  • Niel Pretorius - CEO

  • Good morning, everybody, and thank you very much for taking the time to attend our results for the quarter ending June 30, 2010.

  • I think before we start the presentation, I think from -- there's just one item that I need to cover because it's something that I think deeply affected most of those of us who watched the news yesterday and this morning. And that is just to commiserate with the families and friends of the young schoolchildren who died in that dreadful accident in Cape Town yesterday. And looking at the circumstances it's just so unfortunate for something like that to have happened.

  • Turning to our presentation for the quarter, and while you consider the disclaimer, which I ask that you do, I think what I hope to convey to you, the message that I'd like to convey to you all today with regards to our results, is to hopefully, finally bring together the results that we present, the outcomes of our collective efforts as a management team, and the stated strategy of our company the way that we've been communicating it to you now for quite some time. And hopefully you will see both in respect of income statement and balance sheet how those results are slowly but surely starting to come through.

  • Our highlights for the quarter, we start off with the fact that we are very fortunate once again to be in the position to declare a dividend of ZAR0.05 per share. I think that is -- that represents earnings of about 1.5% to the share price.

  • Our operating profit was relatively flat at ZAR91.5m. In fact, there's a slight drop in operating profit. But as I go through the presentation I think you'll see where that comes from, what the main impacts were on operating profit for the quarter. Our headline earnings increased to ZAR23.9 per share and that works out to earnings of around 7%.

  • We are very fortunate and very grateful that we managed to see the quarter out without any fatalities. Blyvoor, I think, had approached is it close to 4m fatality free shifts with regards fall of rock and seismicity, which really are your environment-related fatality rate or safety rate. And I think they are proving themselves to become the safety benchmark when it comes to -- or the benchmark when it comes to safety practice in challenging deep level mining.

  • Ergo is slowly but surely lifting its head, it's getting where we want it to be. Obviously with some of the recovery issues that we experienced early on in this circuit it became necessary to overcome those. And the best way of doing that is by remaining volume-driven and managing costs. And as a consequence I think you will see that Ergo has opened up substantial margin. In fact, the margin at Ergo now is equal to the gold price about three or four years ago.

  • Crown and Ergo pipeline, we've been talking to you about synergies between our surface operations towards the Central and West of Johannesburg and those of our footprint in the Far East Rand. And that pipeline is going ahead. We've run the numbers. It's without a doubt a feasible project, a good project. And we've hit the start button on that one.

  • And then Blyvoor's trending is very much consistently towards becoming a more stable producer. There are certain very clear in our mind sustainability drivers. We focus on those, and step by step we are starting to achieve those as well.

  • You'll recall that Blyvoor was in distress last year after the wage strike. It went into judicial management, which is really the South African version of bankruptcy protection. It managed to trade itself out of that on time, within the time schedule that it had forecast, and it is now increasing the trending towards the stability that we wanted to achieve ultimately.

  • And then of course Zimbabwe, which is our exploration project. There we managed to increase our exploration area to 80%. In fact, it's increased slightly further in the last few weeks. And it occupies a footprint now which is capable of supporting a sustainable mine. And I'll talk you through some of the progress in Zimbabwe.

  • What we like to demonstrate through the presentation or through the course of every presentation are the trends, the key trends that determine where our business is going and where our management focus is taking it.

  • Our tonnes milled, you could see what's been happening to both underground and surface tonnes. You can see that surface tonnes are significantly increasing, and that is mainly as a consequence of increased tonnages of Ergo.

  • The underground tonnes are -- this is a scale that doesn't really tell the full story in so far as underground tonnes is concerned. But Blyvoor has trended from below 50,000 tonnes per month to touching 70,000 per month in the last two months. And this is one of its key sustainability drivers as far as we are concerned. It's the only way that you can address your unit costs affectively. At DRD we believe that the true measure of efficiency in the underground environment is rand per tonne, and Blyvoor has certainly, I think, has that firmly in its sights.

  • The yield gram per tonne from underground, it's the one item in Blyvoor's drive to stability and sustainability that's lagging, it's the underground grade. And that to a large extent is as a consequence of the way that we need to move our teams and our people around for reasons of safety, and also simply because of the manner in which we've opened up and developed that footprint.

  • Gold produced, we trended slightly down quarter -- between the December quarter and this quarter. And the circumstances which gave rise to those we'll deal with more fully as we go along. I think what is important though is to point out the trend between September '08 on surface and where we are currently at.

  • Cash operating cost rand per tonne, I said to you earlier, this is what we believe is the true measure of efficiency in an underground environment, also the surface environment, it's very sensitive to volumes, it's a volume-driven environment. And there you cans see slightly down, and then flattening out.

  • This, of course, is impacted in winter months particularly by winter tariffs. In the mining environment you don't only pay the increases that ESCOM announce from time to time. There are three months in every year where you pay winter tariffs, which add about ZAR8m to the bottom line costs per month for those months.

  • Cash operating cost, rand per kilo, there very much you can see in the underground environment the consequences of slightly lower grades and the winter tariffs. And in the surface operations then the impact of winter tariffs taking it back to where it was around about September. When we break up the different circuits I think you'll see exactly where the impact has hit hardest, and where we've been able to dilute it through additional volume and production.

  • Cash operating profit was steeply up from September through to December, and then very much between ZAR90m and ZAR100m for the remainder of the quarter. I think if you add up the month of winter tariff in this particular quarter you'll see that slight dip between March and now is to a large extend attributable to that. This cost us a little bit more to generate power into our operations that what it did in the previous quarter. We'll have two more of those in this quarter and then we go back into summer tariffs by the end of the quarter.

  • Right, the Ergo trends, Ergo has very much become the center of gravity of our surface expansion project where we focus most of our energy, most of our time. Most of the capital, in fact, all the capital as been spent in so far as the first phase of Ergo is concerned. It basically means that we now have two reclamation stations on the Elsburg dumpsite. The Elsburg site is now capable of delivering 1.2m tonnes of material per tonne into Ergo. And the actual Ergo capital associated with that circuit has been spent.

  • Further capital going forward is associated or is in connection with the connection of -- of the linking up rather of the Crown circuit with the Far East circuit.

  • So the margins that have opened up at Ergo now, the margins after CapEx are the margins that that particular portion of the circuit will continue to maintain going forward, having spent all of the capital necessary to put that in place.

  • Ergo volumes from March '09 through to where we are now you can see that those volumes have consistently trended upward. With the second reclamation station now installed at the Elsburg facility, obviously they can push their volumes beyond 1.2m and effectively manipulate at will the mix between the first site that they accessed, the Benoni Dam and the Elsburg site. So there's a large degree of optionality that has opened up at Ergo.

  • Ergo head grade, the head grade I think that you'll see here is an indicator of fewer volumes from the Benoni Dam. Benoni Dam is a dam with higher head grade but a much lower recovery rate. So that's the one factor.

  • The second factor is that we did open up all of the face of the second reclamation site. At Elsburg you have to cut an area open. It's about 30 meters high in order to start effectively reclaiming that site. And a lot of that material obviously is [sort] of under the higher portion of the tailings dam, which contains lower grades. And it was the site establishing basically that attributed to that.

  • But what you'll see when you look at the next slide it's notwithstanding the fact that there has been this temporary downward trend in the head grade, the recoveries in grams per tonne remain flat, which suggest that the actual recovery percentage, the recovery efficiency per circuit certainly improved over the last two quarters.

  • And there you can see basically stayed flat. Lower grades still gave us exactly the same yield in grams per tonne. And this has enabled Ergo to effectively open up the current cash operating margin that it's running at of roughly ZAR100,000 per kilo or $400 per ounce.

  • There gold produced, see this is a trend that we are very, very happy with. It tells us that Ergo is certainly pointing in the right direction.

  • Ergo costs, once again it's a trend that's certainly going in the right direction. ZAR20 per tonne to introduce Ergo materials into that plot. Ergo costs rand per kilo, where you can also see certainly trending in exactly the direction that we want it to be trending in.

  • Ergo margin ZAR100,000 a kilo at today's price. Looks as though it's definitely taken the bit between its teeth, the gold price, it seems to be on a bit of a rally. There are a variety of reasons for that. So it looks as though Ergo's picked the right time to starting peaking in the right direction. Now all we need to do is to teach the Springboks side to more or less simulate the Ergo trends as to when they need to peak.

  • Ergo margin dollar per ounce, see it's touched $400 and we are confident that we'll be able to maintain that for the circuit where it's currently at.

  • Right, we've been talking a lot about the Ergo Crown pipeline. We started the project. We've spend just on ZAR36m in the last quarter ordering pipelines. And we'll be ordering the rest of the equipment, pipes, so forth necessary for the pipeline and also the upgrading of the plant over the next few months. And we hope to complete this project by the end of next year. Then it will be fully operational and would have steadied by the end of next year.

  • But it effectively connects these areas here. That's where Soccer City is in the Far West Ran, our Crown plant, City Deep plant, the Elsburg slimes complex. And this is the route that the pipeline is intending to take. That's the Benoni slime sand that we first started to treat with high grades, but their recovery has just about finished now.

  • That's our plant and that's our tailings deposition facility, so 50 kilometers across the South of Johannesburg, Central and South Johannesburg to link these two up. We've run the numbers over a five-year period on this circuit combined, and we have an overwhelmingly attractive business model to support this investment.

  • All right, we thought we'd share with you the trends which we consider to be the key trends, taking Blyvoor towards sustainability. And these are particularly underground trends.

  • Blyvoor has to become a more volume-driven and volume-focused mine simply because of the fact that the areas where the high grades are situated are also the more challenging areas to mine.

  • So a lot of time, a lot of effort is going into opening up and development and mining more tonnes. And there you can see a very positive trend towards the end of the year of the face length that's in fact available to be mined at Blyvoor. And this will continue to trend exactly the same direction going forward.

  • On a quarterly basis we assess the ratio of square meters mined and meters opened up and developed. There's a very clear relationship between those two, and we are keeping close track of those.

  • In situ per capita efficiency, what we've done is reduced the number of service employees and maintained the number of in-stope employees. And as a consequence you'll see an increase per capita as a whole. But we are also seeing an increase in per capita output in respect of in-stope employees, and there you can see where those numbers are trending. Every in-stope employee is giving us just under 20 square meters per month up from -- it's actually up pretty -- quite a lot if you look at where we were in January of this year.

  • There we go, reef tonnes broken, if ever there was a trend that suggests that they slowly but surely are getting their story sorted out then this is it. As I said to you earlier what is lagging though is grams per tonne. But Blyvoor if it wants to make it through further challenging times it's got to get its volumes sorted out. And this is what they are doing.

  • Gold broken, you can see that's also on the increase, obviously it's now getting the gold out and processing it through the plant. There is about a three week lag from breaking it underground to actually recovering it in the plant itself. So some of the ounces that we liberated underground only started coming through in July and early in August. But this is certainly also an encouraging trend for Blyvoor.

  • Craig will take you through the operational review, the financials and also the reserve and resource statement.

  • Craig Barnes - CFO

  • Thank you, Niel. Good morning, ladies and gentlemen. Blyvoor's operational, sorry -- let's just get back there. Blyvoor's operational review for the quarter, what we can see for the quarter is Blyvoor's volumes picked up quite nicely with a recovery at the No. 5 Shaft, which was impacted by seismicity in the last financial year and that recovery continues.

  • The surface, there was a decrease in their surface gold production and that's mainly as a result of the lower grades achieved at the No. 4 Slimes dam. If you look at the gold produced for the quarter it was 7% down, and that was due to the fact that there was a drop in underground production of 2%, and also a drop in surface production of 23%.

  • The volumes -- the drop in production at Blyvoor's underground was as a result of mainly the drop off in grade of 12%, which was offset by the 11% increase in volumes from underground. And as I mentioned the surface gold production at Blyvoor down 23%, and that's mainly because of the lower grades being recovered at the No. 4 Dam.

  • The total cash operating costs increased significantly 24%, and that's a function obviously of the drop in gold production and also the higher electricity costs during the quarter.

  • Notwithstanding the drop-off in production and also the increased costs, mainly because of electricity prices, they managed to achieve a ZAR4.6m operating profit for the quarter.

  • On Crown you'll note that we've included Cason, the Cason operating segment under Crown for reporting purposes. Comparatives have been restated as well to show that. We also see at Crown during the quarter an increase in CapEx and that's basically because of the Crown/Ergo pipeline which has commenced.

  • Their production increased by 1% during the quarter. And that was mainly as a result of increased volumes of 6% during the quarter, offset slightly by a 4% reduction in grade. And you can see the cash operating costs were also impacted by the ESCOM electricity costs. They managed to achieve an operating profit for the quarter of ZAR55.1m.

  • On Ergo, as Niel mentioned, volumes stabilizing with the second Elsburg line that's been completed. And as a result, also an increase in production, recoveries are improving although you can't really see it because it's such a small number. They basically were maintained.

  • And the margin has increased to around about a 32% margin or $400 per ounce during the quarter. And there is continuing research and development to try and resolve the grade issues and trying to improve recovered grade at Ergo. So their production for the quarter was 11% up. And that was mainly as a result of the increased volumes of 4%.

  • The cash operating costs, there was an improvement in the cash operating costs, and that also reflects obviously the increase in production. And they managed an operating profit for the quart of ZAR31.8m.

  • Moving onto the review of the income statement for the quarter, revenue basically remained pretty flat. The decrease in gold sold in the quarter of 8% was obviously offset by the higher -- the 8% increase in the rand gold price.

  • Net operating costs, in that number is the cash operating cost number. That increased by 9% during the quarter. And then as we said mainly as a result of the increased -- the 25% increase in electricity tariffs which commenced, I think, beginning of March. And also the higher winter tariffs which they experienced for one month in June. Now that will obviously -- the higher winter tariffs will obviously flow through to the next quarter for July and August.

  • Also in the operating -- there was also an increase in operating costs due to higher volumes, specifically at Blyvoor. And that resulted in an operating profit for the quarter of ZAR91.5m compared to ZAR96.9m in the previous quarter.

  • Just some other numbers I want to highlight there, the depreciation number obviously increased due to, if you have a look at our balance sheet you'll see our property, plant and equipment number has increased. And that is a result of the acquisition of Ergo, the remaining 50% in Ergo. So there we've seen a pickup in depreciation because of that.

  • In the other income and costs number you'll see that's quite a large credit, and I want to highlight two numbers that are sitting in that number. The one being the movement in the rehab provision during the quarter of ZAR110.9m, which was a credit that came through, and a reduction in the environmental rehab provision.

  • And then the other big number sitting in that number is the realization of a foreign currency translation reserve which relates to our offshore subsidiaries, which are holding companies of some of our offshoring business, which were liquidated during the year and resulted obviously in a disposal and a realization of that foreign currency translation reserve.

  • This resulted in a profit before tax of ZAR290.9m for the quarter compared to ZAR17.6m in the previous quarter. The tax number includes a ZAR12.4m credit for income tax and a deferred tax expense of ZAR55m. Ended with a net profit of ZAR247.9m for the quarter compared to ZAR12.3m in the previous quarter.

  • On the balance sheet, as I mentioned, the increase in property, plant and equipment you can see that on our balance sheet. And again that's mainly as a result of the acquisition of Ergo, the remaining 50% of the Ergo JV.

  • Some other numbers to highlight in there, obviously the cash number there's a slight decrease I think it's about ZAR13m in the cash number on our balance sheet.

  • Again just to highlight the long-term liabilities is no interest bearing debt. That's -- those numbers or the numbers contained in that long-term liability number include the liability for the pref shares that our [BE] partner holds as well as some post-retirement employment benefit provisions. And then again the current ratio is still maintained at 1.5.

  • On our attributable reserves -- I see it looks like there's a problem with the slide there, but reserves basically increased by 21% during the quarter to 7.3 -- I mean in the year to the end of June by 21% to 7.3m ounces. And that was as a result of obviously higher gold price that we are using in our reserve and resource estimations.

  • And there was also an increase in Crown's reserve, which is basically unlocked because of the building of the -- or the commencement of the Crown/Ergo pipeline.

  • And then just the same with the resources, there was a 6% increase in resources to 60m ounces, and you can see how those are broken down between the various operations. I see that one is working.

  • And then [we have] this is just a split between our surface and underground reserves and resources. You can see that our surface resources -- our surface reserves are 30% of the total reserves 2.2m ounces and that the resources are 16% of total resources, at 9.8m ounces.

  • Thank you. I'll hand you back to Niel to finish off the presentation.

  • Niel Pretorius - CEO

  • Thank you, Craig. So a small update on what we've been doing at Zimbabwe. Our claims, as I intimated to you earlier, has increased in number to 46. The IP survey that we conducted during the course of the quarter had shown us a very clear set of anomalies underground. It's almost in a Y shape. We came to the conclusion or we saw that that the -- what seems to be the point where these two features merge fell just outside of our lease. A few weeks ago we applied for an increase to our claim. So the next quarter there will be an update on this and you will have seen that our claims have further increased, or the site has further increased.

  • We've identified three targets where drilling is proceeding. We started drilling this week, in fact. And we hit hard rock at about 80 meters underground. We are planning to do limited gold recovery during this exploration phase. It will really just resemble mass sampling, so to speak, and mostly also through gravity-based technology. We won't have anything chemical on site just yet.

  • Up until now we've spent ZAR5.2m. We intended to spend for the year just under ZAR8m, ZAR7.5m, ZAR8m, and we are getting to that point. But most of the news that we're getting out of Zimbabwe is good news.

  • We thought that we'd also share with you some of the sustainability endeavors of our Company, of economic development and corporate social investment. We're required to deliver into a three-tier bottom line. And this has become part of our core focus.

  • I think you will see that quietly DRDGOLD has been increasing its involvement in the communities where it functions. It's set up what I believe is a very dynamic training center or academy, a ZAR5m capital investment. We currently have 254 students enrolled. And they're doing a variety of courses, from information technology, health services, metallurgy, literacy, engineering. There's in fact also a course on entrepreneurship, how to set up a business and how to run that business. And we increase to extend the range of activities and the range of courses that this academy offers.

  • We have a number of high-powered partners. And it looks like we may get some more on board, some of the big banking institutions in South Africa, and so forth. Some of the more prominent chemicals companies have asked us to assist them with verification or accreditation of their artisans, all of 3,000. So these are the things that this academy is slowly but surely doing.

  • It was established with a focus of ultimately becoming a self-sustainable business, an institution of learning. What we also want to increasingly do is roll out its activities to provide classes to the surrounding communities, to school children, specifically focused on math and science and accountancy. Simple fact of the matter is that the demand locally in South Africa is just so big that government will never be able to, on its own, turn around the literacy levels and the training levels in South Africa. And if we want to grow this economy, if we want to grow this democracy, we all need to get involved. And hopefully, in its own small way, this academy can increasingly start playing a role in that regard.

  • What we've also been doing is involving communities in projects, aimed at assisting them to get financially on their feet. We have two hydroponic farms, one at Blyvoor and another one on the East Rand. We've spent ZAR13.6m on these. Ultimately these too need to be self-sustainable. The kind of support that we provide is financial. Our managers set aside some of their time. We also provide logistics and infrastructure. And we also get involved in sports teams and that sort of thing.

  • What we do want to focus on going forward over the next few months or over the next year is for every unit manager, for every business unit to determine what its area of influence is and to start assisting with sewerage and refuse services in that area; not installation of services, but providing logistics and infrastructure and equipment for those communities, mostly in informal settlements, to start doing something about their refuse and start doing something about their sewerage, because I'm firmly of the belief that if you live in your own refuse, then you are not going to be able to lift your head. There's a certain dignity issue involved here and we need to help them with this very basic issue. And then hopefully we can start, slowly but surely, uplifting those communities. And some of the individuals, high-capacity individuals, could come through.

  • I saw the most unbelievable program yesterday about a gentleman who lives in an informal settlement up in the northern area, towards Limpopo. Couldn't find a job. And then basically decided to, out of his father's shop, start a recruitment agency. And he's placing that entire area, people in that entire area, he's placing into places like [Kibbutzkru] and [Vigotolsen Resorts] and so forth. He's found jobs for 3,000 people.

  • And maybe somewhere, in some of these informal settlements around our areas, there are people with a similar sort of ambition, a similar sort of capacity. Maybe all he needs is just that one little thing to trigger. Take away a bit of the squalor, help him to lift his head, and maybe we'll just unlock some remarkable talent. And I think that's the sort of thing that DRD increasingly wants to be remembered for.

  • Right. We've been speaking about delivery on our strategy. We have a three-tier strategy of reducing risk and managing our way away from risk, sustainability and so forth. And I thought what we'd do this time around is just to show you how some of these strategies are slowly but surely starting to come through in both the balance statement, balance sheet and also in the income statement. There will be questions no doubt asked about where does this operating profit come -- where does it come from, the big jump, and it is a big jump, ZAR250m operating profit attributable in part to items that may be considered to be non-cash items.

  • Simple fact of the matter is that the DRDGOLD team has dedicated itself now for a substantial period of time towards the reduction of risk and tying up loose ends. If you've finished somewhere and there's some loose ends, we go and we tie them up; we need to clean them up. Transfer risk, reduce risk, don't allow an offshore structure to just putter along and carry liabilities on your balance sheet.

  • And what you've seen in our income statement this quarter is not an opportunistic or a coincidental consequence; it's the consequence of three or four years of dedicated effort to start trading the business further and further away from risk. We report our financials under IFRS. And if we apply those accounting standards to the activities and the outcomes of our business over the last quarter, then that is the outcome. And we're not going to apologize for it, because these are not coincidences. These are the consequences of concerted efforts on the part of the DRDGOLD management team. You can see that we're still debt-free and we still have a healthy current ratio.

  • We've also been focusing increasingly on lowering costs. And I think you can see, by looking at the training in our operations, what sort of focus has gone into that. A highest-volume producer, highest-volume circuit, consistently reduces its costs quarter on quarter. And one of the items that I present to my Board on a quarterly basis is the performance of every circuit to budget in respect of costs. And I can tell you that every single circuit in our operation beat budget in respect of costs for the last financial year.

  • There are a lot of things that we, as managers, cannot control. We cannot control the exchange rate. We cannot control the gold price. We don't tempt fate and mining circumstances that are unsafe. If our seismicity monitoring network suggests to us that certain areas are becoming unsafe because of a buildup of pressure, we move our people away, regardless as to how wealthy or rich that particular area is. Those things we can't manage.

  • But there are certain things that we can manage. And cost is one of those things. And we are consistently beating our forecasts through the focus and dedication of our operating personnel.

  • Our annual cost increase, 7%. That is significantly below the industry average, also considering what sort of cost dynamics we had to endure and absorb into our operations. And whilst we're the first to accept that the ore body that we're mining, mainly these tailings dams, are low in content, gold content, it's become, slowly but surely, it's become the lowest cost-per-tonne producer in South Africa. And I think there's significant de-risking in that as well.

  • Delivering on strategy, increasing margin. Both our surface circuits running at 28% and 32% respectively. Ergo has not yet arrived; I think I just need to clarify that as well. If you look at the recoveries that we're seeing at Ergo, in the actual gold that we're extracting from our ore body, from our material, it's lower than what we had anticipated when we embarked on this project.

  • It was a concern to us, the concern being that perhaps the material was incapable of relinquishing a larger percentage of its gold content than what we were achieving at the time. And as a consequence we built a pilot plant; we've told you about the pilot plant. And we've run a variety of tests through that pilot plant under controlled circumstances. And we are achieving higher margins in that pilot plant.

  • So I think a big reassuring factor to us is the fact that it's become clear that the material is in fact capable of relinquishing a higher percentage of its gold content. What we now need to do, what we need to achieve going forward is to simulate that which we're achieving in the controlled environment of a pilot plant in the mega-volume environment of our plant. That's the one thing, using the same technology.

  • Obviously the second big thing I think for us at Ergo would be if we can achieve that technology or scientific breakthrough of reducing our tailings residues from the 0.2 or the 0.18 that we're targeting, to about 8.1, because that, we believe, we'll achieve without a significant increase in cost. And the day that we achieve that, the sky is the limit.

  • And to you who've been looking for the optionality in surface reclamation, that is the optionality. We know the gold's there. The optionality lies in finding the technical, engineering and scientific solution to unlock it. And it can happen in a year or it can happen in five years. There's no doubt in my mind that it will happen because there is vast upside in achieving it, it's just when is it going to happen. We will call that surface reclamation optionality for lack of a better description.

  • Right, so looking ahead, I've covered most of this, we are phasing out the Benoni Dam, which was a very steep learning curve for us, the complexities of mining a second-generation tailings dam. We are continuing with R&D along the lines that I suggested to you earlier.

  • Blyvoor, we will continue on increasing face length optionality. Face advance will remain a key factor for us. We will try and maintain current ratio -- productivity per capita upward ratios. Mix management is important, because we obviously not -- the ore body doesn't have a consistent gold content all the way through. There's certain high-grade areas and low-grade areas. And we'll feed the circuit with those areas that pay the bills. And obviously we want to have greater exposure to those areas that represent the cream on top. And then, of course, also managing grade, the geology of this circuit.

  • And at Crown, in all honesty, the pipeline, the construction of the pipeline will now continue.

  • Right. Those are our results for the quarter. Thank you very much for listening. Once again I'd like to thank all of you for attending. Special thanks to our friends from the Far East, [Robin] and [Patrick]. Very welcome to you as well for taking the trouble to attend today. And we will take your questions now. Thanks very much.

  • Allan Cooke - Analyst

  • Hi, Niel. It's Allan Cooke from JPMorgan Cazenove. Just two quick questions. Can you just update us on the CapEx that's required for that Crown/Ergo pipeline and the timing that it'll take to complete that very long pipeline?

  • And then also you're doing a lot of work now and Blyvoor's looking better, but over what timeframe would you envisage the underground operations ever becoming breakeven or cash flow positive, excluding the surface contribution?

  • Craig Barnes - CFO

  • Yes. I think I'll deal, Allan, with the capital question. I think we're looking at just over ZAR300m that we budgeted this year for the pipeline. And completion of the project, and correct me if I'm wrong, Charles, but I think it's August 2011, so a year from now.

  • Then the other question?

  • Niel Pretorius - CEO

  • Yes. Allan, our budget suggests that Blyvoor should lift its head towards the beginning of 2011, the underground circuit. And it's very much a matter of grade. If the grades get to closer to -- the recoveries get to closer to 4 grams a tonne and the gold price does not go down, then it should start lifting its head by then.

  • But I think one needs to be realistic about Blyvoor as well, and that it's always going to be a marginal mine. It's always going to be a high degree of volatility risk. But what we've demonstrated is that it's very much a ring-fenced risk. Last year, in October, when we came out of the strike and when the grades were really low because of the damage that we had suffered to some of our higher-grade areas, and the risk arose that Blyvoor could cause the collapse of DRD as a corporate entity, it was placed in judicial management. And we will continue to manage it from that perspective.

  • And the management team, I think, appreciates the fact that we have to be a little clinical about that. So there's, on the one hand, there's the full support from the corporate setup, from DRDGOLD corporate, to assist with capital, to assist with whatever assistance we can provide to make sure that the team stays intact, because it's all about the team at this stage. But then on the other end, the reverse side of the coin, there's also the realization. And it might sound a little clinical, but it's very much a realization that the Blyvoor risk is a ring-fenced risk. And we can only allow it to deteriorate, if it does, up to a certain point before it may again undergo a change in status.

  • The upside, of course, is that whilst the Blyvoor risk is a Blyvoor risk, the Blyvoor upside is in fact a DRD upside. So with a gold price of ZAR325,000, DRD benefits handsomely from Blyvoor. With a gold price of ZAR250,000, Blyvoor unfortunately faces the prospect of a change in trading status of a judicial management. So that's basically how we try and balance the risk and the upside.

  • And the Blyvoor General Manager and his team are both here. They're all here today. And I think if you look at the way that they've planned their budget, if you look at the way that they've planned their capital, the manner in which they deploy their resources, then the Blyvoor team are far, far from throwing in the towel. They believe that they do have a sustainable business. And if they continue to do the right things for a long enough period of time, then it will become a sustainable business. And I think that, at this stage, is probably Blyvoor's biggest asset, is the fact that is has a very dynamic and a very focused management team.

  • Jonathan Faurie - Media

  • Hi, Niel. Jonathan Faurie from Mining Weekly. If you guys had no fatalities over the quarter, does that mean that your LTI [following] safety aspect has dropped? And, if so, can you give us a percentage that it has dropped?

  • And then if you could just discuss what about Zimbabwe has really attracted the Company's interest? Is it the low gold trends that you can open up surface operations or is Zimbabwe just opening up as a potential place for you guys to open up business, on a business-wise?

  • Niel Pretorius - CEO

  • What we're seeing, what we're witnessing is that the number of increases, the number of injuries do in fact increase as we get more involved in the high-grade areas, because geologically those are the more complex areas. And in fact we had an incident early in this quarter which had led to a fatality. We're not convinced that it's a mining-related fatality. I think the jury's still out on that because it's one of our colleagues who passed away several days after the injury. And first inspection and subsequent medical examination suggested that these were non-fatal injuries; they were in fact lacerations.

  • But yes, the -- I think as we -- the more we take exposure to the more controversial areas, there's always the risk of higher -- an increased risk on injury, which we manage by way of the rate of advance in some of those areas and by simply avoiding some of those areas altogether.

  • The actual trending we'll give you the full details of. We, in fact, do give some indication in the report to shareholders, if you just want maybe to have a look there. It will always remain a high-risk environment. And I think we will always err on the right side of caution.

  • Insofar as Zimbabwe is concerned, we visited Zimbabwe. I think if you rely solely on what you read in the newspapers and in the reports of people who monitor the political situation, then you would probably not go into Zimbabwe. You would probably not venture into Zimbabwe. But Zimbabwe took a decision last year, or earlier this year, rather, to introduce a dual currency or a new currency, the rand and the US dollar. And I think whilst the machinery, the government machinery is taking a little bit longer to lift its head and start getting going again with regards services and infrastructure development and that sort of thing, the entrepreneurial mood and entrepreneurial culture in Zimbabwe is very much alive and is certainly trending in the right direction.

  • Zimbabwe stopped exploring for minerals before the start of the Second World War. And we just never believed that a country which is this close to the richest gold deposit in the world would not have something similar. And remember that mining in South Africa a century ago wasn't two and three kilometers underground; it was a few meters underground. So we thought that if you want to go into an environment where most of the people are very well educated, where they're very happy to see you because they are hungry for foreign direct investment on the African continent, where you can drive over tarred road very close to where your resource is. And it's a resource that is virtually untouched; it's greenfield and very near to surface, then Zimbabwe's a very good jurisdiction to go into.

  • It's not like some of the other countries where they've had a civil war for the last 20 or 30 years and you've got to find your way, on muddy roads, through land mines. Zimbabwe is a country that really came to a standstill economically and commercially because of policies regarding the redistribution of agricultural land and so forth, and that set the whole thing in motion. Clem Sunter in fact has a very good graph where he demonstrates exactly how these things happen.

  • But we're not going to wait for the government to sort things out, because we believe it's inevitable that they will. The ordinary Zimbabweans will not go back to the regime where they once were, because there was nothing for them. And people who were wealthy became very poor overnight. They're very much trending in the right direction. And I think they're taking their government with the, regardless of what the government sentiment and mood is.

  • Obviously one has to be realistic about the fact that government still has the ability to implement legislation that would limit the amount of upside that you can actually expatriate. But we went in there with the mindset of we're going to find a partner and have a 50/50 percent partnership as we go along, and that we were not going to buy assets, but we will try and obtain assets through our partner, and that we will limit the amount of capital that we spend so that the capital is not disproportionate to the risk that we take exposure to.

  • And I think our timing was right, because Zimbabwe now is a lot better than what it was when we started out there first. The road -- is Kevin here? Yes. Kevin Kruger is in charge of our operations. And he'll tell you that the road between Harare and Norton, where our operations are, is in the process of being changed into a dual carriageway. So there's definitely infrastructural investment going on there as well.

  • And I'm just -- there's a lot of people in South Africa, and one in particular whom I believe is a very good trendsetter, follow him and you follow cash flows, and that's the CEO of Checkers, Mr. Basson. If he builds a shop somewhere then it's not a bad idea to just go and look around and see why is he building his shop there, because he won't be building shops unless there's cash flow. And he's building several there. And I think he's led the charge into Zimbabwe.

  • So we think our timing is right. We think the political risk is a diminishing risk. And we do think that we will soon be building mines in Zimbabwe in an environment where the sovereign risk is a tolerable one. The upside potential is enormous because since, as I said, since before the Second World War, they've been farming there; they haven't been mining there. And it's just so exciting to find these ore bodies so close to surface that have a gold content which is far higher than anything that we see in the underground environment here.

  • All right, well, thank you very much. We'll be around here for a little bit more. Were there any questions from our webcast that we haven't answered through the presentation? Well, thank you very much.