Stewart Bailey - SVP IR & Group Communications
Morning, everybody. Apologies for the late start. Welcome to our second half and full year results for 2016. As is customary, I'll just start by reading
the Safe Harbor Statement.
Certain statements contained in this document, other than statements of historical fact including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, total cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, productivity improvements, growth prospects and outlook of our operations, individually or in the aggregate, including achievement of project milestones, commencement and completion of commercial operations of certain of our exploration and production projects and the completion of acquisitions, dispositions or joint venture transactions, our liquidity and capital resources and capital expenditures and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental, health and safety issues are forward-looking statements regarding our operations, economic performance and financial condition.
These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these statements. Although we believe that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that they'll prove to have been correct.
Accordingly, results could differ materially from those set out in these statements as a result of amongst other factors, changes in economic, social and political and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, and business or operating risk management.
For a discussion of these factors refer to our Annual Report on Form 20-F filed with the SEC. These factors are not necessarily all of the important factors that could cause our actual results to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on future results, and consequently you are cautioned not to place undue reliance on these statements.
We undertake no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written and forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by these statements.
The financial information contained in the news release has not been reviewed or reported on by the Company's external auditors. The Company may -- the communication may contain certain non-GAAP financial measures. We utilize these measures -- performance measures and ratios in managing our business. Non-GAAP financial measures should be viewed in addition to and not as an alternative for the reported operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS.
In addition, the presentation of these measures may not be comparable to similarly titled measures other companies use. We post important information to investors on the main page of our website at anglogoldashanti.com. You -- it's important information and you should read it.
I see Venkat's champing at the bit, here, so I'm going to hand over.
Srinivasan Venkatakrishnan - CEO
Thank you, Stewart. Morning, ladies and gentlemen. Today is actually a long presentation because we have got a fair amount of ground to cover and that was the reason I was trying to give myself a head start.
Before we move onto the results for the second half and the full year 2016, let's briefly revisit our overarching strategy, which we recap at the start of each presentation, which has remained absolutely consistent since 2013. It's also important to note that the strategy is underpinned by a strong set of ethics and values that really form the DNA of our organization.
In every decision we make, we consider our five key business objectives and how they can support our central strategic goal of delivering sustainable improvements to cash flow and returns.
Through this presentation the team will highlight key progress areas in which we have delivered against our strategy. In particular our brownfields opportunities that we are actively working through. This is especially relevant today as we outline our plans for inward investment in 2017, which we have flagged through the latter part of 2016, to deliver better quality production that'll add to margins, extend mine lives and also shape the portfolio in the longer term.
It's important to note that this is not a new tack for us, but an approach that has been fundamental to our strategy over the past four years. And staying on this slide, what's key in looking at the Company today is to appreciate the results of the work we have done in lowering costs, reducing debt and rebuilding our balance sheet.
A critical factor that differentiates us now is our ability to withstand shocks in the gold price, whilst bringing a number of smaller capital, quicker pay-back options into play, on a very disciplined basis. Importantly, they are self-funded and we have not asked our shareholders to foot the bill.
Moving onto the next slide. As you can see from the map, we remain one of the gold industry's most geographically diversified companies, with about three quarters of our production coming from our international operations and around one in four ounces coming from our mines here in South Africa.
This helped us deliver $278 million in free cash flow, even after paying a $30 million premium to bullet our highest cost debt. And our definition of free cash flow is after all outgoings.
Our exploration team helped us come very close to cover depletion and our balance sheet continued to strengthen with lower leverage and improved flexibility.
In the second half of 2016 we lifted our production 8% above the first half, and this was driven by a recovery in South Africa, Brazil and Kibali, and that generated a healthy $170 million of free cash flow in the second half of the year.
Importantly, what that has helped us to do over this period is to resume dividend payments for the first time since we suspended our pay-out in early 2013. We'll be paying a ZAR1.30, approximately $0.10 per share dividend, which is in recognition of free cash generation in the business, our much-improved balance sheet, and our commitment to strict capital discipline, but also our growing confidence in the robustness of our business and its potential.
But encouraging as all of that is, the most important achievement for us in 2016 was the improvements we saw in safety, relative to the previous year. We ended the year with a fatality-free South Africa fourth quarter for the whole Group, and we managed to end the year with almost 160 days without a fatality in South Africa, and touch wood, we've been going fatality-free since.
Spending some time on safety. Let's be very clear, safety remains and will continue to remain our highest priority. It underpins everything we do and it's an area that we continue to work on improving. We reported six fatalities in South Africa last year and another in Brazil. This remains by a long way the most disappointing part of our performance last year and the one we are committed to improving upon, similar to how we improved from 2015 to 2016.
We will look for inspiration to some of the important milestones of this past year, particularly in South Africa, thanks to the tireless effort of Chris and his South African team and the corporate teams, where Moab remained fatality-free at the year end, after reaching full year mark in September.
The Vaal River region hit 2 million fatality-free shifts and Mponeng and Kopanang both reached 1 million fatality-free shifts. Continental African operating mines had another year without any fatality.
Our improvements over the past decade are a result on one hand of our continued focus on and investment in improved operating and safety systems and technologies. These are advances that we, as part of this industry, have helped spearhead and roll out across our operations. The results are encouraging, indeed, but we realize that there's more to do here.
But technology alone is not sufficient. Like in any heavy industry, and especially in a Company like ours that employs more than 50,000 people globally, human error remains one of our greatest challenges and hence opportunities. This is an aspect of the business that we'll continue to work hard to mitigate, in cooperation with a broad group of stakeholders.
We also work continually to ensure that every person in AngloGold Ashanti places a greater focus on identifying and avoiding risk. In an environment where minor missteps can have catastrophic consequences, it is critical that we are not only relentless in identifying and eliminating hazards, but we instill a sense of culture that prizes safety above all else. We have made encouraging strides in that regard and we'll continue to look for ways to improve.
We've also seen continued year-on-year improvement in the critical area of environmental stewardship, with another steep drop in environmental incidents. This is an absolutely critical building block in our social license to operate.
Looking back, in terms of delivery to our commitments, we shared an ambitious list of priorities with you this time last year, and I'm happy to report we covered good ground in fulfilling these obligations. Safety has improved. We have moved our capital projects closer to development, improved margins and seen some good exploration successes, which Graham will touch upon shortly.
All of this has been underpinned by a vastly improved balance sheet. As you will all know, South Africa's turnaround remains work in progress, notwithstanding the fact that we saw a successful and strong performance from Mponeng and a better performance at Moab, relative to the previous year, which Chris will talk to in a minute.
We are back into Obuasi after a year's disruption from illegal mining occupation, so we have work to do there this year to find a lasting resolution.
Looking at our disciplined approach to growth, our primary objective remains not production growth for its own sake, but rather on margin enhancement through the cycle. We have strategically positioned AGA to achieve sustainable cash flows, giving us the balance sheet flexibility to make decisions around our future investments.
We carefully consider every dollar we invest, and ensure that our capital is allocated to the highest return options that have been appropriately handicapped for project and country risks. We target returns in the mid-teens for these investments, and this year we have a good pipeline of those that we'll bring into fruition.
Our disciplined approach to planning has assisted us in making proper investment decisions across our portfolio. In general, our all-in costs remain well below our current reserve price, leaving a significant cushion when compared to the average three-year gold price and the current spot price.
Quite clearly, the industry is coming to a point where companies either need to reinvest or, as we have seen increasingly, turn to M&A to shore up and improve their portfolios. We are firmly in the reinvestment camp, with a pipeline of very good, high return brownfields opportunities that will improve our production mix.
We will also continue to look for ways, as we did recently with Tropicana, to unlock value by making fundamental and lasting improvements through innovation, rather than large capital investment. Ron and Graham will focus on these investment areas in their presentations, but we have a number of well thought through, targeted investments to occupy us this year.
You should also note that these mine lives outlined on this slide are based on our current mine plans and our views on the geology of our concessions. It also shows that our core portfolio still has a long runway ahead of it, with further extensions quite possible from the exploration potential.
So what does this investment buy you? On a five-year view, you will see that we can maintain a steady level of production, whilst our sustaining capital profile peaks this year before moderating. Our overall tonnage profile will also remain more or less steady. And we will see grades pick up in the coming years as we reap the benefit of our inward investment across our portfolio.
These charts don't include Obuasi or Colombia, which we will update you on as and when we gain more certainty on the path forward. I must add here that we won't hesitate to cull production that does not meet our margin or return criteria.
Before I handover to Chris, I'd like to take a minute to bid fond farewell to Ron Largent, who, after more than 20 years with the Group and over 30 years in the industry, has elected to retire. It would not be an exaggeration to say that Ron has effected one of the gold industry's most significant operational turnarounds over the past four years, turning our international portfolio into a globally competitive suite of assets, with an incredible set of growth and life extension options.
The numbers we have posted over the past four years are really testament to Ron's status as one of the world's best mining operators. We bid him a fond farewell, and a restful retirement with his family. Thank you, Ron.
Testament to Ron's leadership is the strong succession pipeline he has created over the years, through his tenure, so he passes the baton onto a familiar face, for many of you, in Ludwig Eybers. Ludwig and his team worked hand-in-glove with Ron in effecting perhaps the most noteworthy of these turnarounds, which was turning our continental African business from a significant cash drain into our largest source of cash generation.
He has widened margins, opened up high return investment options and placed it amongst the best performers, globally, from a safety perspective. Ludwig has held safety, production, cost, capital and planning accountability in the international team since his appointment as Deputy Chief Operating Officer International last year. We welcome him to the Executive Committee from tomorrow, and are confident he will continue to build on his successes with us.
Ron will remain with the Group until June 30 this year, to assist Ludwig in a continued, orderly transition, which is already well advanced.
With those introductory comments, I'll hand you over to Chris.
Chris Sheppard - COO, South Africa
Thank you, Venkat and good morning, ladies and gentlemen.
In my previous presentation to this audience I stated that one of the key issues facing the South African operations was an unsatisfactory safety performance. Six months later it's pleasing to note, as alluded to by Venkat, that the South African operations have been fatal-free since July 26, 2016. And Moab Khotsong has achieved a fatal-free 2016, and has recently been recognized with the AngloGold Ashanti 2016 Safety Achievement Award.
And while six regrettable fatalities were reported in 2016, compared to nine in 2015, we remain completely focused in our endeavors to achieve our goal of zero harm. Furthermore, the need to hold all levels of the organization accountable for safe outcomes has never been more compelling. Our focus continues, through our safe production strategy, to improve skills, safe behavior, work planning and protecting workers from risk and thereby improving levels of compliance in the workplace.
In this regard, much attention is being given to major hazard critical controls, in particular to the management of fall of ground and rail-bound equipment. Pleasing progress has been made in ameliorating the effects of seismicity, particularly at Mponeng, where the rigorous application of in-stope roof bolting and netting, preconditioning of the advancing stope face and improved quality of backfill is delivering far safer outcomes in our deepest mining operation.
Whilst the South African operations enter a transition phase over the next five to seven years, where some of our operations reach the end of their economic lives, it must be emphasized that AngloGold Ashanti remains a significant investor in its South African production base, which employs around 28,000 employees and has a potential future spanning some 30 years.
The viability of this business needs to be ensured, by ensuring that costs are actively managed according to the projected production base. Pleasing progress has been made with the prefeasibility work regarding the Life of Mine Extension project adjacent to the Below 120 level phase one project at Mponeng. And this reaches completion and final production ramp-up early in 2018.
Critical path activities within the Life of Mine Extension projects continue, whilst the pre -- the feasibility study is completed for Anglo Board -- AngloGold Board consideration in mid-2018.
Turning to the operational performance of our South African operations. This slide shows the operational performance over the period 2015 and 2016. Mponeng delivered a good set of results for 2016, and was one of the top performers in the AngloGold portfolio.
TauTona, now some 60 years in operation, was severely hampered by the impacts of three fatal incidents during the year. Modifications to support standards to address the seismic risk were implemented, which impacted our ore reserve development rates in the short-term.
Moab Khotsong improved volumes. We improved face lengths, mine grade and Mine Call Factor.
Kopanang, however, experienced headwinds, particularly after the regrettable fatality in July last year. And that was after having been fatal-free for a full 12 months. Significant safety stoppages ensued in the second half of 2016, resulting in disappointing productivity levels and a resultant financial loss for 2016.
Our surface operations produced a steady result for 2016, characterized by anticipated lower marginal ore dump grades and increased throughputs at our Mine Waste Solution operation. The uranium circuit was recommissioned in the second half of 2016 and optimization efforts are underway to improve plant recoveries further.
Regarding unit costs, the weak exchange rate benefit was largely offset by lower production volumes, which were partially due to safety-related stoppages, as well as operational inefficiencies. And the costs were further impacted by cost inflationary pressures, including annual power tariff increases and salary adjustments in the second half of the year.
The first and most pressing of our key priorities for 2017 is to put an end to fatalities, by improving workplace conditions and behaviors, along with improved compliance. Much focus is being placed on ensuring sustainable and effective adoption of safer production processes, including technology rollouts.
Options are being studied with a view to assess the most appropriate manner to integrate the remaining life of mine of TauTona and Savuka into our long-life Mponeng operation. A comprehensive P500 program is once again underway, to realize both on-mine and off-mine cost reductions, as we manage the transition on production, as our mines reach the end of their respective economic lives of mine.
Surface sources will focus on increased throughput and recovery, to manage the impacts of anticipated lower grades, while we reduce our surface footprint. The Mponeng Below 120 phase one project's production ramp-up remains critical, with rock handling and logistics infrastructure being completed in mid-2017.
The Mponeng Life of Mine Extension project will be progressed to feasibility study, as I mentioned, for finalization by mid-2018, with critical path activities continuing through the rest of this year.
Our significant commitment to our technology program will remain driven by a focused project management team, fully focused on delivering a viable mining production system. We are currently progressing the authorization of continuous operations with the regulator, to enhance the business case of this capital-intensive technology.
In closing, we continue to see pleasing momentum at Mponeng, as we position it as a long-life, tier one asset.
I will now hand over to my colleague, Ron Largent, who will report on international operations. Thank you.
Ron Largent - COO, International
Thank you, Chris, and good morning. I will provide an overview for the second half 2016 operating results for continental Africa, Australia, and the Americas regions, and a high-level discussion on the international operating portfolio.
I'd stated during the year end 2015 results, about one year ago, that our all-in costs would be impacted by exchange rates and some levels of inflation. We actually saw this impact in 2016 with the largest impact being the Brazilian real.
In addition to the foreign exchange and the inflationary impact, we have lifted our investment in brownfields drilling, with an aggressive program under way at a number of our operations, and also the execution of the Life of Mine Extensions, which we're planning to execute from 2017 and forward. The increase in brownfields investment can be seen in our reserve additions that Graham will go through later in the presentation.
To manage the costs, we've introduced operational excellence as our operating platform. Whereas P500 involves processes for identifying and monitoring the execution of discrete cost reduction projects, operational excellence drives improved behaviors from every person in the workplace. This is about continuous improvement across all facets of the operation.
We have seen improvements across the entire portfolio, whether it's production metrics, planning sequences, equipment efficiencies, recovery improvements, and so on.
Operational excellence is based on a very simple model, but everybody must be engaged for a successful outcome. It requires certain management behaviors that are supported by organizational design, leadership behaviors and business systems, with P500 being one of those business systems. With this work, the business performance can be altered to ultimately enhance each and every asset value.
My takeaway from this slide is we've established a sustainable operating margin for our international portfolio, and for the year, having continental Africa completed in the year at $717 cash cost, South America at $578 cash cost and Australia at $793.
I think overall, the international operations had a successful 2016, and met their operating targets and expectations.
Now, as far as priorities are concerned, as work continues to enhance the mid- to longer-term effectiveness of the portfolio, there's some priority work for 2017.
At Sunrise Dam in Australia, as an outcome to the successful transition to solely underground mining, now at an annualized rate of 3 million tonnes to 3.2 million tonnes per annum, the ore types we've become familiar and the ore types are known and understood. This requires a change to the process flow sheet that includes fine grain and flotation that will dramatically improve the recoveries.
Associated with this is the continued work on resource extension through drilling and the materials handling study for improved ore transport efficiencies as we get deeper into the future.
I will touch on Tropicana in a little more detail after these specifics.
But at Siguiri mine, construction and the execution of the hard rock combination plant has the favorable outcomes of increased production, lower [capacity] and extension of mine life beyond 2023. This project is approved, permitted and long lead items have been ordered.
Now at the Geita mine, we've commenced underground mining about 18 months ago. 2017 will be the first full year of production from Star and Comet. The portal in the Nyankanga ore body commences in quarter one 2017, which also allows for ore extraction and future development drilling to deeper underground sources.
This mine will ultimately use both surface and underground mining methods for resource exploitation, to keep the production profile at what we're used to at the Geita gold mine. I think the key to this is for resource exploitation at depth, and using underground mining methods.
At Iduapriem, 2017 represents a change to the operation in the fact that pre-stripping has commenced at Teberebie. This allows for elevated grade and commensurate production profiles into the future.
In the South American operations, brownfields work is scheduled to improve ore body knowledge, to extend and optimize the life of mines.
At the Mineracao assets -- as the Mineracao assets have life of mines beyond 2030, work is concentrated around effectively bringing forward opportunities that positively improve production profiles.
There's specific work to bring forward higher grade resources, defining potential of newly-defined structures, the applicability of ore-sorting technology and defining the potential optionality of the newly-defined JV with Orinoco, which is in the Serra Grande region of Goias state.
Now onto a little bit more detail on Tropicana. I think it's important to state that Tropicana mine was built and operated in line with our investment case. The project was built on schedule and within the capital budget, and I think most importantly, the payback schedule has been met, despite the downward pressure on gold price since commissioning, some four years ago.
The continued success of the brownfields drilling program, down dip and a long strike of current ore bodies has allowed us to define a larger reserve and resource. In 2016 we added 1.1 million ounces to reserve and an additional 1.5 million ounces to the resource. This was, and continues to be, the set of work that has defined targets to grow the reserve, improve production profile, lower costs and extend mine life.
The ongoing work has included plant optimization to the circuit and has produced a 30% increase to nameplate design, which was at 5.6 million tonnes per year. The expansion to 7.5 million tonnes per year was completed in 2016, with very limited capital. And we plan to take that to 7.6 million tonnes to 7.9 million tonnes this year, with debottlenecking activities.
The plant throughput improved -- improvements, combined with the resource and reserve growth, has allowed us to re-evaluate the mining sequence, to ultimately reduce mining costs. I think I went over that in the last half year review. We brought in a large, 600-tonne face shovel that was delivered in quarter four 2016. This is driving a reduction in mining unit cost and improved productivity. All this work is aimed at making material improvements to Tropicana's life of mine from 2017 and beyond.
The timeline for the work to be done? I guess I would go back a little bit and say, in late 2016, when we improved the reserve and resource through drilling program, the plant was optimized at 30% above nameplate and mining equipment was added and modified to support the new mining plan.
For 2017, we're back into grade streaming and operating with an elevated mill throughput that positively impacts our ounce production profile. Optimization of scheduling the new reserve and the associated life of mine will be the framework for the new business plan. This new life of mine allows for the improved Tropicana pit extraction rates, which improve gold production profiles from 2017 forward.
As you can see from the timeline, 2019 is when the initial cutback commences, but gold profile commenced changes in 2017.
So that's basically my final comments on the international operations, but I'd like to take a minute, as this being my last results presentation, I'd like to thank my colleagues at AngloGold Ashanti for an incredible journey through the last two plus decades, but most importantly, the last four years of my career.
Together we have managed to take this business, when many things went out of line -- the market, our costs, balance sheet, and on and on, and turned it into a world-class portfolio with an exciting range of future options.
In particular, I'd like to thank Venkat, for steering us through this volatile time. I believe we have come out of this challenging time stronger, more focused and with a very bright future.
I now hand over to Ludwig with great confidence that he will continue to build on the good work we've done in creating a framework for doing business that not only focuses on basic fundamentals, but also utilizes innovation to ensure we generate a healthy return for our stakeholders, while continuing to develop our long-term options.
Thank you. I now hand it over to Graham Ehm.
Graham Ehm - EVP, Group Planning and Technical
Thanks very much, Ron, and good morning all. It's been certainly quite a journey over the last 15 plus years that we've been working together, Ron, and I wish you all the best in your future plans. I'm sure you're not going to disappear from the industry.
Firstly, to our resources, and our reserves update. I'm pleased to report that the effort of our greenfields and brownfields teams have delivered a good result in 2016. Resources are estimated at $1,400 an ounce, and have replaced depletions of 4.4 million ounces, and have increased year-on-year from 208 million ounces to 215 million ounces.
Notable increases have been at several operations, including Mponeng, Tropicana, Sunrise Dam, in Brazil, at Geita and Obuasi, while there have been decreases at Kibali and some of the South African operations.
Reserves are again estimated at $1,100 an ounce, and have come close to replacing depletions of 3.9 million ounces. Reserves have decreased, year-on-year, from 51.7 million ounces to 50.1 million ounces, with notable increases at Tropicana, Brazil, and Sunrise Dam and a small offset from Kibali.
Venkat has spoken to value driving portfolio improvements. On the back of good brownfields exploration results, Ron has also spoken about a number of projects at several operations, aimed at improving margins, improving efficiencies and extending mine life. In Guinea, the Siguiri hard-rock expansion is now fully approved and is under way, now that the government completed the final steps to ratify the Convention de Base.
The project initially extends the mine life to 2023, producing around 300,000 ounces per annum at an all-in sustaining cost of around $900 an ounce. The capital cost is estimated at $158 million, $43 million higher than previously reported, as we had decided on an owner-build approach for the power station, as this reduces the power cost from $0.20 a kilowatt hour to $0.165 a kilowatt hour, including capital charges. And this increases the overall project value. First gold from the expansion is scheduled for quarter three, 2018.
At Sadiola, a joint venture with IAMGOLD and the government of Mali, is also planning a hard-rock expansion. The study is very well advanced and we're in detailed discussions with the government, regarding the mining charter and power supply. The project will add 10 years to mine life, producing 300,000 ounces a year at around $900 an ounce, at a capital cost of $409 million on a 100% basis.
Combined, these two projects deliver over 4 million ounces at significantly lower costs.
There are a number of other studies in the pipeline aimed at daylighting value from under-appreciated assets. At Gramalote in Colombia, the team aims to complete the optimization of the pre-feasibility study this year, and this will enable the resource to reserve declaration at the same time.
The project is already permitted, so it's a matter of optimizing the study, and proceeding to the feasibility study and project execution planning. As you know, Gramalote is a low-grade deposit, but it is in a favorable location, has a low strip ratio, very good and simple metallurgy, leading to low operating costs.
On a 100% basis, the project would produce about 350,000 ounces a year for 10 years. All-in sustaining costs are quite low, at $700 an ounce, and capital costs are in the order of $950 million. So the all-in cost basis would be about $900 an ounce.
At Obuasi, you would be aware of the illegal mining challenges during 2016. At the end of December, all illegal mining activity had been stopped in the operating footprint. Following a security risk assessment, it was concluded that the event leading to the declaration of force majeure no longer exists, and force majeure was lifted on February 13.
On January 7, a new Ghana government, the New Patriotic Party, was sworn in following the elections in December. The NPP was elected on a platform of pro-business, anti-corruption and development, including the redevelopment of Obuasi.
Our first round of interactions with the government has been extremely encouraging, with promises of support to lift any road-blocks hindering Obuasi's redevelopment. This includes assisting us to find a suitable joint venture partner should we need one.
Despite its challenges of the past years, Obuasi is a world-class ore body with 33 million ounces at 7 grams per tonne. In 2016, we continued mine planning and study work, examining a sizeable project based on the capability of such a large resource, and we've looked at a smaller-scale, lower-capital, earlier start option.
In 2017 we will progress this work, and we will progress other options to provide a lasting solution for Obuasi.
Mponeng also has a large resource of 50 million ounces, and a reserve of 12.5 million ounces at 10 grams per tonne. Chris has explained that the team have been working on a phased development strategy to extract the VCR and Carbon Leader Reefs, but the team has now assessed this approach, and have just completed a pre-feasibility study and a combined extraction approach using declines and trackless equipment.
This approach deals with some of the logistics and materials handling weaknesses of declines and trackless equipment, and is now looking more at shafts and a combination of declines.
This approach optimizes the project as a whole, and would set up Mponeng as a 450,000 ounce a year producer for over 20 years, with all-in sustaining costs improving to about $750 an ounce real.
Typically of these deep level projects, project execution occurs in parallel with ongoing production over a fairly lengthy period. The capital cost would be approximately $1 billion nominal, but is spread over 10 years, with a maximum capital spend of only $80 million per annum.
The work is now progressing to feasibility study, which is planned to be completed in the second half of 2018.
Now a few comments on Kibali. Kibali saw significant improvements in quarter four. On a 100% basis, gold production increased to 182,000 ounces, a vast improvement on the first half of the year. Gold production for the year was 586,000 ounces.
The all-in sustaining cost for the quarter was $825, and for 2016 was $893. You'll note a difference between the cost reported by AngloGold compared with that of Randgold, as we report on an all-in sustaining cost basis.
Underground production in quarter four was a record 454,000 tonnes, and mine grade improved as issues with stope execution and backfill were resolved.
The process plant performance was significantly improved with record tonnes milled due to a much improved operating time and stable operations on both the sulphide and oxide circuits. Recovery improved from lows of the first half of the year to 83.3%.
Early in the year, a trial on 100% sulphide identified weaknesses in the flow sheet. Additional fine grinding and concentrate leaching was needed, as well as a number of operational improvements. The planned modifications to add four additional fine grinding mills and expand the pump cell circuit are on schedule for commissioning in quarter two of this year.
Commissioning of the second hydro power station at Ambarau with 12 megawatts of capacity commenced in early February, and construction of the third power station at Azambi is about 10% complete.
This will provide Kibali about 42 megawatts of hydro power, which is generated at a cost of less than $0.02 a kilowatt hour compared with $0.28 for thermal power.
Off shaft development of the crusher and materials handling system is on track for commissioning on ore in quarter four this year. With the commissioning of ore production from the shaft, this will bring an end to Kibali's initial project scope and capital.
Finally, a few comments on greenfields exploration. AngloGold has a very good track record of discoveries, consistently delivering ounces at less than $25 an ounce. Greenfields exploration spend peaked in 2011 and 2012, and was rationalized following a drop in the gold price.
Greenfields spend in 2016 was $25 million, and we plan to keep the grass-roots spend at around $30 million per annum in the future, only increasing this for a drill-out of a significant discovery. We focus greenfields exploration in the countries in which we operate and have a significant presence.
Thank you, and with that I'll hand over to Christine.
Christine Ramon - CFO
Thank you, Graham, and good morning everyone. As you have heard from Venkat and my other colleagues, our strong operating and financial performance underpins our strategy to improve cash flows and returns on a sustainable basis.
Free cash flow has almost doubled compared to last year, allowing the Company to further reduce debt levels, self-fund our capital requirements, as well as resume the payment of the cash dividend to shareholders.
Moving onto the key metrics, the second half reflects a steady performance despite 4% lower production, which was impacted by 60,000 ounces of lost production due to safety stoppages in South Africa, planned lower-grades at Geita and Tropicana, and the Obuasi mine having been on care and maintenance for the full 2016 year.
Production during the second half of 2016 was 8% higher than the levels recorded in the first half, due to strong improvements from Kibali, Brazil and South Africa. All-in sustaining costs reflect an 18% increase on the second half last year, increasing to $1,058 an ounce.
Although all-in sustaining cost was overall favorably impacted by weaker local currencies in South Africa and Argentina, this was more than offset by lower ounces sold, inflationary pressures, and higher sustaining capital due to the usual higher spending patterns at our operations in the second half, as well as the delay in CapEx spend in the first half of 2016.
Our EBITDA margin improved by 1.6% from the second half 2015 to approximately 36%. Free cash flow for the second half of 2016, at $170 million, increased by more than 50% from 2015 on the back of lower finance costs and the higher gold prices received, despite negative working capital movements.
The net negative movement in working capital primarily related to the unsold gold lockup, increases in receivables relating to import rebates in Argentina, and pre-payments for the new power plant and truck fleet at Geita.
Our focus remains on improving margins despite gold price volatility, currency headwinds and lower grades. In looking at the space between the yellow cost bars and the orange gold price line, you can clearly see that this is a company committed to improving efficiencies and widening, or at least maintaining, margins, regardless of a lower gold price.
(Technical difficulty) all-in sustaining cost and all-in cost margins remain steady compared to last year, at 21% and 14% respectively. We will continue to look at widening those margins by focusing on the controllable factors, in particular stringent cost management, reinvestment in low capital, high return options within our business, and driving our operational excellence program, which looks to innovative ways to improve efficiencies in our operations.
Moving onto the cost performance. Looking at the detail year-on-year, we note that inflation, lower grades -- which was partly offset by higher volume -- and higher sustaining CapEx have pushed costs higher in the second half of the year.
In addition, environmental rehabilitation provision increases and other non-cash provisions further contributed to the all-in sustaining cost increase by approximately $21 an ounce in the second half of 2016.
The increase in the environmental rehabilitation provisions was due to changes in the assumptions around discount rates, and timings of cash flows.
Looking at the adjusted headline earnings reconciliation, the full year ended with adjusted headline earnings of $143 million, almost trebling in absolute terms compared to 2015's adjusted headline earnings of $49 million.
Headline earnings for the year was $111 million, which was $48 million higher than basic earnings, primarily as a result of the recycling of the historic foreign exchange losses of $60 million from the foreign currency translation reserve in the statement of changes in equity to the income statement.
We then adjust headline earnings for unrealized losses on non-hedged derivatives, fair value adjustments, bond premium costs, and certain impairments due to term and adjusted headline earnings for comparability purposes.
Adjusted headline earnings benefitted from weaker local currencies, higher gold prices received, and lower finance costs. This was offset in part by the decline in ounces sold, inflationary effects, and lower equity earnings from the Kibali and Marula joint ventures, as well as increased expenditure of about $5 million in respect of Gramalote.
The net impact of once-offs and non-cash movements, as detailed on the slide, results in normalized adjusted headline earnings of $130 million. This movement includes a deferred tax credit, arising in our South American operations, of $35 million due to the weakening of the Brazilian real.
Moving onto balance sheet flexibility, the net debt levels in the Group fell by a further 13% from last year, mainly due to the strong free cash flow generation on the back of lower interest costs and the higher gold price.
Going forward, we expect our positive cash flow momentum to continue to benefit from efficiency improvements as well as the leverage to gold price, despite currency headwinds.
We have fully redeemed the high-yield bonds on August 1, 2016, utilizing cash on hand and a draw on the US dollar RCF facilities to the extent of $330 million.
The outstanding balance on the US dollar RCF was $50 million at the end of December 2016. Going forward, we expect to save interest of approximately $105 million on an annualized basis, relating to the high-yield bond, although we will continue to bear interest at a much lower cost on any outstanding amounts under the Revolving Credit Facilities.
Our net debt to adjusted EBITDA ratio of 1.25 times reflects ample headroom to our covenant levels of 3.5 times net debt to adjusted EBITDA in terms of our Revolving Credit Facilities.
Our balance sheet therefore remains robust, with strong liquidity, sufficient undrawn facilities and long-dated maturities providing the financial flexibility required in the current volatile environment, whilst positioning the Company to remain self-sufficient with regards to our low-capital, high-return reinvestment opportunities, as well as to resume the payment of an annual cash dividend.
Moving on, the positive cash flow momentum over the past three years has given us comfort regarding sustainable free cash flow generation in our business, despite significant volatility in the gold price.
We see the resumption of the dividend as a positive catalyst. As Venkat mentioned, the declaration of the dividend, although modest at approximately $0.10 a share, reflects capital discipline, management's confidence in the ability to sustain free cash flow generation in our business, and our commitment to improving shareholder returns.
Our dividend policy is based on 10% of free cash flow generation pre-growth CapEx, subject to the Board's discretion, taking into consideration market conditions, the strength of our balance sheet and our future capital requirement.
Lastly, on the guidance for 2017, our production guidance of 3.6 million ounces to 3.75 million ounces for the year assumes a slow start-up in South Africa in the first half of the year, aligned with past trends, and no production at Obuasi for the full year.
The stronger average exchange rate assumptions in particular as it relates to the South African rand and the Brazilian real, together with the higher planned sustaining CapEx for the year, results in a higher all-in sustaining cost guidance range of $1,050 an ounce to $1,100 an ounce for 2017.
Both our costs and cash flows, as you are aware, remains highly sensitive to the average changes in commodity prices, currencies and production. We have provided indicative sensitivities on all-in sustaining costs and cash flows pre-tax, with a health warning, at the forecast average commodity prices and exchange rates provided.
Completing our total CapEx, our total CapEx is guided at $950 million to $1050 million, with 85% of that being sustaining capital.
The increase in sustaining capital relates directly to all reserve development at AGA Mineracao in Brazil, advancing the underground development at Geita, Kibali and Sunrise Dam, and increased deferred stripping at Iduapriem, clearly all of these with the objective of extending the mine lives, and improving either production, grades and recoveries at the relevant operations as noted by Ron earlier.
In 2018, we expect the sustaining capital to reduce to a level between 2016 and 2017's spend.
Graham discussed our growth projects earlier, and we estimate growth capital at between $120 million to $150 million for 2017, which relates primarily to the Siguiri hard rock project, including a power plant, Mponeng, and the Kibali plant upgrade and hydro power plants, as well as AGA's proportionate share of the funding for 2017 in respect of the Sadiola Sulphides Project.
The funding on the Sadiola Sulphides Project, as Graham mentioned, is $410 million for 100% of the project, and this is expected to commence only once the investment decision has been approved post the successful negotiation of fiscal terms and the necessary approvals that we require from the Malian governmental authority.
We currently estimating our share of the SSP spend to be $21 million for 2017.
I will now handover to Venkat to conclude. Thank you.
Srinivasan Venkatakrishnan - CEO
Thank you, Christine. This slide maps our actual production delivery against our annual guidance over the past four years. Despite uncertainty and headwinds, we have stayed within the production guidance range for each year.
Our operations remain the engine room of our business, and we continue to believe that predictable performance will ultimately assist us in improving our rating.
Robust planning, realistic forecasting and consistent delivery on commitments has been a pillar of our strategy. We will continue to redouble our efforts to ensure that this remains the case.
As we do every year, we have a clear idea of where our efforts will be focused on during 2017. Of course, safety tops the list, and we will continue to invest time and resources into ensuring that we make further gains in this regard, to build on our efforts over the past decade.
As you would have seen, we will have our work cut out for us in respect of our brownfields projects across our portfolio, which will set us up for a strong future. Therefore, ensuring flawless execution on this is critical.
We will also be ensuring that the longer-term step-out projects continue to move up the value curve at reasonable costs. This is imperative to our strategy, precisely because it removes us from the feverish bidding of assets that happens when many companies in the sector realize that their growth pipeline is bare.
We remain committed to investing in our asset base through the cycle, and not chopping and changing in this regard. Ludwig and Chris will both be working closely with the operational excellence team to find efficiency in every corner of the business. We will innovate, get back to basics and negotiate hard to ensure that we get the best and most sustainable margins possible in our suite of assets.
The integrity of our balance sheet remains absolutely central to our approach, and Christine will be ensuring that, at every step of the way, we have the best possible financial foundation to work in this regard.
We have today announced our return to dividend paying status, and our efforts will continue to be directed towards ensuring capital discipline, and that the owners of the Company are recognized for their patience and confidence they have shown in us.
Obuasi remains an area that needs to be addressed, and we ask for your patience in this regard as we re-enter the site, evaluate its condition, update our studies and restart talks with a new, progressive and business-friendly administration in Ghana.
Whatever the path forward for this asset, the environment for a lasting resolution that suits all parties is better than it's been for many years.
And finally, though we saw a good recovery in the second half of 2016, there remains work to do to consolidating emerging turnarounds in both South Africa and at Kibali, where we'll continue to work closely with our partners Randgold to ensure that this asset goes from strength to strength.
To conclude, we have a long-life portfolio that we continue to sweat for the best, highest return options, and we are fully geared to the gold price. We are a transparent management team that doesn't shy away from taking tough decisions. We have proven we can deliver in any market environment without turning to our shareholders to foot the bill.
We are focused on the right things, margins and returns over growth for its own sake. It's our true [naught], and we won't deviate from it. We have a strategy that is suited to any market, even one as volatile as the current gold market.
That strategy has helped us deliver a much-improved balance sheet that we believe is fit for purpose, and gives the flexibility we need, and we have a stakeholder model that has served us very well, though one which we will continue to look for ways to improve.
Thank you, ladies and gentlemen. I will hand you over to Stewart.
Stewart Bailey - SVP IR & Group Communications
Thanks. We'll take questions. If you could just identify yourself and the organization you're from. Thanks.
Patrick Mann - Analyst
Hi, good morning, it's Patrick Mann from Deutsche Bank. Just looking, kind of high level, at your portfolio, the Americas and continental Africa are doing very well, and in Australia and South Africa there's obviously higher costs and not as much cash generation as the rest of the business.
You've given quite a lot of detail in Australia on Tropicana and Sunrise Dam as the hard to improve grades, recoveries, production and presumably drive costs down. In South Africa, does it really hinge on Mponeng, and moving forward with that -- I mean, Christine said we're entering a five to seven year transitional period for South Africa.
What are you guys doing to improve the performance out of that region, and what does it look like in future? Thanks.
Srinivasan Venkatakrishnan - CEO
Thank you, Patrick. If I can make an overarching comment, and then I'll farm it across to Chris to cover.
South Africa still remains a big cash generator within the Group as you can see, year-on-year, and certainly the biggest driver in South Africa is volumes. If we can get volume and efficiencies right by reducing the cost base at the same time, it's a good cash generating machine.
But Chris will pick it up from here on. Chris.
Chris Sheppard - COO, South Africa
Thank you, Venkat. I think you've clearly seen Moab and Mponeng are the two strong cash generators within the South Africa portfolio. Of course, we're building on that with the work that we're doing on Mponeng Below 120 at this point in time, which does bode well for the medium- to long-term sustainability of that operation.
As far as Moab's concerned, we are progressing the pre-feasibility study around bi-plots, which is work in progress at this point in time. The areas of challenge remain both Kopanang and TauTona, for slightly different reasons.
Kopanang is a lower-grade operation which has had an extended life of mine at this stage, and is being challenged at this stage by lower productivity levels, which is imperative for a low grade operation that requires high productivities and high volumes. Obviously, that is a work in progress and the key focus at this point in time. It doesn't help having unnecessary safety stoppages, and I'm not going to dwell on that at this point in time.
At TauTona, we had a lot of disruptions flowing from safety incidents through the course of the year, which I alluded to in my presentation, and we believe that through the integration exercise that we are undertaking between TauTona, Savuka, and Mponeng, where we will in actual fact integrate what remains of the economic life of TauTona into Mponeng in the next 12 to 24 months, that that will bode well for that operation.
Stewart Bailey - SVP IR & Group Communications
Thank you very much. Derryn?
Derryn Maade - Analyst
Hi, good morning, it's Derryn Maade from HSBC. Sorry, I was a bit late coming in, and I'm just very disappointed that I'm going to have to wait another six months to hear Stewart read the disclaimer again.
I've got three questions, please. First one, just for you Chris, to build on what Patrick was talking about. Do you have any firm guidance on where Mponeng is going post the completion of Below 120, in terms of production levels, cost levels? What should we be thinking about in terms of that asset? You said it was going to be a tier one asset. What does that look like?
Then just the second question, potentially for Graham or Venkat. It's just in terms of the brownfields projects. Can you please give us some indication as to the hurdle rates that you're assessing these at, and where are the IRRs on your numbers at the moment?
Then just in terms of the greenfields projects, is there optionality with the copper-rich ore bodies -- I know you're looking at Gramalote first, but is there optionality with the copper-rich projects to pursue a potential disposal later on once they're up the value curve? Thanks.
Srinivasan Venkatakrishnan - CEO
Let's take the questions in the reverse order. We'll start with the returns and the hurdle rate, then move across to copper gold deposits, and then the final one coming across to Chris.
Firstly, in terms of returns, what we do is we actually take the cash flows from each of the projects. We build risk into it, and at the same time we handicap it for project risk and country risk. Typically, we are targeting in the mid-teens in terms of after-tax returns from those projects, and they vary from 15% up to 25%, 30%.
I know there's a case there for brownfields projects to go lower, but generally we stick at that level above it. That's not the only measure we look at. We look at what it does in terms of our all-in sustaining costs, to the portfolio, to the cash flow, payback period -- it's a mixed bag.
But in terms of returns, very focused that it's got to be in the mid-teens, plus.
In terms of our copper gold deposits, certainly Nuevo Chaquiro is the one you are referring to. It is further behind in terms of the work which we need to do as compared to Gramalote, but it's certainly not off the radar screens. We are continuing to do work in that regard.
At that stage, I'll pass it across to Graham and Ron to pick it up.
Graham Ehm - EVP, Group Planning and Technical
I think it was on South Africa, was your next question, Derryn (multiple speakers) --
Ron Largent - COO, International
I mean yes, it is -- it's primarily a copper deposit, and we're just early on. We've completed what we call a conceptual study. At that stage you'd move it into a pre-feas and get ready to see what the permitting and the details for the plant -- but yes, it's always been our plan that we explored it, we found it, and then you've got to take it up the curve a while and have it get to proper market condition. It would definitely be something that would be marketable, but we don't have a plan in 2017 to necessarily get there.
Chris Sheppard - COO, South Africa
Right, maybe if I can just respond a bit on the Mponeng piece. In terms of its tier one asset, some people say it's 400,000 ounces per annum through to 500,000 ounces per annum, and that's the ballpark where we see the Life of Mine Extension project going, in that sort of area.
That definitely extends the life of mine by some 30 years if an investment is made, and that decision, as I said early on, would take place in 2018.
In terms of unit costs of production, I think I'd steer you towards our actual results for 2016, where Mponeng came in at $1,011 per ounce. I think it would be fair to say that we're projecting unit costs of production lower than that.
I'll just say that at this point in time, okay. What else is there to say about it? I think that's it. That's the key issues.
Derryn Maade - Analyst
Thanks very much.
Stewart Bailey - SVP IR & Group Communications
Alright. Steven?
Steven Friedman - Analyst
Hi guys, Steve Friedman from Renaissance Capital. Just a question -- you put up a slide showing sustaining CapEx levels over the next five years, and production staying flat or rising slightly -- it looks like 4 million ounces by 2021, while sustaining CapEx peaking 2017, coming down to a level roughly -- it looks like $500 million.
Just two questions on that. Is that a guided steady-state sustaining CapEx level for the Group? The reduction looks like it's coming predominantly from SA and continental Africa, but South Africa looks like it's falling to almost nothing.
What does that say about your levels of production going forward for the other assets, excluding Mponeng?
Then thirdly, at that sustaining CapEx level of $500 million, what sort of life of mine could we look at from a Group perspective? Because we have 2021 -- what happens further out at that sustaining CapEx level if it is your sustaining CapEx level?
Srinivasan Venkatakrishnan - CEO
I think if I can pick that up at a high level, really the focus in terms of giving CapEx guidelines has been illustrative going out over the next five years. The sustaining capital does peak as we go in and invest in some of these brownfields projects, and bear in mind that the only two projects that are excluded from sustaining capital are the one in Siguiri and Sadiola.
Everything else, Geita, Brazil, what we are doing in terms of Tropicana, Sunrise Dam, Iduapriem, everything comes in through in terms of sustaining capital.
So as far as we are concerned, the big uptick in production comes in in 2018 onwards, driven by Kibali going underground. That's a big uptick in that regard. Then Siguiri coming on-stream, and Sadiola coming on-stream, and Geita picking up as well. They are the key drivers as to what pushes the production up.
We haven't given guidance out beyond that level. Also, bear in mind that there are some currency assumptions which pull the sustaining capital down. These are nominal numbers, so obviously there's a currency play there where weakening currencies have been built into the forecast going out into the future. This is based on consensus, in that regard.
Stewart Bailey - SVP IR & Group Communications
Right, I think that pretty much sums it up. I thank you all for your time and attention, and we look forward to seeing you back here in [May].