  • Stewart Bailey

  • All right. Good morning, ladies and gentlemen, and welcome to our presentation of the results for the 6 months. We've got a full presentation today. There's a lot of detail to get through. So what I would like you to do is just have a look at the disclaimer. It's important. There's a lot of important information in it, take time, read it. Get back to us with any questions you might have.

  • And without further ado, I'm going to hand over to Venkat to give us some introductory remarks. Thank you.

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • Thank you, Stewart. Good morning, ladies and gentlemen. That was quicker than I anticipated. Normally you get a minute or 2 to prepare, but there you go.

  • Starting off with the presentation today, before we move on to the results of the first half of 2017, if I can revisit the overarching strategy, which has remained consistent since 2013.

  • We continue to be guided by our 5 key business objectives on how to support our central strategic goal of delivering sustainable improvements to both free cash flow and returns. And this is especially relevant today as we provide a progress report on our plans, where we are investing to deliver better quality production, improving margins and extending mine lives and shaping our international portfolio in the longer term.

  • We're also taking steps to address our older loss-making operations in South Africa in order to ensure the viability of our core assets in that region. Chris Sheppard will speak more about that shortly.

  • This internal focus has been fundamental to our strategy over the last 4 years, where we have directed our efforts, yielding opportunities that lie within our pipeline, whilst optimizing our existing portfolio, improving our cost structures and fortifying our balance sheet. We'll continue to build our ability to withstand gold price shocks and to weather the challenges that tend to crop up when you manage a globally diverse portfolio with long-life gold assets, such as ours, whilst executing on the self-funded quick payback options that exist within our portfolio.

  • The proudest element of the results for the first half of the year is the continuation of our exemplary safety record. At the end of June, we passed more than 283 days across all of our operations without a fatality, and for the first time ever, we have logged 3 back-to-back quarters without a fatal accident at any of our operations. This achievement is all the more noteworthy when you consider that, at the end of the first half of the year, our ultra-deep South African operations registered 339 days fatality-free, with every unit surpassing 1 million fatality-free shifts.

  • To this end, whilst we are proud of this achievement, we will never be satisfied until we eliminate fatalities at all of our operations. Again, whilst this shows world-class standards in safety management that we have developed over several years, it also reinforces our commitment to have a management and analysis of high-potential incidents as we look to improve further.

  • Before we move on to our 6 monthly performance, I'd like to touch briefly on the second quarter's result. This is especially important given the fact that we had a weak start for the year in Q1, and we have now seen the improving trend come through in our South African operations, coupled with steady improvements from our international portfolio.

  • As you'll see through this presentation, we have continued to follow our strategy of improving the quality of our portfolio through our inward investment in strong suite of brownfield project opportunities as well as by continuing to remove loss-making ounces from our production profile. I've already covered safety, but it's worth noting that we achieved this result whilst delivering a very strong second quarter with a 20% jump in our South African production from Q1 levels and a 10% drop in Rand-denominated costs. In fact, we saw improvements right across the portfolio in the 3 months through to June 17. Production was up 11% on a first quarter to second quarter basis and 4% on a year-on-year for the same quarter. All 4 regions reported quarter-on-quarter increase in production levels. That means cash cost reduced by about 4% from Q1, and the escalation year-on-year was contained at 10% despite mining inflation and markedly strong currencies.

  • Moving to the 6 months to June, we saw production at 1.75 million ounces, which puts us to around 48% of our production in the bag for the year when you take the midpoint of the guidance, and this is very much in levels seen last year. But despite this abnormally slow start to the year, in line with prior years, we expect to see a stronger second half, with most of the pickup coming in the fourth quarter.

  • All-in sustaining cost of $1,071 were up from $911 for the first half of last year, which comes on the back of stronger currencies in all of our key jurisdictions and planned increase in our capital investment program, which we flagged at the beginning of the year. Christine will break all of that down in detail in our discussion of the financials. We'll be working hard to maintain an improving trajectory over the remainder of the year, though, it's important to note that, similar to last year, there will be a continued element of seasonality in the third quarter, driven by our mine plans in Brazil, the Congo and Australia, in particular, before the customary strong finish during the fourth quarter. With that said, we are keeping guidance intact on all of our key metrics.

  • I'd like to take a moment to discuss the situation in Tanzania. Geita is an important asset for us and in one where we are investing for the longer term. It's worth remembering that Geita had a challenging past and has required capital injections at various points over the last 17 years, starting with the initial investment to develop the mine back in 1999, then, when you remember, the collapse of the main pit wall in 2007, which took several years to dig our way out of and then with a major mill replacement back in 2012.

  • As the life of the open pit start to taper, we are now investing in the extension of mine life through underground development. We are progressing well with the construction of the new power plant, guaranteeing reliable power over extended life, whilst we have also commenced developing the underground mining infrastructure that will extract oil from beneath the current Nyankanga and Star & Comet pits. Tanzania has historically been one of our preferred investment destinations, given both its geological endowment and the predictability afforded by our mine development agreement. Under the agreement, we have continued to operate and invest in a true Tier 1 gold asset for the benefit of all of the stakeholders.

  • An analysis of the cash flows in and out of Geita since it was developed in 1999 shows that, over this period, the mine has delivered more than $1 billion to the Tanzanian government in the form of royalties, corporate taxes and employee income tax. As shown on the chart, which is up on the slide before you, in nominal terms, we only repaid the development capital at Geita in 2011. It also shows that the government, through tax and royalty payments, has been a beneficiary since day 1, with its cumulative share of total benefit from Geita increasing as the mine life progresses.

  • In terms of the net cash distributions to stakeholders, after accounting for repaying of capital and, obviously, funding the operation, the net share for the government of Tanzania, thus far, has been about 55%, and our share 45% in nominal terms. When one takes into account the time value of money, the government share is obviously significantly higher.

  • We hold as one of our core values and belief that communities, whether those directly affecting our operations or host countries at large, must be material beneficiaries of our activities if this enterprise is to remain sustainable. We will continue to strive to ensure that we strike that balance in Tanzania.

  • We are one of the largest taxpayers in Tanzania, certainly the largest in the mining sector, and have received recognition from the authorities to this effect. It's a distinction we are proud of. We believe that as Geita goes from strength to strength, it will be an important tool in enabling Tanzania to realize its goal of reaching middle income status.

  • In addition to making the requirement to list 30% of the Tanzanian mining operations on the local stock exchange, during late June, over the course of less than a week, the government of Tanzania tabled, debated and approved a number of laws that could alter the landscape of the country's extractor sector. Whilst we are seeking a dialogue with the authorities to gain clarity on how these new rules may affect our operation, given the protection afforded by our mine development agreement, we have continued to operate as normal at Geita. It has, however, been necessary to pay on a without-prejudice basis the additional 2 percentage point on royalty on revenue and also the 1% clearing fee in order to ensure the continued export of our gold doré bars.

  • During this capital investment phase, we are currently operating Geita on a self-funding basis, given the higher royalties, combined with the continued lockup of VAT receivables on eligible inputs at this mine. As a precautionary measure, as we said in our announcement on July 13, our subsidiaries have initiated arbitration to protect the status of our mine development agreement. We have, as I mentioned earlier, continued to seek dialogue with the government on the issue of the new law and its associated impact, and we'll continue along both tracks until we find the resolution.

  • This is a situation that requires patience, diplomacy and a need to take a long-term view. We must balance the optionality of this important long-term asset and the goodwill of our Geita and Tanzanian shareholders, whilst planning for different contingencies and remaining careful custodian of our shareholders' capital.

  • With those introductory comments, I'll hand you over to Chris Sheppard.

  • Christopher Bernard Sheppard - COO of South Africa

  • Thanks, Venkat, and good morning, ladies and gentlemen. The South Africa region has now accumulated more than 7 million fatal-free shifts, including Kopanang, which reached 1 million fatality-free shifts last month; and Moab Khotsong, which passed 2 million fatality-free shifts during the reporting period. In fact, at the end of June, mine average is at 21 straight months fatal-free without a workplace fatality. These are impressive stats, but we can't declare victory yet in this important aspect of our business. We are as focused as ever on pursuing the implementation of our safe production strategy, which we launched towards the end of 2015. And as you recall, we had a challenging spate of fatals at that point in time. A huge amount of effort has gone into entrenching integrated workplace planning, workplace management routines and workplace service strategies. Leadership accountability remains critical for effective execution of the safe production strategy and delivery of the required outcomes.

  • So at this stage, we are certainly proud of this achievement, but definitely not satisfied.

  • Our core assets operated in line with plans during quarter 2, clawing back quarter 1 underperformance and delivering strong results. We experienced continued challenges at TauTona and a hard rock surface source unit.

  • In the Vaal River, Moab Khotsong production was up 3% year-on-year due to improved throughput and face time. In the West Wits, Mponeng mine, according to plan, was localized lower grade areas, which resulted in lower year-on-year production and higher costs. Production improvements at Mine Waste Solutions resulted from reclaiming higher growth, partially offsetting the disappointingly low grade from some of our marginal ore dumps, and plant availability constraints in the ore receiving areas with limited mill availability also due to planned shutdowns for the pit.

  • Kopanang and TauTona both posted unsustainable losses with half 1 cash costs of $1,472 per ounce and $1,639 per ounce, respectively. Kopanang was affected mainly by a decline in grades as well as mining mix and dilution, thus, perpetuating the negative margins. The Savuka section of TauTona continue to operate at lower volumes, resulting from reduced available mining ground. And finally, we halted the opening up project on 116 level following the seismic incident of April last year.

  • Turning to cost performance. The South Africa region produced 435,000 ounces for the first half, compared to 486,000 ounces in the same period last year. The second quarter registered a recovery from a poor first quarter, whereby the poor adherence to mining schedules experienced in the first 2 months of the year and which resulted in poor face length availability and limited access to our high-grade areas were largely remedied.

  • The all-in sustaining cost for the South African operations was $1,259 per ounce, compared to $958 per ounce in the same period in 2016, and total cash cost were unfavorably impacted by lower output, the markedly stronger local currency against the dollar, inflationary pressures mainly related to labor, consumables and power, and an unfavorable byproduct contribution.

  • Given the challenging operating conditions, a tough decision had to be taken to restructure the South African assets after review of our assets in quarter 1 in order to ensure that our long-term assets are positioned for a sustainable future. While we made our initial disclosure on this at the end of June, I must affirm our clear view that job loss is always a last resort, particularly within the context of an elevated unemployment within South Africa.

  • We have considered integrating TauTona into our long-life Mponeng mine, similar as was done on a previous occasion with the integration of Savuka mine into TauTona some years back, and that led to an extension of profitable life for that mine at that time. Unfortunately, it appears, at this stage, that there's simply limited potential to replicate that model on a sustainable basis.

  • Our initial number of roles impacted is catered for with this eventuality. So there's no change in this regard. We have commenced 2 separate processes of engagement. Firstly, with the Minerals Board subcommittee, which is convened under the auspices of the MPRDA Section 52, and we have provided plans, forecasts, opinions and assumptions to unions and the DMR for scrutiny and expert review as committed.

  • Secondly, as from the end of June, a mandatory consultation process is progressing in terms of the Section 189 of the Labour Relations Act to mitigate job loss. We anticipate reaching a conclusion during the second half of this year, and meanwhile, in parallel with these consultations, a voluntary severance program has been opened up to all employees. Depending on the timing and outcome of the process, we will make the necessary amendments to our outlook and an update on our future cost and production profile.

  • On that note, I'll hand over to Ludwig. Thank you.

  • Ludwig Eybers - COO of International

  • Thank you, Chris. Good morning, ladies and gentlemen. I'm pleased to report that our international portfolio again delivered strong performance, with increased production from all our operations in the second quarter relative to the first. The trend is encouraging and one that we are working on, on extending the second half of the year, which as Venkat has pointed, out, we'll see a very strong performance in the fourth quarter in all our key operations.

  • Worth looking at here is the fact that year-on-year, despite the strongest currency and ever-present mining inflation as well as higher costs at Kibali, we managed to contain our overall increased cash cost to less than 5%. The increase in all-in sustaining costs was driven mainly by higher sustaining CapEx. We saw exceptionally strong operating performances over the period from Siguiri, Iduapriem and, of course, Tropicana, which I'll talk to you in a little more detail in a minute. Siguiri, in particular, was a knockout performer during the first half on the back of the commencement of the mine at the new Seguelen pit, which came with anticipated increase in grade. We also saw better grade performance at Geita, as we've expected.

  • Kibali has moved from last year plant commissioning challenges and is now moving towards ramp-up of the underground, which will allow it to fully show and embrace its potential. Graham has more on that in a moment.

  • The Americas also showed improved performances from Mineração, where underground tonnages improved and at CDS where gains were driven by better plant performance.

  • As mentioned earlier, we have maintained our margins over an extended period of time, which speaks to our focus on operational efficiencies through our operational excellence program. The bars for quarter 1 and 2 show that we've managed to hold a good all-in sustaining cost margin even as we increased sustaining CapEx into our brownfields projects, which will drive fundamental operating improvements in the medium and the long term.

  • A quick look at our progress on some of the value-adding projects shows that all aspects within our control are progressing exactly to plan. At Geita, the power plant is 80% complete, underground development is on track and brownfields exploration is looking very promising. At Sunrise Dam, the project is bearing a 6% improvement in recovery, is tracking its plan, [grates in bulk] are meeting our high expectations. And Graham will talk to the excellent regional potential we're uncovering in the nearby surface drilling program at Butcher's Well. At MSG in Brazil, we are on schedule to develop the high-grade Palmeiras and Inga ore bodies and on ensuring the pipeline remains top [thee at] brownfields at -- --and regional drilling program. A collection of intervention aimed in increasing the mine life and margins at Mineração are on track and yield good results.

  • Finally, whilst we remain positive on the potential at Sadiola, the ball is firmly in the mining government support with respect to negotiations around the agreements, we need to proceed. Meanwhile, we'll mine oxides into early next year and continue processing into 2019. Our mine plans are being reviewed and will change depending on the progress on our negotiations with government.

  • Onto a very good new story that is developing at Tropicana. We've continued to exceed our initial planning assumptions. We've now accelerated mining rates to 90 million tonnes per annum with the introduction of a 600-tonne face shovel. This, combined with increased throughput following the processing plant optimization and expansion project, has enabled us now to resume grade streaming and bring forward 200,000 ounces of production into the 2017 to 2019 time frame.

  • Further optimization of the plant will lift throughput to 7.7 million tonnes per annum by the end of the year, from a feasibility design of 5.5 million tonnes per annum. In addition, we have identified an opportunity to increase production at this mine by introducing a second ball mill. This will lift the throughput rates around 8.2 million tonnes per annum, and more importantly, at a finer grind size, thereby increasing the recovery at the same time. The accelerated mining rate has brought productivity improvements to lower mining unit cost by 37% over the past 2 years. Importantly, the successful transition to a higher mining rate has set us on the pathway to implement the proposed Long Island mine plan, which will see mining rates of between 100 million to 110 million tonnes per annum.

  • We have also made very excellent progress on the Long Island strategy. This concept has been driven by finding more cost-efficient way to mine wastes in CapEx. It involves using a strip mining approach that minimize waste solids, [distances] by using an input [backfold].

  • The Long Island life of mine plan gives us optionality. Long Island comprises 8 stages, and there are 3 major decision points, which is great, because it gives us the flexibility to tailor our approach at each decision point depending on the market conditions. The mineralized zone for Tropicana remained open as is, and there is potential to carry out underground mining in conjunction with the Long Island mine plan. The extensive drilling program carried out last year further enhanced underground potential and identified additional high-grade underground zones at Boston Shaker.

  • We have underground resource of almost 2 million ounces at Tropicana, we have potential to grow this further. We'll be carrying out underground studies over the next year and envisage underground ore providing higher grade additional (inaudible), in parallel with the Long Island mine plan from 2020, '21 onwards.

  • And that completes my international operations. I now hand over to Graham.

  • Graham J. Ehm - EVP of Planning & Technical

  • Thank you, Ludwig. Good morning. Today, I'd like to make a few comments on the progress at Kibali, the progress on the Siguiri hard rock project. I'll provide an update on our thinking around Obuasi and share some exploration results that are proximal to Sunrise Dam.

  • At Kibali, the focus is on the completion of the shaft material handling system and commissioning of the automated loading system, enabling ore hoisting in quarter 4 this year. Once completed, underground production will increase to 3.5 million tonnes per annum. Grade control, stope design and the buildup of drilled stalks and broken stalks is on track to enable us to achieve this ramp-up.

  • Apart from the construction of the third hydropower station at Azambi, this will complete the construction of the Kibali project, which has been in progress for some 4, 5 years. Then, from 2018, Kibali will be producing at a rate of 750,000 ounces per year.

  • You will recall the low recovery issues in 2016, the 4 additional concentrate fine grinding mills and the expansion of the pump sale circuit is being commissioned, and plant recoveries have improved substantially and are now at or above design. The process plant is operating very well with good run times and above nameplate capacity.

  • The second hydropower station at Ambarau was commissioned earlier this year, lifting hydro capacity to 32 megawatts. The third and final hydropower station will be commissioned late next year and will increase capacity to 42 megawatts.

  • Interesting, hydro power is developed at about $0.015 a kilowatt, compared with thermal power around $0.25 to $0.28 depending on the oil price.

  • Now still on Kibali, underground exploration is delivering very good results. As shown on the left-hand side of this slide, drilling of the up plunge extension and central sections of the 3,000 lode has added approximately 350,000 ounces at 4 grams per tonne. Drilling on the down plunge has commenced and should add a further 650,000 ounces.

  • On the right-hand side of the slide, drilling at the up plunge extension of the 9,000 lode has added 700,000 ounces, and drilling further up plunge towards the Sessenge Pit has a scope to add a further 1 million ounces.

  • The Siguiri combination plant project adds hard rock crushing and milling capacity and extends the power-generation capacity from a peak demand of 20 megawatts to 30 megawatts. The whole project had a capital cost of $158 million. The project extends the mine life by more than 5 years, adding 1.6 million ounces. All long lead items have been ordered, and major commitments have been made. As you can see, the mill shells have been fabricated and are on their way to site. The project is on budget and schedule for commissioning in quarter 4 next year.

  • In regard to Obuasi. The site remains clear of illegal miners, and care and maintenance activities are ongoing. Ghana has definitely done a 180-degree turnaround in the first half this year following the election of the new government of President Nana Akufo-Addo. The government has made its support for Obuasi's redevelopment very clear in its election manifesto. We are engaging with the government of Ghana to obtain all the requisite consents and approvals. We are very pleased to say that this engagement is progressing well, and we anticipate having everything in place before the end of the year.

  • On the environmental front, we have agreed and executed a new reclamation security agreement, which defines the approach and the cost range for reclamation at this 120-year-old mine. And following public consultation and approval of the scoping reports by the EPA, we have submitted the final EIS based on which the EPA will issue permits.

  • Assuming that all the government consents and approvals are received, we would approach Obuasi's redevelopment in a phased manner, which enables a reasonably quick start to gold production and reduces the capital cost.

  • The long section in this slide illustrates the main mining areas. Mining would start in the Sansu and Block 8 areas, progressing to Block 10 and then the very high-grade Block 11 area. The first year would involve establishment of the project and operating teams, the recommencement of mining and the refurbishment of plant and infrastructure to enable a commencement of operations in the second year at 2,000 tonnes a day. Production would ramp up to 4,000 tonnes per day in the third and subsequent years. Gold production would start at 200,000 ounces per annum, increase to 300,000 ounces per annum for the first 10 years and increase further to 400,000 ounces per annum when the high-grade area at Block 11 is reached. Mine life would be over 20 years, producing over 8 million ounces.

  • Compared to a larger project, this approach provides a very, very good capital efficiency and returns that are comfortably above our benchmarks. We will provide a further update on Obuasi next quarter.

  • Turning to Sunrise Dam. Regional exploration opportunities near Sunrise Dam have been enhanced through a farm-in agreement with Saracen Mineral Holdings announced late last year. This has provided a consolidated tenement package along the western side of Lake Carey. Despite its location, this area is underexplored due to a long history of fragmented tenement holdings and because of the drilling carried out to date has only been to the base of oxidation or about 40 meters.

  • The first round of diamond drilling beneath the Butcher's Well pits over a 3-kilometer strike length has returned high-grade intercepts from beneath the Hronsky-Enigmatic pit and identified a new mineralized zone. The results indicate that the steeply dipping west -- sorry, steeply west-dipping Enigmatic zone extends down due to a vertical depth of about 400 meters. The drilling also picked up the northerly offset extension on the Enigmatic zone at a depth of about 300 meters. Follow-up diamond drilling is in progress, while air-core drilling is testing the strike extend. The resource potential currently estimated at between 0.5 million and 1 million ounces.

  • Thanks very much, and I'll hand over to Christine.

  • Kandimathie Christine Ramon - CFO and Executive Director

  • Thanks, Graham, and good morning, everyone. We've delivered a solid operating performance reflecting good recovery in Q2. Our cost performance reflects our planned capital expenditure, reinvestment plan as well as the impact of stronger currencies. Frankly, our balance sheet remains strong and positions the company well to fund its brownfields reinvestment strategy and weather the current volatility.

  • Our focus remains on improving margins despite currency headwinds and lower grades anticipated for this year. The all-in sustaining costs margin has significantly narrowed in H1 to 13% margin due to the planned higher capital expenditure signaled earlier this year, which was exacerbated by stronger currencies. We will continue to focus on improving margins through operational excellence program, which Ludwig spoke to, and that looks at ways of improving efficiencies and enhancing recoveries as well as targeted investments to improve our portfolio mix.

  • Moving on to our key metrics. We see that despite the marginal increase in the gold price and improvement in the overall production for the 6 months, our cash costs and all-in sustaining costs reflects the impact of stronger currencies, inflation and our significant capital reinvestment program.

  • Adjusted EBITDA was impacted by the once-off silicosis provision of $63 million contributing to a lower adjusted EBITDA margin of 30%. Finance costs are $16 million lower than last year, benefiting from group cash optimization and the settlement of the high-yield bond last year. However, free cash flow has declined due to the planned higher CapEx, stronger currencies and the working capital lockup in Continental Africa, which I'll elaborate on later in the presentation.

  • Free cash outflow in Q2, however, improved to $42 million, compared to the outflow of $119 million in Q1 largely on the back of improved production. The half year adjusted headline earnings has been impacted by noncash once-off provisions. The adjusted headline loss of $93 million reflects the for-redundancy provisions of $47 million related to the potential outcome of the Section 189 process and an estimated provision in respect of the silicosis class action lawsuit of $46 million. Both these amounts are stated on a post-tax basis.

  • On a normalized basis, excluding the impact of these once-off noncash provisions, which we also refer to as special items, adjusted headline earnings would be neutral for the first half. In addition, as a consequence of the restructuring of certain South African business units, an impairment of $86 million post-tax was recorded in earnings for the period, which impacted basic earnings that was excluded from the headline loss and the adjusted headline loss.

  • Looking at the cost performance in detail year-on-year, we note that cash costs have increased by 6% excluding the impact of stronger currencies due to the adverse impact of inflation and lower grades, which was offset by positive movements in inventory and byproducts. Cash cost in Q2 was down by 4% compared to Q1, at $781 an ounce.

  • In addition, all-in sustaining costs increased by 18% on the back of higher cash costs and significantly higher planned sustaining CapEx, which increased by $67 an ounce in H1 compared to the prior comparable period. Sustaining CapEx increased by 46% to $400 million, compared to $274 million in H1 2016.

  • In Q2, all-in sustaining costs at $1,082 an ounce increased by 2% from Q1, primarily due to a $22-an-ounce quarter-on-quarter increase in sustaining CapEx. The higher capital spend reflects the group's strategic inward investment strategy on life extension and margin improvements principally across its international operations.

  • All-in sustaining cost at $1,259 an ounce for the South African operation was 31% higher due to the slower-than-anticipated ramp-up in production in Q1 after the festive break despite the clawed back production in core assets in Q2, as explained by Venkat and Chris. We also saw a 14% stronger rand-dollar exchange rate in South Africa.

  • All-in sustaining costs for the international operations at $988 an ounce was 13% higher and was underpinned by solid performance across the operations and reflects the impact of the capital reinvestment program, inflationary pressures as well as a 14% stronger Brazilian real.

  • The free cash flow lockups relating to the increase in mixed VAT receivables across Continental Africa and the Argentinian Patagonian port rebate has negatively impacted on the group's free cash flow generation and earnings. These receivables have increased by $61 million year-on-year after currency devaluation.

  • Geita in Tanzania is the most significant contributor to the VAT lock-up over this period amounting to $40 million. We have received $5 million in the current period from the Argentinian authorities in respect of Patagonian rebates, which is positive. In addition, our attributable share of VAT and fuel levies receivable from Kibali, which is treated as an associate and therefore not included in the working capital movement but impacts on free cash flow generation from associates, amounts to $64 million as at 30th of June 2017, and that is after the impact of $15 million due to currency devaluation, and that has also had a negative impact on free cash flow generation in the group.

  • We continue to expend significant efforts in engaging with the authorities to recover VAT and fuel levies across Continental Africa. However, this remains an area of concern and continues to impact free cash flow generation across our business, whilst also exposing the group to adverse impacts of the devaluation of local currencies in these jurisdictions.

  • Net debt was 3% higher at $2.15 billion, compared to $2.1 billion in the first half of last year due to the free cash outflow of $161 million. Negative free cash flow was impacted by the higher CapEx of $136 million, and that includes Kibali as well as adverse working capital movements of $62 million and increased operating costs.

  • We expect production improvements to benefit our cash flows over the remainder of the year, similar to what we saw in 2016. Our capital investment plan, which we constantly review, will impact cash flows as will possible retrenchment costs in South Africa. Hence, we are seeking to put additional Vaal facilities in place to fund the possible retrenchment costs.

  • We remain strongly leveraged to the gold price, from which we expect continued benefit as well as from efficiency improvements, which will offset currency headwinds. Our net debt-to-adjusted-EBITDA ratio of 1.56x reflects ample headroom to our covenant levels of 3.5x. That shows a balance sheet that remains robust. We have strong liquidity, ample undrawn facilities and long-dated maturities, providing us the financial flexibility required in the current volatile environment.

  • We remain focused on self-funding our brownfields capital program and repaying our facilities as the opportunity arises. Our credit ratings remain intact despite the downgrade in the South African sovereign ratings.

  • Finally, on guidance. If we can move the slide, thanks. Our cash costs and all-in sustaining cost guidance remains intact for the full year on the back of improved second half production despite stronger key exchange rates and including our assumption of a lower (inaudible) crude oil assumption by $10 a barrel. Guidance for corporate and exploration costs have been reduced.

  • Just to remind you, our costs and cash flows remain highly sensitive to changes in commodity prices, operating currencies and production. We provide indicative pretax sensitivities on all-in sustaining costs and cash flows with a health warning at our forecast average commodity prices and exchange rates.

  • Total CapEx for the year remains within the original guidance range at $950 million to $1,050 million. About 85% of that figure relates to sustaining capital, and that relates directly to ORD and infrastructure at AGA Mineração, latest underground development and power plant, the CapEx at Iduapriem, recovery improvements at Sunrise Dam and the mine optimization at Tropicana. We expect to incur about 50% -- sorry, we expect to incur about 56% of our capital expenditure in the second half, and that would be in line with past trends.

  • We continue to see sustaining capital reducing to levels between those we saw in 2016 and 2017 in 2018. We reaffirm this year's growth capital at between $120 million to $150 million, and that capital relates primarily to the Siguiri hard rock project and power plants, Kibali's underground development and Mponeng.

  • With that, I will now hand back to Venkat.

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • Thanks, Christine. So after that detailed presentation, please allow me to recap. We are executing on our strategy of realizing the options that exist within our portfolio. In Brazil, for example, our exploration work is looking very promising indeed, and we are confident of extending mine lives there, whilst our investment in increased oil reserve development will yield future benefit to the productivity of those operations.

  • Turning to Continental Africa, which is a hive of activity. Our investment will see production ramp ups coming from Siguiri, Kibali and Geita, with significant latent potential still to come from Obuasi and Sadiola once we have reached agreement with our host governments there. Iduapriem continues to tick along as planned.

  • In South Africa, we are investing in the significant restructure of our base capacity, stripping out loss-making production and focusing on a core set of cash-generative assets that we have proved can be operated safely.

  • Finally, turning to Australia. The leading-edge optimization work has turned Tropicana from a short-life low-margin operation to a true Tier 1 asset with world-class margins and more upside to be realized through the Long Island project. Sunrise Dam remains an excellent regional option that looks more attractive with every hole that is being drilled on-site and on neighboring tenements. Together, these 2 operations remain one of Australia's most attractive gold packages.

  • To remind everyone, we have advanced all of this work in a self-funded, self-executed package of projects that are on budget and are on schedule and are underpinned by a solid balance sheet and an appropriate overhead structure, given our operating base. We will continue to look for latent value in the business and to take steps to realize it, whilst keeping our eyes firmly on the fact that we are careful custodians of our shareholder capital.

  • In conclusion, we are pleased with the first half operating performance despite the slow start and are confident in our ability to meet full year guidance despite the currency headwinds. We have a clear-eyed view of the fact, as I've said many times before, mining is indeed a long-term gain, and as managers of the world's largest emerging market gold producer, we need to take the long-term view in managing some of the current volatility that we see, whilst keeping a tight rein on capital.

  • For the remainder of the year, our 5 focus areas are: continuing the strong safety performance; completing the restructure of our South African assets to ensure our vibrant cash-generative business for the longer term; continuing to execute on advancing our high-return brownfields projects; and engagement with our host governments and jurisdictions, where we see significant long-term potential; and finally, further enhancing the portfolio, which should, in turn, result in improved cash flow going forward.

  • With that, I'm happy to take any questions.

  • Stewart Bailey

  • All right. Let's kick off the (inaudible). If you could just give your name and designation.

  • Brendan Ryan

  • It's Brendan Ryan, Miningmx. I've got a number of questions regarding Obuasi. The first one is how much is rebuilding this mine going to cost? The second one is, are you doing it on your own or are you still looking for a JV partner? The third one is you talk about government consents and approvals. What are the main ones required there? My fourth one is I recall you saying that you would require a cast-iron guarantee from government against future illegal invasions if you were to ever reopen the mine, how are you going to get that? And then my last one is what is the cost -- what was the cost of completion of that invasion of Obuasi? And are you going to get anything of it back through the arbitration proceedings you instituted against the Ghanaian government?

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • Thanks, Brendan. If I can pick up those questions, I may not be able to remember all of it, but answering in no particular order, Graham outlined what the production metric he's targeting at. We are still doing the work in terms of capital, but the capital will be certainly significantly lower than what was originally contemplated. If you remember, at one stage, it was between $800 million to $1 billion, but it's going to be significantly lower than that, and we'll put out the exact numbers once we have completed our review and engagement with the government. That's Item 1. Secondly, are we looking for joint venture partners or are we likely to do it on our own? All options remain open in that regard. We have not closed any door in relation to option. Whatever gives us the best value in terms of shareholders, that's what we'll do. Then in terms of the agreements which we need with the government, it's really around the Reclamation Security Agreement, which governs the environmental provisions, that has actually been signed. Then the second is the Investment Development Agreement, which talks about the investment going in, the conditions for that investment and the fiscal regime for that, that is currently being negotiated with the government. Then, obviously, we are seeking their commitment in terms of security. What I can say with regard to the security is the government has already taken the steps to ensure security is provided, not just in terms of Obuasi, but across all Ghanaian operations. And you've seen comments in the Ghanaian media about the stance the government has taken against illegal mining. Illegal miners have left the Obuasi concession. They are not anywhere operating in Obuasi, and the government has taken a clear view that they'd rather support structured, large- and small-scale mining as opposed to illegal mining in that regard. And in terms of the exact loss which we have suffered on this, I don't want to discuss numbers in here. Our current maintenance costs are published in the -- in our account, and all of these will be part of the negotiations with the government.

  • Brendan Ryan

  • So do you expect to get the (inaudible).

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • I think all of this is going to be part of the discussions with the government, Brendan.

  • Yatish Chowthee - Gold Analyst

  • It's Yatish from Macquarie. Just 2 questions. At the South African operations, given we are in a challenging environment and given what's happened at other companies, what is your realistic time line to actually finalize the retrenchments and wind down Kopanang and the Savuka section? And on the second question related to Sadiola, not much was mentioned. Exactly what is outstanding from the government's permitting base? And when do you expect to at least start spending that, given you have forecast some sort of expansion CapEx at Sadiola for the year?

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • Firstly, with regard to the South African question, the Section 189 process is underway, and the 60-day consultation period ends towards the end of this month. Although that 60-day consultation process can be extended by another 30 days with the consent of all of the stakeholders. So we are looking at effectively getting the whole Section 189 process completed certainly during the course of this year. That's in terms of South Africa. Then turning to Sadiola. The ball is very much in the government's court, I must point out. What we are waiting for is, which mining code actually applies in terms of the operations because we are subject to a current mining code, and obviously, the government wants to look at a new mining code under which the project should fall under. And we had received a bunch of fiscal framework and power tariffs, et cetera, when we were going to do the project back in 2012 before the gold price fell. We're really seeking to have those reinstated to enable the project economics to work, and here, again, we're not rushing to spend money on the project. We are currently mining oxides, and we'll complete processing the oxides by the end of this year. At the end of the day, that project has to meet our return criteria, and we have explained that clearly to the government. Really on this one, the ball is in the government's court to come back.

  • Stewart Bailey

  • Patrick?

  • Patrick Mann - Research Analyst

  • It's Patrick Mann from Deutsche Bank. I just had a question on Tanzania and Geita -- or 2, actually. One, can you clarify what the Mine Development Agreement covers? I know you said that the government hasn't approached you to renegotiate that, but that you are paying the additional royalties and the export clearing. So what is covered by the Mine Development Agreement that's not covered by the changes in legislation? And then the other thing is you've obviously got the Geita Underground project that's kicking off now, and Ludwig was saying that you're on track in terms of the underground development there. Does this kind of regulatory headwind put that at risk or slow it down? Or just how should we think about that underground project, given what's happening in Tanzania?

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • Okay. The Mine Development Agreement in respect of Geita covers the terms of the investment going into Geita in order to provide stability. And primarily, it provides a range of fiscal and economic sort of framework within which the mine operates, and that is an adverse variation clause in the Mine Development Agreement, which requires both parties to sit down and have a discussion in the first instance. And Patrick, here, again, as part of this, it's not that we have, a, not paid taxes. We have demonstrated we have paid over $1 billion of taxes, both collected and [bone] to the Tanzanian government. And where the government has had issues in the past, we have actually found compromised grounds within the Mine Development Agreement in terms of capital elements, in terms of local levies, et cetera. So where we stand at present is that we are firmly of the view that the Mine Development Agreement stands, and certainly, the government hasn't disputed that. What we are seeking the dialogue with the government saying that, given their new legislation, how does this impact us in the context of the Mine Development Agreement? And any negotiations we do will be in the context of the new Mine Development Agreement as opposed to the laws, which have been promulgated. So that's in respect of Geita. Secondly, in terms of the prospects of Geita, it's still a long-term asset. And without being blase about it, jurisdictions do go through these ups and downs. If you remember, we had similar issues back in Guinea going back 10 years ago. We've had issues, for example, in Ghana, et cetera. So one has to take a long-term view and not knee-jerk. So the power plant is already 80% complete. So we will complete that. The underground expansion is still going ahead because we are already doing that expenditure there. It is on a self-funded basis. We go back into our planning and budgeting discussions between now and the end of the year and like how we review the plans of all of the assets, we'll review the plan of Geita as well in the context of where those negotiations end up or don't end up before the end of this year.

  • Stewart Bailey

  • All right. I have one e-mailed question from Adrian Hammond at Standard Bank or a set of questions. And I'll just start off with the first one, Venkat. AngloGold continued to incur a cash loss despite improving -- costs improving in Q2 as well as South Africa improving all-in sustaining costs to below the current gold price. However, current costs are within full year guidance. How long can you continue like this?

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • To answer Adrian's question, we did flag at the end of last year through to the early part of this year, that, whilst we have been cash-generative in the 3 years before, we will be reinvesting in our operations, and we outlined the suite of investments which we are putting in. And therefore, the increase in cost reflects an element, as Christine outlined, of about $67 an ounce on a year-on-year basis of that extra capital going in. We've also had headwinds in terms of currencies, but if you look at the free cash outflow in Q2, it's come down significantly as compared to Q1. And bulk of that contributor has been the VAT lockups and the cash loss in terms of South Africa. If you were to strip those 2 out, you'd find that, effectively, the cash generation has been relatively stable in terms of Q2. We expect Q3 performance to obviously pick up and Q4 to pick up as well, but bear in mind, should the Section 189 process result in retrenchments, that cost will actually have to be bone. So this year is going to be skinny in terms of cash flow, but having said that, you are actually going to see an uptick in production coming through in the second half of the year, which should actually help. But that then puts us in a much better position going out into next year when the highest element of the sustaining capital has peaked and then we go back to the levels, which we saw in '15 and '16, coupled with South African assets where the loss-making assets have been removed from the mix. We will start to see Siguiri produce additional gold, Kibali going into underground ramp up, the situation in Geita resolved hopefully to everyone's satisfaction, and that's starting to produce as well and the orders of development paying off in Brazil and Tropicana firing on all cylinders. All of those should help in helping us pull our costs down. The currency headwinds is a matter of concern, but we can only control what's within our control.

  • Stewart Bailey

  • Adrian also asks, "In your results, you indicated your projects have high returns and short payback periods, can you expand on this?"

  • Srinivasan Venkatakrishnan - CEO and Executive Director

  • I think we can give a couple of examples here. Siguiri hard rock expansion is a very good example of that. This is a mine, which has actually historically met our criteria of strong double-digit returns on a real basis, and that's what we target, and we risk-adjusted based on the asset and based on the jurisdiction. So that's the area of focus. And the payback is relatively short -- within a short period. So gone are the days where you put in significant amount of capital, and then you have to expect the payback coming in 10, 15 years later, hence, Graham's comment about having a phased approach even in terms of Obuasi.

  • Stewart Bailey

  • Adrian, your final question I'll answer, which is what CapEx is needed to develop Tropicana further. We haven't given a forecast on that, and as soon as we do, you'll be the first to know, among the first to know.

  • All right, I think we'll call it there. And thanks, everyone, for making the time today, and we'll look forward to chatting to you again in 3 months. Thank you.