Gold Fields Limited (GFI) 2017 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • (technical difficulty) 2017. We've got quite a few of our executive management here today. Nick Holland, our CEO, who everyone knows; similarly Paul Schmidt, our CFO; a new introduction, Martin Preece who's now EVP of South Africa, so he heads up the South Deep operation; Alfred Baku, who is Head of West Africa; and then Richard Butcher, who's Head of Technical, who was with us the last time when we did this as well. So they'll be part of the Q&A, but Nick will do the presentation.

  • As usual, if there is an emergency, there's exits at the front and at the back and you can assemble at the front of the building. Over to Nick.

  • Nicholas John Holland - CEO & Executive Director

  • Thank you very much everybody, and good morning. And I think it's a good slide to start with, showing you something that is pretty interesting. It's a great photograph and for those of you who haven't recognized it, that is the invincible pit at St Ives, which is in the Salt Lake or on the Salt Lake. And as you can see, the Salt Lake has really not much water. And at sometimes there is, you can get up to 4 or 5 meters of water, but most of the time, it's fairly wet sand with a crust on it. So that is obviously a lake-based pit. And you see over here there is a causeway, we had to build that to get there. There's one of the old pits over here, Formidable, that we mined about 7 or 8 years ago, which is now used as a water containment area. This has been a great operation for Gold Fields and for the Australia region. We're starting to do an underground operation now. And sort of if you stood over there and looked down, you could see 2 underground portals going in over here and over here, as we look to actually open up the underground operation. And in fact, good news is we hit first ore in December of this year and we'll be running the open pits and the underground together, at least until the end of 2019. And then we'll gradually come off the open pit into the underground operation. So that's an interesting way for us to start.

  • I think instead of just getting straight into a whole bunch of numbers and looking at what the trends are year-on-year, I think it's good for us to just stand back and let's understand where we are as a company.

  • Looking back on '17, we've managed to achieve our production and cost guidance. In fact, we've gone beyond the upper range of the guidance that we gave you in February. So I think that is good news. Obviously, within that, there's always pluses or minus but net-net, overall, the guys have done a good job in getting the numbers at the right cost.

  • We're in an interesting period, as I mentioned a couple of quarters ago. We are in a reinvesting period. We're building 2 new mines, 1 in Ghana and 1 in Australia, that is going to give us greater longevity, and importantly, at lower cost. It's Gruyere in Australia, and it's the Damang push-back in Ghana. Of course, at the same time, South Deep continues to ramp-up. And also we're doing a feasibility study at Salares.

  • I think the thing that we're pretty pleased about is, initially we thought we're going to be cash negative for 2017. We actually said that in February because of the significant capital that we'd have to spend here, we are talking circa $300 million of growth capital that we have to spend. Pleasingly, because of the really good performance from our operations producing more gold than they planned, coming in at lower cost, and of course, some of the tailwinds we've got from the gold prices meant that we've actually broken square for the year, which certainly is beyond what we expected. And as a consequence, the balance sheet is robust.

  • Salares, we've talked about before. I know there's been a lot of questions on it, I'll talk about it a little bit later. But this is starting to emerge as a tangible growth project for Gold Fields. We've been busy with this now for a good 7 or 8 years. The mother hole was discovered back in 2011. We've done 167 kilometers of drilling, as you can see. We have an ore body now with pretty high resolution. And there's quite a lot of upside potential, too, so that's one for the future.

  • South Deep obviously continues to enjoy a lot of commentary. Maybe enjoy is the wrong word, but certainly we get a lot of comments on where South Deep is. I think let's say upfront we are not satisfied with where we are on South Deep. We would prefer to be much further ahead than where we are.

  • That said, if you stand back and look at South Deep, the ore body continues to be robust in the 10 years we've owned the mine. We've done significant surface LIB Drilling and also Grade Control drilling on the ore body. In fact, we're doing a lot of mine definition drilling now short-range targets. The ore body continues to be good. It's definitely there, and we know when we mine the ore body spatially correctly across the 1.2 kilometer footprint, that we actually get the production and we get it at the right grade.

  • Certainly, this last year the grade resolution to plan was pretty good. We fell short on the volume, that's been our big problem. Technically, it's sound. We've got a mining method now that's been embedded since the middle of 2015. We have a panel of experts that come from Canada and Australia, and of course, from South Africa, who've been working with us for the last 4 years in helping us recreate the technical journey at South Deep, which culminated, of course, in the move away from the old feasibility model of 2005, which was a low profile destress. We changed that. That's been embedded. They're satisfied that the technical solution works. Of course, we've got a stiffer geotechnical design with reduced mining spans and bigger localized pillars. Again, they're satisfied with that.

  • I think our problem is our execution needs to improve. And I think the real challenge from here is for us to improve the entire execution of South Deep, integrating all of the different activities from destress development, ground support, stoping, backfill, they've all going to talk to each other in an integrated fashion and we have not managed that as well as we could've in the past. We believe that we can improve. We're seeing improvements on the ground. And I think from here, the execution side, with the right culture, will deliver the benefit. We've said it will take time. We've indicated the rebase plan is up to 2022, whereby we'll get to 500,000 ounces a year, circa. We still believe that's a reasonable goal for us, as we stated in February last year. And the question is now, we've just got to take the time, embed the right practices and see the improvement from here.

  • The balance sheet, as I've said, is strong. We're quite comfortable that we can take on our commitments for 2018. And really we're in now the second year of a big capital year. Last year, we spent about $840 million on capital expenditure. This year is going to be very similar. The mix, of course, between sustaining and growth is different because some of the sustaining will come off as we move away from big strip in the open pits, particularly in Australia. But we're ramping up the growth capital as well, particularly, as Gruyere gets into the second year. So by the end of '18, we should be through the main capital hump on these projects.

  • We shared with you in the past some longer-term profiles that showed that we're pretty good to maintain 2 million ounces a year for the next 8 to 10 years. The bulk of that, the vast majority of that 90% plus is in reserves, and we're still comfortable with that. And I think as we are redoing our strategic plans every year, we're seeing benefits beyond that, that can give us a longer life of mine. Of course, Salares Norte is potentially something that can also...

  • (technical difficulty)

  • get into that as well.

  • So on the numbers overall, it's all history now as we say, we're into a new year, but we are looking back today on what we've achieved.

  • Attributable gold, then, 2.16 million ounces, slightly above last year, and of course, above our guidance. The quarter numbers, of course, are implicit in those year numbers.

  • All-in sustaining costs, a good year for us. We're below last year and we're below the guidance, which I think is tantamount to a really good performance on cost control, getting the leverage of the additional ounces, notwithstanding the currencies in Australia and South Africa have actually worked the other way.

  • All-in costs, as we expected, are up, because of the growth projects that we're funding, but we're still within the envelope of what we set out for ourselves.

  • Now here's the number that I think is interesting to look at is what are the core operations delivered for us. If we take out these growth projects and we take out corporate interest charges and other costs, if we just look at the core operations, then they've delivered $441 million of cash flow as against $452 million last year. And that is cash flow after all capital expenditure on the core operations, after all taxes, royalties. So it's money that comes through to the center.

  • Project spending has been just below that, $326 million. Roughly that's made up then of $115 million at Damang. We've had $81 million at Gruyere. Of course, we're still funding the balance of the AUD 100 million purchase price by contributing Gold Road share, so that's another $60 million; South Deep as well, $17 million. So that gives you an idea of what is in those numbers. Of course, Salares Norte as well, $53 million.

  • And then of course, you've got interest and other charges. Interest is around about $65 million to $70 million per year, and that brings you down to the net number.

  • Now obviously, once this project capital is out the way, you get 2 benefits: one is less capital; and two, you get those projects starting to deliver cash flow. And our job really is to make sure we continue to maintain a strong base and that the cash flow we'll get from the projects will add incrementally to what we see for the bottom line going forward.

  • Normalized earnings are down somewhat. That's mainly due to higher amortization. We've mined more ounces than what we've produced in Australia, so we stockpiled some ore, which I think is not a bad thing because it helps to de-risk the plan for 2018. And Salares, which is fully expensed still, we haven't started capitalizing the expenditure on the studies at Salares. That's gone up about $20 million year-on-year. So those are the main contributing factors behind that.

  • Dividend. We've declared a final dividend of ZAR 0.50. This puts us at the upper end of our payout ratio of around about 1/3 of our earnings.

  • Net debt, as I mentioned, well within what we thought it would be. And the ratio of net debt-to-EBITDA about 1x. So we are very comfortable in relation to our long-term objectives and targets as per our debt agreements.

  • So here's the guidance compared to the actual results over the last 5 years. You can see in blue is the actual results. Production is slightly above, costs are down. So overall, I think the team is delivering the objectives as set out for the group.

  • Here's a reconciliation. You know that we're very focused on cash flow. It's really part of our mantra. We start with that mine cash flow, we knock off Damang there, which is next to that. Then you have South Deep. And that gives you the operating cash flow before projects, although, that really is a project, that $115 million, it wasn't there before. We've got the 2 pieces on Gruyere, our piece and then the balance of the purchase price. There's very little left of that now so that will disappear most probably in the first quarter. We've got Salares Norte, we've got some minor exploration costs. Take off your interest and then sundry costs that run through the corporate, and that gets you down to the net number. And we can talk about this afterwards if there are particular questions you want to deal with on a one-on-one basis.

  • Balance sheet, I think I've covered in some detail. The important thing is we don't have any debt maturities until the middle of next year. So we've got some time. Obviously, we're not going to sit on our hands. Paul, I think, is busy strategizing what the best way is for us to actually reposition the balance sheet and the tenor of the balance sheet, and I'm sure that we'll give you more information on that during the course of the year.

  • We've taken out a new facility in Australia to fund our share of the project capital at Gruyere, so that we can actually get the debt into the region, which is where it should be from a debt management perspective. So that's in place and we've got lots of headroom there, too.

  • This is something we're putting in for the first time. It sort of is an attempt to show the near cash that we have in terms of other investments, although I think a lot of these are strategic. If we look at Cardinal Resources, for example, that's a 20% partially diluted interest in a project in Northwest Ghana. Namdini is the main project, they just put out a PEA that shows around about a 7 million ounce position. So we have an interesting position here, and we can't tell you yet what the longer-term outcome is going to be here. But this is certainly something that we've put our foot on and we have an interest in for the future. And obviously, we have a cordial relationship with the team there.

  • Gold Road, we actually bought that last year as well. Both of these were bought this last year. 10% interest in Gold Road, that was opportunistic. And again, I think it gives us a greater exposure to a project we really like and we think there's upside in.

  • Maverix is something that's based out of Canada. We put all of our royalties in there a couple of years back, about 18 months ago. And those royalties really weren't attracting any value in our NAV. And here we're sitting on a value of about $60 million, which is available at some point if we wanted to cash in on that.

  • And then Red 5, we sold Darlot, which we've decided to back the management, put most of that money back into shares. We quite like the story where there are synergies between one of Saracen's ex operations, Darlot, with spare processing capacity and economic trucking distance. It's quite a good equity story, so we're going to back them on that equity story instead of just taking the cash.

  • All right, so talking about some of the projects, specifically.

  • Damang is through the first year of our investment. It's really about a 2.5-year investment. That's got off to a strong start. We've done -- between all of the different sources, we've done about 40 million tonnes compared to 33 million tonnes in the plan. As you can see over here, there are areas that -- in green, we are ahead of where we were supposed to be, that's on the western wall, that's on the eastern wall. And that pit wall is coming down now. For those of you who were last at Damang, you would stand at the lookout point, look down into the pit, which is full of water from the old workings. When you stand there now, that water is much closer to you. In fact, we're going to be starting to dewater that pit as the walls continue to come down.

  • Pleasingly, the guys were able to produce way beyond the gold production that we thought we'd get.

  • Amoanda, which is on the same trend as this, has proved to be quite a bonus for us. And it continues to extend. And it looks like it could actually be 1 system with something called Tomento East, which we also mined some time ago at low prices. So that's providing us with a really good filler while we get the main pit into position. We're hoping to get first ore by the second half of '19 and hit steady state in this main pit here by the first half of 2020.

  • So it'll be another big capital year. We spent $115 million in '17. Going to spend another $105 million in '18. And then we'll start to see capital come off.

  • Just to bear in mind, we're talking here around about 1.7 million ounces in this pit. That's for the first 8 years. Steady-state production should be about 225,000 ounces. All-in sustaining costs, getting down to about $750 an ounce, so that's going to have an impact on the group.

  • We're not sitting on our hands because we know there's the potential to go. Beyond this, we're sitting with another 4 million ounces in resources. If you go to the declaration from last year, you'll see it, at over 2.5 grams a tonne. We're going to be doing another study, a prefease study, looking at the unconstrained case below this. And we believe there's another couple of million ounces. But I think the timing of that will be the key thing is we want to get our money back, we want to show a return. We want to put the cash on the balance sheet. Deliver on the commitment. Get the 28% return that we talked about when we started the project. And over time, we'll bring this back as something that I believe will take Damang to, probably, I think, 25-year mine life is not something that is overly optimistic, with upside, because we haven't found the base of the mineralization in this pit.

  • If we look at Gruyere. It's a 50-50 joint venture. As you know, we took over operatorship on the 1st of February. I think the team has done very well in terms of tracking pretty close to the project schedule, which is around about a 2-year build. It's a 2-year build projects and taken into account the plant and all of the infrastructure. Construction progress is pretty much on track. Roughly we're about 1/3 through, we're about 1/3 through the physical activities, we're about 1/3 through on the spend. Engineering is about 3/4 complete. And we're still on track for first production in quarter 1.

  • So in the first year, there will obviously be a ramp-up. Steady-state production was 270,000 ounces per the study. We're still good for that. And for '19, we're talking somewhere between 170,000 and 230,000 ounces. The lovely thing about this ore body is there's very little prestrip. And in fact, the prestrip that there is, we're actually using it for foundation for the plant, foundation for the tails, walls, et cetera. So once we get into this, we're into ore almost immediately, the ore body almost daylights. The mining contractor has been signed up. They've been mobilized. They'll start the stripping in December. And that will start feeding into the plant, I guess, the back end of quarter 1.

  • We've got a full village built, 648 rooms. That was one of the early wins on the project, is to get that done. We've now got a fully sealed airstrip, which is right next to the camp. So we can fly now jets in from Perth, 100-seater jets from Perth, right to the camp, which is really going to facilitate the fly-in, fly-out scenario.

  • The other thing that gives me a lot of comfort is we've priced $477 million of this project already. We've locked it in. We're not going to be subject to variations on exchange rates, on schedule changes. So we really don't have much left. In fact, most of the stuff that's not priced is -- remain in contingencies that sit in the project. So AUD 186 million spent to date, as you can see that's around about 1/3. We've got a big year this year. We're going to be spending $311 million. Why is that? Because the big chunky things are going to be delivered and implemented like the SAG mills, ball mills, finishing the plant infrastructure, et cetera. All of these things come together all at once.

  • We've got all of our contractors in place. We've got the access road basically done, which is -- that's about 28 kilometers. We've got the certified airstrip in place as well. The TSF is proceeding very well. This is a circular TSF, which is unlike what you'd see in South Africa, but not unlike what you would see in Australia.

  • The plant construction has been awarded to a joint venture, Amec Foster Wheeler Cimvec, they're doing that. So that's all going well. The plant is pretty bulk standard. This is a normal Carbon-in-leach operation, single-stage crushing, nothing fancy in here. Obviously, you've got your normal elution circuits, your flotation tanks at the back end. Your gold room, electrowinning, there's hundreds around the world, there's nothing too complex in this entire thing.

  • What we decided to do is to build and operate a gas-powered model, which has entailed a 198 kilometer gas pipeline, being built from Laverton to the project. We had to get approval from the Western Australia state government for that. We got the approval so that is on track now. And we'll have then an on-site power station, diesel genset, 45 MW. It's quite a big power draw here for the site. And that's all proceeding to plan.

  • We've got sufficient water. We've got boreholes on-site. And now we're building all the reticulation systems to take that water to the plant. I mentioned that we've awarded the contract on the mining. And this has all come pretty much within the envelope of the cost that we had in the study.

  • So just to show you here, here's the camp and some of the office facilities, these are all the rooms over here, 648 people. Here is the airstrip over here. As you can see, it's right there. That is our sealed airstrip.

  • The process plant is sort of over there, about 6 kilometers. Tails dam is sort of over there. The main pit is another 2 kilometers beyond that on to that side. So it's a fairly compact site. It's pretty flat. It's pretty arid because this is getting close to the middle of Australia, where you are on the sort of eastern extremity of the rain belt, although we did have a particularly big rain event a week or so ago.

  • So again, in the distance here, remember, I mentioned it's a circular tails dam, that's an aerial photograph, you could see it over there. And here is the area that's been cleared for the plant construction. And you can see some of the foundations for the leach tanks over here as well. So it's changed a lot over the last 6 months. And by the end of the year, this is virtually going to be built, which is pretty exciting for us. It's coming very quickly. There's the stage 1 pit. We've already started some of the -- we needed some of this material, as I mentioned, for the foundations of the tails dam in particular so we've started doing some of the clearing. So when a mining contractor comes in December quarter, he can just get straight in and start stripping this. Remember, the prestrip here, as I mentioned, somewhere between 10 and 30 meters or so on average of prestrip which is negligible and then you're into the ore body.

  • Okay, that's the power station. Already you can see some of the genset construction is fairly advanced over there.

  • So I think, broadly, this project is tracking really well, and we can't see any showstoppers here that would prevent us from hitting the numbers. I think the timing, we don't have the potential for significant delays in the project. But we're not seeing significant delays at this point in time.

  • So South Deep, let's move on to that. Obviously, 2017 was below where we wanted to be, around about 11%. And I think, unfortunately, the first quarter's performance was really the thing that made it very hard for us. We had 2 fatalities in quarter 1, we had 3 falls of ground. And usually these things always happen in the higher-grade corridors. We lost one of the main arterial haulages for around about 4 months that serviced one of the higher-grade corridors. So it had a really tough impact. I must give credit to the team under Martin. Martin came in in May, had to pick up the pieces of where we were. And the second half of the year, we've done much better. As you can see, we're up 36% in the second half, we did 5 tonnes of gold, which was broadly tracking where we needed to be. So unfortunately, losing that 700 or 800 kilograms of gold in the first quarter, we just couldn't make it up. But the important thing is let's make sure that we track well from here.

  • So overall, although we were 11% down, I think the team came back strong to show a good recovery.

  • As I mentioned in November, when we talked about the update, the fact that we're behind and some of the destress is behind relative to where we wanted to be, some of the faces obviously are behind where the plan is, that does have a knock-on effect. I mentioned, it'll be about 10% knock-on effect. So essentially, what we're saying is, although the rebase plan was premised on about 11 tonnes of gold, for this year, it's going to be around about 10 tonnes of gold. I think there's still some risk in that, in fairness. But there's also some opportunity for upside. But I think, on balance, the team believes that is a number that we can shoot for. And certainly, if you take out a lot of the one-off impacts of losing higher-grade areas for 3, 4 months of last year, we should be able to make up a lot of that as well.

  • I've talked about the ore body, the geotechnical design. And a big thing we're focused on now is, how do we integrate all of these cycles in the whole mining value chain to get a better integrated result for the group. And that comes down to how we organize ourselves better, how we actually do better medium-term planning. And we've certainly upgraded that area. So there's a link between the long-term planning and the short-term delivery. That's already giving us early wins, but we've got to continue to embed that over time.

  • Broadly, South Deep is not about the ore body. It's not about the technical solution. It's actually about getting the people to work in an effective way. And we believe that is a journey that is going to take some time but it's a journey that we should succeed on over the next 3 to 4 years.

  • We've taken the impairment, principally on prices that are lower. That's probably around about 2/3 of it. And the other piece relates mainly to the deferral of the build-up, and we thought we should just give you some new numbers as to what we think it's going to look like in terms of gold production, destress, et cetera, as we hit the long-term target that we're still aiming to do by 2022, which was the rebase plan of 500,000 ounces. We're still sticking to getting to that. Okay, so it's a little bit down, 20,000 ounces. And the rebase plan I think was [497]. But it's pretty much there.

  • All right, so that's South Deep. I think the other important thing is what is going to be the catalyst again for change? If you look at the current mine that we've inherited here, a lot of that infrastructure was put in place even before we bought the mine. It was all conventionally destressed, and we were essentially mining this on a very selective basis, using much greater drifting and benching, which is just taking small cuts above and below in the ore body. It's really scattered mining, as the guys over time have taken some of the higher-grade areas. And then you end up mining bits and pieces all over the place. This is only 1.5 million ounces out of the total reserve, which is 37 million ounces. So this is like 3%, 4% of the reserve.

  • The area we're aggressively moving into now is to move away from this selective scattered mining to a nonselective bulk full extraction between the different regional corridor pillars, and that's what we're moving towards here, which requires much greater discipline in opening up the ore body, driving that destress, driving the development. These are all the different cuts. And you can see this is all the primary and secondary stopes that we would take out on a retreat basis. Over time, you can see, there's going to be much more infrastructure, more ore passes. There's going to be satellite workshops and stuff like that. This is going to be mined in an area where there's no trucks. It's going to be direct tipping into ore boxes and the cut itself, down to crushers, onto high-speed conveyors, into big concrete lined silos which have already been built. A lot of this infrastructure has already been built. And then up the shaft into the plant.

  • As we move forward, right now, the mix between these 2 over here is about 50-50%, in terms of contribution. As move forward, this will go up to somewhere around about 75% to 80% over the next 4 years, which will give us a catalyst, and that's 9 to 10 million ounces of reserves, that's about 1.5 million. So that shows you where we need to get to. And this is being set up really in line with best-in-class international standards. It's coming down the road, but it's going to take time.

  • Salares. So we've been in Chile now for round about 10 years and here's a great photograph. Actually, this was taken when I was there. In fact, that's the Argentinean border over there. We were standing on the slope looking down. That is Brecha Principal, which is the main ore source. It looks like a dome. There's probably around about 150 to 180 meters of barren waste that has to be moved to get into the ore body. And then Agua Amarga is sort of over here and there's quite a large hill above it that needs to be removed. So that's that 2 ore sources we have here.

  • So we've got 23 million tonnes at 4.9 grams a tonne gold, 66 grams silver. This is a gold-silver epithermal high-sulfidation ore body. Very typical of the kind of styles of mineralization you'll find on this particular Maricunga belt, which is host to many prolific gold mines over the last 20, 30 years. This is not a dream anymore. I mean, 95% of this is in the indicated category, so it's got great solution. Well you'd expect that with 167 kilometers of drilling over the last 7 years.

  • So we've done the trade-off studies. This will be an open pit, 2-million-tonne-a-year plant. Because there's a lot of silver, there'll be a dual-stage process of zinc precipitation through Merrill-Crowe. We'll get the silver out and then we'll get the gold out through CIP and the tails from that Merrill-Crowe process. So we've targeted around about a 10-year mine of life, about 3.5 million ounces produced over that period. The profile is still being finalized, but a lot of that gold will be front-ended over the first 5 or 6 years.

  • The feasibility study is being finished. We expect to finish it before the end of the year or by the end of the year at latest, including peer reviews. We've got water. We've got more than enough water because if you don't have water up here in the Andes, you can't run a mine. Because without water, you just can't move forward. We've got the water about 12 k's away, we've got a number of wells that's permitted. It will be an on-site power station again. And we think this could be around about $575 an ounce, capital of about $850 million, dry stack tailings, of course, because we have to conserve water. And lots of upside potential as well.

  • So briefly, if you look here, here's Salares over here, that project. And we've got all of these ground positions around us. The green ones are what we own, the red ones are what we option. We've already done some drilling on some of them. We've intersected mineralization on a number of these particular positions. We are going to be exercising some of these options over the next couple of years. But we see very similar styles in mineralization around us here as what we've encountered at Salares overall. So this really is a camp scale opportunity, as you can see the scale over here. So watch this space.

  • Tactical hedging. So this is not a surprise to you. We've said that we're in a period of high capital. We spent $830 million last year, there's about $840 million this year. We believe that we need to protect ourselves in these periods of high capital, which is in line with our existing policies. So we've taken out a bunch of hedges across the group. And I think we've probably hedged, Paul, about 40% to 45% of our production so far this year. And we haven't done it in a way that locks us out of upside, except in Peru. I mean we've taken a view there that copper won't go above a certain level, but it's only for a year. So this is going to protect us, make sure we get out of the capital hump. We are not long-term hedgers, per se, this is purely short term to cover our needs. The details are all in the book, I won't dwell through all of that.

  • So the outlook for the year, now with Darlot obviously sold, we are going to be a little bit lower than last year. So if you added back Darlot which stood about, under our watch, something like 40-odd thousand ounces, you'd be pretty close to where we were. Costs, over here, what we've done is taken a conservative approach and said Aussie dollars at AUD 0.80, roughly, what was up to the last practical date, the rand is at about ZAR 12. So we've rebased our costs based on the latest exchange rates. And of course, exchange rates do have a fairly meaningful impact on your costs in dollar terms. Obviously, we're getting a nice gold price in dollar terms. But of course, with a weaker dollar driving the gold price, the flip side is, of course, you're going to be seeing stronger exchange rates in places like Australia, South Africa, other emerging markets as well.

  • Capital spend for the new year, $105 million at Damang. As you can see in the note over here, we're doing $145 million at Gruyere, USD, $36 million at South Deep as we accelerate more, getting into not only 100 level development but also 105 level development. We want to try and move quicker into getting the North of Wrench, the new mine as the center of gravity, at South Deep. Salares, of course, with the study is going to be a pickup in spend.

  • Very quickly on the overview. I'll go through this pretty quickly because I want to leave enough time for questions. Overall, as you've seen, we've generated good cash. South Deep, of course, we were negative, but we were less negative than what the rebase plan indicated for the last year. I'll leave those numbers with you, but I think we've dealt with them sufficiently.

  • Australia, as you can see, the guys have exceeded their guidance on production and they have come in under on their costs. Darlot, we've talked about. We talked about Gruyere. St Ives is changing, as I mentioned. We're going to be moving to the underground in the future.

  • Another interesting thing that I'll just flag, which I think we'll come back to over the year, we've identified over 100 kilometers of Paleochannels, which is essentially alluvial riverbed gold across St Ives. Now this is not something new, we've mined it before, but now we're trying to look at this as a holistic project. And with the drilling that we've seen, we're quite encouraged, we're seeing average widths of between 5 to 6 meters, grades in excess of 2 grams a tonne. The problem, of course, is there's quite a lot of waste to move, so we are looking at opportunities here to find a solution to moving a lot of waste as quickly as we can and then doing conventional mechanized mining once we get into the Paleochannel. Doing a prefease study here. There's 2 to 3 million ounces, which is seen as additive to where we are. And we'll do a trial mine as well over the year, and we'll come back to you on that. But that's quite an interesting one.

  • And of course, Granny is getting deeper as we get into the new load. About 2.5 million ounces of resource. The reserve portion is about half, but I think there's potential to get more out of that.

  • We're doing a lot of exploration in Australia. As you know, we're doing between 550 and 600 kilometers. The objective is to not only replace what we mine, because we're mining close to 1 million ounces a year, but also to try and get ahead, create more flexibility. You know, particularly in area like Agnew where we have a fairly short reserve life, but that shouldn't be construed as a short mine life. But nevertheless, we'd like to get more ounces reporting to reserve, and of course, convert more from the existing endowment into resources as well.

  • At St Ives, the big focus is on driving further extensions to Invincible. Getting Invincible Deeps, Invincible South, which is down dip, and Greater Invincible, which is further down. And we have further targets on this trend, which is about 30 kilometers. We've got visible gold intercepts in multiple areas that we've drilled down here, so a lot of work for us to do.

  • Many other areas, we've done very little. Kambalda, that's a piece of ground we got from BHP about 3, 4 years ago. You can see it's a big part of our lease. Largely underexplored, so there's work to be done there as well.

  • Here's a cross section of that Invincible. So here's the Invincible pit, the different stages. Remember that photograph at the front, this is a section if we cut through that. Here's the underground over here. And here's Deeps. So we're believing that, potentially, this could all link up.

  • Then we've got Invincible South, which is separated by a fault, but that's further down dip of Invincible, and then we got that extending further down there, Invincible Far South, now the geologists call that.

  • Big system. It's probably talking about 2.5 to 3 million ounces the way we're going to end up here. So very exciting for us.

  • Granny Smith, I talked about getting further down. We're going to be mining now, developing 110 to 120 down here. But we've got an eye on this Zone 135 which -- it looks like it's a replica. These are all lenses that geologically and structurally are replicas of each other at 150 to 200 meter intervals. That's, again, a plan view of that particular load. The message here is it's extending, south, east, west. We haven't found the end of this yet.

  • We're in the north. We talked briefly before the meeting. This could be a long-term replacement for Kim. Kim we've mined about 1 million ounces out of Waroonga, you can see it's largely depleted. And Waroonga North is on a parallel shear zone. It looks like it could be an analogue for Kim in time. And what we're encouraged about is we thought it was only going to be over here, in fact, it's down here. So we've got 3 drives now. We've got one here, one here and one that should be finished soon, going in there. And the benefit of that is you get a drill platform in, you can get much better resolution by underground drilling. So that's looking quite exciting for us.

  • Peru has done very well. They do very well every year. They've exceeded their guidance again and come under on costs. The big thing we wanted here is life extension because the life was going to expire in 2023. We finished a prefease study. And as you can see, we've been able to bring forward 40 million tonnes at 0.5 gram and 0.4% copper -- 0.5 gram gold, 0.4% copper. The reserve grades were around about 0.85 grams a tonne and about 0.46% copper. So this will drop the reserve grade slightly. But it's such a low-cost operation that this is not going to fundamentally change the cost structure either. So we're taking the total reserve from 2.3 million ounces equivalent to 3.7 million ounces. And we will do a combination of life extension on existing dam. That's mainly through a high-density factor and a marginal 3-meter lift in the dam from 3,800 to 3,803. That really isn't going to cost much. And then doing input tails. That means we have to accelerate the mining in the pit. We'll stockpile, and then we'll preferentially process the higher-grade feed over the remaining life. And we're doing another project now to see if we can get another -- who knows? Another 4, 5 years beyond the 2030. So really good news for what has been a great project.

  • South Africa, I think, I have covered. I don't think there's much more to say. We'll leave these numbers for you to peruse, and we'll deal with any questions afterwards.

  • West Africa, again, done well in terms of exceeding their guidance, coming under on cost. And I must give credit to the team because we thought we're going to be cash negative in Ghana. With $115 million capital we had to spend at Damang, we didn't think Tarkwa could carry it. So in fact, what's happened is not only Tarkwa has carried it but Damang has carried more. We've had greater extensions at Amoanda, we've seen more gold coming out of that as well. So it's really been, again, beyond our expectations to be where we are. You know, it's a credit to Alfred, who's here today, and the team in Ghana.

  • We're moving to contractor mining at Tarkwa, we think it's the best model going forward. By the way, it is the preferred model in Ghana. And you know it's not a big deal because most of the employees will actually be employed by the contractor. Contractor takes over the fleet, the employees get a generous redundancy package and mover on -- move over on new terms. So we're hoping we'll get this done. The union is opposing us, but we believe that in time that we will prevail on this. I think, certainly, the other stakeholders in Ghana are supportive of what we want to do.

  • So with that, I'll pause, and I'll hand back to Avishkar, and we'll take questions, either myself or my colleagues. Thank you.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Okay, [Martin], we'll start with you.

  • Unidentified Analyst

  • As a South African, I noticed that the kangaroo has really taken over from springbok here. And I'm just wondering, with the winds of change blowing in South Africa, would you want to invest more here? I mean, I look at De Beers now, they've gone for, like, 16 prospecting licenses. They want to bring diamonds back to Kimberley. What do you think South Africa can do now, as we enter this new era, to encourage some sort of investment? I don't see any exploration around South Deep. Well, you might say it's a big ore body, but I see exploration everywhere else in the world. So are you sort of not enthusiastic at all about South Africa? Will this lack of enthusiasm continue now that we seem to be entering a better phase? And what sort of conditions do you want to do more in South Africa?

  • Nicholas John Holland - CEO & Executive Director

  • Look, I think, [Martin], we've got a balanced portfolio around the globe that we're quite happy with at the moment. So we always felt that prior to offloading and spinning off Sibanye that we're probably too overexposed to South Africa. So I think our exposure now is better. South Deep is a -- it's a world-class ore body. It's something that we really like, and we're prepared to run the course to get it there. But if you think about it, most of the gold that's still here in the Wit Basin is very deep and it's going to need new technological solutions. And I know that the industry is working on that, but that's going to come later down the road. I do think the environment could change. With the winds of change blowing through the country politically, I think the environment from a policy and investor perspective could improve, which I think is great because all of us will benefit from that. We never say never, but I think we have a nice, balanced portfolio at this stage. We've worked quite hard over 10 years to achieve that. And I think we're quite satisfied with our exposure to South Africa at the moment. South Deep has got to be delivered. So before we sort of get our head in the clouds about looking elsewhere, let's deliver what we have on the table, which is really one of the largest orebodies in the gold space.

  • Unidentified Analyst

  • Just before I leave you, is there anything we can learn from Chile? Should we have some chili sauce when it comes to promoting South Africa in the future? I mean, have you found your interactions in these sort of regions very favorable? Something we could learn from? And then just if you can give us a little bit more light on your hedging in South Africa, which was left off your sheet?

  • Nicholas John Holland - CEO & Executive Director

  • Yes, so we have done some hedging, I'll let Paul talk about the hedging in a moment. But I'll just say, in terms of other jurisdictions, what we like about our interaction is we can get in front of the key decision-makers in government quickly. And we're building relationships with them that I think are constructive, and we're trying to work together for mutual benefit. So that's what we got to get to in our country, is we have to get all of the stakeholders together, organize labor, government, business and working together for a new dispensation. I've been saying this for a long time, [Martin], you've heard me. I haven't changed my view. I'm hopeful that we can move forward. Everybody has got something to contribute to this, and the industry can't do it on their own. So we're hopeful that, that will change, but there needs to be a more constructive dialogue here about how we take the industry forward.

  • Hedging?

  • Paul A. Schimdt - CFO, Finance Director & Executive Director

  • Yes, we've hedged about 2 tonnes of gold with a floor of 600 and a cap of ZAR 666,000 a kilo. So where we sit today, that is a very lucrative and profitable hedge that we managed to put in towards the end of last year.

  • Unidentified Analyst

  • That's your short-term hedges, not long term?

  • Paul A. Schimdt - CFO, Finance Director & Executive Director

  • No, not long-term hedges. That's just to cover this year of capital investment throughout the group. 2019 will default to our strategy of no hedging.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Adrian?

  • Adrian Hammond - Research Analyst

  • It's Adrian Hammond, Standard Bank. I just want to ask a question around how Gold Fields thinks about capital allocation and returns. And just by way of backdrop, gold shares haven't gone anywhere in the last 10 years, and one can argue that returns at best in the single digits, far below cost of capital, is one of the reasons, but you stated Damang has a return of 28%. But I'm more interested in South Deep in comparison to Salares Norte. It looks like on the new revision, you've got about $300 million left to breakeven. You've pushed breakeven out to 2 years and you've just impaired the asset. Whereas, Salares Norte, your margin is almost double what you expected there compared to South Deep. So have you ever thought about replacing one with the other?

  • Nicholas John Holland - CEO & Executive Director

  • Yes, look, I think that Salares is something that looks like it could be one of the best projects in our group, and we'll comfortably get over just about any hurdle rate that investors would want. I think the thing on South Deep is that if you look at the capital we've invested to date, we've built most of the infrastructure that we have. You know, on a go-forward basis, if you'd -- and I know we shouldn't do that in isolation of what we spent, but where we are is where we are. On a go-forward basis, the incremental value to add on South Deep compared to not continuing is quite substantial. But I mean, you're on a good point, Adrian. We simply cannot continue to absorb cash flow deficits. That is not a business that we can entertain, our board can entertain or our shareholders. So that only holds true if we can start covering our costs, and we have to move quickly. And we'll keep evaluating. We're not wedded necessarily to anything in our group. It's got to add value. We've got to be a little bit agnostic. But from where we sit, we think the value creation here is quite significant, carrying on in relation to not carrying on. But clearly, we have to see a movement upward in the right direction.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Patrick?

  • Patrick Mann - Research Analyst

  • It's Patrick Mann from Deutsche Bank. I've got 2 quick questions, please. Maybe firstly, Nick, you seem to be downplaying the growth a little bit in the portfolio. You spoke about the projects being life-extension projects, and then in the later slides said, we can comfortably maintain our production profile for 8 to 10 years. Just looking at Gruyere, your attributable percentage is 135,000 ounces. Damang is going to add about that much when it gets to peak production, that's over 10% of your current production base. I mean, am I missing something? Are the ounces coming out elsewhere in the portfolio? Are you just being conservative? Where do you see your kind of production profile peaking now based on the current plans?

  • Nicholas John Holland - CEO & Executive Director

  • Yes. So it's something -- I haven't been in this group for a long time. The one thing I've learned the hard way is that you like to believe the projects are all incremental and the base is solid, it's all going to be there. Sometimes, that holds true; sometimes, it doesn't. I believe with the exploration we're spending in Australia, I'd like to believe that Gruyere will be incremental and could get us up to 1 million ounces a year again because we flirted with 1 million ounces a year and then we came off a little bit. But I think there's enough there to suggest there could be 1 million ounces a year. I think if all the stars align, we could get up to, who knows? We could get up to 2.5 million ounces if all the stars align. But I do want to introduce an element of caution because orebodies are variable, they can change, and we are mining a multitude of different sources, which all -- are all at different stages of maturity and evolution. So yes, if everything works out, great. But what I'm trying to give you is what we see as a hard-core base, that should be a hard-core base that we can take to the bank. And if we can do better than that, fantastic. Let's see how we go.

  • Patrick Mann - Research Analyst

  • Thanks. And sorry, if you don't mind, one more quick one. I'm just looking at Slide 13 on South Deep and effectively saying the current mine is 30% of production. Well, sorry, the current -- it's split 50-50 between current and North of Wrench and it needs to move to 30-70 to get to the 500,000. Just wondering if you can unpack for us how much of that production growth comes from the shift to North of Wrench? And how much of it is efficiency improvements? So maybe another way to say it is that if the -- if you were already at 30-70, what would the production base be today? And then how much would you have to improve efficiencies to get up to the 500,000?

  • Nicholas John Holland - CEO & Executive Director

  • I'm going to let Martin have a go at that, if you don't mind.

  • Martin Preece - EVP of South Africa

  • It's a combination of both. I think the mining method naturally brings efficiencies with it because you move from a scattered mining method into taking the whole bulk. You are moving in, as I spoke earlier about, moving almost into a manufacturing cycle. So you're getting continuous stoping of repeatability of the mining methods. So what that does, it bends itself to efficiencies though. I think part of it is the mining method, and with that comes efficiencies. But what we need to do, we need to up our overall mining efficiencies. That's -- I think it's a combination of both. It's -- the method is going to liberate efficiencies because of the nature of the way we're going to mine, but we also need to drive efficiency into the business. And I think as you come into a narrower, focused area, you get better and tighter control, you get better focus on your equipment, you get better focus on your people. And you'll drive the efficiency from that perspective, but also the mining method (inaudible).

  • Patrick Mann - Research Analyst

  • The existing North of Wrench mine today, what improvement are you factoring in to 2022?

  • Martin Preece - EVP of South Africa

  • I don't have the number off the top of my head now. I've got it in the back here somewhere. But I think there's a steady, distinct improvement every year that we're looking, a couple of percent every year.

  • Nicholas John Holland - CEO & Executive Director

  • Yes, it's between 5% and 10% off a low base.

  • Martin Preece - EVP of South Africa

  • 5% and 10%. It's not a 50%. Yes, off a low base.

  • Nicholas John Holland - CEO & Executive Director

  • The only other thing that I'd add is, as you increase the proportion of longhole stoping because the proportion of longhole stoping now is only about 47% as well, and as you increase that to 70%, Martin was talking earlier about that's the meat and potatoes, the destress is the access. You get an exponential effect because the average tonnes per rig per month on a stope is about 9,000 tonnes. So as you get more proportion into that, you get another exponential effect. Sorry, if you don't mind me helping you there.

  • Ian Cruickshanks

  • Ian Cruickshanks, Institute of Race Relations. I'd like to ask about the attitude of the labor movement, specifically in South Africa. Obviously, you are trying to cut down the cost, cut down the rewards of labor. Is there a greater understanding or not? Is the labor movement still regarding the mining fraternity as the enemy and -- government, that applies to government too, with a lack of understanding that there should be a straight line between productivity and reward? Is progress being made in that respect?

  • Nicholas John Holland - CEO & Executive Director

  • Well, we'll talk from a South Deep perspective, if you don't mind, because that's what we understand. Martin, over to you.

  • Martin Preece - EVP of South Africa

  • I think there's always a lot of legacy issues that we've got to deal with. We've been dealing extensively with a -- with the organized labor, and I think we're maturing that relationship. I think it's becoming very constructive. I think that there's more of a focus on what's right for the business. There is a connection being made that we can't keep on running assets at losses. We've got to make money to be able to put money back into people's pockets back into the community. And I certainly sense that the engagements we've had over the last 6, 7 months, we've seen a, I think, a narrowing of views. I think there's always going to be different points of departure for obvious reasons. But I certainly sense that -- we met with the unions yesterday. And I think there's a common objective that we want to make the mines work, and that a working mine is going to be beneficial for all of us. So I think there's an acceptance we've got to up productivities, we've got to up skills to achieve those productivities and that they're wanting to work with us and support us and us support them, I think we get a better deal for everybody. I'm very encouraged with where we are.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Do we have any questions via the conference call?

  • Operator

  • We do have a question from Johann Steyn from Citigroup.

  • Johann Steyn - MD and Head of South African Equity Research

  • I've got two questions. But before I ask them, I just want to first of all commend you on the open and honest assessment that projects like Gruyere and Damang will most likely result in replacement or sustaining effect of your current production profile because I do think that there's a lot of people that get that wrong in their forecasts. But the 2 questions that I had was effectively around South Deep. First of all, have you ever had any approaches by competitors or peers around South Deep either to partner or to acquire it?

  • Nicholas John Holland - CEO & Executive Director

  • Yes, look, we haven't have any definitive conversations regarding the asset because at this stage I think it's recognized that this is seen as part of the long-term future of Gold Fields. And certainly, we've not created that impression that it's anything but that. So no, we haven't been shopping it.

  • Johann Steyn - MD and Head of South African Equity Research

  • Okay. And then just secondly, how many operational heads have you had at South Deep over the past 8 years? If you can just remind us about that.

  • Nicholas John Holland - CEO & Executive Director

  • I think the -- let me answer it slightly differently, the average tenure of an operational head is like 18 months to 2 years, which is not a good track record for delivery. And I think one of the reasons possibly is we're not further down the track is because of that. It's just the upheaval of changing people at the top really sets us back. We lost Nico Muller really in December last year. And we were lucky enough to get Martin to come across from De Beers, and he started in May. But I mean, you have a hiatus of 5, 6 months, and that does have an impact on an operation with uncertainty. So that is not a good track record at all, Johann, and it's something of concern. So obviously, we'd like to have some stability. Why did people leave? Look, there's a whole catalog of reasons, which I won't go into, but we do need to get stability at that level, that's probably a key driver here. And while we get stability, we should actually improve the institutional capacity of the mine, so that actually we have winning teams on the faces. And when you get to winning teams on the faces, then it'll just happen. It's like in Australia. We've had also many changes in Australia, but you haven't seen us miss a step in Australia over the last years. Why? Because we have a winning team culture right down to the rock face. And that's one of the things that Martin and the team are trying to put in place now because then we'll make this more sustainable where it needs to matter, at the rock face.

  • Johann Steyn - MD and Head of South African Equity Research

  • I think I counted 7 or 8 operational heads over the past 8 years. Would I -- is that kind of far off the mark? Or is it close?

  • Nicholas John Holland - CEO & Executive Director

  • I think it's about 5, about 5 possibly. But look, whether it's 5 or 8 in 8 years, it's far too many.

  • Operator

  • We have another question on the line from Dominic O'Kane from JPMorgan.

  • Dominic O'Kane - Analyst

  • Just a quick question on Salares Norte. The -- have you -- are you giving any thought to what the appropriate ownership is for the project? You own 100%. Obviously, the CapEx number the feasibility is kicking out is reasonably large. Are you wedded to owning 100% of it? Or do you think maybe bringing in a partner or sharing some of the risk might be appropriate?

  • Nicholas John Holland - CEO & Executive Director

  • Yes, we obviously have a stream of work that we're looking at, Dominic, to actually understand what is the best way to capture the value of the asset because it's not an asset that generally is regarded in our portfolio at this stage. So we're trying to figure out what is the best way for us to move forward. Joint ventures in the mining industry are becoming more in vogue. I think in the past, mining companies that wanted to do everything on their own, do big megaprojects, I think we've seen what big megaprojects have done to certain companies. So we are circumspect, but we haven't made a definitive call yet on how we would move forward on this. But we certainly wouldn't rule out any of a bunch of options at this stage. But the main focus is, let's get the study finished. And I think this will be a conversation we'll circle back to, I suspect, in the second half of this year.

  • Operator

  • We have no further questions on the conference call.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Okay, Yatish. Sorry, over the back. Sorry.

  • Nkosi Nyanga

  • It's Nkosi from Momentum. With regards to what's happening at Tarkwa, I just want to have a view as to your relationship between -- the relationship between yourself and the Ghanaian government and also the unions. I also want to hear a view as to how powerful the Ghanaian unions are compared to SA.

  • Nicholas John Holland - CEO & Executive Director

  • I'm going to hand it over to Alfred Baku, who's the head of West Africa based in Accra, he'll deal with it.

  • Alfred Baku - Head of West Africa Region and Executive VP - West Africa

  • In terms of power, every union, as you can see, they carry a lot of power. But compared to South Africa, I would say our unions are not as aggressive as the South Africa union. In terms of the relationship between the company and the government, it's been quite good and very, very strong. In all the things that we do, we engage them and they are onboard, they are aligned. Unions, human nature, they always resist change because they always want to be in their comfort zone. But we believe that, as Nick said, the model that we're looking or we're selling to the government and to all our stakeholders is a model that Tarkwa needs to, in fact, put more on the table for all our stakeholders. But so far, I will say that we're going through the motions, and we should be able to get over the line. They did the same thing when we were planning to move from owner mining to contractor mining at Damang, but now they've come to see the wisdom in what we were trying to sell to them. Thank you.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Yatish?

  • Yatish Chowthee - Gold Analyst

  • It's Yatish from Macquarie. Just to get back on to South Deep, two questions. In terms of the plan, technically sound and so forth, over the last 12 to 18 months, it has been more of a behavior-based issue, or challenge rather, to get the right mindset in. So perhaps, Martin, a question for you is how do you actually practically do it on the mine in terms of adjusting mindset to a bulk mechanized mining at -- mine at depth? And the second question is, in terms of your LHD operators, what's the average qualification across the board? Because I do see you spending money, around 6 million adverts over the next 3 years, to sort of fill that mechanized mining gap that South Africa, or rather South Deep, needs. So could you just elaborate around qualifications and the behavior issues at South Deep?

  • Martin Preece - EVP of South Africa

  • So I think the behavior issue has to start with me. And I think that's one of, I think, the things we're trying to change is that if you want to drive behavior through the organization, you've got to start at the top. So it's about changing our mindset, changing the mindset of our senior managers, changing the mindset of our middle managers and frontline leaders. It's about changing the systems and processes that align to that so that you can't say you're a bulk-mechanized mine and then we have systems and processes that don't support that. So a big, big focus, I think, from the top down. I think it's aligning our training methodology. We're putting a lot of effort into business improvement and flowing out of that into many business areas, that I discussed earlier, that we try and drive single lines of accountability, that our frontline leaders have into [inter-accountability] in ends, they're responsible for the whole process. And I think a key component, in my view, of around a bulk mechanized mine is that the point I was making earlier, we've got to see this no different to a motorcar-manufacturing plant or a shoe-manufacturing process. We've got to get the process methodology in. It's about repeatability, because as you start getting repeatability, you're going to get stability in your processes. And we've spoken about there's 3 key capabilities we want to build into the business. The social capability, where we're getting the right people in the right roles, doing the right things, working effectively together. The technical capability around do we know how we're supposed to be doing it, are we embracing the right technology, the right measures, and I think most importantly, are we executing in a disciplined manner. So we're doing the same thing the right way every time and in a repeatable way. And then the last capability we want to build into the business is the capability around commercial acumen, that we start making sound commercial decisions. This isn't a mine that we're trying to sort of make money for the next 3 to 5 years. We've got to embed a culture and a mindset for the next 70 years. So we're building the future while we are trying to mine the past.

  • I think in terms of our qualifications, we've set a benchmark now that the minimum entry requirement to work at South Deep is going to be a metric. We've agreed with organized labor around a set of entry assessments so that we get the right people. I think you can appreciate one of the challenges when you're running a mechanized fleet underground, hand-eye coordination and ability to multitask on a number of components is quite critical. I somehow feel that if I had to apply for an LHD operator, the coordination test might be a bit of a problem for me, I was never a great cricket or squash player. So -- but we need -- that's the kind of work we've got to do. We've got to set minimum literacy and numeracy as we start embracing technology. We want to have visual display and communication on the machines where guys can input, respond so that we can get our methods of working, short-term scheduling and control and dispatch in place. And for that you need skilled people from a numeracy and literacy perspective, but also from a physical. One of the other key issues is around doing assessments around your propensity to take risk because we work in a high-risk industry, and we need to try and find people that don't have a natural tendency to take risks. So I think there's a lot of a focus going into trying to get the right people. I hope I've answered your question.

  • Avishkar Nagaser - EVP of IR & Corporate Affairs

  • Okay, with that, I say thank you to you. We have a conference call at 4:00 p.m. if you have more questions. The media that's joining us for the round table, it's upstairs, and we'll see you in 6 months. Thank you.