Anglogold Ashanti PLC (AU) 2018 Q4 法說會逐字稿

完整原文

使用警語:中文譯文來源為 AI 翻譯,僅供參考,實際內容請以英文原文為主

  • Stewart Bailey - EVP of Corporate Affairs

  • All right. Good morning, everybody, and welcome to the presentation of AngloGold's full year and second half results for 2018. As is the case often with our year-end results, it is a busy schedule today, so I won't delay it too much. I would draw your attention to the disclaimer, which -- concerning forward-looking statements. If you have a moment, please look at it and study it. It is important.

  • Our lineup today on this slide, very clear. Kelvin will give a brief introduction. Christine will talk through the financials. Ludwig Eybers, our COO for our International and Projects and Exploration, will talk to those assets and the Continental Africa assets. Chris Sheppard, our COO for the South African region, will talk those. Graham Ehm will run you through our projects. Tim Thompson, who heads up our exploration programs, will talk to that in some detail, which is a fairly new development for us. And Kelvin will end with some concluding comments.

  • Without further ado, Kelvin?

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Thank you, Stewart, and good morning, everybody. Thank you for joining us. And (inaudible) the slides and don't be courteous, give me a shout if I miss something.

  • Well, I've been in the role for 6 months now. And during this period, I've been very much immersed in our budget and planning cycle. It's given me a very good look into the business. And from that, I've come to some conclusions on things we need to do going forward and some changes that we'd like to make. And we'll highlight those during this presentation.

  • As I mentioned back in November and on a few occasions since the portfolio feels a little heavy. And so we expect to be doing some streamlining. You'll see some discussion around that and some divestments we've announced -- divestment processes we've announced. And I'll come back to that as we move along as well.

  • With regard to potential divestments in the assets, this is something we're going to take what -- characterizing as a big bang approach to. We're going to be systematic and measured. And importantly, there's no fire sales. We said this in November when we announced a process around our Sadiola joint venture in Mali. And the same applies and it will apply for any potential asset sales.

  • And the reason for that is because our balance sheet and liquidity are in great shape. So we're not pressed into anything. The divestments we'd consider will be strategic and with a view to maximizing efficiencies and again tightening up on the portfolio. But we're not forced to do anything.

  • The balance sheet continues to strengthen. We believe the -- and as a result of that, we believe the 1.5 target of net debt-to-EBITDA for a single commodity company in a cyclical industry is a little high. And therefore, we're bringing that target down to 1x net debt-to-EBITDA through the cycle. And I'll come back to that.

  • Our return thresholds for projects and brownfield investments is 15% after tax using a $1,200 gold price. And this adds another layer of capital discipline into our decision-making process. Our dividend is another layer of discipline. And it ensures that our shareholders get the first slice of cash surplus before we invest in growth in the portfolio. With our strict return metrics and leverage targets, on the one hand, and our dividend policy on the other, we're comfortable that we've got the appropriate guardrails in place to ensure capital discipline going forward.

  • Now what this means is that not every project will go forward. We're going to be stubborn in our decision-making process. And the reality is that some options in the pipeline won't make the grade. And for those, they'll be monetized as we pursue the highest interest investments in the portfolio. We're 100% committed to meeting guidance always. And we're taking steps to improve our planning process, so we'd like to be able to provide longer-term guidance for the business into the future.

  • License to operate. This is an area, it steadily climbed among the top issues industry-wide. And certainly, that applies to our company as well. Now fortunately for AngloGold Ashanti, it's been a top priority for some time. This is reflected in our performance across a broad range of metrics, as you can see on this slide.

  • And in particular, I'm pleased that safety is showing a significant improvement but we know we can still do better. Likewise, environmental management, critically important and an area where you're also seeing improvement. But again, both with environment and safety, these are areas where although we're doing well, we know we can always do better and it's an area where we'll never be complacent.

  • Now speaking of safety, we should reflect for a minute on the recent tailings dam tragedy in Brazil. As a company with a large number of employees who live in the area, we've extended our deepest condolences to all affected. And clearly, that incident has an impact on all of us in the industry. Ludwig will cover our own safety measures in this respect a little further in his presentation. What? Thank you.

  • So turning to our performance. The company did very well in 2018. For the sixth consecutive year, AngloGold Ashanti has met or improved on every area of our guidance. All-in sustaining costs for the full year has dropped below $1,000 an ounce to $976 an ounce. That's a 7.4% improvement year-on-year.

  • Our International business ended the second half of the year with all-in sustaining costs below $900 an ounce, great performance. And our leverage has continued to improve. We're now at 1.12x net debt-to-EBITDA, which is down almost 20% year-on-year and moving nicely closer to our new target.

  • In Q4 alone, we generated $85 million in free cash flow even with one-off items, loan repayments and the slow remittances from the DRC as a result of the elections there. This shows that we're starting to deal with the cash conversion issues that we faced. And we expect to see more of that unwind as we move through this year and into 2020.

  • Productivity over the past 5 years is up by more than 50% and it's rising while every element of our cost structure is falling. And this is despite recent inflationary pressures. Our focus on margins is also paying off with investments in previous years helping to achieve wider margins, even in a flat, stable gold price environment. And while sustaining CapEx was lower year-on-year in 2018, we're still continuing to invest in operating improvements. And we'll deliver and see the benefits of this in the years ahead.

  • So I'd like to turn over to Christine to walk us through the financials, please. Thank you.

  • Kandimathie Christine Ramon - CFO & Executive Director

  • Thanks, Kelvin, and good morning, everyone. As you've heard from Kelvin, our key metrics reflect solid overall operating performance as well as focused cost and capital discipline, which underpins the improvement in free cash flow generation.

  • Production from retained operations was up by 2% compared to last year. All cost metrics continued trending towards the bottom half of the global cost curve. We did experience inflationary pressures. However, they were more than offset by weaker currencies, Operational Excellence savings and lower capital expenditure.

  • All-in sustaining costs for the year came in $968 an ounce with H2 at an impressive $936 an ounce, which supported the improvement. Our clear aim of improving margins by focusing on the controllable factors in our business through Operational Excellence helped us achieve a healthy all-in sustaining cost margin of 23%, which was a strong improvement on the prior year margin of 16%. The marginally higher gold price and improved sales volumes on retained operations benefited both adjusted EBITDA of $1.48 billion and free cash flow.

  • Free cash flow for the year of $67 million, which excludes the $309 million proceeds from the SA asset sales, improved significantly. This whilst despite the delayed cash repatriation from Kibali of $55 million, Argentina export tax receivables of $14 million, $61 million relating to the SA region restructuring and $10 million relating to the refinancing of the $1.4 billion multicurrency credit facility. Overall, free cash flow for the year, excluding the abnormal SA retrenchment costs and the once off refinancing cost, is $140 million.

  • On a positive note, VAT receivables in Tanzania were largely steady as we offset $33 million in historical VAT. The recent VAT agreement in the DRC is another positive development, where the government has committed to the $60 million cash refund to the Kibali JV in respect of historical amounts owing. The JV has already received a VAT refund of $6 million towards the end of 2018 and the balance will be offset against all forms of future taxes owed. Any future buildup of VAT receivables will be curbed once the President signs the legal mechanism to exempt the JV from VAT for the purchase of local goods and services.

  • The South African business was free cash flow positive in H2 despite funding retrenchment costs of $22 million in this period. The final tranche of the restructuring cost in the SA region amounts to about $1 million and will be paid during Q1 of 2019. With the first phase of the SA restructuring now complete, the focus has been shifted to reducing the legacy costs in order to right-size the cost base to the smaller footprint and drive further operational efficiencies through the improved productivity. Chris will elaborate on this a bit later.

  • In terms of capital expenditure, our total capital expenditure of $721 million was 24% lower than the prior year despite the increase in the Obuasi and Siguiri project capital. The standing capital expenditure of $571 million for the year was 31% lower year-on-year due to the peak of our inward investment last year, savings from Operational Excellence and the now closed and sold South African operations as well as favorable currency effects.

  • Moving on to the cost performance. Looking at the cost performance in detail for H2 year-on-year, our cash costs continued to improve to $726 or 8% lower than the prior year. These benefited from the South African asset sales and closures, weaker currencies, Operational Excellence efficiencies and an overall improvement in volumes and grades. However, inflationary pressures continued to prevail across the emerging economies that we operate in. We also saw higher mining costs relating to Geita Underground, higher royalties at Geita, Brazil and Kibali and the additional 1% clearance fees at Geita.

  • All-in sustaining costs in the second half were 10% lower or $102 an ounce lower year-on-year at $936 an ounce, mainly due to cash costs and sustaining capital being lower. All-in sustaining costs for the International operations were 5% lower at $920 an ounce from $972 an ounce in 2017 with H2 coming in at an impressive $895 an ounce. We expect to sustain a large portion of these cost savings. And Ludwig will provide more color on the nature of these savings achieved.

  • All-in sustaining costs for South Africa in rand terms were 7% lower, reflecting the benefits of the portfolio restructuring. In U.S. dollar terms, all-in sustaining costs for the South African operations for the year were 5% lower at $1,178 an ounce with H2 reflecting an improved all-in sustaining cost of $1,033 an ounce for the South African business.

  • To protect the cash flows of the South African business, we have implemented a zero-cost collar revenue protection mechanism for 2019 at between ZAR 545,000 per kilo to ZAR 755,000 per kilo, covering 300,000 ounces of the production. This will provide a degree of certainty on revenue while we focus on the second phase of the business restructuring.

  • Moving on to the balance sheet. Our balance sheet strategy continues to enforce capital discipline with net debt at $1.65 billion, being the lowest level since 2012 and 17% lower than last year. Our net debt-to-adjusted EBITDA ratio of 1.12x reflects ample headroom to our 3.5x covenant. Liquidity remains strong, providing good flexibility in a volatile climate.

  • The refinancing of the U.S. dollar and Aussie dollar RCF facilities into a $1.4 billion single multicurrency facility was concluded in Q4 of 2018. That means that the only near-term maturity is the $700 million April 2020 bond. With the U.S. dollar facility completely undrawn and significant cash balances at year-end, we have flexibility in deciding on refinancing options for the bond.

  • We've lowered our net debt-to-adjusted EBITDA target to 1x through the cycle, taking into consideration that we have been below our self-imposed target of 1.5x since 2016. That reflects declining net debt levels in the group on the back of improved free cash flow generation and asset sales. A lower net debt-to-adjusted EBITDA target signals our intention to further deleverage the balance sheet on a self-funded basis whilst keeping our capital allocation framework intact. That means making wise capital investments on both brownfield and greenfield projects and maintaining the dividend.

  • As you're aware, we remain strongly levered both to the gold price and currencies. And given current market conditions, we do expect to benefit from improved cash flow generation across our business as well as from efficiency improvements. A cash dividend of the equivalent of USD 0.07 per share has been declared by the board, which is in accordance with our dividend policy to pay 10% of free cash flow pre-growth capital.

  • In addition, the board exercised its discretion by adding back the SA region restructuring cost of $61 million to free cash flow in determining the dividend. And this was consistent with the discretion that the board applied last year. Finally, our credit ratings remain intact with Moody's at an investment-grade rating with a positive outlook and S&P at 1 notch below investment grade with a stable outlook.

  • Concluding on the guidance for 2019. We see production at 3,250,000 to 3,450,000 ounces. We've kept the top end of the production guidance range intact but lowered the bottom end of the range compared to 2018. This adjusts for the SA asset sales and closures, the anticipated sale of Sadiola and the lower-than-expected production from CVSA.

  • These factors are partly compensated for by the increased expected production from Siguiri. In line with past trends, production is expected to be weighted to the second half with strong performances expected from Geita, Siguiri and Brazil in the final 6 months of the year.

  • We remind you of the usual caveats to our guidance relating to power, labor, regulatory and other disruptions. The cash costs and all-in sustaining cost guidance ranges reflect improvement compared to 2018, capturing weaker currency and current commodity price assumptions. Other operating expenses estimated at $85 million includes care and maintenance costs for Obuasi and the South African region.

  • Our currency exposure across 2/3 of our portfolio continues to provide a natural hedge to inflationary effects and to the volatility in the gold price. However, we do remain sensitive to changes in currencies and commodity prices. And the estimated impacts based on the assumptions provided on all-in sustaining costs and cash flows are provided with a health warning.

  • The total capital expenditure is guided at $910 million to $990 million to 2019, which includes the peak funding requirements for Obuasi growth project. The total project capital of Obuasi is anticipated to be $495 million to $545 million, including $45 million for the mining fee purchase, of which 10% was spent in 2018, 60% will be spent in 2019 and then the balance of 30% will be spent in 2020.

  • The remaining growth capital -- the total range of the growth capital is $390 million to $430 million, which includes the peak spend on Obuasi. So the remainder relates to advancing the feasibility study for Quebradona, completion of the Siguiri hard rock project, which will be spoken about by Ludwig. And we expect that to be ramped up by midyear. Then we have some capital expenditure on Tropicana and Mponeng. Our sustaining capital expenditure of $520 million to $560 million amounts to approximately 55% of the total capital budget for the year and is estimated at approximately $160 an ounce, which is at the low end of the industry range, noting that the brownfield inward investment program was completed in 2017.

  • I will now hand over to Ludwig to talk about the International operations. Thank you.

  • Ludwig Eybers - COO of International

  • Thank you, Christine, and good morning, everybody. Last year's production from our retained operation was just up over 2% from 2017. Continental Africa gave another strong performance with higher underground tonnages and grades at Kibali and Geita lifting their results. Iduapriem increased production by 11% year-on-year, thanks to improve grades and throughput from Teberebie pit. The strong performance was partially offset by lower tonnages treated at Siguiri, caused by mining of harder material.

  • America saw a drop in production over 2017, mainly at AGA Mineração. The Cuiabá complex faced some development and infrastructure constraints through the year. But we started to see improvements during the fourth quarter, an improved stope availability, drilling rates and recoveries. At CDS, we saw lower grades in the sulphide operations while heavy rain affected the open pit production.

  • Australia had a good year with production up 21% at Sunrise Dam on rising volumes from the Vogue orebody. At the same time, we struggled a little to achieve the targeted recoveries from the REP project immediately after commissioning. At Tropicana, the second ball mill was commissioned ahead of schedule in November and is delivering the planned increase throughput and recoveries. Chris Sheppard will cover the performance of South Africa later in his presentation.

  • We saw another good cost improvement with all-in sustaining costs 7% -- down 7% to $976 per ounce with benefits from lower sustaining CapEx and improved efficiencies. Operational Excellence initiatives in Americas region weaker and weaker local currencies helped lower costs. In Continental Africa, our costs benefited from strong production and also the Operational Excellence interventions.

  • During 2018, we completed a number of brownfield investments, including the new power plants at Geita and Siguiri, the cutback at Iduapriem and the new plant at Siguiri. At Sunrise Dam, costs were higher due to the once-off improvement projects, including a Recovery Enhancement Project, increased ore development in Vogue, new ventilation facilities and the expansion of our central tailings facility. The mine is set up well for the years to come. International operations' all-in sustaining costs improved by $52 an ounce to $920 per ounce in 2018, demonstrating the impact of our Operational Excellence program.

  • Looking forward into 2019, we expect another solid operating year from Continental Africa. At Geita, we're seeing a stable trend as we continue to invest in underground development and exploration. Mill maintenance is underway this month, so we expect a slower production start with 60% of the 2019 output in the second half of the year.

  • At Siguiri, the focus for the year will be to stabilize the plant throughput and operating stability as the new plant is commissioned. Now that the underground production has ramped up at Kibali, the team will aim to replace reserves through the brownfields exploration.

  • At AGA Mineração, we expect improved grades for this year, resulting in higher production. Reserve conversion is a clear focus for us. At Serra Grande, the mining of the crown pillar will lead to higher grades towards the end of the year. And I just want to make a quick comment on the company's management of tailings facilities.

  • We have a clear framework to set principles, standards and guidelines for construction, management and oversight of our TSFs. It's our obligation to ensure that our tailings facilities are stable, nonpolluting and contained. We are guided in this regard by international best practice and conduct regular detailed inspections from international specialists and independent third-party experts as well as ongoing monitoring and ongoing preventive maintenance.

  • Moving on here in Australia. At Sunrise Dam, the focus will be on stabilizing the Recovery Enhancement Project, which we expect to boost recoveries around 6%. And that's what we've seen recently in the last couple of weeks. In Tropicana, we expect the strong performance to continue and we think there might be upside to that as the ball mill appears to be capable of delivering higher throughputs and recovery than planned. So we are looking at possibilities to improve the output.

  • I will now hand over to Chris Sheppard, who will take you through the performance of South African operations.

  • Chris Sheppard - Former COO of South Africa

  • Thank you, Ludwig, and good morning, ladies and gentlemen. 2018 saw the conclusion of the third wave of restructuring within the South Africa region business at year-end, following the sale of Moab Khotsong and Kopanang mines in quarter 1 of 2018.

  • During the half 2 of 2018, we sold the West Vaal Hospital in Orkney, the pharmacy, chemical laboratories and the Vaal River rail transportation network, which assisted with job loss avoidance measures. Of the 2,000 jobs that were contemplated in our May 2018 restructuring announcement, we finally applied compulsory retrenchment to some 70 employees.

  • As a consequence to these actions, it's pleasing to note that the SA region portfolio returned to free cash flow generation in half 2. And from a production perspective, production from the retained operations was up some 2% year-on-year. And Mponeng performed very well, assisted by higher-than-planned grades and improved workplace compliance.

  • Looking into 2019. Production from the retained operations is expected to see a slight improvement year-over-year with all-in sustaining costs expected to drop below $1,100 per ounce. Mponeng is expected to see grades reduce year-on-year in accordance with the predicted grade model, along with higher output as planned productivity improvements kick in.

  • Unit costs are expected to benefit from improved mining practices and the new shift arrangement. Mine Waste Solutions is expected to see a slight improvement in both grades and throughput and recovery and ultimately, leading to an improvement in margin.

  • I alluded to a restructuring of the SA asset base on the previous slide. To be clear, without the constructed approach and engagement of all our stakeholders, we would not have been able to conclude the significant reduction in labor and associated costs. The restructuring costs, including 2018, totaled some $61 million and facilitated the return to free cash flow generation in half 2. Efforts will continue in 2019 to realize further cost reductions within the off-mine cost structure, focusing on systems and work process streamlining.

  • Mponeng implemented a new shift arrangement in quarter 4, which should be fully embedded by the end of quarter 1 2019. And to recap the 5-day work week, 11-hour per shift arrangement for production teams and supervisors allows for a substantially increased face time, allowing for planned work cycle activities to actually be realized, resulting in improved safe production levels. It's early days yet, but encouraging signs are evident with buy-in from all stakeholders concerned.

  • I'll now hand over to Graham Ehm. Thank you.

  • Graham J. Ehm - EVP of Planning & Technical

  • Thank you, Chris, and good morning all. Today, I'll provide an update on the progress of the Obuasi redevelopment project. And I'll provide a summary of the Colombian Quebradona project, for which the board approved the pre-feasibility study and the progress to feasibility.

  • You will recall that the Obuasi project is being tackled in 2 phases. The first phase is to recommence mining and refurbish the plant sufficiently to achieve a production rate of 2,000 tonnes per day. This is on track for first gold at the end of this year and production in 2020 at a rate of 2,000 tonnes per day. The second phase is about ramping up the mine production and the construction of new facilities to achieve a production rate of 4,000 tonnes per day. This is on track for completion at the end of 2020 and production from 2021 at 4,000 tonnes a day.

  • The operations and the construction teams are now fully established on-site. The design of the operating systems for geology, mine technical services and mining has been completed. And at the end of 2018, the operational readiness program was 25.4% complete. At the end of January, the design of the new elements was 51.7% complete and procurement was 53.2% complete. We've prioritized work on the critical packages and the long lead items. Phase 1 critical items have been ordered. And these include the BIOX cooling tower, the jaw crusher and grizzly feeder.

  • And turning to a few photographs. The mining fleet has been delivered to site. The mining contractors are now established on-site and underground development has commenced. The first development has commenced with the first blast on the 1st of February. You can imagine that this caused quite a lot of excitement, both in the town of Obuasi and amongst our employees. It was really a fantastic milestone, the mine having been dormant for a number of years.

  • Demolition of sections of the old plant is advancing safely and a little bit ahead of schedule and is now 45% complete. Construction of the mining contractors' camp is well advanced and refurbishment of housing for the Obuasi workforce is progressing well.

  • On the next slide. On the 22nd of January, it was quite an event. We had the President of Ghana and the Asantehene, or the Ashanti king. They launched the redevelopment project in front of a very large gathering of elected and traditional leadership, the community, our employees and contractors. Both the President and the King were quite effusive about the project and were complimentary about AngloGold having stayed the long course and having worked constructively with government and the community to bring the project to fruition.

  • Consistent with our commitments to government and to the community, we're very focused on Ghanaian participation. Recruitment is focused on Ghanaian participation for local communities within Ghana and even offshore, as many Ghanaians work globally. Where we have imported specialists, operational, managerial and technical skills, these have been matched with Ghanaian successors, who will be developed during the course of the project. The 5-year mining contract was awarded to the Underground Mining Alliance, the joint venture between AUMS and Ghana's Rocksure. The contract will employ and train over 500 Ghanaians.

  • Now let me turn to Quebradona. The pre-feasibility study has recently been approved by the board and we're now progressing into feasibility. Quebradona is an underground copper-gold project situated in the municipality of Jericó, approximately 100 kilometers southwest of the city of Medellín. The orebody is a subsurface copper-gold porphyry and lies within an escarpment, as you can see on the photograph there. Mining will be both sublevel caving. Access and materials transport is via tunnels in the valley below. The process plant and infrastructure are positioned in the valley, close to the bottom of the escarpment.

  • To provide a few highlights of the pre-feasibility study. The planned mining rate is 6.2 million tonnes per annum over 23 years at an average grade of 1.2% copper and 0.66 grams per tonne of gold. Combination will incorporate high-pressure grinding rolls and single-stage ball milling at a very of similar scale and design to our successful Tropicana project in Australia. The copper-gold concentrate will be produced through a conventional flotation circuit. The concentrate is very clean and from our market research, is expected to be well received by smelters.

  • The all-in sustaining cost is $0.88 per pound of copper. With capital cost of about $990 million, the all-in cost is $1.24 a pound, providing a healthy margin to the forecast long term and the spot copper price. The project return, based on the pre-feasibility study and including the cost of the feasibility study, is estimated at 16.8% at a copper price of $2.90 a pound and $1,240 for gold. At the current spot copper and gold prices, the return is 16.4%. At $3 a pound, which is a long-term view of many copper producers, the return is 17.5%.

  • As we move into feasibility and the permitting phase, we will be significantly increasing our engagement with the local community and with other stakeholders to whom modern mining will be quite new. Finally, we are pleased to announce the maiden ore reserve for Quebradona as 2.8 billion pounds of copper and 2.2 million ounces of gold. For more details, I'll refer you to a separate press release in regard to the ore reserve.

  • Thanks very much. And I'll pass over to Tim.

  • Tim Thompson - VP of Growth and Exploration

  • Thank you, Graham. Hello, everyone. 2018 was a great year for our project team at Quebradona, as Graham already mentioned, and also for our generative and our mine site exploration teams across the portfolio.

  • We completed 2018 with a net increase in ore reserves after depletion on a portfolio-wide basis. We continued to unlock value from our investments in Colombia as well as gains from our mine sites from exploration on-site and cost reduction initiatives. As Graham mentioned, we declared our first copper ore reserve of 2.8 billion pounds in 2018 at Quebradona. Our mineral resource portfolio remains stable as a source of optionality as we continue to push conversion of mineral resources to ore reserves throughout the company.

  • Next slide, please. Our generative and mine site exploration programs were active across the portfolio, delivering ounce additions at a favorable $34 per ounce unit cost from our International group since AngloGold was formed in 2003. We have core exploration hubs that operate out of Australia and North America with active drilling programs in both of those areas. We also had target generation that focuses in South America and West Africa.

  • In Australia, we were quite pleased that an internal stage gate review following H1 drilling program at the Butcher Well joint venture with Saracen near Sunrise Dam reported AngloGold completing our end to 51%. We will continue to advance project work over the next 12 to 18 months to establish a first mineral resource and prioritize any necessary permitting to access the open pit oxide targets while we establish access and the engineering work to advance into underground exploration and development.

  • We also completed the successful field season in Queensland, and areas we secured following target generation work that our teams completed based on analysis of new data sets that were available. We expect target -- drill targets to be defined following a review of our own positive sampling results and geophysical survey anomalies from recently completed surveys.

  • In North America, our year ended with winter drilling programs in progress at both our Minnesota and Nevada project areas. In Minnesota, we have roto-sonic drilling program in progress. That's where we collect samples to prospect below the till material that covers the broad area where our target generation teams have identified may be prospective for gold deposits.

  • In Nevada, I hardly need to explain why we're excited to have exploration in progress in the prolific Walker Lane Trend.

  • At the Silicon project, we have approximately 17,000-meter core in our recirculation drilling program in progress at this time based on targets generated in the past 18 months by our North American-based exploration team complemented by our global specialists, working out of our Australia and North American offices.

  • We expect to complete stage gate reviews following logging, sampling and receipt of assays to determine whether we advance these programs forward with additional drilling and we maintain that rigorous stage gate process to make sure that the best projects move up in terms of our capital prioritization and allocation of expensed funding.

  • Next slide, please. Our positive exploration results in 2018 continued to support mine plans across the portfolio with a steady transition for mines where underground operations have commenced or are planned in the near term. The highlighted results shown here speak to the health of our assets in the pipeline of mineral resources undergoing conversion beyond our ore reserves.

  • Next slide. In this slide, we see the continuing development of our exploration project pipeline of generative and mine site programs in every jurisdiction where we explore, with additional early-stage projects coming in from the work that our target generation teams have completed in each of the regions where we operate.

  • This supports and complements the ongoing mine site exploration programs and the development programs that are underpinning the stability of our portfolio.

  • At Geita gold mines, it's in the process of transitioning from open-pit mining to most ore being sourced from underground mines over the next few years. As you can see in this first slide, the resource extensions of the orebodies of both Nyankanga and Geita Hill orebodies continue from the drilling completed at surface and specifically at the Nyankanga orebody or -- is now being further defined from underground drill stations. The results observed show that similar gold mineralization continues down plunge from the ore mined in the open pits.

  • In the next slide, we see similar orebody extensions in the Star & Comet area, where underground mining is in progress in both the Cut 2 and Cut 3 areas.

  • We also have additional underground targets in the Ridge 8 and Roberts areas, where we expect to progress with additional drilling in upcoming years as we move our exploration programs out into those jurisdictions.

  • Last, the Geita team has advanced exploration a few kilometers northwest from the Star & Comet area, where they have a target emerging at Selous, that may provide a surface-mining opportunity with additional potential to develop funds extensions as another underground mining prospect. We'll continue to advance the project through the stage gate process over the upcoming months.

  • Now on the last slide, we're excited about the new and continuing exploration opportunities resulting from the work of our generative and mine site teams in 2018. 2019 should be another active year across our exploration portfolio. A few of the highlighted programs for the year out of our project pipeline are shown here. Roughly $30 million will be allocated towards our generative programs, while the bulk of the remainder of our exploration will be focused on resource conversion and new resource addition at our current mine sites.

  • And with that, I'll turn it back to Kelvin.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Thank you, Tim. As I mentioned before, I place a very high premium on focus, particularly when it comes to the portfolio and our ability to run it efficiently.

  • With the smaller South African footprint and also the processes that we indicated are underway in Argentina and Mali, we've decided to make some organizational shifts to support that emphasis. It's an opportune time to do this given the scheduled retirement of 3 valued members of the executive team. We offer them our deepest thanks for their distinguished service and we wish them all the very best in whatever the next chapter unfolds for each of them.

  • We've now reorganized our 2 operating units into International and Africa divisions, with the Africa unit incorporating South Africa. Ludwig Eybers will maintain responsibly for the International portfolio and exploration. This includes Australia, the Americas and the Colombia projects. The Brazilian and Australian operations, in particular, have significant potential to improve and these will benefit from Ludwig's deep understanding of the business, his focus and his particular familiarity with all of those assets.

  • The Africa unit will be led by Sicelo Ntuli, a top -- I think Sicelo is here, too. Sicelo, won't you just stand up and let everyone see who you are. There he is.

  • Sicelo Ntuli, top member of the operations team. He's worked the deep underground operations at Mponeng, and also has an extended period of -- at Iduapriem, during which time the mine recorded a very strong operating and safety run.

  • For the past 2.5 years, Sicelo has held direct line responsibly for an improving Continental Africa portfolio, and he has had an exceptional track record for the company for almost 2 decades now, and he'll be a very strong addition to the executive team and we welcome him.

  • In addition, Moses Madondo. Moses is here, too, right beside Sicelo is Moses. Moses has distinguished himself as head of our Vaal River assets before their sale last year and he'll assume responsibility for the South African business.

  • Moses is a seasoned mechanical engineer. And he's another one of our exceptional homegrown leaders, who's really developed an excellent track record during almost 20 years with the company. So we welcome Moses to that important role as well.

  • Now Stewart Bailey, to my immediate left, who many of you know is our Senior Vice President of Investor Relations and Communications. He's going to assume the rule of Executive Vice President of Corporate Affairs, and Stewart will head a team of experienced specialized -- specialists in the broad area of stakeholder relations and sustainability, and importantly, he'll also continue to maintain the investor relations and communications portfolio.

  • So his mandate has broadened and Stewart brings particular expertise to the role. His knowledge of our assets and operating geographies and close cooperation with sustainability function over the years provides a really strong foundation for Stewart.

  • And finally, I'm pleased to announce the addition of Pierre Chenard as Executive Vice President of Strategy and Business Development. Pierre is a seasoned executive from the Rio Tinto organization, where he was Head of Business Development and also General Counsel for his aluminum unit. Pierre brings decades of commercial and business development experience in the metals and mining industry and an in-depth knowledge of the gold space from a number of senior roles he's held in the sector during a distinguished career.

  • Pierre will work alongside an excellent corporate development team here in Johannesburg and round out a highly talented and motivated leadership group as we look to unlock value from the potential in the portfolio.

  • We place a premium on clear and uncompromising capital allocation. This means that certain investments may not make it if they don't pass our return hurdle rate and rank below other opportunities in the portfolio.

  • As we look across the portfolio, Cerro Vanguardia in Argentina is the next asset we'll explore selling. As with Sadiola and Mali, Argentina has been an excellent jurisdiction for the company for, I think, more than 2 decades. But with competing demands for capital, another owner may be better placed to investing the life of these assets.

  • Now as we divested these operations, we'll replenish the portfolio with lower-cost, higher-margin ounces from Obuasi as it moves through the course of its redevelopment stage this year and then ramps up from 2,000 to 4,000 tonnes a day in 2020, as Graham has explained.

  • In order to sustain value creation over the long term and without resorting to expensive and often complex M&A, it's important to ensure consistent investment in exploration. So I think Tim gave a very good overview of how we intend to do that.

  • Over the past 15 years, our geologists have discovered some 49 million ounces of gold from outside of the South African portfolio, averaging roughly 3.3 million ounces of gold a year, and we've added that in inventory at a very competitive cost as Tim alluded to.

  • We'll continue to invest in exploration to ensure that our pipeline remains well-stocked, and we'll work hard to optimize projects to achieve our 15% return hurdle rate and those that don't pass the hurdle, we'll monetize.

  • For those projects that go ahead, we'll look at a range of financing options and our intent is to ensure that cash generation and direct returns to shareholders aren't something that's just continually pushed into the future.

  • So let me finish with some points on how we intend to run the business. We'll continue to place a clear emphasis on getting the basics right, that includes meeting our guidance always and strengthening our license to operate, we'll keep a sharp focus on costs and managing capital, we'll build on the recent efficiency improvements that Ludwig spoke about as well as Chris, using operational excellence across the business to continue to move down the cost curve. We'll continue to work hard to eliminate leakage that impacts cash conversion, especially in care and maintenance costs and working capital lockups. A near-term example of this we'll see at Obuasi, where we've historically been spending in the order of $60 million a year on care and maintenance. And as we move through the redevelopment stage, that figure will decline dramatically this year and disappear altogether in 2020.

  • We'll continue to streamline and focus the portfolio. We'll invest wisely to progress our exploration pipeline and projects and as we do that, we'll ensure that we move the 2 Colombian projects you heard of up the value curve. We'll ensure Obuasi comes in on time and on budget, and in fact, Obuasi's redevelopment really is going to be a top priority for this year. We'll do it prudently, mindful that this is a very long mine life.

  • So our vision is clear, we want to be a solid, predictable business that will generate through the cycle.

  • So with that, I'd like to open it now up for questions, and we appreciate your patience, I realize it was a long presentation.

  • Do we have a moderator or am I moderating? I guess I'm moderating. That's for standing (inaudible).

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Yes, Patrick.

  • Patrick Mann - VP & Research Analyst

  • Patrick Mann from Merrill Lynch. You've said that you feel the current portfolio is quite heavy in terms of mines. Do you have a number in mind that you think is the optimal number? Or it kind of, as you said, if it doesn't meet the 15% return, monetize the asset and kind of -- you'll end up with the number of mines you end up with?

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Yes, well, thanks, Patrick. Small distinction, I said, I think it's a little heavy, not quite heavy, but heavy, nonetheless. Look, it really hasn't really come down to an absolute number, i.e. we have 14 and that number needs to come down, but it's more about the concept of us wanting to be moving forward in areas where we've got critical mass or clusters of projects, for example. So we can take advantage of relationships, supplier relationships, government relationships, community relationships and other things. And synergies between projects themselves. So that's really the focus. And we're going make those decisions based on areas where we see strong geologic potential, orebody optionality where we can continue to drive margin, extend mine lives. So that's really the intent behind that. It's not about an absolute number, but rather being in areas where we have clusters that we'll continue to divest in or invest into the future. Thanks for the question.

  • René Carlo Hochreiter - Mining Analyst

  • Rene Hochreiter from NOAH Capital. Your dividend, second sense is -- seems quite low. I know your cash flow is looking like it's going to improve with your strategy in place, but quite a long time ago, the attraction of investing in a gold mine or a gold share was that they would pay out everything after all CapEx and all costs, and I'm sure it was a bit lumpy, but that was part of the game. Do you have any sort of intention of moving towards that? Or are you going to stay at 10% of free cash flow before CapEx?

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Well, first of all, Rene, thanks for the question. I think it's a very good one. I think it's a very fair criticism of the industry in general. And that's -- generally, that was my comment earlier about wanting to be in a position where we're now continually pushing returns back to investors into the future. So in terms of the dividend policy, the board looks at it every quarter, and I can tell you that -- I don't speak for the board necessarily on that account, but the consensus view is that we want to continue with progressively increasing dividend with time. But we want to do that in a measured way, no lurching. And we recognize that 2019, in particular with the heavier capital year related to Obuasi which was moved to 2019 into 2020. And if you look out beyond that, all things being equal and a supportive gold price, we do start to generate material amounts of cash. The objective will be to reinvest in the portfolio but to do in a way that we're not again pushing those returns always into the future. So I'll come back to that in a second because it relates to our view around partnerships. So it's -- just give me a second to come back to it. But then with regard to the dividend itself, we would look to try and increase that over time, but we'll also work on chipping away at our debt, and we indicated that one time net debt to EBITDA target, which we're comfortable with. Over time, in terms of direction of travel, if you look at this company moving forward into a number of years, I'd like to see that continue to come down in fact. So that's the balance. And the other point I wanted to come back to about partnering is because when you look at the portfolio going forward, there's no real capital-intensive investments that we need to make as we move out beyond Obuasi. When you think of projects like a Gramalote to encourage it about based on the resource additions in 2018, we have a partner in Gramalote. By the way, it's a partner with a pretty good track record in terms of developing projects and operating projects in a way that's predictable, reliable and tight managers of capital. So we like that. Quebradona, also really exciting as you saw from the materials today. And Quebradona, it's a copper/gold asset, predominantly, copper in fact. And that's an asset where as we moved through the feasibility study and unlock value, nobody should be surprised if we contemplated bringing in a partner for something like Quebradona, where we can then take the proceeds from a Quebradona divestment possibly and invest -- reinvest that back into our gold business, and again, look at the 3 capital allocation priorities in that regard, reinvesting in the business, paying down the debt, increasing dividends. So -- and the reason we're thinking that way is for the very reason you articulate is, we want to be the company that distinguishes ourselves as being a business that does return value to shareholders, not just a promise of it into the future. So your point is a very good one. Sorry, it's a long-winded answer to it. I apologize for that, but hopefully, I covered the question for you. Thank you.

  • Yatish Chowthee - Gold Analyst

  • It's Yatish from Macquarie. Just few questions around risks. Firstly, at Obuasi, given the capital that's been put in this year, what are your immediate concerns or risks that could actually derail the plan for the timeline? And then just secondly, more for Ludwig, given what's happened in Brazil in terms of geotechnical failures of a tailings dam, what are the geotechnical risks of -- mining be harmful at Sierra Grande?

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Well, maybe I can start on Obuasi, and Graham, by all means, jump in if you'd like, and then we'll turn to Ludwig on Brazil. So Yatish on Obuasi, I think that -- look, it's a big project, complicated project, so I don't want to underestimate it or anything. Lots of work to be done this year, no question about that. But I have a high degree of confidence in Graham and his project team, of which, of course, came from Tropicana, is our last project they built very successfully. And having spent time on the ground there, I think that something that gives me comfort is the fact that this project actually stopped and went through the process of redesign, thinking things through and then developed the plan that's now in place to successfully bring it back into redevelopment. And I've seen situations elsewhere where projects like that, the objective is to try and plan for a redevelopment while you're still planning to run it, and I use the analogy of trying to change the tire on a car while you're driving it. It's very hard to do. In this case, it would be more like doing an engine overhaul while you're driving the car. That's even tougher. So by having stopped Obuasi, done all the reconfiguration, and importantly, negotiated and taking the time to negotiate the deals with government that have been passed through parliament, putting all those pieces in place first, I think will help ensure that we bring the project in on time and on budget. But Graham, maybe you could comment if there's anything else. You're building it, so it doesn't help that I say that, it's better to hear it from you.

  • Graham J. Ehm - EVP of Planning & Technical

  • Thanks, Kelvin. Let me start with a couple of positive things. I'm not concerned about the geology nor mining. We've got the right mining partner and we've put a huge effort into the geology and the mine plan over the last couple of years. I was initially concerned about safety because we're really trying to maximize the use of local contractors, and -- but I'd have to say that we're really impressed with the contractors we've used so far. JOV Construction are during the demolition, have taken a very methodical approach to the demolition and we're pleased with the way they're performing. The community support is an area that we were very focused on, and together with my colleague, David Noko, we spend a lot of time addressing that issue. There are a few things that come up from time to time, and it's really about understanding about how we're going to engage with the community and how we're going to deal with the employment. So we've resolved those issues and have quite a good dialogue there. Now it would be the schedule. And as I explained, the first part of the schedule is about refurbishment, and if anybody's refurbished their house, they know what that's like. As you start to pull it apart, you find things you don't know. And so far, we've had a couple of surprises. For example, the MCCs, they're not worth refurbishing. We're better off replacing. So we've been able to do that within budget. As we do the refurbishment, we'll be very focused on our schedule and should we find ourselves starting to slip on schedule, we'll reorganize the work in order to apply resources to the program. So this year's schedule is tight. And I think we've got it under control and we've got mitigating plans should we find any issues. So these are probably prime risks for this year. In terms of 2020, which is when we do the new facility build, that's a lot more comfortable. And frankly, that's the big prize, is to ramp the operation up to 4,000 tonnes a day from 2021 on.

  • Ludwig Eybers - COO of International

  • All right. Sorry to go in and sort of grasping the ground better. When we normally go into these kind of mines, we do a full risk assessment and we've got the expertise in our company to actually -- to support that and we follow due process with procedures, everything that goes with it. The 2 risks, obviously was -- this is due to technical and water, and both those ends are covered. I must say, in terms of Serra Grande, that's why I also mentioned towards the end of year it's going to be very slow mining. So we've got a way of doing this and tried to, obviously, mitigate all the risks and we've -- like I said to you, we've got enough expertise in the company to actually supervise and oversee that. So I think that's -- I don't see much risk in doing that.

  • Stewart Bailey - EVP of Corporate Affairs

  • Kelvin, we have...

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Thank you, Yatish. That answer the question?

  • Yatish Chowthee - Gold Analyst

  • Yes.

  • Stewart Bailey - EVP of Corporate Affairs

  • One question on email from Adrian Hammond at Standard Bank, or 1 email, 3 questions. The first one is, where is AngloGold on the cost curve? And where do you think the company will say -- will be positioned in 2 to 3 years from now? The second one is, what do you see as the major risks related to resumption of illegal mining and the problems that that brings in Obuasi? And the third one is, VAT buildup in Tanzania and the DRC, where do you see that going in the year ahead?

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Okay. So maybe I'll start with the first question, then I'll ask Graham to comment on Obuasi and Christine on the VAT. So the first question is where are we positioned on the cost curve and where do we ourselves moving out 2 to 3 years. Well, this is a question I ask a lot and I'm very pleased with the answer which is, we presently sit -- we've come off kind of dead middle, if you will, in the industry cost curve and we're now moving into the second quartile which is very positive to see. And as you look out over the next 2 to 3 years, particularly as we bring in projects like Obuasi, as Kibali kind of is firing on all cylinders, Geita continues to perform and as OE is helping us bringing down the costs on some of the other operations, including in Australian and in Brazil, I think we'll be moving into the top quartile and that's certainly our objective. Now whether we'll ever be at the upper part of the top quartile, a lot of work to get there. But certainly, do I see us in the top quartile? I do, and that's our target. So Obuasi -- now Adrian isn't here to say whether I answered that or not, but I'm thinking that we're close enough. So Graham, on the artisanal mining risk at Obuasi?

  • Graham J. Ehm - EVP of Planning & Technical

  • Thanks, Kelvin. Firstly, at this stage, there are no illegal miners on Obuasi lease. There have been no illegal miners on the lease since 2017 after the illegal minor incursion back in '16. We have a security agreement with the government. But I think probably the best reassurance is the comments of the President at the opening, and he said more or less, never again will we see illegal miners being allowed to run over the leases of investors, such as AngloGold. So he very publicly made that statement and he very publicly put his government on that platform.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Thanks, Graham. And Christine, on VAT?

  • Kandimathie Christine Ramon - CFO & Executive Director

  • Yes. So talking specifically to Tanzania. What we are seeing is a $3.5 million a month backlog. So that will amount to about $42 million. We are planning to offset half of that in the coming year and that is assuming the status quo situation pending a broader resolution. I think certainly going forward from 2020, we are anticipating moving to owner mining at Geita and that will help offset half of the VAT lockup as well. So the producers, the VAT in essence, by half by dubbing owner mining. In the DRC, in particular, we're not anticipating a further VAT lockup, and I think, quite importantly, taking into account that there is an agreement that's been signed with the government regarding quite a large refund of $60 million for the whole Kibali JV. Ours is an attributable share of that, so 45% of it. We have, like I said, received a cash refund already pertaining to that $60 million -- of $6 million in December. And we are expecting further cash refunds during this year. So the balance of the VAT, we are expecting to offset -- so this is the historical VAT, we are expecting to offset that against all forms of future taxes. What is pending in the DRC to avoid further buildup of VAT on local suppliers is a legal mechanism and that is sort of pending signature. My understanding is that's it's been signed by a number of the ministers, but just given the whole transition to a new President, I think that is pending signature.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Thank you. Any more questions from the floor? Yatish?

  • Yatish Chowthee - Gold Analyst

  • Sorry, just on -- just, again, looking at South Africa, the strategy around opening, costs are looking good, capital potentially much more lighter. Explain the rationale behind going into a hedging program? I mean, you've hedged around about 65% of South Africa's gold production this year. Just sort of elaborate on the thinking and strategy behind that.

  • Kandimathie Christine Ramon - CFO & Executive Director

  • Thanks. The thinking around this was that the South African revenues, and I do say, it is a revenue protection back to them, and as you know, it's the rent part of gold that we receive. We're very sensitive to changes both in the exchange rate and the gold price, and so we did want to have a measure of certainty in the business as the business is focusing on a Phase 2 of restructuring of the legacy costs in the business. And for us, it was quite important that we maintain the free cash flow positive position of South Africa and really allow management to focus on what they need to focus on, which is stable and improving production and reducing costs in the business. I think we'll be less effort on -- this hedge really evolves after the end of November -- sorry, it's actually on the 31st of December, and so it's something that we will assess closer towards the time when this hedge unwinds. So it is a short-term hedge, and I guess, these things do have to be assessed taking into account market conditions and where we're at on the restructuring of the business.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Yes, but I would say, we would be opportunistic as opposed to considering a steady (inaudible) program.

  • Kandimathie Christine Ramon - CFO & Executive Director

  • Yes, yes. Rolling off of the hedge -- yes.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Patrick?

  • Patrick Mann - VP & Research Analyst

  • Sorry. Maybe just one more, and probably for Tim, I think. Geita is the largest mine in the group, and historically, been pretty low cost, a good cash generator, but with the move from open pit to underground, optically it looks like it has a short life of mine, but you always put the slide up which showed all the exploration potential. I mean, how confident are you in terms of replacing the ounces, maintaining their production profile and for how long?

  • Tim Thompson - VP of Growth and Exploration

  • We have a large resource space out ahead of the reserve at Geita specifically. And what you're really seeing is it's -- we're in a position now where we have the right drill platforms in place so we can actually start that conversion process. You should see a fairly stable front of reserves sweeping out ahead of production. But just from the nature of the ore body, it'll probably never be lots of years at any given time. It's probably in that 3- to 5-year range of reserves.

  • Kelvin P. M. Dushnisky - CEO & Executive Director

  • Hopefully, it'll be like an experience I had before with Goldstrike in Nevada which has had X number of years ahead of it. When it was first developed, we thought it had -- we bought it for 600,000 ounces, hoping there was 1.2 million, I think it's produced almost 50 million ounces now. And who knows how many decades ahead. I think Geita will be that kind of an asset.

  • Sorry. Any more questions? If not, then, it's been a good morning. Thank you, everybody. Oh, sorry, did you have a question? No? Good morning, and really appreciate everybody's input. It was a long presentation. We'll tighten them up in the future, but there was a lot to go over. So thank you very much, everybody, for attending.