  • Avishkar Nagaser - IR

  • Good morning and welcome to Gold Fields' results for the quarter and year ended December 31, 2015.

  • Following the presentation, you will be given the opportunity to ask questions. In the unlikely event of an emergency, there are exits at the back and the front and you assemble outside the building.

  • I will now hand you over to Nick to lead the presentation.

  • Nick Holland - CEO

  • Thanks very much, everybody, and good morning. Thanks for coming. I'll get straight into it. We've got quite a lot to cover here.

  • Right. Looking at the quarter results, good to see that we've managed to increase our production again this quarter, up to 566,000 ounces. Still making cash, $47m of cash flow. Costs again down, $942 an ounce, and that puts us I think pretty close to the bottom of the cost curve.

  • Now, a lot of the producers only give you all-in sustaining costs, but we give you everything. These are the all-in costs. And I think if you go and look at some of the other major producers, we wouldn't come out too bad in comparison to that.

  • Normalized earnings, if you strip out the impairments, close to $200m asset impairments and then some tax adjustments to add to that, if you strip those out, about $15m. We've paid a dividend. We've stuck to the policy. Our commitment has been to pay between 25% and 35% of earnings as dividends. We've done that. So shareholders will get a nice dividend, including me, so I'm happy about that.

  • Net debt decreased by $47m. We continue to drive our debt down. We want to get to 1 times EBITDA, if we can. That was a target we'd set for 2016. Whether or not we can get there is debatable, but we're going to continue driving the debt down. That's certainly a target for us.

  • South Deep, one of the highlights is we got the production up 24% this quarter. That's on the back of a 42% increase in quarter three. So if you look at second half 2015 against first half, we're up about 70% on production, and that's obviously had a major impact on the unit costs.

  • Guidance for 2016, we're looking at between 2.05m and 2.1m ounces, at costs that are very similar to 2015.

  • Here's an indication as to how we've tracked over the last three years. I think the key point to highlight here is that production has been flat to rising over that period, particularly over the last year. A lot of this is seasonal, but over the period of three years we've picked up. Gold prices obviously have been coming down, but you can see the costs have been coming down more than the gold price. So if you compare us to, say, three years ago, we're down probably about $400 per ounce.

  • How much more can we do? Well, I think we're into diminishing returns here. Certainly, currencies have helped us over the last year and inflation has been benign and continues to be benign. Australia is pretty flat. In fact, you're able to employ people now at less than what you paid three years ago, which is quite amazing, and contractors have pulled back costs. Whether it's going to stay this way, time will tell.

  • We said a number of years ago it's not about ounces; it's actually about making cash. And we moved the strategy back over here. When we stopped all of the projects division, we stopped greenfields exploration, we stopped marginal production and, guess what, we started making money, against the backdrop of a gold price that continued to decline over that period.

  • We had one little area here where we didn't make cash, and that's mainly because of lower production in quarter one that was scheduled and some of the capital that was front-ended. So that wasn't a surprise to us, but it was a surprise to some people out there. But overall, you can see the trend is in the green.

  • The balance sheet, as I've mentioned, we're comfortable. We don't have any near-term maturities. The first maturity only comes in 2017. We've got lots of headroom that's committed. So I think Paul and his team have done a great job in making sure that we have the flexibility and the liquidity to withstand lower prices, if they come. That said, we want to continue this trend of bringing down the net debt and the net debt to EBITDA ratio.

  • South Deep. Let's look first of all at that operation. As you can see, in quarter four we went up to 68,000 ounces, and you can see the enormous impact it has on costs. Costs have come down to $1,156.

  • Now, that's obviously at a rand/dollar exchange rate of around about ZAR14, not the spot rate, and that came down from ZAR14.31 the previous quarter. So that's a big decrease that we've seen. Given the fact that about 75% to 80% of the costs are fixed in the short run, the extra production comes through to the bottom line at a very low cost.

  • We've done a lot of work in putting the right leadership and skills in place. We've installed a more performance driven culture. Skills development has been key. We're training our operators. We're training our artisans. Safety has been the backbone of all of this. If you get safety right on an operation, you'll generally find that the production follows behind that.

  • We've moved to a new type of mining, and I'll talk about that a little later, to high profile destress instead of low profile distress, and the early signs are encouraging. We're targeting breakeven by the end of 2016.

  • And you can see over here as well the significant reduction in cash out burn over the year, down to just under ZAR60m in quarter four, and obviously the gold price in rand terms is certainly helping us. So let's see. We'll obviously try and get there quicker, but we have to be careful for the impact of the rand on inflation. I'm a little bit worried about the impact of inflation.

  • Been watching the rand for 25 years in the gold industry and the mining industry. You usually find that you get opening up of the margins and then inflation comes in and closes it again, so we've got to watch out for that, that we don't give it all away and we find that in two years' time our costs have followed the gold price in rands. That's the risk.

  • Sorry. So just to let you know, guidance for next year, or this year, rather, 257,000 ounces at all-in costs of about ZAR575,000 a kilogram. And I think you all know what the spot price is today. It's slightly more than that, as we speak.

  • I've talked about putting the skills in place. Nico and the team have also put together a matrix of over 68 initiatives that are prioritized that are going to mean the difference between success and failure over the long term, how we actually create sustainable operations on all of these categories of people, health, the fleet and the infrastructure, as well as the mining design.

  • So all of that's in progress. We've done a lot of work on fleet replacement over the last year. We've replaced a third of the fleet. And you get a big kick-up in availabilities when you bring in new fleet. We've seen that before over the years when we've bought new fleet, so that's certainly helped us.

  • We've done a lot of work on making sure that the infrastructure is fit for purpose. I think it's fair to say that's work in progress, more work we need to do. I think the morale on the mine has turned a lot. And if people are feeling more confident about themselves and their job, they will usually give you better results over time.

  • So look at the safety here, I mentioned. Now, this is the lead indicator for improvement, 68 injuries this year from 167 last year. And we achieved something we've never done in quarter four. We had 38 injury free days. Now, that is a first for the operation. That means people are doing things better, they're doing things properly.

  • Underground conditions have also improved. Secondary support installation. Now, there's a backlog of many kilometers that's been built up over the years. We're starting to eat into that, a lot of work still to do, but the trends are positive. Injuries down, support up, and here's the physical conditions rating that also looks better than where we were.

  • Couple of pictures help to tell a story, given that we're not doing a mine visit this time. Look how poor the footwall conditions are, too much water on the foot, mud there. That's what it looked like. Now we've cleaned it up. Much better.

  • Look at the bad support here, the support's hanging. We've got water pipes hanging. What have we done? We've tightened up all the support. We've put the mesh on properly. We've got the pipes undercover. Much better. So these are the kind of things that can improve an operation.

  • We've often said that the success of South Deep is dependent upon distress. That's essentially the underground development. If you can actually get that up, you will create more face over time in the open stopes, which is the meat and potatoes of the operation. That's gone up. Open stope production has gone up and the ratio has gone up as well. That's with a high grade. That's where the big volume is.

  • Backfill production has gone up. Remember, we have to backfill all of these big voids; otherwise we can't continue mining. So we had a backlog of that. We're starting to eat into that and development's going up. So the trends are all positive and it's looking a lot better from here.

  • Now, we've also changed the pillar layouts. We used to have four mining spans of 240 meters, with 60 meter pillars, and we also had crush pillars in between the MADs and the SADs, the main access drives and the secondary drives or stope access drives over here. So what have we done? We've decided to create a more stiffer structure. We're going to reduce the mining spans and keep the same stability pillars of 60 meters.

  • So that's now been agreed. We've had independent geotechnical consultants who have been working with us for two years to actually come up with this change in configuration. So we're now able to move to a shorter mining span, now we have 180 meter mining spans. We've moved from four to six corridors, with 60 meter stability pillars in. And as a consequence of this, we've also brought in a little finger over here, on the more distal part of the mine, 1 west, that previously wasn't in here.

  • So that's given us a stiffer structure. That's going to mean that we're going to behave much better in terms of seismicity, to the extent that we have seismicity as a risk, and it should mean that we have a much better long-term sustainable plan with shorter mining spans.

  • In addition to that, we've also put in bigger crush pillars between the MADs and the SADs. So that will also give us better localized conditions as well and help us to make sure that we don't have closure. That's one of the risks that we have is to reduce the closure.

  • Previously, we were looking at closure of potentially up to 25% per meter. Now, with the changed system, we think we can reduce that by a third -- to a third, around about 80 millimeters per meter. So all round I think this is going to be a much better design for us.

  • Now, we're not giving you the reserves today, because that's only going to be finalized in March, but we're not too concerned about the impact on reserves overall. So we don't think this is going to be fatal for South Deep and, if anything, it's going to derisk the entire mining profile.

  • We just want to show you briefly, while we're here, how we actually open up the ore body. We've got a series of slides here. We get into the ore body first of all. This is a typical destress cut. Now, a cut will be superimposed on one of the corridors that you've mentioned earlier. On one of these corridors here, a cut will go across that entire corridor.

  • So it starts off with your access to the ore body, your main access drive or MAD. From there, then we have our breakaways, we have the stope access drives that come in over here, like that, and then we have the stope drives that come from there. That's how we actually open up the area.

  • What we then do is we take those stope access drives down. You'll notice we follow the inverted Christmas tree geotechnical design. That's a 45 degree angle, so that we honor the geotechnical design over that period. We take the stope access drives down and we actually backfill these as we go.

  • So the MAD stays open, the SADs stay open, and we fill the stope access drives as we go down. And you can see over here I've marked in red where we actually are filling those stopes. So that destresses the ore body, and then in between these stope drives we have the crush pillars over here, which must crush to actually absorb the stress.

  • And all of this actually achieves one result: we take all of the latent rock pressures and we push them to the boundaries of this cut. So now we've had the best professors of geotechnical design in the world that have been working with us over the last two years, and even before that, to get this right.

  • So that's how it works. Now, it's important for us also to make sure that we always have a front of at least three secondary access drives, or SADs, opened up before we start the meat and potatoes of the business, which is the open stoping.

  • So that's the next thing. There's your open stope. So you mine these stopes from in to out on a retreat basis, so the stopes will be mined from the side here right through into the MAD. You will start your slot over here. That'll be your access into your stope. You get your Simba rigs in there, they drill the big holes, and then we start to do five rings a time and we take that all the way through and mine that.

  • So if you look at what that looks like over here, you can see there. And notice underneath we're starting the next cut. The next cut actually overlaps the cut above and the development over there in grey shows how we're getting into the next cut below.

  • So if you look now in a mature destress cut, you can see over here these are all of the primary and the secondary cuts. Just important to note we do the primaries, we have to backfill the primaries, then we come back, we mine the secondary stopes. And you can see as well we mine them in a sequence. We can't mine everything at the same place. From a geotechnical design basis, we do one over here, two there, that one, that one, that one, we fill as we go and then we come back, get the rest.

  • So at the end, we've essentially mined all of the stope access drives. They're all filled because they're mined as part of the long-haul stope. And then we mine the MAD, because this is all on reef, folks; this is all in the ore body. We mine the MAD on a retreat basis right back up to the top there, we fill that, and then we get the remaining ore out over here and then the access, and that's men and materials as well that is used.

  • And that's your cut. And you can see over here, there's the cut below starting to push up; there's your development drive. That's how we mine at South Deep, or that's how we want to mine.

  • Okay. So if we look at where we were on the low profile destress, we made a decision in July this year to stop the low profile and move away to high profile, and these are the reasons we were doing it, or the reasons that we made the decision to change.

  • So this is the low profile cut. As you can see over here, we brought in low profile equipment. We didn't have equipment that could do all the support, so we're doing a lot of manual installation, hanging wall drilling, with handheld rigs in some cases, remote air legs operated. It took hours and hours to do the support. Then you had to come back and do your bigger excavation once you've destressed.

  • These are all destressed 2.5 meters. Then we come back, we do the bigger excavation. Then we have to make it bigger, 5 meters. We have to take out all the support again, rip the hanging wall. And then thirdly, we come in and we start mining the stope. So the slope would be over there, and we've come back on a retreat basis, and there you can see the Simba and the dozer doing the five rings over there, right to the top, and letting it fall.

  • So that's how we did it. And the typical life of a cut is about six years, but it took us 30 months to actually get to stoping. So the lead time to stoping was too long.

  • Now, if we go to high profile, now we're going to 5 meter cuts and you can see we're mining it once. So we bring in the equipment, we mine it once, we support it once. Everything is mechanized, including the support. There's no manual intervention. We've got available rigs. Only one fleet and one suite of equipment is used for all of this, so much easier.

  • And guess what? The lead time to stoping is now 19 months instead of 30 months. The cut life doesn't change, of course, but it means we get into this area here, which is really a focus of South Deep. We get into that area much quicker as well.

  • So here's where we are in terms of the destress at the end of 2015. You can see the high profile are the blue areas that we've done over six months. The magenta areas represent the low profile areas. And you can see, if you worked all this out, it's about 40% of the total mine that right now is on the high profile destress. So that's quite a lot of progress that has been made over six months.

  • This is where we will be, once we've finished the low profile. Now, some of the low profile it's not worth stopping, because we're fairly advanced on the low profile, like over here, for example. We may as well just finish it all the way through, so not stop it, because we're virtually more than halfway. But the rest of the mine then, by the end of next -- end of this year, we'll probably have about 80% of the mine on high profile, and then the full mine on high profile by the end of 2017, early 2018.

  • Obviously, there's a lot of work to bed this down. There's a lot of training to be done. The geotechnical experts are holding our hands. But the one thing we can tell you is this is going to be better than what we were doing. There's no doubt about it. It's not going to be easy. We're going to have to bed this down, we're going to have to get better at it, but it's going to be better than where we were. There's no doubt about that in our minds.

  • In terms of fleet, here's a recon of the fleet. I won't go through a lot of the details, because you can study it in your time. But the important thing is we're going to be reducing the number of fleet, in fact, from 95 at the end of 2015 to about 87 at the end of 2016, because we're going to get more out of the bigger fleet. A bigger fleet will be more productive. We need less.

  • But importantly, in terms of replacements, we will have brought in 24 new pieces of gear, which means if you add to that the 24 pieces of new gear we brought in, in 2015, it'll mean that about two-thirds of the total fleet is between one and two years old. So the availabilities and the utilization will be much higher. So that investment in the fleet should help us to improve our advance per meter and our availabilities and utilization.

  • Here's the new 93 level workshop. We've talked about this quite a lot over the years. So it's active. We also have the OEM maintenance, this outsource for corridor two, or what was corridor two, which now represents about 35% of the mine. And so, as you can see, much better workshop.

  • And just to put this into context, it's like two rugby fields underground, obviously with pillars in between that you can see over here. So it's a massive footprint. It's probably got to be the biggest underground workshop at 2,900 meters in South Africa. We've been working on this for many years and now it's starting to pay back dividends to us.

  • In terms of people, we've brought in 143 out of 146 core positions that have been filled. And we've looked long and hard, we've searched around for the right skills, so it's taken us a while, but we're quite comfortable with what we've got.

  • People are feeling a lot happier across the mine. If you did this a year ago, we wouldn't have even showed you this; it was so bad. But today, I think we feel brave enough to show you that at least half the workforce are satisfied and a third of them are strongly satisfied, so that's a big turnaround. I think that is another lead indicator to improved performance.

  • We've now got artisans in training. We did a skills assessment of our artisans and found that most of them actually couldn't do the job. So now we've got them in training and it's going to make a big difference to us over time. Particularly with the OEM in there, we're going to have a transfer of skills and that's going to be a lot better. So, all round, the team is feeling more empowered.

  • So back to basics is what we said. That still continues. A lot of work still to do. We're probably still three or four years away from where we'd like to be, but I don't think the journey at South Deep is about three or four years. This is going to be a mine that is going to be continuous improvement. And next year, when we're bold enough to bring you to the mine and tell you what we think it can get to and by when, that's only going to be the first step. I think it will be continuous improvement over many years.

  • 250,000 ounces of gold in 2016 is our commitment, and breakeven by the end of the year as a minimum.

  • All right. So let's look at the rest of the Group, because believe it or not, Gold Fields does have some other mines beyond South Deep. Sometimes, based on all the questions, I wonder whether people know that. So here's what the other mines have done. This is a company in its own right that can stand against anything out there.

  • Quarter four, 500,000 ounces of production, roughly, 2m ounces for the year, all-in costs $912 an ounce. So that's right there in the lowest quartile. And they made $334m of cash. You won't find too many global gold companies making that kind of money. Just the international assets of Gold Fields manage to make that money.

  • Australia. I think the big thing here is we want to continue to discover ounces, so we can keep the longevity going. 1m ounces a year is a great target to have achieved, but of course you become a victim of your own success. And we're not in an industry that produces widgets. We're in a finite industry. So we have to find 1m ounces a year. That's not so easy to do, once you've got to that level.

  • But there's lots of encouraging signs. At St. Ives alone, we've got some really good discoveries along the Speedway Trend, Invincible South, and I'll talk a little bit more about these. We've got a few slides a little later.

  • We're going to be spending a fair chunk of money on exploration, AUD86m. We spent about AUD90m in 2015. We said it's a three-year program. We're going to early generative targets now. We're not just looking for extensions to the existing mines, so it is going to take time. We're not going to see near-term results. It's going to take two to three years to see results on all of this.

  • If we look at St. Ives, I think a great quarter for them, 100,000 ounces in quarter four, all-in costs of about $836. Invincible has really performed exceptionally well over the last year. It's proved to be everything and more that we hoped it would be. And hopefully we'll have more extensions, maybe a push back in time. The underground will come in as well.

  • I mentioned the Speedway Trend. That looks exciting. We've got some really good intercepts as well on the Eastern Causeway, 40 meters of 1.6, 10 meters of 3.7 at the Retribution project, so clearly there's more than just a bit of smoke over here.

  • Lower production this year, because we're closing Athena. Athena is one of the two underground mines that has been in production for about eight or nine years, so we're closing that now. Actually, next week we're starting to close it. So obviously we're going to lose that production.

  • Neptune will come in as well, but that will come in later in the year so there is a little bit of a drop in production, from 370,000-odd ounces to 350,000 ounces. But we think as Neptune comes in, which also performed exceptionally well last year, that we should be able to maintain or possibly even increase this over time.

  • So here's Invincible South, the Speedway Trend across the lake. This is one of the exciting discoveries that we've got. This is fairly new. We've already got 312,000 ounces. Fairly good grades over here. This looks like it could be an underground operation.

  • And here's some of the intercepts, and you can see here's the grades. Purple grades are the higher grades. As you go down to the black, that's all the grade that's low grades. Here's the ore body structure, typical steeply dipping ore body, open plunge, so I'm sure that we're going to find some more there over time. There's the strike length. So it's not small and hopefully it will get bigger over time.

  • So across Invincible we have a number of targets that we're looking at to put back what we've mined and also add in what we've mined. As you can see over here, all of these stars indicate the targets. Here's the Speedway Trend as well that you can see over there and there's the Eastern Causeway Trend. A lot of these are associated with shear zones that go across the ore body and also shear zones that are perpendicular to the main shear zones. This is 90 kilometers.

  • You can see a lot of the area here, very little exploration. And it's a function of getting to it and getting the rigs, getting the people to it. And you don't want to spend too much money, because you can waste. You have to actually have success and then build on success.

  • Agnew/Lawlers, good turnaround. They had some tough geotechnical conditions at the Kim lode, the base of that mine, which I think it's fair to say it is getting narrower; it's splitting out. Geotechnical conditions are certainly getting tougher so mining rates will decrease, and we know that Kim South is coming to an end. That's why we're developing into the FBH ore body which is adjacent to Kim, with good grades as well, and also looking at getting into new areas on the old Lawlers complex.

  • But they've done well. They've pulled their production back up. And I think they'll do well again this year, as you can see, 223,000 ounces, slightly lower than 2015. But as we bring the new ore bodies in, I think we can certainly push this up possibly down the road.

  • Here's what I was talking about earlier. So here's a long section. Here's the old Waroonga open pit that was mined out some years ago, and obviously the portals come in here and we go down over here into Kim. Here's Kim, and you can see we're fairly deep into Kim. Here's FBH, which is going to be the new mining footprint for the future.

  • And here's the drill drive going into something called Waroonga North and Kath. Similar shear zones, parallel shear zones to the Kim shear zones, so the host rocks and the geological structure lends itself to another ore body. We've got surface drilling and underground drilling in here which look positive. But I think the exploration drive into what we think is the heart of the ore body will tell us a lot about this over the next few months, and if all goes well, this will be another significant mining platform for Agnew/Lawlers.

  • Now, here's Cinderella. This is on the other side of the old Lawlers operation and you can see it's over here. This is the Cinderella area. Now, this straddled Agnew and Lawless, and this is one of the reasons we were quite keen to get hold of Lawlers, because this ore body couldn't be mined by either Barrick or ourselves. Now that we own 100% of the two mines, we can actually mine all of this, and we've had some really good intercepts over here.

  • We're developing the drive into that as we speak, and we should be mining in quarter two or quarter three in Cinderella. And the other thing with Cinderella is it looks like it extends into a thing called Himitsu, which is down here. So this could be quite a bigger strike area than what we see now, so the guys are quite excited what they see there.

  • Darlot has done incredibly well in the second half of the year. First half of the year was not too good, but the second half we've done well. We've brought our costs down significantly, and that's mainly because we're into the heart of the Lords South Lower ore body. Grades of about 6 grams a tonne that we can actually take into the plant, which is pretty good here.

  • Our problem with Darlot, though, is we're running out of real estate, and as you can see, our forecast really doesn't fill the mill for the whole of 2016. That's now, but that doesn't mean to say that's where we're going to end the year. There's something else deeper down in Centenary called Oval that we're looking at, and we're drilling that area now. If we're successful, we should be able to add something to that for this year and possibly next year. The timing is difficult to predict, but we may see some of that this year and we may get some other sources in as we look across the ore body.

  • Now, we're doing a lot of work outside of Centenary, which is the main ore source, and you can see over here in the middle. That's Centenary. There's about 1.5m ounces that are being mined out of Centenary, but we're now looking at other areas across the lease. So, 6.5 meters at 1.3 grams at the Waikato Prospect looks interesting. And also, over here at the top, we've got some other interesting drill intercepts over there and at the Khan Project as well, 4 meters at 7.9.

  • So it's far too early to give up on Darlot. We have to do the work and assess what we've got here. These are orogenic systems. They look as though they're going to die on you and all of a sudden you find something new. So certainly I want to give the team every chance to find something new.

  • Granny Smith, another good quarter, slightly off where we were before. I think 82,000 ounces was really shooting the lights out. But as we mine across the central corridors of where we were in Zone 90 and 100, we'll obviously have to get the lower grades because the ore body overall is going to give you an average grade. So the grades are slightly down. Still a very good performance, still good costs, and we expect to do well again in 2016, about 270,000 ounces. And the exploration continues to be very exciting at depth.

  • So we're mining pretty much over here, Zone 90, Zone 100, the last vestiges of Zone 80, these sort of gently dipping lodes across the ore body. That sort of goes under the salt pan over here. But we're right down here and we're finding really exciting intercepts, like one, two, three, four, four lodes down. And typically, in situ, these lodes have contained up to 1m ounces per lode, so that gives you an idea of what we're looking at over here. This is pretty exciting and it's still open. We haven't yet found the limits of the Wallaby underground.

  • So there's some of the drill results, very briefly. Zone 135 over here, 6 meters at 9.7, 14.8 meters at 13.6, 15 meters at 7.8 (sic - see slide 39 "17.87"). There's a lot here. I think we've just got to get through it. It's going to take time.

  • Obviously, as we get deeper, the one question that a lot of you will ask is what are you going to do, and yes, we are doing the studies potentially for a shaft system that might come down, not for men and materials, just for ventilation and rock hoisting. It might actually be more efficient than having the vehicles drive down the spiral decline all the way down. We're doing that study. We'll probably have a better view on that in a year's time.

  • So, Granny Smith, we're looking at a whole bunch of targets across the lease, and I'll leave this with you to study in your own time, but a lot of work to do in following up some interesting results.

  • Moving to Ghana, good performance from Tarkwa, 145,000 ounces, $800 an ounce, this truly is a world-class operation. About 7m ounces of reserve, and I have to tell you, this is an ore body that's very similar to Wits style ore body, conglomerate stack reefs. And it's open, in many directions, and we think that there's potential to find another significant paleoplaca on the lease that we're looking for.

  • So we are spending a little bit of money on exploration, although we don't need to do much at this stage, but we'd like to know what might exist there. So we expect another good year ahead of us at pretty good cost structures.

  • Damang is obviously a mine in flux. We're starting to run out of flexibility in the pits that we are mining. We're mining the extremities of the Greater Damang complex, Huni and also Juno. As you know, as you get deeper into the pit, the pit floor gets more constrained, you run out of logistics to move the ore, and unless you do a big push back, the mine comes to an end.

  • So we're now looking at potentially a push back of the area below the original pit that we mined for 10 years that actually was very good to us. We got very good grades there of over 2 grams a tonne. We've got a resource there of about 4m ounces at over 2.5 grams a tonne in situ.

  • And so we're doing a full study now, looking at the potential of accessing that ore body. Obviously there's going to be quite a lot of strip, waste strip, to get there. We've brought in some independent consultants to validate the work that we've done ourselves, and I would hope to come back to the Board in the next quarterly board meeting and then give an update to the market as to what we want to do here by May.

  • But certainly it's a world-class ore body. I guess the question is whether the gold price is actually high enough for us to have the guts to spend the money at this stage to do it. But there's an ore body here that will be mined in due course, I'm sure.

  • Cerro Corona has had another good year, just under 300,000 ounces, although this last quarter we did come off quite a lot. That's a function of where we are in the pit. We expected that. And of course, with the grades coming down, you can see that it has a major impact on the all-in costs. Nothing to be concerned about going forward, however.

  • And as you can see in the guidance, we expect this year to come in at all-in costs of about $860, all in, 260,000 ounces. So that was a function of taking the entire pit floor down. You have to mine the lower grade areas, the high grade areas, and you do it all in a sequence, but next year we expect to do reasonably well.

  • Why is the ounces down? Well, the copper price is down. So this is a little bit of alchemy, of course. We try and convert copper to gold, and if you use a lower copper price, guess what, you get less ounces. That's the alchemy. So if you run that through the copper price we achieved in 2015, the production would have been closer to 300,000 ounces. So that's what that is.

  • Copper at $2 a pound hurts this operation. 50% of the metal in the head is obviously copper. But we're still going to make money, but obviously not as much as we'd like, at $3 a pound or higher, so maybe those days will come back, one day.

  • So I think, in conclusion, just wrapping up here, our objective is unchanged. We've said to you before, we're here to make money. We're here to actually generate free cash flow, and we're going to reconfigure the Group to make cash flow. The days of putting in heroic, long-term production forecasts are over for us. We're not going to be doing it. If the others want to do it, good luck. We're not going to be doing that.

  • So it's making money at current prices. That's the key. And we've been doing that the last quarter, and we believe that certainly at spot prices today, we've got a reasonable chance of repeating that during the course of this coming year.

  • Near-mine exploration is key, and the ongoing development of our ore bodies. And you'll see that our capital for this year is still around about $600m. There's significant development going into St. Ives and Invincible and Neptune. There's significant development going into Granny Smith, as we open up the deeper parts of the mine. There's ongoing strip going into Tarkwa, of course. Damang, we're going to make the decision in the next few months.

  • So we have an eye not just on today. We have an eye on tomorrow. And the fact that we're putting AUD86m into Australia for brownfields exploration I think is testimony to that statement.

  • Guidance for next year, or for this year, rather, about 5% down at the lower end, 2.05m, about 2% or 3% down on the upper end of 2.1m ounces. And costs, as you can see, are pretty similar to what we've achieved in 2015. So, I think that's not a bad outcome, to keep the costs where they are.

  • I think, with that, we're going to leave a little bit of time for questions. I've got Paul Schmidt as well. Sorry, I should have introduced the team. I've got Paul Schmidt, our CFO, as well as in the corner there I've got Nico Muller, who's the Executive Vice President and Head of Operations in South Africa, so between the three of us we'll endeavor to answer your questions. Thank you.

  • Johann Steyn - Analyst

  • Okay, thanks. Thanks, guys. Hi. Johann Steyn from Citi. Nick, first of all, thanks for the transparency on Australia. I think it's really enlightening and comforting to really get the advance guidance on a lot of the things. We've always known, when you acquired these assets, that there's going to be a three-year period where you've got the reserves in the ground and thereafter you need to go and find things. And Australia has generated a lot of cash for you over the past two to three years, so very well done with that.

  • But the key question now is, strategically, you've got more cash from this business than you've put in. Now, the exploration really needs to start pick up. You need to spend more capital into this business. Is this the optimal decision? Isn't now a time to try and call it quits, take the money that you've received here? Otherwise, this just becomes a normal gold mine, if I might say that.

  • Nick Holland - CEO

  • Yes. So, I remember in 2001, Johann, when we bought St. Ives and Agnew, and we were roundly criticized and people said, why are you buying these dying mines? Western Mining doesn't want them anymore. That's why they've sold them to you. They've only got four years to go. It's like 2m ounces. You're wasting your time and your money. So, 15 years later, we still have four years of life left and we've mined 8m ounces.

  • Johann Steyn - Analyst

  • How much of that was driven by the gold price going from $200 an ounce to $2,000 an ounce?

  • Nick Holland - CEO

  • Very little, because the costs followed it. As you know, in this industry, the problem you've got with the gold industry and probably other sectors of mining is that the gold price goes up and the costs go up. I remember when we first bought the mines, the gold price in Aussie dollars was probably AUD500 an ounce and the costs were AUD300 an ounce. Now, the gold price in Aussie dollars is AUD1,700 an ounce and the costs are AUD1,200 an ounce. So the costs have come with us.

  • I think the key here has been finding really good mines that we've discovered and brought to account. Leviathan was a good mine that served us over five to six years. Athena has been a mine that's been with us for six years. We had Apollo, we had Argo, we had Cave Rocks. They all made good money for us over time.

  • So, I don't think there's anything at this stage to suggest that on the lease there isn't the opportunity for us to replace. And what's been the cost of replacing those ounces? It's actually been around about $80 an ounce, on average, over time. What's the cost of M&A? Cowal went for AUD400 an ounce, Cowal.

  • So, what you can do is you can either go and try and discover additional ounces on your existing lease for under $100, or you can try and buy those ounces for maybe three, four times that. We just think this is better business for us. I think we've proved the critics wrong about the reason that we bought the assets in Australia and why we have kept them.

  • When we bought the three mines in Barrick, all of you condemned us and the analysts said, you're wasting money. What are we missing here? Barrick doesn't want these mines, etc. Well, what have we done? We've dropped the costs by 25%. We've increased the production by 25%. We've got a two-year payback on the mines. So those kind of deals are very hard to do.

  • So, I think we've got a reasonable portfolio here, but it is chunky in terms of exploration. We might go through one or two years of lower production before we come back, but we're pretty confident that we're going to find some additional stuff here.

  • Johann Steyn - Analyst

  • Okay. Thanks for that, Nick. Then, with regard to South Deep, can you mine this mine profitably if it's only 300,000 ounces? Let's say you go through all of this stuff that you're doing now and you conclude that because of the fact that you need to reduce the width and all these things you need, effectively, you can only mine the 300,000 ounces. Can you do it profitably at 300,000 ounces?

  • Nico Muller - EVP and Head of Operations, South Africa

  • I think 300,000 ounces per annum is probably close to our breakeven point. And we've not actually invested a significant amount of our effort in cost optimization, which I also think that there's some potential for. So can we mine South Deep profitably? I have absolutely no doubt that we're on track to do this. And the production point, that maybe we'll come back in February next year and give a more accurate view on what that's likely to be.

  • Johann Steyn - Analyst

  • And then just one last question, if I may. This is not the first new plan for South Deep. There's been a number of new plans at South Deep and none of them have worked. Why is this going to work? What have you learned? Why should people start giving you the benefit of the doubt for South Deep?

  • Nico Muller - EVP and Head of Operations, South Africa

  • So, it's hard for me to talk about the plans that haven't worked, and I'm very aware of the track record and the credibility that goes with it. I think what we are doing is -- I think Nick was very brave at the beginning of last year by taking the plan off the table and just giving us the latitude to focus on the basics, and the support that we've had from the Board and Group has been absolutely overwhelming.

  • So they've afforded us the time to get the infrastructure, the mining conditions, fleet. They've given us a free hand in terms of reconstituting a team. And so I think if you look at the things that Nick discussed, those are things that you require to have a world-class mining operation established. And so I think that has been our focus, and I think that's the reason that Nick has been a bit cautious to talk about long-term future guidance.

  • And so I think what we want to do is develop a link between current performance and the guidance that will come back that we have confidence in, in order to convey that confidence to shareholders.

  • Johann Steyn - Analyst

  • Thank you.

  • Patrick Mann - Analyst

  • Hi. Good morning. It's Patrick Mann from Deutsche Bank. I've got three quick questions, please. The first one is just around -- previously, you guys used to target a 15% free cash flow margin, but I think it was $1,300 gold. Is that still a guiding principle? Now that you've strung together two years of positive cash flow, has that fallen away as a guiding principle for the Group and should we look rather from a bottom up and per operation basis?

  • And then secondly, just if you look at the balance sheet and the desire to get below 1 times net debt to EBITDA, but then potential project at Damang, potential further underground options or development of areas in Australia, if there's a project that's got a positive IRR but is going to be -- mean that the business is free cash flow negative for a year or two, how do you -- the desire to get below 1 times net debt to EBITDA, does that take it off the table completely? Do you have to keep the Group cash flow positive when evaluating those individual projects?

  • And then the third question is just on Ghana again. If the decision is taken to close or not to reinvest in Damang, what does that do to Tarkwa or your relationship with Ghana and the mining rights at Tarkwa? Thanks.

  • Nick Holland - CEO

  • I'm going to ask Paul to field all of those three questions.

  • Paul Schmidt - CFO

  • What? On Ghana? I think in terms of looking at investing into the projects, the main aim is that we look at balancing it over the year and still maintain some type of cash flow generation during the year. So when we look at if we're going to invest in Damang, we'd have to look exactly when the spend is happening, etc., etc. So, no, we wouldn't take off the debt reduction off the table if we were going to invest. We'd also have to look at other ways of potentially financing it as well.

  • Next question was --?

  • Nick Holland - CEO

  • Free cash flow margin.

  • Paul Schmidt - CFO

  • The free cash flow margin. It's still on the card, but obviously the way we look at it, at a lower -- at a, say, $1,100 gold price, that percentage probably equates to around 8%, if we take the gold price off. So we still do always target a free cash flow margin. The $1,300 is the benchmark, but as gold goes up or down, we change that percentage in relation to that.

  • And in terms of Ghana was the last question?

  • Nick Holland - CEO

  • About the investment in Damang, if we're prepared to spend some money to make some money.

  • Paul Schmidt - CFO

  • I think we are. And obviously, you can't -- you're right. You can't look at Damang on its own without taking into account Tarkwa. Obviously, the investment agreement is still -- we discussed it with you guys earlier. It is still something we're looking at. It may not happen. It may happen. And we've got to look at the two as a package.

  • So, we're well aware that any decision made on Damang might impact some things on Tarkwa, and that's why we're looking at the two together. And as Nick said earlier, we're not moving quickly on Damang. We're weighing up all our options and what are the potential overflows onto Tarkwa as well.

  • Patrick Mann - Analyst

  • Thanks.

  • Adrian Hammond - Analyst

  • Morning. It's Adrian Hammond from Standard Bank. Two questions. Firstly, for Nick, as I understand, Ghana is going into elections this year. Are there any potential policy changes you're concerned about?

  • And then, for Nico, on South Deep, could you -- now that this new high profile method has been rolled out, can you compare the efficiencies in terms of tonnages to the low profile method, please? Thanks.

  • Nick Holland - CEO

  • Look, I think on the first question, it's far too early to give any kind of view. And look, we're fairly apolitical in our views. We'll work with the government of the day and continue to nurture our relations with whoever is the government. I think the relations with the current government are good. We have a lot of positive dialogue and we'd like that to continue, irrespective of who's there after the election.

  • Nico Muller - EVP and Head of Operations, South Africa

  • If I can comment on the efficiencies, from a tonnage point of view, we actually adopt a very conservative approach to the development of the high profile. And we started with it in July, so we have to limit, for instance, the advance rate for blasts to make sure that we implement a successful high profile destress cut. So I'm not expecting a significant increase in volumes from destress in the coming year. The idea is to perfect the method and then to look at productivity improvements as we go along.

  • What I will say is the efficiency of high profile is favored as a result of the larger pillars, so per linear meter of development, you have a greater area of destress that is achieved. Given the mechanical installation, safe environments, the reduction in deformation from 25% per meter to 8% per meter, what we have found is that our drill rig efficiencies, which we battle to achieve [60] meters per rig per month on the low profile, has exceeded that already on high profile, even the fact that we've only done it for six months.

  • Derryn Maade - Analyst

  • Good morning. It's Derryn Maade from HSBC. I've just got two questions, please. The first one is on Cerro Corona. Obviously, last quarter wasn't such a great result; the lower copper price environment, you're trialing grade profile. Can you just elaborate on how you see the asset moving forward, if this environment stays where it is?

  • And then the second one is on South Deep, unsurprisingly. And just the 2016 target is again, I think, in my opinion, is fairly low, and we're not yet down to the 2013 300,000 ounce profile that was achieved then. Nick has mentioned that he doesn't expect much volume uplift from the destress side. Is that the constraining fact behind that, or what other factors are limiting your ramp up at the moment? Thank you.

  • Nick Holland - CEO

  • I'll answer the first question and then I'll pass the second question on South Deep to Nico.

  • On Cerro Corona, we've been saying for quite some years that the ore body will ultimately progress to the reserve grades. If you go back and look at the mineral reserve and resource supplement for 2015, you'll see the reserve grade is about 0.9 grams a tonne, copper grade's about 0.42%, and we're graduating towards that. So, the ore body now is starting to show what we always thought it would show.

  • That said, it's still a low cost producer. What are we doing as a result of that? It's not been a surprise to us that this is happening. We've seen it coming. We've cut the costs quite a bit over the last number of years, in real terms, never mind just in nominal terms. And the other thing we're looking to do and we have increased the throughput through the plant. We have the potential to further increase the throughput.

  • So we're looking at a project as to whether or not we can debottleneck the plant for us to do more through the plant and maybe bring forward some of the ounces and actually leverage the fixed cost base at the lower marginal cost of production. So we're looking at that too.

  • We haven't given up on life extension. Bear in mind we still have the potential to bring to account economically possibly 25m to 35m tonnes, depending on the copper price and the gold price assumptions. That's not for now. At these sort of prices, we don't think that's the right business decision, but we have the optionality of doing that into the future.

  • And then we're going to slowly start looking around us for potential around Cerro Corona, around the lease itself, and see if there's other opportunities for us to look for incremental inputs to the plant. And remember, this is a porphyry system. So it's not closed out at the base of the pit floor. Where the current pit shell ends is not the end of the mineralization. We have done some drill holes in the past, into the base of the floor. And who knows, we might be able to continue longer than the current life of mine plan.

  • Question is whether it needs a big pushback, whether you have the space on a very constrained site. Don't know if you've been to the site, but it's fairly mountainous and it's rugged, being up in the Andes, and we don't have a lot of space, so pushback is difficult but it might be that we could get more into the base of the floor.

  • So we're looking at a combination of issues to see how we can optimize Cerro Corona. Don't forget, as well, we've got oxides on the site that we could still process over time. We're trying to see whether we could process the oxides in tandem with the sulfides, or whether we should actually process them at the end of the life. And they were from the original cap of oxide ore that we had to take off the mountain, before we started getting into the lower stuff.

  • Lots of options. We're strategically working through all of them. Thanks.

  • Nico Muller - EVP and Head of Operations, South Africa

  • Well, first of all, I apologize for the disappointing guidance. Now, I suppose whether it's low or high is relative. At least 30% up from where we have been in 2015. And as we have explained in previous presentations, we've got a journey to develop our operation maturity, and unfortunately there's not a single bullet. It's not like we can pull one lever and increase production.

  • So if we look at the operation, it is skills development, it's backfill, it's infrastructure. It is so many parts. And I must say, if you look at the leading indicators that Nick has shown, the increase in backfill, the increase in secondary support, we're sitting on 31 kilometers of not unsupported, but the development ends without secondary support.

  • So I think for us we have to manage our growth rate, because we are at risk of having a short-term focus and going up the production curve only to fall down later. It is a bulk mine at ultra-deep depths. It's a value chain with a lot of independent parts to it. And I think the true value at South Deep lies in understanding the value chain and managing the combination of all of the independent, interdependent parts in a very systematic and structured manner, to make sure that the growth that we are achieving becomes sustainable and it will remain profitable.

  • And so I think if we committed to more than that, we would adopt a very short-term focus and we would be at risk of disappointing later on.

  • Nick Holland - CEO

  • The other thing, just to add to Nico, we did change the mining method halfway through 2015. That hasn't bedded down yet and we've got to get more confidence in the new mining method in 2016. So, I think just having the ramp up we've got I think is already quite bold, given that it is a new mining method. So it needs to bed down. We're going to learn things along the way, and there'll be bumps as we have those learnings.

  • Derryn Maade - Analyst

  • I just wanted to ask that slightly differently. If you had the same situation now but your destress mining was at the high profile, say 100% of it well bedded down and running efficiently, what would your target have been for the year?

  • Nico Muller - EVP and Head of Operations, South Africa

  • It probably would -- to by quite honest, my answer's going to bore you because it's pretty similar, because it's not the destressing itself that is the critical constraint. So that is one part of the puzzle, but if -- so in order for us to produce more, we need to have the backfill capacity which is absolutely vital in our mining value chain.

  • So if I mined -- if South Deep accelerated its destress stoping without the support of backfill, we would run to a crash. If we accelerated our development without the necessary ventilation and cooling capacity to provide ideal operating conditions, we would run our -- we would continue to run our fleet to destruction.

  • So, it is a systematic process, covering a wide area, which is why we've brought in business development teams, people that don't have a day job other than paying attention to the fundamentals. And I'm very confident that over time we will see the benefit through a sustained, long-term, profitable operation.

  • Derryn Maade - Analyst

  • Thank you very much.

  • Allan Cooke - Analyst

  • Good morning, gentlemen. It's Allan Cooke from JPMorgan. Just sticking with South Deep, briefly, Nico, has the fleet availability and utilization changed at South Deep? I understand the composition of the fleet has changed. Has that improved over the last year or so? And where do you think fleet availability and utilization needs to be at South Deep? That's the one question.

  • Then the other, you've changed the geometry of the mine design, which will change the extraction ratio. What implications does that have for the reserve? And should we be expecting a decline in the reserve at South Deep as a result of the change in the geometry?

  • And then last but not least, just on that secondary support backlog, when do you anticipate the secondary support backlog will have been caught up at South Deep, please?

  • Nico Muller - EVP and Head of Operations, South Africa

  • The second question I'll answer first. We are going to publish our reserve -- our resource and reserve statements in March, and I think the outcome will satisfy your question.

  • As far as the backlog secondary support is concerned, that's probably going to take us a decade to catch that up. What I think we probably -- what we've asked our geotechnical engineers to do is to categorize that and to create different classes of priority. There are some excavations that we don't have a high traffic volume, and actually that has stood up stable, notwithstanding the fact that secondary support has not been installed. So we want to have a risk ranking of all of the excavations, but it's going to be a long journey. It's a large volume of these -- of secondary support that we have to install.

  • And your first question?

  • Allan Cooke - Analyst

  • It's just the fleet availability and utilization (multiple speakers.

  • Nico Muller - EVP and Head of Operations, South Africa

  • Yes, and I hope my engineers don't listen, because -- I can talk about fleet availability. It's been improved, but I think at this stage more so as a consequence of the new fleet that we have introduced. I don't think we've become particularly good at maintaining fleet. We have implemented a lot of initiatives. There's new workshops. We've got the OEMs in. We've started training our people. We've got a very strong engineering team of people in.

  • And I do have stats, but I think the differences are, as far as I'm concerned, so marginal that it's not worth talking about. And if I talk about our business improving that we have engineered, the differences that we have achieved so far is not as a consequence of our improvement. I do expect an improvement to happen during the course of 2016, given the strength of our team and the systems that they are installing.

  • So, we would aim at an 85% availability and 85% utilization generally in a mechanized operation. We are still tracking between 60%, 65%, 70%, so there is definitely room for improvement, which is great because I think given where the current gold price is in rand terms, I think we've got a great chance of being cash positive much earlier than what we have said. And this is just additional opportunities for us to improve over time.

  • Nick Holland - CEO

  • Getting close to the end.

  • Avishkar Nagaser - IR

  • We have got one question on the webcast. What oil price assumption is in your guidance and what is the sensitivity to this? And are you unhedged for 2016?

  • Paul Schmidt - CFO

  • In terms of oil, we're unhedged. It's difficult to look at the oil assumptions. In each of the countries, they've gone and picked more a specific diesel price that that they've used, and we can get it to the (inaudible) for each of the countries that we've used.

  • Because in each country, Ghana, Peru, they've got different legislation that you don't see the full impact of oil. We'd rather work on set prices. Like, in Ghana, we're using $1 per liter of fuel used. But we can get the rest of the information.

  • Nick Holland - CEO

  • It's not a linear relationship.

  • Paul Schmidt - CFO

  • It's not a linear relationship, unfortunately.

  • Nick Holland - CEO

  • Doesn't flow all the way through in every case, so.

  • Avishkar Nagaser - IR

  • Okay. We can take one more, if there is one here.

  • Kane Slutzkin - Analyst

  • Morning. It's Kane Slutzkin, UBS. Nick, just quickly on M&A, I know the last four or five quarters you've actually actively mentioned M&A and this time round it seems like you haven't. If I read between the lines, is it a case of the near-mine work you're doing is taking the priority and M&A takes a back step, particularly given your comments around what assets are maybe going for now, particularly Cowal? As you mentioned, you paid much less for Yilgarn. So, just with respect to capital allocation, how are you viewing that M&A strategy? Is it on the back seat now?

  • Nick Holland - CEO

  • No, not at all. We would still love to add to the portfolio and we're out there looking, but I think it's hard. It's very competitive sometimes and it's not easy to get the right thing. So, we'd rather be cautious and careful and, as always, be opportunistic for things that come along.

  • But in-production ounces is still the big focus for us. We'd like to add another mine in production. Ideally in the jurisdictions we're in, simply because we know the jurisdiction, we have the footprint on the ground. It makes sense if you know the country to add something in. So yes, we would like to add.

  • So we're still out there looking. But as I always say, the probability of success is low, and until we've done something, you can't assume we're going to do something. When we call you all in and say we've got a deal to announce, then you know there's a deal. Until then, there's no deal.

  • Kane Slutzkin - Analyst

  • Thanks.