使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主
Operator
Good afternoon. My name is Miles and I will be your conference facilitator today. At this time, I would like to welcome everyone to The GEO Group Incorporated second quarter 2004 earnings conference call. All lines have been placed on mute to prevent any background noise. After the speakers' remarks, there will be a question and answer period. If you would like to ask a question during this time, simply press star, then the number one on your telephone keypad. As a reminder, ladies and gentlemen, this conference is being recorded today, Thursday, August 5, 2004. Should anyone need assistance at anytime during this conference, please press star then zero and an operator will assist you. Thank you. I would now like to turn the call over to Ms. Rosa Suarez. Ms. Suarez, you may begin your conference.
Rosa Suarez - IR
Thank you operator. Good afternoon everyone and thank you for joining us for today's discussion of the The GEO Group's second quarter 2004 earnings results. With us today are George Zoley, Chairman and Chief Executive Officer, accompanied by Wayne Calabrese, Vice Chairman, President and Chief Operating Officer, Jerry O'Rourke, Chief Financial Officer, and Brian Evans, Vice President of Accounting and Chief Accounting Officer. This afternoon, we will discuss our second quarter performance, current business development activities and conclude the call with a question and answer session. This conference is also being webcast live at the Company's website at www.thegeogroupinc.com. A telephonic replay will be available through September 5, 2004. The replay telephone number is 1800-642-1687. Before I turn the call over to George, please let me remind you that much of the information we'll discuss today including the answers we give in response to your questions may include forward-looking statements regarding our beliefs and current expectations with respect to various matters. These forward-looking statements are intended to fall within the Safe Harbor provision of the Securities Law. Our actual results may differ materially from those in the forward-looking statements as a result of various other factors contained in the Company's Securities and Exchange Commission filing, including the Form 10-K, Form 10-Q and 8-K report. With that please allow me to turn this call over to George Zoley. George?
George C. Zoley - Chairman & CEO
Thank you Rosa and good afternoon to everyone. Thank you for joining us today as I provide you an overview of GEO's financial results for the second quarter 2004. When I conclude my remarks, I'll open the call up to a question and answer session. As announced in the press release we issued earlier today, our second quarter earnings were $0.38 per share or $3.7m based on 9.7m diluted weighted average shares outstanding, compared to $0.29 per share or $6.3m based on 21.4m diluted weighted average shares outstanding for the second quarter of 2003. As you may recall, this difference in shares outstanding resulted from the repurchase of the 12m shares from our former majority shareholder Group 4 Falck, which we executed on July 9, 2003. For the first half of the year, earnings per share was $0.63 or $6.1m, compared with $0.54 or $11.5m for the first half of 2003. Second quarter 2004 earnings include income from continuing operations of $4.1m or $0.42 per share compared to $5.3m or $0.24 per share for the same period in 2003. Second quarter 2004 earnings also include an after-tax loss of $350,000 or $0.04 per share from discontinued operations related to close-out costs for our contract with the Australian Department of Immigration, compared with earnings of $1m net of tax or $0.05 per share for the same period in 2003. We anticipate additional after-tax losses of approximately $150,000 during the third and fourth quarters of 2004, related to the closeout of our contract with the Department of Immigration in Australia. We do not expect these costs to impact our current guidance.
Our second quarter revenue increased by 7% to $146.7m from $137.2m for the same period in 2003. Revenue for the first six months of 2004 increased to $289.3m from $268m for the same period in 2003. Second quarter and year-to-date 2004 revenues include $3.6m of construction revenue related to the expansion of our South Bay Correctional Facility in Florida. The total project will generate construction revenues of approximately $23m and we expect to complete the expansion in March of 2005. We expect the construction revenues during the third and fourth quarters of 2004 to be between 6 and $8m for each quarter. In addition, these revenue increases reflect the opening of the Lawrenceville Correctional Center in March 2003, the opening of the Sanders Estes unit in Venus, Texas in January 2004, and contractual adjustments for inflation, slightly higher occupancy rates in improved terms negotiated in a number of our contracts. These factors offset the discontinuation of our management contracts for the McFarland facility in California and the Willacy and John R. Lindsey state jails in Texas. Our second quarter 2004 expenses increased by 7% to $122.9m from $115m for the same period in 2003. For the first half of 2004, operating expenses increased to $244.1m from $225.2m for the first half of 2003. Operating expense increases for the second quarter and the first six months of 2004 are consistent with the increase in revenues as a result of the strengthening in the Australian dollar as well as nominal inflationary increases.
Second quarter 2004 depreciation and amortization expense decreased to $3.4m from $3.6m for the same period of 2003. For the first half of 2004, depreciation and amortization expense was $6.8m compared to $6.7m for the first half of 2003. Our second quarter 2004 general and administrative expenses increased to $10.8m, up from $10.1m for the same period a year ago. For the first six months of 2004, general and administrative expenses increased to $21.9m, up from $19.1m for the same period a year ago. These increases reflect higher cost related to the implementation of the Sarbanes-Oxley Act including accounting, legal, and other professional fees, as well as increased head count at the corporate office attributable to additional personnel retained as a result of the assumption of corporate functions and services that were previously provided by Wackenhut Corporation. Our effective tax rate for the second quarter of 2004 was approximately 42% and we expect the effective tax rate to remain approximately 42% for the remainder of 2004. Our equity income from affiliates for the second quarter of 2004 decreased to approximately $400,000 compared to $1.4m for the second quarter of 2003. In the first six months of 2004, equity income from affiliates decreased to approximately $700,000, down from $2.1m for the same period a year ago. Second quarter year-to-date 2004 equity income from affiliates represents the results of our South African joint venture entity only while the comparable periods in 2003 include results from our joint ventures in both South Africa and the United Kingdom. Our compensated mandate increase to 2.9m for the second quarter of 2004 compared to 2.7m for the second quarter of 2003.
These figures exclude our South Africa joint venture. Our second quarter 2004 average occupancy rate remained in line with comparable period for the 2003 at approximately 99%. Our average correctional per diem rate for the second quarter of 2004 was $52.89 compared to $48.79 for the second quarter of 2003. This increase is due to higher per diem rates generated from our existing and new correctional contract. Turning to our balance sheet, cash at the end of the second quarter of 2004 was approximately $82m compared with $125m at the end of first quarter 2004. On June 25, we announced that we had used $43m of the $80m in pretax proceeds from the sale of our 50% interest in our former joint venture in the United Kingdom. Premier Custodial Group Limited. To reduce borrowings under the term loan portion of our senior secured credit facility to approximately $53m. This debt repayment reduced our cash on hand from $125m to $82m. We believe that this reduction in our term loan debt strengthens our ability to access the senior debt market of the future, which along with our cash on hand and the ability to sell additional equity will enable us to finance our future growth. We are continuing to explore accretive acquisition opportunities domestically and internationally in our core businesses, involving correctional and mental health services and we are evaluating opportunities for expansion on select facilities where occupancy exceeds 100%.
At the end of second quarter of 2004, our balance sheet reflects approximately $198m in total debt, not including non-recourse debt of approximately $40.9m. Our senior secured credit facility consists of a $100m term loan bearing interest at LIBOR plus 2.5% and a $50m Revolver bearing interest at LIBOR plus 2.25%. At June 27, 2004 there were borrowings of approximately $53m outstanding under the term loan, no amounts outstanding under the Revolver and $28.9m had been satisfied for letters of credit under the Revolver. This concludes my overview of our financial performance during the second quarter and I would like to say that we are very pleased with these results. Before turning to our business development activities, I would like to provide to with an update on our start of the activities during the second quarter. As you know, we entered into a management agreement with Reeves County, Texas in November of 2003. Under these agreements, we manage roughly 3000 beds and three housing areas of the Reeves County Detention Complex, two of these housing and areas, house up to 2200 federal prisoners while the third building houses up to 864 prisoners from Arizona. The third building achieved full occupancy on May 20, and the entire complex has remained essentially at full occupancy, since that time I am pleased to report.
Moving to our business development activities, we are continuing our efforts to expand every area of our business including domestic and international correctional management services, management services for mental health and special needs population facilities and other related management services. We continue to believe; there is a significant growth opportunity at the local state and federal levels of government. As of the second quarter, we have submitted proposals and/or are in discussions with existing clients and new clients for approximately 6000 beds, approximately 5000 domestically and 1000 internationally. With respect to the US corrections market, we are pursuing new opportunities for contracting correctional services and are excited about our potential . We expect to see a number of project opportunities at the local state and federal level, over the next 12 to 18 months, totaling approximately 21000 beds, including the possible expansion of approximately 1000 beds at a number of our existing facilities. This domestic growth potential continues be based on a growing need for beds in select states and local jurisdictions together with increasing needs of the federal government in their partners of Homeland Security and justice.
On the local front, we are working on a project at multiple locations totaling approximately 4000 beds. These locations include local jurisdictions located at three states across the country. At the state level, as state departments and corrections continue to struggle with financial and budget constrains, we believe our industry offers both short and long-term solutions for their correctional needs. We are currently working in southern states across the country, with the expectation that we will see project opportunities for approximately 7000 beds over the next 12 to 18 months. As we mentioned in our last conference call, the State of Florida approved a procurement for an adult male private prison of 1268 beds with the contract to be awarded calendar year 2005. At the federal level, we expect to see several potential project opportunities, totaling approximately 10,000 beds over the next 12 to 18 month period. First on April 13, the US Marshal Service issued a solicitation for up to 2800 beds within a 50-mile radius of the new federal courthouse in Laredo, Texas. We submitted our proposal to the Marshal Service on August 3, 2004 and we expect the award of this project to be made sometime in late December 2004. This is the first federal project to allow for a 20-year contract term inclusive of option terms. President Bush's 2005 budget places a moratorium on new prison construction by the federal government, while promoting more aggressive year old prisons contracting with state, local and private sector prison providers.
The President's 2005 budget provides partial funding for an additional 4,500 contract beds, which we feel that this funding will provide new business opportunities for the private sector and our company. The Office of Federal Detention Trustee continues to work with the state governments, local governments, and private sector providers to contract for adequate detention capacity to house detained individuals charged with federal offences or awaiting a hearing on their immigration status or deportation. The number of detainees in state, local and private prisons during 2004 and 2005 is expected to represent approximately 77% of the federal detention population. These state, local and private contracting relationships allow the federal agencies to carry out function of federal detention in a cost-effective manner. We believe that these increasing federal detention needs will serve to expand our business based on the next 12 to 18 months. As I had mentioned in previous calls, there are two potential pilot projects to be undertaken by the Office of Federal Detention Trustee, one located in Chicago, Northern Illinois region. And the second in the El Paso, Texas region totaling approximately 2,700 beds. We believe that these solicitations will possibly be issued in the first half of 2005. As noted in our last conference call in 2004, bidders for a 1,750-bed project in Baltimore, Washington DC area were notified by the Office of Federal Detention Trustee or OFDT that a solicitation would not be issued at this time. We believe the OFDT is working with congress to find an alternative location to those sites that were submitted by our competitors and us, we expect this procurement to proceed, but on delayed basis.
Turning to the international area, we continue to see opportunities for us to partner with government agencies around the globe, we expect to see a number of project opportunities over the next 12 to 18 months totaling approximately 17,000 beds. In Australia, we are responding to the expression of interest published by the New South Wales government for the outsourcing of non-custodial services at a new 128-bed forensic hospital under the government, public-private partnership program. We also continue to monitor business opportunities in the Republic of South Africa, where on July 27, the Department of Correctional Services announced that it is moving forward with its plans for the development operation of four new prisons on a public-private partnership basis, with the appointment of project advisors who will facilitate negotiations between the Department of Correctional Services in private parties, as well as undertake feasibility study to the correction and operation of these four new prisons. On completion of this feasibility studies at four new 3,000-bed prisons will be built in different areas of the country. In addition, we expect the several business opportunities will develop the United Kingdom elsewhere in continental Europe within the next 12 to 18 months. We've responded to a request for qualifications issued by the Scottish prison service for a new 700-cell prison in Addiewell, Scotland.
This will be a design built, managed and financed project conducted under the private finance initiative public-private partnership program. On July 30, we received a letter from the Scottish prison service on the finance that we have advanced to the invitation to negotiate stage of this procurement, we will submit a proposal in the fourth quarter of this year, and order is expected in the first quarter of 2005. This project is valued at approximately 80m pound sterling. We remained committed to reestablishing our presence in the UK market and have undertaken steps to do so. We continue to market very aggressively our diversified service offerings, which include providing mental health, substance abuse and sex offended services, special needs management services, home detention, electronic monitoring and offender transport. We are monitoring several states that are considering public-private partnerships similar to our landmark South Florida State Hospital project. As I mentioned in our previous call, the State Legislature of Florida recently authorized the privatization of another of its state hospitals. We expect the procurement for this 200-bed facility to be issued in the next few weeks with the contract awarded by the end of 2004, due to the success of our South Florida State Hospital project and the national recognition as received we expect to be a strong competitor, when selection procurements for a new project of this type emerge during the upcoming year. That concludes my presentation and I would be glad to address any questions from our audience.
Operator
At this time I would like to remind everyone, if you would like to ask a question, please press star then the number one on your telephone keypad. Again, to ask a question, press star and the number one on your telephone keypad. We'll pause for just a moment to compile the Q&A roster. Your first question comes from the line of Jim McDonald with First Analysis.
Jim McDonald - Analyst
Hey guy's, a very good quarter.
George C. Zoley - Chairman & CEO
Thank you Jim.
Jim McDonald - Analyst
I'll start at the top, I mean you did, I guess $0.42 or may be more, is it an effect of some debt extinguishment cost in the quarter. Are you updating your guidance for Q3 and Q4?
George C. Zoley - Chairman & CEO
No, we are not at this time Jim.
Jim McDonald - Analyst
Why not?
George C. Zoley - Chairman & CEO
Because we think it's good strong performance and we don't see a reason to adjust that at this time.
Jim McDonald - Analyst
Are there any additional costs or - in the Q3 or profits in Q2 that are going to recur in Q3?
George C. Zoley - Chairman & CEO
Well there are - - of the four quarters, there is two quarters that are impacted by award fees at two federal facilities. And those award fees occur in the second and fourth quarters, and that's why the earnings on those quarters are higher than the other quarters.
Jim McDonald - Analyst
Can you tell us what the award fees were in the second quarter?
George C. Zoley - Chairman & CEO
No, we don't announce award fees.
Jim McDonald - Analyst
Okay. And in terms of, could you go back, you mentioned some stuff about construction, could you explain that and whether there is an impact on the second quarter on the revenue side?
George C. Zoley - Chairman & CEO
There was, and I think I announced 3.6m. So we are back in the construction revenue business as we were a few years ago as you may recall when there were substantial amounts, but in this case, it's a very modest amount of revenues.
Jim McDonald - Analyst
A 3.6m in the second quarter, and I think you said something for the third and fourth?
George C. Zoley - Chairman & CEO
There will be 6 to 8 million per quarter for the third and fourth quarters.
Jim McDonald - Analyst
And in terms of Reeves, are you now in the proper position there and when did that start?
George C. Zoley - Chairman & CEO
I think we filled up in late June and we are at full capacity, and so we are at a normalized level of occupancy and financial performance.
Jim McDonald - Analyst
And then could you remind me the - you have these - I think there about a million dollar a quarter payments related to the change of control in your G&A. When exactly did those go off?
George C. Zoley - Chairman & CEO
During the second quarter.
Jim McDonald - Analyst
So, they were partially in the second quarter?
George C. Zoley - Chairman & CEO
Yes.
Jim McDonald - Analyst
Half or a quarter or?
George C. Zoley - Chairman & CEO
One month's worth.
Jim McDonald - Analyst
Let someone else ask, and I'll come back.
George C. Zoley - Chairman & CEO
Okay, thanks Jim.
Operator
Your next question comes from the line of Susan Jansen with Lehman Brothers.
Scott Schneeberger - Analyst
Hi, it's Scott calling in for Susan. You guys have mentioned a lot of opportunities that are there to add new bids in the upcoming years. Do you have a target of how many bids you realistically think that you can add?
George C. Zoley - Chairman & CEO
Well, historically on competitive bids, we've won 30% to 40% of the opportunity. So just to use a simple number 1 out of 3.
Scott Schneeberger - Analyst
Okay great, and my second question is - there really hasn't been that much pricing constriction over the last several years, have you seen states come around a little bit and are they more willing to start constructing again or is it still pretty stagnant in that area?
George C. Zoley - Chairman & CEO
In the last two or three years the greatest activity has been of the federal level with the three federal agencies, and I think it reflects - and that's reflected in our company's current client roster in the financial results. I think one third of our revenues are now derived from the federal agencies, which is a substantial increase from a historical perspective. It's changed because the states kind of plateaued out during the mid-90's in their build-up, where they saw some of their populations capering off, but almost simultaneously the federal agencies started growing significantly in their need. Now we are seeing a continuation of activity at the federal level, while certain select states, like our own state of Florida, and other states around the country are experiencing capacity needs once again.
Scott Schneeberger - Analyst
Okay, thank you.
Operator
Your next question comes from the line of Andrew May with Jefferies & Company.
Andrew May - Analyst
Hi, good afternoon. Couple of things. What was cash flow from operating activities in the quarter?
George C. Zoley - Chairman & CEO
$18m.
Andrew May - Analyst
$18m of CF ops in the quarter.
George C. Zoley - Chairman & CEO
No, this for the year-to-date.
Andrew May - Analyst
That's okay. All right, while I can do my own arithmetic and get the three months. And how about maintenance capital expenditures or whatever measure of CAPEX you can give me?
George C. Zoley - Chairman & CEO
$4.2m year-to-date, and it is about $1.8m for the quarter.
Andrew May - Analyst
Great, and on the construction revenue, what are you building that you are booking construction revenue on it? Is it the Florida expansion?
George C. Zoley - Chairman & CEO
Yes, Southway expansion.
Andrew May - Analyst
Southway expansion. All right. And what are margins in that, higher or lower than Company average margins?
George C. Zoley - Chairman & CEO
There are no development fees or margins in the construction revenues. We will be negotiating a modification to our existing operating contract to provide for a rates, once the construction is completed spring of next year.
Andrew May - Analyst
So, the 100% of the construction revenue is offset by construction expense?
George C. Zoley - Chairman & CEO
It's essentially revenues through a general contractor.
Andrew May - Analyst
Right, right. And then there is no development fee or management fee that you charge and do -- ?
George C. Zoley - Chairman & CEO
Correct.
Andrew May - Analyst
All right. Fair enough, and that's going to continue to be the case, when you have construction revenue, we can regard it as essentially profitless and you'll make your money on once the facility is open?
George C. Zoley - Chairman & CEO
Correct.
Andrew May - Analyst
Fair enough. Would you tell us what kind of -- how you are booking revenue from Reeves now that it's full? I know you are basically just sort of passing through, anyway I'll be quiet, and let you tell me. Just wanted to understand what the economics of Reeves are now that it's full, I know it's not quite a normal deal?
George C. Zoley - Chairman & CEO
Our only revenues that we booked from Reeves are related to the management fees derived from the management contract. As most people on the call are aware, most of the costs of any operating contracts are related to personnel. In the Reeves contract, we don't employ the majority -- overwhelming majority of personnel. We have about half a dozen individuals, so that we directly employ, and through them we manage the facility. We are paid for them, their salaries as well as our management fees, but the overwhelming bulk of the costs are directly handled by the county. So they are not booked through us.
Andrew May - Analyst
Fair enough. So, you are getting paid a flat fee or a flat fee with some incentives, and the offset against that is some facility level management cost?
George C. Zoley - Chairman & CEO
Yes.
Andrew May - Analyst
Are the Reeves inmates included in your compensated man-day counts, and is the Reeves --?
George C. Zoley - Chairman & CEO
You know, occupancy counts. Yes.
Andrew May - Analyst
It is. So, even that 2.865m compensated man-days, that does include the man-days from Reeves?
George C. Zoley - Chairman & CEO
Yes.
Andrew May - Analyst
Okay. Your revenue per man-day is impacted by the revenue per man-day at Reeves?
George C. Zoley - Chairman & CEO
I just wondered whether the calculation of that whether rightly or wrongly.
Andrew May - Analyst
I think that's probably a wrong way.
George C. Zoley - Chairman & CEO
Yes, we may have to examine that again, but I think the answer is yes.
Andrew May - Analyst
Okay, all right. Fair enough thanks.
Operator
Your next question comes from the line of Patrick Swindle with Avondale Partners.
Patrick Swindle - Analyst
Good afternoon.
George C. Zoley - Chairman & CEO
Good afternoon.
Patrick Swindle - Analyst
Looking at the pipeline you mentioned 6000 beds, there was some point in negotiation, is that situation where you submitted RFPs or you are in negotiations or can you give any more specificity on the on the 5000 domestic and a 1000 international beds you mentioned to the pipeline?
George C. Zoley - Chairman & CEO
I'll just get back to that part here. The 6000 beds that you mentioned that are going on right now are the ones that we've either submitted proposals on our end discussions on, looks like of the state -- with various states represents approximately 3600 as that total, Patrick, local which we will generally consider to be county beds 1250 of them and federal relatively minor number.
Patrick Swindle - Analyst
Thanks. Now those facilities that are already in place that you would be managing are those new facility built contracts as well?
George C. Zoley - Chairman & CEO
This includes both new contracts and expansions of existing facilities, it does not include obviously the expansion of South Bay.
Patrick Swindle - Analyst
Right.
George C. Zoley - Chairman & CEO
And prospective ones yet to be announced.
Patrick Swindle - Analyst
Right, and looking at the SG&A expenses you had higher expenses this year obviously as you separate yourself from Wackenhut, are we at somewhat on an absolute dollar basis near a level that will allow you sustain growth going forward, are there still investments that you're making in the corporate office that will require that to ramp up throughout the back half of the year?
George C. Zoley - Chairman & CEO
We are at a sustainable level for our current configuration as a Company, if we make acquisitions we will have to likely do some modest increases in our G&A.
Patrick Swindle - Analyst
Right. That was going to be my next question. In terms of acquisitions, can you talk it all about obviously you're looking domestically, internationally, but can you give any color on your pipeline, what your seeing competitively and looking at acquisitions and any general terms about the environment?
George C. Zoley - Chairman & CEO
All I can say is there are acquisition opportunities that are very interesting to us. We are pursing them and that's about all I can say at this time other than the obvious that we haven't made one yet, and we are careful to assess the opportunities with respect to their accretion value for our Company. We are looking for acquisition opportunities that are going to be properly managed and not presenting unnecessary exposure to our investors.
Patrick Swindle - Analyst
All right. And then I have two final housekeeping questions. First, the 150,000 in losses that you expect to continue in the third and fourth quarters, is that a 150 per quarter for the situation?
George C. Zoley - Chairman & CEO
Yes it is.
Patrick Swindle - Analyst
And that is already included in the guidance that you've already provided or implicitly included. Is that right?
George C. Zoley - Chairman & CEO
Yes it is.
Patrick Swindle - Analyst
Okay. And then you also mentioned, one last question, that the contract in Scotland for 700 beds. Is that -- you've been selected to negotiate? Have there been other providers selected as well or they are in direct negotiations only with you all?
George C. Zoley - Chairman & CEO
It's still a competitive procurement process. It's -- the term is selected to negotiate is really a procurement term for proceeding within the procurement along with others. So I don't want to imply that we're the only one. We're not. Yes, Patrick, we've really been selected as one of several who are qualified to proceed with this procurement. There may have been some who did not reach that point but I think at least four firms and perhaps more have been selected as qualified to proceed with the procurement.
Patrick Swindle - Analyst
Thank you all very much. Excellent quarter.
Operator
Your next question comes from the line of Jeff Kessler with Lehman Brothers.
Scott Schneeberger - Analyst
Hi guys. It's Scott Schneeberger for Jeff Kessler. Just want to follow up on a number of projects coming. I believe you mentioned 21,000 beds, a 1000 beds expansion. If you could please just confirm those numbers and any added color you can give on that 1000 beds of expansion, location, timing perhaps?
George C. Zoley - Chairman & CEO
That will include the South Bay. No -- I'm not including the South Bay in the numbers. South Bay is just given and announced. The other 1000 are not announced and they are not things that we would discuss until they are ready for announcement. So the ones that we are undergoing conversations with our clients about, several of our clients have reached peak capacity and are looking for expansion and in many cases are looking for the private sector and in this case our Company to expand what we have for them. So this 1000 beds is an addition to South Bay and involves existing facilities that we are presently operating and there are probably facilities that are at or approximately 100% occupancy in which we are considering the extension of the facility.
Scott Schneeberger - Analyst
Thanks, and one other question. You had mentioned the opportunity in South Africa, could you add any timing or size to that?
George C. Zoley - Chairman & CEO
I would guess the timing of -- for a procurement early next year and maybe towards by the end of '05. We think that will be four 3,000-bed facilities considered for procurement.
Scott Schneeberger - Analyst
A total of 3,000 beds?
George C. Zoley - Chairman & CEO
No, our current facility over there is of 3,000-bed facility and we expect they would do four more of that size that sizing.
Scott Schneeberger - Analyst
Okay. Great thanks very much.
Operator
Again ladies and gentlemen, if you would like to ask a question at this time, please press star then the number one on your telephone keypad. We will now return to the line of Jim McDonald of First Analyst.
Jim McDonald - Analyst
Hi. Scotland, you mentioned 80m -- over how many years of that 80m pounds?
George C. Zoley - Chairman & CEO
I am sorry Jim, once the question?
Jim McDonald - Analyst
In Scotland you mentioned that 80m pound contractible over how many years?
George C. Zoley - Chairman & CEO
I didn't touch that, on the 700 beds facility? Is there any number attached to it? I think it is 25-year sort of contract under the PPPs financing arrangements.
Jim McDonald - Analyst
Then 80m pounds seems low?
George C. Zoley - Chairman & CEO
Not being told the 80m -- I see is the now the projects validated 80m pounds, Jim that is the approximate construction cost. That is not it being a hundreds of millions of pounds obviously over 25 years for operation.
Jim McDonald - Analyst
Okay, could you give us the amount of debt retirement cost in the quarter? Which I think was an interest expense.
George C. Zoley - Chairman & CEO
$300,000.
Jim McDonald - Analyst
Okay, and could you give us update on Dina and ?
George C. Zoley - Chairman & CEO
We are continuing our efforts in both cases; at Dina there we are continuing with both Federal and State as well as local authorities. we are talking exclusively with the state authorities to reactivate and use that facility.
Jim McDonald - Analyst
Do you expect decisions in a what point?
George C. Zoley - Chairman & CEO
Well, as I think you know we have written-off some of the expenses on genes through February 2005, we continue to think at least at this point in time. That is the appropriate guidance and appropriate treatment. I think Farland, we have really don't have a particular projection on that. I misspoke Jim, it was February '06 not '05 gene.
Jim McDonald - Analyst
Okay, thanks very much.
Operator
Your next question is a follow up question from the line of Andrew May with Jeffries and Company.
Andrew May - Analyst
Dina, that has been answered. Thanks very much.
Operator
We will now go to the line Patrick Swindle of Avondale Partners.
Patrick Swindle - Analyst
A very quick follow up on the opportunity in South Africa. How the rates that you see in South Africa compared to the those domestically, and just trying to get a sense of the magnitude of that potential opportunity from revenue standpoint?
George C. Zoley - Chairman & CEO
The deem rate s are lower in South Africa because the wages are much lower, the cost of providing the services are much lower. But the number of employees is substantially higher in proportions, so it still end up the in sizeable contracts but at the themselves are lower than the US comparables.
Patrick Swindle - Analyst
Thank you.
Operator
Again, there is a remainder, if you would like to ask a question at this time, please press star then the number one on your telephone keypad. To ask a question, please press star then the number one on your telephone keypad.
George C. Zoley - Chairman & CEO
Well, there are no more questions, then we will adjourn this call and look forward to addressing you in Q3. Thank you very much.
Operator
And thank you sir. Ladies and gentlemen, this does concludes today's Geo Group conference call, you may now disconnect.