Gold Fields Limited (GFI) 2010 Q2 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Willie Jacobsz - Head of IR

  • Thank you very much for joining us here for our second quarter financial 2010 results. Also welcome to those people who are following the results on DS TV, Bloomberg and on the website. We will follow the normal program today with Nick kicking off and then Paul and each of the Executive Vice Presidents of the different regions will give an update on the different regions. And then we will go over to a Q&A. We will first take come questions from the floor and if there are any by email or from the website we will deal with those as well.

  • Just in terms of emergency, in the unlikely event that something goes wrong we will all have to get down these narrow stairs at the same time very quickly, out the front doors and onto the lawns on the far north where you need to wait for any further instructions.

  • We're going to kick off with Nick. I just have to draw your attention to the forward-looking statements and then Nick will take it away for us. Nick.

  • Nick Holland - CEO

  • Thank you very much and good morning, everyone. Good of you all to come and I wish all of you a prosperous 2010. And after a month away from holiday destinations and back in the job I think it's very quick to forget our holidays and get back into it.

  • The quarter, I believe, could be characterized a good quarter for Gold Fields as solid financial results and the fact that we've seen a higher gold price has also reflected in our financial results for the quarter. And it's always pleasing to make sure that when you get higher prices that they come through and we've had a good set of results.

  • Having said that, I must say at the outset that Driefontein and Kloof have not done as well as we would have like. They have been constrained by flexibility and also stoppages. And as you can see the results for these two mines for the quarter weren't quite what we would have liked. But I'm going to talk to you about some of the challenges on these two mines as we go through this presentation, some of the things we're going to put in place. We know we've got some issues but more importantly we've got a plan.

  • If we look at our growth projects, South Deep is performing exceptionally well and if you look at it on a year on year basis our production at this mine is up 50%. Our development both above and below infrastructure is also up significantly. And if I look at this operation I suppose around about 18 months ago also we were driving on the highway but we didn't have headlights at night. Now we have headlights and we know exactly where we're going. So a 50% increase year on year, a tremendous performance at South Deep. And we've just gone FULCO, which I'll talk about a little bit later, and I believe that's going to help up underpin an even better performance out of South Deep going forward.

  • At Damang in Ghana, a mine that I thought was running out of ore body around about two years ago, I believe now is probably going to be somewhere between 10 and 20 years. It's really going to be one of the mainstays in our portfolio. That's going to be assisted in part by putting in a secondary crusher system that is going to enable us to have much more flexibility in the type of ore feed we put into the plant. And that project Peter will talk about but that should be finished in the next few months and there are very exciting things ahead for Damang.

  • Athena as well in Australia, remember this is the new mine we're developing at St Ives. Part of that Argo-Athena complex which we believe is the next big camp at St Ives probably 3m ounces at least there. I wouldn't be surprised if it's a lot more than that. And that mine development is proceeding and Mark Zeptner, Acting EVP for Australasia is here, he will take us through some of the progress on that.

  • The exploration portfolio, as I've said before, it's the best portfolio Gold Fields has ever had. And to have four projects at the advanced drilling stage with two of them about to complete initial scoping studies within the next six months is something Gold Fields has never had before and the results are looking better and better all the time.

  • So summarizing the financial results, our gold production for the quarter about the same as last quarter 900,000 ounces. Our gold price of course up in all currencies, 9% in rand terms, about 14% in US dollar terms as well and that's reflected in higher revenue. Our costs are the same as the previous quarter at ZAR147,000 a kilogram, so we've kept good cost control. And our NCE as well, very similar to the previous quarter despite the fact that we are in a very significant inward investment program.

  • And as you can see the higher gold price has translated itself into higher operating profit and of course a higher operating margin for these operations. Net earnings up 40% on the bottom line, and if you strip out all of the so-called once-off items, up 64%. The core earnings in the business up 64% so I do believe we've demonstrated that Gold Fields does show good leverage to gold price increase.

  • And you can see here again, this is a graph you've all seen before and you'll see it again from us because it's one of the key principles that we're going to stick to, is creating and maintaining a margin at the notional cash expenditure level. We're the only producers who report notional cash expenditure. The all-in cost of production, that's what really matters and that's what drives whether you are going to make a margin in your business and whether you're going to be sustainable. As you can see, we're showing a reasonably healthy margin even this last quarter, some $200 an ounce and that's something we want to maintain and grow as we go forward.

  • Looking at some of the assets. As I've said, South Deep building up to 300,000 ounces and I'm sure you'll agree looking at the production for the December quarter we're on track to achieve that. And that would be a very significant improvement for the year as a whole when in fact last year 2009 we only did 175,000 ounces. I told you at the beginning of the year we're going to do 300,000, I believe we're going to do it.

  • Beatrix has proved to be a very steady asset. Vishnu and the team have done a great job in recovering that and we've now starting to see stability coming out of that asset, which is good to see.

  • Cerro Corona, I think outperforming is a bit modest. This is a star performer. And this is an operation as you'll hear from Juan that is generating good free cash flow and is setting itself up to be a really good asset in the portfolio.

  • Agnew, of course, we've always known is a good cash generator. The good grades from Kim in particular continue, around about a 10 gram underground ore body which makes this a good asset in the Australian portfolio. Another good performance.

  • Damang, we did come off in our production, we decided to accelerate a mill rebuild program. We hit some short-term process issues and decided to undertake a 13 day accelerated maintenance plan. That would have had to have happened anyway down the road so we've taken this opportunity to do it. It's done, it's behind us and Damang is now set up for the future.

  • Tarkwa had a very steady quarter similar to the previous quarter. We could have done a little bit better but we did have a power change over to a new substation beginning of the quarter. It did cause some process interruptions but again that's behind us and we're looking good.

  • St Ives, we do have a challenge on our grade. We know that we can deliver a better grade into the mill and not having Belleisle, one of the three underground mines, for a large part of the quarter has certainly hurt us. But as things stand we should be back into production in the newer part of Belleisle, a new extension of that very soon within the next few week and I'm sure that St Ives will do better this quarter.

  • So Driefontein and Kloof I believe are a challenge to us to do better. These assets have the ability to do better, they can do better and we'll talk to you about some of the things we are going to do to improve that.

  • So looking a little bit further out, where do we want to get to? I mentioned FULCO has been implemented last Sunday evening, January 31, and that's going to give us significant extra shifts on this operation. And it's how a mechanized underground operation should be run and in fact how mechanized operations are run across the globe. And having Mark Morcombe there for a few months now, who is Australian and well versed in how underground mechanized mines should work, you can see some of his influences start to come into this asset and I'm very excited about the future.

  • And we started to leverage South Shaft to help us to increase production even beyond 330,000 tonnes a month. And that's my objective into the future and our objective, not to be constrained by 330,000 tonnes a month, look at that infrastructure and start seeing how we can accelerate and compress the mining profile of South Deep.

  • Beatrix, Cerro Corona and Agnew I'm not worried about, they're in good shape. They're just going to keep doing what they're doing.

  • Damang, we've spoken about the secondary crusher and that should enable Damang to get back to around 250,000 ounces a year initially. I'm sure we can even improve on that particularly when you see some of the exploration upside that Peter's going to talk to you about under the West Africa Portfolio.

  • Tarkwa, a number of very exciting things happening there. The HPGR project is starting to really gain momentum and this is now really a world-class mine that I believe is going to deliver good results for Gold Fields over the period.

  • St Ives, we've got a plan to solve the grade gap and you'll see the impact of that when Mark talks through that.

  • And Driefontein and Kloof, I'm going to spend a moment or two talking about. Let's just take stock first what we have here. In South Africa Gold Fields has probably the best ore bodies, in fact the best ore bodies in the country. Long life quality ore bodies, well capitalized infrastructure. We've got the basic ingredients to have a good suite of assets at Driefontein and Kloof. We're not quite getting the level of performance we would like, the question is why.

  • Lack of flexibility is one of them. And catching up 90 kilometer of backlog secondary support that's been allowed to accumulate over five or six years and we're trying to address that in two year has definitely hurt our development. We had to do it, we've got no regrets in doing it but now we have to open up these ore bodies to create the flexibility. So that is impacting in short term volatility of results.

  • Unplanned production stoppages are a concern. And yes, some of these are self imposed but I believe that we've got to work out a protocol with government and we've got to work out a protocol with the DMR about doesn't create significant stoppages. And whilst at the same time I'll be the first to say that safety is the most important value, and we're not going to move one millimeter away from that, I'd like to find a way that we can avoid significant stoppages whilst at the same time making sure that we comply with protocols of the department, we comply with our own protocols. I think there's a solution here that we need to find. So we're engaging and looking for win-win solutions on how we can prevent significant mine stoppages because these operations don't react well to stop start situations.

  • And of course as a consequence of where we are, the SA region isn't generating cash right now. And with the demands of South Deep, which are going to be with us from a capital perspective for the two to three years, there is a bubble of expenditure particularly as the tails stand gets done, the deepening and equipping of the ventilation shaft, a new plant will have to be built. Those by definition are front ended so we've got to try and find a way of funding all of that from the region and generatng some cash for the Group.

  • So we have plans on that focusing on seismicity, also accelerating development which in turn helps us to reduce the concentration of mining. We also need to come up with an alternative working arrangement and that's really driven by the need to create more face time for our people and also to make sure that we can deploy all of our people.

  • First prize for me and for the Group and for the Board is to deploy all of our people productively in gold winning. And if you analyze the value creation in this industry you don't get value creation by reducing costs as much as you create value by increasing revenue. The tradeoff between increasing revenue and reducing cost is heavily skewed in favor of making sure that these assets sweat for us and these assets work for us. And if we can find a way of doing that, deploying our people, I believe it's going to be in the best interests of our Company, our employees and the country at large. So that's the challenge for us over this quarter and over the balance of this fiscal year.

  • So Paul is going to talk through the financials for us, and then Vishnu will give more color to what's happening in the South Africa region. Mark, who's acting head of Australasia, and it's good to have Mark here today, is going to talk about Australasia, Peter, of course you all know, will talk about West Africa, Juan, South America and I'll wrap up at the end and hopefully we'll have some time for questions.

  • With that over to Paul.

  • Paul Schmidt - CFO

  • Thanks, Nick. Good morning, everybody. If we start at the salient features. If we look at gold production, attributable gold production was 900,000 ounces, slightly down from the 906,000 in the previous quarter. If we look at the revenue matrixes the gold price in dollar terms increased from $959 to $1,096 per ounce. The rand strengthened to the dollar and was at $7.49. The effect of this is that the rand gold price increased from ZAR241,000 to ZAR264,000 a kilo. The effect of this is that our revenue line increased from ZAR7.4b to just over ZAR8b.

  • Operating costs were flat at ZAR4.6b and this reflects our emphasis on cost control throughout the Group. The effect of the changes in revenue and operating cost resulted in operating profit increasing by 25% from ZAR2.7b to ZAR3.5b. In terms of operating margin it increased from 38% to 43%. As Nick said, cash costs were flat in rand terms at about ZAR147,000 a kilo.

  • If we look at notional cash expenditure, let me just refresh everybody, NCE is taking into account all operating costs plus capital. Basically we're saying the cost of running our operations. That increased from ZAR208,000 to ZAR216,000 a kilo or $900 per ounce. The increase is largely due to ZAR200m more invested into our capital expenditure.

  • If we move over to the next page the main item I want to concentrate on is the exceptional item. The main number in the ZAR432m relates to just on 4.1m shares we receive in Eldorado Gold as a result of Gold Fields exercising its top up, which was due to Eldorado taking out all the issued share capital in Sino Gold. The effect of everything is that my net profit increased ZAR400m to ZAR1.6b, while my normalized earnings, that increase 64% to just over ZAR1b.

  • If we move to the cash flow statement, main line I want to concentrate on is the cash flow from operations. It's substantially up from ZAR1.3b to ZAR2.1b and this is showing that the increased gold price is reflected in our cash flows. Capital expenditure, that's up to almost ZAR2b and most of this relates to expenditure on infrastructure at South Deep, at the Athena underground mine in Australia at St Ives as well as continued focus on ORD at the South African operation.

  • Net loans, this quarter we had a repayment of just over ZAR600m compared to loans received of ZAR600m in the previous quarter. This is a net swing of about ZAR1.2b. The net effect of everything is that cash flow for the quarter outflow was about ZAR500m. Taking into account the positive translation adjustment as well as the opening balance we ended up with about ZAR1.8b in cash at the end of the quarter.

  • If we look at our balance sheet, if we look at our debt. Our net debt has remained fairly consistent at about ZAR6.7b and as you saw the decrease in the cash is basically reflected as well in a decrease in our debt, resulting in the net debt being similar. A point to highlight here is our net debt to EBITDA ratio it's only 0.48 and I think there's very few majors who have a number that can -- that can boast a number as low as this. It's a number that I'm very comfortable with the debt at the moment.

  • If we look at our headroom availability we've got almost ZAR6.6b or almost $1b in available facilities, it's a good position to be in. If I can just highlight the slide in terms of our maturities. I know those are numbers that would worry a lot of people but most of the money, the debt sitting there, is our commercial paper which is backed up further on here our long term three and five year bank debt. The reason why we are accessing the commercial paper at the moment is because it is about 2% cheaper than normal bank and debt and it is reflected in our much lower net interest cost for the quarter.

  • If we move on to my final slide we've declared an interim dividend of ZAR0.50. It amounts to 50% payout in terms of our dividend policy, 67% higher than the previous quarter -- I mean the previous period last year. I know a lot of people were expecting more but I think this is still a sizable dividend and I'm happy with it.

  • In conclusion, I think Gold Fields financially is in a good state. We've had a very good quarter and I'm happy with the numbers.

  • Thanks for that and I'll hand over to Vishnu.

  • Vishnu Pillay - Head of South Africa

  • Thank you, Paul. Ladies and gentlemen, good morning. It's good to see you here this morning and it's the first time we meet in this year and I'd like to take the opportunity to wish you great health, much success and indeed much prosperity for 2010. 2010 is going to be a great year for all of us, Gold Fields included.

  • The one thing that I want to reflect on is that 21 months ago, when Nick and I and the rest of my colleagues took office, one of the things that we felt we needed to do was build an organization that was stronger for longer. And clearly what you'll see coming out of what we have to talk you through is reinforcement of that principle that we had adopted. Indeed what we had to do in addition to that was enhance our operational excellence to cope with volatility. And volatility not just in terms of price, volatility in terms of stoppages, volatility in terms of operational delays that we had to cope with and of course the intense degree of seismicity that we have to deal with in our operations.

  • I guess one had to ensure that in all of this we had to make changes to strengthen our business fundamentals. This industry is at a crossroads and we have to make sure that in the march forward into the future we have to shape this industry and now's the time more than any other for us to make sure that we put in place the long term sustainable actions that would guarantee the future value for our shareholders.

  • Our scorecard for the operations for the last quarter reflects the actions that we have been taking over a period of time. Our safety trends continue to improve. The march that we had on safety has delivered significant results for the organization and I'm happy to say that on two of the three key indications we're even better than our peer groups.

  • We've dealt with secondary support, we've installed just under 90 kilometers of secondary support across all our operations and this monkey is finally off our back. What we're going to do now is turn our attention to the activities on the face and make sure that we advance our ends. 52% of the ends in our long life shaft are mechanized. We've had some challenges with up-skilling our mechanized crews but I'm pleased to say that the training and the maintenance of the equipment is well entrenched now. And we'll see traction on this going forward into the future.

  • Despite the fact that we had to deal with some tragic fatalities when we had seismic activity, I'm pleased to say that the short term actions that we have put into place is beginning to bear fruit. The long-term solution to the management of seismicity on deep level mining operations rests in making sure that we can spread the concentration of mining across greater areas on our mine. To be able to do that we need to ensure that we find traction in our development and open up our ore bodies.

  • We recognize the unplanned production stoppages in our operations over the last two quarters but we have been working feverishly, as Nick pointed out, with the Department to put in place a protocol so that we can manage this on an ongoing basis into the future.

  • There are some key activities that we have implemented on our operations and I'd just briefly like to show you some of the results we've achieved through centralized blasting, increased areal support and pre-conditioning. The solution however still remains in opening up the ore body so that we can actually mine a certain amount of square meters over a certain area. And although we've calculated that number what we have to do now is make sure that we deliver the face for those areas.

  • On centralized blasting we have now restricted the seismic window to three hours from eight and within a three hour period, which goes from six to nine in the evening, we don't have staff underground at the face. And that's a significant achievement and you'll see this coming through on all our shafts.

  • Our falls of ground, both gravity and seismic, are beginning to show the right trends and that's a 60% improvement that we have seen in our rates of injuries in falls of ground. And that's no mean feat given the work that we have been doing on our operations in terms of improving areal support.

  • Seismic face bursts is an issue that we've had to consistently manage across our operations. We are now preconditioning every working face on all of our deep level mines. And you can see the benefit of preconditioning on the hanging wall, on the sidewall and on the face. In 2009 we've had minimal incidents of face burst across at Kloof and Driefontein.

  • We recognize the impact of seismicity on production and our answer, apart from our short term interventions, is to make sure that we fast track our development. That's already in place now, we've dealt with secondary support, we've dealt with the up-skilling of our mechanization crews, we've got our maintenance contracts in place, we've set up our maintenance workshops, and what we're finding is that traction is beginning to be taken on development across our deep level shafts.

  • In calendar 2009 we lost 76 days from our production calendar through unplanned stoppages. And that's 7% of our production shifts, and that's 2.2 tonnes of gold. Now that's a significant amount by any standard and, given the complexities of the operations, stop start mining is not the best way to actually run these deep level gold mines. We've entered into discussions with the union leadership to go into a six-day working week.

  • South Deep have acknowledged the need to work that asset on a continuous basis. We've signed an agreement with our union leadership. And as Nick has pointed out we've implemented FULCO on Sunday night. And I'm pleased to say that transition has gone off well. I guess it'll take at least four to six weeks to bed down fully the implementation of FULCO but you'll see the results of that coming though in the next quarter.

  • Across on the other mines a six-day working week will give our staff the opportunity to be able to work in a cycle that will give them long periods of off. And I guess this is the one thing that we have to all acknowledge, union leaders consistently fight for more money and less work, the six-day working week will take our people off the face for significant periods of time and give them extended holidays, of course for the same amount of money. But nevertheless what we'll be able to do is deploy our people effectively onto the face to deliver value for the organization.

  • Both Kloof and Driefontein are engaged in discussions and hopefully we'll be able to succeed in putting together an agreement on the six-day working week pretty soon. And ladies and gentlemen, these are the fundamentals that we have to put in place to change the way we work to deliver value in this business going forward into the future.

  • In summary, the region had a steady quarter. It was marginally down on gold production despite all of the challenges that we had to face. However, I should remind you that these stoppages don't actually affect the quarter that they happen in, it has a knock-on effect on the following quarter. And quarter three we've had a very slow start to January and we expect that quarter three will be a challenge going forward. But nevertheless we are fully focused on making sure that we deliver our plans this quarter.

  • To talk to each of the mines in detail, Driefontein was largely affected by the stoppage that we had as a result of the seismic event on December 6. We had a full weeks' stoppage and the reason for that stoppage was largely the extent of the damage caused by the event and the long time that it took our proto teams to actually get to the face. And given that in these conditions that we had to work in we had to hand lash a significant tonnage of broken rock before we could get access to our colleagues who were trapped. Unfortunately, as in all of these events, we lost both of our colleagues who were on the face.

  • There were significant knock-on effects of that event throughout December and we only picked up when we returned from leave on January 4. The philosophy going forward is that Driefontein would have to build a buffer and the buffer that we're going to build is a stockpile on the surface. And we are reorganizing the operation currently so that it delivers a large percentage of its lower grade west side ore onto the pad that we've built to build the stockpile.

  • Kloof, Kloof's delivered the best safety performance that we've seen in a long time. And, like we did at Beatrix, we've pulled Kloof into an intensive care situation and we are addressing all the endemic issues on this operation and we're beginning to see the benefits of that going forward. And it's reflected currently in the safety performance of that mine.

  • In addition, the one thing that we have invested significantly in is ventilation infrastructure at both 3 and 4 shafts. It's not always possible to work consistently in temperatures that are not ideal and the infrastructure that we're putting into place will make sure that we can run these deep level shafts at an ambient 28.5 degrees.

  • Beatrix, I think there's not much to be said. This mine, at a time when we look to performance on these operations in South Africa, Beatrix has delivered. It's delivered consistently and the turnaround that we had put into place has been consolidated. There is one remaining issue that the team's working on and that is to address the mine call factor at number 3 shaft, which is on hydropower. A significant improvement in the mine call factor will see gold production change on this mine and I'm expecting that within the next quarter we'll see the benefits of that.

  • We had a hoisting constraint on number 3 shaft, our engineers worked across the Christmas break and that's been resolved now so that shaft's back up to 160,000 tonnes a month hoisting capacity. We were actually doing 144,000 for some time.

  • South Deep must remain the star performer in the South African portfolio. This mine is a good mine but it's a tough mine and, as Nick has pointed out, for some time we were wandering in the dark. But as I'd repeatedly said Gold Fields owns the prize asset in the South Africa mining industry. Gold Fields owns the prize asset in the world gold mining industry and we've put every effort into making sure that this mine delivers the value that's expected for our shareholders.

  • What's most impressive is that we are bringing South Shaft into production on July 1. Stencil that date into your diary, Nick and I will be going underground for the first blast and anyone that desires to come along and share in this occasion is welcome. That'll give us an additional 20,000 tonnes of ore at anything between 4.5 to 6 grams a tonne and we expect to deliver an additional incremental 100 kilograms a month. And the beauty of this is that it's going to give us the flexibility that we actually desire on that mine. I have no doubt that given a few more months we'll be bringing the bulk of that shaft back into production. And it's been our desire as an executive to make sure that we reap the benefits of this operation in that shaft and I'm pleased to say we've just about arrived.

  • That's a picture that tells its own story, gold production up, development meters up. And no one can dispute that performance. Despite that fact that we've had our challenges, I'm pleased to say that this mine is finding the traction that we've always desired for it. There's a lot of hard work that's gone in behind the scenes by the team and we've got the greatest concentration of engineers in this industry right on the operation right now to make sure that we deliver the desired performance. And you can see this reflected in the capital program that's been run for that mine. All of our sub-projects are on track, they're delivering as per the schedule we/re pleased to say that it's been tightly managed and will support our delivery of 2014.

  • I'd just like to reemphasis that safe production culture that we've always talked about, we're beginning to see the benefits of that. And very clearly when compared to our peer groups we're making great progress and it's a credit to our operational teams. We've delivered on South Deep to date. We don't expect to falter on that and I have no doubt that going forward into the future you'll see progressive improvements.

  • I'm also pleased to say that we've spent a significant amount of our time in addressing the issues around our people. The one example that I always give is it's for the first time in over a decade we've been able to source and man our engineering portfolio. We've had an influx of applications to the organization and I'm pleased to say that we now have the best mining and engineering team in the industry.

  • The one failure that I have to recognize, and which we are working on and we have plans to, is to make sure that our development finds traction. There are reasons that we haven't been able to do it to date, Nick's pointed out some of that, getting secondary support in place, addressing the up-skilling of our mechanized crews. But I think all of that is largely behind us now and you'll see progress on that going forward into the future.

  • I guess with that I'd like to hand over to my colleague, Mark Zeptner, who will take you to a tour of Australia.

  • Mark Zeptner - Acting Head of Australasia

  • Thank, Vishnu. Good morning, everyone. In Australia we are currently investing in capital by way of accelerated mine development and exploration drilling. We're doing this in order to build production flexibility that we simply haven't had in the past, we must do this. I'll talk a little more on the rationale behind this and you'll get a feel for the specific CapEx increases as I go through. I would also like to say that we're expecting to build the production up in the Australasian region to 150,000 ounces by the end of the third quarter and position the operations such that we can go beyond this in quarter 4.

  • At St Ives production was adversely affected by lower underground grades due mainly to a stope failure at Belleisle and mining of lower grade areas in the Argo mine. It was counterbalanced somewhat to higher grades out of the open pits mainly due to the higher-grade Apollo pit coming on line earlier than scheduled.

  • At St Ives our outlook is to get back up to the 100,000 ounces per quarter mark in quarter three but importantly we're hoping to do this at almost $100 an ounce lower cash cost than in Q1. Also I ask you to consider the 100,000 ounces in the context of a seven-day shut down which we've just recently completed at St Ives at the Lefroy Mill, in addition to a new ore blending strategy which will effectively tie up 300,000 ounces in high grade underground ore but will allow us to feed a more steady grade into the mill rather than the grade fluctuations you have with an underground and open pit mix.

  • We also expect our aggressive exploration strategy to deliver, as a minimum, 2.5m ounces come the middle of the year as reserves at St Ives.

  • How are we going to get back to 100,000 ounces on the undergrounds? It's through an intense grade focus. This is the Argo mine, we've reevaluated the mining mix at this operation. The graph clearly shows what impact that has had. We're mining in the areas of high grade and high margin. We're effectively taking a mine that's produced in the range between 4 and 5 grams per tonne for some time up to 6 grams and even beyond. The yellow line's the daily grades, obviously the bars are the moving average.

  • Also I'd like to take the opportunity to mention whilst not discussed on this slide the Belleisle mine. Nick mentioned that we had some issues with stope failure in the heart stopes, we're moving into a new ore body called the [Niad]. Happy to say that geotechnical and ground water conditions are much more favorable there. We're currently developing that ore body and we hope to be in full production before the end of this quarter.

  • On the Athena project we have fast tracked development. In quarter two we completed the box cut, the portal surface infrastructure and even some initial development. But we've also, in addition to this in January, early January, on the 4th in fact around this day here, we installed a high speed development team to accelerate the project even further. You can see the impact of the change that it's had in January alone on the cumulative meters. The schedules that the high-speed team are aiming for in the next six months are up to 400 meters per month. We're still evaluating the impact that will have on the project time lines you see at the base but we have early indications that this will accelerate the full mine production by at least six months, or up to six months sorry, to the start of F2012.

  • A moment to discuss the Argo (technical difficulty), which is an exciting part of St Ives. It's got the potential for both open pit and underground mines and the number of project areas here simply goes up the more drilling you do. In fact, there are other project areas that we haven't got to both to the north and south of these areas that aren't shown on this slide.

  • Argo, Apollo and Athena already mines but we're looking to bring on Hamlet by the end of the year then you've got Diana, etc. etc., so it's just a function of how many drills can we get in there and how quickly can we bring these things to bear. I believe this area actually can host up to 4m ounces [in it] and I think that we can actually add incremental ounces to St Ives to the extent that we can go from around 420,000 ounces per annum all the way up to 500,000 ounces by virtue of the impact of this area alone.

  • At Agnew, Agnew for a long time has been a steady cash flow producer as you know and it continued in that vein in quarter 2. What I'd like to point out at Agnew is that with successful deep drilling in the Kim zone which is a plus 10 gram ore body and we see no reason why we can't follow that up with the main load ore body, we're looking to achieve 1m ounces of reserves by the middle of the year. Cash flow plus 1m ounces of reserves, we're like to think that this asset can be valued as much outside of Gold Fields as it is inside.

  • Having a look at where we've done the drilling, this is a long section of the Waroonga mine. Kim ore body here, main ore body here, north is to the left of screen. Current workings are at about 800 meters below surface. We've completed lines of drilling at 1,400 meters. We've done that drilling from surface with directional drilling technology.

  • It's been successful, even to the extent we've got a widened zone highlighted in red here, which we may be able to bulk mine and increase production rates. So the life is rosy at Kim and we've also got that open at depth. As we speak, we're moving the drilling across into the zone below the main lode and it's pretty obvious to see that the opportunity for down dip extensions you see is pretty obvious. Again, a five year reserve is well within reach at this mine.

  • Finally, to the focus areas and there's three really for me, in the region. We have to get St Ives back above 100,000 ounces by closing the grade gap. Continuing the good work we're doing at Agnew, making that sustainable. Ramping up Apollo. It's a 2.5 ground pit which is much better than what we currently had going into the mill from the open pits. And fine tuning our blending strategy.

  • Improving flexibility, we've got an aim of twelve months of developed reserves on our underground mines. In that I mean the decline is twelve months ahead of the stoping front. On some mines that might mean we need to accelerate our declines and we'll have to manage our cost and our NCE in line with that.

  • And finally, turning St Ives and Agnew into long-life mines. By the middle of the year we're looking at plus five year reserves. And in the part of the world that the ore body is typically a lot less than this, the outlook remains bright for Gold Fields in the Australasia region, given those life-long mines. Thank you. I'd like to hand over to Peter.

  • Peter Turner - Head of West Africa

  • Good morning, ladies and gentlemen. I'd like to share with you our performance for the West African region. And starting off with our regional summary, West Africa had a steady quarter. A better result however was marred by a slow start up to the quarter, with the VRA sub-station plumbing into our CIL plant at Tarkwa. And also we had a plan scheduled, a rebuild of our Damang mill which took us out for a period of time.

  • However, I'd like to report that these are all issues behind us. The CIL is performing steadily and for the first month we did 1m tons for last month, quite steadily. Also Damang is well on track and ahead of schedule with respect to gold production.

  • Also I'd like to report that the growth from our growth projects, the secondary crusher is well on schedule and progressing well. And at Tarkwa, the HPGR project has showed some really encouraging results, producing flawlessly at 10,000 tons a day. And recovery is improving as we would have expected. I'll also share with you, during the course of this presentation, some very interesting brownfields and greenfields exploration results.

  • Moving on to Tarkwa then. A steady quarter for Tarkwa with the CIL and the heap leachers performing well and grades holding. The new HPGR is performing flawlessly at 10,000 tons a day as I mentioned. And what we're really seeing here is the ability to recondition the recovery profile of our ore that's going through to the heap leachers. This holds good opportunity for the future with respect to our north heap leachers and also future prospective projects with respect to reprocessing of old heap leach dumps. So very exciting technology that is showing good results.

  • Moving on then, to Damang, our new reborn mine. As I mentioned earlier, we had the mill issue at Damang, which is a rebuild, which we scheduled to bring forward. This secures the future, essentially, for this mine and puts us in good shape. The secondary crusher project on this mine is well advanced and on schedule and showing good promise. I'll share with you later some exploration results as well and there's some really exciting stuff on the exploration front at Damang.

  • The pictures here just show the progress on our secondary crusher plant. Screen civils on the left, at the bottom are crusher civils going in and the final product, to be expected later next quarter, is the secondary crusher project in its complete form.

  • Moving on then, to our growth strategy. Our exploration program has yielded good results and the key focus for this -- for our exploration is in the Greater Damang and the Greater Amoanda areas. On the left hand side of your slide you will see the Greater Damang pit, spanning some 2,8 kilometers. And mineralization continues along that trend, all the way to the South, including Tamang, Tomento North, Tomento East and ultimately coalescing into Greater Amoanda. A region spanning some eight kilometers. We're targeting a reserve here of some 2m ounces for this year, which we certainly will have brought to book by the end of the year.

  • Moving on, then, to our super pit. This is our new baby which we're drilling out at this point. This slide shows a section through the ore bodies of the Damang pit, the Huni pit and the Juno pit. Drilling is underway to coalesce these three ore bodies into one super pit environment. If you can see on the slide, you see the Huni Gap and the Juno Gap, these are areas that we are focusing on, with respect to drilling out. And we're expecting in order of 350,000 ounces to come from this project this year. Very exciting prospect for us.

  • Closing in on that drilling, we see the red stars is our in-fill drilling, which is taking place. With the Huni pit in the foreground, Damang pit cutback in the background. The process plant off to the right and just showing some of the intersections. And I highlight the one there which is DDD003, left hand top corner, yielding 4.96 grams a tonne over 3.6 meters. DRC, which is the one on the far right, 29 meters at 1.5 -- one meter at 15. Now these are typical of grades here but if you compare this to the average mining grade of this area, at 1.4, these are certainly some improved results.

  • Moving on to Greater Amoanda, this is our new discovery. If you look at that slide, you will notice that there is a significant ore body plunging off to the left. There is a reverse fault that has thrown that up. We're picking up widths of 30 meters at eight grams and we've seen four meters at 11 grams, close to surface. So one can just apply your mind to what a pit shelf could look like in this environment, a 900 meter long pit with significant grades. We're really, really excited to see what's going to come out of this one.

  • Moving away from Ghana, to our new frontier, Mali. The Yanfolila belt is our focus area. This belt is in an underexplored gold ridge, part of southwest Mali and holds great prospectivity for us. And I'll show you what we mean by that.

  • We've just concluded the Glencar acquisition and work is taking place at a furious pace on our new assets. The flagship of our emerging gold camp in southern Mali is Komana, where drilling during the season has commenced. We continue to consolidate real estate in the area and a conceptual scoping study is underway for the Komana project, expected by the end of the financial year.

  • I'll show you some results here. And we see Komana East has yielded some very positive results, with intercepts of 5.56 over 29 meters. 15.7 grams over 9.45 and if you'll notice, that's fairly close to surface. That's within 50 meters. Visible gold has also been detected in some of our drill core, as indicated on that little slide on the right hand side. These deposits lend themselves to free dig. For those of you who know Sadiola and Mali -- in Mali, know that the first 100 meters is free dig. This is no different to that part of the world. So we could expect some cheap mining in the upper oxides of these deposits.

  • We also have early stage exploration projects underway, within a 60 kilometer radius of Komana. And these are Bokoro, Faliko and Badogo. And as you can see, these are early results but indicative of the kind of stuff that we're going to find. And all proximal to Komana, where we could lead us synergies off a central gold district, or a central hub, to bring these to account.

  • In terms of our program, our Komana drilling is continuing until June 2010. And our conceptual study will be complete by December 2010. And we hold a lot of hope for this new emerging gold district and look very forward to a prospecting and exciting future here. Thank you, ladies and gentlemen. I'll now hand over to Juan, who's going to tell us a bit about South America.

  • Juan Luis Kruger - Head of South America

  • Thank you, Peter. Buenos dias, amigos. I'm very glad to report today that on the back of continuous improvements in safety, Cerro Corona outperformed the plan in the December quarter, consistently improving its performance over the previous quarter, which resulted in strong, sustained cash generation.

  • Gold equivalent ounces produced increased 11% over the September quarter, driven by a 16% increase in copper and 3% increase in gold production. The increase in production and the impact of higher prices allowed Cerro Corona to increase its operating profit by 30% over the previous quarter offsetting the impact of a slightly higher cash cost. This strong performance allowed Cerro Corona to generate a cash flow of S29m for the quarter, which in turn, enabled us to pre-pay S30m of the project financing facility during the December quarter.

  • Looking into the current quarter, Cerro Corona shall continue improving its operational performance, in order to deliver 100,000 gold equivalent ounces at a cash cost of $355 and an NCE of $575 per gold equivalent ounce. Equally important in this quarter will be to complete the final phase of the construction of the tailings dam up to level 3740, which is on track to be finished by April.

  • Cerro Corona has proven its capacity to consistently deliver and create value quarter over quarter. This is what drives our team, who is focused on maximizing the generation of cash flow, swelling this asset. As illustrated in this chart, the strong operational performance achieved during the December quarter, together with the steady NCE, allowed Cerro Corona to leverage on the higher prices and increase its NCE margin from 38% in the first quarter to 43% in the December quarter.

  • Management continues focus on costs as a key driver of value. Controllable costs were in line with the plan for the quarter while the increasing cash cost was attributable to costs driven by the higher revenues, earnings and volume shipped. Bottom line, we continued increasing our margins and cash generated per ounce, which in turn has allowed us to consolidate three consecutive quarters of positive cash flow generation for the Group.

  • To continuously improve our operational performance, we have been focused on four key drivers, for which we set challenging targets at the beginning of the fiscal year. Maximize throughput above the nameplate capacity. Increase our recoveries, improve our grade control, mainly through better ore blending to the plant and optimize our costs. As evidenced by the results obtained in the first two quarters, and particularly in the December quarter, Cerro Corona has achieved most of the targets and is in the right track to continue delivering on its goals as we move into the second half of the fiscal year.

  • Costs on production are not the only drivers of value at Cerro Corona. Given the magnitude of the construction of our tailings dam, it is critical to ensure that the project is completed on time and within budget. I have to report that (technical difficulty) was made during the December quarter, with 78% completion of the race to 3740 level within budget.

  • The picture here illustrates the magnitude of the work done and highlights that the Las Aguilas Dam, which is here on the left hand side of the chart, has been completed. I'm talking about the starter dam up to level 3720 here. Reaching almost the same height as the Las Gordas starter dam. We have to bear into mind that 14 months ago, we had here a big creek with nothing in it. So significant progress has been made in track with the budget and the schedule.

  • Cerro Corona has proven its capacity to deliver and focuses now on continuous improvement. Equally important to us is to continue focusing on delivering on our growth strategy for the region. And in this sense, our Chucapaca project in Southern Peru continues to be our flagship project in the region and one of the most encouraging projects for Gold Fields in the world.

  • Work on Chucapaca continued as planned during the quarter, with the interim scoping study on track to be delivered by the end of the fiscal year. In line with the work program, 64 drill holes were completed for a total of 16,000 meters drilled on our targets. The results of the drilling program confirmed a robust mineralization still open to the west with very high grades, reaching between 8 to 9 grams per tonne. Especially on the latest drill holes that we performed on the western section, 700 west section of the deposit of the -- this is the Canahuire target deposit.

  • So the drill results are basically getting better and we're very encouraged and excited with the prospect of Chucapaca becoming Gold Fields' next mine in South America.

  • Further on our growth profile in the region, we continued our exploration activities during the quarter, in the Maricunga belt in central Chile, a highly endowed area of that country, with important projects currently under development and in operation. A second drilling campaign of 2700 meters was completed in our Pircas project, where we have an option to acquire 100% of the property. Initial results of this drilling campaign look very encouraging.

  • During the quarter we also continued actively working on other projects in this area. Still early stage but increasing our pipeline with potential for growth in Chile as well. Early days but very promising.

  • Finally, and to summarize the update on the South American region, I believe that the December quarter was challenging for Cerro Corona, but very rewarding given the results obtained, the continuous improvement in the operational performance and its steady and consistent cash flow generation. The future looks equally challenging but, more importantly, very promising.

  • Management is committed to deliver on our goals and continue improving Cerro Corona. But equally important, it is also focused on two relevant growth initiatives. The first one being the analysis of alternatives to treat and monetize the oxides that we have in stock at Cerro Corona. And secondly, the evaluation of the potential of resource conversion into research at Cerro Corona.

  • Last but not least, the Chucapaca project is only looking better quarter over quarter and remains as our most promising project in the region. All required resources and efforts are in place to complete the interim scoping study by the end of the fiscal year. Muchas gracias to all of you, and with that I'll turn back to Nick for his final conclusions.

  • Nick Holland - CEO

  • Thank you, Juan. I'm just going to wrap up quickly and then we'll leave some time to answer any questions you might have. As you've heard, the growth portfolio of Gold Fields has never been better. A number of greenfield projects, as you can see, are starting to advance up the curve. The uranium project feasibility study should be completed at the end of this quarter and I know that a lot of you have got questions on that. And once we've finished, we'll give you an update.

  • What's also particularly interesting, APP and for those people who have been around looking at Gold Fields for some years, you'll maybe be asking, why is this up again? I thought Gold Fields was a gold company, not a platinum company. Well, we are a gold company but this is in the portfolio. We've had it now for around about seven or eight years. It does represent 11m ounces of 2 PGE plus gold, a 3 to 1 palladium platinum ratio in central Europe, so it's a unique position. And we've not been able to make this work so far.

  • What's particularly interesting is that we're now looking at a new approach. Instead of trying to produce concentrate on site, we're looking to try and produce metal on site. Effectively copper cathode, platinum and gold palladium precipitate and that creates a whole new opportunity. And it creates an opportunity to increase the recoveries. We're doing some test work on this. In fact we're extracting a new sample of base material. We're going to test it through the whole process.

  • That's going to be the scope of 2010 and let me not even conclude where we're going to end up. But what's important for us, is to take assets in Gold Fields that right now have no value and to create value out of those assets and that's why we're looking at the uranium project, that's why we're looking at arctic platinum. So let's see where it goes, but it does look encouraging into the future.

  • And underpinned behind all of this is a strong brownfields growth portfolio across all of the assets. You've heard about growth opportunities at South Deep. You've heard about growth opportunities at St Ives, at Agnew, at Damang and let's not forget Tarkwa. Growth opportunities on reprocessing those south heaps and that's a project that Peter and his team are going to be looking at in 2010. And seeing if we can roll out that HPGR process and increase our recoveries on the heap leach, which is particularly important, given that we're going deeper into the pits where some of the material is getting harder. So all of those assets have got opportunities to do better, as well.

  • I've got to talk about power, because it is something that has been deeply concerning to me, the executive and the board of directors of Gold Fields. And it's the increase that ESCOM has been asking for, the so-called MYPD2, which is asking for 35% increases over three years. And as you can see, even if we look at the blue bars, which is where we are today, our power has already doubled in two years.

  • Just based on the increases we've already had to absorb, doubling over two years. And now what we're being asked to do is absorb another 146% increase over a further three years, which would add cumulatively since 2008 to 2013, ZAR3b a year. That's before considering the knock-on effects of this on all of the other costs. What does it do to pay limits, etc.?

  • Now I've personally presented to NERSA on January 23, Gold Fields has made its own presentation and I really do hope sanity will prevail. But first of all, let me say, I'm the first to say that affordable power to all in South Africa has got to be a critical objective for us to achieve. And we've got to make sure that, as a company, we do what we can to assist the national imperative. The question is how do we do it? How do we do it, that doesn't cripple the very income earning assets that provide jobs? That provide the multiplier effect on support industries. That provide benefits for the many dependents of our workers.

  • And we're not going to find a solution in three years, for a problem that's been developed over 15 to 20 years. A long term problem requires a long term solution that's sustainable for industry. So let's look at things that aren't going to hurt the income earning structure of our business, of our company. Let's rather look at something that maybe is looking at sharing the fruits of that business, through the form maybe of some kind of taxation, whether it be direct, indirect, broad based.

  • And in the short run, I do hope that we are going to get some movement on the only lever we really have in the short run and that's demand management. That's the only lever we have to pull right now. Other countries have shown that it can be done in the short run. We've only been hit as key industrial users in times of crisis and there may well be further times of crisis coming on power supply down the road. Let's not wait for it to happen, let's aggressively reduce our demand. Us as consumers individually, and us as companies. And I think that's what we've got to do to help the government.

  • No point just pointing things at the government here, we've got to work with government as well, to find a sustainable solution for this issue. And that's the only way I think we're going to get out of this problem. And there is a solution. We mustn't panic, we've just got to be focused on how we deliver it. I don't believe that what we're seeing here is the solution.

  • So, in conclusion, the increased gold prices have shown a significant increase in our operating cash flow. And that's very pleasing to us and that shows that if we can deliver the increase in the gold price into our operations, we're doing some things right. Our balance sheet is probably the strongest in the industry and as you've heard Paul say, to have only six months of operating cash flow as net debt, I don't think anyone should be concerned about that.

  • South Deep is delivering on its promise. I'm looking forward to 2010 being another great year for this mine and for those of you who have not been down in the operation, I welcome you at the appropriate time to do so. And Willie would love to set you up, because when we talk about a mechanized mine, now people don't believe us. It is only a mechanized mine right now. And come and see for yourself. And it is going to be, I believe, the greatest mine in the world.

  • Our exploration portfolio is starting to deliver promise and we're going to see good things coming down the road. And we recognize that Driefontein and Kloof are not where we want them to be. They're great ore bodies, they've got good, well capitalized infrastructure, how do we translate that latent value into delivery for the benefit of shareholders? I think we can do it. Thank you. I think with that, Willie's going to coordinate any questions that you might have.

  • Willie Jacobsz - Head of IR

  • Thank you. Do we have some handheld microphones somewhere? Where are they? Okay, let's start with [Ruby] over there?

  • Unidentified Participant

  • Thank you, Mr. Jacobsz. I'd like some clarification please, if I could get it, from Mr. Schmidt on the reporting. On the income statement, we are shown an exceptional item of ZAR432m, which is taken upstairs into the main body of the report. But I do not see the ZAR57.3m taxation featured separately. Am I to conclude that it's included in the ZAR403.6m taxation, or is it an additional item?

  • Paul Schmidt - CFO

  • Ruby, it's included in the ZAR831m. It's sitting in the deferred tax line. That's where the tax is sitting for that transaction. So it's in the number. It's really accounted for.

  • Unidentified Participant

  • Okay. Next please, I want to go to the balance sheet. Under liabilities, the current portion of long-term loans is shown as ZAR3.674m current, suggesting to me that it's payable within the next twelve months. I then go down to the table headed the Debt Maturity Ladder which I read as debt that is payable within the years shown. But immediately beneath that, it states that these are available loan facilities. Now what I want to know is, what's the amount that is payable in 2010? Is it ZAR3.674m, or is it ZAR4.742m?

  • Paul Schmidt - CFO

  • Ruby, it's the bottom part. It's not the available for loan below it. There's a thing called utilization. What I have to pay in the next two quarters is ZAR3.4b and then I've got a ZAR940m fiscal 2011. The ZAR3.6b that you see in the balance sheet is split between those two numbers, because as you rightly said, it's in the next twelve months. So it transcends fiscal 2010 and 2011. What the top one shows, it's just the available debt I have. When I talked that I had the ZAR6.6b, that is the net number. It's made up of ZAR15b available, of which I have utilized ZAR8b, leaving me the ZAR6b that I can still utilize.

  • Unidentified Participant

  • All right. Now given the fact that in the December quarter, your cash flow statement was negative ZAR534m, mainly because of loans repaid obviously, are we going to see the same type of results in the next half period? Are you still going to be negative because of loans repaid?

  • Paul Schmidt - CFO

  • No, we're going to be positive.

  • Unidentified Participant

  • Positive?

  • Paul Schmidt - CFO

  • There's two things could change in the next half year, Ruby, is if we had a big working capital build up, which we'll release in the next quarter and the next six months, and also some of the loan repayments are half yearly ones. So you'll see a massive swing in the cash flow over the next six months, going positive.

  • Unidentified Participant

  • Thank you for that.

  • Willie Jacobsz - Head of IR

  • Thank you, Ruby. Allan? Allan Cooke, JP Morgan.

  • Allan Cooke - Analyst

  • Hi, thanks, Willie. Alan Cook from JP Morgan. Just could you perhaps flesh out what you'd want to do at Driefontein and Kloof in terms of alternative working arrangements that you've mentioned now the six hour working week? And in the back of my mind, I'm thinking about the impact on the economics there? Could you talk to what you're expecting? In the past we've seen other companies roll these out, there's a history here and they've not worked, FULCO at other companies.

  • And then also the impact, if you don't mind, on shaft maintenance. What will that do to your shaft maintenance programs on the shaft when you move those working arrangements? That's the one question.

  • And then just two quick ones on top of that, if I may. At Agnew, the resource and the depth extension there will require a shaft, is that correct? And what would that entail as a project?

  • And then finally, you've not mentioned the one project, you've mentioned all the others, very good results I might add, but Talas in Kyrgyzstan, where you're also completing the scoping study this quarter, or by the end of the year. What progress there?

  • Willie Jacobsz - Head of IR

  • Shall we start with Vishnu on the South Africans? Then Mark if you can address the Australian bit and then Nick, you'll probably speak to Talas?

  • Vishnu Pillay - Head of South Africa

  • Thanks, Willie. Thanks, Allan, for those questions. Firstly, it's not a six hour working week, it's a six-day working week. I just don't want anyone to go away with the impression here that we're now going to work one day in the week. So it's a six-day working week and it's not FULCO, I should stress. A six-day working week still gives you Sundays and public holidays off.

  • And what it actually does for us, and I'm happy to talk through the roster when time permits. In fact, anyone is welcome to give me a call and talk to me. In an 11 shift fortnight, an average individual works 77 shifts, in an 11 shift fortnight. In a six-day working week, an average individual will actually only work 72 shifts and will be given a period off as well. So without being facetious, our employees will work lesser time.

  • But what we will do is that we will always have people on the face, through the way we roster the operations. And we can only work these mines, given all the imposts that are being placed upon us and Nick's talked extensively to the 35% increase in electricity. Let me be harsh. A 35% increase in electricity over three years is going to be tough for us to accommodate if we don't change the fundamentals in the way we operate our business. And that's the harsh reality that we all have to face. So to accept that we're going to run these operations like we did yesterday is not going to work for us.

  • So I guess, Allan, what we're really saying is that we've worked this out to make sure that we have got our faces fully manned and productive. To give our employees sufficient time off, so this debate about fatigue is at rest. But more importantly, is to make sure that we have the maintenance built into this roster. A six-day working week will stop operations on midday on Saturday and then from midday Saturday, through to Sunday 9 o'clock in the night, it's over to maintenance and that's been built into it. I'm quite confident and our engineers are quite confident that we'll be able to do our routine maintenance.

  • The Christmas and Easter break are also worked into the schedule. So we have long off periods to do major infrastructure maintenance. And I'm quite happy that that's been taken into account as well. But in essence, I think we've got the right kind of solution that addresses the kind of issues that we want to see fixed. It addresses the concerns of our union leadership.

  • More importantly it gives our operations some degree of sustainability going forward. Given that it's not just electricity, it's the stoppages that are costing us. It's the added input costs that are going to come with the electricity increase that we're going to have to carry. And Kloof and Driefontein are the two juggernauts in the South African region. We've got to make it work. I guess that's really --

  • Willie Jacobsz - Head of IR

  • Thank you Vishnu. Mark, will you speak to Agnew?

  • Mark Zeptner - Acting Head of Australasia

  • In respect of a haulage shaft, Allan, you might well be right. Luckily the new haulage shaft, the vent shaft, refrigeration but for Agnew we're in a unique position whereby we're at 800 meters and we already know the ore body extends to 1400. What you typically have in Australia is, you mine the decline all the way down to 1500 and then you're buggered. You're too deep.

  • We've got the advantage now that we know ahead of the time and we've already started work on those projects, to enable us to mine below 1500. The ore body could extend to 2Ks and we'll be the only underground mine in WA mining at that depth. So we've got an opportunity to do that.

  • Allan Cooke - Analyst

  • Thanks, Mark.

  • Willie Jacobsz - Head of IR

  • Nick?

  • Nick Holland - CEO

  • What we did say on Talas, Allan, is that the scoping study should be complete by the middle of the year. The indications are that this is a very large tonnage ore body and what we're seeing today is definitely over 200m tonnes. The grades are a little bit lower than I would have liked. Around about 0.75 grams a tonne. About 0.2%, 0.25% copper and there's also some moly in it too. And we're doing some more work on that to firm up these numbers and do some value engineering around this and see where we go.

  • It's a significant opportunity. It's not something that we're going to abandon and it does present similar characteristics to what initially was seen in Cadia. And we've got to stick around here and maybe do some more drill work. So I think worst case scenario, we might find the initial scoping study results a bit iffy for us to go.

  • But there's enough here for us to continue doing some more exploration work in and around and focusing on the high grade shoots that we believe can exist. And maybe see if we get a starter project away, that kind of approach. But I'm not discouraged by what I've seen so far and it does represent a very significant opportunity. We'll give you more detail on this once we've got the initial scoping study around about the middle of the year. Okay?

  • Willie Jacobsz - Head of IR

  • Good. Ladies and gentlemen, any more questions? I think we've got time for one more. Johann?

  • Johann Steyn - Analyst

  • Thank you. Willie. Johann Steyn from Deutsche Bank. Just quickly in terms of the 3Q outlook, you're guiding to 850,000 ounces, which basically means you'll have to get 1.1m to 1.2m ounces in your final quarter. What -- is the 3.7m to 3.8m full year target still on?

  • Nick Holland - CEO

  • Well, we're going to give it our best shot. That's the target we've set. We said 925,000 to 950,000 ounces a quarter is what we're targeting and I think we would have made it this last quarter, had it not been for the significant stoppage at Driefontein. Certainly, we were well positioned to do it. The Christmas break is worse this year than what we've had before because of some of the safety issues have prevented us from going into the Christmas break with stockpiles, for example.

  • We've gone into the Christmas break there, this time around, because of these stoppages, so the effects of the Christmas break and the start up thereafter are worse than what we expected because of the stoppages. So I would hope to see that we certainly get into that range of the 925,000 to 950,000 in the June quarter. Are we going to do a million in the June quarter? I think that's a tough call.

  • Johann Steyn - Analyst

  • Okay.

  • Willie Jacobsz - Head of IR

  • Ladies and gentlemen, thank you very much. Mark, do you have a last question?

  • Unidentified Participant

  • Yes, Nick. There's a certain chap who is talking about that we should nationalize the mines. Now I don't think it's ever going to happen, but Gold Fields has got so many good assets overseas, now what would that possibility be of splitting those off, should this stupid thing ever happen? And putting them on some other exchange, the other assets and leaving only the South African assets here? Have you -- do you think you should look into it as a possibility? What could happen?

  • Nick Holland - CEO

  • One of the things that struck me coming into this job 21 months ago, when I went to my first investment conference as CEO and picked up the book of all the companies that were presenting with me in the gold sector. And what I couldn't understand is how Gold Fields could be valued at the same valuation as another company that produces 400,000 ounces a year and only has 13m ounces of gold in the ground. We are producing 3.5m ounces a year, 3.6m ounces a year. 80m ounces of reserve and we're the same valuation as them.

  • That didn't make any sense to me and it still doesn't, by the way. Even if you overlay on top of that some of the challenges we've had to face. So I think one has to work out, how do you eliminate that gap? The starting point of this debate has got to be, what have you got to do to eliminate that gap? Now let me take you back a few years ago. I remember in about 2003, in fact the South African gold companies were trading at the same multiple and at the same rating as the international gold companies. And since then we've lost it. It started with the mining charter and since then, we've just opened up the gap again.

  • And if you look at some of the companies around the world that we're comparing ourselves to, they've got significant challenges themselves. Don't think that they haven't got challenges and those of the gold analysts in the room will know, some of the majors are having a lot of difficulties finding the same quality of mines to replace those that have been completed now. And their cash cost curve is starting to move rapidly up.

  • There's a misconception that costs in South Africa are rising and the rest of the world is standing still. If you track the South Africans against the world producers over the last few years, you'll find that we're slap bang in the middle in terms of costs and we can make that data available to you if you want it.

  • But having said that, our first objective, before we'd even consider any kind of restructuring, is to make these assets work. Number one, how do you fix these assets and how do you make them work? And that comes back to the strategy that I've put up quarter after quarter in the last seven quarters. Sweating the assets. Before we even come to that conclusion, we've got to work out, how do we sweat the assets? Then we can get the rating up there.

  • Now coming back to nationalization, it's this week it's on, next week it's off, then it's on. I've spoken to the President directly on this. I don't believe it's an issue. I have spoken to the mining minister, they assure me it's not going to happen. I've spoken to the department. So is it going to happen? Is it likely to generate value for the country? It won't. We've seen what nationalization has done in other parts of Africa. It destroyed the copper belt. The copper belt has never been the same even after you privatized it again.

  • I think it's a lot of hot air. I don't think we should get too worked up about it and what we need to do is rather focus on delivering the value in our business. If we deliver the value in our business, then we can get these assets to perform in the current suite or structure that they're in and we can get the release in the share price. And that's what I'm focusing on. I'm not going to spend a lot of time worrying about these debates. Let the debates go on. We'll carry on running our business.

  • Willie Jacobsz - Head of IR

  • Thank you very much. We will now break to have some lunch. Please join us for that and the press people, if we can meet in the boardroom just below us here in, say, 10 minutes from now for the roundtable. Thank you very much.