risk. It is front-ended because what we're going to do is we accelerate the mining. Why do we do that? Because it's the best economic outcome to fine mine as quickly as you can. So you probably mine of around 7 years. You stockpile and we've got enough space to stockpile and then we preferentially feed the higher grade through, that gives us the best economics. Notwithstanding, obviously, mining quicker gives you a working capital investment. The higher grade upfront more than offsets that. We've done gazillions of iterations of these numbers over the last year, so we're pretty confident.

  • Good project, I mean, this will be in the lowest quartile of costs. As you can see over life, we're talking about $545 an ounce. If you include the upfront capital, $785. So I mean, this can work at much lower gold prices, and the reserve is very inflexible to lower prices. This pulls up at a significantly lower prices.

  • Capital of $834 million, that's in real 2018 quarter 4 terms. And as I said, over the year, first number of years, we'll get about 450,000 ounces or so over the first 7 years and your cost would will be somewhere around about $465 an ounce. So it'd be a short payback, 2.2 years, IRR of about 25%, NPV of $650 million.

  • This is recognized globally as one of the top discoveries in our space. And I can assure you, there are no shortage of other gold companies that would love to get their hands on this. So obviously, we have to get the EIA process complete. We've got to work out a funding plan, because it is a lot of capital to spend, and we have to make a decision. Do we go on our own? Or do we go with a partner? Or do we do some innovative financing structure that can take the sting out of $800 million being spent over 2 years? And that's going to be the job we have to do.

  • On-site diesel power, because we're far from the grid. We've got water secured. We've got 3x the water we need in surface boreholes about 12 kilometers away. I wouldn't let the guys proceed with the study without that, because you run out water up here in this dry arid area, you have no project. You can have the most wonderful grades but water, no mines. So we had to get the water. It took 2.5 years to get the water discovered and permitted. In fact, even more, 3 years. So I'm glad we got that done.

  • So that's where we stand on Gruyere -- on Salares. So here is the cross-section. Here's the Brecha itself. Brecha is basically fluids coming out under extreme pressure and then being broken up and being disseminated back in here. And you can see the high-grade areas are the purples and the reds and the orange, then low-grade areas are the yellow. Here is Agua Amarga. That's a flatter ore body that sort of runs. Now if you could see this 3D, doesn't quite run through, it runs alongside it, behind it, that's in front over there. That's about 500 meters. This is probably about 1.5, 1.7 kilometers in total. Some people have said, "Well, okay, it looks good, but is it enough, to keep going?" Well, to start, with besides the fact that it's a 25% return, here is Salares over here.

  • This is a 20-kilometer distance. The green and the red are properties we either own or we have options on. And we've got some interesting drill results in some of these properties. And this has got all of the potential to be a camp. Very similar to other high sulfidation epithermal styled ore bodies that have been discovered and mined in this whole Maricunga belt that straddles Chile and Argentina with many mines, and you will know them if you look around. So -- but it takes time. We are spending about 40% of our budget this coming year on drilling some of these targets so we can add to that 4 million ounce reserve base, but it will take years. It's not a 1-year journey.

  • All right. So I'll leave these for you to go through. Here's the tonnes treated. The gold grade, all-in cost, the tax regime is your right of capital of life. Tax rate is 30%. There is a 1% third-party royalty, and there is a 0.5% royalty based on mining profits, as I said. So hopefully, this gives you enough to try and model this out and do your own numbers, if you so wish.

  • Asanko. I've talked largely about what we're trying to do here. Esaase is up here and Nkran, Dynamite Hill, Akwasiso are down here, the plants down here. So this is the potential that exists in the north here. Of course, we got 30 Ks of distance between Esaase and the process plant. Process plant can do about 5 million tonne a year. We're quite pleased with the work they've done in getting that process plant to where it is. It's in pretty good shape. Recoveries are good, plus 90%. Processing costs are pretty good. They benchmark well against what we know. I think we got to find what is the best solution here.

  • What it comes down to is, if Esaase is going to be quite large. I mean, let's assume for arguments like this could be a 3 million ounce plus ore body, significant tonnes, then you may decide to do a conveyor option down here. If it's going to be smaller and you go for higher grade but lower tonnes, and it might be more suitable for a tracking solution. And a tracking in Ghana, of 30 Ks is, by no means, impossible. Obviously, you have to clear away some jungles and trees and swamp but it's not impossible. So we're looking at those options. The idea is we'll come back in the second half of the year with our joint venture partners and figure out the best way for us to go forward.

  • So here is the photo of Esaase. I was up there in December and sort of stood up at the top here. This is the ramp going up. And one thing we found when we did the ramp, that was all mineralized. And when we got to the top, the ore body was not supposed to dilate, but then we did some grade control drilling, and in fact the ore body dilates so you get mineralized intersections, which are quite good all the way down. And you can see, it's very soft oxides to start with. So it's going to be fairly cheap mining for us. Here's the RoM top pad over there, so it comes down here. It's about 100 Ks north of Damang. And then from there, it goes on the road at the moment. So this year, we're going to do about 1.5 million tonnes out of Esaase. That will go on the road as we look for longer-term opportunities.

  • All right. South Deep. I think I've talked about most of this up front. But if you look at the beginning of the year and the end of the year, this actually what we've done in totality. We started the year '18 with almost 4,000 employees. We ended with under 2,500 because there was other restructuring too. Contractors, we started with 2,300. We ended with 1,700. But in fact, by quarter 1, quarter 2, that figure will be 1,500. So we will be 4,000 in total from something like 6,000, 6,200, 6,300 that's a big reduction in people.

  • We've obviously kept the fleet and having too much fleet could be a hindrance as oppose to benefit, from 98 to 66. What Martin is doing is, I think it's very sensible, he's going to bring them out of the mine, and he's going to have them locked up. And I think the key will be somewhere in his top drawer. Nobody else will be able to get to it. And that will enable us to recondition, refurbish a lot of that fleet and stop spending a whole bunch of money down the road on buying new fleet.

  • So it's going to have the added benefit of reducing further capital. But at the same time, better focus on short-term maintenance and operating. If you got less to play with, you're going to be more careful with how you deal with it.

  • Low-grade sections, as we mentioned, have been taken out. That is a big footprint we've reduced. That is meant that we can take the south shaft and actually turn it into a single shift -- shaft with only services. And the backfill pipes have to go down various water reticulation, et cetera and cuts a lot of the cost out. And the new mine development, we were ahead. We're quite happy that we could take a breather while we consolidate our position. So ZAR 800 million is out of the operating cost, about ZAR 400 million out of capital. And we're going work on a basis here. We earn the right to spent from here. Let's get short-term delivery, we earn the right to spend and invest further. That's the way we'll do it from here.

  • Okay. The key enablers. These are the things that will make the difference. These are the lead indicators. Backfill. If you don't backfill, you can't mine. We have to backfill. Ground support. You have to make sure your ground support follows on.

  • Improved drill and blast. What we mean here is actually making sure that it's per design and that we create nice cavities, nice smooth hanging walls, side walls, because if you can't get that right, it makes it hard to do ground support. It makes it hard to mine from there because we use that platform to create the open stopes.

  • Fixed infrastructure. We got to keep an eye on the fixed infrastructure, make sure that the shafts, water reticulation, power, chips, boxes, ore passes, look after all that stuff.

  • Improved fleet availability and utilization by pulling it back, I think, we'll be able to achieve that. Flatter organization structure we've moved towards. Performance management. Making sure people understand what they've got to do and deliver it.

  • Those are the key things, right. So for this coming year, we're looking to get up to as high as 7% higher than what we've achieved in 2018, as you see those growth projects. It is a tale of 2 halves. The capital will come down in the second half and production will go up in the second half. Those projects come through. All-in sustaining then around about $980-ish. All-in costs, round about at $1,075, that is to say, tale of 2 halves.

  • The focus areas. South Deep. We talked about Gruyere first gold, quarter 2, let's ramp it up, Damang. Let's ramp it up, Asanko. Let's work out the longer term solution for a very exciting addition to the portfolio in Salares. Let's advance the detailed engineering, let's do as much of the planning work upfront. That will reduce the cost and time later. Come up with a funding plan, get the EIA process done and then we'll see where we stand.

  • Just briefly at the end, I'll leave this for you to read. We are member the ICMM. Why is this important for us? Because this is the cornerstone of how we run our operations. We focus on 10 sustainability principles, 7 position statements, focusing on health, safety, environmental stewardship, stakeholder management, human rights, diversity, you name it, and we report on those things, and we have them externally assured. And you'll see that when you read the annual report.

  • Good. I think that's probably as much as we should say. And then I think we can leave it to any questions that people may have. Thank you.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Some questions here. Then we'll take from the conference call webcast. Yes, Yatish.

  • Yatish Chowthee - Gold Analyst

  • Can I have a mic?

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Yeah, I think.

  • Yatish Chowthee - Gold Analyst

  • Avishkar, it's Yatish Chowthee from Macquarie. Nick, 3 questions. Two on South Deep and one on Salares. Just quickly on the South Deep slide that you put up on, on Slide 25. Some of those bullet points we've seen on numerous occasions, and perhaps also directed to Martin is, although you've done the restructure, what confidence do you have in the current employees and management on the mines who actually -- for some of those materials -- for those points to actually materialize, things such as improved fleet availability, utilization has always been a recurring theme, fixed infrastructure. These things have been there for a while. What makes it different now? And then just secondly on South Deep. When we talked about the international operations, a lot of companies, including yourself, talk about being -- assets being at $800, $900 all-in sustaining cost number. If you look at South Deep, what would be your long-term all-in sustaining cost number that you could provide us with?

  • Nicholas John Holland - CEO & Executive Director

  • Okay. I'll answer the second question. I think Martin is here, so it'd be good to let him give his perspectives on the first question if you're okay with that. Look, we want to get South Deep down to $900 as well. That's the longer term strategic goal of this group, and it's stated in the annual report last year. And I think you'll see it again in the annual report for '18. That's where we need to get to because gold prices will be volatile. Whilst people may be talking gold prices up, for the 20 years, you know that they will go up and go down. And so we think that's the minimum or the maximum amount of spend per ounce. We need any asset to be at over tonne, so that's no different. That's ideally where we would like to get to. In terms of the initiatives, Martin will talk to it now. But I guess, it's focus on the execution side that we're tightening up.

  • We've always know what we have to do with the execution. And Martin's got a number of particular initiatives that he's putting in place. And maybe we can just give him a minute or 2 to talk about this.

  • Martin Preece - EVP of South Africa

  • Thanks for the question. These are old story, and I think the difference this time is that I think the nature of restructuring. We've taken, I think, really bold steps to completely -- if you look at the business, we started the early part of last year, looking at senior structures on the mining [product] that now restructuring at the bottom. I think we've taken complexity out, taking a lot of the low-grade areas off. Talk about infrastructure, the key component of our infrastructure is south shaft which now I need to use for servicing. These are product to maintain and look after that property. I think through our selection process, one of the focus was fewer better people. So we thought to retain the better people in our teams with better capability. And my past experience and what we're seeing now, is we take complexity out, reflecting 30% of your fleet after [large] and what narrow focus. And in supporting that, we brought in 2 organizations -- Australian organization on maintenance specialist, to help us get the right focus on particularly the fleet maintenance but all the maintenance across all the infrastructure. And then coming out of the restructuring, you've got a big drive on what we call a front line productivity interventions of 4 to 5 companies that are [ORM]. We'd be working with teams that gives self-directive work principles embedded and if you talk about the performance management. So getting teams to take courage, understand how their objectives test fail and hope to deliver the organization's objectives.

  • Yatish Chowthee - Gold Analyst

  • So no -- any pushback from the Aussies coming in?

  • Martin Preece - EVP of South Africa

  • Any?

  • Yatish Chowthee - Gold Analyst

  • Any pushback from labor or organizations as the Aussies are now coming in to help fix South Deep?

  • Martin Preece - EVP of South Africa

  • These people that are coming from Australia, these consultants that are helping us put our maintenance management system together. They aim for a very short durations in a long-term thing, just helping us build the background. I think in terms of organized levers, as much as it was, I think -- it's really acrimonious during the restructuring. We pulled up a -- I think it all ended well and worked well with the national and regional structures of the National Union of Mineworkers. I think they've shown great maturity and helped us broker a deal towards the end of the year. And we've been -- one of the conditions of the settlement agreement was renegotiating a host of our political agreements. That's progressing well and is progressing very constructively, I think.

  • Yatish Chowthee - Gold Analyst

  • And sorry, Nick, then just the other question on Salares Norte. On the $850 million CapEx that you indicated to us. On the processing side of things, will the processing plant be both on a modular basis, given that you are going to transition from oxide transition to sulfide? So at some point, is it going to be another -- a bit of CapEx coming in as the sulfide ores come through?

  • Nicholas John Holland - CEO & Executive Director

  • Okay. So just to be clear, there is no sulfides in here. This is only oxides. There is a sulfide potential ore body at depth. I think the thing there is we would need significant modifications to the process configuration to deal with that. And to be frank with you, I'd rather go out and down at this stage. I think if we can stick to oxides, that will be better. To answer your question though, it's not a large plant. I mean, 2 million tonnes a year is not big. I mean, you look at Tarkwa, Tarkwa is 13.5 million. Gruyere is going to be 8.25 million. 2 million tonnes is not big. So yes, we have done it on a modular basis. So if we wanted to put another line, we could do so. So if we're lucky on the exploration side, and we could see in time, and let's say for argument sake, I'm not saying there is, but if there was 8 million ounces here, then clearly we'll have to look at whether in fact instead of mining that over 25 years whether you bring it forward, you get economies of scale et cetera. But I think that is for another day. So just to be clear, no sulfides in here. The plant is adequate. There is no further capital required to deliver what we said here, this was all in the study.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Adrian?

  • Unidentified Analyst

  • Mr. Holland. Nick, is it my turn?

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • No, but you can carry on at the time, carry on, and then we'll go to...

  • Nicholas John Holland - CEO & Executive Director

  • You can carry on, [Ruby], you're in.

  • Unidentified Analyst

  • Can I go?

  • Nicholas John Holland - CEO & Executive Director

  • Yes.

  • Unidentified Analyst

  • Mr. Holland, you mentioned that this year you would be refinancing your long-term debt. It needs to be pointed out that noncurrent liabilities went up $340 million from the year before. So I'm assuming that the portion that you intend refinancing is the $1.587 billion from the years before. What are the current arrangements for repaying that? And to what extent do you intend extending the terms of payments? Because I'm assuming that's the refinancing portion you're referring to since it's highly unlikely that you'll get a better rate of interest.

  • Nicholas John Holland - CEO & Executive Director

  • [Ruby], we're going to -- refinance the bonds, it's $850 million outstanding on our bond, our U.S. dollar bond, that could be done during the year. We also have a term loan in an Aussie facility about $1.27 billion. That will also be refinanced. We're looking to do a minimum of 5 years so we'll extend the maturities out to around 2024, 2025, and that's on the full amount. You refinance the whole package. So the bond obviously is totally drawn, because that's the way the bond works. And on the loans of $1.2 billion, about $500 million and $600 million is drawn off the group debt that will be refinanced. But we refinance the whole package. That's how you do it with the banks you'd own -- and you don't do it on the drawn portion, you do it on the whole package that they give you. So we'll be looking to refinance that $875 million, and we'll be looking to refinance the circa $1.2 billion, $1.3 billion of bank debt.

  • Unidentified Analyst

  • To extend, what you -- that your answer. Does that suggest that if you are unable to refinance, would have difficulties or challenges, as they now say, to repay within the current...

  • Nicholas John Holland - CEO & Executive Director

  • No, there is no issue with refinancing, [Ruby], and we've got other facilities that we could draw down to pay those if we had to. But we intend refinancing this year. There is no issue with refinancing.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Adrian?

  • Adrian Spencer Hammond - Research Analyst

  • Adrian Hammond, Standard Bank. 3 questions, none on South Deep. Just to bit of a more macro question. We've seen 4 of the top gold producers do mergers on the last 6 months and then there was speculation around you and AngloGold merging. What is your view on consolidation now? Do you think that brings value for shareholders? And have you considering any opportunities that could be realized if you were to merge to someone like AngloGold?

  • Nicholas John Holland - CEO & Executive Director

  • Yes. I think it's interesting that we're seeing a flurry of merges. And I think it is going to be a very active year and there will be more. But I think a lot of it comes back to many of the things we've been saying over 5 years is that there is a dearth of new discoveries, projects are not being built, the production profiles of the major companies are in decline, et cetera, et cetera.

  • So if you look at that against the backdrop, the capital is dried up. It seems when you tick off all the other alternatives, that's what you're left with. So I'm not surprised, we're heading there. I believe that we saw this coming a few years ago. And we said this, let's look at ourselves and what have we got to do to make sure we're well-positioned for the future. And we took the conscious decision in 2016 that we're going to run this company cash negative for 2 years to actually build a pipeline of better projects that will give us life extension and give us growth and give us better costs. And I think you're seeing that coming now. So we're sitting in a position where we've got 10 years of 2 million ounces or even more. I mean, Salares is not in those numbers. If Salares is done, we're beyond that. That's even before South Deep. You've seen the reserve position. I think that will grow some more. So we don't feel compelled to do anything, except to focus on our projects. The other thing with big deals -- and I remember when Gold Fields was formed in 1997, and I was part of the team that formed the company, it took us 3 to 5 years to bed down the culture between the old Gencor and old Gold Fields of South Africa. It's not easy. These big deals often don't have synergies. You look at some of the big deals being announced now. I mean, how many mines have they got. They've got far too many mines. They are going to have to offload assets. They might think that people are going to pay them big numbers for those assets. Time will tell, because they won't offload the best assets, and they will offload the ones that are running out or that had big reclamation liabilities or need significant capital input. And there will be people who will step in, but at what price? So I'm not going to comment on any speculation about what certain people think we're going to do. We don't respond to speculation on specific potential transactions. But just to say, our focus is delivering our strategy that we set out and started with. In fact, we started this strategy in 2012 when I stood up in Australia and said, "The industry is focusing on the wrong metrics. We've got to focus on making money and not just on ounces on the balance sheet and growing production, et cetera." And our steps in '16 are a natural extension to that process. So we're quite comfortable, Adrian, to be where we are. And let's deliver this value and see what it means for Gold Fields going forward. Never say never. I mean, you can never say you will never consider anything, but it's not our focus right now

  • Adrian Spencer Hammond - Research Analyst

  • And sorry, just being more specific, what is the free gold percentage at Asanko? And what are you finding at Esaase relative to core pit? And then for Paul, your AIC guidance, the sustaining cost guidance, for this year is the same as it is last year, despite Damang, Gruyere, Asanko coming into full swing, so why is that the case?

  • Nicholas John Holland - CEO & Executive Director

  • Look, there is obviously pluses and minuses. We have increases in costs in Australia. Costs have gone up in Australia because of deeper mining at Granny Smith. But also it's a particular year at Granny Smith where we're into a low-grade area. The grade we're mining this year, as I think, it's an aberration in the longer-term grades at Granny's. We've finished mining the higher grade Invincible pit. Albeit, we got one more stage to go, which is small, that had high grades. We're still transitioning into the underground. A lot of the grades, we're getting now are development grades as we open up steps, which are lower. So St Ives is more in a transition. At Agnew, we're building a camp and a pile station that will have a good payback and lower our costs, because we were actually using a campsite in Leinster, which is quite some kilometers away. Now we've got a on-site camp, which we own. Those $30 million of nonrecurring capital going into Agnew. So I think a lot of those things are impacting the cost. Paul, I don't know if you wanted to add anything. Those are the main ones.

  • Paul A. Schmidt - CFO & Executive Director

  • Mainly in Australia, yes.

  • Nicholas John Holland - CEO & Executive Director

  • Mainly Australia. So some of those will be nonrecurring. Some of them are a function of increased debt. And clearly, as Granny Smith gets deeper at Wallaby, we know that the cost will be higher. But we got a double whammy this year with the lower grade. As we get into the core of zone 110, 120, we think the grades will pick up potentially 0.3 grams to 0.5 grams a tonne. That will make quite a difference on that. So that's why -- but again, it's quite difficult to look at the numbers for the whole year. In the second half, you'll see -- I think you'll see a step change down.

  • Adrian Spencer Hammond - Research Analyst

  • On the free gold there, the same...

  • Nicholas John Holland - CEO & Executive Director

  • Free gold -- sorry, so gravity gold going through for the plant is probably around about 40%. So it's a fair degree of gravity. We're very early in the stages of mining Esaase, but the bulk metallurgical test work is showing we'll probably see similar gravity gold. The guys of Asanko have seen this. They have got the Nielsens in place. So we can capture those. And if anything -- I think the potential of the grade here is quite good for us to improve. Look, the cost is still high because they got a big strip store in Nkran, which is the bulk of the ore. But as that moves out and we transfer more of the center of gravity to Esaase, we'll see lower grades, higher costs that is in transition. I think you are going to see, by the time at the end of the year comes, Adrian, we're going to be giving you a longer life different plant. We didn't buy this mine for $1,150 cost. That is not our strategy. We bought this because we can see the potential of this to hit that $900. That's where we see this. And remember, we came in at a situation where the company was under significant duress, needed to refinance, facility that come down from almost $1 billion to something like $180 million we came in. Now we do see long-term value. I'm sure by quarter 3, we'll be able to give you something more concrete on this.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Can we take any question on the conference call, please?

  • Operator

  • One question from the conference call.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Okay, thanks.

  • Unidentified Analyst

  • Two questions, Nick. One is Eskom, what does Eskom mean for you people in looking forward into the future? You haven't mentioned that so far. Secondly, it's now 12 years you guys have been in South Deep. Does there come a point where you say enough's enough?

  • Nicholas John Holland - CEO & Executive Director

  • Yes. I think the second question I'll answer first. Spot on. And we've asked ourselves that question and our board has asked us that question. And I would say, had we not gone through what we just gone through, this major restructuring which we've never done before, and probably the answer would have been, it's just too hard. But I think given what we've gone through now, we've significantly reduced the cost base. We've constrained the footprint. We feel that we've got to give this a go. But that's not to say that, that means we can continue just putting money into this month after month. I have no appetite to do that. I'm also a shareholder in this company. And if we're going to have a repeat of that, there won't be a future. There has to be a step change and soon. So that's on that one.

  • On Eskom, yes, it does worry us. The silver lining, of course, the fact that we're mining. I mean, our mining plan this year is premised on about 100,000 tonnes a month. We got installed capacity of 330,000. So the silver lining in all of that is, we can move things around. We can schedule hoisting in different times and stockpile underground. We can campaign, mill through the plant if we have to. So I think we can work around it, provided we stay at the current level. If we go to Stage 4, then we're going to be in trouble. But I think the whole country is going to be in big trouble.

  • What are we going to do about it? Look, we saw this coming, and we worked on a renewable solution over the last 2, 3 years. But we paused on that given the restructuring we were doing. So we do have a solution that could provide up to 1/4 of our power needs per solar at lower costs over the fence. So no sort of capital to us. I think we're going to dust that off now and crank that up again. In the short term, we can schedule things. And if we have to bring in additional power by renting in units, whether it's gensets, whether it's mobile units, we'll do what we have to do. So we've got a multi-pronged strategy. My feeling is though this problem with Eskom, it's a big problem. It's not going to be solved quickly. And I think the silver lining again here is, finally, we're going to start getting renewables being taken seriously by the government because they're in trouble.

  • And I think someone was saying this morning. All of a sudden, permits are now being given more quickly than what they were in the past. So I think the solution is that half of Eskom's base load is way past mid-life. It needs to be decommissioned over the next 10 years. Nuclear is a pipe dream. It's going to cost far too much money and business is going to have create their own solutions. If we wait for the government to fix Eskom, we're going to be waiting a long time. We're going to fix our own situation. So I think we're going to move aggressively over time. Look, we got 16 megs we need. We are one of the big users. I means, 16 megs is huge. So it's not that the Eskom's going to blow up, but I think we're going to have to get used to the fact that we're going to have less power, step change down in power than what we had before and we got to bridge the gap. We can't wait for that.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Okay. Any last questions in the room?

  • If not, media, the roundtable starts at 11:15 on the first floor. Otherwise, thank you for your time. We'll see you in 6 months.