使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Zakira Amra - Head of IR
Welcome to the quarter-two results for Gold Fields quarter-two interim results presentation this morning. My name is Zakira Amra. We will be taking through a revised format of the presentation. You will notice it is a much shorter presentation than previous years. Nick Holland, our CEO, will be taking you through the overview and going into growth projects and then we will then follow on to the question-and-answer section.
Just in terms of safety, in the event that we do have an emergency, could you kindly evacuate to your right? The exits are to the north of the building and I would please ask you to congregate on the lawn. I will now hand over to Nick Holland.
Nicholas Holland - CEO
Thank you very much, Zakira, and good morning, everyone. Welcome today.
I think before I go into the presentation itself I'd like to take you through a couple of management changes that have taken place. And I'm delighted that Peter Turner is with me today. Peter, I think most of you know, has been in the mining industry for over 30 years, in the gold mining industry in particular. And he has taken over responsibility for the South African operations with effect from this last Monday.
As you will remember, Tim Rowland had acted in that role for round about eight months. And Peter previously, very successfully I must add, ran the West Africa region for Gold Fields for almost three years. So he's returned from West Africa and has now taken over the role of the South African operations. Tim Rowland is going to head up Group Technical Services for Gold Fields. One of the things I've decided to do is to put together a Group technical function for Gold Fields, which will be a small nucleus of highly qualified, highly skilled technical people, particularly given the fact that, as you'll see later on, we not only have a whole series of operations across the globe, but we have around about five or six major projects coming down the track at a hell of a speed at us and felt that we needed to get a Group technical function together.
Peter's replacement is imminent. And I expect to be able to finalize that, all being well, within the next week or two, certainly very soon.
The other change we've made is given the genesis of our projects throughout the Group over the last year or so and given that most of these projects in fact are an ingredient, if you like, or an output of the exploration effort, the other thing that I've done is to combine capital projects with exploration. So we've put that all under Tommy McKeith, who couldn't be with us today because of a personal matter that he's had to deal with.
But he is now going to be responsible for running both exploration and capital projects, which we think is going to create a much more seamless process as projects graduate from initial drilling to advanced drilling, through to initial scoping studies through to concept studies and, of course, through pre-feasibility and ultimately feasibility and construction. And having all of that housed under one area, having that skills base under one area, is going to make, I believe, the process much easier for us to manage. And Tommy already has quite a lot of skills that are compatible with project delivery in his area.
So those are the principal changes. And last but not least, Zakira Amra, who introduced the presentation today, has joined us around two or three months ago as Head of Investor Relations and Corporate Affairs. So you'll get to see a lot of her. And she's taken over that job from Willie Jacobsz, who thankfully is still going to be with the Group; in fact Willie's here with us today. He'll be going back to the US tonight because he looks after the US shareholder base. But thankfully Willie will still be in the Group, and together with Nikki Catrakilis-Wagner, who's also here today, Zakira and Willie, I think we've got a knockout team here that will help us take our Investor Relations to a new level. So I think it's useful that we just highlight these changes. And some of them you'll see are actually described in the book.
Now the other thing we've done is change this format because one of the things that I've seen in having done the last 12 quarterlies or so like this, having a detailed presentation that goes on for an hour or so, I find that people start fidgeting and get restless after a while. And having too many speakers talking I think takes too much time. So what we'd rather do is I'll just give a presentation of the highlights. Paul, of course, our CFO, is with me today. Peter is here today.
Unfortunately Richard Weston, Head of Australasia, could not be with us today and also Juan Luis Kruger from Peru could not be with us today. But this afternoon as we do our conference call, we do a four o'clock conference call to the international markets when the US wakes up, and Zakira, I believe they will be on the call this afternoon. So if there are any questions that you want to ask them directly or get some more clarity, please tune in for the second edition of this this afternoon at -- it's 4.30, in fact, I think, 4.30 for the conference call. And it's always a good opportunity for some of you to hear it again possibly and ask any questions you might have.
Good. Well without any further ado, let me get into the results. And hopefully you've had a chance to see some of it today. Our production for the quarter up 5% at 872,000 ounces. And of course we did expect to improve against March given the fact that the March quarter always has the Christmas break in South Africa, which has a number of public holidays. But I think we shouldn't forget that the June quarter also has a lot of public holidays. In fact it has almost the same number of public holidays as over the Christmas period. And unfortunately they're interspersed over a period of time so you have a stop-start process.
In fact, in this last quarter there were six public holidays in the country. And it does tend to play havoc sometimes with the operations. So we're up 5% at 872,000 ounces, notwithstanding that we had almost the same number of public holidays. And a lot of that increase of course has come out of South Africa.
Our operating margin very healthy at 47%. And our NCE margin 21% for the quarter and of course for the half-year to June. Remember we changed our fiscal year; our fiscal year now is in line with the calendar year so the results for the six months to June are also the six months of the fiscal year. I did say some time ago it was my target to get to at least a 20% NCE margin. And we already achieved that around about four quarters ago. And our intent now is to move on and see if we can improve that further.
Good cost control across the Group. And if you look at our total rand-denominated costs, and if you look at this quarter ended June compared to the quarter in June of last year, you'll find that on the income statement, you'll see that our total rand operating costs in rand millions have only gone up 1% year on year. And that's despite having to absorb over that period electricity increases of 27%, having to absorb wage increases of around about 10% and also power increases and fuel increases across the globe.
And I think that does bear testimony to the business process reengineering exercise that started around about 15 months ago in earnest, and we're making good progress. Quarter on quarter we're up 5% on our costs.
And again, just to give you a very quick way of trying to understand these numbers, if you take the electricity increase out, which was 27%, which applied from April 1, and you also take out the one month of winter tariffs that we get levied; we get levied winter tariffs in June, July and August. And if you take those out, in fact our costs quarter on quarter only went up 1%. And that's despite all of the other cost pressures that exist across the business.
And believe me there are cost pressures, not just in this country, and I think that's the one thing that I find that many people make a mistake on. The cost pressures in this gold industry are not just in this country. And you should look at the compound annual increase in costs across the gold industry worldwide over the last 10 years and you'll see, in fact, that cost increases are an issue affecting all countries at this point in time.
So the net effect of all of that is our net earnings, on the back of the slightly higher gold price and the increased production, went up by 15% to ZAR1.3b or ZAR1.84 per share.
If we look at cash flow for the quarter, and my definition of free cash flow is really to look at what the core business has generated. And if you take that note at the bottom there that you can't read too well on the screen but you'll see it in your book, you can see that if you take cash from operations, which is essentially EBITDA cash flow, and you deduct our ongoing capital expenditure, then the core business generated almost ZAR700m of cash flow during the quarter.
Now of course if you look at the cash flow, you'll see in fact that we spent a lot of money also on acquiring minorities. But my perspective on this is we need to look at what the core business is generating because that will dictate whether or not we can afford to make those acquisitions. And clearly with this kind of cash flow we can.
We're making good progress on the growth portfolio. And I'll talk about that in a moment. But we've also declared an interim dividend of ZAR1 a share, which I think is a good indication of our ability to deliver cash flow to shareholders and for shareholders to benefit directly in the form of dividends as a reflection of the higher gold price.
This is a graph I've shown you before, where we indicate the NCE margin as against the gold price and against the cash costs. And I've really gone back three years. And you can see three years ago we didn't really have a margin. We weren't making any money. That's when the philosophy of moving to generating an NCE margin came to the fore.
And I think before that time a lot of companies in the gold industry were quite happy to generate cash of ZAR500 and spend ZAR600. And it's only when this discipline really got into people's minds that we all started thinking -- hang on a minute, our job is to actually make money, to make cash. And so slowly but surely we've increased that margin. Yes, of course it's increased because of the gold price. But in the past we've often seen, despite the gold price going up, people have still not made money. So at least we generated that gold price increase to the bottom line and we hope to be able to continue that.
And certainly if we're going to be able to afford to fund our projects going forward without recourse to shareholders, which is certainly first prize for us, we need to do that off the back of positive cash generation and on the back of a strong balance sheet. And right now we're moving into a period where we have both. And we certainly want to try and use all of that cash flow to fund our projects without having to raise any additional funds in the form of equity, if we can avoid it.
Also where did we come from three years ago? I talked to you when I got into this job about wanting to create a truly globally diversified Company. And where did we sit at that point in time? South Africa represented the bulk of the portfolio, about 63% of our production, and international ops 37%. Well over that three-year period we have added 650,000 ounces of international production to the portfolio in the form of bringing Cerro Corona to full production over that period of time, and just recently in the form of acquiring the minorities in both Peru and Ghana.
And the impact of that now is that on a pro-forma basis, if you take the results for the half-year just finished, you'll see in fact that the international operations now make up over 50% of our total production. And on the actual reported numbers for the six months, which is the column next to it that you see there, it's 50%. So it's moving in the direction that we indicated it would. And this is not a reflection of losing confidence in South Africa; this is more of a reflection of creating a truly globally diversified Company that we've been striving to do. And it shows you that execution is well underway.
And here is the international portfolio. Let's look what it looks like. And slowly but surely our international production, our attributable international production right now is a shade under 2m ounces a year. And three years ago that was 1.4m ounces. You can see there these are figures that are given in half-yearly periods. And you can see also the NCE margin of that production up to round about 40%. And that certainly bodes well against the total portfolio and the risk of the overall portfolio.
Let's look briefly at some of the regions and where we've got to. In Australasia we've had a steady quarter, production basically flat quarter on quarter. We did have the mill outage in St Ives which took the mill out for round about two weeks. One of those things that sometimes just happen after almost eight years of uninterrupted operation. We unfortunately had a small problem in the plant so it took us out for two weeks, and we probably lost about 12,000 to 15,000 ounces in the quarter.
Notwithstanding that, Agnew came to the party big time and they had a 33% increase in production up to 50,000 ounces. And that's really on the back of improving their productivity underground. They've recently gone owner mining. We completed that transition around about six to nine months ago. And we're now seeing the benefits of higher efficiencies and productivity of owner mining.
And most of you heard me say before that I really do prefer us to actually do the business that we're supposed to be good at as opposed to farming it out to other companies. And I think this is another example of owner mining being a better option for us. And I think you'll see more from Agnew in the future as the Songvang open pit operation comes to full production over the next quarter. So I think we can maintain similar levels of production at Agnew going forward, and certainly St Ives is doing reasonably well.
We've also converted the underground operations at St Ives to owner mining. That process has been done. And watch out in quarters to come for us to show the benefits of that in both cost and in terms of improved efficiencies as well.
The two exciting projects at St Ives, which is the Athena and the Hamlet underground mines, and for those of you who've been to St Ives, you'll know that when you go into the portal that if you go left, you go to Athena, and if you go right, you go into Hamlet, because it's the same portal entrance from the base of the pit that you go into. Athena is virtually at full production and achieving its goals. And Hamlet's construction is well underway.
Why I'm excited about these particular mines is they're going to give us the potential for two long-life underground operations which we haven't had at St Ives since we bought the operations in 2001. We had an underground mine called Junction, which was almost an analog, if you like, for what we're looking at in terms of Athena. We haven't had that for 10 years. And that's been one of the reasons we've had more volatility on the production.
Now in fact, bringing these underground mines into production and giving us a base load of good high-grade production at St Ives is going to make a big difference to reducing the volatility on that operation. And again I'm sure we're going to put back into reserves at the end of the year what we've depleted during the course of 2011.
If we look at South Africa, we've had a 9% increase in production to 447,000 ounces. What's particularly pleasing is a great performance from Beatrix that had a 32% increase in production; they're up to almost 100,000 ounces a quarter, an NCE margin of 23%. That's pretty good. I'm very happy with the performance of Beatrix this last quarter. In fact it's been our top performer in the South African stable this last quarter.
Our business process reengineering is delivering good results. And we've absorbed a lot of inflation over the last period. And again, if you look at our operating costs year on year, 6% up, and that's despite having to absorb electricity increases, as I mentioned earlier, of 27%, wage increases of double digit.
Our Shaft Full Potential program at KDC is really aimed at stabilizing production in the long run. And I guess in the long run we're talking five years. We want to stabilize production between 1m and 1.1m ounces a year. If we can achieve that and do it safely I think we can achieve our goals at KDC.
If we look at South America, this is truly a major cash generator, with NCE of $526 an ounce. And if you look today with gold a shade under $1,800 an ounce, then you can work out the potential of this operation going forward. I do now feel that we will get our money back on this investment and we'll get it back probably three or four times, if not more. So it's proved to be a wonderful operation for Gold Fields. I'm delighted that we were able to buy out the minorities at the price we were able to do. And we can benefit from this tremendous performance at a mine that I think you'll see more from.
We've got 300,000 ounces of oxides stockpiled at the moment. And we're looking at different ways of processing that, whether we build a small oxide plant, or alternatively whether we actually decide to do a mini heap leach operation. And good grades in there, almost 1.5g a tonne. So this can be a very nice project for us.
We're also continuing to drill at the base of the Cerro Corona pit for two reasons. To firm up our view on the positive metal reconciliations we're getting right now against the model and what we're mining, and secondly to see more opportunities at the base of our pit. And as you all know, there's around about another 30m to 40m tonnes that sit in resources right now because we don't have tails capacity. We are working on that and, again, I'm confident that the team over the next year will find the solution for us to bring that forward. And that could potentially add another five years of production to this tremendous asset.
If we look at West Africa, again I'm absolutely thrilled that we've been able to complete the acquisition of the minorities in these operations and take our ownership from 71% to 90%. And you can see assets that have an NCE margin of $885 an ounce. And again almost $1,000 margin per ounce if you rebase it compared to today's price. And, as you'll see a little later, there were other good reasons why we were particularly keen to make the acquisition of these minority stakes.
Again on owner mining, an excellent job has been done by Peter Turner and his team in converting Damang to owner mining. We bought a brand new fleet there and we've got that all commissioned in March. A seamless transfer of activities from the contractor to ourselves. And, as you can see, we're dropping our costs from $4 to about $2.70 a tonne.
And you might say -- well what's the big deal there? Well the big deal is we're going to be mining about 25m to 28m tonnes at Damang this year. So there's a saving there of already $28m before a 30% fuel increase -- sorry, after a 30% increase is factored in, which would have actually had to be factored into the $4 anyway. So this is going to be one of those projects that I think we'll get an 18-month payback on. The kind of project on a long-life operation like this makes a lot of sense. And at a time when we're increasing our strip significantly to open up Huni and Juno, it's been the right timing for us to change to owner mining.
Let's look at the growth portfolio and see where we stand on this. South Deep, first of all, on track and the infrastructure projects in particular are going well. The refrigeration plant on 94 Level has been commissioned. And that's operating and it's brought down the temperatures to the required levels. The ventilation shaft we expect to have completed and commissioned in the second half of 2012. So that's on schedule. And that will mean that we will have the full hoisting capacity in place for the 330,000 tonnes. And it will be around about a six- to 12-month ramp-up period to get to. Bhat but we'll have all of the infrastructure in place.
The new tailings storage facility that we needed to support full production has been commissioned. That is in place. And we've started the work already on the plant expansion. Remember the plant expansion entails adding some more thickeners, leach tanks, a ball mill. All of those key activities are in process, plus a new conveyor system. All of those processes are well underway and we expect that to dovetail with the completion of the ventilation shaft system in the second half of next year.
And then new mine development will obviously continue right through to 2014. And pleasing to see that in fact the mine development is ahead of budget in the what we call new mine, which is the sub 95 Level area.
De-stress is obviously the activity that needs to pick up significantly. And you can see we've had an 11% increase in de-stress to over 5,000 square meters over the last quarter. And that needs to more than double over the next three to four quarters. So that's the biggest area of focus right now is to make sure that we de-stress the ore body.
And the reason we de-stress the ore body is, remember, we're trying to mine big open stopes at 3,000 meters. In order for us to do that, we need to actually simulate an operation that is between 700m and 1,000m. And by de-stressing the ore body in these 30m to 40m cuts across the ore body, we essentially simulate a shallow operation. And we can then get into the big open stopes, the 25-by-25-by-25 open stopes, which will be the heart of the mining operation, around about two-thirds of it, in fact, when we get to full production in four years' time.
If we look at the Damang super pit, we have done a lot of work over the last three or four months to drill out the area and understand the potential below the base of the existing Damang pit and also to the north at Huni and to the south at Juno. And if you look right now at what we've got, if you look at the June 2008 bar there, you'll see that our reserve at that particular point in time was only 1.3m ounces. And I thought this mine was on its knees, thought that we only had about four years or so of production and then we were going to tail off.
And we were only spending a couple of million dollars a year on exploration. And we made a conscious decision as a team to spend $10m a year on exploration, see what we could do. Well the results, as you can see, by 2010, which is the third block there that you see, you can see already we have not only put back everything we depleted, but we also took the total reserve to 2m ounces at a very low cost of exploration.
And since then we've done more work. And we are targeting, for certainly March next year or very soon thereafter, for us to take the Damang pit four times up and get that reserve -- not resource, reserve, up to 4m ounces. That's what we're looking at. And don't forget there's another 1m ounces that already exists in places like Rex pit, the Amoanda pit and various other ore sources. And there's significantly more potential because this ore body is open at depth and is still open on strike.
So we are halfway through another 45,000 meters of drilling after having done what we call 25,000 meters proof-of-concept drilling. And on the back of that the team brought me a motivation to spend $20m on a pre-feasibility study and a second round of drilling, largely infill drilling, so that we can try and get this into the indicated category, which is what we need to do obviously to get into reserve. And we're halfway through that already. So we're making very good progress. And we expect to finish that pre-feas study and that second round of drilling by the end of December. And we'll hopefully have that pre-feas study ready to share with you when we give the half-yearly results.
So this provides an opportunity not just for life extension. Let's be realistic, if we're going to take this up to 4m, 5m ounces, we don't want to be mining this at 240,000 ounces a year. We need to look at expanding the production base. So part of that feasibility study is evaluating whether we build a brand new plant on site and doubling production at Damang.
And here's some of the drill results that you can see. The existing dark blue here is the existing pit outline that you see. And you can see a lot of the drill results in here. It's in your book; I'm not going to dwell on them. But just to let you know that this is not closed out in mineralization; it's still open. So there's a lot more that we can see coming forward here.
And here's a good way of describing it to you, the potential. Here's the existing pit over here. Now for those of you who've been there, you'll recognize that area. The green over here -- so that's what we're mining. The green over here is the reserve pit shaft, okay? That's what you see over there, what we are going to mine the reserve. And here's the potential of the super pit if you add all of the purple there.
Now the current strike of the pit is about 1.3 kilometers. The total potential strike here is 3 kilometers and goes down much deeper. And again, this is open at depth. At some point you can only optimize a pit to a certain depth and there may well be the potential for underground operations going forward. And these have been done at very conservative gold prices, as you can see. And I think if you rebase these at today's prices, the potential here is significantly bigger. So a very, very exciting opportunity for us.
If we move on to Peru, the Chucapaca joint venture project that we own 51% of and we are the operators, we are well underway in terms of the Phase II drilling. We've got 12 drill rigs on site right now, a massive drill program doing both infill drilling so that we can move more of the inferred resource to indicated, step-out drilling to continue to test the extent of the mineralized envelope, and then of course geotechnical drilling so that we can understand the ground conditions for when mining commences.
90,000 meters of drilling has been done to date. And we continue to get positive results from Canahuire, which, let's not forget, Chucapaca is a series of targets within a 5-by-5-kilometer zone. And our area of focus is on Canahuire, which is the target in the top left corner of that 5-by-5-kilometer zone. So there are other targets here; this is just the most advanced of those targets.
Now this target is open to the west and it's open at depth. And the grades are continuing to improve. We're going to give an updated resource during the course of September, that's what we're hoping to achieve, and we're well advanced on that. Our metallurgical test work continues. And so far the results are positive. We're not seeing any particular deleterious elements that we need to worry about. And the environmental baseline study and feasibility study continues. And we expect to have a feasibility study complete by the middle of next year and hopefully we can move rapidly thereafter to a construction decision.
So what have we got? If you look back to May 2010, most of you can remember the 5.6m ounces that we spoke about as the initial inferred resource, which was this blue line here. And one of the things we'll do one day is get people down there. But if you stand on top of the ridge and you look down, there's a valley, you'll see that there's these rolling hills either side of you and you're looking down this valley over here, that's what you're looking at. So this is basically outcrops here on surface. Surface is not there, surface is there, but you've got these rolling hills on either side.
So that's what we had, 5.6m ounces. And this is what we're seeing since we've done that. Now obviously we've got to model all this, put a pit shell around it and see what it comes out at. But that's not all; it's extending further out here. And the ore body is dipping, outcropping from the surface in the east, dipping about 14 degrees across to the west. And we're seeing further mineralized zones over here as well. So we're not sure yet what the size of this is going to be, but we'll give you an update in August -- sorry, in September on that.
If we move onto Arctic Platinum Project in Finland, and I've just got back from Finland having visited the project. I was there two weeks ago to go and have a look first hand what was on site. And we are in the process of finalizing metallurgical tests on a new hydrometallurgical process called Platsol, whereby we've taken two 50-tonne cuts from each of these deposits, Konttijarvi and Ahmavaara, and we produced a flotation in Finland. And we took around about three tonnes of that concentrate and we shipped it off to Canada to actually replicate an entire mini-version, if you like, of the entire Platsol process.
And in essence what Platsol is, it's an autoclave system, which I think you're all familiar with, pressure oxidation, where we introduce chlorides upfront so that we can actually leach in the autoclave compartments themselves. And we can actually liberate the PGMs and the gold upfront, liberate them upfront. And then we continue further down through the process and extract the copper in a copper cathode form and then we extract the nickel in a hydroxide form. And that's essentially the process that we're testing right now.
And why this is significant, and for those of you who have followed Gold Fields for some years, you'll know that we looked at this project about eight, nine years ago and we didn't do it. The feasibility stopped. That's because we were producing a concentrate that we were going to ship to the smelters and we were getting about a 55% recovery. And at a head crate of 1.8 grams a tonne and the price stake that existed at that time, the project didn't make sense.
Today, what's happened? The price stake in all of the metals has rocketed. And remember, nickel and copper make up 40% of the metal in the head. It's palladium-rich as well. And I think we've seen a structural change in the palladium market. So the prices have all moved up. And early indications are that this new process of producing the metals onsite can get our recoveries up into the 70s from the early 50s.
And I think most of you know too that recoveries are very, very sensitive in terms of their impact on economics and these models. So we should finish the work before the end of the year and firm up one way or another whether it works. There's still some work to be done. But it looks very, very exciting. And we have a pre-feas study underway on this.
I believe if the metallurgical test work works, we'll get full scale into a feasibility study on this property, and we'll look at the optimal size. And there is opportunities beyond Konttijarvi and Ahmavaara, which are the two main open pits. There's opportunities further afield, Vaaralampi, Tuumasuo, and also in something we called Suhanko II, which is up here. So lots of opportunities for us to increase this beyond the 12m ounces. And having just come back from Finland, I'm even more excited than I was before I went there.
Yanfolila in Mali, a very large ground position we have, about 180 kilometers by 60. And we split this into two areas because it's so big. And Yanfolila, as we know it today, is south of the Sankarani River. And we've renamed north of the Sankarani River as Kangari. And we're doing some drilling up there as well. It's an enormous property with a whole bunch of different targets.
We are concentrating our results in the south, in Yanfolila, which is near the border with Guinea. And we have a number of targets that we're drilling right now. We've done 38,000 meters of drilling, mainly on Komana East and Komana West. We did announce a resource in our declaration of March of 740,000 ounces.
As we said today, we've got about 1m. So there's more work to be done. I think we need to get to somewhere between 1m and 1.5m for us to get something going. But you have to remember this is a property that will increase in size over time. And we'll see a lot more, both in the south and in the north. And so I think we need to just keep drilling on this. It's not ready yet, but I don't think we're that far away from this being a project that we can get going.
And what's really nice about this, it's surface. It's basically outcropping on surface. We've got an oxide cap of about 100 meters. The grades are good, as you can see here from the drill results, which are in your book. This is Komana East. And you can see the original pitch shell that is based on the resource that you see in the book is based on this blue line over here. And you can see the drilling is extending beyond that. So it is getting bigger.
And the grades are pretty good, some exciting opportunities here. And this won't be difficult to mine. This will be free milling probably for the first three or four years. More work to be done there.
Far Southeast in the Philippines, we've now got eight diamond drill rigs turning on that. Remember we have a 60% option here that we have to make a series of stage payments on. The next payment is due at the end of September, $66m. We've paid $55m to date. And the final payment to vest to 60% will be $220m, which will be the later of March next year or when we have what we call the FTAA, which is a mining tenure agreement that allows foreigners to own a majority interest, in fact 100% interest in Philippines projects.
We've started gearing up for the surface drilling, which is largely driven by the need for geotechnic information. So that's the reason for that. And I must say the early drill results to date support both the existence and the extent of a known core of mineralization and further extensions, both laterally and at depth, outside of that core.
Now let's try and understand what we mean by that. If you look at the ore body itself, here's surface, it's an underground ore body that starts at about 700 meters below surface, extending down to 1,700 meters. That's what we call the known core. And then the latitude goes across about 1,000 meters as well. That's mined out previously by Lepanto, our partner. There's an indication of the scale and extent of this thing. That's already mined out.
This is still being mined, but it's a vein system. This is a porphyry, gold-copper porphyry. This is a series of epithermal veins. So it's a different style of mineralization. But this is what we'd understood was the mineralized core in this particular ore body.
So we've got a drill platform here at 700, with a series of drill cuttings that we've put in place. And we're drilling out a series of fans across the ore body because the previous drilling that was done, there was about 118 diamond drill holes, but those drill holes were all done vertically. So what we're now doing is we're doing a series of drill holes fanning across the ore body to test the continuity of the mineralized zones. And that's the program we're currently involved in right now.
So if we look at what that means, here it is. You can see here is the drill level over there, and you've got a series of drill holes going out. And our initial drill program is to do 17 holes. And I'm giving you really just a quick taste, if you like, of what's to come. The first three drill holes have been completed. You can see them over here where I've marked those drill holes. So if you just capture that in your mind for a moment and you move on.
Now let's look at one of those drill holes 5003. And, in essence, what we've given you here is the full extent of the drill hole. That's the core as we've previously understood it to be. Okay? And if you look at the drill hole going across here, you can see that we've given you two intersections, one at a copper cutoff, copper equivalent cutoff of 0.5%. And you can see there's 872 meters at 1.06 grams gold and 0.55% copper. And then if you want to use a 1.5% copper equivalent cutoff, you can see over here we have 552 meters at 1.49 grams gold and 0.73% copper, but, in both cases, significant mineralized zones stretching over a long distance.
But what I thought was really interesting, and as did the team, is that this started in mineralization before it got to the core and ended in mineralization. In other words, this could extend even further. So it's quite possible that the so-called core of mineralization that we're seeing could be a lot bigger than what we initially thought it to be. And the grades are looking good as well.
And those are the drill results of the three holes that we've given you so far. And you can see we've given it to you at -- sorry, I did say a copper cutoff. Apologies, that's a gold equivalent cutoff. It's a gold equivalent cutoff of 0.5 grams a tonne and 1.5 grams a tonne. We've given you those drill results for those three holes that you can look through later.
It's early days, and we have to finish all of the drilling. And then we'll have to block model all of these results and see what it means in terms of the potential target we have in front of us. And that's going to take us through to at least the end of this year and possibly into early next year. But there's enough here for this to be a very, very exciting addition to the Gold Fields Group.
So, in conclusion, our growth projects are moving along in leaps and bounds. I believe that by the end of next year we should be in a position to have feasibility studies for at least three of them and possibly even construction decisions. So that's really good progress from where we were.
You've seen from our results that the international portfolio is really starting to gather momentum. And we've achieved critical mass in those areas. And the higher gold price is generating improved margins and greater cash flow for shareholders, which is reflected in an increased dividend.
With that, I'm going to ask Zakira to come and deal with the questions, please. Thank you.
Zakira Amra - Head of IR
Thank you, Nick. And we'll now open the floor to questions. At the front?
Allan Cooke - Analyst
It's Allan Cooke from JPMorgan Cazenove. Just a few questions on KDC to start with, if I may. Could you let us know what the safety stoppages cost in terms of ounces or tonnes or just lost in the first two quarters of this year? I noticed that some of the incidents and some of the safety stoppages, the whole complex had been stopped. For example, you had a tramming issue. And tramming across Kloof and Driefontein was stopped. Is that something that you're experiencing post the restructuring that you did there, that the whole complex, all shafts are shut when you have a Section 54, for example? And is that an unintended consequence? What are the losses and the trend there, if you like, now that you've changed the way you report and manage that complex?
And then also, the BPR has been on the go there at Kloof and Driefontein for some 12 months now. Could you give us some color on the changes that have been made and how things are progressing there? I noticed that the underground yield you said is temporary and localized. But the reduction was some 10% nearly to six gram a tonne across the complex. What is the outlook for underground yields at KDC?
Nicholas Holland - CEO
First of all, if I may say that, on 54s, we haven't had 54s imposed across the entire property in all cases. Yes, there have been occasions when there has been a 54 imposed across the whole of KDC. But most times it's been localized to the area involved or particularly the shaft involved. In fact, with one accident that we had recently, in fact, I made a decision with the management that we would shut KDC ourselves and actually go back and reassess some of the safety standards. So in fact we took a decision internally to shut down the whole mine and go and redeploy all of the crews to go and recheck certain areas given what happened during the quarter.
If we talk about what we've lost in terms of, I wouldn't say safety stoppages; let's call it accidents, because safety stoppages are by and large the consequences of the accidents. We've lost about 750 kilos in the June quarter, and we've probably lost around about 500 kilos in the March quarter. And that's been the impact on our production. So it's not insignificant and is another key reason why if we're going to sustain these operations, besides the very important moral issue of safety, it's a business imperative to improve safety.
In terms of the underground yields, as you can see, we've had a dip in the overall yields for KDC. And unfortunately part of the problem with accidents is they often happen in the high-grade areas. And you tend to have to then fill your mills with lower-grade material as a consequence of that. But we've also not been getting the right volumes that we should be getting in the high-grade areas, and that's another big focus.
Since quarter end, we're already seeing a good improvement in those underground yields. So I do expect that those underground yields will improve. But I don't see any reason why we can't get the underground yields at or around 7 grams per tonne. I think that's certainly a target we should shoot for. And if you look at the ore reserve, now the ore reserve is telling us that if we mine at the right rate in the right areas and we get the right mine core factors that we can certainly do better. And that's a big focus of the team right now.
Business process for engineering, Paul, I don't know if you want to talk to that.
Paul Schmidt - CFO
We've delivered about 294m since we've started in June. A lot of it revolves around labor reductions, control over overtime, and about the total cost of ownership looking at the purchasing of some of our equipment as well as some of our [goods wares]. Sometimes the cheapest thing is not necessarily the best thing if you look over the lifecycle of the product. So I think it's going well. I think 294m basically in a year is a good start to the project, and we're well on track to achieving our target.
Allan Cooke - Analyst
Sorry, just a follow-up. You mentioned mine core factor at KDC. What is the mine core factor running at now? And where would you like it to be?
Nicholas Holland - CEO
Well this last quarter, we got the mine core factor up to around about 81%, 82%. We believe if you look at the long-term averages, which is what we generally use, the five-year averages, we think there's scope for another 4% or 5% on that. And I'm sure that that's one of the things Peter will be focusing on.
And Peter, I know it's only been one week, I don't know if you want to add anything to these responses.
Peter Turner - EVP, Head of South Africa Region
Thanks for that (inaudible), Nick. No, sure. Mine core factor's really about quality and getting the basics right. And certainly, Nick, that'll be one of my core thrusts going in. Really what can you -- to improve productivity, cleaning out all the areas, and really doing the basics of mining right.
Steve Shepherd - Analyst
It's not a conspiracy. Steve Shepherd, JPMorgan. Nick, you've highlighted the attractive opportunities you've got in Peru. And I'm sorry to ask you the question, but could you give us your take on the politics and how that might affect your decisions going forward?
Nicholas Holland - CEO
Well certainly I think if you look at the cabinet that's been appointed in Peru, the signs are very positive. Now the people who've been appointed are certainly people that we know and we understand and are people who are very keen for business to prosper in the country. And the other thing is one has to look at the total constitution of the congress and who else is in there. And I think that gives you a reasonable idea of what's going to go on.
But also I would point you to the inaugural speech of President Humala, where he's reiterated again what he said in his acceptance speech, is that he's not looking to interfere with any international bilateral investment agreements. He's going to respect law as it stands today and the order of law. He wants the mining industry to prosper. And we have to remember that this is a country that has been the fastest growing economy in South America for the last couple years. And mining has played quite a significant role in that.
And in particular, there's -- we've worked out there's about a $40b of mining investments waiting to go in Peru. And it's right up there in terms of copper production, right up there in silver production, and important in terms of gold. So our view is that we think a sensible solution will be found to this. And we're certainly, both as a company and as a part of the local mining industry, playing a key role in collaborating proactively with government to find out how we can help them solve their issues. So I'm reasonably comfortable that we're going to work through this without any particular issue.
The impact on our operations right now, no impact. Cerro Corona's in full production already. So that continues to operate. We've had no interruption at all. We've had no disruption during the elections at Cerro Corona.
In Chucapaca, which is in the south of Peru, which was an area that was largely dominated by Humana supporters. We took a proactive decision to suspend operations at the project for 30 days, just as an abundance of caution, if you like, to make sure that our people were not placed in any jeopardy. As it so happens, there were no real issues around there and we're back in. And our relationship with the communities is good. And people are keen for the project to go.
So we'll continue with our feasibility study and our infill drilling campaign. And that will take us through to June next year. And before we make a final decision on whether we go ahead with the project, we will have had another nine months, 10 months or so to digest whatever's coming down the track.
So I think for us, we don't have any particular key decisions to make right now. But obviously we'd like to try and get a lot of the uncertainty out of the air because it is a concern that we're hearing on the road.
Johann Steyn - Analyst
Good morning, guys. Just a quick question. Sorry, it's Johann Steyn from Citigroup. You maintain your guidance for the year at 3.5m to 3.7m ounces. If we look forward for 2012, '13, and '14, what are you guys thinking about? I know we've got the 5m ounce under production development. But if we can just look further than this year, how does it stack up at this stage?
Nicholas Holland - CEO
Come to the Analyst Day on December 5 and then we will reveal all.
Johann Steyn - Analyst
So at this stage no additional guidance.
Nicholas Holland - CEO
Not going to give anything new at this stage. What we want to do is give you a much better profile over the next five years. At that time we want to give you a better indication as to when the projects might come in, what that might look like.
So if you could bear with us. But to give you some idea, going forward obviously you can now rebase your estimates on the assumption of 100% of Peru, 90% of Ghana. I've given you an indication as to what KDC's going to look like. You've got the buildup in production at South Deep. Beatrix should be able to continue where it is. And the rest of the international operations, I don't see much change over that. So I think that using the information that we've given you, I think you can take that data, Johann, and you should be able to simulate it. And if you want just to look at it before you go, we'd be glad to.
Johann Steyn - Analyst
You've done already, so I'm not going to send it again.
Just quickly also on Beatrix, what's your strategy with Beatrix at this stage? Do you -- isn't it a good opportunity to get rid of at this stage?
Nicholas Holland - CEO
Well, I think at this stage, we're very happy with a mine that's making ZAR200m of free cash flow a quarter. So right now I'm happy to continue having that in our portfolio. It's a pretty good asset right now. And 5m to 6m ounces at a gold price of ZAR400,000 a kilogram, it's one of the most leveraged mines in the country to the gold price. And unless someone was going to pay me for that, then I'm very happy to keep that in our stable and generate nice cash flow for shareholders and for the Group.
Johann Steyn - Analyst
Okay. And what do they need to pay you before you --?
Nicholas Holland - CEO
A lot of naughts on the checks.
Johann Steyn - Analyst
Okay. And just one last question on Cerro Corona. Obviously it's a fantastic mine. Long term, what further potential is there at Cerro Corona? I know the tailing is the key bottleneck for the foreseeable future. But what is the potential that you guys have been finding?
Nicholas Holland - CEO
Well, as I said earlier, are the long-term grades going to be the grades that we expect to see? Based on the positive metal reconciliations we're seeing right now, it may be a little better. Who knows? It's early days. But that's one of the reasons we're doing more drilling on that. There may be potential to extend the mineralization out to the sides. It may extend laterally. So we are looking at opportunities around the property.
But I think the big thing is, if we can get the extra tails capacity, whether it be looking at trying to increase the level of the dam, whether it be looking at dry tailings, which would give you typically 6 to 7 tonnes more capacity, a critical component over the next 12 months is to find a way of converting potentially another 30m tonnes. Now that would give us five years of life extra to the already [14] years of life that we have. So let's see how we go on those and then take it from there.
Johann Steyn - Analyst
Excellent. Thank you.
Unidentified Audience Member
Thank you. I'm going to refer to the cash flow statement, please, and also the balance sheet. The cash flow statement shows two payouts, ZAR1.24b for La Cima non-controlling, and ZAR4.52b at -- in Ghana. Incidentally, why do you call it non-controlling when before the payouts you were holding respectively 90 -- sorry, 80.7% and 71%? I don't quite follow what is meant by non-controlling, given those percentages that you were holding.
In any event, the total paid out is ZAR5.762b, which accounts for 90% of your total increase in net debt. Now it's rather intriguing to look at the ratios between these two payouts. In each case there was an additional 19% in West Africa and 18% shareholding in South America. The ratio of the payouts, ZAR4.52b and ZAR1.243b is 3.64 times.
Now by itself that's meaningless. But when we have a look at the same ratio for EBITDA contributions, the ratio comes to 2.1. Now when you were discussing the buyout for South America, you stated clearly that you were very, very pleased with the additional shareholding that you were able to obtain. You weren't as enthusiastic in describing that same buyout in Ghana, suggesting that possibly you may have overpaid given the much higher price you paid measured against what you paid in South America.
Now would that be a fair conclusion to reach, or can you contribute something else to what I might have missed?
Paul Schmidt - CFO
Let me answer. Let me go through all your questions, first of all. So one on the non-controlling interest, when you have a company that you don't own 100%, the percentage that's owned by outsiders is called a non-controlling interest. So when we bought out the minorities in Peru and in Ghana, they are called non-controlling interest. And hence we call it purchase of non-controlling interest; that's the name. It doesn't refer to the stake we already own, but refers to the stake that we bought out.
When you go to your calculation, you need to look at the cash flow. You need to look at the two quarters for the purchase in Peru. The ZAR1.2b, we split it over the quarter because it was a process where we bought some of them in the March quarter and some of them in the June quarter. If you add the two together, you get to ZAR2.8b, which then comes back to -- and if you compare that to the ZAR4.5b, it's close to your ratio of 2.21, not to the 3.21 that you talked of initially that you get to. But it ties up to the EBITDA ratio. So I don't know if that answers your question.
Unidentified Audience Member
It certainly does. Thank you.
Paul Schmidt - CFO
Okay.
Nicholas Holland - CEO
In terms of did we overpay, we're very comfortable with the price we paid for the Ghana assets. If you look at it, we effectively, on a reserve ounce basis, we paid around about $300 an ounce. On a resource ounce basis, we paid $200 an ounce.
If you look at what ounces are trading before this big jump up in the gold price, resource ounces were trading at around an average of $200 an ounce, resource ounces. Now that's often a deposit with a few drill holes in, if you're not too sure that it extends, whether it's going to be a mine. Those kind of things are trading at $200 an ounce. And we can give you the data if you want it. And it's not our data; it's external data that we've used.
So to buy in production ounces at $300 an ounce, with all of the upside that we have on Damang, and there is upside on Tarkwa as well that we'll talk to you about later on, maybe on the Analyst Day. Even before the big run up in the gold prices, it was a great deal for us. And I'm very pleased that we've done it. So if I didn't sound enthusiastic on the second deal, let me now sound enthusiastic for you.
Unidentified Audience Member
And lastly, one more question, please. The current portion of long-term debts at 3.72, the description suggests that you intend repaying that within the next 12 months. Is that correct or is it not correct?
Paul Schmidt - CFO
That is just the current portion of debt. A lot of the debt is rolled over. We have a $500m facility that needs to be terminated in March next year. And that's basically the number that you're seeing there. That will be rolled with the new facility.
Unidentified Audience Member
Thank you.
Zakira Amra - Head of IR
Thank you. A question at the back, please?
Unidentified Audience Member
(Inaudible - microphone inaccessible). Magazine. I just wanted to find out how the recent wage strikes will affect production figures for the next quarter. And if you could just give us how much you lost production-wise per day and then overall the whole period, please.
Nicholas Holland - CEO
Well look, the strike lasted around about four days overall. But the strike notice was received three days beforehand. And one of the things you need to do when you know you're going to shut down operations, it's like the Christmas break, we need to actually make safe and make sure that we're supporting. And the guys start ramping down. It's a natural consequence, I'm afraid.
And similarly, when you skip back into production, it takes some time before you get back to steady state. You don't just get the cruise in and they start producing again like they were. So I would think for us this strike is going to cost us between a tonne and 1.2 tonnes of gold.
When I say cost us, we haven't lost the gold and the gold is still there. We'll mine it. But we're not going to see the benefit of that 1.2 tonnes this particular quarter. Paradoxically maybe we'll see in a subsequent quarter at a higher price. But the bottom line is it's about 1.2 tonnes of gold.
And notwithstanding that, we have reiterated our guidance at the back end of the book taking that into account. But I guess we should be grateful it's behind us. And we've got a two-year arrangement. And I think for the union, for the workers, and for us, it's a relief that we have two years where we can get on and all do our business.
Zakira Amra - Head of IR
Thank you. There are no further questions on the floor. Can we open up the question to the people on the telephone and the Webcast, please?
Unidentified Company Representative
Your first question from the Webcast comes from [Jonathan Boroko]. Based on the initial drill results for the Far Southeast project, how many million ounces of gold reserves can we produce out of this project? Also what is the probability of producing 500,000 to 1m ounces annually from this project?
Nicholas Holland - CEO
Okay. Well my answer is it's too early to tell you. And again, once we've put together an initial resource statement, we should have a better idea of the potential size of this ore body, together with the potential grades and also the potential mining profile. So it's early days. But we're showing you these drill results today to give you an indication of the work that's been done over the last six months. And obviously the next time that we all get together here, which we hope will be in six months' time, we hope to be able to give you more information, if not before on the Analyst Day.
Zakira Amra - Head of IR
Any further questions?
Unidentified Company Representative
No further questions.
Zakira Amra - Head of IR
Any further questions from the floor before we end the morning? Well, you've had your quota for the morning.
Unidentified Audience Member
(Inaudible - microphone inaccessible).
Nicholas Holland - CEO
Okay. For the Group, it's about 2.7%, about $22. For the SA ops, it's about 4.5%, about $46. So for the Group, 2.7%, not a massive impact.
Zakira Amra - Head of IR
Okay. Well thank you very much, ladies and gentlemen, for joining us this morning. Refreshments will be served in the room to the back. And we will kindly ask the media to join us in the roundtable at 11am. Thank you.