Gold Fields Limited (GFI) 2014 Q2 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Willie Jacobsz - Head of IR

  • Good morning, ladies and gentlemen. Thank you very much for joining us for our quarter two 2014 results. (Conference Instructions).

  • The process we will follow this morning is that Nick will first do a presentation after which there will be an opportunity for some questions and answers. Immediately after that there will be a roundtable for all journalists in the room downstairs, it is marked. And we'll probably meet there say five to 10 minutes after the end of this session here. There will also be some refreshments out front and the members of management who are here will be able to answer some of the questions that you might have then.

  • Nick, over to you.

  • Nick Holland - CEO

  • Thanks very much, Willie, and good morning, everybody, and thanks for joining us for the half-yearly results and second-quarter results of 2014. Also with me today on the platform I've got Paul Schmidt, our Chief Financial Officer who is here and then Alfred Baku who is our head of operations in Ghana, West Africa. He's with us today so I've asked him to join us and of course Willie. And I've got other members of the executive here as well and of course one of our Board members, Gayle Wilson, thanks also for joining us today.

  • It's almost two years since I caused a lot of trouble in the gold industry by doing a presentation in Melbourne, Australia, saying that the industry has actually destroyed value over the last 10 years, which included us by the way. I didn't think that we had done terribly better than anybody else over that period of time. And what I said is the industry's got to change the way it runs itself, and it's got to get back to generating fundamental returns for shareholders. And that made us get into a lot of debate as an executive and get thinking about what we should do.

  • And we went back as a team and said that one of the things we should do is actually move away from growth targets where everyone believes they have to stand up and say, how much is your ounces of production going to grow? How many projects do you have in the pipeline, etc? Let's get back to fundamental returns, fundamental delivery. And what is the most important thing that underpins that, it's cash.

  • Now, for those of you who may disagree with that view and that approach, well, I can tell you I've personally spoken to over 200 fund managers around the world over a period of two years to validate or corroborate whether that's correct. And I can tell you for sure it is correct. That is what investors do want. So we've been restructuring our business accordingly, taking out marginal production, changing the whole profile of the Company. And so the results you're seeing today are manifesting the implementation of that strategy over a period of time.

  • And if you look at the quarter overall we're pretty much in line with what we said we'd be for the year. We've talked about a 2.2m ounce guidance, as you can see we're tracking based on quarter one and quarter two, 548,000 ounces, 2% down in the context of the previous quarter. There's all sorts of variances that will mean that you do go up and down, but that's pretty much in line. Costs, in fact, are lower than guidance. So all-in sustaining costs $1,050, all-in costs under $1,100. So had said for the year we'd be about $1,150 and so far we're tracking below that.

  • I'm pleased that we are making good earnings again. I wouldn't say they're great earnings. But given where the gold price is we are generating earnings. But more importantly we're generating cash. $65m of cash we've made for the quarter, $54m at the end of the previous quarter.

  • Now, let's go and look back where we were in the same half last year. So for the half year up to June we've increased our production by 20%. We've dropped our all-in costs from $1,522 to $1,104. That's a 30% decline. We have improved our earnings. But more importantly look at our cash. Our cash generated in the first half $119m versus a negative $276m in the same period in the previous year, even with the higher gold price that we had.

  • So, I think you can see that the strategy has certainly delivered when you look at the portfolio as a totality. We've got the Company back to where we wanted it. And I've said that we want to make a good margin at $1,300. We don't know what the long-term price is going to be so let's work on $1,300 for now. And we're working to make sure that we sustain this over time.

  • So our key themes is it's all about the cash. Now, you've heard that from me and from the team a number of times. A rebasing of South Deep continues to make sure that we can create a sustainable operation. So instead of pushing very hard to make sure that we achieve the objectives for the year, what we've done instead is say, how are we going to make sure that we create a sustainable operation over seven years? Not an operation that delivers in one year and then has a problem again in years two, three and four. And that's why we're rebasing South Deep.

  • We're driving brownfields exploration hard in favor of the assets in Australia in particular, and Ghana. And we've cut back on greenfields exploration as you know. We've been much more successful at brownfields than greenfields. We've added to the reserve lives of St. Ives and Agnew over 13 years that we've owned them. And today the reserves at those mines are the same as what they were 13 years ago when we bought them, and yet we've mined 8m ounces over that period of time.

  • We sold projects that we don't believe are Gold Fields' franchise assets. We've sold Yanfolila to Hummingbird for shares. We now are a 26% shareholder in Hummingbird and we're going to go for a ride on that one. They are very optimistic that they can develop the project and that's great. As a shareholder in that company maybe we can actually participate with them.

  • Chucapaca we've sold. We've essentially recouped our investment in Chucapaca and we've given ourselves a 1.5% uncapped royalty across the area of interest.

  • Our balance sheet has strengthened. We've paid down $100m of debt. And we're paying dividends again.

  • So if you look back what I said in August of last year when we were in this room a year ago almost now that is, when we were in this room. We said that one of the key objectives is to further reduce our costs. We needed to make sure that the Yilgarn assets were fully integrated and are delivering. We wanted to make sure that Tarkwa can transition from a heap leach and CIL operation to CIL only. And we needed to make sure that Damang could either be turned around or we'd have to think of another strategy for Damang. All of those have been successfully achieved.

  • South Deep is work in progress and we'll talk about that a little bit later. And we have disposed of a number of projects, Yanfolila, Chucapaca also Kyrgyzstan and also in Ethiopia we've got rid of a project there as well. So that process continues.

  • Let's look at the Group overall and the three international regions. Bearing in mind South Deep is still a project, it's not a mine that is at commercial levels of operation, we have to remember that. It's only filling half its infrastructure at best.

  • So let's look at the operations that are at steady state across the world. And you can see Australia for the year to date 500,000 ounces, all-in costs of $1,072. That's making a free cash flow margin of 20%. If we look at Ghana 373,000 ounces, this includes Damang of course, at $1,061 that's making a margin of 14%. And South America, Cerro Corona, 157,000 ounces year to date at $709 an ounce. That's making a margin of 76%.

  • So that's all contributed to getting a free cash flow margin of 18% in quarter two versus 13% in quarter one. So we're on track this year for achieving our objective of a 15% margin based on our half-yearly results.

  • So if we look over a period of a year, and I've eluded to this earlier, our all-in costs, all-in sustaining costs are down 26%. So if you look year on year 26% down from where we were. Our production is up about 20%, all-in costs year on year down 30%. That is a massive impact. If you work out the impact in terms of dollar millions of what that means we've taken out about $450m a year of expenditure.

  • Now, the one thing I want to say to you today is that we've also been watching what other people are doing in terms of dropping their costs and whether it's sustainable. And there is a degree of high grading going on in the industry. Now, high grading, in case anyone is not clear on high grading, it means you're mining at grades that are higher than the reserve grade, as opposed to mining to the reserve grade.

  • Now that's not sustainable. So there is a red flag out there. We're not doing that. In fact, if you look at our overall grade achieved, in fact, if anything we're slightly below the overall reserve grade for the Group.

  • The second red flag to watch for i, are mines continuing to develop declines in the underground mines that they'll need to mine over the next 18 to 24 months? And are they continuing to strip in their pits that they're going to need for the future? And I think that's the other concern, because if people are pulling back, they're going to have to put it back very, very soon if they're going to sustain their operations.

  • So those are the no no's in Gold Fields because we know that we won't sustain this if we end up in that scenario. So, when you look at these costs bear in mind that the key objectives that we set out for our operations is you cannot high grade and you've got to keep on developing your mines for the future.

  • How do we look then compared to the rest of the peer group? So, this is looking based on what's out there already, what's already been published for quarter two. These are names that you'll recognize. And we've shown all-in sustaining costs and all-in costs for those who are brave enough to disclose them. And we look pretty good on all metrics, on all-in costs.

  • And I must say this whole debate about growth in the industry, by and large in our view, there's going to be very little growth in the gold industry. We've done a lot of work over the last six months in analyzing potential growth in the industry. And we don't believe there is going to be a lot of growth in the gold industry. Probably at best over the next three or four years we'd say about 1.5% compound growth per annum and then tailing off after that.

  • And if you look at the last 10 years we've only had about 1% growth if you compound it over 10 years. So there hasn't been much growth. The so-called growth projects in reality are only replacing stuff that's falling off. So the real metric to look at is all-in cost. So we're well placed and we're in the lower quartile of gold producers on that metric.

  • Now, here's the key thing, it's all about cash. And you can see here the trend over the last three or four quarters how we've actually been implementing the strategy. We were negative. That's when we started really implementing change. And you can see we're gradually growing the cash flow. And that's against a gold price that actually is going nowhere. So, I think it gives you an indication of the operational improvements that have been effected across Gold Fields over the last couple of years.

  • The balance sheet is very good. I must compliment Paul Schmidt and his team on pushing out our debt maturities. We've taken $715m of debt and we've pushed that out two years on the same terms. That was a syndicate of 16 banks that we had a lot of discussions with and I think they've done a great job in giving us a much better maturity ladder now over the next five years or so.

  • We've also reduced net debt by $100m and that is capital, that's not interest or anything. That's reducing the principal amount by $100m. And we're back into different payout ratios.

  • Paul and myself have the view that we'd like to get our net debt to EBITDA down to closer to 1 to 1 over time. But I think, Paul, it's probably going to take a couple of years for us to get there. But we're moving in the right direction.

  • So, how have we managed the portfolio? And in essence we have a portfolio of assets. And from a strategic perspective every asset is evaluated against its ability to sustain a metric of a 15% free cash flow margin. So in the medium to long term every asset in the portfolio has got to get that, otherwise we ask ourselves, well, should it be here?

  • And certain assets need restructuring. Certain assets possibly aren't going to make it and certain assets need more time to achieve that. So that's the way we're looking at our business to make sure that we generate sufficient cash for us to pay dividends, to continue to pay down debt and for us to pursue accretive growth. And when we talk about accretive growth we're talking about growing cash flow. So anything we want to buy has to fundamentally grow the cash flow of the Company.

  • So where does the portfolio sit? Let's start at the bottom. So projects that have either been divested or will be divested, Talas in Kyrgyzstan is gone. Yanfolila in Mali, Asosa in Ethiopia, Chucapaca. APP we're still looking at a process on that, so that's very much in the melting pot at the moment and Woodjam which is a -- largely a copper project in British Columbia we continue to look at opportunities there.

  • So if we look then at the operating assets. Darlot, we indicated when we bought the Yilgarn package that there was no value that was attributed to that, that was part of the package we had to take it. We're looking at seeing whether we can find a game changer, and I'll talk about that a little bit later. It's too early for us to decide today whether Darlot should be in or out. But there's a question mark on it, there's a flag.

  • And we have been restructuring Damang and South Deep, as you're aware, and St. Ives. And we need to actually get those up into the 15% box. So we think we can. The initiatives in place are giving us confidence they'll be up there. And then the star performers, Granny Smith, Agnew, Cerro Corona, and Tarkwa are already there or above. So that's the way we're looking at the Group.

  • The disposals I've talked about, Yanfolila sold to Hummingbird. I think we've got a reasonable deal there, we're quite happy with that and we've got exposure to the upside. Chucapaca, we got a $81m check yesterday, so that was good to get. That's obviously outside of these results. And we have a 1.5% uncapped royalty across the entire property. Now, remember we only owned half the property. We're getting a 1.5% royalty across the entire area of interest which includes not just Chucapaca. In fact, what we referred to as Chucapaca is in fact a deposit called Canahuire. Chucapaca is the area of interest and there's at least four or five other targets on the property that we could participate in a royalty on gold, copper and silver.

  • So let's look at the overall portfolio. So, the red ones are sold already. What we're going to retain, we're going to retain Far South East in the Philippines, a 900m tonne copper gold porphyry deposit which we see as fantastic optionality to future markets when copper, I think, will recover and it will recover over time.

  • Salares Norte in Chile you've seen in the reserve and resource supplement we put out at the end of April we've got an initial inferred resource of around 3m ounces there. It's very much work in progress. It's an advanced drilling project and we're going to be doing another year of drilling. What I've asked the team to do is a comprehensive infill program to understand more about what we've got and then also a step-out drilling program to test the extensions of the mineralization. But so far that looks like an interesting opportunity but some ways to go.

  • And then the other ones we're looking to get rid of I've talked about Arctic Platinum and I've also talked about Woodjam. We have a royalty portfolio as well that we will consider trying to monetize in some way. But we're not in a rush to do that. We'll assess the markets and see what the best timing is to do that, if at all.

  • Let's talk about South Deep in particular. We mentioned back in May that we decided to suspend most of our operations to undertake a ground support program in the main access ramps to the destress projects and long-haul open stope areas. Unfortunately that's affected around about 70% of production. We deemed it necessary to do this because we need these ramps and haulages to be open and safe for us for a period of 10 years. And with the Australian contention having come in their view certainly is that we need to be pushing South Deep to best international practice when it comes to all aspects of the mine. So we've had to pull back on that.

  • We're making good progress; we're about 70% complete. And we expect all of the ground support to be finished by the end of September and for us to have opened up all of the areas by the end of next month.

  • So in the meantime it's given us an opportunity to relook at our labor and make sure that our labor is fit for purpose and put them through some refresher training. And I must say I was out at South Deep yesterday afternoon and visited some of the training centers to talk to some of the employees about their experience. And this has been the most comprehensive training we've done on South Deep since we owned it.

  • And it's a massive commitment because we're taking all the labor out, corridor-by-corridor over a period of three weeks. And we'll be putting through all of the surface and engineering labor after that, and all of the plant labor. So it's a massive investment in our people and it means that we will obviously have an impact on production, but we believe it's worth doing to make sure the people operate safely and more productively.

  • It's also given us time to catch up on some of the backlog maintenance on the machines and to actually reduce the level of unplanned breakdowns. And rather increase the amount of time that we send our machines into planned maintenance. That's the best way for us to go.

  • I want to talk about destress and some of the thoughts we've got about changing the mining method in a moment. But the long-term plan still remains in place. And we still believe that cash breakeven by the middle of next year is a possibility.

  • You've seen this diagram before indicating the key initiatives. Looking at the infrastructure to debottleneck it, making sure that our fleet availability and utilization is pushed up, and making sure that both our operators and the artisans and the diesel mechanics who service the equipment we can upgrade all of those skills.

  • These are some of the key issues that we're working on to really underpin the movement forward. It is all about the people. That really is the key issue for South Deep. It's not about the ore body, it's not about the infrastructure, it's actually about the people, so that is the main intervention here is to up-skill all of our people.

  • Now, that takes time. It doesn't happen over a few months. But we don't need a huge improvement in the performance of our people to actually achieve quite a bit. So there is certainly significant upside potential.

  • We have gone through a voluntary separation process whereby we've reduced the workforce by around 15% from where we were. That's now complete. We've got about 3,400 people, 1,900 contractors. We actually think we've got enough for full production. We don't think we need more people at this stage. And in fact we're going to be trying to redeploy some of our own people into contractor roles over the next 12 months and bring down those contractors as well.

  • Some of those contractors are also engaged in some of the capital projects, like conveyors in the new mine development, crushing systems, silos which are being finished. And some of those contractors will come out anyway over the next six months. I can't give you definitive numbers today as to where we'll settle at in terms of our total complement. But it will be lower than where we are today.

  • We have taken surplus equipment out of commission. And we've reduced our total equipment by around about 40% from where we were. And we've also placed some orders for some very specialized equipment that we think will make a difference. We've bought some new roof bolters that will speed up our development. But by and large we've been able to rationalize most of the equipment. In fact, we've ordered about eight new pieces of gear, so it's actually very little in comparison to the 80 or so that we're currently deploying in the operations or will be deploying at steady state.

  • I've talked to you about the training and also the fleet management program. The new workshop is progressing extremely well on 93 level. So I think when we do the mine visit in February next year we would like to take people down and show them the new workshop. And who knows the mine may yet surprise us and have that commissioned by the time you have your visit. We'll certainly put that out as a challenge to that.

  • Looking at the mining method, one of the things we've done which is work we commissioned at the beginning of the year, so it's been ongoing now for about eight months. Is we've got our international geotechnic advisory board made up of experts from this country, Australia and Canada. And they have visited the mine a number of times over the last eight months to look at the mining method.

  • One of the challenges that we put to our team is, is there an easier way of doing this, as opposed to having this complicated 2.2 meter destress has to open up main access drives and secondary access drives? Two to three years of development before you can get in and do the open stoping. Is there any easier way of doing this without compromising the integrity of the mine or safety? So that's the quiz we've given all of them.

  • And so they've come back with two thoughts which have been taken to a high level of conceptual design. The first one is moving the destress conventions from 2.2 meter by 5 meters to 4 meters by 4 meters. And essentially what that means is you treat these as normal development drives, you don't need low profile equipment anymore and you can actually speed up all of the support because you can use one suite of equipment everywhere.

  • So that's something that would already make things much, much quicker. So we're going to be trialing that in an area in the eastern boundary of the mine which is outside of the current plan. We hope to start trialing that in quarter four and we'll have to give that at least six to nine months to see what it looks like. And if we think it works that would already speed up the destress.

  • The other one is far more revolutionary, that is in fact moving away from destress as we understand it today altogether and using what we call an incline slot method. And essentially the incline slot method replaces the destress.

  • Now, talking about the 4 meters by 4 meters, here's the existing convention that we have. That's obviously the Christmas tree design that you see for geotechnic purposes. And we'd be moving to something that is more like this. Crush pillars would be a slightly different design.

  • But here's the key dimensions, 4 meters by 4 meters instead of 5 meters by 2.2 meters that's the height by the way. So the height would go from 2.2 meters to 4 meters. So just makes things much, much quicker. The other nice benefit of this is you're going on strike and into the ore body. So even if you have bigger excavations there's no dilution, you're actually into the reef horizon.

  • The incline slot method essentially means that the slots themselves actually replace destress. And we'd be putting in 55 degree slots into the ore body and then actually mining in between the slots very quickly. So the slots can be put in place and then you can mine the open stope in between the slots within a period of six months, so much, much quicker.

  • The other thing is it's a single-pass system. You actually go in and develop it once, you don't need to come back and do manual support as you have to do in the 2.2 meter destress. And you don't have to do footwall ripping to actually get the big conventional gear in there; it's a one-pass system.

  • Let's try and explain it in a little bit more detail to you. So, in other words here's your access drive over here and then here's your slot, 55 degree slot that you put in place over here. And then you'll have another slot next to it. You push the drive out again; create your slot over there. These are 20 meter slots at 55 degrees. That's obviously an open void that we create from a similar draw rig over here and from a similar draw rig over there.

  • These are on different levels. There's a different drive coming out over there. You also put sacrificial development drives in so that you can actually break out the open stope into these areas, so essentially that's going to be the open stope in between the two vertical slots in there as well. So this is going to be a lot quicker.

  • And then you can see over here how you've mined out the open stope in between. Those are the dimensions of the open stope, 20 meters wide, 20 meters high and 15 meters long, so that would be the open stope. Then you'll have a slot going next to it like this. And we envisage having four of these slots, 30 meter slots across a corridor.

  • So instead of having corridors of 240m and then having your stability pillars, we're looking at having mining corridors of 120 meters with either 40 meter or 60 meter pillars. We're still modeling the final design there. And in essence what it means is you'll take South Deep from four corridors to eight corridors. Now, that has enormous benefits in terms of flexibility, in terms of mining quicker and driving the whole area into a much more productive site. The other thing is, by making the mining stand smaller we believe we can reduce the risk as well of seismicity on the mine.

  • So this gives you an idea of what it would look like at completion. You can see this is the old conventional destress, here's the slots coming out, there's the slots, and there's the open stopes in between. There's the access drives underneath and there's the completed test area.

  • So we've got a test area, as I said, to the eastern side of the mine. And we hope to start that in quarter four. And we'll assess the results of that. And it's completely outside of the existing mine plan. That's all I'm going to say for South Africa.

  • Let's talk about Australia which has been a great success to us. As we've said earlier we're tracking about 1m ounces a year. These are the four mines' production results. I think worth noting Granny Smith has done 85,000 ounces in the quarter at all-in costs of $692 an ounce.

  • Now, remember when I presented the acquisition some time ago a lot of people were saying, what have you missed here? Why would Barrick want to sell you their old dying assets? Okay, well, here's what the old dying assets are doing, $692, 85,000 ounces of production. So this place is Granny Smith which is clearly the flagship operation into the lowest quartile of all-in costs for the gold industry around the world. So I think that gives you an idea of our response.

  • What we've done is taken the nine months that we've operated the Yilgarn South assets and compared them to the nine months prior and tried to do this on a like-for-like basis. And so over the period of time that we've owned these operations we've done 367,000 ounces instead of 341,000 ounces under Barrick.

  • Our all-in sustaining costs for this package is AUD982 versus AUD1,243 so we've taken out any exchange effect between the US dollar and the Aussie dollar. So you can see we've substantially reduced there. We've pushed up the grade, that's not because we're high grading. It's because we're actually focusing on mining the ore body to the reserve as we see it. And we modeled the reserve when we bought these mines. In fact, we're tracking pretty much the grade that we thought we should be getting, and also focusing on just improving our mining methods.

  • This morning on one of the radio interviews someone said to me, but how have you managed to Granny Smith to perform so well? Well, I would say there's three things that have helped. First of all, we are mining in better grade areas. We're into the Z90 lode. That has certainly helped us to perform better. Secondly we've reduced our dilution. That was a conscious effort to reduce dilution; we've reduced it by about 15%.

  • The other thing is, and this is actually so simple, we've improved our recoveries in the plant from 87% to 92% just by changing out the cyclones and putting in fit-for-purpose cyclones, which, by the way, were actually in the store when we bought the mine, so thanks Barrick for leaving those behind for us.

  • And secondly, by just changing out some pumps and regulating the water flow better through the circuits. Now, if you model a 5% improvement in recoveries on Granny Smith over the life you'll find that that's a very big number of extra value that's being created with very, very little investment, in fact virtually no investment.

  • The carbon tax in Australia has been repealed, you may have seen that. So that is going to give us a benefit in the second half of the year. We're spending heavily on exploration as we look to drive these assets harder. Remember these are orogenic ore bodies, so they do need quite a bit of exploration to make sure that we can keep them going. And we're looking forward to building up the future.

  • Now, for those of you who did go on the Australia visit, our exploration head did give you a presentation on orogenic ore bodies. And one of the questions that people often have is, they look at the reserves of the mines in Australia and say, but you've only got three or four years of reserves, these mines are dying. That's because of the nature of the ore bodies.

  • Orogenics typically are not fully disseminated up front, they're disseminated over time. They tend to pinch and swell. They follow vein systems. And they tend to keep on replacing and replicating themselves over time. So I think the conventional way of modeling gold mining companies and just using declared reserves will not give you the value potential in these operations.

  • Let's move to St. Ives, here's a picture of the Neptune pit. You can see this is the salt lake over here around it. And we're stripping that pit now and we're getting very close to exposing the mineralization. The interesting thing about this it's a Paleo Placer ore body, similar to the [vits] style ore bodies, which means it has the potential to get bigger.

  • We're going to be mining stage one over quarter four, but there's four other stages. And we're not yet sure of the vertical or horizontal limits of the ore body. So there's quite a bit of work for us to do there.

  • And as Neptune comes in I think that will fundamentally change the nature of St. Ives, because you're talking about a 3 gram to 4 gram ore body. Certainly phase one will be about 4 grams. Now, the open pit grades we've been getting in the past have been about 1.5 grams to 1.7 grams. So you're talking about a doubling of the reserve grade. So we'll get that in, in quarter four. The stripping is going well and I think that will set us up well for the rest of the year at St. Ives.

  • Of course Invincible is the talk at St. Ives at the moment. Also a lake-based deposit. And over a period of two years, just over two years we've already got a resource of 1.3m ounces. Look at the grade over here as well, open pittable, potentially 4.5 grams. And you can see over here the reserve and most of that in fact is open pittable at 4 grams. And we expect to be mining that into 2015. In fac,t we're going to be starting the strip already in quarter four.

  • Now, we don't know where this ore body is going to end, because already we've got a strike over here of 1.9 kilometers. It does go through the other side of that shear zone. But interestingly down to 800 meters we found 26 meters at 6.5 grams and at 850 meters, this is the width of the mineralization, 850 meters we found 21 meters at 12.8 grams. So, this thing is going to be sizeable over time. So we don't know what the vertical limits are and we don't what the horizontal limits are at this stage.

  • So here's an indication as to where it is. I said earlier that Neptune was on the lake, you can see over here. Very close to the plant, the Lefroy Mill. And we're going to do causeways across to Invincible. In fact those causeways are well constructed at this stage. We're almost complete, I saw them a few weeks ago when I was there, so that we can actually access Invincible. So that's going to be a very short trucking distance for us.

  • But where does it end? Well, we're not even sure yet, because here's Invincible at the top here, that's the 2 kilometer strike we just talked about which has potential to feed 2m ounces. We've encountered mineralization in Invincible South. We've encountered mineralization in Heracles, also in what we call Incredible and right down at the bottom here in Pandora.

  • So we are going to be doing a lot more drilling across a trend that is 22 kilometers. And we've found visible gold in some of these intersections. So we're quite excited about this. And we've mined on the lake before, but we've never really spent the kind of time and effort to explore this.

  • So one of the things I'll be doing next year with the team is giving them a reasonable exploration budget so we can give this a good kick. So, this could be something really, really interesting for St. Ives. And it continues to show why it's one of the most prolific pieces of land package in Western Australia.

  • Let's move across to Agnew Lawlers, steady as she goes. I think we're very happy with the performance. This quarter we did 66,000 ounces at $1,000. So they're achieving their goals, in fact they're overachieving their goals in terms of costs. And I predict that the rest of the year should go reasonably well. We're quite comfortable with those two mines.

  • The synergies have largely been captured. We have rationalized the processing. We're only now running one plant, that's helped us to reduce our costs further. We've reduced the overheads. We have everyone now in one camp on the site and that's also helped us to reduce our costs further. So there's lots of upside potential here too.

  • So, this is the Lawlers ore body and these are the targets in the circles for next year. This is close to existing infrastructure over here in the 600, 700 series. These are like parallel lodes going across where they replicate themselves. That's going to be the focus for next year. Infrastructure could come down over here.

  • Now, this is previously drilled. But we're going to get to that once we get to this, and you can see the strike length here is probably about 3 kilometers or 4 kilometers of strike. Hidden Secret, we're going to be doing some drilling over there as well. And then where you see the arrows, that's going to be extensions of existing areas that we've mined. So we're going to push the 200 series, 500 series and what we call Batavia, which is over here and then Sheba. So lots of opportunities for us to extend based on surface bore hole information that will help us to go in the right places.

  • If we look at Agnew itself, this is the current mining operation, what we call Kim that's all mined out. You can see this is the area we've developed over here. So, just to prove the point we've continued to develop so that we've got at least two years ahead of us at any point in time. These are all of the spiral declines that are being pushed out.

  • So the area that's quite exciting to us at the moment is what we call FBH. FBH we're going to be moving into that area during the course of quarter four and sending across a drive that links it up from over here. And the grades in there are very similar to the grades that we have been getting from Kim over the last five years we've mined it, so really good grades coming through.

  • It looks like it goes through the link, so all of this could be linked up, that's why it is called the link. We're going to be looking at Waroonga North which is on a parallel shear zone to Kim and we think there might be a replica there. And then Kath, which is only 100 meters away is really an extension of Kim. So it's very, very easy and quick to get into there and we've got some reasonable drilling (technical difficulty) over there too. So lots of opportunities for us to keep on adding to the resource and reserve base of Agnew.

  • Granny Smith has clearly been a great performer. Here you can see the plant and that's the dome that's made Granny Smith quite famous. You can see that quite clearly when you fly into the strip from the air. And there's the conveyors and the primary crusher in the back over here.

  • So they've done very well. So far, to the half year, 150,000 ounces at $788. That's way beyond even our expectations, so we are very excited about what they've done. They have got a good record of replacing their ounces. It is in a prolific area; the Laverton area has had over 20m ounces mined in the area. We've mined 2.5m at Granny Smith, Wallaby 8m ounces, Sunrise 10m ounces.

  • So it's a prolific area and the lake is pretty much well underexplored, I should say. It's not that well understood. We've done a geophysics exercise and review on the lake, to determine targets. So this is a salt lake, like Lefroy at St. Ives. It's not quite as big as the one at St. Ives, but it's got a similar potential. In fact, the Wallaby underground mine is starting to move under the lake, as it moves across. So eventually it does end up under the lake. So there's lots of potential for exploration.

  • So the lease area over here is about 61,000 hectares. You can see -- here it is over here. And here's the lake, that area in the background over there; quite big. So we are looking at a number of targets outside of the Wallaby underground operation itself. And here's some of them over here. Here's Wallaby that you understand, that's the underground mine. Here's Keringal that's potentially an open pit deposit, but it could be underground -- more underground than open pit in due course.

  • Jubilee Deep, Wedge Shear, Hill Side IP, you can see the dots there as they come up. Platypus, Boomer and then what we call the Northern Fleet Targets; Dallas, South Alabama and something called Raw Prawn, would you believe? So these are some of the targets. Where they get these names from is anyone's guess. And then something called Tail Pipe that we are looking at. So we are going to be spending some money over the next couple of years, looking at some of these targets, as well as the Wallaby underground mine.

  • Now, no money or time or effort was spent on this stuff over the last five years, nothing. They were starved of exploration dollars. We are going to put some dollars into this because we think there's potential here for multiple additional deposits, to add to Granny Smith. And here's even some more, so plenty of opportunities.

  • So let's move to the Wallaby ore body, which is what we are mining at the moment. If you can recall, this is the old open pit, and then we've got these gently dipping horizontal lodes, what we call zones, in the different areas. And at the moment we are mining principally Z80 and Z90. Those are the two areas we are mining. We are developing into Z100 and we are also doing resource development at 110. We are doing some exploration drilling in 110 to 150.

  • Now each of these lodes has the potential to be in situ about 1m ounces. The other thing is that, as we get in deeper into the ore body, we are finding the lateral extensions are getting wider. And that's one of the areas we are going to be working on, is to understand the lateral extensions of the different lodes.

  • So here's another indication. So the mineralization tends to be above what we call Thet's Shear, and over here is the lake, so this is moving under the lake over here. And this gives you an indication as to the resources in the different zones. So if you look at Z80, there's about 1m ounces in situ, Z90 about 1.1m ounces, Z100 almost 1m ounces, and very limited on 110, because we just haven't drilled it yet.

  • So I think as we drill more the potential for this to keep replicating itself at depth, the indication is very good. And as you can see the grades over here are getting better. We are seeing 9 grams resource grades as we are getting into Z100; it's a very, very good ore body.

  • This just gives you it in a different perspective, as to where we are going. And a point I'd make here is that we are doing exploration drilling in 130 to 150, and we are doing resource drilling in 110 to 120. And here's the step-out drilling we're doing on Z100. We are actually going to be testing the lateral extensions over here, to see how far wide of the original estimate the -- or how far laterally it goes -- from where we thought it was.

  • This is getting to around about 1.1 kilometers, 1.2 kilometers. Now the rock conditions are very good. We don't need to use any paste fill at this stage. It's not been a problem for us and one of the things we are actually doing is deciding whether we can improve the extraction ratio, by putting in paste fill. So it's a study we're doing at the moment.

  • So conditions are very, very good, very competent rock conditions. So we are not concerned about the depth over here. Obviously we'll need to put in some additional ventilation and cooling capacity, eventually, but so far no real problems. Vertical risers are usually what you do. You just drop them down further, get some more ventilation in. So no real concerns at this stage.

  • We think we can probably mine down to 1.5 kilometers, without the need for any additional infrastructure beyond the declines. If you want to go beyond 1.5 kilometers, you would. So we are looking at that down the road, is it worth us putting in a shaft system down the road. And that will depend on exploration success, but it's too early to make that call.

  • The other thing is if we can increase the extraction ratio from where we are now. And -- given the fact that we don't use paste fill, we need bigger stability pillars. But if we could use paste fill instead, maybe those stability pillars could be less. And we might get more of the ore body out. And with grades increasing to 8 grams, 9 grams -- we want to be getting all of it, if we can. So we are going to be looking at that over the next year.

  • So moving to Darlot, this was the one that came for free. We didn't value this in the package we bought. And that's done very well. They were losing money; they are now making money. We've restructured the operation and what we said to Darlot is -- you can invest whatever you make into exploration with a view to finding a game changer for us. That's going to be the strategy over the next year.

  • So the areas that we are looking at for the game-changer is what we call the Centenary Depth Analog. Essentially this is a replica of this structurally, in between two shear zones. It looks very similar and we've already got some interesting information that's come out. So we are targeting this as a potential analog of what we've previously mined in Centenary.

  • This is another area we're looking at, Middle Walters. Lords South Lower is what we are developing into now, so we'll be mining this next year. And then we're mining bits and pieces around, which tends to be a little bit inefficient. So if we can get a couple of stable sources of ore supply, it will be good for us to consolidate the operation.

  • And then we're also looking at some other potential open pit targets, Cornucopia, Waikato, but could also extend into undergrounds down the road.

  • So who knows? The early indications are good and, just to give you an idea, this is an analog of Centenary, which mined about 1.3m ounces, so it could be interesting over time. But, as I said earlier, it's got to achieve, in the long term, the 15% free cash flow objective.

  • West Africa, steady as she goes, very happy with the performance of the region, 181,000 ounces in the quarter, at $1,084 per ounce. Damang did have a shut -- a plant shut for about nine days. So I think in the -- under the circumstances for them to have done 40,000 ounces was very good. I think it shows the depth and the extent of the turnaround that's taken place, and we are very confident that Damang can continue to perform well into the future.

  • Tarkwa, we have now got the mine to steady state, following the closure of the heap leach operation; 140,000 ounces this quarter at $1,026 all-in costs, as you can see a great performance. We're working on a mill expansion. We want to take the mill from 12.3m tonnes per annum to 13.3m tonnes per annum.

  • It's essentially debottlenecking the backend of the plant, putting in some additional tail-piping facilities, very little else. That'll be finished by the end of the year, so we should see the benefit of that from quarter one in 2015. So that will give you another 10% production.

  • Recoveries through to our CIL plant are amazing; we are getting 97% recoveries. So basically anything you throw into that plant comes out the other end, almost fully.

  • We are looking also at exploration opportunities. We've found some hydrothermal mineralization onsite, and this is a Paleo Placer ore body. Fairly low grade, as you know, about 1.2 grams to 1.3 grams, but very, very extensive. But the hydrothermal overprint potentially gives us a higher-grade sweetener, so we are looking at opportunities for that. It's early days, but we are quite excited about that.

  • And we haven't tested the lateral extensions of the pits for over 10 years, so it's time for us to get the drill rigs out here. And drilling is pretty cheap in Ghana, for us to start testing the lateral extensions of those pits.

  • Here's Damang, and if you can recall, here's the original pit. So it's quite deep, that's mined out. This is Huni over here and the Saddle. Extensive stripping has already taken place, and there's Juno to the south. So we are mining at the moment Juno over here, and we are mining Huni and the Saddle over here.

  • But further down on this trend, there are other opportunities to augment the ore reserves and the mining plan going forward. Also, having done a lot of stripping over the last couple of years, we are now starting to get some of the better grades deeper into the Saddle, Huni and Juno that we always thought were there. And in fact the indications are that they are there. So the drill rigs didn't lie to us; they certainly showed us where to go.

  • And here's the trend that we are talking about. Here's a smaller version of that photograph I showed you up top. That's going north, this is going south. There's Juno, Saddle and then Huni. So we are looking now to find some additional targets on this 17-kilometer trend. In fact, the length from Damang down to Tarkwa is about 30 kilometers, and it's all potentially mineralized, but we are only going to look at the 17-kilometer trend for the moment. And the targets that are most exciting are Nyame, which could be combined into Juno, Tomento North and also Amoanda. So we are going to get to some more of these earlier.

  • We've mined over here and over here previously, when gold was down at $400 and then we moved out. So we know there's gold there, and at $1,000 price we are looking to see what we can add into the portfolio over time. So we are quite excited about the potential upside at Damang.

  • South America very briefly, it just continues to perform exceptionally well. During the quarter we did 77,000 ounces at all-in costs of -- in fact there's an area that's on a credit basis -- all-in costs of about seven -- I think it's about $789, Paul. It's $307, if you account for the copper as a credit, but if you actually show it on an equivalent basis it's actually about $780.

  • So some people want to show it as a credit; some people want to show it as equivalent. So we've give you both sets of numbers in the book; you can pick your choice as to what you want to put in. That's about $780 all in. Is that the right number? $789 all in.

  • So the key issue here is that we do have a 10-year life ahead of us. We did stop work on adding another 15 meters to the tails there, because we felt we weren't getting the requisite return for the amount of money that we are spending. But we are not going to walk away from those ounces, because there's another 30m tonnes that could potentially come back into the reserve, that's in the resource. That's around about six years of extra production.

  • So we are looking at different methods of getting additional tails capacity, whether it be dried tailings onsite, whether we can acquire in the area around us additional sites, old defunct mines that could be used, etc. And I'm pretty confident that we are going to have a solution to this over the next 12 months to 18 months, so that we can actually bring those ounces back.

  • In conclusion, we've taken a lot of your time, so I appreciate your patience. Our Group guidance for the year is maintained. Rebasing of South Deep, of course, continues to be a top priority, as we look to get this mine to certainly cash breakeven by the middle of next year, which is still our target.

  • Brownfields exploration across the world is key, particularly in Australia and Ghana. And we are going to continue the momentum on the international project sell-down, and that's going to help us to improve the debt position of the Group and make sure that we have the flexibility to take advantage of opportunities down the road.

  • Thank you very much for your time. Between myself and my colleagues, we'll now take questions.

  • Willie Jacobsz - Head of IR

  • Shall we start in the front here? Thank you, Allan and then Adrian.

  • Allan Cooke - Analyst

  • Good morning, gentlemen, it's Allan Cooke from JPMorgan. Just three quick questions. Firstly, on South Deep, you mentioned in the booklet changes to the shift roster. If you could just give us some color on what's changing at South Deep in terms of shift arrangement, and what might -- that might do to the ramp-up program.

  • And then in addition, while you are trialing the changes to the destress mining and potentially to the mining method, what -- hypothetically, if you have success with either or both of those, what would that do to the ramp-up profile? Would that change the end number in terms of ounces, and will it change the timing and the plan for South Deep, if you can help us with those?

  • And then just two other short questions. One, the big inventory shift that you've had over the quarter, I know it's just timing at Cerro Corona. That was quite a big shift. Was there something untoward there, or was there just normal -- I haven't seen a big inventory swing like that at Cerro Corona before.

  • And then lastly, at Damang I think previously you'd said you'd moved, or you were moving the high-pressure grinding rolls from Tarkwa to Damang. Is that still going to happen, and will that make a change, or will that help you with milling and crushing at Damang, please?

  • Nick Holland - CEO

  • Well okay, if we could start -- let me ask Alfred, who's here, to deal with the issue on Damang first.

  • Alfred Baku - EVP and Head of West Africa Region

  • (Technical difficulty) for the question. With the HPGR, the high-pressure grinding, we are not going to move it across anymore. One, because of the high operating cost; two, we have also actually come up with a lot of initiatives to be able to deal with the material that we are actually treating. One of them is we are installing an oxygen plant that is going to push our recovery, from the current 89%, 90% to about 92%. So considering the operating costs of the oxygen plant and the HPGR, we are no longer going to move the HPGR.

  • Nick Holland - CEO

  • Okay, in terms of the inventory buildup, Paul?

  • Paul Schmidt - CFO

  • Allan, there were issues in the March quarter (inaudible) about ships coming in to take out our concentrate. So if we have a look, in quarter one, our sold was far less than our produced. In quarter two our sold is far higher and obviously it's the GRP that was built up in quarter one and then subsequently released in quarter two. So it was all about the concentrate sitting at the port.

  • Allan Cooke - Analyst

  • Okay, port issue?

  • Paul Schmidt - CFO

  • Yes.

  • Nick Holland - CEO

  • Vessel came late.

  • Paul Schmidt - CFO

  • Yes, yes.

  • Nick Holland - CEO

  • So the buildup plan for South Deep, I think it's too early, Allan, for us to give a definitive conclusion. I think once the trials have been run and we can actually model this through the entire ore body extraction sequence, we'll have a better feel. But the idea is to make things simpler, to avoid a three-pass system, actually open up the ore body quicker, because with destress you've got a 24- to 30-month lead time to open up the ore body, as we currently do it. So if we can find a way of doing things easier, then I'm sure it's going to make the buildup a lot easier to achieve in the timeframe.

  • But at this stage I wouldn't want to give you an educated guess. I think once the trials have been done we'll have a better feel, but it's all meant to make things easier and improve the extraction sequence.

  • In terms of the roster, we've changed to a 7 to [7/5] roster, with 9.5 hours back to back, instead of the 4-by-4 roster of 12 hours. And we've done it for two principal reasons. The roster was very unpopular with our staff, who weren't too keen on 12-hour shifts, and we weren't actually achieving the leverage out of it anyway.

  • And having reconfigured, we actually believe this is going to be a better roster, because there's also overlaps on this roster, whereas the 4-by-4 didn't really have overlaps. So that when one crew comes in, another crew is still there, so you can have a proper handover.

  • The other thing is we are now moving from four cycles to three cycles with the change in roster, so that's enabled us to reduce our workforce. That's why we've been able to drop 550 out of the workforce, because we actually don't -- we don't need those people.

  • So we think this is going to be adequate for us in the long term, so it'll essentially give us two shifts, which together add up to 19 hours per day, instead of the -- well, the nominally 24, but you never got 24. The other thing is there was an hour lunch break in the 12-hour shift and here there's only a 30-minute lunch break as well. But we think this is going to work better and it's certainly something the employees are much more comfortable with going forward.

  • Willie Jacobsz - Head of IR

  • Adrian?

  • Adrian Hammond - Analyst

  • Morning, it's Adrian Hammond from Standard Bank. I have two sets of questions, firstly on South Deep. It sounds to me that -- the mining method is -- the mine planning is all going to change that talking about a ramp-up profile is actually futile now, once we've established these two new mining methods. Are these mining methods tried and tested (inaudible) and, in retrospect, what would you have done differently?

  • Nick Holland - CEO

  • Yes, so one of the things that has induced us to look at what we call the incline slot method. If you go and visit Agnew mine in Australia, for example, they are doing exactly what we are suggesting. The only difference is the ore body is vertical, okay, whereas here the ore body is dipping at about 10 degrees. So this is -- to quote Garry Mills, the General Manager -- this is putting Agnew on its back, okay, with a slight variation in the geotechnic design, because of the fact that you don't have gravity to help you as much here as you do in Australia.

  • The other thing is the geotechnic experts who are looking at this are people who have also helped us design Agnew previously. So they do know what they are doing. So it's not as if we're talking about something that is completely brand new; this is bog-standard. In fact, it's not just Agnew that has this mining method, it's also the other underground mines we have in Australia, other than Granny Smith, which is more board-and-pillar-type design. That's the main difference.

  • So it's something we've done elsewhere; it's not something brand new. But that said, if we are going to deploy this, it's going to take we think at least a year, for us to test this properly and to make sure that it works. And then we'd also have to make sure that we drive all of the faces down to one consistent advanced level, because you can't have -- piecemeal do this.

  • The other thing is in the periphery of the ore body. We may still have to employ benching and drifting, because this'll work well for ore bodies at about 20-meter thickness. And when you get closer to the shore line -- corridor four, you are talking more about 5- to 10-meter thickness. And it might be that we are going to be using the classical bench and drifting, as opposed to this.

  • But when you get into the more distal areas, like the one corridor where the package is up to 100 meters to 120 meters wide, this will be perfect -- it should fit in nicely. So I can't tell you what the impact on the buildup plan can be; it's early days. We've got to continue working to the buildup plan that we've currently got, because I think realistically we can only implement the new method by beginning of 2016. I don't think we should expect to see it on either of these bases before then. And that will give us a better indication as to what it would look like. But in the meantime we've got to keep going.

  • Adrian Hammond - Analyst

  • Do you think these methods could increase the steady-state profile you have given us?

  • Nick Holland - CEO

  • Production?

  • Adrian Hammond - Analyst

  • Yes.

  • Nick Holland - CEO

  • No, but I think what it would do is it would de-risk it because, as I said earlier, imagine now you're mining eight corridors at 120 meters. So in other words having four slots going across and then either a 40- or 60-meter pillar, and then other corridors. It's going to mean that you are going to be advancing eight destress horizons, or flat horizons, as opposed to four. So it's going to help you maybe to accelerate, and it's going to help to provide more flexibility. If one area is not working, it's not the whole corridor you lose, for example.

  • Adrian Hammond - Analyst

  • Thanks, and just quickly for -- a question for Alfred. Damang, you've obviously done a turnaround there but it's just edging along now. What is your new plan? Could you give us some more light on your new plan regarding your movement into the target range of 15% free-cash-flow margin? When do you think you will reach that, and how long do you think the satellite pits could give you in terms of additional reserves? And are you considering bringing in some of those reserves that were recently removed? Thanks.

  • Alfred Baku - EVP and Head of West Africa Region

  • I'll start from the back end, on the reserve from the satellite pits. As Nick mentioned, the focus is on Amoanda-Tomento corridor, and then also Chida. It's still early days, however the results we've actually received so far, indicating that Amoanda is actually going to add some reserve, or increase our reserve. We believe that Amoanda can do about [150], so about 200,000 over and above what we are looking at.

  • For this year we should be able to see some [tic from all the exploration work we are doing, but will continue to actually move or push along.

  • In terms of our turnaround and in production, we are considering -- or concentrating on the Saddle, the Huni, then also the Juno. Steady state to get us to 15%, I would say towards the end of next year, 2015. We should be able to get there.

  • Willie Jacobsz - Head of IR

  • Thank you very much. Kane?

  • Kane Slutzkin - Analyst

  • Good morning, Kane Slutzkin from UBS. Could you just remind me what your reserve grade is at Granny Smith? I'm just trying to get a sense for the sustainability of this quarter's performance. I think it's around 6, if I'm not mistaken.

  • Nick Holland - CEO

  • Yes, (multiple speakers).

  • Kane Slutzkin - Analyst

  • I just wondered -- yes, because year to date you've done 6. So I'm just thinking the level going forward, you are -- there, right?

  • Nick Holland - CEO

  • Just below 6, but we must just emphasize a health warning on that. We are using the Barrick reserve grade, because at the end of last year we didn't do new reserves for these mines, given the timeframe; we only got them in October. So essentially we took the Barrick reserves and then we just knocked off the depletion. So, as you can see, we are getting better grades than the reserve grade, which I think gives you an indication as to where we might be going.

  • We -- ultimately I think the results you are seeing are showing that we probably, at the end of this year, will have a much better indication of the reserve grade. At depth, it's getting higher. So as we open up bed 100, we expect to improve the grade profile. But I wouldn't want to hazard a guess today as to what I think it'll be at the end of the year, Kane.

  • But at this stage we are pretty confident that Granny Smith should look a lot better than what the reserves were at the end of last year, both in terms of tonnes and grade.

  • Kane Slutzkin - Analyst

  • Thank you, and just one last one, on St. Ives. Can you just give us maybe an outlook for the rest of the year, because if you look at the cost profile it's still fairly higher, relative to the rest of the Aussie portfolio? If I strip it out at 900 or thereabouts, how -- maybe obviously you have got Neptune, etc., coming on, but how does the cost profile look for St. Ives, because obviously that is a bit of a drag on the Aussie region?

  • Nick Holland - CEO

  • Yes, look we haven't updated our guidance, so I would go back to the guidance we gave in February and look at that as a proxy. Now when we reviewed the business plan for St. Ives late last year and early this year, it was a tale of two halves, it always has been.

  • Argo mine fell off in the June quarter. We always knew that was going to happen. And we also knew that Neptune was going to come in in the second half of the year. So that's going to have a fundamental impact when you bring in a 4-gram ore body to replace what was a dying underground mine that was at the extremities. So that'll have a major impact.

  • St. Ives is very, very sensitive to grade. So with Neptune coming in that should help to ensure a much better second half than what we've seen in the first half. And we are sticking to the guidance for the year overall.

  • John Cransell - Analyst

  • [John Cransell]. I'd like to ask a couple of questions on South Deep. Obviously next year is going to be a very variable kind of a year so, looking to that, what sort of cost structure are you looking at? Where can you see it coming down to? And from the work you've done, are there any changes you think in the kind of output you are going to get out of it?

  • Nick Holland - CEO

  • Look, I think we should be better next year. And it's very, very volume sensitive, so as you get the extra volume you are going to see the cost impact. We've actually rebased the cost base, and we didn't say this in the presentation. But if you go and look at the overall cost base for South Deep a year ago, capital and operating cost, we were spending around about ZAR5b a year. And we are dropping that down now to around ZAR4b a year.

  • So the cost base overall has come down around about 20%, and with the review that we've done in terms of people and equipment, the indication of the work done over the last six months, since the mine was probably overcapitalized in terms of people and equipment. And that's the reason we've had the voluntary separation process, and we've taken the fleet down from about 140 to about 80, the fleet that we require.

  • So all of those are going to have a knock-on effect -- less fleet, less people required, less maintenance, less rebuild, less consumables. So all of that's going to help. But the key for us now that we've actually right-sized the cost base or we're getting pretty close to it. It's now about the volume. And all the volume that you get will actually flow through to the bottom line, because the costs are not going to change much from here.

  • So, we've got to drive the volume up. We are currently only achieving a blast of about 0.75 per day; if you look at the rolling six-month average, about 0.73 per day. Our first objective is to get to a blast a day, which is still pathetic, actually, in the context of what we achieve in Australia. 19 hours, one blast; it's very conservative in fact. So we only get to one blast a day and full production -- just to give you an idea, full production would be two blasts a day. And we are saying we want to get to that in four years from now.

  • John Cransell - Analyst

  • Are we talking $1,100 an ounce? What do you think you'll --?

  • Nick Holland - CEO

  • Full production?

  • John Cransell - Analyst

  • Yes.

  • Nick Holland - CEO

  • $900.

  • John Cransell - Analyst

  • 900.

  • Nick Holland - CEO

  • $900, that's what we're saying.

  • John Cransell - Analyst

  • In four years -- you think it'll take?

  • Nick Holland - CEO

  • By 2018. The full year 2018 we believe that we can achieve the 650,000 ounces base at $900 an ounce. Now obviously all of the work we're doing on these new mining methods, as Adrian has pointed out, we may have to re-model. But if anything we are not going to make those changes unless we make things at least better, or de-risks where we're going.

  • John Cransell - Analyst

  • There's been some criticism in the press about Gold Fields and South Deep, here about not meeting the government's requirements. Is that just the press, or has that been resolved now?

  • Nick Holland - CEO

  • No, look I think, like most companies in the mining industry, we have had ordered reviews and comments passed. And there are some areas we need to address, but by and large we are substantially compliant. I wouldn't say sitting here that there are major gaps in our area of compliance. And certainly in terms of the mining charter the measurement's point at the end of the year, not now. Measurement point is the end of the year and we believe that we will be compliant by the end of the year.

  • So no, we are not concerned, but we value the ongoing dialogue with the Department of Minerals. We treat it seriously when they come out to review us, and we treat our commitment seriously. So our commitment to our shareholders, the government and our Board, is that we will be compliant with all of our commitments, and that's what we intend to do.

  • Willie Jacobsz - Head of IR

  • Thank you. Derryn?

  • Derryn Maade - Analyst

  • Hi, good morning, it's Derryn Maade from HSBC. Just two questions. In the release on South Deep, and sorry, South Deep seems to be doing -- being done to death today. But you mentioned that second-half performance is expected on production base to be pretty much the same as the first half. Does that mean that you are lowering the guidance for -- FY2014 on that basis?

  • And the second question just relates to Cerro Corona. Are you looking to accelerate the brownfield options there? Given the performance of that mine has been good over time, it has significant optionality from looking at the brownfields projects. When can we expect feasibility outcome, or something along the lines that would signal that process is being progressed?

  • Nick Holland - CEO

  • Yes, so we are looking at a couple of things here. And we've done some deep-drilling holes previously into the foot of the porphyry, and the indication is that the mineralization continues way beyond the expected base of the pit. And that's not unusual for porphyries. This is what you really call a pencil porphyry, and it has the potential then to open up into a much bigger porphyry at depth. So we've only got a few holes to test this theory, so we've got to do some more drilling in time.

  • The other thing we'd need to do is, if we were going to either expand or increase the life of the ore body, the two key constraints -- there's obviously waste-storage capacity and tails capacity. And we are blessed in the sense that the strip ratio here is only about one to one, for every tonne of ore there's a tonne of waste. But the site is very constrained. For those of you who have been up to site, it's a very small footprint. So one of the things we'd need to do is to secure additional tail and additional waste-storage facility, which we are doing anyway.

  • So that process continues, if nothing else but to actually see how much more of the resource we can get back into the reserve, and even go beyond the 30m tonnes.

  • We will actually get back to looking at the drilling program in time, but I would like first of all for us to explore additional tailings and waste-storage capacities first. And that would give us a better basis to do more drilling in time. We've got time, that's one of the benefits. But you are quite right, Derryn, the potential for Cerro Corona to continue at depth and laterally is certainly there.

  • So coming back to the first question, if we are going to do similar in the second half to the first half, particularly with the ground-support issues and the intensive training program we've put in place. We have said that, I think, at best we are going to be about 7 tonnes at best for the year on South Deep. That's our latest indication at this stage.

  • Derryn Maade - Analyst

  • But overall guidance, Nick, remains unchanged?

  • Nick Holland - CEO

  • Overall guidance for the Group remains unchanged, thanks for reminding me. Because in essence what we've found is that we are getting overperformances from Granny Smith. As you've seen, we are getting overperformances from Tarkwa; we are getting overperformances from Cerro Corona. So it all balances out, so we are still saying that the 2.2m ounces for the Group is still a good number.

  • One final question. Is there anybody who has that last, burning question?

  • Patrick Mann - Analyst

  • Thanks. Morning, it's Patrick Mann from Deutsche Bank. Just like, a sort of more broader strategy question on the 15% free cash flow margin. So you are sort of there, and we've had gold range bound around $1,300 an ounce. Should we be thinking of that as a cost target, or rather, if we get any significant moves in the gold price -- expenses should move up or down on that? And I suppose -- would there be more spend on exploration ounces, would there be decreases or increases in grade? Just in terms of now that we've reached that target, if we see any shifts from here how does it develop going forward?

  • Nick Holland - CEO

  • Well, look, if you back calculate our breakeven price at a 15% margin, it's about $1,050. So if gold collapses down to $1,050 we still break even. In all honesty, if gold goes to $1,050 to $1,000, I think we are going to be hanging on. We are going to try and retain the optionality of our assets, and we are going to basically run this Company so that we can actually come out of the difficulties and still have operations intact.

  • If gold does go to $1,000, I don't think it's going to stay there too long. Bearing in mind the long-term replacement cost of an ounce of gold is probably somewhere around $1,500 to $1,600, we are already below that. And we see that quite big drop-offs in supply two to three years out from here, even at these prices.

  • If gold prices go up, I think the important thing we've got to do is not lose our discipline, and not be seduced into the low grade, the allure of the low-grade ounce. And Paul and I will certainly make sure the operations continue to be focused on that.

  • But obviously you have to look at the dynamics in some of your operations, and would it mean that we might change things here and there, we might, but no fundamental big shift to low-grade ounces. We think it's all about grade; grade is king. So don't be too keen to chuck some low grade into your plant.

  • The other thing is if you can fill your plants with high grade, you don't want to be substituting any of that for low grade. And that's the other temptation -- is that in going for the low grade you sometimes end up substituting the high grade you've already got with the low grade. So I don't think we are easily going to move away from that strategy if prices go up.

  • Greenfields exploration we've essentially stopped. That's probably going to be a strategy for the foreseeable future. We've been far more successful at acquisitions and with brownfields exploration. That's not to say never, because never is a long time. But when gold is at $2,000 an ounce and there's a massive shortage of gold, maybe we'll look at it again. That day will come, I'm sure.

  • Willie Jacobsz - Head of IR

  • Good, thank you very much. Thank you, Nick.

  • Nick Holland - CEO

  • Thank you very much.

  • Willie Jacobsz - Head of IR

  • If you -- the journalists could join us downstairs for the roundtable, and the rest of you please come and join us for some refreshments. Thank you very much for coming today.