  • Morning everybody. Thank you very much for taking the time to attend our year end results presentation. I know that we clash with one of the other bigger companies, so it's really good to have you all here.

  • While you take a look at the disclaimer, what we did this time round was change the format of our presentation slightly.

  • In the past we jumped in with numbers straight away. What we thought we'd do this time round is maybe talk a little bit about some of the key events and key features of this year; some of the things that worked to our favor, some of the things that worked to our disadvantage during the quarter in discussion. And then also give you some idea as to some of the finer detail of some of these events and maybe give you -- put you in a position to take a view as to whether these are the sorts of things that one could overcome or not.

  • Looking at the first slide, obviously one of the key features is that the Board decided not to break practice that we reinstated last year, declaring a dividend. It's a dividend that is 50% lower than last year's dividend and it's for the simple reason that in the last quarter in particular revenues are significantly down as a result of the strong rand.

  • So we thought that the effect of the strong rand did not put so much pressure on our cash position that we had to not declare a dividend, but at the same time we thought that caution was perhaps in order.

  • At the -- halfway through the year in February -- in the February Board meeting obviously we'll take another look at what the cash position is and how the operation has performed. But for the time being this is the dividend that the Board thought was appropriate in the circumstances.

  • Surface production for the quarter was steady, a steady 5,000 ounces for all of our circuits together. We'd obviously hoped that surface production would be slightly up with Ergo, but I'll talk a little bit about Ergo -- ErgoGold and some of the issues that we encountered there further down.

  • We completed the acquisition of the remaining 50% of ErgoGold. So the entire upside of that circuit is now for our exclusive benefit going forward. And as I said, I think you'll probably have a very good idea as to where we currently are with the project and what the prospects are going forward by the end of this presentation.

  • Our operating profit is down from last year at ZAR282 million. Obviously last year we also had the benefit of a disposal, but I think the impact of the last quarter in particular and the stronger rand in the last quarter is something that you'll see had quite a significant effect on earnings and on revenue flows for the last quarter.

  • And then while headline profit for the year, which in part I think justifies the decision on the part of the Board not to break, let's call it, the new tradition of paying dividends.

  • The profit trend we thought was important to put up here. We've had a very, very good run at our operations for the last few reporting periods. And maybe one of the reasons why we think that this period is so bad is because the previous periods were so good. We had the benefit of really for most of the preceding periods being in a position to report 38% increases, 65% increases of profit quarter-on-quarter. This one, of course, is different and I think you'll see why as we go through the slides.

  • And there are the main reasons for why you're seeing the sharp decline in our cash operating profit. We don't hedge. We take full exposure to the gold price. That is a deliberate decision and we will I think, remain -- this will remain our position going forward. And I'll talk a little bit about that as well later on during the presentation as to why we think hedging is still an inappropriate policy at this point in time in the South African gold mining industry.

  • Our costs increased by ZAR18 million due to the acquisition of the additional 50% of Ergo Mining. Of course, our partner Mintails would have picked up ZAR18 million of the costs for the quarter. Having purchased their share, we carried the full cost of this circuit and that added 18% in the total operating -- ZAR18 million rather in the total operating costs of the business for the quarter.

  • Our total electricity bill was ZAR7 million higher, because of mainly winter tariffs. The latest increase obviously had not yet kicked in prior to the end of this quarter. That is going to have an impact on our operations as well obviously going forward. It's something that we have to factor in and we have a pretty good idea as to what the effect is going to be on our unit costs in particular and more specifically underground unit costs as a consequence of the 32% increase in electricity. And I'll talk a little bit about what we're doing about it as well.

  • We saw a 5% decline in underground gold production at Blyvoor, And I have a few slides also to give you some perspective as to the -- on the reasons as to why this occurred. Blyvoor took off really well. The first month of this quarter was a very good quarter. They made a ZAR26 million operating profit in April and after that, because of a series of seismic events in certain very specific areas, underground production in particular came off sharply, and is going to remain at relatively modest levels for about a six month period until after certain remedial measures are taken in order to counteract the effects of these events.

  • And then ErgoGold recoveries were not where we had hoped that they would be by this time. And I'll spend a bit of time talking about that as well when I talk about the Ergo slide. There are a lot of things at Ergo that we're very excited about.

  • One of the things that did not give us any reason for excitement during the quarter under review were the recoveries. But we've got some -- I think we figured out what the reasons were. It's a young plant. It's been in full operation for about -- for six weeks prior to the end of the quarter and I think our engineers are on top of the issues there. And we're certainly expecting better results in the recoveries going forward.

  • But for the quarter under review and what exacerbated the position -- the cash profit position is the fact that we had these additional hire costs and not the anticipated recoveries at ErgoGold.

  • Here the -- this is a picture of the seismic events, these little balloons depict the seismicity or the seismic events that we experienced in number five shaft at Blyvoor during the month of May. This one over there knocked out seven of our higher-grade panels and that's where remedial steps are going to have to be taken.

  • It was important for us to put this slide up, because we talk about seismicity the whole time. Seismicity is almost sort of becoming -- in mines of this nature and most deep level underground mines has become a one sentence report. We had a seismic event and as a consequence we saw some losses in production. But I think it's important that we see what it is that our operating staff have to deal with at this mine with these sort of seismicity, the number of seismic events that occur.

  • Obviously most of these occur during the blasting window. So, it's managed seismicity or mine related seismicity. But we had a number of seismic events that occurred outside of the blasting window. And these are typically ones that you cannot forecast, because it's because of a buildup. They occur as a result of a buildup of stress over many, many months, sometimes over many years. They get transmitted through these geological features. That's the Alpha Dyke. That's the Boulder Dyke; or maybe just the other way around, and these are the conduits during which pressure release take place and ultimately they end up in those areas where we created cavities and that's where it kicks.

  • The ones that really affected us and that I want to talk about are these over here, in our Area 38 29. Now this is one of the higher grade areas. One of the reasons why we decided to increasingly start focusing on Main Reef, and if you talk to Collie Russouw and Owen O'Brien who are here, they'll tell you that the one capital item that's been consistently overspent at Blyvoor in the last year is (inaudible) and development, specifically in the Main Reef areas.

  • One of the reasons why we have this program of really wanting to increase our exposure to Main Reef is because of the seismicity patterns that we experience in these higher grade carbon leader areas. We have become overexposed, I think we've been overexposed to the volatilities associated with these particular areas and in this quarter in particular we were hard hit by it.

  • This is an area of very high grades where we were mining 2,500 square meters immediately prior to the event. We lost seven panels, as I said earlier. Our rock engineers -- whilst we still have access into those areas, our rock engineers have advised that we rather de-stress the area first by mining through at the bottom here and then returning from the other side and then mining it from two opposite directions. That's apparently a safe de-stressing method of mining something which is as active from a seismicity perspective as this.

  • But this is a six month project before we get back into that, which means that the sort of numbers that we're seeing coming out of Blyvoor now are the sort of numbers that we can expect coming out of Blyvoor for the period of rehabilitation and opening up into Main Reef, also about a six month period.

  • This is the story that I was telling you just now with reference to those balloons.

  • Of course we're very thankful that withstanding the fact that we had these events, that Blyvoor has managed to avoid any fatalities and serious accidents over the period that we are reporting on. And in fact, we haven't had any fatalities in our organization for this whole year. We hope to keep it that way.

  • Blyvoor also managed to record 1 million fatality-free shifts and I think we have now managed 2.5 million fatality-free, gravity-related -- a fall of ground gravity-related accidents or fatalities at Blyvoor, which I think is an important indicator of the attention to safety detail.

  • Seismicity is seismicity. It happens when it happens. But fall of rock because of gravity is an indicator of a poor support regime and we've managed to avoid any deaths for 2.5 million shifts related to that. So, I think the discipline generally with regards safety at Blyvoor is amongst the best in the industry if not the best.

  • It is in fact very, very encouraging when you read through these reports that the Mine Health and Safety Council produce with a list of fatalities and you don't see the name of any of your operations appearing on those. And [then] that's something that, I think, we're both proud of but also very thankful for, because a lot of that also has to do with when these events occur.

  • The things that we want to do in order to address some of the issues that impacted on our revenue line and on our profit line this quarter, obviously there's not much we could do about the rand price of gold and we have no intention of really -- or maybe I can put this differently. I think we want to work towards the rand price of gold as opposed to simply waiting for a better rand price of gold in order to ensure that we have a sustainable business.

  • I'm of a view that if your business doesn't work at ZAR250,000 a kilo at this point in time, then maybe one need to seriously consider whether one does, in fact, have a business in our current environment.

  • At Blyvoor the things that we do want to do going forward in order to address the patterns that we saw in the quarter, obviously would be to rehabilitate those panels that contribute the higher grade in the mine, and we want to continue our robust opening up and development program in the Main Reef.

  • So we have not -- I repeat, we have not limited the amount of capital or reduced the amount of capital that goes into opening up and development of the Main Reef section. I believe it's counter productive and you're really just prolonging the agony.

  • And I think with the objective of mining profitability at ZAR250,000 per kilo it's become necessary to also consider the right sizing of Blyvoor, making sure that we have the right number of employees deployed in the right areas in the mine. It has predominantly had a very large contingent of surface personnel -- surface and related personnel. But we've spent a lot of capital on Blyvoor towards the upgrading of equipment, towards new equipment and so forth.

  • And I think the time has come where Blyvoor should have more rock breakers than support personnel and there's a very deliberate program at this stage to swing the ratio from 60% services and 40% rock breaking to just the other way around. I think as it is we're probably much closer to a 50/50 now than what we were and we deliberately want to move towards a 60/40 the other way around in the not too distant future.

  • At ErgoGold, ErgoGold I think just to put the status of this project into proper perspective, the project consists of two lines -- two feeder lines, each intended to feed 600,000 tons of slimes material into the Brakpan plant. The first line was completed last year towards October and we started producing from the L29 dump, which is a slimes dump, and that's been ongoing. We've been hitting our volume target there consistently now, probably about three months after we commissioned it.

  • That line I think taught us a number of valuable lessons with regard densities, with regard flow control, with regard search capacity that one needs to create. And maybe because of the lessons that we learned there, after we commissioned the second line, which is the one that runs through the Elsburg Tailings facility, this one consisting of 180 million tons of material, that we have not had a single hiccup in the recovery, the reclamation and of the material and the delivery of the material into that plant. It has been as incident free a commissioning of a reclamation site as I certainly have ever witnessed.

  • However, what we've seen obviously in the quarter under review is a plant where we, to a large extent, have the downside of 100% of the overhead but the upside only or the benefit only are 50% of the volume flow, especially during this quarter, the second line only having come into commission in the -- on August 3.

  • Going forward and because of the way that we applied the capital and implemented the project, especially at the Elsburg Tailings Complex, we will have significant search capacity at the Elsburg Complex. And all that basically means is that we now have the option to manipulate the volume flows from the two reclamation sites.

  • We've had our metallurgical challenges, especially insofar as the Benoni materials or the L29 materials are concerned. And I think it would be -- we have the advantage now of manipulating volumes flows in such a way that we could find out whether those issues, the ones that we haven't addressed are, let's call it, ore body related or material related or whether they're related to what we are doing in the plant itself.

  • What we are seeing though is, and there are two distinct differences between the Benoni material, the L29 material, and the Elsburg material. What we are seeing is that the carbon loading percentages having -- since having introduced the Elsburg materials are significantly higher than what we saw when we were mining only the L29 materials.

  • And the reason might be in the fact that the Benoni dam is a second generation dam. AngloGold Ashanti put it through the Ergo plant once before, whereas the Ergo dam is a first generation dam. So 15 million tons of our resource on -- in this project is a second generation dam and the other 185 million tons -- 186 millions tons of this resource is a first generation dam.

  • And of course, first generation dams for us are -- it's familiar territory. It's the sort of dams that we've been mining now for the last 30 years and then that may account for some of the increases that we're seeing in recoveries.

  • We think our engineers have nailed the problem. They have been working very hard since April of this year, after the commissioning of the elusion plant to address the recovery issues that we are experiencing. Charles Symons is here. He'll give anyone who cares to find out more about this problem a detailed analysis of the things that we had to do.

  • I think if I can maybe just mention one. The Brakpan plant is not a redesigned plant. It is a refurbished plant. So a lot of the -- or most of what we did there was simply just to replace what was there at the time when Anglo Gold Ashanti was running the mine.

  • There were some modifications with regards screens. There were some modifications with regards agitators and so forth. But I think the science and the technology in the engineering of this plant remain consistent with what we had at Anglo, what Anglo had at the time when they owned it. And as a consequence, most of the assumptions upon which we based the project when we launched it, were assumptions based on actual numbers that we got from their records.

  • Now one of the things that we did exactly the way that Anglo did was the specifications of the elution plant, the specifications of the elution columns and the also the heat exchanger, the layout of the heat exchanger.

  • And all this basically means is that once you've loaded the gold onto the carbon, it needs to go into an elution column where through pressure and heat the gold is lifted off the carbon and placed back into solution. In order to create adequate heat to do that, water is pumped into the elution chamber and that water gets heated by way of a heat exchanger with heated oil.

  • And what we're thinking is that Anglo were running six elution columns at the time and obviously could generate adequate flow rate in order to run their elutions at the required rate. We think that because we only have one elution column at this stage in operation that the flow rate at which we heat the water and introduce it into the elution chamber is inadequate and as a consequence we're not seeing the elution efficiency. So in other words the gold is not being lifted off the carbon at the required rate.

  • What we've done is we're in the process of commissioning a second elution chamber and, of course, also the second heat exchanger that would introduce adequate flow rate in order to get the recoveries closer to where we want them to be.

  • Recoveries have since improved considerably or, in fact, recoveries improved between April when we started the plant until the end of last month by more than 100%. So, many of the other engineering tweaks that had been done by our engineers have already had the desired effect, but we think that this is probably the last one. And then hopefully we'll see the sort of recoveries that support the project.

  • As I said, the carbon concentration or the gold concentration in carbon since the introduction of the Elsburg materials have gone up from 300 grams per ton to 500 grams; we've touched 700 on occasions. Now it's a matter of making sure that we can elude the material -- the carbon loaded material at an adequate rate in order to make sure that it goes into solution and then into the electro winning circuit.

  • But Charles will explain to those who didn't follow, in the way that he explained it to me, and I think that's the reason why I have a reasonable understanding of what this process is all about.

  • So two things going forward I think insofar as Ergo is concerned is better optionality with regards where the materials comes from, much improved -- elution efficiency and higher volume.

  • A not insignificant number that you'll see right at the end of the report that we wrote for the quarter is the cost per ton of the material going into the Ergo circuit. It's been ZAR25 a ton, which I think is bang on target if not slightly better.

  • So insofar as the flow rates are concerned, insofar as the quality of the ore body is concerned, specifically Elsburg, insofar as the engineering is concerned, insofar as the cost per ton is concerned, all of those things are bang on target. What we need to do now is to make sure that the gold that we see settling in the carbon is eluted out and recovered.

  • That's the next step and that's one of the reasons why I say in this presentation, and in many of the other communications coming from my office that we are aiming to achieve steady state at Ergo by September of this year. And we're aiming to see the production upside of the Ergo circuit, full upside, by the fourth quarter of this calendar year, second quarter of this financial year.

  • DRDGold produced 35,000 ounces from its various surface circuits at an average cost of ZAR186,000 per kilo. That was for this quarter under review. You'll see that the contribution by Ergo towards that number, both the volume and the cost, was 624,000 or 620,000 odd. The exact number is a little bit further down.

  • So not withstanding the fact that the recoveries were well below project specifications, the total average cost of the 35,000 surface ounces that we produced was ZAR186,000.

  • We're hoping that by December, or for the December quarter we'll be in a position to report something near to 50,000 surface ounces for that quarter with about 15,000 coming out of Ergo in addition to the surface ounces that were produced by the other circuits during this quarter.

  • And I think that shows why we think it's appropriate to make the statement that in working towards sustainability, working towards profitability, one should really try and make sure that your business works at a gold price of ZAR250,000 a kilo, and not have to rely too much on a significant increase in the gold price in order to return a profit.

  • And after that ERPM; ERPM we had hoped to sustain the optionality associated with that ore body at a monthly cash burn rate of not more than ZAR2 million. That assumed that we were going to spend about ZAR7 million a month, Craig, if I'm not mistaken, but offset that by about ZAR5 million in revenues from remnant cleanup.

  • The remnant cleanup project has not been successful. We're simply just not getting the gold out of the odds and ends where we are cleaning up. And as a consequence just about everything there has now been stopped. The stores have been literally locked. The materials controller has been transferred. The plant's been closed.

  • Most of the management personnel have decided to go, most notably the last general manager there, Mr. Louis Lamsley, who knows that site better than anybody else. He's taken control and charge of that. There is a meter. That meter is just about all that monitors consumption of just about everything in every corner of that mine, electricity, water; nobody buys a torch battery without getting his prior approval.

  • So we've implemented a very, very strict cost management regime at ERPM. And to the extent that any value was attributed to DRDGold insofar as ERPM underground optionality is concerned that should now be factored out, because ERPM underground is now closed.

  • The remaining care and maintenance staff are being engaged in a retrenchment process in terms of Section 189 of the Labor Relations Act.

  • Concerns that I know arise in this sort of scenario is what about the rehabilitation of a site like this? And rehabilitation usually involves the tailings dams of a site and also water -- underground water. Those are the big risks and the big cost items if you close an underground mine.

  • ERPM has two tailings dams, or they're two clusters. The one is the Cason dam, which is just about halfway mined out though Knights -- the Knights plant. And the other one is the Elsburg Tailings Complex, which is the main resource for the ErgoGold project. So those two main -- I think what would otherwise have been headaches for -- from a rehabilitation perspective, are actually part of our mine plan going forward for this site.

  • The second big issue, of course, is underground water. We know exactly what the rate of rise is. We're closely monitoring it. We're a member of the Central Basin Utilities Corporation, which is an entity that was established specifically to manage underground water in that area. We're in discussion Central Rand Gold. They were directly affected by the rising water levels and they have a variety of plans.

  • But if none of these things come together, if none of these things work, what we also do have in place is a concept, or a project I would imagine, to by way of submersible pumps intercept the water at 150 meters from surface at our central shaft and to maintain water levels. And we have more than enough need for the water going forward into our Ergo circuit.

  • In fact, all of the contract negotiations that we have with our neighbors and also with the Central Utilities Company -- Central Rand Utilities Company is premised on the assumption or on the understanding that we will remain entitled to adequate water.

  • So we're allowing them access to our high density separation plant, which has adequate capacity to treat all the water from that basin. We're participating on the planning of the water extraction infrastructure. But nothing is done unless it's clearly understood that DRDGold will remain entitled to adequate water from that site.

  • If we do not succeed with the concept of 150 meter submersibles, an alternative is to establish a pump station at 300 meters below surface, also on central shaft and then intercept the water there. The shaft will be plugged. It will be a suction flat layout. There's adequate ventilation in that area and the chamber is also large enough to install the sort of pumps necessary to intercept and pump the water at that depth.

  • So the water problem at ERPM, as far as we're concerned is not a problem in the long-term but it's, in fact, a solution insofar as the water needs of Ergo are concerned and we are actively engaging in the resolution of that issue.

  • The last thing that we need is the sort of situation which we had at the North West operation, where there was a sudden switch off of pumps and all of a sudden there was a scramble as to what to do with the underground water with litigation and Government getting involved and so forth.

  • Here's our operational review. We saw a 2% drop in total production and that's mainly because of the production in underground ounces, which I explained earlier on. Obviously, the -- this number would be very worrying to our United States investors.

  • But I think it's more an indication -- or I don't think, I know it's more of an indication of how our own currency is performed to theirs; 31% increase in dollar terms, 11% increase in the rand per kilo. And as I say, that's by and large because of the fact that we were unable to offset the cost at ERPM with production and the fact that we were carrying 100% of the overhead at Ergo without -- with only 50% of the volume flows and those are at really low recoveries.

  • Well, you can see the net profit. I think the taxation regime was kind to us in the sense that our assessed losses at ERPM could now be applied towards the future earnings of ErgoGold. The reason being that Elsburg Tailings Complex belongs to ERPM and that is the accounting conduit through which this is happening, and our auditors also recognize ZAR56 million negative goodwill. They believe we paid ZAR56 million too little for the 50% in Mintails.

  • All right, and this is Craig's part. Thank you.

  • Craig Barnes - CFO

  • Thanks Neil. Good afternoon ladies and gentlemen. Just to maybe correct Niel a bit, I think our auditors would be a bit concerned with him saying that they recognized it. I think the fact is that we recognized that number.

  • I'm going to the quarter's results first and then move onto a little bit of a discussion around the results for the full year. Our revenue for the quarter decreased by 22% or roughly ZAR116 million to ZAR420.7 million for the quarter. And that was a result -- or ZAR82 million of that was as a result of the 16% lower rand gold price, and the remaining ZAR34 million due to lower gold production.

  • The -- our net operating costs increased by 3% or roughly ZAR13 million. And that was really, as Niel mentioned previously as well, ZAR18 million of that increase was due to the consolidation of ErgoGold 100% from April 1, 2009. ZAR7 million of that was due to the higher winter tariffs for electricity and the remaining balance of that difference really results to gold in process amendments in the income statement.

  • That resulted in a 99% decrease in our operating profit for the quarter to ZAR1.3 million. The investment income line there for the quarter of ZAR3.3 million includes actually interest received of ZAR10.3 million, dividend and other investment income of ZAR3 million. And that was offset by a ForEx loss of roughly ZAR10 million, which is why that number looks a little bit small there.

  • The impairment number of ZAR19.4 million for the quarter is really the impairment of the City plant at Crown, which was as a direct result of the reduction in volumes coming from that plant going forward, and that resulted in an accounting impairment of the City plant.

  • The financial liabilities line, the ZAR8.8 million there is really the movement in the preference shares held by our black empowerment partners, which is treated as a financial liability on our balance sheet. That was a movement for the quarter.

  • Included other costs -- there's various items lumped into that number and it's probably better if you look at the quarterly presentation to get detail of that. But that really includes admin and other costs, depreciation charges, environmental provisions or movements in the environmental rehab provisions, finance expenses and the negative goodwill number of ZAR53 million that Niel mentioned is included in that line as well.

  • This is resulted in a profit before tax -- a loss before tax of ZAR81.2 million compared to ZAR95 million profit in the previous quarter.

  • Included in taxation, as Niel mentioned, as well, is a deferred tax -- a movement in the deferred tax assets of ZAR123.8 million -- ZAR 120 million and that really resulted, as Niel pointed out, due to -- because of the future -- or the current assed losses that ERPM and DRDGold that can be utilized against the future profits that we expect to flow from Elsburg. 65% of those profits will flow up to ERPM and 35% directly up to DRDGold.

  • The -- there was also a ZAR3 million adjustment to current tax and that really relates, I think, to Crown.

  • This resulted in a 2% decrease in our net profit after tax to ZAR42.6 million for the quarter.

  • For the 12 months our revenue increased by 4% to just over ZAR1.9 billion. And that was mainly as a result of the 30% higher gold price, which was obviously offset by 23% lower production in the year.

  • The net operating costs for the year increased by 11% to just over ZAR1.6 billion. And that really reflects inflationary cost increases, as we mentioned the consolidation of ErgoGold for the quarter, which really impacted that number. And that resulted in an operating profit of ZAR282.7 million, 26% down on the previous year.

  • Included in investment income for the full year, the ZAR82.5 million, ZAR75 million of that is interest received on our cash holdings. And really the balance is other investment income, and like dividends and also movements on the rehab trust funds, investment income from that.

  • The impairment of ZAR75.1 million for the full year, as I said, includes the City plant, which was impaired in the last quarter of ZAR19.4 million. And the balance really relates to ERPM underground assets which were impaired in previous quarters.

  • Financial liabilities, and again that is really the movement on the preference shares held by BEE partners treated as a financial liability on the balance sheet.

  • Other costs, as I said, similar to the quarter's number, includes, really admin and other costs, depreciation, the movement in environmental provision, retrenchment costs, finance expenses and also the negative goodwill number's included in there.

  • Really the increase in that number is really as a result of higher depreciation charges, higher rehab costs coming through in the year. There was also a provision that was made -- or an increase in the provision of our post retirement medical liabilities which came through Crown. That was an ZAR18 million increase, I think, for the year. And then also the retrenchment costs included in that line, mainly from ERPM during the year.

  • That resulted in a profit before tax of ZAR82.3 million compared to ZAR86.1 million in the previous year.

  • The taxation number of ZAR28.4 million includes current tax of ZAR42.6 million, mainly coming from Crown, which is in a tax paying position again for the year. And then deferred tax -- the raising of deferred tax assets of roughly ZAR75 million. Also STC, which was paid on our dividend of ZAR3.6 million, is included in that number.

  • And we ended up with a net profit, after tax for the year of ZAR110.7 million. That was down 28% on the previous year's net profit.

  • Moving on to the balance sheet; just some numbers that I want to highlight in there. Included under non-current assets, the biggest number in there is just over ZAR1.7 billion property, plant and equipment. There was quite a large increase in that number due to the consolidation of ErgoGold as at April 1, 2009.

  • Under the Accounting Standards and accounting for business combinations we had to, at that point in time, fair value the assets of ErgoGold in line with those accounting standards, which resulted in a fair value adjustment to ErgoGold's mining assets of ZAR546 million. In addition to that there was deferred tax relating to that, which you'll see when I talk about the long-term liability number there of ZAR185 million odd.

  • Also included in the non-current assets is a deferred tax asset of ZAR165 million, the investment in our trust funds of ZAR130 million and various other investments of just over ZAR40 million.

  • Our cash, obviously reduced quite substantially from the previous year, ZAR846 million to ZAR350 million, really reflecting the capital spend at our Ergo projects, and the acquisitions that we made of the additional 50% of Ergo.

  • Other current assets is made up, mainly of, inventory of ZAR94 million, debtors of ZAR88 million and assets held for sale of ZAR15 million. Included the long-term liability number, the biggest number in there is obviously our rehab provision, which is around ZAR413 million. The deferred tax liability, which I alluded to earlier with the acquisition entries of ErgoGold, which is in total, ZAR195 million, of which roughly, ZAR180 million came from that transaction.

  • Also included in there are the -- our provision for employee benefits of ZAR44 million. And the preference shares, which I talked about, we saw movement coming through on the income statement, the preferences shares are held our BEE partner of roughly ZAR65 million; so still no interest bearing borrowings on our balance sheet as at the end of this year.

  • Included in the current liabilities is mainly creditors of ZAR324 million and ZAR2 million remaining on the Anglo loan, which is really the loan to -- where we acquired the assets of Ergo from Anglo. So, there's only ZAR2 million remaining on that, which will be obviously spent in the following year; in the first quarter really.

  • And that's really what I wanted to cover on the balance sheet. So I'll hand you back to Niel to complete the rest of the presentation. Thanks.

  • Niel Pretorius - CEO

  • Thank you Craig. In your pack, there is a summary of our reserves and resource. Obviously the biggest move was this one here, 2.6 million ounces at ERPM across -- but down to 1.5 million ounces. And that's really the -- that's what remains of the surface ounces at ERPM the Elsburg Tailings facility. Because of the care and maintenance decision, late last year and, of course, the decision now to close, the difference between the two is now recognized as resource, as deepwater underground resource.

  • There are -- the -- this is our resource statement. It's -- you see the biggest chunk really still remains our underground -- deep level underground resource; a nice increase there also at Ergo, with increased drilling and test work and so forth.

  • The splits between surface and underground, and reserves and resource you'll see there's a page also on that in the bundle and the movement on that resource. Underground resource on surface, we've got a lot of surface resource left, just under 10 million ounces, which obviously makes this linkup between Crown and Ergo such a compelling idea going forward.

  • Just the operational review; I think I've said most of what I wanted to say about the operations during the summary -- the initial summary. But as you could see, the pretty sharp drop off at Blyvoor and that, as a consequence of the sharp drop off in underground production.

  • This remains a very good number, our costs -- surface costs of $365 an ounce; ZAR100,000 per kilo the Blyvoor surface record. It remains our most profitable circuit of all of our circuits; and then just the profit and CapEx numbers.

  • Operational review at Crown; well, Crown does show a 13% drop in ounces in production. However, the combination of Crown, Knights and City, which are really the three surface plants other than the Brakpan plant, and which fall under the authority of the same General Manager, remain consistent. They actually went up to 23,000 ounces up from just over 20,000 if I'm not mistaken.

  • So, on the whole, the performance of those three circuits well within expectation. And also satisfactory, you could see that cost line which has always been pretty flat and predictable. The production in ounces, of course, is consistent with the phasing out of the Crown Tailings facility. This is an 18 month program and it will be phased out after Top Star has been mined. We've reduced tonnes -- controlled reduction of tonnes through the two City -- through the two City -- through the two Crown plants, City and Crown to 400,000 tonnes per month.

  • In order to maintain surface run rate, of course, we need to link up the Crown footprint with that of Ergo. We have the contractual rights to do that. Notwithstanding the fact that we don't own the whole of Ergo Mining, the company, we do have the right to deposit tonnes in addition to that which merely comes out of the Ergo -- the Elsburg circuit on to that and, hence, the idea of a continuation of the mining of the Crown resource. It's not just a concept; it's very much within our operational means.

  • ERPM, obviously we didn't spend more money on ERPM. Costs have actually come down. But, of course, we didn't see this happening. We didn't see the production going up from surface reclamation, and hence the decision to just bring it all to an end.

  • In these numbers the production from Cason. Cason goes into the Knights plant which is managed by the Crown management. You can see that a lot of the issues that they've dealt with in the past, they managed to address. And we saw a handsome increase there, taking Crown, the three -- the three Crown plants, Knights, City and Crown Central up by about 3,000 ounces.

  • ErgoGold, we're paying 100% of the cost. It does have a high overhead component -- a fixed overhead component. But as at the end of this quarter we were only putting 50% of the total intended volumes through this plant, and hence the larger, rather high per unit costs. As I pointed out to you earlier the true efficiency measure of rand per tonne is bang on target at ZAR25.

  • We're very happy with the fact that the second line, has now come on stream and running at that rate that it does. It's a very impressive and imposing set up that our engineers managed to establish there. It's the highest face that's mined for surface tailings, and I think anywhere in the world. It's got a 35 meter high face. It's being mined from opposite directions. So it is pretty impressive. And I think that also maybe contributed towards the healthy volume flows that we're seeing from that.

  • So going forward, what we think we should be doing going forward in order to deal with all of things. The first thing which you don't see here is we believe it's the right thing not hedge. Simply, because we believe that the drop in revenues that you're seeing in South African goldmines now, it's not because the dollar price of gold has gone soft. It's because the rand is performing so well.

  • And if you hedge now and the rand goes soft then you will have industry inflation very similar to what we saw in 2001, 2002, which means that your hedge is going to get the -- underwater so quickly that you'll regret that decision forever. So we will just work through this phase.

  • We'll just have to apply the -- our asset mix in such a way that we could come through this phase until after the gold price recovers. And if the gold price doesn't recover, as I said to you earlier, we want to make sure that we position ourselves in such a way that we could operate sustainably at the equivalent of ZAR250,000 per kilo. And I think looking at the numbers, you'll see that that's certainly within reach.

  • By December this year the split between surface and underground will be 70% surface and 30% underground, thus further I think diluting the impact that underground volatility has. And I know we talk a lot about underground volatility and the risk associated with it.

  • But I think I just need to reiterate that in April of this year Blyvoor gave us ZAR26 million in operating profit. Blyvoor has been cash positive after CapEx by some handsome numbers over the last two years. And I don't think we should allow two or three months of negative trends in the gold trend cycle to cause knee-jerking.

  • One of the senior -- one of our senior colleagues, if I could call him that, the CEO of Harmony, Graham Briggs said the other day, don't panic yet. I think that's very important. We're not panicking yet, because I think we've got the asset mix, the balance sheet, the cash resource in order to see this cycle through.

  • So we will continue to rehabilitate these damaged panels, because the gold's there. We will continue to develop towards the Main Reef at Blyvoor.

  • We've closed ERPM underground. We will not dispose of the equipment at below salvage value. I think we'll try to be a little bit more innovative this time round, when we start disposing of assets. Maybe by way of the Internet, have more international exposure. But we don't have to sell anything, we can hold on to it until the demand for this sort of equipment improves and we could sell it at the sort of values that, I think, are justifiable.

  • We have the means to grow our surface footprint. And we are very confident that we will increasingly start achieving the project parameters, which supported the Ergo project; the wonderful engineering that's been put in place. And I think we have a solid ore body and the means do deliver the materials to plant.

  • The Ergo Crown pipeline feasibility study will go ahead. It's important that it does go ahead, as I pointed out earlier, contractually. We have the right to deposit everything that Crown can treat onto the Brakpan's Tailings facility, not just the Ergo volumes. And we will seek to exploit those synergies.

  • Still a lot of gold in our other dumps and there's no reasons why those plants should close. We could put the materials through those two plants, City and Crown, and simply just pump the residues through to Brakpan. We have an uninterrupted line -- line rights, which will allow us to do that.

  • But there's a bit of video material as well which shows you what a good paint job the guys [already] have done. (Video playing).

  • All right, I'll just promise that next we'll play something by Kurt Darren to accompany the visuals.

  • Well, I think Craig and I will take questions now. We've had enough of this leopard running across the savannah type music.

  • Unidentified Audience Member

  • Hi, Niel. Hi my name is [Paulo] from Anglorand Securities. I want to ask you a couple of questions if you don't mind.

  • Number one, you say you've got an average price of $900 an ounce. Quarterly average US dollar per ounce price is $922.09. You've said placing that on your 57,000 odd ounces, that's ZAR10 million which I can't account for. I'm not quite sure where that's gone. And why are you setting it at $900 if you don't sell gold forward?

  • Extraction efficiencies, you guys are talking about 50% coming out of Ergo, out of the Elsburg dumps. Initial numbers, you guys are talking 0.32 grams per tonne, and we could expect when we did our models on 0.16. I see you guys are doing 0.04 and you're saying you've improved by 100%. Is that still 50% lower than what you were expecting?

  • And another thing, your road show, you went out to the US markets (inaudible) and NASDAQ, because obviously investing on the NASDAQ -- on the NASDAQ counter. I see that your stock is being sold by the US not by the South Africans. Transparency, I think that could be a little bit set for DRD position, because you guys aren't really keeping us in the loop.

  • And while the US guys are not liking the story, what were your feedback -- is your feedback from the US investors?

  • And one more thing, why a ZAR10 million loss on FX in your investment line? Thank you.

  • Niel Pretorius - CEO

  • Right, looking on your first question, the -- how we arrive at the $900. I think it's probably best if Kobus, our financial -- answers that. Do you want do that now?

  • Kobus Dissel - Group Financial Manager

  • You've obviously calculated on a daily average over the quarter, but the gold doesn't get sold daily. Gold gets sold either on a weekly basis, on different times during the week for instance, and that would have a --

  • Unidentified Audience Member

  • (Inaudible - microphone inaccessible).

  • Kobus Dissel - Group Financial Manager

  • Well, that would --

  • Unidentified Audience Member

  • It would mean you're selling -- I don't understand, because it means you're selling some stock -- some of the stock below [$900] (inaudible).

  • Kobus Dissel - Group Financial Manager

  • Yes, but I think we could take you through that in detail, but I would expect that that's the reason there.

  • Niel Pretorius - CEO

  • Well, then on the extraction efficiency issues, yes, we started off at about 0.04. We achieved about 0.08 by the end -- was it about the end of last month, we were getting around 0.08? So that's below project assumptions still. But we think we'll get closer and closer to what the project assumption is with the new material.

  • Unidentified Audience Member

  • (Inaudible).

  • Niel Pretorius - CEO

  • Well, we --

  • Unidentified Audience Member

  • What are we looking at? Are we looking at 0.16; is 0.08 (inaudible)?

  • Niel Pretorius - CEO

  • Well, I think it depends. If the problem is an engineering problem then obviously it's something that you could fix, if it's in the plant itself, because I know the assumptions that we made are assumptions that are more optimistic than what our predecessors there achieved, and are certainly not more optimistic than what we're achieving at any of our other circuits. So, if it's an engineering problem it's something that we could fix.

  • But we also do have to consider though, as well, as a possibility, is the quality of the ore body itself. Now remember, we brought in the L29 dam as an early starter basically, which consists of 15 million tonnes of material. Now that dam has been treated once before. It has the grades, which initial drilling and test work suggested it would have. The grades are not a problem. The grades coming into the plant certainly also are not a problem. It's what we see -- the percentage of what we actually extract from it.

  • Now, if from a second generation dam, by virtue of the fact that it had been treated previously, we do not get the sort of efficiencies that support the project initially, then for as long as we have a mix of Benoni and Elsburg material, the recovery will not be 0.16, because it's intended to run 50/50 until after Benoni is fully depleted. And I think we're probably about 60% through Benoni as we speak.

  • What we have created though, and if it does turn out to be a material problem, is the ability to pump more than the 50% intended contribution from the Elsburg dam, which is a first generation dam, and then otherwise sacrifice some of the Benoni materials. We have a four year window, during which we could treat Benoni. And we obviously want to manipulate the mix as much as we can.

  • Once the Benoni materials are no longer coming to the dam, if that is the cause then, of course, we will get to the extraction efficiencies that we're accustomed to at all of our other circuits.

  • Unidentified Audience Member

  • As an investor I'm a little nervous when you say you think, because we've got a situation here where we've obviously -- you're putting it out every quarter aren't you? Every quarter we just [add] another three months.

  • Niel Pretorius - CEO

  • Yes.

  • Unidentified Audience Member

  • I'm asking (inaudible - microphone inaccessible), but the real crown in the jewel, this whole Ergo plot, you say you think -- are we try, are we going to -- what have they raised at the moment, since August 3, coming out of Elsburg?

  • Niel Pretorius - CEO

  • What we're seeing in Elsburg now is that the concentration -- the carbon concentration, is up from 300 grams a tonne to 500, and spiking at 700. So we're seeing a very real and distinct increase. Once we've upped the elution circuit flow rate, we could do the elutions at such a rate that we could pull off all the gold off that carbon.

  • And then, relying on past experience, relying on past performance of our circuit, we'll get to the efficiencies that I think that we've been achieving over the last 20, 25, 30 years.

  • Unidentified Audience Member

  • Could you give me a date as to when I can expect as an investor to hit those numbers?

  • Niel Pretorius - CEO

  • Well, it's very difficult to give you a specific date.

  • Unidentified Audience Member

  • (Inaudible).

  • Niel Pretorius - CEO

  • I've been saying to the market now for -- well, during the road shows and also in the lead up to this, I've been saying to the market that we're targeting September of this year as steady state. In other words when the volume flows are where they need to be, and where the extraction efficiencies are where they're supposed to be.

  • I set it as a goal for ourselves as a team to achieve the additional 15,000 ounces for the last quarter of this calendar year.

  • Now, you know what? We have very skilled people working at this, people with several decades of experience. We've people working with something that they are familiar with. They have experience and -- previous experience in this. We have people that have taken a very conservative estimate in what it is that they can achieve. Based on the circuited live, based on the two recent slime zones that we pumped through Crown and through City Deep.

  • So I'm confident to sit here and say to you that I believe the worst is behind us. And maybe I can illustrate this by way of example; when we started off -- because whilst we're running at -- a similar kind of circuit, we've never really attempted something of this magnitude, of this scale.

  • So when we started off in October of last year, with the Benoni [tailings], the L29 dam, we had -- for probably the first three months, we had real issues dealing with the volume flows. Our screens were choking up. We had problems with densities. I think at one stage one of the agitators went on the blink; we had to drain the entire tank. And that was a valuable learning curve for us in how to deal with these larger volumes.

  • If we started the Elsburg tailings then in August, and we had similar problems, I think I would have been a little bit despondent now and I would have said to you, maybe we don't learn from previous experience. But the volume issues going into that plant were very efficiently dealt with. I have no reason to believe that the recovery and the elution issues will not be dealt with as efficiently.

  • And as I said, we've already seen a double, with material that may be of questionable quality, having been treated in the past. But what I can assure you is that once the solution circuit has been upgraded, to have additional capacity and facilitate the volume flows that are required to do the elutions at the required rate, the gold that's in Elsburg we're going to pull out at the same efficiencies that we're pulling it out elsewhere in circuits of a similar nature.

  • Does that address some of your concerns?

  • Unidentified Audience Member

  • It does, thanks Niel. Yes, just really that; I was hoping that you guys -- when you guys gave us numbers last year when we visited the plant and things looked good and I understand it was a refurbishment and the years of experience, which would have -- well, we would have known that things aren't always got a [repayment]. Aren't you guys actually under shooting a bit, so that you guys would look great when it comes to this time of year? And yes, (inaudible) could be that you under shot in the -- under shot rest of the year above that or below that --

  • Niel Pretorius - CEO

  • Yes, yes.

  • Unidentified Audience Member

  • (Inaudible).

  • Niel Pretorius - CEO

  • Look, the recovery side out of Benoni have been a very big issue for us, and I can tell you that the team working with that, it hasn't been a pleasant time for them. Nut what I am seeing going there now is that the mood is certainly improving. Elsburg was a big day for us; you could see that people were, in fact, happy.

  • And you can gauge a lot from just the demeanor of people on site. And there's certainly a much more optimistic mood and a much more optimistic demeanor amongst the people in the know; the guys who actually do the numbers and who are in charge of the engineering, and so forth.

  • Unidentified Audience Member

  • (Inaudible - microphone inaccessible), because those are the guys who really to want [to buy] in your Company, (inaudible) pay them back.

  • Niel Pretorius - CEO

  • We want them to buy the Company?

  • Unidentified Audience Member

  • You want them to be buying the stock (inaudible - microphone inaccessible). I run a hedge fund, and I can tell you that your stock comes 3.30 every afternoon (inaudible - microphone inaccessible), every afternoon.

  • Niel Pretorius - CEO

  • Yes, when the States --

  • Unidentified Audience Member

  • Because the States, it's the American investors, and when you went on that road show there was a hell of a lot of interest, because I saw the bids coming in at 3.30. And now it's the opposite way round. So I'm not quite sure if that's [termed] a solution if they're going to wait another year to see if they're going to get back on board?

  • Niel Pretorius - CEO

  • Look, it's very difficult to know what's going on in the heads of these investors, but I'll give you some background as to why the decision to do the road shows, and what it was that we said at those road shows.

  • I think there are -- I'm sorry?

  • Unidentified Audience Member

  • (Inaudible - microphone inaccessible) rand gold price of [250] [which is] what you want, but loads of operations they're are running at 280, 290 some at 600, some at 800.

  • Niel Pretorius - CEO

  • No, look, what I'm saying is that I don't want a 250. I want a 350. But what I'm saying is your business has got to work at 250 if you want to have a business.

  • The -- I have a concern or I had a concern. I developed a concern, with regards the United States investors. And my concern was the following. We started to get some of the funds coming back and supporting our stock. And obviously the funds are traditionally slightly more conservative than your retail traders. And obviously the funds suffer because of some of the decisions that the retail traders make.

  • Now traditionally our stock closely track the dollar price of gold, and I think many of the retail shareholders in the United States think that because the dollar price of gold is high, there'll be the sort of margins that they've grown accustomed to over the last 2, 3 years, coming out of our operations, because they've been pretty good years. And I wasn't convinced that the offshore investors were really factoring in the effect that the stronger currency was having.

  • So, in other words, my road show was really to say to the guys, listen, take last year's presentation, or last quarter's presentation. All you do is you adjust it for the exchange rate and just make sure that you understand the dynamics which impact on our stock.

  • I don't think that, that is unfair, or improper, because you guys know that. You're right here. You know what impacts on our stock, and you factor that into your investment decisions. But I don't want people who recently got involved in the stock to now get burnt, because they inadequately factor in the dynamics that impact on our stock.

  • And that was pretty much it. And both of those trips were initiated by brokers who invited us to go and see them. I'm happy for any of the brokers here to go and see your clients if you want me to.

  • Unidentified Audience Member

  • I just think that you're in a sexy space at the moment. [The whole] financial crisis, where we're going. You're in a sexy space. So I imagine that the fund managers you were seeing -- were looking at an operational level and wanting to hold on for the long haul, not daily punters.

  • Niel Pretorius - CEO

  • I can assure you that the retailers are probably going to be a little surprised by what they see, and maybe they'll dump the stock. But maybe many of those institutional investors will understand the business story good enough to step in and take up some of the stock.

  • Okay. Thank you. Steve.

  • Craig Barnes - CFO

  • Just -- sorry, your last question I think was on the ForEx loss. So that related to the early offshore structure. It was a remaining debtor for withholding tax that came back from Emperor and it was really the realization of that loss hit our income statement.

  • Unidentified Audience Member

  • Well I'm not a disillusioned PA investor, and could you talk to us about the future, Niel, because clearly you're going to have three months of winter power tariffs coming through. I don't think you've -- have you put your wage increases through yet?

  • Niel Pretorius - CEO

  • No.

  • Unidentified Audience Member

  • Or you're doing them in October I think?

  • Niel Pretorius - CEO

  • That's true, yes.

  • Unidentified Audience Member

  • So we've got a pretty clear view of where those are likely to go.

  • You've got ZAR353 million left, cash on the balance sheet. The underground grade at Blyvoor sounds like it's going to stick around at 4.4 grams a ton, is it? Because I'm not sure when that seismic activity knocked out those higher grade panels in the quarter.

  • Niel Pretorius - CEO

  • Yes.

  • Unidentified Audience Member

  • But the way it looks to us is that you're going to be fairly profoundly cash flow negative at Blyvoor [80]. On -- and -- or so can you comment on that?

  • And can you comment on how much CapEx you're going to be spending in the next quarter, couple of quarters, maybe, if you can?

  • And finally, that ZAR353 million of cash is ZAR500 million less than it was this time last year. It looks like you could go into a situation where you need some external funding again, perhaps, if things stick around where they are at the moment, gold price, rand per kilogram, gold price wise. Could you share with us what your contingency plans would be to seek external funding? Would it be an equity capital raising? Or would you go for debt? And that'll do for me thank you.

  • Niel Pretorius - CEO

  • Certainly. Look, I think in so far as the trends at Blyvoor are concerned, I think you're probably pretty accurate in your assumption. We had the seismic event on --at the beginning of May, so it impacted immediately on the numbers from there.

  • We're not going to -- I don't think our strategy will change, because the strategy that we have of growing the surface assets is the strategy that's allowing us maybe a little bit of more room to maneuver at a time like this.

  • We have a different asset mix now, because we don't hedge. And we know that there are always going to be these cycles in the gold price, and therefore we will continue to grow that asset mix and maybe start favoring surface side even more.

  • So the -- I'm trying to think what your second question was. I had a very good answer for it, and now it's slipped my mind.

  • Unidentified Audience Member

  • The questions revolve around the cash flow situation at Blyvoor.

  • Niel Pretorius - CEO

  • Yes.

  • Unidentified Audience Member

  • And the wage increases, the power increases --

  • Niel Pretorius - CEO

  • That's correct, yes.

  • Unidentified Audience Member

  • The depleting cash buffer that you've got.

  • Niel Pretorius - CEO

  • Yes, what we worked out is that the power increase that Eskom is proposing will add just under ZAR12,000 a kilo to the unit costs of our underground circuit. The wage increase will add ZAR7,000 -- or the wage increase that we offered, 6.5%.

  • So you could run the numbers and see where it is, where it's going to. That's more. That's about just under ZAR20,000 a kilo for the underground circuit, just those two components.

  • Now what we did in order to address that, is you could see that we don't see trends changing at Blyvoor underground by the beginning of next year. So we approached Eskom, about a 1.5 month ago and said that they should allow us to defer the implementation of this until after six months, until after we find our feet and an increase -- and see an increase in our grades.

  • It's a recommendation that was -- they made the recommendation. The Regional Manager of Eskom made that recommendation to the person that he reports to. They have a body that considers this. They turned down our request initially, but they've taken it to the Senior Executive. They've taken it to the CEO himself of Eskom. Now, I don't know if he has enough time to consider our request, but we're hoping that that deferral will be favorably considered.

  • And we did it for the following reason. Not only because there's about a six month window during which we need to see this come through, but we also made the wage increase contingent upon an increase in the gold price. So whilst I'm saying to you that you need to be able to run your business at ZAR250,000, the reality is that we can't at this stage, not at Blyvoor.

  • So we said to labor that we'll give you a 6.5% increase as and when the rand price of gold hits ZAR275,000 a kilo. But I think that is a sure fire way of having a strike declared, not because of anything other than the fact that I don't think the Unions are really in a position to accept this sort of condition. So we envisage that we might have some labor action. Obviously that will be on a no-work, no-pay basis.

  • Maybe the gold should stay in the ground a little bit longer? I don't know, until after the gold price recovers.

  • In so far as the cash situation is concerned, we're not going to wait until the cash position deteriorates to the point where we are beyond the point of no return. We have some very clear and definite [pins] in the cash flow position of our Company that will prompt certain decisions.

  • One thing that I can say to you, Steven, it's because I've been personally involved in some of these things in the past, is high on my priority list is to prevent hardship and to prevent a contingent loss to neighbors. So those are two very important things. Like at the North West operation, the flooding issue; can't have that. I'm not going to cause embarrassment to Gold Fields and to AngloGold, Ashanti and Harmony by a sudden and uncontrolled flooding of Blyvoor.

  • So what I can say to you is that there are clear and distinct decision markers going forward over the next few months related to the position of our employees, related to our cash flow position and related to the sort of recoveries that we've seen coming out of Blyvoor.

  • The first stop -- step, of course, is to right size and bring production costs in the underground to the circuit to below what we believe is sustainable. We're not going to allow the cash to run out and simply just announce one day that there's another sudden decision that was taken that has severe impact on interested parties.

  • Unidentified Audience Member

  • So, are you saying to us that you foresee external funding or you don't foresee external funding?

  • Niel Pretorius - CEO

  • No, we're not looking for external funding. And the strategy that I've discussed with my Board over the last three days is one that assumes the preservation of our business and the preservation of a certain quantum of cash -- amount of cash as markers to take the next step.

  • Unidentified Audience Member

  • Okay.

  • Allan Cooke - Analyst

  • Hi Niel, it's Allan Cooke from JPMorgan. Could you just talk to us about the [staffing] license in Mintails?

  • Niel Pretorius - CEO

  • Yes.

  • Allan Cooke - Analyst

  • The deal that fell through. And what's happening with the uranium?

  • And then also out at the West Rand, what were the assets in particular that you were interested in there? And to the extent possible can you talk to why that deal fell through? And which [blocks] it was that had the high valuation on the assets; interesting sales announcement that they put out.

  • Niel Pretorius - CEO

  • Yes, certainly. Look, I'm disappointed that the deal didn't go through, because I think there's a wonderful opportunity for both DRDGold and Mintails to benefit from a much larger surface reclamation footprint. And we would have been able to link up the entire West Rand through to the Far East Rand.

  • The -- look, we made the offer for two very distinct reasons. The one is we thought that it was a good deal; that both parties would benefit from it. But we were also concerned about the ability on the part of Mintails to fund their proportionate rehabilitation funding out of the program. And also to take care of that West Rand footprint, because remember the West Rand footprint belonged to DRD some years ago. And if Mintails were to fall over then a lot of those rehabilitation issues would find their way back to DRDGold and that's more litigation, because Government will say it's our job to do something about it and we'll say no, it's not.

  • So we were a little bit concerned about the fact that perhaps if Mintails don't do as well with the projects that they were running with that they would go into distress and that these things would come back to us. So there were two very good reasons; managing risk and also the clear and compelling synergies between our businesses and the opportunity to grow something really, really nice; really fancy.

  • It would seem that amongst the shareholders of Mintails some of them, at least, there was the suspicion that the value of the uranium resource was under declared. Now look, what I'm telling you is basically what I read. Whether that was a valid objection I don't quite know.

  • If Mintails were to come to us tomorrow and say we'll do the deal with you on the same terms that you proposed, I'm pretty sure that my Board would support a decision to extend the offer to them again. But they haven't. It's a disappointment, but at least they now have some additional funding with which they could continue to match either capital requirements out in the East Rand and grow their business on the West Rand and make that a sustainable footprint and reduce the (inaudible) and environmental liabilities associated with it.

  • Allan Cooke - Analyst

  • But -- sorry, just to -- do you have an idea of the potential liability rand million number roughly, or a range?

  • Niel Pretorius - CEO

  • I'm not sure. I'd be very reluctant to say something here that embarrasses my colleague, Dick van der Walt. But, yes, it's certainly the sort of liability that you could really only cover if you have a business there.

  • Allan Cooke - Analyst

  • Okay then. Maybe a last one; in your guidance on CapEx for the 2010 financial year, what do you plan to spend at Blyvoor, Ergo and Crown?

  • Niel Pretorius - CEO

  • Craig will take that. He's actually got the whole list here.

  • Craig Barnes - CFO

  • Okay. The total capital is round about ZAR240 million for the year; roughly ZAR116 million at Blyvoor, ZAR36 million at Crown. Really most of that capital is to be spent on the deposition sites there.

  • Remaining at ErgoGold is round about ZAR40 million. I think most of that relates to reclamation stations, just really getting that second stream of 600,000 tonnes capacity up from Elsburg. Charles, am I correct there? There's about ZAR28 million worth of capital at Ergo. And another ZAR14 million where we want to spend some money on just bringing some properties to value at ERPM and disposing of them.

  • Niel Pretorius - CEO

  • Thank you. Leon Esterhuizen from RBC has a question. In all difficult seismic mines mining volumes are critical to maintain profitability. Does the Main Reef have the capacity to offset Carbon Leader completely? Assuming it carries lower grade, do you have enough points of attack for ample volumes? I'm going to ask Collie maybe just to help me here. Collie, what is the ratio going to be in six months from now, Carbon Leader and Main Reef?

  • Collie Russouw - Executive Officer, Underground Operations

  • Niel, thank you. The ratio of -- historically was 60% Carbon Leader, 40% Main Reef. We'll never get away with just mining Main Reef, because you'll not get the right recovery grades.

  • At this point in time it's round about 55% Main Reef and 25% Carbon Leader. The right balance would be to have 55% Carbon Leader and 45% Main Reef. In other words, in totality increase Main Reed and in totality increase in Carbon Leader. We've been spending a lot of capital on development which three years ago was non-existent and we're confident that this flexibility's going to kick in in the next six months, as you now appreciate.

  • Niel Pretorius - CEO

  • Thank you. Right. There are no further questions. [Sydney]?

  • Unidentified Audience Member

  • Sorry, can I just -- just to add on to Leon's question, you only showed us a little bit of the plan there, Collie, on the slide. But you haven't got much development, you say, and obviously therefore your flexibility on the Carbon Leader's limited, isn't it. So I guess sequential grid mining is a little bit challenging for you, isn't it?

  • And I don't know if looking at the geology on that slide, there seemed to be quite a lot of dykes and such which are notoriously active and if you're not mining in the right sequence, isn't there a pretty significant risk that you'll have to stop periodically to prevent -- if your energy release rates get too high? So how confident can you be in being able to get to that production under those circumstances?

  • Collie Russouw - Executive Officer, Underground Operations

  • Steve, it's -- the grade at Blyvoor was always the tributary area of (inaudible). There is got a huge block to the west of the area where we had these high grades and the recent seismicity. A lot of money's gone into that development and it's much bigger blocks, which you don't run the risk of the sensitivity in terms of seismicity.

  • So yes, between 38 levels and 35 levels to the west we've got nice grades. And that development's going to kick in and obviously will give us (inaudible) and the grade.

  • Unidentified Audience Member

  • I think also it's 90 meters on the hanging wall, if I'm not mistaken. So it's to an extent distressed.

  • Collie Russouw - Executive Officer, Underground Operations

  • Yes.

  • Unidentified Audience Member

  • The Main Reef is 90 meters from the Carbon Leader hanging wall. I believe it's been (inaudible).

  • Collie Russouw - Executive Officer, Underground Operations

  • Yes, it's been under stoped.

  • Unidentified Audience Member

  • Yes, it's been mined.

  • Collie Russouw - Executive Officer, Underground Operations

  • But the majority's been under stoped.

  • Unidentified Audience Member

  • It's under stoped, yes.

  • Niel Pretorius - CEO

  • Thank you very much, everybody, once again for taking the trouble and time to come and listen to us.

  • I hope that what we're trying to achieve became apparent through this presentation. And I'm hoping that over the next six months we can show progress on the things that we told you about.

  • Please join us for some coffee and snacks. There's some snacks, [rice cooks] and a complementary (inaudible), so come and have a bit of chin wag with the boys. Thanks.