必和必拓 (BHP) 2006 Q2 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Charles Goodyear - CEO

  • Ladies and gentlemen, welcome to our presentation of BHP Billiton's results for the first half of financial year 2006. My name is Chip Goodyear, the chief executive officer of BHP Billiton, and I'm joining you from London today. With me from Melbourne is Chris Lynch. Chris is chief financial officer and was recently appointed an executive director of BHP Billiton; and with Chris is Bob Kirkby. Bob is the group president for Carbon Steel Materials. Chris will have some prepared comments today, and Bob and Chris will join me in answering some of your questions a little bit later. Let's move on to the highlights.

  • First, in the area of safety -- for this six-month period, we've seen a 1% increase in what we call our "total recordable injury frequency rate," and a 13% increase in our classified injury frequency rate. Obviously, this is a trend in the wrong direction. There are a number of reasons for this, and one of those is that the increase in the number of contractors in our business as a result of our project activity is bringing new people into the BHP Billiton system.

  • Secondly, the integration of WMC into the BHP Billiton health safety environment and community system is also an item that has taken an impact on the safety statistics.

  • And then, thirdly, our exploration activities are moving into new and challenging environments as we look for significant resource accumulations in new parts of the world, and in some of those parts of the world, the safety issues are not quite to the headline that we see in the areas that we're used to working more particularly into those that have been indoctrinated into our system.

  • Well, obviously, and emphasis in this area, education and communication continues and continues quite aggressively, and we look for that to continue to push us to our long-term [treadline], which is a decrease in these statistics.

  • So moving on now to the results, we had strong results for the six-month period ended in December. We set a number of operational and financial records over that time. If we move to the finance side, the underlying EBITDA for the six-month period was US$8 billion, 42% from the prior period. Underlying EBIT was up 43% to US$6.7 billion, and attributable profit came in at US$4.4 billion, up 48% from the prior period. This is the fifth consecutive six-month record that BHP Billiton has set.

  • The earnings per share were up to $0.72, this was a 51% increase. This is a greater increase in the attributable profit as a result of the share buyback program, which we completed last year.

  • We found that our margins, the underlying margins, in our business rose to 42%. This is despite the cost increases that have occurred in our business, and we'll talk about those cost issues in a few minutes, but we continue to see a strong benefit from the pricing environment in which we currently exist.

  • On the WMC side, the integration has been complete, and it was completed ahead of schedule. I am also pleased to report the savings that we expected to get, which was originally estimated at AUS$120 million on an annual basis, now we estimate to be on about AUS$180 million on an annual basis. Chris will talk a little bit about that.

  • The next area was our project activity. We continued in that area quite strongly. We approved five major projects in the last six months with a capital cost of almost US$3 billion. In addition, we approved two smaller projects. Our current pipeline now sits at 25 projects with a cost of about US$14.4 billion, and we'll go through that later.

  • I think, quite importantly, the company continues to generate strong cash and, as a result, the board has elected to adjust our dividend, our base dividend, up 30% from where it was in the interim period a year ago. We've increased that number to US $0.75 per share. Now, this becomes the new base for which we'll continue our progressive dividend policy. It's an illustration of what we believe is a strong outlook for the future as well as an expectation for improving earnings and cash flow in the years ahead. If you're aware, we look at dividends not based on how much we earned this past year but our expectation for future cash uses and sources in the years ahead.

  • And in addition the board has approved a capital management program of US$2 billion. This will begin immediately with an off-market share repurchase program in Australia targeted at about AUS$1.5 billion, again, we'll talk about that in a few minutes.

  • This entire picture from operating to financial to cash performance is an illustration of the execution of our strategy and, again, quite consistent with creating long-term shareholder value.

  • With that, let me turn it over to Chris who will walk through the numbers, and then I'll come back after that for a few comments. Chris, over to you.

  • Chris Lynch - CFO

  • Thanks, Chip, and welcome to everybody. Before I go through our financial results, I'd like to highlight a couple of items. Today is the first time we report our results under International Financial Reporting Standards, IFRS. This has introduced a number of variations to our results. Throughout the presentation, the EBIT and EBITDA numbers I will refer to are the underlying figures, which exclude net finance, costs, and taxation for jointly controlled entities. A reconciliation to the statutory EBIT figure is contained in our profit announcement.

  • As usual, all references to dollars in today's presentation will be to U.S. dollars, and comparisons to the prior period are against the half-year ended 31st of December 2004, which has been restated for IFRS. There are no individually significant items, previously known as "exceptional" items, in either period.

  • Slide number 6 shows our record results for the half-year ended 31st of December 2005. Revenue increased by 20% to [unintelligible] billion, primarily due to higher commodity prices, which added $2.9 billion but also due to higher volumes from new and acquired operations, which were sold into the higher-price environment.

  • EBITDA of $8 billion and EBIT of $6.7 billion are up 42 and 43%, respectively. Attributable profit of $4.4 billion is 48% higher than in the comparative period, and earnings per share of $0.72 represents an increase of 51%. Our interim dividend declaration of $0.175 per share is $0.03 higher than the 2005 final dividend and 30% higher than last year's interim dividend of $0.135. Today's announced increase strongly signals our confidence in the sustainability of our strong cash-generating capacity.

  • Over the last two years, our dividend has more than doubled from $0.08 to $0.175 per share.

  • Turning now to slide number 7, in today's environment where cost pressures across the industry are strong, we have once again delivered record results with significant gains in EBIT for base metals, carbon steel materials, petroleum, and stainless steel materials. In general, the positive variances have been price and volume [unintelligible] with an offset for increased costs.

  • In the petroleum CSG, EBIT increased by 14% to $1.4 billion. Prices for all petroleum products were up and, in particular, oil increased by 30% and natural gas by 6%. We had a net volume increase also contributing to the result with an offset from the divestments of our interests in the Laminaria and Corallina oil fields during the 2005 year.

  • There was a positive variance from exchange commitments also compared to the comparative period.

  • During the period, the hurricane-related disruptions in the Gulf of Mexico had a total cost of just under $120 million.

  • Our new petroleum operations are running well and provided approximately 10 million barrels of oil equivalent during the period with a contribution to EBIT of $191 million, and these assets will provide the platform for our future petroleum growth.

  • Exploration expenditure charge to profit was $68 million higher than the corresponding period with gross expenditure for the period of $251 million. We expect total exploration spend for the full year in this business of around $450 million with the largest proportion of that spend being in the Gulf of Mexico.

  • In aluminium CSG, EBIT decreased by $43 million to $406 million. Increased prices and record production volumes of metal added $125 million, and the continuing capacity [creep] we are seeing from our South African smelters with no material capital spend continues. Increased costs and exchange and inflationary pressures had a negative impact.

  • The rising cost of fuel, LA [malink power], other input costs such as caustic soda and increased potlining activity were evident during the period, particularly so in the alumina business where the majority of our sales are contracted long term, and we do not have any real leverage for spot price to offset the rising costs. This position is improving as we renegotiate contracts and will improve further when the Worsley expansion commissions during the current quarter. This will improve our long alumina position.

  • Base metals, EBIT rose 82% to $1.9 billion. We had record copper production during the period with the inclusion of Olympic Dam volumes and an outstanding performance from Escondida together with increased sales volumes across all our base metals products. This provided the opportunity to maximize our leverage to the current high-priced environment. Increased priced linked costs and other costs, particularly TCRCs, were higher than for the previous period. Operating performance continued to improve at all assets in the second half, which positions us well for the remainder of the financial year.

  • In carbon steel materials, there were 130% increase in underlying EBIT to $2.3 billion. It was driven by higher prices for iron ore, coking coal, and manganese ore combined with increased sales volumes for iron ore. Higher royalty costs and increased mining charges at all operations had a significant impact on the results. Operating costs increased at WI Iron Ore and Queensland Coal, period-on-period, at approximately 20 and 30%, respectively. These cost increases are largely due to the heated market exerting upward influence on input costs and, in particular, contractor margins, our higher usage of contractors for mining activities and the impact of tie-in activities. However, margins generated from this business continue to be excellent.

  • Diamonds and specialty products underlying EBIT decreased by $145 million to $261 million, 36% less than the prior period. As we've highlighted previously, we had been mining a very high-grade zone at Ekati, and this is now complete. So the current period result is reflective of lower grade and a lower net realized diamond price combined with higher operating costs per carat. This is expected to continue for the second half of the 2006 financial year. Our previous EBIT guidance for Ekati of $200 million for the 2006 financial year remains intact.

  • The EBIT of our energy coal CSG decreased by 31% to $205 million. The decrease is largely driven by lower results at Ingwe where export prices decreased over the period, and we continue to incur costs associated with our Ingwe recovery plan. Future periods will benefit from this spend with increased stability and utilization rates.

  • We had improved realized prices for export coal sold from our Colombian and Australian operations where we have a lower leverage to spot prices as well as an improvement in domestic prices. In aggregate for the CSG, this resulted in a negative price impact of $700 million. Increased costs of labor and fuel, higher depreciation and amortization charges at Ingwe, and adverse inflationary and exchange impacts also contributed to the lower result.

  • Stainless steel materials EBIT of $374 million represented an increase of 11% out of the comparative period and was largely driven by the additional volumes resulting from the acquisition of Nickel West. Nickel prices were relatively flat but lower average prices for cobalt plus exchange movements had an adverse impact. Increased costs were negative and, in particularly, at Yabulu where tie-ins and a number of maintenance activities were occurring.

  • Group and unallocated costs increased by $39 million due to increased insurance claims, which are primarily offset by insurance income and CSG results. Higher employee share awards and corporate project and regulatory compliance costs, the WMC integration, and transition expenditures. Exploration and technology expenditure also increased compared to the prior period due to less sales during their exploration equity stakes.

  • Before I step through cost impacts in more detail, let me recap on the volumes -- the additional contribution from increased volumes from new and existing businesses amounted to $370 million. As always, we adopt a conservative approach of using 2004 rather than 2005 margins when we measure this volume variance so that it is more reflective of the sustainability of the contribution rather than the current higher-priced climate.

  • We had record production of nickel and copper with the highest-ever half-year production from Nickel West following our first six months of ownership. As I've already mentioned, we also had strong contribution from our new petroleum developments now continue to ramp up over future periods. This is not a six-month story, however, but one of sustained and continued volume increases over a much longer period of time. By nature, capacity increases from major projects are lumpy. In the four-and-a-half years to the end of December 2005, we delivered, on average, volume increases of around 42% across our major commodities on an annualized basis, and naturally this is not reflected in this period's volume variance, but our results reflect this growth. We expect similar growth over the next five years.

  • Turning now to costs -- the underlying EBIT increased by 43% during the period from $4.7 billion to a record $6.7 billion. While our EBIT margin net of third-party trading, was 42%, a 14% improvement on the comparative period. This very solid result has been achieved in a period where increased costs are having an impact across all of our businesses. In total, net of the effect of price-linked costs, exchange rates, and inflation, costs had a net unfavorable variance on EBIT of $795 million compared to the December 2004 half. This represents an approximate 8.2% increase on our total cost base.

  • Moving into the detail of this $795 million cost variance on slide number 10 outlines the major areas of costs calculated on a pretax basis. We estimate that only around 30% of these costs are structural changes, higher cost of fuel, energy, and raw materials represent the largest cost increase, but this is no surprise, given the prices we are realizing from these commodities ourselves from the revenue side. In fact, across the company as a whole, we have a 93% long energy position.

  • Noncash costs largely represent depreciation and amortization charges, which are higher due to commissioning of a number of new operations, contracted charges have increased due to increased contractor rights and usage across our businesses, running our operations at capacity or near capacity levels impacts the spend on maintenance, and investment is made here to ensure that we can continue at these levels.

  • Now, Ekati Diamond Mine is the largest component of the mining grade variance where lower-grade -- prices in lower-grade ore has resulted in higher unit costs per carat. The final result after these increases is that in what is currently a very tough cost environment, approximately 68% of our increased revenue went straight to our bottom line and our EBIT margin again improved to 42%.

  • Now I'd like to talk about our progress on the WMC acquisition. The integration of WMC has been successfully completed. The assets and functions have been fully integrated into our structures. We have now fully closed the XWMC corporate offices in excess of 430 people that's a part of organization, and we had record production from Nickel West and Southern Cross Fertilizers in our first six months of operation. We have exceeded our synergy target and expect this to further improve, and we have done this with a lower-than-expected integration cost.

  • The acquisition was focused on the long-term value to be won from the tier 1 ore bodies, which exist at Olympic Dam and Nickel West, and indications are that these ore bodies are, if anything, better than we had expected.

  • Moving now on to net finance costs, tax, and attributable profit -- our net financing costs increased by $23 million to $215 million. This was driven by higher average debt levels following the funding of the WMC acquisition combined with higher average interest rates. The tax charge for the year was $1.6 billion excluding exchange impacts and royalty-related charges, this represents an underlying effective tax rate inclusive of taxation of jointly controlled entities of 27.8%. Continued progress in the Gulf of Mexico has again enabled us to recognize the benefit of U.S. tax losses of $175 million in line with previous guidance. We would expect this level of loss recoupment to continue for the remainder of the 2006 year.

  • Under IFRS, a number of royalty tax payments in our petroleum and diamonds businesses amounting to $323 million, or $227 million net of tax, are now included in our tax expense line and are no longer reported as an operating cost.

  • Let me just recap -- today we have delivered our fifth consecutive half-year of record results; we have achieved record production in four major and two minor commodities; we have completed the integration of the WMC assets into our business; and the continuing strength of our cash flows has allowed us to again accelerate returns to shareholders -- all in all, another very good half. With that, I'll hand you back to Chip.

  • Charles Goodyear - CEO

  • All right, thank you, Chris. I'd like to address three things in the next few minutes. First, the market outlook, and here I'll talk about costs, and I'll talk about our pricing pipeline. We'll then take a look at the outlook, the economic outlook around the world as we see it, and then, finally, I'll give you a brief strategy update. We have updated our strategy slightly, and I thought it would be interesting to review that with you.

  • Moving first to the area of cost pressures -- now, cost pressures are not new to you. This is something we've talked about for well over a year, and it's not a great surprise. We've been through at least two-and-a-half years now where product prices, our product prices, have risen pretty dramatically and ultimately that's going to flow through into some of the input costs that we have as well as the competition for some of those resources that make our business work. We are seeing it in capital and operating cost. It's coming in people, it's coming in equipment, and it's coming in materials.

  • Just to give you an example, in the area of earth-moving equipment, the prior lead times were on the order of nine to 12 months. Now it's 18 months, and for large trucks we've been told by one of our suppliers that unless you're already in the queue, you will not see a new truck until after August 2008.

  • In the area of drag lines, previous delivery times were 18 to 24 months, now they're over 30 months, and I think many of you know that both significant suppliers of that kind of equipment were in bankruptcy at some point in the last five years.

  • In the area of tires, you've heard a lot about tires. It's been a topic of discussion. I can at least say you've heard it here first. We first saw this when we saw -- when we had to order for the Ekati diamond operation, which we have to do in advance because of the ice road there, and two years to 18 months ago we saw the tire situation coming.

  • What I'd like to mention in tires is not that the situation is tight, but the fact that a company like ours, because of the global extent of our business, does have very good visibility to what's going on out there and allows us to plan. And, ultimately, the need for equipment, the need for people, and the need for materials is really all about planning so we can work with our suppliers to make it happen.

  • The other element, though, is if you're not in this business, the difficulty you have in entering the business is quite significant. Now, last summer I heard about a company that had ordered new trucks, and they were very surprised when it showed up at the mine site with no tires. For very large trucks, only 10 to 15% of those trucks come with tires, and if you're not in the business, if you were in the dot-com industry a few years ago, you don't realize that and, therefore, that company had to go back to using their old, inefficient trucks. But the strong relationships we have and the knowledge we have of business helps us manage some of the risks that are out there.

  • Let's take a look at what that means to our project pipeline. This is obviously the pipeline you're quite familiar with. Just to review briefly, we completed three projects in the last six months, we added seven projects to our project pipeline, five of those being what we call "major" projects with a capital cost around $3 billion, and we added three new projects to our pipeline. And, again, our pipeline covers projects in execution and in feasibility only, it does not include pre-feasibility in concept-stage projects.

  • Those three new projects that we added were the Worsley efficiency and growth project, was an efficiency project at Douglas Middleburg, and a new oil field on the West Coast of Australia called Pyrenees, which is 100,000 barrel-a-day field, which has been added to our pipeline. As I mentioned earlier, this pipeline is 25 projects with a total capital cost of US$14.4 billion. Now, despite the cost pressures that I mentioned, these still represent quite good value, but I would mention that we are in this business for the long term. This is a marathon for us not a sprint, and we will continue to assess the desire to move projects along this pipeline based on not only the market demand that's out there but also the cost of moving these projects on.

  • One of the people in our project development area mentioned about three months ago in a, I'd say, non-auditable fashion, that every project you approve in Western Australia, you need to add 10% to every other project you have in Western Australia. That's how tight the situation is. There is no excess capacity, and in environments like that, we have to ask ourselves, "When do we progress things along that pipeline?" But we do that on the basis that it is a long-term, it is a long-term decision not a short-term decision about next month's production.

  • What are doing about managing costs? Many of these things you've heard before. First of all, it's around business excellence and making sure that we use our six sigma process to identify efficiencies all across that business, and we've talked to you about that for quite some time, and in the presentation area where you are today, you will see some of those items -- a recent update.

  • The next area is strategic relationships. I think many of you are aware that we have strategic relationships with our suppliers that gives us the opportunity to plan and to have preference with regard to access to equipment and access to supplies.

  • In the third area that Chris mentioned and quite importantly is we build -- try to build -- around variable cost structures. Chris mentioned that we believe those cost increases that you see, approximately 70% of that is cost that we expect to be able to work out of the system if and when we see prices moderate. It won't come out immediately, but it is a way that we design our cost structures in order to be flexible for different environments in which we operate.

  • Now, from a cost point of view, certainly, there's two ways to look at it. The bad news is costs are going up. The good news is costs are going up. Now, what do I mean by that? In an environment where a company like ours has significant resource and significant production currently, the fact that the supply side is being delayed is actually having an impact on price and a positive impact on price. So a company like ours with production and the ability to bring on brownfield opportunities and to do that efficiently and be able to reach our agreement with our suppliers on our preferential basis, that gives us an opportunity to outperform, but it also illustrates that the supply side delay will prolong the current environment that we're in.

  • Now, we mentioned this a year ago, and what you've seen is essentially what we expected at that time. So, again, good news and bad news come in costs. We try to manage costs in a very proactive way, but it does have an impact on the ultimate product price.

  • Now, moving to that, the strong demand environment is obviously what's driving the product prices that we see today. The next slide illustrates a 10-year demand picture for the Chinese market in the area of copper, which is up in the upper left-hand side; nickel in the upper right-hand side; aluminium in the lower left-hand side; and then iron ore in the lower right-hand side. I'm not going to go through each of those. I think it's pretty clear that we are not seeing a demand slowdown in China in terms of commodity demand.

  • The only thing I would point out here is what I say is the law of large numbers. If you take a look at the aluminium business, 10 years ago when production was about -- demand was about 2 million tons a year, a 10% increase in demand was 200,000 tons. If you look today, with 7 million tons of demand, it takes a much smaller growth rate to have a similar impact on overall quantities. So even if you saw a 5% growth rate in aluminium demand, that's 350,000 additional annual tons of aluminium. It's not a prediction of growth, but as that baseline increases, the amount of capacity that must be added to this marketplace is quite significant.

  • Now, moving on to the discussion of marketplace and what we see in the global economy, China is a critical engine for global growth. GDP in China last year grew at about a 10% rate, but I think many of you are aware that China revised its GDP growth rates for the last 13 years or so. That was based on a census they undertook in 2004. Now, although we all knew that the number was probably somewhat lower than the actual GDP growth rate, one of the most interesting things that came from that study is the balance between industrial growth and this service economy. The change was in the service side of the economy. One of the criticisms of China growth in the last several years is that it's been balanced to the industrial side, perhaps overweighted to the industrial side. These new numbers show a much stronger balance between the industrial economy and the service equipment not unlike other North Asian economies during their periods of rapid expansion. What this indicates is more sustainability to the Chinese growth story.

  • Now, we would expect that the commodity demand will continue to grow. We illustrated that on the prior slide. But I would also say that you are going to see the government continue to use macro policy adjustments in certain areas of the economy. We've seen that in aluminium, we've seen it in cement, we've seen it in the property market, and in steel. We would also see that there is going to be an expansion of some of those things. Our belief is we will see it expand into the area of coke, power, and the copper business, particularly the copper smelter business.

  • Having said that, we expect GDP to grow by about 9% in the upcoming year, or this year, 2006. I think one very encouraging thing is despite these macroeconomic adjustments the government has made there, growth continues. You can see on our slide, the slide there that the bar chart illustrates our sales to China since fiscal year 2002 -- fiscal year 2002, $371 million. In the last six months ended December, it reached almost US$3 billion. Obviously, a very significant growth rate.

  • Now, the industrialization and urbanization story we believe in China is very much intact and, as a result, we would expect, let's see, 8% growth in China for the foreseeable future. I would caution, though, that there will be bumps and bruises along the way, and the critical thing for us and others in our industry is that we create cost structures and we create -- we have the asset base that allows us to sustain through those little bumps and bruises, obviously, on a long-term, very exciting environment in China.

  • Moving on to the United States -- the United States did see a slowdown in the fourth quarter of 2005. That's a result of the energy price increases as well as the hurricanes that took place in the Gulf of Mexico. But since that time, we've seen employment growth, we've seen export growth, durable goods orders are up, consumer confidence continues to rise, capacity utilization has increased, and, overall, the economic policy is quite supportive of growth. We expect U.S. economic growth in 2006 to be on the order of 3.25 to 3.50%.

  • Now, the surprise for 2005 was Japan. Last year I told you that we expected Japan to grow on the order of about 1% for the year 2005 when, in fact, growth turned out to be on the order of about 2.5% for the year. Industrial production rose at a 5% rate over that period. We continue to see employment growth and an improving investment picture in Japan, and, as a result, we look this year for about a 2% growth in Japan. If that was the case, it would be the third consecutive year that growth in Japan has been at 2% or greater. And if that occurs, it will be the first time since the early 1990s.

  • Moving on to Europe, we have seen a rise in confidence in Europe, both business and consumer confidence. If that's the case, and if it carries through to added employment and added growth in Europe, we would expect a reasonable year there. That's a function of the global economy and the demand in the global economy as well as the weaker euro, which is improving the export picture for the euro zone. Our expectation here is a consensus -- and consensus estimates put growth at somewhat less than 2% or just a little bit less than 2%.

  • Having said that, the global economy is not without its risks but, overall, we see a good global growth for 2006, and we see raw material demand continuing to be quite strong.

  • Moving to the next slide, really, a synopsis of what I've said -- demand does remain strong. We have a positive outlook as we go forward; supply side is being constrained for a variety of factors; projects are being prioritized, they're being phased, and some projects are being delayed, and that's across the industry, and I know more of those announcements were made in the last few days by others; we've seen relatively high prices, certainly in nominal terms. But, having said that, cash flow in the company remains quite strong. As a result, the board has chosen to take some of that extra cash flow and return it to shareholders in a couple of different ways, and the next slides detail a couple of those things.

  • Probably the most significant move is the increase in the interim dividend. That's up $0.03 from where it was at the final dividend of 2005. It is up $0.04, or 30%, from where it was a year ago. It's up 120% from where it was two years ago. So as we've said, our dividend is not based on our performance this quarter, this day, or this half. It's based on how we expect the global outlook to be in the years ahead and what the profitability and cash flow picture looks like for this company. I think you should look at this as a strong sign for our belief the outlook is, indeed, quite good for all of those financial metrics for BHP Billiton.

  • It's from this level that we'll continue our progressive dividend policy. Again, decisions on that will be based very much on future investment opportunity as well as market conditions.

  • The next area is the capital return US$2 billion that will take the form of share buybacks. We'll begin the first phase of that immediately with a AUS$1.5 billion off-market buyback in the limited security. We would expect the balance of the funds to be used in an un-market program, and it is most likely that will occur in the PLC security. These will be completed over 18 months but, as I mentioned, we will begin the off-market right away with the on-market to follow.

  • Again, this does not change our priorities for cash flow. We continue to invest strongly in our business and find the optimum opportunity to reinvest in that business. We keep our capital structure in line, and we have done that over the years, and when we do have extra cash flow, we have committed, as we have done in the past, to return it to shareholders.

  • Now, before I finish I said I wanted to make a few comments about strategy. The strategy we have been working to is the one that we instituted at the time of the BHP Billiton merger. That's been about five years. At that time, the strategy very much focused on efficiency and execution of our projects and, obviously, sharing knowledge across the wide expanse of the company.

  • Now, these initiatives and priorities remain but, obviously, the world has moved into certain areas and expanded quite significantly in terms of the demand side over that period of time, and it is an obligation for a company like ours to make sure that our strategy is reflective of some of these changes that have taken place. And so as a result we have had a chance to adjust this strategy slightly.

  • If I move to that slide, you will see there, up in the upper left-hand corner what we call our "purpose," or our "core purpose." This is captured in our charter, and just to remind you of what that is, is to create long-term value to the discovery, development, and conversion of natural resources and the provision of innovative customer and market focused solutions. There are four critical things in this statement. Again, this has not changed over the last five years. It's about long-term value, it is about the upstream side of the resource business, it's about innovation, and it's about the customer.

  • Now, if I got to the pyramid, many of you have seen this before, at least in a similar form. We have a very -- we can be a very complicated company, but we can also be quite simple, and this pyramid is meant to illustrate that. It is a way to communication not only externally but also internally how this company expects to prosecute that core purpose.

  • We begin with a foundation, and that's how you should look at this. It is a foundation built on people. Many of you think about this company by its great physical assets. The Escondidas, the Bass Straits, the Northwest Shelf, the Alumar operations, et cetera. And that's true. But it takes people to find these resources, develop these resources, produce them and ultimately deliver them to the customer. People are a critical part of any corporation, and that's very much true with BHP Billiton.

  • The next one is the license to operate. We do have an impact on the communities and the environment in which we operate, and we need to make sure the communities benefit from our presence, and that's what we call our "license to operate." It's about safety, it's about partnerships, it's about win-win relationships, and that is the next critical layer of our pyramid.

  • World-class assets -- as I've said, they are -- they are fantastic assets, but we need to take care of them. They produce the cash flow that pay our employees, that pay our suppliers, that pay our taxes, that pay our financial partners in this process. You need to make sure that we're being efficient in what we do here; that we benchmark, and we look for continuous and progressive improvement in the way that we operate these businesses.

  • The BHP Billiton way is around value-added processes that go across all the things that we do, and this involves our customer-centric marketing, our investment approval process, our people pillar, and the areas of health, safety, environment, and community process.

  • The next one is financial strength and discipline, solid single line of credit, our portfolio model, these are critical items that we build into this -- in addition, how we use our cash, how we efficiently use our cash to reinvest as well as return it to shareholders when appropriate. The project pipeline is about the identification, prioritization, and execution of the projects, which we progress and doing that on time and on budget.

  • And then growth options -- it's about exploration, it's about technology, it's about our global footprint to identify the next generation of investment opportunities that will continue to lead BHP Billiton to the next level of performance.

  • Moving on to the last slide, the summary, just simply going over what we said -- the fifth consecutive six-month period of record results. We see margins continue to expand, as Chris mentioned, about 68% of our price has made it to the EBIT line. The WMC integration has gone extremely well, and we've identified savings that are 50% higher than we'd expected at the time of the combination. We continue to execute and invest in our project pipeline and replenish that pipeline as time has gone on. The interim dividend is about 30% from where it was a year ago; it was very consistent with our overall use of cash and an indication of our view of outlook and ultimately the earnings in cash flow performance in the years ahead for this company. In addition, a $2 billion capital return program in the form of a share buyback, which begins right away, and, overall, an outlook for the year ahead, which continues to look positive.

  • With that, I will open it up for questions. What we will do is rotate our questions. We'll begin in Melbourne and take three questions; we'll move to Sydney; and then the telephones, and we'll continue that as long as we have time for. And what I'd like to ask you to do is address your question to me, and then I will farm that out to Bob and Chris, as appropriate.

  • So with that we will begin in Melbourne.

  • Neil Goodwell - Analyst

  • Neil Goodwell from Goldman Sachs JBWere. Just a question around your comments on new projects in WA. If you face it, from what you were saying, I always said that your, I guess, [unintelligible] has put a new project into the pipeline now, and does that marry in with your slight change in strategy and your bigger dividend payouts as well? Basically, is that your slight change in strategy that you were talking about?

  • Charles Goodyear - CEO

  • Well, first of all, the slight change in strategy is really recognizing the issues around license to operate and the BHP Billiton way. Most of the other things -- and then specifically identifying growth options to expand into the area of exploration and technology. So it's not about -- there's not a change in any way in terms of the long-term nature of the business or the prioritization of cash flow.

  • I think I commented -- just meant to represent this is a long-term business. So it's not a strategy business, but it is a long-term business, and it's not about next year's production. We have to think about what happens in the years ahead, ultimately price will come back into line at some point in time, and will we be happy with the capital investments made in the period of a heated market.

  • I wouldn't look for a major change here. Again, we've approved seven major projects -- or five major projects and two smaller projects some of which have been in WA. But I think we have to, again, recognize that it's not necessary that we do them all today, but we make sure balance what's the marketplace for the product as well as what is the cost to bring that project online?

  • Now, in terms of the dividend and the capital management program, that's simply a function of the cash availability in the company and our ability to put it to work in a prudent way.

  • Vicki Binns - Analyst

  • Hi, Chip, Vicki Binns from Merrill Lynch. My question is on costs. You've mentioned that costs in your iron ore business were up 20% and 30%, I think, for coal. Can you give us some sort of idea about what we may expect in unit costs over the next couple of years, given that you had quite an aggressive buildup in your iron ore volume growth as well as the potential near-approval of coking coal passed 59 million tons towards the 100-million-ton per-annum rate.

  • Charles Goodyear - CEO

  • Thanks, Vicki. What I'll do is, I'll ask Bob to answer that question, but let me just make a couple of comments. You are seeing cost fractures, and I think, as Chris mentioned, you're seeing those in some of the areas of contractors and some of the input costs that we have, and there's no doubt that in an environment where we are today, where the margins are quite strong in those businesses, I think Chris mentioned that the margins were excellent. That when you have a high price, the desire to get that product to the customer, even if it comes in a little bit more cost, i.e., using a contractor within your own work force, is a good investment decision. But the key is do you go hard bake or make those a structural change, and so that's how we think about it. It's always a trade-off about, "Gee, if costs go up, that's something we have to worry about," but this is ultimately a business about that margin and about generating that positive margin. So, again, you never like to see costs go up, but when you have margins that potentially can be $50 a ton of coal, even if the costs are up a little bit, it sure is hard to turn that down, again, assuming you can manage those costs out.

  • But, Bob, maybe I'll turn it over to you and see if you have some comments on Vicki's question.

  • Bob Kirkby - Group President Carbon Steel Materials

  • Thanks, Chip. The major increases have been in the use and in the right of contractors, I guess, both in iron ore and coal. In addition, in iron ore, as you would be aware, Henry and Walker Elkin have been taken over by licensed -- sorry, memory lapse -- and during that process, we did renegotiate some of the rates, particularly for [unintelligible], but that's been set, and now we will just have the normal sort of rise and fall that we see, going forward. The increased use of contractors, I mean, while demand is strong and while we're ramping up, that is likely to continue.

  • The offset to all this, of course, is you do get economies of scale on some of your fixed costs, and as we ramp up, we would expect to see that continue. The other issue in Western Australia is that Galsworthy is one of their high-cost operations and, of course, we are looking at some sort of suspension of Galsworthy, as we go through our construction program.

  • In Queensland, the issue is that we are using more and more truck and shovel activity to supplement our drag lines. This is to help us ramp up and the truck and shovel costs, of course, are more than the drag line activity. So it's the same sort of issues -- the increased use of contractors. The rates are up in Queensland. The mix of earth moving is more expensive at the moment, and then as the volumes rise, we will see more leveling off of their fixed costs.

  • [unintelligible] down to what Chip said, I mean, we keep an eye on this very, very closely, and while the margins can be sustained by this type of activity, we will make these decisions.

  • There are other cost increases, of course -- fuel has gone up, as we know, and explosives are up in Australia. There's a very tight supply of explosives. We expect that to continue for at least 12 to 18 months when [unintelligible] will come on when we would see less need to have to import explosives, which is expensive.

  • Tim Gerrard - Analyst

  • Yes, Chip, Tim Gerrard -- two questions. The first is with regard to [unintelligible], which was a fantastic result, very strong result, but in view of Chris's comments that the group in unallocated, there are some favorable movements with regard to insurance. I was wondering if there were any insurance payments made into the copper division either as a result of Cerro, Colorado -- the delays because of the [technical difficulty] impact or possibly civil destruction back in Tintaya or perhaps Escondida. So any thoughts on that would be appreciated.

  • And, secondly, coming back to iron ore, the iron ore [technical difficulty] is targeting quite an aggressive fourth quarter production [technical difficulty] for 9 million tons or close to 120 million tons right off. Can you [technical difficulty] in light of your comments to analysts in the last six months that you're more targeting sales of around about 110, how [technical difficulty] production of sales through '06-'07.

  • Charles Goodyear - CEO

  • All right, Tim, I'll tell you, why don't -- well, Chris, I get you to just comment on whether there's any particular insurance issues in the base metals number, and then, Bob, maybe you could comment on Tim's question about the 29-million-ton expectation or target, I guess, aspiration in the iron ore business in Western Australia.

  • Chris Lynch - CFO

  • Thanks, Chip. Tim, the insurance issue really rests with -- the businesses have an arrangement with the center where we self-insure. We'll have a deductible in the business, and the business is on the hook for up to that amount of money and, beyond that, the self-insurance kicks in, and we wear that at the center, and that's the way that that would go. So I don't see any major issue in there for insurance-related matters, but your point is valid with regard to Cerro, Colorado, and that has been running sub-optimally since the earthquake there, which compressed the leach pads. So what that actually does is underlines even further the excellent performance at Escondida, because it's more of an offset for that volume and the other mention of Tintaya. So the overall volumes, they were very strong, headlined by a great performance at Escondida, and the short answer to your question is really no significant -- nothing of any significance to come from the insurance back to base metals.

  • Bob Kirkby - Group President Carbon Steel Materials

  • Thanks, Chris. Tim, 29 million tons for the fourth quarter remains our target, and we have had some wet weather. Of course, we had two cyclones in Western Australia in this question, but we're getting equipment, I mean, our bottlenecks are well identified by the team over there. We're getting the [unintelligible] equipment primarily. We put more people in the bottleneck areas to assist us, and so as far as I can see, things are on track to achieve that in the fourth quarter.

  • Brendan Harris - Analyst

  • Yes, hello, Chip, Brendan Harris from McQuarie Bank. Two questions just on the base metals [unintelligible]. [technical difficulty] this period, and the second question [technical difficulty] that you've generated from you third [technical difficulty] is significantly higher on similar revenue bases. I'm just trying to understand that so an explanation there would be fantastic. And I'm also just interested in the risk profile that one takes to generate that sort of profit internally and sort of the sustainability of those profits.

  • Charles Goodyear - CEO

  • Okay, Brendan, I missed -- you cut out a couple of times. Chris, if you -- it sounded like most of those questions were related to financial activities. If you heard that, I might just pass that over to you. If not, perhaps we can just ask Jane to maybe give you a call to just follow up. But let me just see if Chris heard those questions.

  • Chris Lynch - CFO

  • Chip, it is a bit patchy. That link in Sydney is cutting in and out a bit. You can get the bulk of the question but not the full content of it. But we can't take it through chapter and verse. The change we made to provisional pricing that was at the end of last year where we had the degradation in the market, and we took the basis of valuing open positions at the lower of the forward curve or the current spot, and that's continued -- that's a policy that's continued as the basis of that valuation. Elsewhere, there is obviously the prices for the other base metals commodities have all been quite strong, and so there's -- the [unintelligible] are viable from the [unintelligible] but we can go through on that, but that's, I think, generally, across the patch, the lesser commodities, other than copper, have all been pretty robust.

  • Operator

  • Peter O'Connor of Credit Suisse.

  • Peter O'Connor - Analyst

  • Hi, Chip. I have three questions, if I may -- two on iron ore. Firstly, if I could direct a question regarding Galsworthy. I think you mentioned a suspension to the operation. I just wonder if you could explain that further and, secondly, on iron ore -- taking off from Tim's question about the operating rate in the fourth quarter -- what does that make the operating rate for 2007, fiscal year for BHP?

  • Charles Goodyear - CEO

  • Okay, and did you have a third question?

  • Peter O'Connor - Analyst

  • Yes, I did. Costs -- the comment you made and also Chris talked about the structural cost issue. It's fascinating, because I haven't really gotten that much detail, so thank you. Just looking at that 30%, I'm sure it's a fairly generic number. What does that mean, and have you plugged that into your long-term equations for prices? If there is that structural move in the curve, has that risen [unintelligible] curves across all your commodities moving up because of that -- your long-term prices, I should say?

  • Charles Goodyear - CEO

  • I'll tell you what, why don't I go through the costs -- your question about what does that mean for long-term prices, and then, Bob, perhaps you can answer Peter's question on the -- on the two questions on iron.

  • In terms of our expectation for future prices, we haven't made any adjustment to per alumina, nickel, basically the trade commodities. We've kept it at a similar level. Copper is undergoing a pretty significant study at the moment to see what all that means. We're obviously seeing some pretty strong demand. I'll give you a little story. I had a visit with some of our customers in China last week, and I was commenting on the copper price and how we are seeing activity by hedge funds and other financial players that seem to be driving that price to a significant level. And the individual I was talking to, I expected to say, "Yes, we are seeing a copper price that seems to be above a long-term sustainable level," but he didn't say that. He said, "Yes, but the demand is there." Which I thought was a very interesting comment. But, again, that's coming from someone who uses copper, and so we're looking very closely at copper.

  • But, in general, the traded commodities we haven't made adjustment to. The bulk commodities we have made some adjustments to iron ore, coking coal prices, and we have adjusted petroleum somewhat, but none of that comes close to what I'd say is the spot market kind of prices that you see now, and we have essentially maintained our long-term real decline at some level.

  • But there's no doubt that there is cost pressure in the business, and they did, at some point, going to flow through in terms of overall pricing. With that, Bob, let me turn those iron ore questions to you.

  • Bob Kirkby - Group President Carbon Steel Materials

  • Peter, did you have a question for Chip?

  • Peter O'Connor - Analyst

  • Chip, is your sense, as the CEO of the largest company in the world in mining that the pressures you're facing are similar across the board, or given your six sigma programs and others that you're doing better than the rest, that we should expect that structural component actually higher elsewhere?

  • Charles Goodyear - CEO

  • I would say that we do focus on that a great deal. I think one of the things that you will see, particularly as Bob has described in his business, we have used contractors, and that does give us flexibility around that. But I also think you have to look regionally. Australia is probably the hottest market; Latin America, less so; and I would say Africa, at this point, is probably less so, also. So it is not equal across the world, and I'm not sure it's equal by company.

  • I would also say that I think there is a size issue; that companies like ours, and we're not the only one, obviously, that has been in business for a long time, it can give people and identifiable career that will last, essentially, their entire working life. We can do that. We are able to attract solid people who value that. Entrepreneurs who are out for the next buck are going to go to smaller companies that need to pay premium price because there isn't that stability. I think that those people are going to have higher costs, and I think you've seen some of that in the announcements that have come out recently in the industry by people trying to start up new operations.

  • Okay, Bob, a question on Galsworthy and what the suspension means and then an estimate or thoughts around 2007. Obviously, I think it's thoughts around 2007.

  • Bob Kirkby - Group President Carbon Steel Materials

  • 2007, [unintelligible] expect output through the system there of about 107, 108 million tons, and we passed that some time ago, that hasn't changed. That's down from the right, of course, in the fourth quarter of this year, and it's down because of tie-in activity and the suspension of Galsworthy, which the final date is still to be sorted out, but it will be in the second half of this calendar year. That's [unintelligible] more efficient tie-in activity. Galsworthy is 40 years old, the costs of production are high there. We do have some ongoing exploration. We've been exploring for a long period of time, and we're suspending operations while we go through the construction activity, but we're continuing to look for additional resources in the Galsworthy area.

  • Operator

  • David George of J.P. Morgan.

  • David George - Analyst

  • You commented on the Olympic Dam integration going pretty well. That sounds good. Can you update us on the expansion study that's underway -- any further progress, timing, capital cost estimates, et cetera? And then also just on the fertilizer business, any additional comments you can add on the future of that business or exit [unintelligible].

  • Charles Goodyear - CEO

  • Okay, with regard to Olympic Dam, it's premature to make any additional comment on the expansion activity other than to say there is a great deal of effort going into that. Chris mentioned that drilling continues. I think we've got 17 or 18 rigs working there and continue to get very good results from that. I probably can't give you any exact details, but we continue to be able to move in a variety of directions with regard to that ore body.

  • But there is going to be significant cost to this study. It will come through, at this point, we are seeing those costs come through. And as we mentioned earlier, the feasibility study is going to take -- I'm sorry, the pre-feasibility study is probably going to take a couple of years, and then we'll go into a feasibility study that's going to be a year or two. So at this point it's a little bit early to talk about that, but we are seeing activity physically, and you will see activity financially in the results for the copper business.

  • Fertilizer -- I think your question is about the performance of fertilizer or is it about our intentions with regard to fertilizer?

  • David George - Analyst

  • It's more on the intentions for the future.

  • Charles Goodyear - CEO

  • Okay, yes, we have received indications of interest with regard to our fertilizer business. It's a good business, and it works well for certain players in that business, but it's not a business that -- or an asset -- that's consistent with BHP Billiton's overall skill set, certainly, in terms of the size and scale of that business in a global context. So as a result we would look for opportunities if we can find fair value with regard to exiting that business. Having said that, if we can't, we are at, Chris mentioned, record production there, so we certainly are able to run that business. So it will just simply be a question of whether we can identify value-added opportunities to move that business along.

  • Jack Hadroic - Analyst

  • [Jack Hadroic] from Deutsche. I've just got two fairly [unintelligible] questions. Firstly, the Chinese government [unintelligible] late last year, and it has [technical difficulty] changes in direction in terms of going to a more higher value-added manufacturing base in a more services component. I'm just wondering, given your focus on China what that will mean for the business. And the second question is on risks. You've outlined, I think, a fairly [unintelligible], I think, 24-month picture. I just wondered whether the kind of risk factors you see in this kind of environment?

  • Charles Goodyear - CEO

  • With regard to the Chinese government program, their next five-year plan, and I think you could almost look at that as their next 40-year plan, the Chinese Academy of Sciences had a report recently in which they talked about China in 2050, and it's very consistent with that. They see an information-based economy, one driven very much by a much stronger urbanization and, obviously, see themselves as a very strong leadership position in the global economy, and this five-year plan is reflective of that and moving in that direction. It's also one that is not just around information and so on, it's also around some of the society issues, some of the community issues and health issues, and so on.

  • Overall, we see that as a very positive thing, and the key driver in China is not necessarily building the next plant. The key driver is 10 to 15 million people a year moving to an urban economy. And when that happens, you obviously have all the infrastructure necessary to support that, and that involves steel and copper and aluminium and energy, and we see that as that strong driver and moving to an economy where people have a higher standard of living. I think you're very familiar with our charts on intensity of use against per capita GDP and bringing GDP consumes a large amount of raw materials, particularly in the stage of growth China is in, up to about US$8,000 to US$10,000 real GDP per capita, and they're about 1,500.

  • So I see that as actually a very positive sign for the things that -- the fundamental drivers to our business.

  • What can be the things that sidetrack or that throw this off? Listen, it's always -- risks are things you can measure. You can measure that. Uncertainty is things you can't, and that's always a tough question. I think there are a number of things that can always throw us off. It's going to be things like bird flu. You know, bird flu actually does a human-to-human transmission, it will have a significant impact in Asia, and probably will have an impact around the world.

  • If you step into some other issues, the global picture, global view of political picture is an uncertain place. We read about Iran every day; we read about the Middle East, you know, there's no shortage of issues that can come up for the global geopolitical system.

  • I would say in our business, the issues are going to be around the ability to continue to manage the costs or the availability of people, the availability of supplies to make our business work. I would also say that it's going to be around the ability to continue to work at 100% or 110% of capacity. We are essentially flat-out in everything we do. I'm trying to think if there's any business we're not. I can't think of one. There may be an asset somewhere, but I sure can't think of it, and I don't think any of our competitors are, either.

  • And when that happens, there is no ability to make up for a shortfall. I know you've read about the shiploaders at Hay Point. There is no ability to make up for that. We moved capacity, we were able to do some of that, but when you have something happen, there is no ability to manage that.

  • So that's the risk in our business, and people have been working pretty hard and fast at this stuff for some time now. So that's where I really see the risk in our business, but, listen, there's a lot of things that could have an impact. The key for us is obviously large, low-cost, long reserve life asset based that can survive through the inevitable tough times that come along so we can be there for the good times which, as we've said, we're quite excited about.

  • Glenn Morcroft - Analyst

  • Good evening, Chip, it's [Glenn Morcroft] with UBS. Chip, I just want to understand a little bit the company's view, firstly, just looking at commodities, and obviously we heard about costs, we've heard about supply issues. Could you just do a run through how the company sees the commodity cycle. Twelve months ago you said copper could be back in balance, and I realize last year a lot of supplies you probably delayed that. Could you sort of run through your views on the commodities; how that may play out; which ones may be more at risk of coming back to the balance sooner?

  • Secondly, I would assume some of your peers, and we saw [unintelligible] a couple of weeks ago announced a joint venture with [Norusk]. I was just wondering what BHP's view is on looking into these more riskier areas. Did you talk in [unintelligible]. And I understand after having sold [Pinki] from [Gorun] that you've actually gone back into the Congo now. So just understand the risks you're prepared to take, and I understand that's probably necessary, given all the [unintelligible] deposits you've found in the [unintelligible].

  • And a third question, a sensitive one, and if you can't answer, I understand. Just on the Collin Quarry? If you've got any comments for us?

  • Charles Goodyear - CEO

  • Let's see, you kind of had a lot there, and, let's see, we only have 15 minutes so I'm going to make it relatively brief. On the commodities themselves, if I hit it quickly, alumina continues to be in tight supply. Aluminium, I think it's quite interesting to see what's happening in China. I mentioned that they have restricted some of their capacity there. Higher prices are rising all over the world, and that is having an impact. Aluminium looks like a reasonable future, and I'm thinking here in the 12-month period. I think that's what you were asking about.

  • Base metals, you're right. Copper, we thought a year ago would come into balance. We obviously missed that. A supply side delay has certainly been there. At this point in time, again, in my little comment about my story, my visit last week, I do think there are financial players that are pushing that price above what a fundamental price would be. Having said that, there is good demand out there. So stay tuned on that one.

  • Let's go and do the products, I mean, I think iron ore, again, we continue to see very strong demand for iron ore. Spot price has come back a little bit in China, but it's still significantly above our contract price so, again, time will tell there. But demand continues to look quite good.

  • Coking coal is probably a little bit softer. Hard coking coal continues to be in very good demand, the weaker coals are going to be under more pressure but, overall, I think the hard coking coal is -- you've seen some comments, I think, about where the relative position of those products are, but there's a little bit of pressure there.

  • Manganese ore, manganese allow, that has come off from where it was, certainly, a year ago, and certainly six months ago. So I'm not sure we're going to see a lot of change there. I think things will probably stabilize in that business.

  • Diamonds always looks good. Titanium is looking okay, in fact, that's looking pretty good overall.

  • Energy coal, stock prices did come up recently, and no doubt the energy complex continues to be upside pressure as a result of high petroleum prices, high natural gas prices. So I think there's at least some stability happening in the energy coal business and, again, prices have come up.

  • Nickel, I think, again, stainless steel demand, you've seen prices have started to rise in the stainless steel product. I think that provides an underpin for nickel. We've seen that come up recently. You will also see that -- what was I going to say? Hm. I can't remember. But, anyway, stainless steel prices have come up. I think nickel -- oh, what I was going to say about nickel is that the substitution that's going on in nickel, I think, we feel is pretty much over. There is a quality issue when you start using [bandase], and I think customers started to realize there's an impact of doing that.

  • So, in all, listen, all is going to be what it is. OPEC sets that price, at least indirectly, and there's no doubt that energy demand around the world is strong. So I think, again, $60 is probably a price that is on the high side but, at the same time, global shock can happen at any moment, and that can push the prices into some higher levels.

  • So I hit that pretty quickly. I think you had a couple of more things there. But you asked about the coal inquiry in Royal Commission. Listen, we've said what we can say about that. A company like ours, any company, any individual, never likes to see stories like that about your organization but, having said that, I think we have approached this in a way very consistent with our charter, which is about openness and transparency, respect, and so on, and we're talking about something that began four CEOs ago at this company, and there's many things, I'm sure, that as we investigate and ultimately assess and report, that I'm sure you'll find interesting when we are in a position to be able to do that.

  • But where you ought to be judging us and where we expect to be judged is how this management team and this board reacts to this situation, and I think what we've said is we will investigate it, we will study that and assess the situation, and we will report in an open and honest way. And my communication back from those that I've talked to -- customers, others in the industry, government people -- has been exactly right, and that is you guys are doing exactly what you should have -- what you should do here. Nobody likes the situation, but you've handled it in an open and honest way, very consistent with your charter, and that's what we expect from an organization with the size, scale, reputation, and impact of BHP Billiton.

  • So, again, can't provide more, but when we can, I can assure you it will be a very transparent review of the entire situation.

  • Bob Kirkby - Group President Carbon Steel Materials

  • Sorry, it's Bob, Chip. Glenn asked also about our attitude to moving into risky areas.

  • Charles Goodyear - CEO

  • Oh, yes, sorry about that, Glenn. Listen, I would say that this company has been more open moving into riskier areas than many of our competitors, and where we can say that 90% of our -- 85 to 90% of our EBIT comes from strong, single A countries or better. We still operate in Colombia, Pakistan, Algeria and Mozambique and have some spectacular operations there. So we had a great, what I call, anchor to windward, where we had strong cash flow, but we know how to operate in challenging environments, and we have done so in a very successful way. So that's going to be the future of the resource area. We have a demonstrated track record in doing that. So I can expect that we'll continue to identify and move into areas.

  • I think that is the way of the world, and we'll certainly be there. Having said that, given the lead time for projects and getting all the things that have to be managed there, you're not going to see a significant shift in the source of EBIT, the absolute source of EBIT in the next several years, but we certainly recognize and have the skill to make investments work in what many consider to be challenging environments.

  • Operator

  • Craig Campbell from Morgan Stanley.

  • Craig Campbell - Analyst

  • I have a question just, firstly, with Ingwe. I was just wondering what's your expectation in terms of how long it's going to take to turn around the operations there? Are we looking at a year, two years, some sort of timeframe like that?

  • A second question in terms of some of the smaller assets that is putting some pressure around Tintaya. I was just wondering if you can comment on that -- whether it is up for sale and when that might be completed.

  • And then, finally, on your capex schedule. Do you see any projects within the portfolio there that have potential to slip significantly, given your comments earlier?

  • Charles Goodyear - CEO

  • Okay, let me -- Bob, I'll get you to just comment on Ingwe. I'll talk about Tintaya, and I'll talk about capex. So let me do those first, and then we'll move on to Bob on Ingwe.

  • On Tintaya, it has been reported that we have received some indication of interest here. Tintaya, we think, is a good asset. It has expansion opportunities, which we've been assessing, but in the BHP Billiton family, it is competing pretty strongly with some very interesting projects around the world. Obviously, Escondida and its continued growth an expansion, the Olympic Dam situation, you're well aware of, and then Resolution, another quite impressive project that we continue to look at. So as a result for us to be the ideal owners of Tintaya, I think, is in question within our portfolio.

  • And there, as a result, the indications of interest, we've entertained discussions with those parties, and we will see how that comes out. If we can find a value-accretive opportunity -- fine, if we can't, we're happy to continue to work forward on that asset. There's not a timetable on this thing, so we'll see how that develops over time.

  • On the capex side, I would say there is nothing, in particular, that I would say that is -- we'd move out or that we're planning to move out or whatever. I think it's just meant to illustrate that we are not afraid of doing that if, indeed, that's the right decision to do. We have the capital, there's no doubt we can execute the projects. We just have to -- and we obviously have plenty of capacity at this point, and the projects are available. It's just simply to say we need to make sure we look at that.

  • When you are in a hot market, the fever to continue to invest is there. But, again, we're in the business for long term, and many of those projects, we do have flexibility on execution, and therefore ultimate economic outcome is not only the price of the product, it's the cost of the investment, and so I think it simply should be interpreted as a prudent assessment of a long-term investment opportunity within the company. So there's nothing in particular, it's just something that I think you, as investors, ought to look at and say, "That makes a lot of sense." Obviously, I think that.

  • Next -- Ingwe -- Ingwe has been a challenge. It is a project, it is an asset that is requiring substantial effort to move into a new production scheme, a new environment. Bob has recently taken over the oversight of energy coal and has recently visited Ingwe, so I'll ask Bob to make a few comments. I think at this time it is important to note that it is relatively new in Bob's portfolio, so, Bob, if you have a few comments there, Craig would be interested.

  • Bob Kirkby - Group President Carbon Steel Materials

  • Craig, I've just become involved in this, as you might -- as Chip said, and I liken it to a bit like a midlife crisis, what's going on over there. The Douglas Mine is 50 years old, the optimum mine is nearly 40 years old, the Middleburg Mine is younger than that, but it's quite aged as well.

  • And these assets have been run well for a long period of time, and they've established a certain culture and a certain way of doing things, and they have certain facilities that are being set up in the past. What we're about is trying to set them up, and the team has set them up for the future. There are some things, which we can do quickly, and we do have an efficiency drive run on them at the moment, and many of those short-term activities are due for completion at the end of this financial year, and from what I can see, the bulk of those will be in place.

  • There are changes to practices, there are changes to the organizational structure. It's quite a reduction in people. There's the closure of some of the processing plants, and so on, but this is not going to be the end of it. For instance, we just talked about bringing this Douglas-Middleburg optimization project into feasibility study -- that is a continuation look, a continuing look at the rationalization of the physical assets, and then underlying that, the organization and cost structure.

  • So I expect this to be a lumpy journey. We will have some quick wins to stabilize the situation at the end of this year, but there are further things to be done, and that's going to be ongoing over the next couple of years.

  • Charles Goodyear - CEO

  • I think we have time for one more question. Is there one on the phone?

  • Operator

  • Peter O'Connor of Credit Suisse.

  • Peter O'Connor - Analyst

  • Chip, following on Tintaya, where does Cerro Colorado and Antamina fit and, secondly, a question on Russia -- where are you placed in regards to Russia?

  • Charles Goodyear - CEO

  • Let's see -- Antamina, great asset, we continue to see good opportunity in Antamina, and we would expect to keep that in our family and our portfolio for the foreseeable future, no change there.

  • With regard to Cerro, it is a smaller asset, but there are some technology opportunities that we have that may make that maybe a little more valuable, and as a result it is not an appropriate time to move forward on Cerro.

  • And then with regard to Russia, we've been doing business in Russia for some time. We moved product into Russia. We also source product from Russia for some of our customers around the world. We've been looking at a variety of opportunities there. It's a lot of real estate, as you know, but it is a place that you need to loan your way into Russia. I would expect that we'll have the opportunity to do that in the next -- I would say, foreseeable future. But, at the same time, we will, what I say, "loan" our way in getting, what I'd say is a bite-size opportunity to invest there and be more than just a supplier or a customer there, be actually someone who could put some investment there, but, again, I would expect that to occur on a modest basis, as we move forward. But it is a big piece of real estate and in a world where demand is growing significantly, you at least have to have your nose in that situation.

  • Okay, well, thank you very much for your time, we appreciate it. It's been a very solid, very successful half-year for BHP Billiton. Record results financially, we've seen very good progress in our project pipeline, we've seen good progress at WMC, we continue to see the majority of price fall to the bottom line, and I think, most importantly, we have not only executed all those operating elements of our strategy well, and the financial elements of our strategy well, but continued on, as we have in the past, to make sure when we do have excess cash flow we are returning that to our investors. I think if you look at the dividends, that's the major part of that, and that is an ongoing commitment that goes essentially in perpetuity, and continues from this point with our progressive policy, and then we supplement that, as we have in the past with the share repurchase program, both on-market and, in this case -- or with off-market, and in this case on-market programs.

  • So, again, thanks for your time. If there are additional questions, talking to Jane and the people in Melbourne, and then obviously in London with Mark and his team here. Again, thank you very much and look forward to talking to you at the final year results. Thank you.