  • Niel Pretorius - CEO

  • Good morning everybody. Thank you very much for taking the time to attend our results presentation, our interim results. I think what Craig and I would want to share with you today is really the cost trends, the production trends, the status of Blyvoor's judicial management. And also some perspective on the strategic growth plans and the expansion plans that we have locally.

  • It has been a very good quarter for us, a very encouraging quarter considering where we were a few months back. The September quarter ended poorly for us. We were still in a labor strike at the time when it ended. We have recently also lost various of Blyvoor's higher grade panels and we recorded for the first time in many periods, we recorded a loss.

  • And I'm pleased to able to report to you that we are back in profit. We showed a handsome net operating cash profit. This is attributable in part to an increase in gold production, mainly because the Ergo trending has been very encouraging in the last few months.

  • We also saw significant savings in costs across our operations. We saw a nice increase in the grade trends at Blyvoor, also towards the end of the quarter. We came out of winter tariffs, so electricity costs were down as well. And then of course the gold price was also significantly higher; 12% increase in the gold price. So all of that contributed and assisted us in reporting a cash profit for the quarter.

  • Our strategy implementation is on track. We had roughly ZAR500 million worth of corporate activity in the last few months, involving various transactions that I will take you through as we get there. We are now reporting 73% of our gold production from our surface reclamation circuits. We've seen positive trending in Ergo, Blyvoor stabilizing and also getting closer and closer to our strategic goals.

  • Talking to you a little bit about the trends. We decided to put these up here just to give you an indication as to what the various dynamics and contributors are in our results. The tonnes, as you can see, from our surface operations trended slightly upwards and then settled at about 1.8 million tonnes per month.

  • And then we also saw a nice little uptick in the underground tonnes from October where it hit an all-time low during the strike action, and then trending it back to just below 60,000 tonnes per month in December.

  • I think that is significant, taking into account also that December is our Christmas break month, and we did see an increase month-on-month in December. So we saw some good discipline and commitment coming out of the underground operations during December.

  • Gold production also trending nicely upwards, from the lows in October and recovering nicely towards the end of the quarter, and also healthy trending in the surface circuits, mainly because of Blyvoor -- because of Ergo starting to perform closer to the specification. We've got some way to go at Ergo, but at least the trending is continuously in the right direction.

  • You could see what the yield's been doing, underground in particular. That it is trending upwards and we have in fact now, in the last month, finally managed to get through 4 grams a tonne and still improving.

  • So I think the expectation that we set out there, that we place out there in the market, when we placed Blyvoor under judicial management, that this was a time-out period. That it was necessary for us to preserve the business, make sure that it's protected against hostile creditor action while it was finding its way back into the higher grades where you could see the trending in its recoveries. And it's still improving, back to where it needs to be by March.

  • I think we are still very much on track to have Blyvoor lifted from judicial management by March, if nothing untoward or unsuspected were to happen. Trending patterns are certainly going in the right direction.

  • Cash operating cost per kilo. I think the picture there tells it all, with very high costs in underground during the strike period. We hardly produced anything then but still had costs other than labor costs, which was on a no-work, no-pay basis. And then we're also seeing our surface costs trending down quite nicely and I think we averaged just below ZAR180,000 a kilo on the surface kilos that we produced during the quarter.

  • Cash operating cost, the split. We decided to include this because we think more and more of the funds and analysts are concerned about the impact that labor, the impact that electricity and the impact that water is going to have going forward on our costs. So here's a bit of a breakdown, expressed in cost per kilo, of the various components. And you can go through those at your leisure.

  • As you could see, the highest component in the underground environment is labor. It looks slightly in the surface reclamation side. The source is pretty much on par, a bit of an imbalance or a disconnect on the electricity side. Water is pretty similar.

  • And then Other costs in surface is a little bit higher. We'll give a better explanation of Other in presentations going forward, because a large percentage of Other is in fact contractor costs. All the reclamation is done by contractors, by Fraser Alexander Tailings, as well as the maintenance of the Tailings' disposal facilities. And that is a big enough number to really report independently and you'll see that also in future presentations.

  • Here's the pie graph, just giving you a breakdown on the actual cost per kilo. Every kilo of gold that we produce, how much we spend in respect of the various components.

  • Everybody is concerned about the effect that electricity is going to have. I think Graham Briggs also spoke about that in his presentation last week, or was it earlier this week. Obviously it is a concern and one needs to manage one's business around that and make sure that the exposure that you do take is minimized.

  • Cash operating cost, rand per tonne, also trending down quite nicely at the underground circuit, and pretty steady at our surface operations. In fact it did go down slightly with the higher tons that we're producing but the number is so low on this graph that the trending is not clearly visible.

  • Ergo trends. Ergo has become the center of gravity of our surface operations and as a consequence, it's important I think that we report on these on an ongoing basis, and we'll continue to report these Ergo trends until we hit the target, insofar as our efficiencies and yield are concerned.

  • You can see that the gram per tonne yield has gone up; we finally did manage to get through the 0.1 gram a tonne. And we want to see if we could get closer to the 0.13, 0.14 in the foreseeable future. And this would not be based just on the recovering efficiencies, but also in the mix of the materials that we're putting through that plot.

  • Ergo spent a bit of money in the last few months building a booster pump, and also some additional piping infrastructure in order to increase the volume capacity or the volume flow, from its Elsburg Tailings dam. It's a material that shows better efficiencies; it's of a lower grade, the volume, or the gold content in the material is slightly lower than the Benoni material, but we are recovering more of the gold in that material.

  • And as a consequence, as we increase the volume flow from Elsburg, you'll see further trending in the right direction.

  • Volumes trended up and then came down slightly during December. This is both as a combination of maintenance during that period, and also the rain storms that we've had. It's probably been one of the wettest seasons that we've had in decades, if not more. And obviously with lightning in the air, you pull your people off the tailings dams.

  • That's the one really significant safety risk that you have with the reclamation setup, is that people get hit by lightning on the tailings dams, on the reclamation sites. And it also has an impact on your density, so a little bit of tweaking is necessary after every significant rain storm, before the volume flows recover to where they need to be.

  • The trending is back where we want it to be in the current month, so the engineering and the capacity of our layout are such that we can achieve the volume trends that we give guidance on.

  • Actual gold production. This slide is significant, and I might flip back to this one. The fact that our kilos have gone up, whilst our grade that we put into the plant has in fact gone down. And that demonstrates I think the difference in the recovery efficiency between the Elsburg material and the Benoni material now that we are increasingly becoming more biased towards the Elsburg materials.

  • Here you can see the head grade going into the plant. Whilst the head grade went down, and the tonnes were slightly down, the actual gold production went up. So the efficiency characteristics or the reclamation, the recovery characteristics of this material is, without a doubt, better and more favorable than that which we experienced on the Benoni dam. The Benoni dam being a second generation dam.

  • Ergo costs settling down at about ZAR23 a tonne.

  • Then just going into the actual operational review. Blyvoor, as you can see, the gold production went down as a consequence of just coming out of strike action, and then also the -- still battling with slightly lower grades.

  • What this graph doesn't show you though is the very nice recovery that we saw towards the end of the quarter, and the revenue line breaking through the cost line, cash operating costs, towards the end of the quarter.

  • So by December, Blyvoor was back in profit, and in fact made a profit after CapEx, so Blyvoor did not burn any cash in December. And it looks as though that pattern has continued through January; we haven't had that confirmed but we saw pretty similar patterns for the month of January.

  • Crown; production went up, and obviously with the increase in the gold price, its profits also went up towards the end of the quarter, and it gave us a very nice cash operating profit of ZAR40 million, or just under, and a 20% increase in profit.

  • ERPM. The ERPM is really at this point in time the mining of the Cason Dump. We accounted to ERPM because of the different entities, but it is a dump that is being mined through Crown's nice plant. Here you can see slightly downward trending in production. It was pretty much a volume issue if I'm not mistaken, but still a handsome profit, still returning ZAR18 million to the -- or contributing ZAR18 million to the profit bottom line.

  • ErgoGold. I think we're all very happy that at ErgoGold the yellow line has finally gone through the black line. We had some nervous moments a few months back, especially when we couldn't really figure out what the issues were with regards the recoveries. At one stage, we were recovering less than 25% of what we anticipated. So it's very nice to see this trend, and also nice to witness the trend continuing. And Ergo gave us a cash operating profit of just under ZAR14 million for the quarter.

  • Now Craig will take you through the financial review, income statement and the balance sheet. Thank you.

  • Craig Barnes - CFO

  • Thanks Niel. Good morning everyone. Our income statement for the quarter; you can see that our revenue was up 12% quarter-on-quarter, to ZAR499.6 million. That was as a result of the 12% higher rand per kilogram gold price.

  • Our net operating costs were down on the previous quarter. In fact our cash operating costs were down 4%, and that was as a result, as Niel said, of going back into some electricity tariffs in this quarter, as well as the restructuring at Blyvoor and also the strike action at Blyvoor. This resulted in an operating profit of ZAR87.4 million for the quarter compared to a loss in the previous quarter of ZAR4.2 million.

  • The finance income number there's all interest received on our cash. That obviously has come down because of the cash balance reducing towards the end of this quarter.

  • Retrenchment costs of ZAR18.1 million include retrenchment costs for Blyvoor, the Blyvoor restructuring. Also the finalization of retrenchments at ERPM, and we also had some retrenchments at our corporate office.

  • Other costs. The main number in there is admin and other general costs, as well as interest paid included in that number. You can see that also came down. That left us with basically a break-even for the quarter compared to a ZAR97 million loss before tax in the previous quarter.

  • The tax number there's a credit of ZAR6.3 million. That includes a current tax expense of ZAR7.7 million, which all came from Crown. And deferred tax of around ZAR14 million from some of the other operations -- a deferred tax credit.

  • That left us with a net profit after tax of ZAR6.4 million compared to a net loss in the previous quarter of ZAR63.3 million.

  • On the balance sheet, you can see that our balance sheet still remains pretty strong. We still have a significant amount of cash, amounting to ZAR162.8 million, at the end of the quarter.

  • Important as well to note that we don't have any long-term borrowings, or any long-term debt on our balance sheet. The long-term liabilities there are basically the preference shares from our BEE transaction as well as employee benefits provisions. And the current ratio's still pretty healthy at 1.4.

  • Okay, that's all I've got, so back to Niel for the rest of the presentation.

  • Niel Pretorius - CEO

  • Thank you, Craig. As I mentioned earlier, we had a total of transactional corporate activity of round about ZAR500 million in the last few weeks, involving a disposal of 60% of our stake in Blyvoor to the recently established Aurora company. This transaction involves a cash payment of ZAR296 million as well as funding of ZAR80 million over the next few months, up until June.

  • The transaction will be finalized by the end of June, that's when we get our check. Up until now, Aurora has paid the ZAR10 million deposit, which is held in trust pending the signing of definitive agreements. We exchanged heads of agreements during the previous quarter, and definitive agreements are being drawn up by our attorneys. So ZAR10 million is being held in trust, as well as a further ZAR10 million towards the funding undertaking that they have given.

  • Aurora undertook to provide rescue funding, so to speak, as and when required. There was no need for us to draw down against that during December and January, but this fund is being established and being grown as we go along. And as and when we draw down from this facility, and it'll probably happen round about the time that we apply for Blyvoor to be lifted from judicial management, we will just give further information to the market. We will just report further on that.

  • Aurora also wanted to acquire bits of infrastructure and pieces of ERPM. It became apparent that what they were really looking for was the ERPM plant, because they don't have a plant at their Orkney operation. So we agreed to sell them the plant for ZAR20 million. They paid us ZAR5 million in cash, which has since cleared.

  • And we have an election now to either take a 10-year option over the Marievale and Grootvlei dumps, tailings dams, I think about [114] million tonnes in size, for a period of 10 years, or to take the balance in cash. So we could establish this option if we wish, or we can take the cash.

  • Now obviously we'll establish the option if the Marievale and Grootvlei dams turn out to be viable reclamation options for us to feed into the Ergo circuit.

  • We agreed with Mintails to purchase their 50% remaining interest in Ergo Mining Pty Ltd, which is the entity that owns the entire plant, plant footprint and also all the deposition sites. We agreed to buy that from them for ZAR82 million. That transaction is currently still subject to a few conditions involving regulatory compliances and so forth.

  • But that transaction opens up adequate volume capacity for us to seriously consider not taking Aurora's ZAR15 million, but rather establishing an option over the Marievale and Grootvlei dams.

  • So I think at this stage we do have a number of options that we can exploit.

  • Obviously going forward, as I take you through the presentation, you'll see how Ergo and Crown also co-exist in such proximity to each other that there are compelling synergies which one could exploit, and which would involve bringing the remainder of Crown's resources into the Ergo alliance.

  • I think we have created a number of opportunities, a number of options involving the Crown, Ergo and Marievale-Grootvlei sites, which we can exploit going forward, depending on the feasibility of each of those.

  • We decided to put this Google map up here just to give some context to the Ergo and Crown sites. I think also the size, to demonstrate exactly how big the footprint is over which we have established rights over both resources, rights in respect of servitude, pipelines, cables and also where our various plants are, and how they exist in relation to each other.

  • What this plan shows is our tailings deposition facility towards the west of Johannesburg, south-west of Johannesburg. That's the Nasrec area over there. Soccer City I think is round about there, and these are our tailings dams. The highway runs right through these; you could actually see them on either side of the highway.

  • These are the ones that are now slowly reaching saturation point, and which has made it necessary for us to consider, going forward, linking up this site here, or this area here, with what we have on the far east (inaudible).

  • A few plants in this area; the Crown plant, which is not far from [Edenvale], just across the road from Edenvale, and the City Deep plant which is right next to the railway depot, the fresh produce market somewhere around there.

  • City Deep has been treating the [Menos] dump, right next to the M2 East or M2 West I suppose, depending on which direction you're traveling, just south of that highway. That dump has almost been depleted, and that would, in the event that we did not have access to more tailings capacity, they would have spelled the end of City Deep.

  • The fact that Ergo has now become part of DRDGOLD means that these synergies, or the synergies between these and the full potential of the resource associated both with this plant and that plant, could be developed within the context of what we've secured over here.

  • This is the Elsburg dump. This is going to be the main source for material fed into the Brakpan plant towards Springs at a rate of 1.2 million tonnes a month. That's 180 million-odd tonne resource that we are already mining.

  • As you approach Oliver Tambo from the south, and if you're sitting on the left-hand side of the airplane, the window, you could actually see the two slots that have been opened up, almost like a cross, and how they've opened up, we call it face-length. What you don't see from the airplane is the height of those faces; it's in excess of 30 meters in height. I don't think there's another slimes dam being mined anywhere in the world where the face-length is quite as wide as that, or as high as that.

  • The Benoni dam, that's the one over there, it's nearing -- we'll probably mine through it by the end of this year, but we are now in a position to manipulate volume flow in favor of Elsburg. Our contract determines -- the contractual arrangement that we have with the [land-owner] gives us another four years to clear that site, so we have ample time, and we can start manipulating the volumes in favor of Elsburg, to the extent that we want to.

  • The [Knights] plant is just up there, somewhere around there, and it is treating the remaining materials from both the original Knights, as well Cason (technical difficulty), Cason dump which is situated on the footprint of ERPM.

  • And this is the route that the pipeline will follow. We've now secured all the rights that we require to do that. So it runs all the way from Crown, all the way through the south, follows the railway line at some point or another, and then it goes all the way into the Brakpan plant.

  • In order to mine all of the resources that we currently have under our control, we will need about another four years after the pipeline has been constructed. Once that's done, Marievale and Grootvlei, situated over there, could become relevant within the context of Ergo.

  • And then after that, all of these dumps, they have nowhere to go unless significant capital investments are made to open them up to link them up with a plant and a tailings deposition facility. So that really is the long-term blue-sky potential.

  • And some of these belong to Mintails, some of them don't, but I think once we've done everything that we could do here, once we've done everything that we've done over there, and depending whether Mintails and DRDGOLD will drift nearer to each other or further away from each other, these could become relevant also within the context of Ergo and the Ergo operations.

  • This slide gives you some information on the size of the Marievale and Grootvlei dams, and also the size of the resource. It is not an insignificant resource; it's a 1 million ounce inferred resource. Obviously recoveries at this stage would be less than 50%, between 45% and 50%. So you're looking at mining about 500,000 ounces from that resource.

  • We have established, or maybe one step back, we don't want to create investor expectation at this stage with regards the potential of our surface resource and the reclamation sites that we run, in excess of the actual recoveries that we're achieving, or that we're aspiring to achieve. At Ergo, of about 0.14, 0.15 gram a tonne, and at the rest of the operations, consistent with what we've been reporting.

  • But we do believe that there may well be technology out there, and that the person who's going to find that technology hopefully already shaves more than twice a week; that he doesn't have to -- he's not yet to be born. That he's alive, or she's alive. Obviously then she won't be shaving her face, hopefully.

  • But that person is out there, and we will progressively increasingly invest in knowledge. We intend to sponsor a few theses, masters or doctorate theses, at proper good universities. We want to establish a relationship with some of the other technology groups. I think [Muntic] is one of the companies that we want to start working closely with, to see whether there isn't technology that can increase the rate of recovery. And increase it by reducing the amount of gold that we put back onto the tailings.

  • At this stage, we're putting back between 0.18 and 0.2 gram a tonne. If we could halve that, if we could reduce that by the slightest of margins, then the upside potential of this reclamation business is quite significant. Because it's running at a profit at its current recoveries. If you could drop your residue values by 0.04 of a gram, which is basically an invisible piece of gold, all of that will be upside. And then I think the profit margin that you'll add to your operations could be significant.

  • So that's really the new frontier I suppose. Insofar as growth beyond the volume growth, and the growth beyond the actual linking up of all of these sites and the plant is concerned, that is really the only remaining step that one can look toward, to unlock significant latent value.

  • The language that's used is to reactivate the inert gold, just for that gold to respond to our chemical process and our technology. We might find the answer in six months; we might find answer in five years. But at least everything that's necessary for these sites, or these materials, for the gold and the minerals in these materials, to be reclaimed at a significantly higher margin, all of that's been put in place. The only thing that we now need is to find technology other than the technology that we've been using for the last half a century. If it's there, there's significant blue-sky potential for these sites.

  • I think what is also quite apparent, looking at these slides and looking at the layout of what we have managed to bring under the control of DRDGOLD, is that we have probably established an insurmountable competitive advantage insofar as the tailings dams over this entire area is concerned, all of those.

  • Regardless as to whether they belong to us, nobody else is going to be able to build in order to mind these tailings dams, a plant, a tailings disposal facility to establish the infrastructure rights to access the gold in all of these dams. DRDGOLD finds itself in a very unique position where it gets to mine the mineral wealth of South Africa a second time, at least those in and around the Johannesburg area.

  • And I spent a few days in Zambia last week and I was listening to just how far some of the other companies are prepared to drive and fly and cut their way through jungle in order to get the resource. The nice thing about this is that's not more than half an hour away from where we live and from where we work and a lot of the properties that we are clearing here also belong to DRDGOLD.

  • So I suppose one could run some sort of an annuity model here; your capital investment, your cash flows over the next 10/15 years and here's the upside, here's the payback as and when we realize the value of the properties. We haven't even started to work out the values in that regard, but that too will slowly but surely come into the equation I believe.

  • Then here's a little story that's becoming a big story. We did decide to look around a little bit in Zimbabwe. Whilst the country, I think, is still politically controversial, the ore body is just too good to ignore. And I don't think there's another country in Africa where developed infrastructure takes you so close to gold that's on surface.

  • The geological reports that we're reading now date back to 1938. Unless it was a piece of land order, a claim or a resource explored and mined by one of the majors or one of the larger companies, very little new mining happened in Zimbabwe between the Second World War and now. And I was surprised when I visited the area that we're going to be exploring over the next few months to find gold of the quality, the content, a resource of that quality so near to surface. We go down 3 kilometers in order to recover 4 grams a tonne and here we're finding samples within a shovel depth of 8 grams and 25 grams a tonne.

  • So it was a pretty surprising discovery from my perspective, but reading a little bit about the history of Zimbabwe over the last few decades, it becomes clear why that has happened. They very much favored agriculture in Zimbabwe over the last few decades, then they went into civil war and then Mr. Mugabe took over and there was some development during that initial, very successful, period of his reign but obviously over the last few years not much has happened.

  • There are a lot of countries out there who are not too concerned about whether or not governments ascribe to solid political governance -- solid democratic governance. And they are definitely focusing increasingly on Zimbabwe. And I think they're establishing the competitive advantage because the West is adopting pretty much a wait-and-see approach.

  • I think that it's unfortunate that so few companies out of South Africa and the West are exploring Zimbabwe because the longer we wait, I think the more opportunity we provide other more controversial funders and interested parties of settling down in Zimbabwe.

  • But we've decided that we will balance the political risk with a size of our investment. We won't initially provide more than ZAR5 million in seed capital. We do want to get a good understanding of the ore body that we're looking at.

  • I think we have managed to secure a relationship with one of the more astute individuals in Zimbabwe, a gentleman who has been around, seen it all, and I think who is a man of high moral fiber. He's assisting us with establishing the Company, he's assisting us with getting the necessary infrastructure in place, it's a 50/50 venture so the more recent legislation requiring that the local Zimbabwean ownership is 51% will require a 1% dilution if it comes to that, if that legislation is passed.

  • And the area that we're looking at, as it's said here, is topped and tailed by established mines. So we will do whatever is necessary for us to understand the ore body, to understand what sort of capital might be required. And as and when the political situation in Zimbabwe becomes more certain, I think we want to be in a position where we can hit the ground running.

  • It's very much an early bird, strategic opportunity that we're trying to exploit. We're wanting to make sure that we have a foot in the door, that we have a ready relationship, a ready infrastructure that we can access the mineral worth of this country when it become favorable to do so.

  • Right here's some photos. Not all of those sites are from the site that we're looking at. I think the two in the middle are from us where we did some trenching or our partner did some trenching. The rest gives you more or less an idea of the sort of technology that's being used in Zimbabwe now.

  • Nobody is spending too much capital or risking too much capital, so it's very basic rudimentary. Not much in the form of chemical extraction, it's very much gravity-based at this stage; people use Knelson Concentrators. And they're achieving success, they're mining profitably and of course using this sort of technology means that quite a lot of gold remains on tailings, and that also is something that in future could be attractive to us.

  • So looking ahead, I don't know if the rand price of gold, the dollar price of gold and all the other various dynamics that impact on the two has reached some sort of equilibrium, and whether the gold price is going to stay where it is. We're certainly not planning for these fantastically high gold prices of $1,500 and in excess of ZAR300,000. If it happens it happens and I think we've positioned ourselves to then take advantage of that.

  • The power price hikes, I think this is something that one just needs to manage very, very carefully and make sure that you position your business in such a way that you can absorb some of that. So we'll continue to do what we've been doing over the last few quarters.

  • When we say grow surface retreatment it's really focus on the efficiencies of our surface retreatment. Make sure that we optimize the entire footprint that we have, that we develop and exploit those synergies. That we work towards stabilizing Blyvoor underground, it's certainly on the right track and it's showing signs of getting to where we want it to be by March.

  • And then also take a -- continue to take a cautious approach to growth. And as far as external growth is concerned, really position ourselves more at this stage to take advantage of what could potentially be very attractive as opposed to risking huge capital. And that's where Zimbabwe comes into the equation.

  • Thank you very much. I think that -- yes that's the entire presentation. Craig and I will take your questions. Thanks.

  • Niel Pretorius - CEO

  • No questions? So it looks as though we had a very detailed presentation.

  • Okay, well we're going to be around for another few minutes. If you do have any questions, please feel free to talk to us. Once again, thank you very much for attending.