  • Welcome to CPI Aero's 2014 first-quarter results conference call. With us today are Douglas McCrosson, President and Chief Executive Officer; and Vincent Palazzolo, Chief Financial Officer. After management's prepared remarks, there will be a Q&A session.

  • As a reminder, this conference call will contain forward-looking statements which involve known and unknown risks, uncertainties, and other factors that may cause actual results to be materially different from projected results. Included in these risks are the government's ability to terminate their contracts with the Company at any time, the government's ability to reduce or modify its contracts if its requirements or budgetary constraints change, the government's right to suspend or bar the Company from doing business with them, as well as competition in the bidding process for both government and subcontracting contracts. Subcontracting customers also have the ability to terminate their contracts with the Company if it fails to meet the requirements of those contracts or if their customer reduces or modifies its contracts to them due to budgetary constraints.

  • Given these uncertainties, listeners are cautioned not to place undue reliance on any forward-looking statements contained in this conference call. Additional information concerning these and other risks can be found in filings with the SEC.

  • Now I will transfer the call to Douglas McCrosson, CPI Aero's President and Chief Executive Officer.

  • Douglas McCrosson - President and CEO

  • Good morning, and thank you all for joining us for our 2014 first-quarter results conference call. If you need a copy of the press release issued this morning, please contact Lena Cati of the Equity Group at 212-836-9611, and she will fax or email a copy to you. Also, if you would like to listen to this call again, you can hear a replay on our website's investor relations section in about an hour, at www.CPIAero.com.

  • I would like to begin this conference call by expressing my appreciation to the many shareholders, colleagues, customers, and suppliers that have provided support and advice during my transition from Chief Operating Officer to CEO and President. And to my nearly 300 fellow employees, thank you for your support and encouragement during the past two months. I know that, like me, you are prepared to help us achieve our shared vision for CPI: to make CPI Aero the most trusted manufacturer of aerostructure in our customers' supply chain.

  • So with that prelude, I will now hand the call over to Vince Palazzolo, our CFO, to discuss our financial results for 2014 first quarter and guidance for the year. Then I will comment on the current business environment, backlog, and contract awards; expectations for 2015; and new growth opportunities going forward. I will then wrap things up and open the call to questions.

  • Vince?

  • Vince Palazzolo - CFO

  • Thank you, Doug. As announced earlier this morning, our 2014 first-quarter revenue increased by 9.8%, mainly due to a 30% increase in revenue from commercial subcontracts. Gross margin was 20.5%, which, although lower than the 22.3% reported in the first quarter of 2013, is within our expected range for this year. Our selling, general, and administrative expenses for the 2014 first quarter decreased as a percent of revenue substantially to 8.4% as compared to 9.4% in the 2013 first quarter, mainly due to steps we took to improve the efficiency of our administrative processes. As a result, our first-quarter 2014 pretax income increased by 3.6% to $2.51 million; and net income increased by 3.4% to $1.73 million, or $0.20 per diluted share.

  • The first quarter of 2014 results, which improved as compared to the first quarter of 2013, were in line with our expectations and support our prior projections for the full year 2014. Specifically, for 2014 we expect total revenue to be higher than 2013.

  • We are projecting revenue in 2014 to be between $83.5 million and $85 million. This is mainly due to an approximate 25% increase in revenue from our commercial business, partially offset by single-digit decline in our defense business compared to 2013.

  • We project the commercial revenue to be approximately 40% of total revenue in 2014 compared to 32% in 2013. This commercial revenue is provided by a mix of programs with increasing revenue from our newer business jet programs with Embraer, Honda, and Cessna.

  • As our gross profit margins during startup are often lower and improve as the program matures, we expect this program mix to provide headwinds to our gross profit margin for the full year. Therefore, for 2014 we expect the gross margin to be in the range of 20% to 21%. As these newer programs mature into 2015 and beyond, we expect margins to improve.

  • Furthermore, we will continue to look at ways to lower our administrative costs to minimize the impact of margin fade in the 2014 -- margin fade in 2014 to our bottom line. Recently, we were able to obtain savings from a variety of services providers and have reduced total annual expenses in these areas by $137,000 per year. These savings begin to benefit the income statement beginning in the second quarter of 2014 and will help to improve our operating margin in future periods.

  • In 2014, we project product deliveries to surpass our 2013 record year by approximately 10%, mainly due to increased demand for our commercial products. Several of these commercial programs are now ramping up and will transition to full-rate production over the course of the next six to 12 months.

  • We expect positive cash flow from operations in the range of $1 million to $1.25 million compared to $3.3 million in 2013, as anticipated investments in new program starts will offset the cash flow generated from existing production lines.

  • Now I will hand the call over to Doug, who will comment on the current business environment, backlog and contract awards, expectations for 2015, and new growth opportunities going forward. We will then open the call to questions.

  • Doug?

  • Douglas McCrosson - President and CEO

  • Thank you, Vince. As of March 31, 2014, we received approximately $4.7 million of new contract awards, which compares to a total of $11.5 million of new contract awards in the same period last year. The decrease in new contract awards is predominantly the result of the timing of the release of new awards from our defense customers, as they work to finalize contracts with the DOD or other customers. Based on feedback from some of these customers that have been experiencing funding delays, we are confident that CPI Aero's funded backlog at year-end 2014 will increase as compared to year-end 2013.

  • As announced, our total backlog at March 31, 2014, was $410.3 million, of which funded backlog was $96.2 million. Unfunded backlog of $314.1 million was primarily comprised of the long-term contracts that we received from Boeing, Spirit, and Northrop Grumman during 2008; from Honda and Bell during 2011; and from Cessna, Sikorsky, and Embraer during 2012, for which we expect to receive funded orders in the future.

  • Starting with our 2008 contract with Spirit AeroSystems to manufacture the leading edges of the Gulfstream G650 wing, our strategy to diversify into nonmilitary airspace and our demonstrated ability to execute in this competitive marketplace have been the catalysts of our growth.

  • In 2011, 14% of our revenue, or approximately $10.3 million, was derived from commercial airspace. In 2013, the percentage grew to 32% of revenue, or $26.4 million. In 2014, we expect this trend to continue, and we project greater than $33 million in revenue from commercial aerospace products.

  • Our business plan calls for continued investments and efforts to capture new business from existing and new customers for commercial programs. Going forward, our commercial programs are anticipated to generate a higher percentage of total revenue, and our intention is to have about 42% of our revenue derived from commercial aircraft by the end of 2015.

  • Currently, all of our commercial programs are within business jets and civilian helicopters. We have developed an excellent reputation among business jet manufacturers, and we are getting opportunities to bid for work on many current and future jet aircraft, including offerings from Cessna, Gulfstream, Embraer, and Bombardier. The next logical progression in our growth strategy is to capture business on a large commercial airliner. While this is not an easy path, as it takes time for entry into this market, we are confident that entry into the large commercial airliner market is a question of when, and not if.

  • Our current skills and capabilities position us to compete today on a number of Tier 2 applications, and we are. However, our ultimate goal in this market is to manufacture the larger value-added assemblies direct to the OEM or to their largest Tier 1 partners. Therefore, our business strategy includes new investments in automation technologies and continued investment in production floor software that will increase output, improve quality, and lower production costs compared to our current methods.

  • For example, we will install automation equipment that will enable us to have enhanced capability for new commercial airliner products and greater efficiency for current long-term programs. This automation will require total CapEx of approximately $500,000 in 2015.

  • Additionally, our global supply chain is developing offshore and nearshore sources, which we estimate can reduce costs and increase our competitiveness. We will continue our efforts to prioritize operational excellence and to make the appropriate investment in lean manufacturing to improve productivity. And last, but not least, we increased our workforce and skills training program to ensure that our workers are the best trained and the best prepared in the industry.

  • We have submitted a number of proposals at the Tier 2 level for structure for airliners manufactured by Airbus and Boeing. Our business development team is currently targeting opportunities on several commercial airliner programs at both the Tier 1 and Tier 2 levels, including the Boeing 787, 737 Max, the Airbus A320neo, as well as the next generation of Embraer E-jets. I hope to be able to report a win from these proposals in the months ahead.

  • Our increased focus on commercial aerospace does not mean we are abandoning the defense sector. Defense has been, and will continue to be, an important part of our business. It is an incredibly large market with great potential for CPI in certain segments. For example, in 2015, we see a return to top-line growth in three of our four segments: military helicopters; maintenance repair and overhaul; and the ISR intelligence, surveillance, and reconnaissance pods. So while 2014 will be a down year for our defense sector as a whole, there are many national security platforms for which we provide products that are well supported in the DOD's budget plans that point to a brighter future beginning in 2014 -- 2015.

  • For example, we have strong positions in military helicopters such as the BLACK HAWK from Sikorsky, the AH-1Z ZULU from Bell, and the recently rolled out CH-53K King Stallion from Sikorsky.

  • Our largest program in terms of potential value, the E-2D outer wing panel kit, stands to benefit from the current multi-year procurement negotiation currently taking place between Northrop Grumman and the United States Navy. CPI Aero's share of the multi-year buy is anticipated to be more than approximately $30 million. Northrop Grumman is also leveraging the fact that the E-2D shares a wing with the C-2A Greyhound aircraft and is pursuing a similar multi-year procurement of new wings for the C-2A. If successful, CPI Aero's share of Northrop Grumman's C-2A contract with the Navy would be an additional $40 million for outer wing panel kits.

  • As our domestic defense market contracts, our OEM customers are seeking to grow their international business by direct commercial sales to foreign governments and foreign military sales. We have contracts with Northrop Grumman, and the United Technologies Aerospace Systems, or UTAS, where our products are used to support our customers' international sales.

  • For example, in January of this year, we announced an order received in 2013 from Northrop Grumman for outer wing panel kits that would be used to manufacture an E-2C wing for Japan. And two of our pod structures, the DB-110 reconnaissance pod for UTAS and the ALMDS mine detection pod for Northrop Grumman, both are marketed internationally.

  • Additionally, we have pending pursuits for other high-priority weapon systems, such as the F-16, the F-35, and the CH-53K. We continue to see increasing demand from Sikorsky for our maintenance, repair, and overhaul services. So while there are many prospects within defense on the horizon that bode well for CPI Aero in the future, the fate of one of our important defense platforms, the A-10 Warthog, is currently being debated in Congress.

  • As I mentioned in March during our 2013 year-end conference call, the Air Force is requesting that the entire fleet of A-10s be retired starting in government fiscal year 2015. But just last night during a markup session on the National Defense Authorization Act, or the NDAA, the House Armed Services Committee adopted a bipartisan amendment that would continue to fund the A-10 through fiscal 2015. The next test in Congress comes May 21, when the Senate Armed Services Committee releases its markup for the 2015 NDAA. Powerful senators from both sides of the aisle are on the record in support of the A-10, but the outcome is still uncertain.

  • For our part, I have gone to DC to personally advocate for the A-10 with Congressman Peter King, our representative in the House, and with New York Senators Schumer and Gillibrand. We continue to perform under our contract with Boeing and envision we will continue to do so throughout the remainder of 2014 as the legislative process continues. Notwithstanding the above uncertainties surrounding the A-10, we have sufficient visibility to provide our expectations for 2015.

  • We see continued strength in production rates of our newer business jet programs, particularly our Embraer Phenom 300 and the Cessna 10 program. We see steady demand in 2015 for our G650 leading edges. We are confident that we will receive follow-on funding from our long-term military programs such as the E-2D and C-2A, the DB-110 pod, and the Bell AH-1Z helicopter. We are optimistic that our bid pipeline is large and diverse enough to obtain new commercial and military contracts, including work on a large commercial airliner.

  • We therefore project 2015 will produce the highest revenue in our history. Specifically, revenues are expected to be in the range of $90.5 million to $94 million. We project single-digit growth in military revenue and double-digit growth in commercial revenue in 2015 as compared to 2014. Gross profit margin is expected to be higher than in 2014 at a range of 22.0% to 23.5%, mainly driven by higher production rates and lower unit costs.

  • Before opening the lines to questions, I would like to note that we will continue to tell our story as often as possible and share our message with our existing shareholders and potential investors. We are targeting aerospace and defense industry related conferences, and we are currently scheduled to present at several prestigious conferences, including the B. Riley investor conference on May 20 in Santa Monica, California; the Benchmark Company One-on-One investor conference on May 29 in Milwaukee; the UBS Aerospace & Defense One-on-One conference on June 5 in New York; the Drexel Hamilton Aerospace & Defense Conference on June 12 in New York; and the Jefferies industrial conference on August 14, also in New York City.

  • At these conferences, Vince and I will be meeting with many of our largest shareholders and other institutional investors. We hope to see some of you there.

  • This concludes our prepared remarks. At this point, I would like to open the floor to questions. Operator, can you allow callers to place questions now?

  • Operator

  • Thank you.(Operator Instructions). Mark Jordan, Noble Financial.

  • Mark Jordan - Analyst

  • Good morning, Doug and Vince. Question on cash flow through the year. You've obviously stated that with a higher level of deliveries you are going to be cash flow positive. Borrowings increased in the quarter. Can you talk about the -- your cash flow on a quarterly basis through the year? Or are you going to have a strong delivery fourth quarter like last year? Or how does that work out?

  • Vince Palazzolo - CFO

  • We do expect the deliveries to ramp up through the year. So I would expect slightly -- expect better cash flow in each quarter going forward, similar to what happened last year that the fourth quarter was the big quarter. I don't expect it to be as dramatic, as was the case last year. So the second-quarter cash flow should be better than the negative cash flow that we had in the first quarter. The third quarter should be better than that. The fourth quarter should be the best. It should be a little bit flatter than last year's big spike-up. But, yes, it should improve throughout the year.

  • Mark Jordan - Analyst

  • Okay. Question relative to the bids that I guess that you have or the conversations you've had on the larger Tier 1, Tier 2 opportunities on the commercial side for larger aircraft. Could you add a little more color as to how definitive those opportunities are and what might be the decision cycles on those some of the nearer-term opportunities? And then, finally, what kind of lead time is there with regards to ramping revenues once the relationship is signed?.

  • Douglas McCrosson - President and CEO

  • Okay, Mark, first of all, welcome to the call. I can tell you that one of the more near-term commercial opportunities we expect to close within, I'll say, the next 90 days -- this is an application that we have been working with a customer since the beginning of last year. We were notified near the end of last year that we were being considered, and we entered negotiations that kind of stalled due to some management changes within the customer. So I would just define one commercial opportunity as more likely, although not guaranteed. We are in discussion actively with this customer, and those discussions are ongoing. And I won't comment as to how close we are or how far apart we are. But one of those opportunities, we will know one way or the other within the next, say, 90 days.

  • The others are in various stages. I would not, as my notes (technical difficulty), probably will hear between six and 18 months on some of them. I would call -- other than one the we are in discussion with, I would call them mid- to longer-term opportunities. And as far as lead time, we would expect -- because we do percentage completion accounting, we would expect shortly after a contract award to be able to start booking revenue on these newer commercial opportunities.

  • Mark Jordan - Analyst

  • Okay. Final question from me. In your guidance for revenue for 2015, at the lower end, what level of new business or new relationships do you assume to achieve that bottom-end number of $90.5 million?

  • Douglas McCrosson - President and CEO

  • I won't really comment on how much brand-new we expect to win. We expect the follow-on programs that I mentioned in the -- in my remarks, particularly on the E-2D and the C-2A and the DB-110, those will be required to meet the projection given at 2015. We have, I'll say, a normal amount of anticipated probability-weighted new awards factored into 2015 which -- because again, the accounting system, the revenue recognition system, we have typically until the middle part of 2015 to win to affect revenue in calendar year 2015. So there is no significant win among them, but there is always some factor for new awards, particularly when you are talking about 1.5 years from now, almost 2 years from now.

  • Mark Jordan - Analyst

  • Thank you very much.

  • Operator

  • Mike Crawford, B. Riley & Co.

  • Mike Crawford - Analyst

  • In, I believe, each of the last four quarters, the Company's actual revenue has come in higher than we have modeled, and I believe consensus as well. Yet, the forward guidance always seems to be tamped down a little bit. And so I guess the question is, how can you give such a tight revenue guidance range for a year, given the what seems to be greater variance each quarterly period?

  • Douglas McCrosson - President and CEO

  • I'm not sure I quite get the question (multiple speakers) --

  • Mike Crawford - Analyst

  • So for the year, Doug, you are saying revenues are going to be within a $1.5 million range. Yet, this quarter, you beat consensus by $3 million or $4 million in revenue, which is great. But it seems that there's a lot of variance in (multiple speakers) --

  • Douglas McCrosson - President and CEO

  • Variance from the consensus and maybe the individual analyst, but not from our internal plan. The statement I'm trying to make is that we are on our plan. And the fact that we recognize that a lot of people had our first quarter as being somewhat low -- my internal plan is that by the midpoint we are going to be more or less where we were in 2013, at the half. So we are beating last year, but we are not beating it by $5 million, $10 million. I (multiple speakers) --

  • Mike Crawford - Analyst

  • I understand (multiple speakers) -- so I guess it is -- I guess, how much of a standard deviation, when you put on that range, is a very tight range of expected revenue for the years. Is your operational production schedule and delivery schedule such that you really can see with that degree of precision to what you might do this year?

  • Douglas McCrosson - President and CEO

  • Well, I would like to say, yes, it is. I mean, the -- as we get -- we are already in May. We use models like you all do. And right now, the model is in that range. If -- I don't know how to answer your question, Mike. I'm sorry. I'm not being (multiple speakers) trouble. I'm just having a hard time.

  • We look at our numbers, and that's what we come up with. In the past, we have given too broad a range, and people have said, well, how can you have such a broad range when you are almost halfway through the year? So what I wanted to do, and I think I did is -- in November of last year, we talked about where it could be as high as 2012. And I really felt that a lot of good things have to happen for that to still be the case. And I'm not sure that I'm hedging my bets that they -- some of these might not happen or might not happen in the timeframe to generate that upper-end revenue. And so we guided towards something that is coming off of that $89 million number.

  • Mike Crawford - Analyst

  • That's very helpful, Doug. And then just last question, just to continue in the same vein. So for next year, you have given also what I would consider to be a very tight range, although you give yourself a couple more million a range; it's a $3.5 million range. Can you just maybe talk about the one, two, or three things, either way, that could really drive you outside of that range for 2015? Thank you.

  • Douglas McCrosson - President and CEO

  • Okay. For 2015, certainly a commercial airliner win that comes near to the mid-year or this year will provide upside. In our forecast, we have certain of these awards coming in late third quarter. With the lead time in the ramp-up, that would take some revenue out of 2015. So if it happen sooner, that's better for us. Clearly, the -- probably the biggest driver, if you will, for 2015 is our work on C-2 and E-2. And clearly be a multi-year procurement that allows us to go out and start working on what would be four years worth of requirements on the E-2D and the C-2A would be impactful to 2015 as well.

  • And again, our Sikorsky business is ramping up, as is our MRO business. So we do have some -- there is some degree of visibility in our military, notwithstanding the A-10. And we also have now our backlog in our delivery date set for Embraer and Cessna.

  • So as we move along in our ability to see and work with our customers and see their forecasts and see their delivery demands, we are in a position today where we felt that we could go out in 2015 and provide some level of guidance.

  • Anytime you are talking about something this far away, or that for away, there is some upside and there is some downside. I think my conservative nature is that's more of a, I'll say, the low end of what could happen. You start seeing our new business awards coming on stronger than they had in the first quarter. You see multi-year procurement on E-2D; multi-year on C-2A; a contract with UTAS that follows up on the DB-110; and some positive news out of Embraer and Cessna -- then we could be talking about upside increasing that top-end guidance.

  • Mike Crawford - Analyst

  • That's very helpful. Thank you.

  • Operator

  • David Kaiser, Robotti & Co.

  • David Kaiser - Analyst

  • So you talked about the commercial being 42% of the business. I just want to understand if that's kind of an average or a peak, because I know that business is more cyclical.

  • Douglas McCrosson - President and CEO

  • We project -- in our model, and in our guidance, the $90.5 million to $94 million number is -- includes 42% commercial revenue.

  • David Kaiser - Analyst

  • Oh, okay. I'm sorry; I misunderstood that. I guess what I am asking is what do you think the potential is for the commercial as a percentage of revenue, then? Not giving specific guidance, but long-term?

  • Douglas McCrosson - President and CEO

  • Beyond 2015?

  • David Kaiser - Analyst

  • Yes.

  • Douglas McCrosson - President and CEO

  • We are looking at somewhere in the maybe in the [55%, 45% range]. I think the reality is because we are still working on several long-term programs -- and I mentioned a couple -- on an E-2D, and we have others that we're bidding on. I alluded to some of our bid pipeline being for the military. I think that's still going to be a very large percentage of our business going forward, which is fine if they're the right programs and the things that are happening with A-10 don't happen to those. So that's the risk of the military market, I guess.

  • But, right now, we don't see a pendulum swing to us becoming a commercial aerospace Company in the next -- within the 2016 timeframe.

  • David Kaiser - Analyst

  • Okay, I appreciate that. And just going back to winning some of the Tier 1, Tier 2 projects -- you mentioned training. And I just want to clarify, are there any other things you are doing -- I guess hardware is probably the wrong word -- but structurally to compete in those projects? Or are you waiting until you have more visibility?

  • Douglas McCrosson - President and CEO

  • No, no, no. We have been doing -- the steps we have taken in the past -- I will go back maybe two or three years -- in terms of [cleaning] up our workforce and our training, the skill set within our manufacturing floor management, the improvements and investments we've made in our IT area -- those are all bearing fruit in terms of we are now in a position where we can bid and compete on a global basis to win this work at, say, the Tier 2 level, which are typically like smaller subassemblies, not major sections of the aircraft.

  • What we are looking to do now is we have a number of opportunities in the pipeline that fall into that area. We would like to position ourselves, one to two years, three years down the road, to be a Tier 1-capable Company, where Boeing or an Airbus or an Embraer could come directly to CPI for a large section of aircraft. And those are the things that we're taking the steps, beginning later this year and into 2015, in terms of bringing automation equipment, automatic drilling, potentially looking at some robotics.

  • This is a two- or three-year business plan, with the strategy being get some of the Tier 2 work now over the next six to 12 months, and then build on that by executing well on those and then allowing ourselves to be in a position to bid on bigger chunks of aircraft in the future.

  • David Kaiser - Analyst

  • And in order to do that, is there much CapEx you're going to need spend? Or these are -- but I guess that's what I wanted to know.

  • Douglas McCrosson - President and CEO

  • We are looking at about $0.5 million in 2015. If -- and that is for a limited capability, I'll call it. In 2016, we will have to see. But right now the current plan is that it's about a $0.5 million investment next year.

  • David Kaiser - Analyst

  • So the risk reward is pretty high in terms of what (multiple speakers) --

  • Douglas McCrosson - President and CEO

  • Yes, our internal projections are is that investment would pay itself back in about 2.5 years.

  • David Kaiser - Analyst

  • Okay. All right. I appreciate the color, guys. Thank you very much.

  • Operator

  • (Operator Instructions). Matt Koranda, ROTH Capital.

  • Matt Koranda - Analyst

  • Could you guys characterize the bid pipeline as things stand today? What percentage of opportunities are coming from commercial versus military? And is there any way you could characterize the percent of the pipeline that is associated with large commercial?

  • Douglas McCrosson - President and CEO

  • I can give you the most -- we will -- when we present that at the B. Riley conference later this month, we will update all of the metrics. So I can tell you where we were a couple of months back. We were at around about 44%, 45% of our bid pipeline was for commercial. And of that, about 30% of that was for large commercial aircraft. That number, I can tell you, has gone up as some bids have gone in recently.

  • So in rough numbers, Matt, I would say about half of our bid pipeline is for commercial markets, and probably maybe 30%, 40% of that is for large commercial airliner.

  • Matt Koranda - Analyst

  • Okay, that's helpful. And then just on a higher level, Doug, could you discuss the move into large commercial in greater detail? In particular, how does the RFP process compare to a smaller business jet type contract? Talk about the competitive landscape if you could, as well. Can you characterize the typical competitors in the space and how they differ from the smaller commercial competitors?

  • Douglas McCrosson - President and CEO

  • Okay. I will try to -- that could take a while, so I will try to summarize it. Many of the opportunities that we see are where we are, I'll call them, outsource production -- meaning these aircraft are flying. There's somebody making an assembly; maybe the OEM themselves or maybe the Tier 1 partner itself. And, for one reason or another, the customer is deciding that they would like to look outside to see if they could reduce costs or if they are going to try to make room on their factory floor for something else.

  • And that process does take time. And it takes time because they are -- you are currently making it yourself. You have to develop a plan that shows that the -- go out to the market and go to CPI and our competitors and say, okay, well, what would it cost you to make the same assembly?

  • Then they have to compare it to their internal estimates. We all have to understand are we comparing apples to apples. Then there might be some discussion going back. Then they have to figure out, okay, well, now how are we going to keep production flowing, because we have a production line to make. So maybe that requires a second set of tooling. And it is kind of an iterative process that requires a lot of operational planning in addition to the bidding part.

  • So I guess the perfect example is that -- one that I mentioned was our furthest along, that we were optimistic at the end of last year to announce last year. That started back, I believe, in February of 2013. And we are still talking about it. When all is said and done, from the time that we were invited to participate until the time that we hopefully will win is about 18, 20 months.

  • So the process is not a short one. I don't think that it is untypical -- or atypical of all of our business, quite honestly. That's just the nature of the work these days, is the selling cycle is longer and longer.

  • Matt Koranda - Analyst

  • Okay. That's very helpful. And then, just if you could, touch on a bit on the competitive landscape. And then I'll take the rest offline.

  • Douglas McCrosson - President and CEO

  • Well, right now, we are at a great advantage in the market because we are typically competing against companies that are much larger than us, have higher cost structure. And we have those same capabilities. So we do compete against companies like Triumph. We compete against companies like Command, GKN. We compete now against some of the precision cast part product of companies. There's a variety of competitors out there in the structured space.

  • I guess the good news, though, is that there is a lot of structures work to be had. The business -- the build rates are really taxing the capacity at the moment. And we are very optimistic in our customers that we are filling a need that our customers, or the OEMs, have. The OEMs need more manufacturers that make structure, not less. And so we are seeing opportunities.

  • In some cases, quite honestly, we could be the third manufacturer to build the same identical assembly. And all three of us might be making it at the same time to keep up with the rate. So the competitive landscape right now I think favors smaller, more adaptable, more nimble companies that are like us. And I think the OEMs are real excited that they have such a Company with CPI, and they get great pricing and great responsiveness, and not to mention the great capability which is often only found in companies about two to three times our size.

  • The fact that our bid pipeline is growing, the fact that these customers are finding newer opportunities for us to bid, and they are becoming increasingly larger and more complex, I think holds a lot of promise for us in the 2015 and 2016 timeframe.

  • Operator

  • Sir, did that answer your question?

  • Matt Koranda - Analyst

  • Yes, thank you (multiple speakers).

  • Operator

  • (Operator Instructions). Gentlemen, we are showing no further questions in queue at this time. I will turn the floor back over to you for any additional or closing comments.

  • Douglas McCrosson - President and CEO

  • Okay. I would like to thank all of you for participating in this call, and look forward to speaking with you again in early August when we announce our second-quarter 2014 results. Thank you.