Fortis Inc. (FTS) 2026 Q3 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Operator

    Operator

  • Thank you for standing by. This is Betsy, the conference operator. Welcome to the Fortis Inc. third-quarter 2026 results and new five year capital outlook conference call. (Operator Instructions) The conference is being recorded. (Operator Instructions)

    感謝您耐心等候。我是會議接線員 Betsy。歡迎參加 Fortis Inc. 2026 年第三季業績及最新五年資本展望電話會議。(接線員指示) 本次會議將被錄音。(接線員指示)

  • I would now like to turn the conference over to Stephanie Amaimo, Vice President, Investor Relations. Please go ahead, Ms. Amaimo.

    現在我想將會議交給投資者關係副總裁 Stephanie Amaimo。Amaimo 女士,請開始。

  • Stephanie Amaimo - Vice President - Investor Relations

    Stephanie Amaimo - Vice President - Investor Relations

  • Thanks, Betsy, and good morning, everyone. Welcome to Fortis' third quarter 2026 results and new five-year capital outlook conference call. I'm joined by David Hutchens, President and CEO; Jocelyn Perry, Executive VP and CFO; other members of the senior management team as well as CEOs from certain subsidiaries.

    謝謝你,Betsy,各位早安。歡迎參加 Fortis 2026 年第三季業績及最新五年資本展望電話會議。與我一同出席的有總裁兼執行長 David Hutchens;執行副總裁兼財務長 Jocelyn Perry;其他高階管理團隊成員,以及部分子公司的執行長。

  • Before we begin today's call, I want to remind everyone that the discussion will include forward-looking information, which is subject to the cautionary statement contained in the supporting slide show. Actual results can differ materially from the forecast projections included in the forward-looking information presented today. Non-GAAP financial measures referenced in our prepared remarks are reconciled to the related US GAAP financial measures in our third quarter 2026 MD&A. Also, unless otherwise specified, all financial information referenced is in Canadian dollars.

    在開始今天的電話會議之前,我想提醒各位,本次討論將包含前瞻性資訊,並受隨附簡報中的警示性聲明所規範。實際結果可能與今日所呈現之前瞻性資訊中的預測大不相同。我們事先準備的發言中所提及的非 GAAP 財務衡量指標,已在我們 2026 年第三季 MD&A 中與相關的美國 GAAP 財務衡量指標進行調節。此外,除非另有說明,本文所引用的所有財務資訊均以加幣計價。

  • With that, I will turn the call over to Dave.

    接下來,我把電話交給 Dave。

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Thank you, and good morning, everyone. This past quarter has been one of the busiest and most positive I can remember during my tenure as CEO, leading to meaningful progress and significant opportunities for our business going forward. We are also happy to put another strong quarter behind us.

    謝謝,各位早安。過去這一季是我擔任執行長期間記憶中最忙碌且最正面的一季之一,為我們的業務在未來帶來了實質進展與重大機會。我們也很高興又完成了一個強勁的季度。

  • Operationally, we continued to provide safe and reliable service to our customers and invested $4.2 billion in our systems year to date. For the full year, we expect to invest approximately $6 billion, up $400 million from our plan. And we delivered earnings per share for the third quarter of $0.92. Today, we are unveiling our new five-year capital plan, our largest to date. Big news hit in the quarter with respect to our Tilbury site in British Columbia and ITC being awarded a competitive bid project in Iowa.

    在營運方面,我們持續為客戶提供安全且可靠的服務,並在今年迄今於系統投資 42 億美元。就全年而言,我們預期投資約 60 億美元,較原計畫增加 4 億美元。我們第三季每股盈餘為 0.92 美元。今天,我們將公布最新的五年資本計畫,亦是迄今規模最大的一次。本季也出現重大消息,包括我們位於卑詩省的 Tilbury 場址,以及 ITC 在愛荷華州獲得一項競標專案。

  • And today, we announced that our Board of Directors declared a fourth-quarter dividend increase of 4%, marking 53 years of dividend increases.

    此外,我們今天宣布董事會核准第四季股利上調 4%,這也標誌著我們已連續 53 年提高股利。

  • Before getting into the details of our new five-year outlook, I will turn the call over to Jocelyn to speak to our third-quarter results.

    在進入我們最新五年展望的細節之前,我先把電話交給 Jocelyn,請她說明第三季業績。

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • Thank you, David, and good morning, everyone. For the quarter, reported earnings were $474 million, or $0.92 per common share, and on a year-to-date basis, reported earnings were $1.4 billion, or $2.69 per common share. As you can see on the slide, reported earnings in 2025 included income taxes and closing costs of $0.06 per share associated with the disposition of FortisTCI. Excluding this impact, adjusted EPS for the quarter was up $0.05, and year-to-date adjusted EPS was up $0.06.

    謝謝你,David,各位早安。本季申報盈餘為 4.74 億美元,或每股普通股 0.92 美元;今年迄今申報盈餘為 14 億美元,或每股普通股 2.69 美元。如投影片所示,2025 年的申報盈餘包含與處分 FortisTCI 相關的所得稅與結案成本,折合每股 0.06 美元。排除此影響後,本季調整後每股盈餘增加 0.05 美元,今年迄今調整後每股盈餘增加 0.06 美元。

  • On the next slide, you will see the adjusted EPS drivers for the quarter by segment. at ITC, EPS increased by $0.03, driven by rate-based growth and lower stock-based compensation expense, partially offset by higher finance costs. Our US Electric and Gas segment contributed a $0.02 increase, mainly driven by UNS Energy.

    在下一張投影片中,您將看到本季按部門劃分的調整後每股盈餘變動因素。在 ITC,每股盈餘增加 0.03 美元,主要受費率基礎成長及以股票為基礎的薪酬費用下降所帶動,但部分被較高的融資成本所抵銷。我們的美國電力與天然氣部門貢獻每股增加 0.02 美元,主要由 UNS Energy 帶動。

  • The growth in Arizona was due to higher electricity sales associated with residential and industrial usage and customer growth. The timing of operating costs and lower income taxes associated with the amortization of investment tax credits on the battery storage project also contributed to the increase. Moderating this was the impact of milder weather quarter-over-quarter and regulatory lag associated with rate-based growth not yet reflected in rates.

    亞利桑那州的成長主要來自住宅與工業用電增加以及客戶數成長所帶動的電力銷售提升。營運成本的時點因素,以及電池儲能專案投資稅額抵免攤銷所帶來的所得稅下降,也對增幅有所貢獻。抵銷因素包括較去年同期更溫和的天氣影響,以及因費率基礎成長尚未反映於費率中的監管時滯。

  • At Central Hudson, earnings were largely consistent quarter-over-quarter as rate-based growth, the timing of costs, and a contribution to a customer benefit fund in 2025 were offset by a favorable regulatory adjustment made in the third quarter of 2025 upon implementation of the most recent rate order.

    在 Central Hudson,盈餘與去年同期大致一致;費率基礎成長、成本時點因素,以及 2025 年對客戶利益基金的提撥,被 2025 年第三季在最新費率命令實施時所作出的有利監管調整所抵銷。

  • Our Western Canadian utilities increased EPS by $0.02 in the quarter, driven by rate-based growth as well as lower income tax expense at FortisAlberta. And for our other electric segment, EPS decreased by $0.01, largely due to the disposition of FortisTCI in September 2025.

    我們的西加拿大公用事業本季每股盈餘增加 0.02 美元,主要由費率基礎成長以及 FortisAlberta 所得稅費用下降所帶動。至於其他電力部門,每股盈餘下降 0.01 美元,主要由於 2025 年 9 月處分 FortisTCI。

  • The corporate and other segment reflect net unrealized losses on derivative contracts compared to unrealized gains in 2025, the timing of income tax recoveries, and the disposition of Fortis Belize in the fourth quarter of 2025. Foreign exchange had a $0.01 favorable impact for the quarter, and higher weighted average shares issued under the dividend reinvestment plan and ATM program impacted EPS by $0.01.

    公司及其他部門反映了衍生性合約的未實現淨損失(相較於 2025 年的未實現收益)、所得稅回收的時點因素,以及 2025 年第四季處分 Fortis Belize。外匯對本季每股有利影響 0.01 美元;而透過股利再投資計畫與 ATM 計畫發行的加權平均股數增加,使每股盈餘受到 0.01 美元的影響。

  • As noted on the slide, the 2025 disposition of our assets in Turks and Caicos and Belize lowered EPS by $0.02 in the quarter, net of finance cost savings. Year-to-date results were mainly driven by the same factors discussed for the quarter, with a few additional items to note.

    如投影片所示,2025 年處分我們在特克斯和凱科斯群島及貝里斯的資產,使本季每股盈餘下降 0.02 美元(已扣除融資成本節省)。今年迄今的結果主要由與本季相同的因素所驅動,另有幾項補充事項需要說明。

  • For the nine-month period, Central Hudson was up $0.04, primarily due to rate-based growth and the timing of costs, partially offset by the favorable regulatory adjustment in 2025, as discussed earlier. At UNS, EPS was down $0.01, which reflects lower margin on wholesale sales and higher operating costs, in addition to the other items noted for the quarter. And lastly, the impact of foreign exchange was $0.03, and the impact of the 2025 dispositions, net of finance cost savings, was $0.05 year-to-date.

    就前九個月期間而言,Central Hudson 每股增加 0.04 美元,主要由費率基礎成長與成本時點因素所帶動,但部分被前述 2025 年的有利監管調整所抵銷。在 UNS,每股下降 0.01 美元,反映批發銷售毛利較低與營運成本較高,此外也包含本季所提及的其他因素。最後,外匯影響為 0.03 美元,而 2025 年處分事項的影響(已扣除融資成本節省)在今年迄今為 0.05 美元。

  • Turning next to our regulatory update. In October, the ACC Administrative Law Judge issued a recommended opinion and order in TEP’s general rate application, recommending an allowed ROE of 9.65% and a 55% common equity component of capital structure. We currently have an allowed ROE of 9.55% and a 54% equity component of capital structure.

    接下來談我們的監管更新。10 月,ACC 行政法官就 TEP 的一般費率申請發布建議意見與命令,建議核准的 ROE 為 9.65%,且資本結構中的普通股權成分為 55%。我們目前核准的 ROE 為 9.55%,且資本結構中的股權成分為 54%。

  • The order also recommended an annual formulaic rate adjustment mechanism with a range of plus or minus 50 basis points around the allowed ROE, the inclusion of post-test year adjustments, the elimination of certain adjuster mechanisms, and the deferral of certain costs associated with Roadrunner Reserve 2 for future recovery. The ALJ’s recommendation proposes implementation of new rates by December 1 and is subject to ACC approval, which is anticipated later this month.

    該命令亦建議採用年度公式化費率調整機制,允許 ROE 在核准值上下各 50 個基點的區間內調整;納入測試年度後調整;取消特定調整機制;並將與 Roadrunner Reserve 2 相關的部分成本遞延,以供未來回收。該行政法官的建議案提出於 12 月 1 日前實施新費率,並須經 ACC 核准,預期將於本月稍晚完成。

  • I will now turn the call back to David to cover key elements of our new five-year capital plan.

    現在我把電話交回給 David,請他說明我們最新五年資本計畫的關鍵要素。

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Thank you, Jocelyn. Our new $32.2 billion five-year capital plan is $3.4 billion higher than our previous plan. Our five-year rate base CAGR is 7.5%, up 50 basis points compared to the prior plan. We have also extended our annual dividend growth guidance of 4% to 6% through 2031. This new plan builds on the growth momentum across our high-quality footprint while keeping customer affordability top of mind. The growth in our five-year plan is largely driven by transmission and LNG investments.

    謝謝你,Jocelyn。我們新的 322 億美元五年資本計畫,較先前計畫增加 34 億美元。我們五年期費率基礎(rate base)年複合成長率(CAGR)為 7.5%,較前一版計畫提高 50 個基點。我們也將年度股利成長指引 4% 至 6% 延長至 2031 年。這項新計畫在延續我們高品質營運版圖的成長動能之際,也將客戶可負擔性置於首要考量。我們五年計畫的成長主要由輸電與 LNG 投資所帶動。

  • In ITC, the $1.7 billion increase was primarily driven by projects associated with MISO’s Tranche 2.1 long-range transmission plan, along with higher baseline reliability projects and new interconnections. At FortisBC, the $1 billion increase primarily reflects investments in LNG infrastructure, including the Tilbury Phase 1B liquefaction expansion and the new Tilbury LNG storage tank.

    在 ITC,增加的 17 億美元主要來自與 MISO 的 Tranche 2.1 長程輸電計畫相關的專案,以及較高的基準可靠度專案與新的併網(interconnections)。在 FortisBC,增加的 10 億美元主要反映對 LNG 基礎設施的投資,包括 Tilbury 第 1B 期液化擴建,以及新的 Tilbury LNG 儲槽。

  • The remaining increase is driven by customer growth and reliability investments across our footprint. The new plan is highly executable, with approximately 75% directed toward transmission and distribution investments and critical infrastructure that supports stable and predictable returns. The capital program is low-risk and comprised of 100% regulated projects and includes 11 major capital projects.

    其餘的增幅則由我們營運版圖內的客戶成長與可靠度投資所帶動。新計畫具高度可執行性,約 75% 投向輸電與配電投資,以及支撐穩定且可預測報酬的關鍵基礎設施。本資本方案風險低,100% 由受監管專案構成,並包含 11 項重大資本專案。

  • Consolidated rate base is expected to increase from $45 billion in 2026 to approximately $56 billion in 2029 and $64 billion in 2031, yielding three and five-year compound average growth rates of 7.7% and 7.5%, respectively. Last month, we were pleased to see MISO award ITC the Tranche 2.1 competitive bid project in Iowa, known as the MARS Project. This allows ITC to design, build, own, and operate the project, which includes approximately 300 miles of new 345 and 765 kV transmission lines in ITC’s service territory. The project’s total investment is estimated at USD1 billion, with approximately USD500 million included in our new five-year capital plan, with the balance expected post-2031.

    合併費率基礎預期將自 2026 年的 450 億美元增加至 2029 年約 560 億美元,以及 2031 年 640 億美元,分別對應三年與五年複合平均成長率 7.7% 與 7.5%。上個月,我們很高興看到 MISO 將位於愛荷華州、稱為 MARS 專案的 Tranche 2.1 競標專案授予 ITC。這使 ITC 得以在其服務範圍內設計、建造、擁有並營運該專案,內容包括約 300 英里新的 345 與 765 kV 輸電線路。該專案總投資估計為 10 億美元,其中約 5 億美元已納入我們新的五年資本計畫,其餘預期於 2031 年後投入。

  • Now I will take a few minutes to speak in more detail on the capital plans at our three largest utilities. ITC’s capital plan of $11.6 billion is the largest in the company’s history and supports five-year rate base growth of 8.6%, up 50 basis points compared to the prior plan. ITC’s regulated assets currently represent about one-third of our consolidated rate base, with that portion expected to trend upwards over the plan as ITC continues to deliver our strongest rate base growth.

    接下來我將用幾分鐘,更詳細說明我們三家最大公用事業公司的資本計畫。ITC 的 116 億美元資本計畫為公司史上最大,並支撐五年費率基礎成長 8.6%,較前一版計畫提高 50 個基點。ITC 的受監管資產目前約占我們合併費率基礎的三分之一,且隨著 ITC 持續帶來我們最強勁的費率基礎成長,該占比預期在計畫期間將呈上升趨勢。

  • Significant opportunities above and beyond the base plan exist at ITC, including approximately USD2.9 billion to USD3.4 billion post-2031 for Tranche 2.1 projects assigned through rights of first refusal, as well as approximately USD500 million for the MARS Project that I mentioned earlier. ITC may also realize future opportunities associated with projects as part of the ongoing MISO and SPP transmission planning processes.

    在 ITC,除基礎計畫之外仍存在顯著機會,包括 2031 年後約 29 億至 34 億美元、透過優先承購權(rights of first refusal)分配的 Tranche 2.1 專案,以及我先前提到的 MARS 專案約 5 億美元。ITC 亦可能在持續進行的 MISO 與 SPP 輸電規劃流程中,取得與相關專案有關的未來機會。

  • Other potential areas of growth include customer connections associated with over 10,000 megawatts of load growth for proposed data centers, industrial customers, and economic development projects in various stages of development across their footprint. This is up from 8,000 megawatts last quarter. With significant investments underway and a robust pipeline of future growth opportunities, ITC is well-positioned to deliver sustained long-term growth through this transformative period of transmission expansion.

    其他潛在成長領域包括客戶連接需求,與其營運版圖內處於不同開發階段的擬議資料中心、工業客戶及經濟發展專案所帶來超過 10,000 兆瓦的負載成長相關。這較上季的 8,000 兆瓦有所增加。在重大投資持續推進且未來成長機會管線充沛的情況下,ITC 已具備良好條件,可在這段輸電擴張的轉型期中實現可持續的長期成長。

  • Turning to UNS Energy, their capital plan of $5.6 billion supports five-year rate base growth of 7.4%. Like the prior plan, investments are spread across the value chain. Notably, over two-thirds of the capital plan is concentrated in transmission and distribution infrastructure, with the balance consisting of generation and other investments. As for opportunities above and beyond the plan, we continue to see strong interest from both new and existing customers across our service territory.

    接著談 UNS Energy,其 56 億美元資本計畫支撐五年費率基礎成長 7.4%。與前一版計畫相同,投資分布於價值鏈各環節。值得注意的是,超過三分之二的資本計畫集中於輸電與配電基礎設施,其餘則為發電及其他投資。至於計畫以外的機會,我們持續看到在服務範圍內,新客戶與既有客戶皆展現強勁興趣。

  • At TEP, we have one approved energy supply agreement associated with approximately 300 megawatts of data center load that is expected to begin ramping in 2027 and will be supported by existing and planned resources, including renewable generation and energy storage already in service or under development.

    在 TEP,我們已有一項核准的能源供應協議,對應約 300 兆瓦的資料中心負載,預期將於 2027 年開始逐步爬升(ramping),並將由既有與規劃中的資源支援,包括已投運或正在開發中的再生能源發電與儲能。

  • Beyond this initial agreement and the subsequent phases under negotiations with the customer, our Arizona service territories are experiencing strong demand associated with mining, industrial development, electrification, and broader commercial and residential growth. These opportunities have the potential to drive additional investments in generation, transmission, and distribution infrastructure over time.

    除這項初始協議及與客戶洽談中的後續階段外,我們在亞利桑那州的服務區域正面臨與採礦、工業發展、電氣化,以及更廣泛的商業與住宅成長相關的強勁需求。這些機會有潛力隨時間推進,帶動在發電、輸電與配電基礎設施方面的額外投資。

  • Last week, both TEP and UNS Electric filed their 2026 Integrated Resource Plans with the Arizona Corporation Commission, outlining their plans to meet customers’ projected energy needs over the next 15 years. TEP’s base case scenario prioritizes affordability and assumes average annual sales growth of 5.7% through 2031. It also includes up to USD1.3 billion of opportunity above the capital plan through 2031, subject to RFP processes.

    上週,TEP 與 UNS Electric 皆向亞利桑那州公司委員會(ACC)提交其 2026 年整合資源規劃(Integrated Resource Plans),概述未來 15 年滿足客戶預估能源需求的計畫。TEP 的基準情境優先考量可負擔性,並假設至 2031 年平均年度銷售成長率為 5.7%。該情境亦包含至 2031 年、在資本計畫之外最高可達 13 億美元的機會,但須視 RFP 流程而定。

  • Additionally, to evaluate the significant growth potential I previously mentioned, TEP included a high-growth scenario in its Integrated Resource Plan that would require approximately 800 megawatts of new generation and require up to USD1.5 billion of incremental investments. These opportunities are not currently reflected in our base capital plan, but represent meaningful long-term growth potential for the business. It is important to note that this high-growth scenario is very beneficial to TEP’s customers, with the lowest rates of all scenarios, as seen on the graph to the right. In terms of the next steps, the stakeholder process will begin next year, and we expect ACC acknowledgment in the third quarter of 2027.

    此外,為評估我先前提到的顯著成長潛力,TEP 在其整合資源規劃中納入一個高成長情境,該情境將需要約 800 兆瓦的新發電容量,並可能需要最高 15 億美元的增量投資。這些機會目前尚未反映在我們的基礎資本計畫中,但代表業務具實質的長期成長潛力。需要特別指出的是,從客戶角度來看,這個高成長情境非常有利,因其在所有情境中費率最低,如右側圖表所示。就後續步驟而言,利害關係人流程將於明年啟動,我們預期 ACC 將於 2027 年第三季予以確認(acknowledgment)。

  • Turning now to British Columbia, where investments in natural gas and LNG infrastructure are driving strong growth at FortisBC. FortisBC’s $6 billion capital plan includes investments to maintain system reliability and integrity alongside major LNG and advanced metering infrastructure projects. The capital plan supports rate-based growth of 7.9%, up from 6% in the prior plan. There are a number of projects underway at our Tilbury site, with additional opportunities for growth.

    接著談英屬哥倫比亞省,天然氣與 LNG 基礎設施投資正推動 FortisBC 的強勁成長。FortisBC 的 60 億美元資本計畫包含用於維持系統可靠度與完整性的投資,同時也涵蓋重大 LNG 與先進計量基礎設施(advanced metering infrastructure)專案。該資本計畫支撐費率基礎成長 7.9%,高於前一版計畫的 6%。我們在 Tilbury 場址有多項專案正在進行中,並且仍有額外的成長機會。

  • Back in July, we received an Order in Council for a larger Phase 1B liquefaction project, as well as a marine jetty to support LNG marine fueling in the Port of Vancouver. Total investments for this project are expected to be approximately $1.7 billion. In September, FortisBC received environmental approvals for its Phase 2 expansion, including investing up to $1.1 billion in the Tilbury LNG storage tank expansion project. This three BCF storage tank and associated regasification improves resilience and supports affordability for our customers.

    早在 7 月,我們取得樞密令(Order in Council),核准更大規模的第 1B 期液化專案,以及一座海運碼頭(marine jetty),以支援溫哥華港的 LNG 海運加注燃料。該專案總投資預期約為 17 億美元。9 月,FortisBC 取得其第 2 期擴建的環境核准,其中包括對 Tilbury LNG 儲槽擴建專案投資最高 11 億美元。此座 3 BCF 儲槽及其相關再氣化設施可提升韌性,並支援客戶可負擔性。

  • Phase 2 also provides an opportunity of up to 2.5 MTPA of additional liquefaction capacity to serve emerging domestic and export LNG markets. We have the flexibility to develop this project in stages, and we estimate an investment opportunity in the range of $2 billion to $4 billion, depending on market demand, and the majority of this expenditure is expected beyond 2031. We continue to work through permitting and our final investment decision.

    第二期亦提供最多達 2.5 MTPA 的額外液化產能機會,以服務新興的國內及出口 LNG 市場。我們具備分階段開發此專案的彈性;依市場需求而定,我們估計投資機會約為 20 億至 40 億美元,且預期此支出的大部分將在 2031 年之後發生。我們持續推進許可程序並進行最終投資決策相關工作。

  • Development at the Tilbury site has been many years in the making and represents the exceptional work by our team in British Columbia to expand the use of their gas network to produce regulated LNG that lowers carbon emissions and improves customer affordability. Bringing it all together, we are focused on executing our new five-year plan while working to advance our robust growth pipeline.

    Tilbury 場址的開發已籌備多年,展現了我們卑詩省團隊的卓越成果:擴大其天然氣網路的使用,以生產受監管的 LNG,降低碳排放並提升客戶可負擔性。綜合而言,我們專注於執行新的五年計畫,同時推動我們強勁的成長專案儲備。

  • I will now turn the call back to Jocelyn.

    我現在把電話交回給 Jocelyn。

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • As we prepared our new five-year outlook, customer affordability remained front and center. In addition to efficiently funding our capital plan, several of our key customer affordability initiatives include O&M savings targets, load-growth projects like in Iowa and Arizona, least-cost capital projects like the Springerville Repowering Project, and the continued delivery of customer conservation programs.

    在我們準備新的五年展望時,客戶可負擔性始終是首要重點。除了有效率地為資本計畫籌資外,我們幾項關鍵的客戶可負擔性措施包括:營運與維護(O&M)節省目標、如愛荷華州與亞利桑那州等地的負載成長專案、如 Springerville 機組汰換(Repowering)專案等最低成本資本專案,以及持續推動客戶節能方案。

  • And with increased sales of LNG through the expansion of our Tilbury facility, we expect to continue to provide rate benefits for our customers. We continue to take a disciplined approach to funding the $3.4 billion increase in the new five-year plan, together with the $400 million increase in our 2026 capital plan. We advanced a portion of our funding requirements in 2026 through the issuance of USD1 billion of hybrids and approximately $260 million of ATM equity in the third quarter.

    此外,隨著我們透過擴建 Tilbury 設施提升 LNG 銷售,我們預期將持續為客戶帶來費率效益。我們持續以嚴謹的方式,為新五年計畫增加的 34 億美元資本需求,以及 2026 年資本計畫增加的 4 億美元進行籌資。我們已於第三季透過發行 10 億美元混合證券(hybrids)及約 2.6 億美元的 ATM 股權,提前滿足 2026 年部分資金需求。

  • Over the next five years, as you can see on the funding pie chart, our capital plan is expected to be funded primarily through cash from operations and debt issued at our regulated utilities. Our dividend reinvestment plan remains the foundation of our equity needs over the five-year plan. We do expect to issue approximately $250 million of ATM equity over the next 12 months, subject to market conditions.

    在未來五年,如資金來源圓餅圖所示,我們的資本計畫預期主要由營運現金流及在受監管公用事業層級發行的債務提供資金。我們的股利再投資計畫仍是五年計畫期間股權需求的基礎。在視市場狀況而定的前提下,我們預期未來 12 個月將發行約 2.5 億美元的 ATM 股權。

  • Overall, our funding plan is designed to support our strong investment-grade credit ratings. Our credit profile is underpinned by a diverse, high-quality portfolio of regulated utilities, with 95% of our assets in transmission and distribution across constructive regulatory jurisdictions, providing stable and predictable cash flows.

    整體而言,我們的籌資計畫旨在支持我們強勁的投資級信用評等。我們的信用概況由多元且高品質的受監管公用事業組合所支撐;我們 95% 的資產位於具建設性監管轄區的輸電與配電領域,提供穩定且可預測的現金流。

  • The plan supports average S&P FFO to debt metrics above 12% over the five-year period, with improving financial flexibility in the latter years, as well as average Fitch FFO leverage of approximately 5.9 times. Taken together, our high-quality regulated portfolio, disciplined funding approach, and improving credit metrics positions us to execute the capital plan while maintaining a strong credit profile.

    該計畫支持在五年期間 S&P 的 FFO/債務比率平均維持在 12% 以上,且在後期年度財務彈性提升;同時 Fitch 的 FFO 槓桿倍數平均約為 5.9 倍。綜合而言,我們高品質的受監管資產組合、嚴謹的籌資方式與改善中的信用指標,使我們得以在維持強健信用概況的同時執行資本計畫。

  • Today, we announced the declaration by our Board of Directors of a fourth-quarter dividend of $0.665, representing a 4% increase. This brings us to 53 consecutive years of increases in dividends paid, a track record that we are very proud of. With our strong dividend history and regulated growth strategy, we are extending our 4% to 6% annual dividend growth guidance through 2031.

    今天,我們宣布董事會宣告第四季股利為每股 0.665 美元,較前次提高 4%。這使我們達成連續 53 年提高已發放股利的紀錄,我們對此深感自豪。憑藉我們強勁的股利歷史與受監管成長策略,我們將 4% 至 6% 的年度股利成長指引延長至 2031 年。

  • I will now turn the call back to David to wrap up.

    我現在把電話交回給 David 作結。

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • When we think about the Fortis investment proposition, it really comes down to sustainable growth supported by our high-quality portfolio of regulated utilities. We have strong rate base growth, a robust growth pipeline, and a transparent funding plan. We are investing to strengthen the resiliency of our systems and ensure they can reliably and affordably meet customers’ evolving energy needs.

    談到 Fortis 的投資主張,核心在於由我們高品質的受監管公用事業組合所支撐的永續成長。我們擁有強勁的費率基礎(rate base)成長、充沛的成長專案儲備,以及透明的籌資計畫。我們正投資以強化系統韌性,並確保系統能以可靠且可負擔的方式滿足客戶不斷演變的能源需求。

  • We are doing that from a strong foundation, 100% regulated utilities, solid investment-grade credit ratings, regulatory and geographic diversity, and a proven track record. All the right pieces to provide long-term value to our customers and shareholders.

    我們是在堅實的基礎上推進:100% 受監管公用事業、穩健的投資級信用評等、監管與地理多元化,以及經驗證的績效紀錄。具備所有正確要素,為客戶與股東創造長期價值。

  • That concludes my remarks. I will now turn the call back over to Stephanie.

    以上為我的發言。我現在把電話交回給 Stephanie。

  • Stephanie Amaimo - Vice President - Investor Relations

    Stephanie Amaimo - Vice President - Investor Relations

  • Thank you, David. This concludes the presentation. At this time, we would like to open the call to address questions from the investment community.

    謝謝你,David。簡報到此結束。接下來,我們將開放電話會議,回答投資界的提問。

  • Operator

    Operator

  • (Operator Instructions) Maurice Choy, RBC.

    (接線員指示)RBC 的 Maurice Choy。

  • Maurice Choy - Analyst

    Maurice Choy - Analyst

  • Recognizing that there is a lot of good growth in ITC as well as FortisBC, I do want to touch on the large load opportunity at UNS Energy. In the past, you have highlighted a potential of incremental generation costing about $1.5 billion to $2 billion through 2030. As I look at the presentation today on slide 14, I see that there is up to $1.5 billion of investment. So assuming these numbers are apples to apples, is it fair to suggest that your new plan includes some, but still not very much, large load-related CapEx?

    我注意到 ITC 與 FortisBC 都有很多良好的成長機會,但我想談談 UNS Energy 的大型負載機會。過去你們曾提到,到 2030 年可能有約 15 億至 20 億美元的增量發電投資。我看今天簡報第 14 頁,看到最多約 15 億美元的投資。因此,若假設這些數字可直接比較,是否可以說你們的新計畫包含了一些、但仍不算太多與大型負載相關的資本支出(CapEx)?

  • And maybe as a quick follow-up, if that is true, in the spirit of today’s US elections, how do you see your outlook for this remaining growth CapEx being shaped by the election, if it does proceed as the poll suggests?

    另外快速追問一下:如果確實如此,呼應今天美國大選的情境,若民調所示的結果成真,你們認為這部分剩餘的成長型資本支出展望,會如何受到選舉結果的影響?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • No, actually, there is no additional capital in our plan related to any data center growth in Arizona. The difference is just the size that we were assuming. When we talk about the estimated USD1.5 billion of additional investment opportunities, it was based on adding a certain amount of load to our Integrated Resource Plan. So we are trying to -- we basically ran a model to try to get numbers based on probably something that was in the middle of that range that we were looking at before.

    不,事實上,我們的計畫中並沒有任何與亞利桑那州資料中心成長相關的額外資本投入。差異僅在於我們原先假設的規模。當我們談到約 15 億美元的額外投資機會估計時,是基於在我們的整合資源規劃(Integrated Resource Plan)中增加一定的負載。因此我們嘗試——基本上是跑了一個模型,試圖以先前所看區間中間值附近的假設來估算數字。

  • So when we talk about the projects in Arizona, we have the existing 300 megawatt ESA. We have additional opportunity for investment at that site, which we always put kind of around that 300 megawatts to build that total site out to, say, 500 or 600 megawatts.

    因此,談到亞利桑那州的專案,我們有現有的 300 兆瓦 ESA。

  • And then we were always talking about a second site as well that is still looking at building out in the north part of the Tucson area. And that one we estimated at 500 to 700 megawatts. So when we put in that $1.5 billion to $2 billion, it was more like that whole bucket of projects, and here we are actually just taking a little bit smaller portion of it for that high-growth scenario.

    此外,我們也一直在談第二個場址,目前仍在評估於圖森(Tucson)地區北部進行擴建。該場址我們估計為 500 至 700 兆瓦。因此,當我們提到 15 億至 20 億美元時,更像是涵蓋那一整籃子專案;而在此我們實際上只是針對高成長情境,取其中較小的一部分。

  • And then, to opine on the election outcome and whether or not and what that might mean for data center development, I think as we sit here today and as folks go to the polls in the US, obviously, the data center topic has been very front of mind for a lot of voters and a lot of politicians.

    至於對選舉結果以及其可能對資料中心開發意味著什麼發表看法,我認為在今天、當美國民眾前往投票時,資料中心議題顯然一直是許多選民與政治人物高度關注的焦點。

  • What I am hoping is that we can hopefully find our way away from rhetoric and look at the real positive benefits that we see from data centers, as long as they are done right, as long as there is no cost shifting, as long as there is net benefit to our customers and all the environmental and water and the rest of those things are addressed by the communities that they are going in.

    我所希望的是,我們能夠盡量遠離口號式的言論,轉而看見資料中心所帶來的真正正面效益——前提是要做得正確、不能發生成本轉嫁、必須對我們的客戶帶來淨效益,並且由其進駐的社區妥善處理環境、水資源以及其他相關議題。

  • But when you have these large loads come in, it makes your system more efficient and saves customers money. We are seeing that in Iowa, as you saw on the slide, talking about that 20% reduction in those rates there. We see it in Arizona, even though we are not making any additional investments for the first 300 megawatts of data center that we have there. We are seeing a $13 per month benefit. So all of those things hopefully will flow through, and people will see the proof and the positive nature of what some of these large loads can do. And it is not just large data centers, it is large load and high-capacity factor customers like we are seeing for LNG in British Columbia. So there are some positive benefits, but I think no one wants to talk about them until tomorrow.

    但當這些大型負載進來時,會讓你的系統更有效率,並為客戶省錢。我們在愛荷華州看到了這一點,正如你在投影片上看到的,那裡的費率下降了20%。我們在亞利桑那州也看到了,即使我們在那裡的前300兆瓦資料中心並未進行任何額外投資。我們看到每月可帶來13美元的效益。所以希望所有這些都能反映出來,讓大家看到證據,以及某些大型負載能帶來的正面效果。而且不只是大型資料中心,還包括大型負載與高容量因子客戶,例如我們在卑詩省看到的LNG。所以確實有一些正面效益,但我想在明天之前沒有人想談這些。

  • Maurice Choy - Analyst

    Maurice Choy - Analyst

  • Understood. That all makes sense. And maybe I could just finish it off with a question on funding, particularly given the greater growth that you have in front of you. I know that the DRIP program is still the main tool that you use for your common equity requirements, and in the past, you have said that all options are on the table if CapEx rises, including asset sales and considering your options there.

    了解。這些都很合理。也許我可以用一個關於資金籌措的問題作結,特別是考量到你們未來面臨更高的成長。我知道DRIP計畫仍是你們滿足普通股權需求的主要工具,而過去你們也說過,如果資本支出上升,所有選項都在桌上,包括資產出售以及評估相關選項。

  • How should we think about your use of ATM moving forward? You have initiated that as part of your Q3 period, using that vehicle versus discrete issuances. And perhaps more broadly, I see the 12.3% FFO debt average, but how do you philosophically size what is the right buffer versus your 12% threshold?

    我們應該如何看待你們未來使用ATM(隨市發行)?你們在第三季期間啟動了這項工具,使用這種方式而不是一次性的分批發行。另外更廣泛地說,我看到FFO/債務平均為12.3%,但在理念上,你們如何衡量相對於12%門檻,應該保留多少合適的緩衝?

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • Yes, so we do have the ATM program available, and the DRIP, as you said, has been quite healthy and provided most of the equity needs that we have. Look, we anchor everything back to, I think, the credit metrics that you referred to and what is the right buffer. It takes a lot to move the metrics given the size of Fortis, but we have said that we would like to have a 50 to 75 basis points buffer above those metric thresholds. And really, it is not any one thing that I think would happen with Fortis that would kick us past those buffer limits. It is more about if things change in the world and the thresholds just change at the rating agency level and not anything to do with Fortis.

    是的,我們確實有ATM計畫可用,而如你所說,DRIP一直相當健康,並提供了我們大部分的股權需求。你看,我們一切都會回到你提到的信用指標,以及什麼是合適的緩衝。以Fortis的規模,要讓指標移動需要很大的變化,但我們曾說過,我們希望在那些指標門檻之上保有50到75個基點的緩衝。而且我認為,並不是Fortis本身會發生某一件事就把我們推過那些緩衝上限。更多是如果世界情勢改變,使得評級機構層面的門檻本身改變,而不是Fortis自身的因素。

  • But we do anchor sort of our funding plan around holding that kind of level of buffer. So when I think about the ATM going forward, as we listen to David talk about all those, I guess, above and beyond the plan opportunities in each of our regulated utilities, back to what you said, Maurice, we will be looking at everything. ATM will be one piece of that to fund that, but again, anchor back to our credit profile and our credit metrics. We also have room for more hybrids in our cap structure. We only have about 6% in our cap structure today, and as you know, I mean, there is room to add more there.

    但我們確實會以維持這種程度的緩衝作為資金計畫的核心。所以當我思考未來ATM的使用時,聽David談到我們各個受監管公用事業中那些、我想是超出既定計畫的機會,回到你說的,Maurice,我們會把所有選項都納入考量。ATM會是其中一個用來支應的工具,但同樣會以我們的信用概況與信用指標為核心。我們的資本結構中也還有空間增加更多混合型證券。我們目前在資本結構中大約只有6%,如你所知,還有空間可以再增加。

  • And, so again, no real secret to how we think about funding. We try to maintain the buffer, but when we start to see and get visibility on the growth above and beyond the current plan that we will have, we will assess what options are in front of us, and we will choose it once we can see the new growth profile for the new capital plan.

    所以再說一次,我們對資金籌措的思考並沒有什麼祕密。我們努力維持緩衝,但當我們開始看到並能更清楚掌握超出目前計畫的成長時,我們會評估眼前有哪些選項,並在能看清新資本計畫的新成長輪廓後做出選擇。

  • Maurice Choy - Analyst

    Maurice Choy - Analyst

  • That is great flexibility. Thank you very much for the comments, and congrats.

    這樣的彈性很棒。非常感謝你的說明,也恭喜。

  • Operator

    Operator

  • Rob Hope, Scotia Bank.

    豐業銀行(Scotia Bank)的Rob Hope。

  • Robert Hope - Analyst

    Robert Hope - Analyst

  • Morning, everyone. Appreciate all the details on the updated capital plan. Maybe taking a look at slide 17 and Tilbury LNG and kind of the spending breakdown there. As the federal government and provincial government are much more amenable to, we will call it, conventional energy investment, and there is a concerted effort to accelerate projects. As you take a look at these projects, is there an opportunity to do more at that site, or could we see some of the timelines being moved forward there?

    各位早安。感謝你們提供更新後資本計畫的所有細節。我想看看第17頁的投影片,關於Tilbury LNG以及那裡的支出拆分。隨著聯邦政府與省政府對於(我們姑且稱之為)傳統能源投資更為友善,且正積極推動加速專案。當你們檢視這些專案時,是否有機會在該場址做得更多,或是我們可能看到某些時程被提前?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Yeah, I’ll turn that over to Roger to talk about the timeline, because I know he’s got. They’re really hustling to get these projects done as quick as they can, which is what is shown in this table on page 17. But I also want to make sure that it’s really loud and clear that, that second phase, the Phase 2 expansion that can add up to 2.5 MTPA to liquefaction there, that’s a huge project and has a ton of opportunity. We know we have to figure out the FID and a whole bunch of other stuff and permitting and all the things that we have to do on consultations, et cetera. That one, we’re hoping we could see squeeze in the beginning of the next five-year plan.

    好的,我把這個交給Roger來談時程,因為我知道他那邊有。他們確實正全力以赴,盡可能快地把這些專案完成,這也反映在第17頁這張表裡。但我也想非常清楚地強調,第二階段,也就是第2期擴建,可在那裡增加最多2.5 MTPA的液化能力,這是一個非常大型的專案,機會很多。我們知道還需要釐清FID(最終投資決定)以及一大堆其他事項、許可、以及我們必須進行的諮詢等等。我們希望能把這個擠進下一個五年計畫的初期。

  • But Roger, can you opine on some of those details?

    不過Roger,你能就其中一些細節發表看法嗎?

  • Roger Dall'Antonia - President, Chief Executive Officer

    Roger Dall'Antonia - President, Chief Executive Officer

  • Thanks, Dave. Morning, Rob. Thanks for the question. Yeah, as Dave noted, Tilbury has three distinct projects to it. Tilbury 1B, which is the Order in Council we received in the summer, which is really focused on the marine fueling market as that grows. The second point is the storage tank, a 3 billion cubic foot storage tank. That is really gas storage on site for system resiliency and reliability and managing gas supply costs.

    謝謝,Dave。早安,Rob。謝謝你的問題。是的,如Dave所提到,Tilbury有三個明確不同的專案。Tilbury 1B,也就是我們在夏季收到的行政命令(Order in Council),主要聚焦在隨著成長而擴大的海運加注燃料市場。第二個是儲槽,一座30億立方英尺的儲槽。那主要是在場址進行天然氣儲存,用於提升系統韌性與可靠性,以及管理天然氣供應成本。

  • And then, Tilbury 2 is liquefaction, and that could serve one of two markets. It could serve the expanded Tilbury, sorry, the expanded bunkering market for marine fueling, or it could be export of LNG. That is the full build-out. I think, Rob, you were asking whether we could do more on that site. With this Environmental Assessment Certificate that we just received, that covers the potential on that site.

    接著,Tilbury 2是液化,這可以服務兩種市場之一。它可以服務擴大的Tilbury——抱歉,是擴大的船舶加注燃料市場,或是LNG出口。那是完整的建置規模。我想,Rob,你問的是我們是否能在該場址做得更多。就我們剛取得的環境評估證書而言,它涵蓋了該場址的潛在開發空間。

  • As far as timelines go, Tilbury 1B and TLST are in this plan, and we are into the design phase and contracting, and we expect to commence construction at some point 2027 and in service end of 2031 into 2032. But we’ll have more details on that as we get through the development and planning. Tilbury 2 is the bigger opportunity. It could be done in phases, as Dave said, or we could end up seeing a large offtake, but we also have to deal with upstream investments for gas supply. So there’s a bit more work to realize that opportunity, but given the growth of the bunkering market, part of it could be done earlier within the next number of years to serve that market, while we look to broader opportunities beyond B.C. with export LNG.

    至於時程,Tilbury 1B與TLST都在這個計畫中,我們已進入設計階段與承攬作業,預期在2027年的某個時間點開始施工,並於2031年底到2032年投入運轉。不過,隨著我們完成開發與規劃,我們會提供更多細節。Tilbury 2是更大的機會。它可以分期進行,如Dave所說,或者我們可能會看到一筆大型承購(offtake),但我們也必須處理上游天然氣供應所需的投資。因此要實現這個機會還需要做更多工作;但考量到船舶加注燃料市場的成長,其中一部分可在未來幾年內更早完成以服務該市場,同時我們也會尋求卑詩省以外、以LNG出口為主的更廣泛機會。

  • Robert Hope - Analyst

    Robert Hope - Analyst

  • All right. That’s great. Maybe moving over to a bit more of a broader question. There’s been some large and notable M&A transactions in the utility space. Dave, can you maybe update us on how you’re thinking about the potential for M&A in this environment, or is still the focus on organic growth?

    好的。那太好了。也許我們把話題轉到一個更宏觀的問題。公用事業領域出現了一些規模龐大且引人注目的併購(M&A)交易。Dave,你能否更新一下你們如何看待在這種環境下進行併購的可能性?還是目前仍以內生成長為重點?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Yeah, I would say, still our primary focus is obviously on organic growth, and we are doing a lot of that, as you can see. Our five-year capital plan has increased every year, I think going from $6 billion to $6.5 billion to $7 billion to $7.5 billion. So we are really seeing that additional organic growth come to fruition. I think we and our investors would agree, if we have a dollar to spend, the best place to spend it is in additional organic growth because it is a dollar invested in rate base, and you get a dollar in rate base. So it is the most efficient way for us to add value. It is also a great way for us to add value to our customers, especially investing in the infrastructure that they need for energy or in infrastructure that provides more efficient and lower and more affordable power for them.

    是的,我會說,我們的主要重點顯然仍然是內生成長,而且如你所見,我們正在做很多這方面的工作。我們的五年資本計畫每年都在增加,我想是從60億美元到65億美元、70億美元、再到75億美元。所以我們確實看到額外的內生成長正在落地實現。我想我們和投資人都會同意,如果我們有1美元要花,最好的用途就是投入更多的內生成長,因為那是投資在費率基礎(rate base)上的1美元,而你就能得到1美元的費率基礎。因此,這是我們提升價值最有效率的方式。這同時也是我們為客戶創造價值的好方法,特別是投資他們所需的能源基礎設施,或投資能為他們提供更有效率、更低成本且更可負擔電力的基礎設施。

  • So that is the main focus still. We do see a lot of the M&A activity that is happening in the sector, and there is always the view that there may be some potential opportunities there, whether it is through a balance of synergies, bigger balance sheet, better credit, all of those things. We continuously look at all that stuff. But it is not a focus of ours because it is not something we need to do. It is something that we continuously evaluate, though.

    所以這仍然是主要重點。我們也看到該產業正在發生的許多併購活動,而且一直都有一種看法,認為那裡可能存在一些潛在機會,不論是透過協同效益的平衡、更大的資產負債表、更好的信用狀況等等。我們會持續檢視所有這些事情。但這不是我們的重點,因為這不是我們必須做的事。不過,我們確實會持續評估。

  • Operator

    Operator

  • John Mould, TD Securities.

    John Mould,TD Securities。

  • John Mould - Equity Analyst

    John Mould - Equity Analyst

  • Thank you very much. Sorry about that. Good morning, everybody. Maybe just starting with the Tucson Electric rate case, and I appreciate you don’t want to get ahead of the commission and its debates and a potential final order. Just wondering if you could talk about, from your perspective, the puts and takes in the ALJ recommendation and how you’re thinking about potential regulatory lag just in the context of the recommended post-test year plan and first adjustment in April 2028, excuse me, as currently proposed.

    非常感謝。抱歉剛才那樣。各位早安。也許先從 Tucson Electric 的費率案件(rate case)談起,我也理解你們不想搶在委員會及其辯論與可能的最終命令之前發言。我想請教的是,從你們的角度,ALJ(行政法官)的建議中有哪些利弊權衡?以及在目前所提的建議「測試年度後(post-test year)」方案、以及2028年4月第一次調整(不好意思)這個脈絡下,你們如何看待可能的監管落後(regulatory lag)?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • So first off, yeah, we are still in the middle of the rate case process, and the recommended opinion order is just kind of one piece along the way. And we’re really anxious and excited to get to the open meeting and get the rate case behind us and hopefully get rates effective the December 1, which is the plan currently. Yeah, it is going through the normal process. We filed exceptions last week on a couple issues that are still in debate, like ROE, et cetera. So it’s just in that normal process. I wouldn’t opine any more than that.

    首先,是的,我們仍在費率案件流程的中段,而建議的意見與命令(recommended opinion and order)只是過程中的一個環節。我們非常期待也很興奮能走到公開會議,讓費率案件告一段落,並希望費率能如目前計畫在12月1日生效。是的,它正按正常流程推進。我們上週就幾個仍在爭議中的議題(例如 ROE 等)提出了異議(exceptions)。所以就是處在那個正常流程中。我不會再多做評論。

  • And then, on the regulatory lag perspective, we did get the recommendation for an adjustment mechanism, and it basically looks a lot like UNS Gas and other ones that have been recommended in the state. And it will not go into effect, the first actual adjuster will be in April of 2028. So there will be a little bit of regulatory lag that we’ll see between the time period of these rates going into effect and that April timeframe, which will reflect the costs and investments made up till the end of 2027.

    至於監管落後的角度,我們確實拿到了調整機制(adjustment mechanism)的建議,而且它基本上看起來很像 UNS Gas 以及州內其他已被建議採用的機制。而它不會立即生效,第一次實際調整會在2028年4月。因此,從這些費率生效到那個4月時間點之間,我們會看到一點監管落後;而那次調整將反映截至2027年底所發生的成本與投資。

  • So still a little bit of regulatory lag there, but this is one of those things where it may not be absolutely perfect. It’s not a forward-looking test year kind of mechanism, but it’s a really great result from the perspective of leveling out and smoothing out the earnings down in Arizona.

    所以仍然會有一些監管落後,但這類安排未必是絕對完美。它不是那種前瞻式測試年度(forward-looking test year)的機制,但從讓亞利桑那州的獲利更趨平穩、降低波動的角度來看,這是一個非常好的結果。

  • John Mould - Equity Analyst

    John Mould - Equity Analyst

  • Thanks for that. Then just maybe going to ITC and the 10 gigawatts of potential load-growth customer connections there, mainly data centers and economic development. I appreciate this is out and beyond the plan as it stands. I’m just wondering if you can give us a sense of how that potential low growth is paced, like what the timing might look like, and how we should think about the potential investment on your end that could come from that bucket of projects.

    謝謝你的說明。接著想談 ITC 以及那裡潛在10GW的負載成長客戶連接,主要是資料中心與經濟發展。我理解這是在現有計畫之外。我想請你們大概說明一下,這些潛在負載成長的節奏是如何推進的,例如時程可能會是什麼樣子;以及我們應該如何看待你們端可能因此產生的投資規模,來自那一籃子專案。

  • And maybe it’s aspirational to say that if they all were to come to fruition, but just how are you thinking about the potential incremental investment opportunity that could come from that if you do see a high conversion rate?

    也許說如果它們全部都能實現有點理想化,但如果你們確實看到很高的轉換率,你們如何看待由此帶來的潛在增量投資機會?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Yeah, I’ll turn that over to Chris so she can kind of explain the different pieces we have there for interconnections and then additional transmission investments that might come through some of the other planning processes.

    好的,我把這題交給 Chris,讓她說明我們在併網(interconnections)的不同組成部分,以及可能透過其他規劃流程帶來的額外輸電投資。

  • Unidentified Company Representative

    Unidentified Company Representative

  • Thanks, Dave, and good morning, Jon. Thanks for the question. Yeah, I think you should look at that as incremental. We already have quite a bit in the plan. So, we have $800 million in the plan for data centers, and that’s for data centers that have been publicly announced and have approval. So everything in that 10-gigawatt bucket are things in our pipeline, and they’re anywhere from further down the pipeline and having negotiations on agreements to early stages of doing the planning work. So I think you can expect that not all of that will come to fruition, but it’s real enough that we felt good about projecting that. And as Dave always says, we never put anything in the plan until it’s real.

    謝謝你,Dave,Jon 早安,也謝謝你的提問。是的,我認為你應該把那部分視為增量。我們在計畫中已經包含相當多的內容。因此,我們的計畫中有8億美元是用於資料中心,這是針對已公開宣布且已獲核准的資料中心。所以那個10GW籃子裡的所有項目,都是我們管線中的案子,範圍從管線較後段、正在就協議進行談判,到仍在早期階段、正在做規劃工作都有。因此我認為你可以預期不會全部都落地,但它的真實性足夠高,讓我們有信心做出那樣的預估。而且如 Dave 常說的,我們在它變得夠確定之前,絕不會把任何東西放進計畫裡。

  • Operator

    Operator

  • Ben Pham, BMO.

    Ben Pham,BMO。

  • Ben Pham - Analyst

    Ben Pham - Analyst

  • Thanks. Good morning. I want to start out with the higher CapEx plan and I know you’ve mentioned that it’s highly executable for a number of different reasons. Can you unpack that maybe a bit more for us and comment maybe specifically on your thoughts on the labor availability, material availability, and maybe just more broadly, what do you think is the most difficult part of executing to our plan?

    謝謝。早安。我想先從較高的資本支出(CapEx)計畫談起,我知道你們提到基於多種原因,這個計畫具有很高的可執行性。你們能否再多拆解說明一下,並特別評論你們對勞動力供給、材料供給的看法;以及更廣泛地說,你們認為要按計畫執行時最困難的部分是什麼?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Thanks, Ben. I think this is kind of standard questions that we look at any time we take on big projects, making sure that we have the resources, making sure that we can get in the queue for the supply chain, which will drive the timeline of the projects. All of those things are part of how we’ve been doing projects forever. And it’s no different. It’s just that we have a lot more and a lot larger projects, so it obviously requires a little more attention and focus on those large projects.

    謝謝你,Ben。我認為這些是我們每次承接大型專案時都會檢視的標準問題:確保我們有資源、確保我們能在供應鏈的排程隊列中取得位置,而這會影響專案時程。所有這些都是我們一直以來做專案的方式。而且沒有不同。只是我們現在的專案更多、規模也更大,所以顯然需要對這些大型專案投入更多注意力與專注。

  • But this isn’t something that we’re changing overnight drastically. I mentioned before that we have been slowly increasing our rate base growth. So this isn’t us going from 3% to 7.5% and wondering how we’re going to get all that executed.

    但這並不是我們會在一夜之間就大幅改變的事情。我先前提到過,我們一直在逐步提高我們的費率基礎成長。所以這不是我們從 3% 一下子跳到 7.5%,然後再去煩惱要如何把這些都執行到位。

  • This is all well within the capabilities of our companies and things that we’ve been planning for a long time, and we’ll focus on that. So that’s why we think that they’re highly executable, because it’s stuff that we do and have been doing for decades and decades. So other than supply chain, labor, and kind of those same concerns that you’ll see across any sector really these days, we think that we will be able to sort that out.

    這完全在我們各家公司能力範圍之內,也是我們長期以來一直在規劃的事情,我們會專注在這上面。因此我們認為這些計畫具有很高的可執行性,因為這些都是我們做的事,而且我們已經做了數十年、數十年。所以除了供應鏈、勞動力,以及如今幾乎各個產業都會面臨的那些類似疑慮之外,我們認為我們能夠把這些問題理順。

  • Ben Pham - Analyst

    Ben Pham - Analyst

  • Okay, got it. Maybe my second question is on the Productivity Mega Deduction. Is that reflected in your plan at all? And then, if any, is there implications on credit metrics or rate base implications for the Canadian utilities?

    好的,了解。我第二個問題可能是關於「生產力超級扣除」(Productivity Mega Deduction)。這在你們的計畫中有反映嗎?另外,如果有的話,對加拿大公用事業的信用指標或費率基礎是否有任何影響?

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • So, Ben, we have not reflected. As you know, that’s not into legislation just yet, and so the final details of that is to be determined. Based on what we see, though, thus far, we don’t expect it to have a material impact on our credit metrics. And, if you think about it, what this deduction does, it allows you to sort of write off things a little faster for tax purposes, so it reduces your taxable income and the amount of taxes you have to pay. But that would also reduce, particularly in our Western utilities, the amount that we’re collecting from customers. So, net-net, we’re not expecting it to have a material impact on credit. And -- so we’ll stay tuned for the final rules around the PMD, and once we have it in hand, we’ll come back with more certainty around the impact.

    所以,Ben,我們尚未將其納入反映。如你所知,這項措施目前還沒有正式立法,因此最終細節仍有待確定。不過就我們目前看到的情況而言,我們不預期它會對我們的信用指標造成重大影響。而且,如果你想想這項扣除的作用,它讓你在稅務上可以更快地攤提/沖銷某些項目,因此會降低你的應稅所得以及需要繳納的稅額。但這也會降低——特別是在我們西部公用事業——我們向客戶收取的金額。所以整體而言,我們不預期它會對信用造成重大影響。因此——我們會持續關注 PMD 的最終規則,一旦掌握明確內容,我們會再回來更確定地說明其影響。

  • Operator

    Operator

  • Mark Jarvi, CIBC Capital Markets.

    CIBC 資本市場的 Mark Jarvi。

  • Mark Jarvi - Analyst

    Mark Jarvi - Analyst

  • Good morning, everyone. Jocelyn, just going back to your comments on funding, just curious in terms of where you could push the hybrid issuances, and then just what would be a reasonable assumption in terms of ATM usage over the next few years to execute on the plan ahead of you?

    各位早安。Jocelyn,回到你對資金籌措的評論,我想請教一下,你們在混合型證券發行方面可以推進到什麼程度?

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • Mark, with respect to where we could push the hybrid capital, like I said, we have about 6% in our Cap structure today. I mean, DBRS’s limit, I think, is 10%, and S&P is 15%. If we were to push it to 10%, we definitely have over $2.5 billion that we could do in hybrid capital for any growth above and beyond the plan. With respect to usage of the ATM, we have laid out what we need for the current plan that we have. We have no plans of using the ATM program, all but for additional capital being added to the plan that you are looking at.

    Mark,關於混合型資本可以推進到什麼程度,如我所說,我們目前在資本結構中大約占 6%。我的理解是,DBRS 的上限大概是 10%,而 S&P 是 15%。如果我們把它推到 10%,那麼針對超出目前計畫之上的任何成長,我們確實有超過 25 億美元的混合型資本可做。至於 ATM 的使用,我們已經說明了現行計畫所需的規模。除了在你目前看到的計畫之外若新增額外資本需求,我們沒有使用 ATM 計畫的打算。

  • ATM will be one thing that we will look at in addition to hybrids and everything else in our toolkit. So no plans to use the ATM above what we have stated here today. And but as we firm up above and beyond the capital plan investments, if some of those were to come to fruition, then ATM would be one consideration that we would use.

    ATM 會是我們在混合型資本以及工具箱裡其他選項之外,會一併考量的一項工具。所以,除了我們今天所陳述的部分之外,沒有計畫再額外使用 ATM。但當我們把資本計畫投資以上、超出部分進一步落實,如果其中一些真的實現,那麼 ATM 會是我們會採用的一項考量。

  • Mark Jarvi - Analyst

    Mark Jarvi - Analyst

  • Would you see anything kind of potentially come into the plan in the next couple of years that would require the ATM, or does it feel like it is more later in the five-year plan that things could change?

    你們是否預期未來一兩年內會有任何事情可能納入計畫、因而需要用到 ATM?還是感覺比較可能是在五年計畫的後段才會有變化?

  • Jocelyn Perry - Chief Financial Officer, Executive Vice President

    Jocelyn Perry - Chief Financial Officer, Executive Vice President

  • So, I mean, we cannot build these things overnight, and these are large projects. And David just basically said that these things are evolutionary over time, and we have been slowly increasing our rate base growth. I would tend to think that we would see more in the latter years of the plan as opposed to the front end of the plan.

    所以,我的意思是,我們不可能一夜之間就把這些建起來,這些都是大型專案。而 David 基本上也說了,這些事情會隨時間逐步演進,我們一直在慢慢提高費率基礎成長。我傾向認為,相較於計畫前段,我們會在計畫後期看到更多這類情況。

  • Mark Jarvi - Analyst

    Mark Jarvi - Analyst

  • Yeah, that makes sense. Dave, just coming back to your commentary on planning and ramping into the growth. How do we think about the IRP base case in Arizona, potentially the large load? Do you just go larger on existing sites where you planned that combined cycle units in 2031? Do you have additional sites? How far in advance are you in terms of an accelerated sort of IRP planning process right now?

    是的,這很合理。Dave,再回到你對規劃以及逐步拉升成長的評論。我們該如何看待亞利桑那州 IRP(整合資源規劃)的基準情境,以及潛在的大型負載?你們是會在既有場址上做更大規模的擴建——也就是你們原本規劃在 2031 年建置複循環機組的那些地點——嗎?你們還有其他場址嗎?就目前而言,在加速版的 IRP 規劃流程上,你們已經提前到什麼程度?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • We have many sites and options that we have been looking at and evaluating for that. So it is quite a number of them. There are sites for generation development, there are transmission needs. There are a lot of different things that fall out of the Integrated Resource Plan if we see especially that high growth scenario. So we do have some options laid out and are evaluating those.

    我們一直在檢視並評估許多場址與選項來因應這件事。所以數量相當多。有用於發電開發的場址,也有輸電需求。如果我們看到特別是那種高成長情境,整合資源規劃會衍生出許多不同的事項。因此我們確實已列出一些選項並正在評估。

  • Mark Jarvi - Analyst

    Mark Jarvi - Analyst

  • I am just curious in terms of the conversation about the expanded 300 megawatts going to another 300 megawatts, the second site. How are the customers thinking about timelines? We are seeing some questions about slippage on timelines. Are your customers feel like there is an opportunity to go faster if you have an accommodating utility setup here and communities to support this project?

    我只是好奇,關於把擴增的 300 兆瓦再擴到另一個 300 兆瓦、也就是第二個場址的討論。客戶對時程是怎麼想的?我們看到一些關於時程延宕的提問。如果你們這裡有配合度高的公用事業架構,以及社區也支持這個專案,你們的客戶是否覺得有機會加快進度?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Yeah, that is a great question. I think, Susan, if you can opine on that.

    是的,這是個很好的問題。我想,Susan,你可以就此發表一下看法。

  • Susan Gray - Chief Executive Officer

    Susan Gray - Chief Executive Officer

  • Sure. Good morning. Thanks for the question, Mark. So, we are working really closely with our customers to understand their needs and to go as fast as they need us to go. That is why, as Dave mentioned, we have got a lot of options that we are evaluating to make sure that we can meet the timelines that come up. We have not had anything put in front of us yet that we cannot meet. Of course, with Project Blue, this first phase, we already have the generation available. And so, as we plan out the next sites, we would work really closely with the customer to make sure that we are bringing the new capability online to meet their needs.

    當然。早安。謝謝你的問題,Mark。就我們而言,我們正與客戶非常密切合作,以了解他們的需求,並以他們需要的速度推進。這也是為什麼如 Dave 所提到的,我們有很多正在評估的選項,以確保我們能夠符合出現的時程要求。目前我們還沒有遇到任何我們無法達成的要求。當然,就 Project Blue 的第一階段而言,我們已經有可用的發電資源。因此,當我們規劃下一些場址時,我們會與客戶非常密切合作,確保我們能把新的能力上線以滿足他們的需求。

  • Mark Jarvi - Analyst

    Mark Jarvi - Analyst

  • Is there any indication, Susan, that their timelines have changed, either accelerated or delayed?

    Susan,有沒有任何跡象顯示他們的時程有所改變,不論是加速或延後?

  • Susan Gray - Chief Executive Officer

    Susan Gray - Chief Executive Officer

  • We haven't seen necessarily a shift one way or the other. We are still negotiating further expansion of Project Blue. We almost got Copper World just announced that they are planning to be online later in our five-year plan. And we have got Cell 32 still moving forward on their original timeline. We have not seen anything shift one way or the other.

    我們不一定看到時程有往任何一個方向的變動。我們仍在就 Project Blue 的進一步擴建進行協商。我們也看到 Copper World 剛宣布他們計畫在我們五年計畫的後段上線。而 Cell 32 仍依照其原始時程持續推進。我們沒有看到有往任何一個方向的變動。

  • Operator

    Operator

  • Michael Lonegan, Barclays.

    Michael Lonegan,巴克萊。

  • Michael Lonegan - Analyst

    Michael Lonegan - Analyst

  • Hi. Thanks for taking my questions. So you raised your dividend 4% after also raising it 4% last year. You continue to guide a 4% to 6% growth, now extended through 2031. Obviously subject to Board approval, but just, what is your thinking? Could you expect the low end of this 4% to continue over the plan, or do you expect an increase in the rate of dividend growth? Anything you could say there, like you have a targeted payout ratio over time? Anything you could say there would be helpful.

    嗨,感謝讓我提問。所以你們在去年也把股利提高 4% 之後,今年又把股利提高了 4%。你們持續指引股利成長 4% 到 6%,現在延長到 2031 年。當然仍需董事會核准,但我想請教,你們的思考是什麼?在整個計畫期間,你們是否預期這個 4% 到 6% 區間的低端會持續,還是預期股利成長率會提高?你們是否有一個隨時間推進的目標配息率?任何你們能分享的內容都會很有幫助。

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • We haven’t got to the point where we’re putting out a targeted payout ratio. What we’ve always said for the last several years is, yeah, we’re targeting that 4% to 6%. We also want to make sure that we’re pulling our payout ratio down, and which we have pretty well over the last three or four years. So we’d like to keep nudging that a bit lower, but we don’t really have anything other than the 4% to 6% guidance on the dividend going forward.

    我們還沒有走到要公布目標配息率的階段。過去幾年我們一直說,是的,我們的目標就是 4% 到 6%。我們也希望確保把配息率往下拉,而過去三到四年我們確實做得相當不錯。所以我們希望再把它稍微往下推一點,但除了未來股利 4% 到 6% 的指引之外,我們目前沒有其他可補充的內容。

  • Michael Lonegan - Analyst

    Michael Lonegan - Analyst

  • Thank you. And then, in Alberta, obviously the third PBR term appeal was dismissed. I know the argument there was that the commission improperly based the capital funding. Just wondering, how are you feeling about the prospects in Alberta going further in terms of going forward, in terms of the regulatory environment, and do you have concerns about less than favorable outcomes in the future?

    謝謝。另外,在亞伯達省,顯然第三項 PBR 期限的上訴已被駁回。我知道當時的論點是委員會在資本資金安排上依據不當。想請問你們對於亞伯達省未來的前景感受如何,特別是就監管環境而言;以及你們是否擔心未來可能出現不那麼有利的結果?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • This is the beauty of our business model, is we have people in each of our jurisdiction to opine on exactly what’s going on in their neck of the woods, so I am going to turn that to Janine.

    這就是我們商業模式的優勢:我們在各個司法管轄區都有同仁能就當地正在發生的事情提出看法,所以我把這題交給 Janine。

  • Janine Sullivan - President and Chief Executive Officer

    Janine Sullivan - President and Chief Executive Officer

  • Good morning, and thank you for the question. Yeah, the outcome on the PBR appeal decision wasn’t entirely surprising. We felt it necessary to bring it forward to the court to have the discussion about how the plan was designed. But we had been prepared that this may be the way the court may align with the outcome of the previous decision of the AUC.

    早安,謝謝你的提問。是的,PBR 上訴裁決的結果並非完全出乎意料。我們認為有必要把案件提交法院,針對該計畫的設計方式進行討論。但我們也已經做好準備,法院可能會與 AUC 先前裁決的結果一致。

  • With respect to our relationship with the AUC, we have a very, very constructive relationship with the regulator. We are operating very effectively under the current PBR plan, and we’ve been in contact with them about how a rebasing opportunity might look and what the prospects for future rate-making might look like, whether that’s a continuation of PBR or a return to cost of service or what other regulatory approaches might be undertaking.

    就我們與 AUC 的關係而言,我們與監管機構的互動非常、非常具建設性。我們在現行 PBR 計畫下運作得很有效率,也一直與他們就「重新定基」(rebasing)的可能樣貌,以及未來費率制定的前景進行溝通——無論是延續 PBR、回到成本服務制(cost of service),或採行其他可能的監管方式。

  • So we are constructively and proactively having those conversations with them, and our relationship allows us to do that. There’s a lot happening in Alberta, certainly a lot of opportunities for economic growth. FortisAlberta operates in 8 of Alberta’s 10 fastest-growing communities, so we’re seeing a lot in terms of new load interconnections, large loads, commercial, industrial, and some data center.

    因此,我們正以建設性且主動的方式與他們進行這些對話,而我們的關係也讓我們能做到這點。亞伯達省有很多事情正在發生,當然也有很多經濟成長的機會。FortisAlberta 在亞伯達省 10 個成長最快的社區中服務其中 8 個,因此我們看到許多新的負載併網、大型負載、商業與工業負載,以及一些資料中心。

  • So on all fronts, I would say feeling very, very positive about the opportunities to continue to invest in a fairly large system that we have here. I mean, even to continue to invest in reliability and wildfire, new technologies to make sure that we’re leveraging the grid for affordability. Lots of prospects, lots of appetite to see us continue to do those things.

    所以在各方面,我會說我們對於持續投資於我們在此擁有的相當大型系統的機會感到非常、非常正面。我的意思是,甚至包括持續投資於可靠度與野火防護,以及新技術,以確保我們能運用電網來提升可負擔性。前景很多,也很期待看到我們持續推進這些工作。

  • The positive relationship with the regulator positions us well to do that, and we are more and more seen as a trusted advisor with the government of Alberta as they want to see these things happen in the province as well. Certainly partnering with them and the AESO to make sure that all of these things can occur.

    與監管機構的正向關係讓我們具備良好條件去做這些事;而且隨著亞伯達省政府也希望在省內推動這些事情,我們也越來越被視為值得信賴的顧問。當然也會與他們以及 AESO 合作,確保這些事情都能發生。

  • Operator

    Operator

  • Hannah Velasquez, JPMorgan.

    Hannah Velasquez,摩根大通。

  • Hannah Velasquez - Analyst

    Hannah Velasquez - Analyst

  • Hey, good morning. Thanks for the update. Just wanted to circle back on the TEP rate case. So, to the extent that the ALJ’s recommendation is tracking pretty closely to your original request, I know you had discussed in the past about potentially revisiting issuing EPS guidance. Is that still something that you would take a look at, or how are you thinking about that in relation to this rate case outcome?

    嗨,早安。謝謝更新。我想再回到 TEP 的費率案件。所以,如果 ALJ 的建議與你們原始申請相當接近,我知道你們過去曾討論過可能重新考慮發布 EPS 指引。這仍是你們會評估的事情嗎?或是就這次費率案件結果而言,你們目前怎麼思考這件事?

  • David Hutchens - President, Chief Executive Officer, Director

    David Hutchens - President, Chief Executive Officer, Director

  • Yeah, we still are considering that. One of the things that one of the prior questions was around regulatory lag associated with the next year and a half until the first adjuster goes into place at TEP. So, we’ll have to manage basically that timing, but it is something that we definitely consider.

    是的,我們仍在考慮。先前有個問題提到,直到 TEP 的第一個調整機制(adjuster)生效前,接下來一年半會有與監管時滯相關的影響。

  • Operator

    Operator

  • This concludes the question-and-answer session. I would like to turn the call back over to Ms. Amaimo for any closing remarks.

    問答環節到此結束。我想把電話交回給 Amaimo 女士,請她做任何結語。

  • Stephanie Amaimo - Vice President - Investor Relations

    Stephanie Amaimo - Vice President - Investor Relations

  • Thank you, Betsy. We have nothing further at this time. Thank you, everyone, for participating in our third-quarter 2026 results and new five-year capital outlook conference call. Please contact Investor Relations should you need anything further. Thank you and have a great day.

    謝謝你,Betsy。我們目前沒有其他補充。感謝各位參與我們 2026 年第三季業績與新的五年資本展望電話會議。如需任何進一步資訊,請聯絡投資人關係部門。謝謝,祝各位有美好的一天。

  • Operator

    Operator

  • This brings to a close today’s conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.

    今天的電話會議到此結束。各位可以掛線。感謝參與,祝各位有愉快的一天。