  • Good morning, everybody. Thank you very much for taking the time again to attend our quarterly presentation for the quarter ending September.

  • While you consider the disclaimer, I think what we will try to illustrate to you this time around are the trends on some of the key drivers in our operation.

  • I think you will notice looking at the presentation that this has been a pretty tough quarter. We had a number of events that we had to deal with and I will give a brief summation on that at the end of the presentation as to what the issues were that we had to deal with and how we dealt with them, and also what that tells us about our operations as a whole and going forward what one could expect.

  • We'll also deal briefly with some of the near-term cost issues that our industry and our company will be facing, take a view on those issues as well, as it impacts on our different classes of operations.

  • But now, this is the first of the trend slides. What we decided to do this time around is to put up a number of slides to show to you what the trending is insofar as underground operations are concerned and the trending insofar as surface operations are concerned. And these being the issues that we really manage and follow up on a weekly basis, at the operations -- on a daily basis, on an hourly basis for that matter -- and then consider and consolidate on a weekly basis.

  • The first slide is tonnes milled expressed in million tonnes. As you can see that the trending insofar as our surface tonnes are concerned is starting to look better and better. This is mainly attributable to the Ergo tonnes coming in. And at underground, pretty flat; going down slightly towards the end of the quarter, and that mainly attributable to the wage strike that we had.

  • Gold produced in kilos. This is a monthly -- it's not a quarter-on-quarter, it's a monthly trend slide where too you could see how the gold that we're producing in kilos, how that's trended.

  • Surface hit a bit of a low in May, and that was after we introduced the last of the volume measures associated -- relating to the tailings facility that we have at Crown, and it's since been ticking up quite nicely. It came down ever so slightly towards the end of September because of slightly lower recoveries at the Crown circuit, but for the rest, the gold production insofar as surface is concerned, is trending in the right direction.

  • Underground needs a bit of further discussion, and what I want to point out is this point here. This is April '09, it's earlier this year. And this is where Blyvoor was contributing quite handsomely. Blyvoor underground was contributing quite handsomely to our total gold production every month. And this is where those series of seismic events took place that caused our grade to come down quite significantly. And this one, of course, is where we've had strike action.

  • But we decided not to show you just these two. We decided to also show you that, because that's where Blyvoor needs to get back towards, and I think that is the Blyvoor story over the next few months, towards January and February of last year. If the ore body had been damaged to the point where we could not get back into the higher grades, if we hadn't done any development over the last three years to provide access into the higher grades at Blyvoor, then this slide here, or this trend here, was pretty much what you could expect from Blyvoor going forward.

  • But that's where Blyvoor is heading. That's where Blyvoor is aiming, and that's where it's heading, and it certainly has the ore body to get it back to that point. It's going to need time though to rehabilitate those panels. We have a very clear time schedule in order to get there, and we have a management team and staff who are very committed to getting it back there.

  • Our grades; obviously on surface, the grades will taper down ever so gently because of the introduction of greater volumes of surface material. Blyvoor there again, this is a -- almost a -- well, this slide is closely related to the previous slide. Here we lose the high grade panels. Here you see where we turn; slight build up; going down ever so slightly again. And then a slight delay also because of the wage strike, but we expect this one to go up quite sharply by March of next year.

  • Total cash operating cost. Now we report our costs in rand per kilo or dollar per ounce. We report unit costs. Of course, if you produce fewer units, then your cost per unit will go up quite significantly. If you produce more units, then you dilute those costs and your costs go down.

  • This slide shows you the actual amount of money that we spend producing our gold. At Crown, we spent a considerable lower amount towards cash costs in September, and that obviously is because of the wage strike, and the same applies to Blyvoor.

  • Costs went up in July; this is usually associated with the winter rates. But the actual amount of money that we spent producing gold is something that is tightly controlled at DRDGOLD. We have a high percentage of fixed overhead costs so, obviously, once those units come back again, or production goes up, then your unit costs look better. But the amount of money that we actually spend is pretty tightly controlled and very well managed.

  • And this slide illustrates the point that I was trying to make. Obviously, with lower -- fewer units coming out of underground, your costs per unit go up quite significantly. So whilst we spent ZAR20 million less on underground costs in the month of September, the costs per unit went up quite a bit to just over ZAR400,000 because we hardly produced anything from underground because of the wage strike. I think we lost about 80 kilos or so because of the wage strike. Not spending more money, but recognizing higher costs per unit.

  • And the same argument applies here at Crown. At Crown, the members of UASA and management stepped up to the plate, and they really carried the operations through the wage strike, and we didn't lose any production shifts. So you had no wages, but same production, and hence a drop in unit costs.

  • Obviously, that's not sustainable but you do need -- actually, you do need your workers to show up at some point in time, or else your maintenance and so forth start sliding.

  • Cash operating cost, dollar per ounce, the same argument applies there. You could see a sharp increase because of grade and the wage strike at the underground section; pretty steady and slightly down at surface.

  • Cash operating costs, rand per tonne. This is for me one of the true efficiency measures in an underground and surface environment. If you want to know how well people are doing, how effectively they're spending the money, look at the costs that you set aside and that you expend on your operations every month. This is a very good parameter. How much are we getting out of the mine with the money that we spend?

  • Rand per kilo and dollar per ounce. To a large extent, that's an indication of the quality of your ore body, but if you want to know if people are doing their job properly, this is where you want to go and look; this is a good efficiency measure.

  • Ergo. We thought we'd spend a little bit of time on Ergo as well. We've been telling the market that we're targeting steady state at Ergo by September, and I think you'll see looking at the numbers that we haven't achieved steady state just yet, but it was important for us to give you some insight into the trends that we are experiencing at Ergo. So you see where we were and where we're going to.

  • And fortunately, I think encouragingly, most of the trends that we can report on are positive, and the improvements that we are seeing, we're witnessing at Ergo, are very encouraging.

  • Tonnes, obviously, up quite significantly with the introduction of the Elsburg line in August, heading towards 1 million tonnes. We need to do about 40,000 tonnes a day for Ergo to hit a [call] of 1.2 million tonnes, and there are more and more days when we do in fact hit the 40,000 tonnes daily target.

  • Gold production at Ergo 2. This is also a pretty encouraging slide that goes up by 25 kilos -- about 25 kilos every month. And this is in a pretty steady line that we're seeing this. This is, to a large extent, attributable to the fact that the tonnes are up, but you'll see that some of the efficiencies on segments in the circuit are also definitely improving.

  • And this is the first one, elution efficiency. I spent a lot of time at the previous presentation talking to you about elution efficiency; just how much of the gold that loads on to the carbon do we actually manage to pull off and put into solution before it goes into the electrowinning circuit?

  • And there you could see a very, very handsome pattern. It was at a low in June of just over 50%, which means that just over 50% of the gold settling onto the carbon came off into the solution going into the electrowinning circuit. That's now gone to between 80% and 90%. We're not quite where we want to be, but we are certainly trending in the right direction.

  • Electrowinning efficiency. There too you could see with the installation of a second bed, or a second circuit, second line, that efficiency's also gone up quite handsomely.

  • So call and actual on those two drivers are virtually on the same line now; virtually -- those two points, or those two lines have converged, or close to converging.

  • Cash operating costs, rand per kilo; this is very much a function of improved efficiencies, and also the introduction of additional tonnes. We're still hovering above the 200,000 mark. In September, we were still hovering above the 200,000 mark. September was pretty much a break-even month for Ergo, cash cost-wise, and we're hoping to go through that profit line and start showing profits there going into the new quarter.

  • Dealing briefly with the operational review of each of the operations. As was expected, Blyvoor's underground tonnes went down; its production went down. We also had in the middle of the quarter, the month of August, we had a pretty sharp drop in the surface production when we encountered a clayish substance in the tailings.

  • Obviously, you don't know what you'll find in those tailings until you actually get there. You never know what people put onto those tailings 60 and 80 years ago. We've had instances where tailings have been used as a sewerage farm and they just mined through it. So every now and then you find something that you didn't know was there, and you mine through it, and then it recovers again.

  • So August, we lost a bit of gold, or production off the surface circuit in Blyvoor, but it was a temporary issue, and it's recovered quite nicely towards the end of the quarter. As was expected, the costs -- the unit costs for our underground circuits up quite a bit, but surface circuit is still well in the money.

  • Operational review at Crown, I think this is also pretty self-evident. Our production remained pretty steady quarter-on-quarter. Slightly down in Crown, the Crown circuit, also in the middle of the quarter, but picking up towards the end. And Crown is still giving us a handsome profit every quarter, a ZAR32 million cash operating profit, up 29% from the previous quarter.

  • ERPM; finally seeing ERPM also responding to the measures that we took since September of last year, the underground closure. Costs are now better contained than where we were a few months back. Its surface circuit, this is the Cason Dump, also responded nicely to slightly higher grades, and as you could see, it was one of the better performing circuits in our operations. ERPM made ZAR25 million profit this quarter.

  • ErgoGold; ounces up 181%. That's a lot, but it's not enough. We want those ounces to go up even more. We want to produce around -- between, I think, 15,000 and 17,000 ounces a quarter is what we targeted in the model, the operational -- the project model. It's going to take us a while to get there, but we are certainly steadily moving towards that target, and the numbers that we've seen coming out of Ergo are increasingly encouraging, including bottom line number.

  • Right, Craig will take you through the financial review and the balance sheet.

  • Craig Barnes - CFO

  • Thanks, Niel. Good morning, everyone. On the income statement for the quarter, our revenue was 6% up for the quarter at ZAR445.2 million. That was mainly as a result of an 8% increase in gold sold for the quarter which was offset to an extent by the 2% increase, or decrease in the rand gold price for the quarter.

  • Our net operating costs, the ZAR449.4 million, includes movement in gold in process of about ZAR15 million. If you just look at the cash operating costs number in there, it increased by 3%, and that was mainly as a result of electricity price increases from July, the 32% increase, as well as the provision which was made for wage increases in July.

  • That left us with an operating loss for the quarter of ZAR4.2 million compared to a profit of ZAR1.3 million in the previous quarter. The finance income number in there includes -- is basically all interest received on the cash that we hold. The prior quarter number of ZAR3.3 million, if you recall, included a ForEx loss, a realized ForEx loss of ZAR10 million, so the actual interest received was about ZAR13 million or ZAR14 million there. And you can see in this quarter the interest has come down due to the lower cash balances in the quarter.

  • Other costs of ZAR101.2 million; again, in the previous quarter, the number of ZAR57.6 million included a credit of ZAR53 million for the negative goodwill which was recognized on the ErgoGold acquisition. That left us with a loss before tax for the quarter of ZAR97 million compared to ZAR81.2 million in the previous quarter.

  • The taxation number includes current tax of ZAR6.8 million expense and a deferred tax credit of ZAR40.5 million. The current tax number is mainly from Crown and also the STC on the dividend which we paid. That left us with a net loss for the quarter of ZAR63.3 million compared to ZAR42.6 million in the previous quarter.

  • On the balance sheet, really the numbers to highlight there is obviously the cash balance which has come down roughly ZAR120 million from ZAR353.6 million in the previous -- at the end of the previous quarter to ZAR234.3 million at the end of September.

  • On the liability side of the balance sheet, the long-term liabilities of ZAR110 million include the preference shares owing to our black empowerment partners of ZAR65 million, and a post -- mainly a post-retirement medical liability at Crown, which is the other number there.

  • Provision for environmental rehab is sitting at ZAR423.4 million. The deferred tax liability of ZAR173.7 million on the balance sheet is really what relates to the ErgoGold acquisition; the deferred tax liability raised on that acquisition. And then our current liabilities at ZAR370 million for the quarter.

  • That's really what I wanted to highlight on the balance sheet so I'll hand you back to Niel just to summarize.

  • Niel Pretorius - CEO

  • Thank you, Craig. I said at the beginning of the presentation that I would talk a little bit about the way forward, and also the challenges that we dealt with that came our way during this quarter.

  • I suppose one could do this by asking the question, or suggesting to you that it may occur to some of you that in circumstances like those that we faced during the quarter, there may be a bit of a reluctance at times to get out of bed and go to work that day.

  • Blyvoor was clearly what I think could only be termed the perfect storm. They had a sharp reduction in grade because of the loss of -- temporary loss of some high-grade panels. They had to deal with a hefty increase in electricity costs, and they had to deal with a wage strike.

  • Is there any hope for Blyvoor? Are they going to get out of this? I think they are, because we know that the ore body is there, and we know that we've done enough work over the last three years for us to start accessing that ore body in January and February.

  • In April, it made a handsome profit; it came down sharply because of the circumstances. There was almost a conspiracy of challenges in the last few months, but from this point forward we're pretty certain that it'll start going better.

  • The one thing that DRDGOLD always does, and that it has always done in the past, is respond very quickly to changes in its environment. When ERPM started becoming a risk to the entire Group, we took what was at the time a pretty controversial decision; we closed the oldest operating mine in South Africa, we sent everybody home which is not a pleasant exercise.

  • I can tell you, the hardest part of our job I think sometimes is having to take those decisions of sending people home who have been working for an operation for 20 and 30 years, through no fault of their own. The decision was necessary. We took the decision, we executed it, and a year later ERPM's fortunes have turned around quite significantly and it's now making profits, become a contributor.

  • At Blyvoor, when it became apparent earlier this year, June, July, that we are going to have to do something because the basic drivers have changed, the sustainability drivers have changed, we did that. We implemented a Section 189 process in the middle of wage negotiations. Of course, the unions didn't particularly like that, but it was the necessary thing to do at the time.

  • So when these circumstances come our way, when new circumstances come our way, I think the one thing that we can say to the market and to those who follow our story is that if change is necessary, our management team are bold enough to make those changes.

  • Why do we come to work after a quarter like this, or during a quarter like this? It's because notwithstanding the fact that we have probably experienced some of the most challenging circumstances that can come the way of any mining organization. We still managed to increase our revenues, we still managed to contain our actual cost, the actual amount of money that we spent, and our production remains steady.

  • And on the other side of this quarter, over and above the optimistic prospects that I have for Blyvoor, is also a very encouraging trending that we're seeing at Ergo.

  • So going forward, we will continue to get out of bed and go to work. We will continue to do it with the same amount of enthusiasm and resolve that we've been doing it over the last few weeks, last few months. And hopefully we will start returning the sort of results that I think we started getting used to, and started enjoying earlier this year, and also during the course of last year.

  • So the spirit of our Company is still very much alive; the mood, the morale of our people, those who influence the decision-making in our organization; those who manage our people. That mood is still where it needs to be. The optimism is certainly there. And with the same resolve that we survived crises in the past, I think we survived this last quarter. And going forward, we will continue to do what I think we've become pretty good at, and that is managing our costs, managing our ore body, managing our people, and take the right decisions whatever they are as and when they are needed.

  • I hope to be able to report to you at the end of the next quarter similar trending insofar as Ergo is concerned. I hope to be able to report to you an improvement in the recoveries at Blyvoor. I hope to be able to report to you an increase in our production. And I hope to be able to report to you an increase in our revenues.

  • Whether or not those revenues, those increased revenues, would be adequate to also report a profit we'll wait and see, because we don't hedge, we take full exposure to the gold price. That's a conscious decision that we took, and as a consequence we sometimes make lots of money, but then there are also times when we don't make lots of money notwithstanding our best efforts.

  • So the things that we know need to work, the things that we know need to happen for us to continue as a business, are working, and are happening.

  • For the rest, those things which are not out of our control, or not within our control, we simply manage towards those and take the right decisions as and when they're required; improved productivity, better cost control, managing margin and conservative growth. We want to optimize our footprint, and then we'll start looking around for something to add on to it which is contiguous.

  • Thank you very much for attending. Let's see what the rest of the year brings. Thank you. We'll take questions now.

  • Dave Palmer

  • [Dave Palmer] in [Durrant]. How much more is it going to cost you to get Blyvoor up and running from a CapEx point of view? Because looking at your balance sheet, you appear to be running out of money fairly fast.

  • Niel Pretorius - CEO

  • Look, we don't have any -- we didn't accelerate or set aside any special capital. The only capital that we'll continue to spend is budgeted capital. Craig's got the exact amount here.

  • Craig Barnes - CFO

  • We budgeted this year for [ZAR116 million] at Blyvoor but we've re-looked obviously at those numbers and it should come down to around about ZAR90 million for the whole year that we're going to be spending at Blyvoor on capital.

  • Dave Palmer

  • How much have you spent today?

  • Craig Barnes - CFO

  • Well, for the quarter you can see that we spent -- it's in the results, let me just get the number. It was ZAR24 million for the quarter at Blyvoor.

  • Niel Pretorius - CEO

  • Any other questions? Thank you, over here.

  • Unidentified Audience Member

  • I think I saw the 189 (inaudible) winds up tomorrow. I don't suppose you could jump the gun and actually say what's happening with the labor force at Blyvoor?

  • Niel Pretorius - CEO

  • In other words, how many people are going to be affected? Well, we said initially that up to 1,000 people could be affected, but we think it's going to be significantly less than that. I don't really want to elaborate on that because you always face the risk of being accused by a union that you've made up your mind before you actually implemented the process.

  • Unidentified Audience Member

  • And also just to illustrate, since the decision was taken on ERPM, just kind of how your labor force from there until now before the 189 on Blyvoor becomes effective has changed?

  • Niel Pretorius - CEO

  • Total labor force? Well ERPM I think a year ago we were 1,600, Louis? And we're down to 30 now.

  • Is that it? Well, thank you very much. Just one more.

  • Dave Palmer

  • Your graded Ergo, it's running at what 0.7 or something at the moment, but surely you can't make money at that level? When will it get to a reasonable level that profits can be made at Ergo? And what do you anticipate the grade likely to be in this quarter?

  • Niel Pretorius - CEO

  • The recovery towards the end of the quarter was at, what, 0.09, 0.08? So we are making money at that level, but that's sort of just above break-even. We didn't spend the money we did to break-even, we spent the money to make a profit.

  • Going forward, what we'll do is decide just how we'll manage the flow of material into Ergo. You'll recall from the last presentation that there are two sources from which we recover; the one is the L29 Dam, the other one is the Elsburg Complex, the Elsburg Complex being the larger one at 180 million tonnes.

  • Now, it would seem as though we are not managing better than 0.05 coming up of the L29 Dam. What we don't know is whether the material from L29 is potentially poisonous so to speak, just to use a layman's term, and whether that's affecting the recoveries from Elsburg.

  • We've constructed a small pilot plant which will assist us, or help us, to separate out the material, to do sampling of larger samples, test work on larger samples, representative samples of the materials. And I think that will give us an idea as to what exactly we can expect to recover from L29 on its own, from Elsburg on its own, and the two combined.

  • If we come to the conclusion that the Benoni materials, the L29 materials, do not affect the efficiency with which we recover from Elsburg, we will continue to introduce materials from Benoni, albeit not at the initially anticipated ratio of 50%, 600,000 tonnes from each. We'll slow down the rate with which we introduce it. That will obviously have the impact that instead of recovering 0.15 or 0.14 grams a tonne, we may be down to let's say 0.12 grams a tonne, but that will coincide with an increase in volume flow.

  • We believe that depending on the outcome of this test work we would be justified in spending around ZAR8 million in upgrading the pipe infrastructure from Elsburg to the Brakpan plant, which will place us in a position to well in advance of schedule, in fact mine up to 1.2 million tonnes of material from Elsburg. And the additional volume would, to an extent, offset the slightly lower recoveries. But, yes, at the current recoveries we're not losing money at Ergo. Martin?

  • Unidentified Audience Member

  • Is there anyone showing an interest in buying the ERPM underground? And can you just update us on what the water situation is like there?

  • Niel Pretorius - CEO

  • Certainly. Look, people come and go. I have enquiries about ERPM and some of the ERPM infrastructure on a monthly, three-weekly basis, from different sources. What we're in fact doing at the moment is offering the equipment of ERPM underground for sale. We've gone out on tender for the plant and for the ice plant, and for some of the winders and so forth. The response is not overwhelming but that's not costing us a lot of money at this stage to secure those assets.

  • For the mine itself, we haven't received any offers really worth considering over the last quarter. We have had enquiries about the resource. You'll recall that we extended the ERPM resource with Extension 1 and Extension 2. I think there's a third one about 18 million ounces, resource ounces, there. We've had some enquiries about that, long-term option players looking at that, but not for the mine itself.

  • Insofar as the water is concerned, the water level is still way below the critical level, and we're not compromising any of the access and infrastructure that we will need in order to access the water. We're a party to the WBEC and CBEC initiative. This is an initiative, it started off on the West Rand, and it's now extended its area of influence also towards the Central Rand.

  • We're in discussion with them, and we've entered into a lease agreement with them for the lease of our high-density separation plant, which has a huge capacity. It has the capacity to treat all the water from the central basin, and all the water from the western basin. So they have now secured that infrastructure which probably gives them a bit of a competitive advantage.

  • How happy the regulator is that competitive advantage has been established in favor of this particular entity, I don't know. We think that maybe they're looking for some sort of a tender process to decide who ultimately gets to treat the water. I'm hoping that they will accelerate the process, and allow those who want to find the solution for the problem actually can get working, and cracking.

  • We've been attending meetings and reading reports, and listening to reports, and waiting for new reports, and so forth, now for the last so many years and it's getting a little tired now. I think the regulator probably needs to now give those who want to provide a solution, the opportunity to provide that solution, and I'm sure they will.

  • What we are doing, though, is covering our bases, and making sure that the infrastructure necessary to set the water at the critical level of 150 meters, that that infrastructure remains intact.

  • Kevin Kruger is here, he's the engineer in charge of that initiative, and he's been really giving them all the information that they require to make this work; submersible pumps with a modular design, where you can increase the capacity and the volume flow, and so forth. All we need now is a little bit of political will.

  • Unidentified Audience Member

  • Will you always be assured of water for your Ergo? Are you going to get water from the underground for Ergo?

  • Niel Pretorius - CEO

  • Yes, well that's one of the reasons why we are definitely holding onto that piece of infrastructure. And that's also why we leased the high-density separation plant to an entity with whom we have a close commercial relationship. A condition of that lease is that they will continue to supply water at cost into the Ergo circuit.

  • We still have adequate water on top of Brakpan Dam, that's one of the reasons why you see that the unit costs at Ergo are significantly lower than that which -- well, you wouldn't see that, but I can tell you that the unit cost at Ergo is below ZAR20 a tonne. And we initially targeted ZAR23 a tonne. And that has, as a consequence, amongst other things, of savings in water.

  • We have a few natural sources where we can also draw water from the Cinderella Dam and the [Blesbok Strait], we have licenses in terms of which we could make use of water there. Obviously, in order to preserve the level of let's call it your reservoir during summer months, you would prefer to draw from those sources and not deplete your reservoir too rapidly.

  • There is the possibility of a brief window somewhere into the future, prior to the infrastructure coming online -- the underground infrastructure coming on line and post the reservoir running empty that we may have to rely on the Rand Water Board. But it's not something that we're waiting to happen. We're definitely planning towards that, and making sure that we have adequate access and optimized capacity into the natural sources that we have access to.

  • Unidentified Audience Member

  • And how much does it cost you just to keep the underground ticking over? What are your repair and maintenance costs?

  • Niel Pretorius - CEO

  • It's approximately below ZAR3 million. There's a retrenchment charge that will come through, if it's not this month then it was last month, but we're managing to keep it to below ZAR3 million at the moment.

  • It's not just the underground, also there's a big electricity consumption charge of electricity that's just going into various directions and being consumed by various third party users. And what Louis has been doing at ERPM now is installing pay-as-you-go meters at all of those. And that has significantly dropped, let's call it the holding costs of that infrastructure as well.