  • Niel Pretorius - CEO

  • Good afternoon everybody and thank you very much for taking the time to attend our quarterly presentation. I know that we probably didn't pick the best day with Harmony also releasing their results and I believe the [Livingstone] (inaudible) are also taking place at the same time, so we do appreciate the fact that you managed to find the time to come and attend this presentation.

  • While I give you an opportunity to read through the disclaimer, I think what I would probably -- what I would like to achieve with this presentation today is when going through the numbers, particularly the operational numbers, I would want to -- hope to point out to you that many of the results that you see where we came in lower than in previous quarters, were not as a result of trends, but rather as the result of events and we'll talk to those events in some detail.

  • And then I would also want to spend some time just talking about some of the dynamics that we've been experiencing and that we experienced especially over the last three quarters of the previous calendar year, how that has impacted on our thinking and I think how that has impacted also on production generally in the South African mining industry and how that affects strategy and strategic decision-making going forward.

  • Key features for this quarter is financially, and this is mainly due to -- sorry, we started a few minutes earlier. Thank you Steve, thanks very much for coming.

  • Going through the key features. Financially it wasn't a bad quarter, but then again the gold price also was quite a bit higher this quarter than in the last quarter. We did see a 65% increase in operating profit. We saw a 30% rise in headline earnings per share. A 2% drop in cash operating costs. This is during a quarter where we provided also for the retrenchment costs of the ERPM, so whilst we had that additional cost, and whilst our cost per unit went up substantially in certain circuits, we spent less money producing the gold that we produced.

  • One of the definite highlights for us was the acquisition of the balance of the Mintails' equity in the Elsburg joint venture. The Elsburg joint venture is the gold face or the gold circuit in the Ergo operation. And essentially what this means is that, for the next 12 years while we access and mine the Elsburg tailings consisting of just over 180 million tons, the benefit of that revenue stream would be for the sole benefit of DRDGOLD.

  • And then we also took the decision to suspend underground operations at ERPM and we have retrenched the entire labor force with the exception of 150 employees who would look after the assets and do a bit of care and maintenance, until such time as we have a better view as to where we want to go with the ERPM underground.

  • Just a snapshot of our operational performance for the quarter. We see that the average costs per ounce were $654 per ounce. That is the average that we arrive at from the lower cost circuit of Crown, right through to the highest cost circuit of ERPM. Obviously ERPM was affected by the fact that its production was down 5,000 ounces for the quarter without a change in its cost -- a real change in its costs.

  • Blyvoor had a very good quarter, its surface circuit had a very, very good quarter. The underground circuit did not perform as well, and in fact the month of December was a pretty challenging quarter for Blyvoor and I'll take you through some of those events further down.

  • Crown finally managed, I think after three years, maybe a little bit more than three years, it finally managed just to hit the button on Top Star. And whilst Top Star's commissioning was delayed by approximately four weeks, due to a variety of issues that I will also talk to you later on, it is achieving the volume throughput now, which it had intended to achieve as forecast and also producing some pretty good grades in the process.

  • ERPM, the underground operations have been suspended. We had some care and maintenance. Surface operations, most notably, case and dump which goes into the Knights circuit and Elsburg which goes to Ergo; those will continue.

  • And then the Ergo circuit, ZAR26 million was spent in capital there. The capital spend is coming to an end, it will come to an end this quarter. Its first phase was commissioned and is on track to achieve the volume throughput that we had forecast and based upon which we had commissioned this project.

  • The next two slides my colleague, Craig, will take you through.

  • Craig Barnes - CFO

  • Thank you Niel. Good afternoon ladies and gentlemen.

  • Our income statement for the quarter; gold revenue was basically unchanged quarter-on-quarter, even though we had a drop in production of 15% due to the suspension of our underground operations at ERPM and also because of a reduction in volumes at Crown for various reasons which Niel will talk to. This was largely offset by an 18% increase in the rand gold price received.

  • Our operating costs showed a slight reduction for the quarter and this was again mainly as a result of the suspension of underground operations at ERPM. But we are also seeing a reduction in the price of certain commodities coming through in this quarter, especially on steel prices. That resulted in an operating profit which increased by 65%, from ZAR57.2 million to ZAR94.3 million for the quarter.

  • Our investment income was mainly made up of the interest received on the cash. The impairment that we raised for the quarter was related to the capital -- some capital that we had spent on ERPM during the quarter. Financial liabilities line, that relates to an adjustment that we made to the preference shares that are held by our black empowerment partners. And included in the other cost line is -- are the rehabilitation -- sorry, the retrenchment costs relating mainly to ERPM of ZAR34.4 million.

  • This resulted in a profit before tax of ZAR63 million compared to the ZAR5.5 million profit in the previous quarter, and a net profit of ZAR33.4 million for the quarter compared to an ZAR8.8 million loss in the previous quarter.

  • On the balance sheet, we've managed to maintain a strong balance sheet. We still have a significant cash balance of ZAR609 million and this is even after we've spent a significant amount of capital in the last quarter, especially on Ergo and we paid our dividend out in the last quarter.

  • We basically have no interest-bearing debt other than a small amount which is still owed to Anglo, around ZAR25 million on the purchase of the Ergo assets. And we are still sitting with a very healthy current ratio.

  • Okay, thank you. I'll hand you back to Niel for the rest of the presentation.

  • Niel Pretorius - CEO

  • Thank you Craig. Talking to the operating results of the quarter, as I pointed out to you earlier, the surface circuit at Blyvoor performed extremely well this quarter, it came in with a 4% increase. This is mainly due to the fact that the areas that are currently being mined in the circuit are the lower lying areas of the Tailings dams, the five and six dam where the yield is definitely better, and its tonnage profile also improved significantly over the quarter. We spent 2% less money than the previous quarter on producing the gold that we did.

  • The underground operations were going alright -- going along quite well up until the beginning of December. During the month of November, it was still producing gold at $650 an ounce. But December was a fairly challenging month when towards the end of December production tapered down quite significantly prior to the Christmas break. And then of course, we also had a fatality right at the beginning of the quarter and whilst the interruption due to DME intervention, the Inspectorate intervention, was only two days, there is always the issue of a day of mourning subsequent to that where you have 100% stay away and your labor force just do not show up.

  • What we've come to realize at Blyvoor, underground in particular, is that the areas from which we mine and where we have been investing over the last two years have created a balance which does leave Blyvoor exposed to volume volatilities. A lot of our production comes out of Five Shaft which is the higher grade area of the higher grade shaft.

  • Over the next few months and through the next few months, over the next two or three calendar years, we are definitely going to have to open up more areas, in particular the Six Shaft and in Four Shaft.

  • Now in Four Shaft, that process commenced about a year ago and Four Shaft's volumes are already touching those of number Six Shaft. It's predominantly Main Reef mining and we are seeing more and more tons coming out of the Main Reef and we now need to do the same with number Six Shaft.

  • Of the Main Reef which lies above the mined out area of Blyvoor, only 5% has been mined up until now. So by developing into that, one could quite easily access those sections of the Main Reef which do hold promise. The reason why we have been avoiding it, or why those before us avoided it to the extent that they did, is that your Main Reef grades are not as consistent as those in the carbon leader, but in the current context, current gold price context, one could certainly, with swings and roundabouts, offset to a large extent the inconsistencies in grade.

  • The (inaudible) pay shoot is a proven high grade Main Reef pay shoot and that's definitely the one that will be attracting our attention in the months going forward.

  • The WAP project, that build-up has reached 610 meters which is the highest that Blyvoor has achieved over a long period of time. And with the Way Ahead project, with the WAP project, we have not come across any of the fundamental assumptions which cause us to invest in this project that turned out to be flawed. So the value assumptions are there, the assumptions of cost per unit which justified the project, those are all turning out to be correct.

  • ERPM. We spoke a lot about ERPM in the months prior to the previous quarter. We shared with the market the feasibility study that we had been running on the Sallies 1 area which is adjacent to ERPM. We talked about a decline shaft into that area. We had searchers looking at the feasibility of that and the CapEx spend going forward in respect of that. And I think the message that we gave to the market was a very clear one, namely if anything in that project turned out to be fundamentally flawed then that would spell the end for ERPM underground in its current state.

  • Now we were going to take a decision based on the Turgis report by December of last year. Events, however, overtook that process when we had a double fatality in the pumping shaft of ERPM. We assessed the risk which led to the death of these two individuals and we came to the conclusion that it was not a risk that we understood well enough to design measures which could adequately and effectively deal with a risk in order to avoid something similar happening again in future. And as a result, we pulled our people out.

  • We could not call or forecast at what rate and how regularly the gas emissions which caused the deaths of our two employees, how and when they would occur. And if you can't call that, if you can't predict that, then it's very difficult to put measures in place, if not impossible to adequately address that risk and prevent it from happening again.

  • We took the decision to pull out of that shaft, to no longer continue pumping; the pumping chamber has since been flooded. And as a result, because this is the basin into which the working area was pumping the 8 million liters of water which it used on a daily basis to cool down ERPM's workings, because that basin has now become flooded, ERPM can no longer pump water through the plug into that basin because the capacity of those pumps is incapable of displacing the head against which it does pump.

  • So that prompted the decision to suspend operations at ERPM and we've also since retrenched the entire labor force, with the exception of the care and maintenance crew.

  • We offered the underground assets for sale, or the underground circuit for sale. We did not receive any offers which at this stage managed to give us what we wanted for the mine and therefore it won't be sold subsequent to those offers. It will remain on care and maintenance; we believe the monthly cost associated with that is ZAR2.5 million. And future events may enhance the value or the attractiveness of ERPM underground for external parties who do want to invest in an ultra deep mine.

  • The likelihood of us spending enormous amounts of capital to re-establish pumping capacity within the next 24 months is extremely remote. There are other projects in which we would rather invest but we will not allow the mine to go to ground. We look after the assets whilst events play out around us.

  • One of our neighbors is exposed to the rising water levels and they may want to implement measures which could address the water levels. And maybe that offers a solution for ERPM too in the cooling and ventilation challenge that it currently faces and which makes underground mining impossible.

  • ERPM surface will continue though, the case and dump will continue to be mined through the Knights circuit. There was a reduction in the amount of material treated from Knights during this quarter because another site, 4L8, which is part of the Crown resource, had to be mined in accordance with undertakings we have given to the landowner. That mix has been slightly changed again and we'll see more product coming out of Cason for this quarter.

  • And then of course, Elsburg, which is the 180 million ton resource which forms the backbone of the Elsburg JV or Ergo, Ergo Gold circuit, that is scheduled to come into commissioning by May of this year and go into full production in the first quarter of the next financial year. There is about 1.7 million ounces of gold in that dump. And as I said earlier, after the acquisition of Mintails' share in that circuit, that would be for the benefit of the DRDGOLD Group 100%.

  • ERPM had 600,000 underground reserve ounces at the time when it closed. The Elsburg circuit has 1.7 million reserve ounces or will have 1.7 million reserve ounces when it comes into operation. And the rate of operation which we envisaged, the rate of production which we envisaged would match and ultimately exceed the rate of underground production out of ERPM.

  • Crown. Crown had a -- I think, in December in particular, its worst month in a very long period of time. And the reason simply being that Top Star finally -- the button was finally hit on Top Star to get Top Star up and running. And the switchover wasn't quite as well timed as it ought to have been.

  • To give you a bit of background, Crown was producing at its current rate of 400,000 tons per month from a variety of slime circuits or slime stems. Part of that circuit required maintenance, an upgrading in maintenance, and this maintenance program was planned well in advance in order to occur at the same time that the Top Star circuit was going to come in. When we decided to move the reclamation site from where the Top Star material was going to be produced further up the dump and not right there at the toe of the dump, that caused approximately a four week delay in the commissioning of Top Star. But by that time, maintenance work on the slime circuit had already begun. So a very definite gap opened up in the volume flow in Crown, and that was the main reason or the main cause why you saw a 6,000 ounce reduction quarter-on-quarter in Crown's production profile.

  • I suppose an analogy that one could use is that this was the running of a relay where the one runner had to hand over the baton to the next and that handing-over process wasn't as fluid as it was supposed to be.

  • And if Crown was running a four by 100 meter relay, it may have been a bit of an issue in the long-term but it's not a four by 100, it's more of a four by 42 kilometer or marathon relay that they're running. And with Top Star up and running now, we're making up ground quite rapidly. I think the grade in Top Star is almost the anabolic steroid in the system of the runner and it is just burning up the track. Top Star is really giving us some phenomenal results.

  • Crown had managed to produce only or less than 200 kilos of gold in the month of December. As I said earlier, it was its worst month in several years. And I can assure you that the trending for the month of January is significantly different from what we saw in December. So the surface operations for going forward hopefully continue to play the very important role that it was playing prior to the month of -- particularly the month of December.

  • I thought I'd just talk a little bit about the project assumptions which prompted the investment into the various projects that we are running with. We don't want to make forward-looking statements but I think it's important that we do, from time-to-time, share with the market those assumptions upon which we decided to invest and embark on certain projects.

  • Ergo Phase 1, which is a combination of mining from the Elsburg tailings facility and then also a new smaller dump, which we acquired for purposes of the Ergo project, is designed and appears to be capable of treating 1.2 million tons per month. Assumption, cost assumption is ZAR23 per ton. The average grades, especially from the -- or at least from the site that we've accessed now and that we are in the process of commissioning now or have commissioned now, those grades are consistent with what we're seeing here, maybe slightly higher. And the life of this project is an assumed 12-year life at those rates.

  • Top Star. The assumption there was that we would treat 260,000 tons per month. We're adjusting that downward to about 220,000 tons and there's a build-up or a ramp-up phase, which is well underway towards 220,000 tons per month. And the reason being that we've had to adjust the rate at which we do deposit onto our tailings.

  • Maybe I could just go back one slide and talk to that, I left that out on Crown. This item here; Crown tailings deposition reduced to a steady 400,000 tons per month. The Crown tailings was, up until the third quarter of the calendar year, the 2008 calendar year, was receiving about 600,000 tons per month, give or take a few thousand tons.

  • We came to the conclusion, because there's an ongoing monitoring process on how well these tailings are doing in receiving and dealing with all of this material, we came to the conclusion that the measures that we have in place to deal with the amount of tailings we put onto the dam, to deal with the amount of water that we put onto the dam, that those measures were not adequate to receive a full 600,000 tons per month and that we had to reduce it.

  • And the reason why that is the case is pretty simple to explain. At the beginning of a project of this nature, your tailings dam is much larger; the surface of the tailings dam is much larger than what it is now. But as you deposit, obviously the top of that tailings dam becomes smaller and smaller and smaller and consequently you would have to also adjust the rate at which you deposit materials onto that tailings dam. And this is essentially what has happened to Crown now.

  • It can, very profitably, still produce at 400,000 tons per month, and I think the timing of the Top Star project and the high grades coming through, has been particularly favorable to us.

  • The life of these tailings does not exceed beyond about three years into the future. And hence the coming onto line of Ergo is also such an important part in our Company's future, simply because this is, at this stage, the replacement answers, surface answers for the Crown circuit.

  • We do own surface right permits, leeways, servitudes and so forth which could connect Crown Central, the area south of Johannesburg, with the East Rand. There is the possibility of building piping infrastructure from Crown Central through towards the East Rand onto the Brakpan and Withok tailings facilities, which now belong to us. But those are an early feasibility phase. We will study that and see whether we could again, or could continue to produce material through the three Crown plants at its current rate, and maybe even a slightly increased rate if we can connect those plants up with the tailings in the Far East Rand. But that is something that will only happen in 24 months from now. If the materials that we still have under our control can be profitably mined after the CapEx of linking up the Central Rand with the Far East Rand.

  • The Blyvoor Way Ahead Project. There again the project assumptions were 10,000 tons per month, ZAR1 per ton, just over 1,000. And then an average head grade of 7.1 grams per ton, a three-year life. Now at this stage, the head grade is consistent with these assumptions and there's nothing indicating that we would have to withdraw from any of those sites. The three-year life is very much on the cards.

  • Update on the Ergo project. I think before I go through the update maybe I can take you to the plan that we've got here just to give you an idea, an overview of exactly what the Ergo project or then the Elsburg Gold JV is all about. The Elsburg tailings are situated just to the south of ERPM mine on the N17; 187,000 tons of material on either side of the N17.

  • This is the project or this is the resource that prompted our initial investment into the Ergo plant over here and buying firstly the Daggafontein tailings dam and subsequently the Brakpan tailings dam. We were intending to only treat that through Brakpan and deposit it onto this tailings dam over here. So all of our targets, all of our timelines, all of our CapEx votes and so forth were based on that dump going into this plant and then onto that tailings dam there.

  • After the acquisition of this tailings dam over here, the Withok, which has considerably more capacity than the Daggafontein tailings dam, we decided that we would rather deposit all of our tailings, those tailings, tailings from the material over there onto this dam. And then, a bit of good fortune also occurred; the landowner of the Benoni tailings dam, a small little dam, it holds 15 million tons of material. The landowner of this little slimes dam here, said to us, don't you want to take this away because I want the land cleared.

  • And we did a desktop feasibility on that and it turned out that by building infrastructure onto this tailings dam or towards this tailings dam, slimes dam, and putting in a pump site, a reclamation pump site, we could actually start the commissioning of the plant about six months earlier than what the initial timeline was for Elsburg. And that is exactly what we did.

  • Whilst the [allusion] plant in the Elsburg plant is still in the process of being constructed and will only be completely by February, we were in fact capable of starting the commissioning of work from this plant, from this dam here into the Brakpan tailings dam several months prior to when we would have been able to start mining the Elsburg tailings complex. So that was a bit of a windfall that came our way after those in the area realized that there was in fact a serious project that was going to go ahead.

  • We have old order rights over this tailings facility here, which is the main resource. We had to apply for new order rights over this slimes dam over here, which were approved in January of 2009. So we're ready to go at this one hammer and tongs and we'll start producing gold through our own allusion plant by the end of February out of the Brakpan plant from material off this little slimes dam here.

  • This is intended to come into commissioning by May, the Elsburg tailings dam, and should be in full production by the first quarter of the next financial year, so just after July.

  • So going back to the Ergo project and the update on this project. The reclamation site, Benoni reclamation site and the CIL circuit, which will receive the entire 1.2 million tons per month that has been -- those have both been commissioned.

  • Our carbon treatment plant in the Brakpan plant is just about finished and will be ready by the end of February. And I need to emphasize that the timing around this plant was scheduled and coordinated with the coming online of the Elsburg tailings dam and not coordinated with the Benoni. The Benoni accelerated the commissioning of the CIL circuit but it did not accelerate the commissioning of the carbon treatment plant. This license has been approved. There's a process involving registration and material execution and so forth, which still is in the process of happening. It was supposed to have happened about two weeks ago and there was some or other delay in the regional office, but we have confirmation that the license has in fact been approved.

  • We've secured our critical supplies, gas, cyanide and so forth, those have all been secured. And then the Elsburg dam civils, those are all on schedule for completion by May 2009.

  • As an aside, ERPM was going to supply water into the Ergo project, water that was being pumped from the South West vertical shaft, the shaft that we abandoned. That's no longer going to happen because we no longer pump water from there. There is just over 9 million cubic meters of water on the Withok tailings dam itself, so the initial 12 to 18 months water supply into the reclamation site, the Elsburg reclamation site, will come off this dam.

  • And then after that, we will either supply water from Central shaft at ERPM itself. We believe that ultimately we are going to have to build a pump station there, both to manage the -- in particular to manage the rising water, if Central Rand Gold doesn't do anything about that. If we don't manage the rise of water it could daylight and there could be an environmental issue.

  • So in order to make sure that the environmental issues associated with our decision to no longer pump water are adequately dealt with, we are firmly of the view that we need to put a pumping infrastructure in ERPM central shaft, which will keep the water level down to about 300 meters below surface. And that will provide an adequate supply of water into Elsburg from about 24 months from now if the water level had arrived by then. If not, then the water would be supplied or sourced from Grootvlei and ERPM is a participant in the Central basin water utilities initiative, which is very similar to the Western basin water utilities initiative. It will place its infrastructure, and most importantly the high density separation plant at the disposal of this initiative, and hence also manage to get access to that water.

  • Alright, this I've taken you through. Looking ahead, the events, both internally and externally that impact on our decision-making at DRDGOLD. There doesn't seem to be much relief on the global economic meltdown. More and more money is being created and pushed into economies to stimulate lending. One doesn't know what that will do to inflation but there are inflation fears and there are currency volatility fears as well, and this may continue to provide a safe haven for -- gold may produce -- continue to provide a safe haven for investors.

  • I think that is probably one of the advantages of gold as a metal. It provides safe haven support for investors during times of currency volatility and inflation. But then on the other end of the scale, once the commodity cycle returns to where it was a year ago, gold does seem to track the rising trends in most commodities.

  • So those who want to sustain buying power or preserve buying power of their currencies, they may want to invest in gold in order to make sure that they could buy the same quantity of commodities going forward with the amount of cash that they have at hand at any given point in time. And gold does provide that sort of protection.

  • Elsburg. So on both sides of the cycle I think gold and hedged gold in particular is not a bad place to be in.

  • Elsburg or Ergo, it's certainly getting there. Top Star is up and running and as I said earlier, it's burning up the track. ERPM underground which started becoming a risk and a headache, that's been suspended. And its exposure, or the exposure that it creates towards our Group, is ZAR2.5 million a month.

  • Blyvoor is venturing increasingly towards the Main Reef. I think about some 45% of Blyvoor is now Main Reef [pulley], is that correct? 46% is Main Reef. Our plan remains firmly to optimize what we currently have; we have a good footprint and we are firmly of the view that the events that impacted on production in the last quarter were just that, events and not trends. And certainly that seems to be the case looking at the last month's production.

  • We will continue to manage our risks and I'll talk a little bit more about those risks going forward. We will continue to control our costs. As you saw in the last quarter, while unit costs were up, real costs were down by 2%. And we will definitely follow a very disciplined approach to growth. We are not keen to extend our deep level underground footprint at this point in time, so we're not looking for that sort of asset. What we would be keen to do is perhaps joint ventures with other companies who share our view of the value offered by ounces that are shallow, or ounces that are on the surface.

  • It was through a partnership or through a joint venture that we managed to launch Ergo and I think there are several other companies out there who may have similar types of assets and who might be looking for somebody with just over ZAR600 million in its bank to launch similar types of projects. Whilst we're not pursuing anything in particular now, we are certainly shopping around and we've declared ourselves as a willing partner to anything that fits that sort of profile.

  • I do want to talk just a little bit about some of the risks that we have encountered and that we are encountering. Risks that were not with us a year ago but that have become risks which certainly deserve our ongoing attention.

  • I think one of the issues that causes uncertainty in the minds of investors is just how severe and profound is the impact that the DME stoppages, the Inspectorate stoppages are having on deep level underground mining. And I can tell you that the impact now is certainly quite a bit softer than what it was when these things started initially. Initially, when the Inspectorate went onto a mine after a fatality or a serious injury, they would stop the entire mine. It's certainly what happened to us on one occasion. It now seems as though the approach is to really limit the suspension of works to the area where the impact had occurred, unless the standard or the non-compliance to a standard is something that could spread through the entire mine.

  • What we are witnessing though is that the members of the Inspectorate are placed under an enormous amount of pressure by the National Union of Mineworkers. Not necessarily those who work on the mine, but the regional members or regional representatives of the National Union of Mineworkers. And unfortunately they find themselves in a position where the issues that they are dealing with are politically controversial and politically sensitive and they don't want to be accused of being insensitive to the plight of the workers. So we see where inspectors are really challenged and placed under enormous political pressure by some of the unions.

  • We believe that one of the risks, especially one experienced by us, is un-intelligent and irresponsible conduct by certain regional representatives of the National Union of Mineworkers. They are very keen to see management placed under pressure, very keen to have punitive measures brought against members of management. The financial impact that this has on the mine they are either oblivious to or indifferent to. The extent to which this impacts on the ability of mines to employ their members is something that they casually ignore. And I think the time has probably come where the National Executives of the National Union of Mineworkers are going to have to take stock and carefully look at the conduct of their members at the regional level because they are causing harm, financial harm to our industry and this is through irresponsible conduct.

  • We had an event at Blyvoor earlier this year where lightning had taken out a substation and the utterances that were made by some of the National Union of Mineworkers' representatives at that event were downright untruthful, were in certain instances absurd and were extremely irresponsible. And there again, we witnessed how members of the Inspectorate were placed under pressure by these representatives to stop the mine because of a lightning strike. Obviously they didn't do that because they realized that there was absolutely nothing that my management could have done to avoid the effects of a lightning strike. And in fact we were commended subsequently for the effort of the management team at Blyvoor in how they had dealt with that issue.

  • Something that has been worrying our Group is the effect on regional stress patterns in underground rock, underground mine workings, caused by the stoppages, the large scale stoppages that we witnessed. At Blyvoor we are increasingly hearing operational members, staff members saying, you know what, this is the first time that this has happened to me in 20 years or in 30 years. We had a fatality in the quarter before the last where one of our colleagues died in a brand new development end, and the Production Manager in charge of that area said, it's never happened to him in his entire career as a miner. And if one then goes back and studies what it is that changed over the last period, then the only thing that has changed is that certain large blocks of mined areas have their workings suspended.

  • Now my understanding of how pressure release works, and pressure build-up works in an underground mining environment is that once you've blasted a face, pressure builds up. That pressure is then released by making sure that it gets blasted very soon afterwards again. If you don't blast that panel, two things can happen. Either the panel kicks because of a build-up of pressure, or the pressure or the stress is displaced to somewhere else. And the only place where it can go, where it gets displaced to, is the weakest area or the weakest section of rock, and that's usually your faults and your dikes. And we have no idea just how far the pressure that gets pushed or the stress that gets pushed into these faults and dikes, how far that gets transmitted.

  • What we do know, and maybe we don't understand it because it's something that's beyond the reach of our senses, but I remember when at the North West operations, several years ago, we had that massive earthquake that led to the closure of the North West operations. We heard from people in Pretoria that they felt the vibration of that bump. So these things get transmitted over several kilometers.

  • So if you stop several kilometers of workings, of stopes where stress release is bound to take place the next day, and it stands for a week, and the week later you stop another area, I think we are definitely interfering and maybe causing a distortion or an imbalance in the stress release that happens in the mining of underground areas.

  • We have rock engineers that are looking into this as a possible explanation as to why we are seeing these strange, out of the ordinary seismic events, usually within the vicinity of dikes and faults. And they haven't come up with anything conclusive, but then at the same time they haven't been able to show any other reason why we have these extraordinary events.

  • Fortunately, as I said earlier, the areas that are affected by stoppages have shrunk and the DME is now more prone to stopping work in certain isolated areas where the actual event took place, unless it's a non-compliance of a standard.

  • I think I need to emphasize I'm not criticizing the conduct of the DME, I'm not suggesting that they acted in bad faith. What they did was towards an improved safety environment. But I think maybe here was an unintended consequence that has had the effect that we are seeing now.

  • I'm sure that the outcome of the safety audit is also something that is on many people's minds. In anticipation of questions that you may have in respective of the safety audit, we haven't been given any details as to what exactly the Inspectorate may have found or the auditors may have found in our own mines which -- and what our percentage of compliance was. I am told though that apparently the seismicity monitoring networks that are used on mines have been found to be inadequate. We didn't know this when we allowed for some additional spending on our own seismicity network in December. We spent just over ZAR0.5 million to enhance our own technology and to improve our own seismicity network. If there are other issues that the Inspectorate believe we should attend to, then obviously we will do those as soon as we have details of what it is that they believe we are not complying with.

  • On the whole though, I think the relationship between the DME and the underground mines is on the improve with more communication obviously. Trust is nourished or trust relationships are established. And I think we're increasingly getting towards a place where we have a functional relationship between our Inspectorate and the underground mines.

  • Right, next we will show you a brief video of Top Star.

  • (video playing)

  • Right, we'll take questions now. Thank you.

  • Allan Cooke - Analyst

  • Hi Niel, it's Allan Cooke from JP Morgan. Just on the ERPM, have you expensed all the costs that came with the retrenchment of the employees and the closure activities that you had to go through at ERPM underground? And that ZAR2.5 million a month, is that it from now on at ERPM? That's the first question.

  • And then just a question on the grades that you gave for the projects. You've given us head grades. Could you give us the recoveries on that slide?

  • And also CapEx, an indication of CapEx over the life of mine and the immediate -- that was the slide 10 I think with Ergo Phase 1, Top Star and the Blyvoor Way Ahead Project.

  • Niel Pretorius - CEO

  • Yes certainly. The retrenchment costs have been fully expensed in the last quarter so there's no carry-over of that. I don't think we quite hit the ZAR2.5 million yet, but that is the target which we will believe once -- we'll get once we've put the final nail on the retrenchment issue. Craig, by when would we get to that? Towards the end of the quarter?

  • Craig Barnes - CFO

  • Well I think the provision is basically -- it covers all the retrenchment costs and I don't think we'll see any further costs coming through from that.

  • Niel Pretorius - CEO

  • So that's all that was expensed in the last quarter. The rest still needs to be dealt with. Your question is the recoveries. Alright, yes, at slide 10. On the slime circuits we're seeing between 45% and 48% recovery, and on the sand circuits at Top Star we're seeing just over 65%. I think the total -- that's the head grade going into the plant so most of your wastage had occurred by then. What is the efficiency of their plant, Collie, what is the percentage recovery?

  • Collie Russouw - Executive Officer, Underground Operations

  • It's 94% approximately.

  • Niel Pretorius - CEO

  • It's 94% approximately. You see it fluctuating between about 87% and 94% I believe.

  • And look, I'm going to have to give you a schedule on the capital expenditure. I don't have that ready -- at the ready.

  • Steve Shepherd - Analyst

  • Steve Shepherd, JP Morgan. I noticed going through your CapEx numbers, Niel, that you spent ZAR23 million-odd at ERPM. You made a comment that most of that or a lot of that was on property that you purchased. Could you just give us an update on your estimated value including that of your property portfolio that was associated with ERPM?

  • Niel Pretorius - CEO

  • Steve, I have a little brochure which I'll give you if you want which we had printed on the properties with estimated values, but it is considerable.

  • Steve Shepherd - Analyst

  • You've obviously added to it. Did I read you correctly that that was a consolidation?

  • Niel Pretorius - CEO

  • That is correct. What we did is the -- we came to an agreement with the landowner. We had several surface right permits in that area and there were certain areas that we wanted and then there were certain areas that they wanted. So we abandoned some of our surface right permits against a certain value of the recognition of value in exchange for freehold, and we then also transferred certain bits of freehold that we had across to them. So there was a good set off but the net cash out which we paid ultimately for the full transfer was about ZAR9 million -- just under ZAR10 million.

  • Steve Shepherd - Analyst

  • What are your intentions with that property portfolio?

  • Niel Pretorius - CEO

  • Well we have a full-time manager in charge of our property portfolio. And he has for some time now been working on the re-zoning of several of those properties because they're all zoned agriculture at this stage. Some of them are being re-zoned for residential development, some of them are being re-zoned for light industrial, some for common use. I should actually give you the brochure as soon as we're finished and you'll see what initiatives have in fact been taken in respect of the properties, but it's pretty impressive.

  • Properties are -- within the mining context, properties are used as or looked at as a side issue and it's something that the HR department has to handle in addition to many of the other things that they do. It's not looked at with a commercial or through a commercial lens. And what we decided to do a year ago was to appoint a dedicated Senior Manager to go and develop these properties and get some real value out of the properties, instead of just selling them off to land developers and losing out on whatever upside value there might be. And because we don't have to sell anything now, we can actually take it up the value curve to a pretty advanced position before looking for capital partners towards the development of those properties.

  • Steve Shepherd - Analyst

  • I was going to say look at who you're dealing with here, we're miners, we're not property developers.

  • Niel Pretorius - CEO

  • Exactly.

  • Steve Shepherd - Analyst

  • And I'm just wondering how we should, or how anybody that's buying a gold mining share, should try and understand the value of that?

  • Niel Pretorius - CEO

  • We don't put it up there because --

  • Steve Shepherd - Analyst

  • Well I'm just thinking is it appropriate to have a property development or real estate company as part of a gold mining company?

  • Niel Pretorius - CEO

  • Well you see what has happened to the gold mining industry is in the past the only thing that we had to deliver into and the only obligation that we had really was to make profit. But gold mines are required increasingly to play a role in the socioeconomic development in the areas where they are situated. And mines don't make more money only because they've got greater social obligations, they make the same amount of money and sometimes even a little bit less.

  • The environmental standards that we have to deliver into have also been increased and DME requires -- the Government requires that we come up with guarantees long before the time. So I look at the properties from the perspective of here is something that could help us fund and help us secure these additional obligations. I don't look at it from the perspective of here's a lot of money to be made that we'll distribute.

  • And it's only once we've funded all of our environmental obligations, once we've provided for all of our social obligations, once we've funded or provided for those socioeconomic initiatives that we're involved in. Once we know what that is, then we'll start telling the market how much upside they can expect from the properties.

  • Steve Shepherd - Analyst

  • And I have a second question in context of ERPM. You've stated here today that you've turned down some offers for that particular underground operation.

  • Niel Pretorius - CEO

  • Yes.

  • Steve Shepherd - Analyst

  • And I'm just really confused to try and understand what you think you're going to make out of selling that mine and what your real intentions are. Because presumably if you want rid of it, you'll sell it for just about nothing because you could argue that's probably what it's worth. But are you thinking that you might be keeping it as some sort of option for the future as well or not?

  • Niel Pretorius - CEO

  • I don't really -- in my own mind I don't attach option value to it. But there are a number of issues that we have to consider for purposes of the conversion of our rights for example. And one of the necessary items which had to accompany an offer for the acquisition of ERPM was a mine works program which would have justified the conversion of old order rights to new order rights, taking into account that Elsburg sits on ERPM. So that conversion is required. None of the parties who made an offer came up with a feasible mine works program. None of them came up with a plan in terms of which one could address the pumping issues. So at this stage, the role which that offer had to play in our process going forward was not met. And as a result, I think we need to take it a little bit further down the line.

  • We don't have any intention of major capital expenditure in respect of the underground -- ERPM underground workings until we know exactly what will happen with the regional water issues. And also until after we have cleared out in adequate detail with the Department of Minerals and Energy what their expectations are with regard that resource. And then once that's sorted out, I think we'll be in a better position to decide what sort of offer should we consider, and who should we go to and try and solicit an offer.

  • But ERPM won't be spending money within the next 12 months on vast capital projects. It will be looking at the circumstances, it will be looking at a variety of options, something that might make it more attractive to somebody with serious investment capacity who could put together a mine works program that can endure into the future.

  • Steve Shepherd - Analyst

  • Just one last quick question. Could you just remind us please Niel, when you sell an asset like ERPM underground mine you sell it with all liabilities that can or may come with those assets. Is that correct?

  • Niel Pretorius - CEO

  • Contractually you can do that, yes. But the -- whether the Department of Minerals and Energy will agree to that and not hold you accountable for that which you've done up until this point, that is another question and that's something that we're seeing at some of the other old redundant sites which we sold off. But where there's a recurring little voice from communities and from the Department, you need to step in and sort things out. That full transfer of risk really only occurs insofar as the regulator is concerned if the purchaser doesn't fail. And that's one of the reasons why we're not going to sell it to somebody who cannot make it work. We'd rather keep it under our own control.

  • Craig Barnes - CFO

  • Also bearing in mind that a large chunk of the liability is Elsburg.

  • Niel Pretorius - CEO

  • Yes, a very large chunk of the rehabilitation liability at ERPM; ERPM has a rehabilitation liability of ZAR80 million, the bulk of which is the Elsburg tailings dam. The Elsburg tailings dam is going to disappear over the next 12 months, so it's not as big a liability as one would think by just looking at the numbers.

  • Any other questions? Well thank you very much.