Stewart Bailey - SVP, IR and Group Communications
Good morning everybody and welcome to our results for the fourth-quarter and full-year 2015. (Conference Instructions).
Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, total cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and outlook for operations, individually or in the aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of our exploration and production projects and completion of acquisitions, dispositions of JV transactions, our liquidity and capital resources and capital expenditure, and the outcome and consequence of any potential or pending litigation or regulatory proceedings or environmental health and safety issues, are forward-looking statements regarding our operations, economic performance and financial condition.
These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct.
Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social and political and market conditions, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending and future litigation proceedings, and business and operational risk management.
For a discussion of such risk factors, refer to our annual reports on Form 20-F filed with the SEC. These factors are not necessarily all of the important factors that could cause our results to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse material effects on future results. Consequently you are cautioned not to place undue reliance on forward-looking statements.
We undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on our behalf are qualified by this cautionary statement.
This communication may contain certain non-GAAP financial measures. We use these measures and ratios in managing our business. These measures should not be viewed in addition -- or should be viewed in addition to and not as an alternative for, the reported operating results or cash flow from operations, or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly-titled measures other companies use. We post information important to investors on the main page of our website and you should look at it.
As usual today, the line-up, we have Venkat with some introductory remarks. Chris Sheppard will look at our South African operations' performance over the quarter and the year. Ron Largent will do the same for the international operations. Graham Ehm will look at our exploration and projects. And then Christine will have a look at our financials, again both for the quarter and the full year. Venkat will wrap it up. Thank you very much.
Srinivasan Venkatakrishnan - CEO
Thanks Stewart. Good morning ladies and gentlemen. It gives us great pleasure to stand before you today and present our fourth-quarter 2015 and full-year results.
The highlights of these results include consistency around meeting our production guidance, beating our cost estimates, delivering free cash flow and sharp reduction in our net debt levels, all of which despite falling gold prices and, importantly, some very good brownfields exploration successes from within our portfolio. You will recall that since 2013 we had implemented a number of initiatives and self-help measures, and these results show the cumulative benefits of these efforts and measures, as you'll see shortly.
Starting with the strategy, everything we do has to be linked to that. To recap, our strategy, which was launched in 2013, has at its core delivering sustainable cash-flow improvement and returns, which in turn we believe will drive shareholder value both in bear and bull markets. And this is supported by five simple business objectives that have helped us do the job well over the past three years.
Firstly, a strong foundation, which is built on safe production, best people and a well-enshrined sustainability model. Second pillar, placing enormous importance on balance sheet strength and flexibility. Third, focus and delivery on production improvements, cost management and relentless capital discipline. Fourth, managing and improving our portfolio quality consistently. And finally, remembering that mining is a long-term gain and therefore value-adding growth remains important, and therefore ensuring that we keep long-term optionality firmly on the radar at an affordable cost. I'll outline some of our successes later on during this presentation.
Now if you look at this slide, we are one of the gold industry's geographically-diversified companies, with around 25% of our production coming from South Africa, and three times that amount coming from our international operations. As Christine will elaborate during her presentation, we offer very good leverage to gold prices, weakening currencies and oil prices, and this therefore positions us very well in the current macro environment.
For the fourth quarter, our production of close of 1m ounces -- but bear in mind it's our strongest quarter -- at an all-in sustaining cost of $860 an ounce and all-in cost of $960 an ounce, all came in significantly better than our guidance. Costs also improved 14% year on year. For the full year 2015, production of 3.95m ounces came in at the top-end of our guidance. All-in sustaining cost of $910 an ounce and all-in cost of $1,001 an ounce was also a beat on guidance. Equally importantly, we generated good free-cash flow for both the fourth quarter and the year and we applied it to further slash our debt levels, which currently stands at 30% lower than the same time last year.
Looking back a year ago, we were certainly not the mining industry's most indebted company by any means. But we are the first one to commit to a range of self-help measures to lower debt from internally-generated cash, without diluting shareholders.
As you can see from this slide, we've delivered on most of our self-help measures, such as margin improvements, cost savings through the business, significant brownfield exploration successes with Obuasi and Colombia being work in progress. There is still work remaining at Obuasi, which Graham will cover a bit later in his presentation.
In Colombia, given depressed market conditions for early-stage greenfields projects we are rationalizing our annual spend whilst work continues to move these projects up the value curve.
Safety continues to remain our top priority, with the biggest challenge at our South African operations, which accounted for 80% of the fatal accidents for the year. And you'll recall South Africa had a very bad safety performance during the third quarter of last year.
During the fourth quarter we unfortunately lost two colleagues, [Peter Reinar-Meynar] at our engineering electrical unit in South Africa, and that was the fatality which we had in South Africa, and Mr. George Baffour at our Obuasi mine. And our heartfelt condolences goes to their respective families and friends.
Whilst we made great strides in reducing injuries across our whole portfolio, as evidenced by the improvement in our all-injury frequency rate, we continue to devote significant effort and resources in realizing the next-step change of the improvement that is needed in this critical area of our business and strategy. And Chris will elaborate on some of the measures in his presentation.
Our focus remains on high-margin or quality ounces rather than an absolute production number. As this table that compares 2015 full-year results with last year -- with the year before that, shows that we faced considerable headwinds from an 8% drop in gold price combined with lower production arising from a below-par performance from our South African operations due to safety stoppages and loss of production from Obuasi and Cripple Creek & Victor.
Notwithstanding this, our costs dropped by 11%, EBITDA margins were improved, free cash flow was up, net debt reduction targets were met. Whilst our cost reduction and efficiency measures helped keep a lid on local inflation and production changes at our respective operations, the tailwinds from our currencies and fuel provided us with the additional mitigation that was needed.
Looking back at our journey over the past three years back to 2013 start, our all-in sustaining costs have dropped by 54% from the peak that was seen in the fourth quarter of 2012. They've come down from $1,597 an ounce to $860 an ounce.
On that note, I'll hand the microphone over to Chris.
Chris Sheppard - COO, South Africa
Thanks Venkat. Good morning ladies and gentlemen. Standing here three months ago I stated that the key issues that needed attention were unsatisfactory safety performance that saw unprecedented impact on the business and the constraints we saw in immediately stope-able face-length, which reduced our mining flexibility. I was also clear that if we succeeded in addressing these issues, we would see an uplift in production performance this year, but it would take much of the fourth quarter to recover from these stoppages and challenges, with the full benefits only evident in the new year.
Well, I'm pleased to be able to show that Q4 saw our all-in sustaining costs improved to ZAR451,000 a kilogram. And you see here a double-margin kicker, with improved costs taking place against a backdrop of an average gold price that has climbed to around ZAR505,000 a kilogram.
This performance was underpinned by higher gold sales as opposed to pure production during the quarter and also the move out of the higher winter power tariffs we see each year. You'll also be aware that we saw the benefits of the weak exchange rate although, to be clear, that the rand only really fell sharply in the last few weeks of the year. We will be the beneficiaries this year of higher dollar gold price and the significantly weaker rand.
Turning to the operational performance of our South African operations, improvements in safety achieved during the quarter saw return of stability and consistency to our operations, though it's worthy to note that the real recovery from safety interruptions that hit quarter three came at the end of quarter four, as we had flagged. That's why you see similar production levels quarter on quarter.
Mponeng improved its production levels by some 13% (sic -- see slide 13, "15%"), in line with the de-risked plan we put in place over the last three quarters to address the seismicity challenges we have experienced. This resulted in the pleasing 2% reduction in all-in sustaining cost to $959 per ounce.
Regarding the Below 120 project, the 123 level section continues its production ramp up to expectation and the completion of 126 level infrastructure and support work is also continuing to plan. Operational readiness for the phase two access to the lower carbon leader reserve below TauTona is also progressing, with a pre-feasibility study approved to evaluate the merits of increasing the project footprints on the lower carbon leader as well as co-extraction of the VCR from the same shaft-deepening infrastructure platform. We expect to see the study result by the end of this year.
Next door to TauTona, we saw a steady performance reflected in the 13% improvement in all-in sustaining costs to $957 per ounce. Our technology project also demonstrated significant progress through last year, with successful deployments of our latest-generation reef-boring machine at the TauTona lower carbon leader shaft pillar. Preparations are now at an advanced stage for the deployment of reef-boring technology at the Savuka carbon leader shaft pillar project.
Turning to our Vaal River operations, we saw Moab Khotsong continue to focus its efforts on establish face-length in the middle area of the mine as we migrate resources from previously seismically-damaged workplaces in the Great Noligwa section of the mine. All-in sustaining cost there improved from quarter three, to $997 per ounce.
Zaaiplaats remains on hold, with our option study that has resulted in approval for a pre-feasibility study to proceed and anticipated completion by the end of 2016.
At Kopanang we continue our work on addressing previously reported face-length efficiency. That delivered a 27% increase in total meters developed and a modest 7% increase in tonnage mined.
Our surface sources returned a similar performance to Q3. You will recall that we took steps to improve recoveries at both uranium and gold, by reconfiguring the treatment plants at our mine-waste solutions, in order to float off the uranium first and then perform the carbon-in-leach gold extraction. In line with that initiative, we will see the first of two floatation streams recommissioning in quarter two.
Lastly, it's pleasing to note that months of ore reserve position and face-length mined position have shown an overall improvement quarter on quarter.
Progress has been made on all four pillars of our revised safe-production strategy. These are around improved knowledge and skills, working on critical aspects of behavior and attitude, optimizing our work planning and, most critically, removing people from risk. It's important to note that the single biggest shift from the previous safe strategy is the work being done on knowledge and skills.
It's accepted in the South African region executive team that this critical aspect requires more prominence and focus from us and that it will take time and effort to achieve excellence in this regard. It is, however, a critical enabler to unlocking success in most other areas and achieving safe, sustainable production. Mponeng is a pilot site for many of our safety initiatives and we will be closely tracking progress there.
So turning to 2016 priorities, the first and most pressing of our key priorities up for the year is to put an end to the fatalities by improving workplace conditions and behaviors. We will look to create stability and control across the portfolio, focusing on ore reserve development and face-length available and stope-able.
We're pushing hard to ensure full implementation of the P500 cost reduction and continuous improvement framework, and associated projects, which will, firstly, modify the operating model and drive out off-mine cost reductions, where we're looking for ZAR500m of benefit for this year; secondly, de-bottlenecking the business; and thirdly, securing labor productivity improvements.
The Mponeng Below 120 phase one project delivery remains critical in the short to medium term, while the work I mentioned on phase two underpins the longer-term optionality for Mponeng. The outcomes of P500 project will also be crucial in this regard.
Our significant commitment to our technology program will remain driven by a focused project management team fully integrated with the TauTona operational management team and guided by rigorous stage-gate mechanisms as we refine our research and development efforts.
In closing, we're seeing some pleasing momentum starting to develop across the region and I remain confident that we will deliver the 10% uplift in performance over last year's numbers.
I'll now hand over to my colleague, Ron Largent, who will report on the international operations. I thank you.
Ron Largent - COO, International
Thank you, Chris, and good morning ladies and gentlemen. I will provide some detail regarding our quarter-four 2015 operating results for Continental Africa, Australia and the Americas region, and discuss some of the work streams that earned our way to develop the optionality within the portfolio. As usual, I won't go into the detail of the quarterly results because they can be found in the quarterly report.
As I stated last quarter, I think you'll agree that this slide is compelling around the outcomes that have been achieved by focusing the operations and relentlessly driving efficiency across the portfolio. Now with three years of data to support us, we can illustrate not only the effectiveness but I believe the sustainability of the process that we've implemented.
We commenced the project to improve our efficiencies throughout the international operations in late quarter 2012, which can be seen on the left-hand side of the graph. As this graph illustrates, we saw a first step change in early 2013 and then a second step change in 2014. Now we've put together four quarters in 2015 that indicate another step change to less than $850 per ounce all-in sustaining cost.
We believe the foundation that has allowed the improvement shown on the slide have been ingrained in our operations and are the framework for the next set of operational efficiencies. Overall the international ops, which account for about 70% to 75% of total production within AngloGold Ashanti, have continued to improve margins even with the reduced gold price.
I first presented this next slide in quarter two 2015 to illustrate our journey, compared to the global gold industry. Our objective was and still is to continue to move our outcomes to the left-hand side of the slide. I believe you can see that it's been a transformational move for the Company from the highest quartile in 2013 to below industry average in 2015. All-in sustainable costs for AngloGold Ashanti in total were $910 in 2015. This is below industry average of $938. For the international ops 2015 was completed with all-in sustainable costs of $822 an ounce.
I want to remind everyone that our cost management work over the past three years has been focused on individual sites around all aspects of operations, including but not limited to procurement improvements, strategic planning, mining contract renegotiations, manning levels, capital management and of course operating efficiencies.
To unpack the numbers at a high level, the all-in sustainable cost of international operations has reduced by about $300 per ounce since 2013. In this three-year period we can categorize it into three general groups, currency about 30%, fuel and power about 15%, cost management and efficiency net of inflation about 55%.
I think just one last comment -- this is the slide that I use across the entire international group -- from 2013 to 2014 the industry reduced costs at an all-in sustainable cost of about $92 an ounce. AGA reduced it by $175. From 2014 to 2015 comparison the industry reduced by $52 an ounce. AGA reduced it by $110. I think I say this reflects our focus on cost management over the timeframe.
Now for just a quick review of the international operations for quarter four. International group produced 745,000 ounces at a cash cost of $619 per ounce and all-in sustainable cost of $786.
To highlight a couple of areas of performance, Geita had another strong quarter in quarter four, producing 139,000 ounces at $465 (sic - see slide 19, "$480/oz") cash cost. The Americas region for the year 2015 had a strong delivery of 831,000 ounces at all-in sustainable costs of $792, an 18% year-on-year cost improvement. Tropicana mine produced its 1m ounce of production in quarter-four 2015 and as per the investment plan 2016 grade reductions are being actively interrogated. The Kibali mine had a strong quarter with 69,000 ounces attributable production at $603 cash cost. This all while production ramp up continued throughout the year.
I'd like to highlight one of the operations, so the next slide is the Geita underground. Each quarter I talk about one or two individual assets that I believe are changing. I'd like to highlight the work at Geita. In January the first round was detonated that commenced underground mining in this asset. The mining of the Star & Comet ore structure will consist of decline and incline access to known remaining high-grade structures. First ore was delivered to the mill from the activities as the structure was exposed in the depleted open pit. The current resource that we're planning to mine averaged 6.2 grams per tonne.
This underground project is the beginning of our work to extend mine life and is also being done in a self-funded manner, in line with our Group strategy. This additional resource can be perceived as not being really relevant to the Geita mine as, I guess, the volume is not big, but I think it's real relevant when it comes to us looking in the future and changing the mining method at Geita.
Our real target is the next slide, is the Nyankanga and actually Geita Hill resource. This current work will set the stage for the future valuation of potential development of the underground mining in Nyankanga and Geita Hill deeper ore bodies. You can visually see on the slide the resources we've identified under the open pit design at Nyankanga. As you can see, there are indicated inferred resources already defined. This is our longer-term future of the Geita operation, along with continued brownfields exploration for surface mining sources. We're actually quite excited about 2016 and getting an underground operation going at Geita.
The last slide is 2016 priorities. I won't go through each one of these in detail, but I want to show the optionality that we have throughout our operating assets. The Sunrise Dam and Siguiri work will be discussed by Graham, following me up here. These are two of them that are actively being planned and implemented, so he will take them as projects.
At Tropicana, down-dip and long-strike extensions to the existing ore bodies are being defined by drilling that will allow mine planning options for the reduced grade profile that we currently see. We're in the middle of understanding these options and our objective is to address our current reduction in grade.
I just discussed the Geita underground in the previous slides and at Iduapriem brownfields drilling continues with successful results that have allowed for a considerable reserve addition in 2015, and planning the extraction sequence is progressing.
In Argentina we've completed an agreement with a neighboring landholder that allows us to explore the known structures that are contiguous to our existing operations.
In Brazil, Serra Grande, the development of the high-grade Inga ore body is on schedule for first-ore delivery in the second half of 2016. Drilling will continue on the second high-grade ore body, Palmeiras [Sul] in 2016. These higher-grade systems are the reason AngloGold Ashanti purchased our JV partner ownership in 2012.
And then at Cuiaba in Brazil we continue to define successfully the high-grade satellite ore bodies and in hanging wall and footwall of our known systems. This allows us to reduce our drop-down rate, which impacts cost, and also reduces the development cost per ore tonne metric.
I think that you can see that we have many options, opportunity and potential outcomes within our suite of assets in the international operations.
So with that said, I will turn it over to Graham Ehm. Thank you.
Graham Ehm - EVP, Planning and Technical
Thanks Roland. Good morning all. Today I'll cover our 2015 resources and reserves statement, some exploration results and I'll provide an update on some of our studies and projects.
Firstly, in regard to reserves, our reserves at the end of 2015 were 51.7m ounces compared to 57.7m 12 months ago. Reserves are calculated at an $1,100 per ounce gold price; the same as last year.
Key changes this year have been the Cripple Creek & Victor sale and depletions of 4.3m ounces. Half of our depletions this year have been offset by gains at Iduapriem, at Obuasi, at Sunrise Dam and other mines as a result of exploration success and mine optimization.
Our resources at the end of 2015 were 207.8m ounces compared to 232m ounces 12 months ago. For 2015 we have reduced the gold price at which we calculate our resources from $1,600 to $1,400 an ounce. Key changes have been the disposals at Cripple Creek and at Mongbwalu and depletions of 4.9m ounces. There were gains at Obuasi and Sunrise Dam, with offsets at Geita in South Africa and at Colosa.
In regard to Sunrise Dam, over the years I've spoken to Sunrise Dam quite often. Sunrise continues to show strong potential. Over the last few years, the mine has fully transitioned to underground mining and the underground mining rate has increased from 1m tonne per annum a few years ago to 2.8m tonnes in 2015. And the annualized rate in quarter four was at 3m tonnes per annum.
Costs have come down considerably, from well above $100 a tonne to $45 a tonne. Exploration has continued to be successful and as recently returned 11.7 metres at 15 grams, nearly 5 meters at 350 grams and 10 meters at 15.7m grams from the Cosmo, Vogue area. Deeper, the Carey Shear, continues to grow with recent drilling.
The strategy being pursued at Sunrise Dam is to increase the milling rate to 3.6m tonnes per annum, which would match the milling capacity. And while doing that we will continue to grow the resources and reserves, particularly at Vogue. And at Sunrise Dam over the last four years, net of depletions, resources and reserves have continued to grow in the underground resource.
To decrease costs we are looking at an underground crusher and incline conveyor direct to the mill. There's also scope to increase recovery by up to 5% through flotation and fine grinding. This would sustain Sunrise Dam as a 250,000 to 300,000 ounce per annum producer and reduce its all-in costs to under $900 an ounce. We expect to complete the study work later this year, leading to a decision in early 2017.
Turning to Brazil, last quarter we reported good results at Cuiaba in Brazil. This has continued this quarter with good results on the Serrontinho load, including almost 9 meters at 38 grams per tonne. The drilling has grown the resource by 238,000 ounces and improved confidence to indicated in some parts. The footwall quartz veins have also added 235,000 ounces to resource and drilling this quarter returned narrow but very high-grade intercepts, including 0.8 meters at 156 and 1.43 at 137 grams per tonne.
Ron commented on the consequence of those sorts of results, which would increase the ounces per vertical meter and also decrease the rate of development -- the depth of development that would be required to sustain a production rate.
Turning to Siguiri, in Guinea our first-grade controlled drilling has been completed on the Kami pit. And this returned better than expected results, with very consistent grades of 3.5 grams per tonne over 30 to 35 meters, which leads me on to the Siguiri hard-rock project. Siguiri has always been an oxide operation and the hard-rock project involves adding hard rock crushing capacity to the front of the process plant, to treat the fresh and the transitional ore, which contains about 1.6m ounces.
The feasibility study is completed and front-end engineering has commenced. The project extends the mine life from 2019 to 2023 and opened significant potential from satellite pits. Annual production would be maintained at 300,000 ounces per annum. And all-in costs would be less than $900 an ounce. Capital is about $115m over two years and project returns at $1,200 an ounce are good at 24%. We expect to give the project the full go-ahead by mid-year when all the required consents and approvals are in place.
Now turning to Obuasi, at Obuasi we were disappointed that Randgold withdrew, as we believed we could successfully develop that mine together. In withdrawing, Randgold commented that the project didn't meet their investment criteria, a pretty tough 20% at $1,000.
So we have now refocused our efforts on three fronts. Firstly, we are optimizing our feasibility study to decrease upfront capital, especially in mine development, to reduce operating costs and improve our recoveries based on recent test work and based on recent engineering. We expect to finish that work by mid-year. We're working with the Ghana EPA to undertake a thorough environmental review process for the redevelopment. We expect this to take us into the second half of this year. Thirdly, we are working with the government of Ghana to agree an investment-development agreement which will define and stabilize the fiscal conditions under which the project would operate.
With these three elements in place, we will have a full investment package to offer any prospective development partner.
More recently, you have probably seen from our press release and from the media, that there has been an incursion of several hundred illegal miners, or galamsey, in the northern part of the mine. To provide some context to this, illegal mining was causing considerable disruption in mining operations across Ghana and in early 2013 the government implemented a program to remove the galamsey from legal mining tenements across the country, including at Obuasi. Through the Chamber of Mines, the industry entered into an agreement with the government to provide ongoing security support to supplement our own efforts to secure our property and our mining leases.
On January 30 at Obuasi there were incursions in the northern part of our operating footprint. This was turned back by the security forces. The tenement map in this slide shows the area of the lease and the location at which the illegal miners are, at the northern end of the mineralized corridor. The mining lease is quite extensive and we have applied to the government to reduce the tenement size by some 60% of that area in the slide.
The red circle shows the mineralized corridor which covers the main Obuasi resource and the area where the galamsey are active is right in the north of the Kado area. At this point the action by our security people and with the support of the police has quarantined their activity to that area.
Unfortunately on February 2 the supplementary security forces were withdrawn and this was followed by a larger incursion on February 6. Very sadly, when our people retreated, when confronted by an aggressive mob, our Communications Manager, John Owusu, also known as Big John to his friends in Ghana, was fatally injured when he was struck by a vehicle that was retreating from the incident.
As the situation was volatile we took steps to remove all non-essential people from the mine. We have kept government stakeholders updated on developments and every step of the way as we've engaged with the authorities to the highest levels for the re-establishment of law and order and for the removal of illegal miners from the site. Our priority is a safe and peaceful resolution to the current situation.
Last Monday a high level delegation was sent to the site to evaluate matters and we await formal feedback from that visit. We're hopeful of a resolution very soon, but at this stage we are continuing to work with the police to prevent expansion of the galamsey beyond the north.
Thanks very much and with that I'll had over to Christine.
Christine Ramon - CFO and Executive Director
Thank you, Graham, and good morning everyone. As you've heard from Venkat and my other colleagues, we continued to deliver on our self-help measures reflected in the strong set of results again beating market consensus views. These improved metrics, together with the lower debt levels, have resulted in improved free cash flow generation in the Group, providing the much needed flexibility in the current environment. I'll now talk through our fourth quarter's and full year's performance, and conclude on the outlook for 2016.
Our geographic diversification continues to differentiate AngloGold Ashanti from the majority of its peer group, providing resilience in a volatile market. With the exception of the dollarized environment in continental Africa, we realized benefits which cushion the effect of the lower gold price in South Africa, Brazil, Argentina and Australia. Together these comprise the remaining two thirds of our production.
We note that even though the gold price has declined by 8% in the past year, on a production-weighted basis, the Group has realized a 30% increase in the gold price when taking our currency exposure into account. We remain sensitive to changes in our currency basket and the oil price, and we issue the following sensitivities with a health warning. For every $10 per barrel change in the average Brent crude oil price, it impacts our cash costs by approximately $8 an ounce. And for every 1% change in our currency basket, it impacts our cash costs by approximately $6 an ounce.
Moving, on, despite a falling gold price since the fourth quarter of 2012, we've been able to steadily reduce our all-in sustaining costs and all-in costs per ounce, through relentless focus on cost control, portfolio improvements and operational excellence. All-in sustaining costs has been reduced by approximately $735 an ounce from the quarterly peak and all-in costs has been cut by more $1,200 per ounce over the same period. Our margins have improved through the cycle, reflecting a 3% improvement in our all-in sustaining costs margin compared to last year at 21%.
Moving on to our key metrics, quarter four delivered a strong operational and cost performance, with production and cash costs beating guidance. Year-on-year production declined due to the disposal of CC&V, Obuasi's move to limited operations, South Africa's disruptions linked to safety stoppages and the grade-related reduction in contribution from Australia.
Both the cash costs and all-in sustaining costs for quarter four, at $663 an ounce and $860 per ounce respectively, are the lowest since 2012 and reflects the benefits of our cost savings initiatives, weaker currencies, lower oil prices, favorable inventory movements and lower sustaining capital spend. All-in costs for quarter four were $959 per ounce.
Despite 3% lower adjusted EBITDA at $388m for quarter four, margin improved to approximately 38% compared to a little under 33% in 2014. Free cash flow for the quarter at $160m improved significantly as a result of lower all-in costs. We also saw tax and VAT refunds, which together amounted to $36m. We had favorable inventory movements of $35m and of course the lower financing cost, benefiting from the repurchase that we did of about 62% of our high-yield bond.
Moving on, if we look at the cost performance in detail year on year, we note that efficiencies were key to delivering the improvement in cash costs for the quarter compared to last year as the favorable currency effects were offset by inflation and lower volumes and grades. All-in sustaining costs per ounce was $145 lower in quarter four compared to last year on the back of lower cash costs, lower sustaining capital and favorable rehabilitation and other non-cash effects.
In particular the lower sustaining capital benefited from favorable currency effects, mine plan adjustments at Iduapriem, resulting in lower deferred stripping and lower ORD development in the ESA region, impacted by the safety stoppages that Chris spoke to. The lower deferred stripping together with favorable currency effects can be banked as permanent savings and the ORD in South Africa is regarded as a timing issue.
Moving on to the next slide, I'm not going to talk to this slide in detail other than to say that the full year ended with adjusted headline earnings of $49m or $0.12 per share compared to an adjusted headline loss of $1m last year.
As indicated at the bottom of the slide, we normalize the adjusted headline earnings for deferred tax rates, prior-year adjustments, inventory and other provisions for comparability purposes. Adjusted headline earnings was mainly impacted by the 8% decline in gold price. We also saw lower ounces sold and inflation increases whilst it was offset in part by weaker lower currencies, lower oil prices and the improvements in operating costs and lower finance costs that we spoke to.
So on financial flexibility we see that the $890m net proceeds received on the disposal of CC&V in August 2015 helped reduce the net debt levels in the Group by approximately 30% compared to last year. We have now reached our target net debt to EBITDA ratio of 1.5 times through the cycle and we compare very favorable to our peers. The ample headroom to our covenant levels of 3.5 times to adjusted EBITDA, the strong liquidity position that we have, sufficient undrawn facilities and long-dated maturities provides the financial flexibility in the current volatile environment.
Moving on to the cash flow slide, we see that our self-help measures have benefited our free cash flow generation and for the first time since 2011, we have been free cash flow positive. And this is on an unadjusted basis after all costs and taking CapEx into account. On an adjusted basis, when we exclude certain once-off payments relating to the bond offer repurchase premium that we had to pay in 2015 and in the prior year, the Obuasi retrenchments and the Rand Refinery loan for two consecutive years, we have been free cash flow positive.
Going forward, we expect this positive cash flow momentum to continue, benefiting from the efficiency improvements as well as the leverage to currencies and the oil price. Furthermore, we will be significantly reducing the spend in Colombia to approximately $44m in 2016 reflecting AGA's attributable share whilst retaining optionality on the projects there. As Graham mentioned, we will be proceeding to secure an investment package for Obuasi and the related spend in this limited operations space will be reduced to approximately $70m in 2016.
We have saved about 30% on our annual interest bill by repurchasing 62% of the high-yield bond last year. We continue to see the option on the high-yield bond at the end of July 2016 as an opportunity and we will keep all options open in this regard. Hence, we will prioritize further de-leveraging in 2016 with the aim of further optimizing the interest bill in order to improve free cash flows in the Group. We are focused on creating a platform to deliver sustainable returns to our shareholders whilst pursuing incremental growth opportunities.
So finally, on the outlook slide for 2016, our production guidance of 3.6m to 3.8m ounces takes into account the disposal of CC&V, Obuasi in limited operations phase with no production planned, the planned reductions in Geita and Tropicana according to the mine plan that Ron spoke to which is expected to be mitigated by the recovery in South Africa. Please take note that the first half in South Africa factors in a slower start up post the festive season as well as the Easter break. No production disruptions, power shortages or changes to the asset portfolio have been factored into the outlook.
On cash costs, we've guided $680 to $720 an ounce and all-in sustaining costs $900 to $960 an ounce, which takes into account the revised exchange rates and oil price outlook as well as the lower production guidance and grade variances. Capital expenditure of $790m to $850m includes project capital of $120m to $140m relating to Siguiri, Kibali underground and Mponeng with 85% of CapEx in 2016 relating to sustaining capital.
So lastly, in order to align with our industry peers in South Africa and in the UK as well as reduce costs and keep the focus on value-adding business initiatives, AngloGold Ashanti will be moving to half-yearly reporting. We will continue to provide the market with updates on selected key data on a quarterly basis. However, the full interim financial reporting will now be done on a six-monthly basis. We will continue to engage with the market in this regard.
I will now hand over to Venkat to conclude. Thank you.
Srinivasan Venkatakrishnan - CEO
Thank you, Christine. To wrap up, if you look at the slide, for the past three years, we have quarter by quarter, brick by brick built a track record of consistent performance and delivery, despite formidable headwinds. And believe me, every time we complete one quarter and the graph is the right way around, big sense of relief.
This slide tracks our actual production and cost performance versus our market guidance and you would have seen for 12 consecutive quarters, we've either met or we've beaten the production and cost targets. This is also the first time, you'll recall, that AngloGold Ashanti has met its annual production and cost targets for three consecutive years.
Our to-do list for this year is a busy one too. Top priority is to turn around the safety and operational performance at our South African operations where we are targeting a 10% year-on-year improvement on the operational front.
We'll continue to target efficiency and cost improvements within the business to further improve margins and cash flow which will be applied prudently to further scale back debt. Importantly, these efforts will not slack despite the recent improvements seen in the gold price and the weakening of exchange rates.
Despite currently not being in production, Obuasi will occupy a disproportionate higher weighting in our list, where the next steps include optimizing further our feasibility study and securing the full package of regulatory consents and approval needed before we proceed to search for the joint venture partner for development.
Despite the recent security incident, which Graham elaborated on, given the most recent proactive feedback we have received from the highest levels within the Ghanaian government who are keen to preserve Ghana as a favorite investment destination, I'm cautiously optimistic of demonstrating further progress this year on this large reserve asset that is highly geared to the gold price.
At the end of the day as managers of this business, our job is to manage and improve the quality of our mining asset portfolio. This important slide shows how we monitor and evaluate our portfolio. Key for our operations is to move up and to the left.
As you'll see from the slide, we've been successful in improving the quality of our continental African, American and Australian operations within the business. And this year we'll start to see the benefits of our efforts on the outlier, our South African operations, start to yield both production and cost improvements, thereby pushing these closer to the international operations.
We have a strong investment case with several catalysts, which we are methodically ticking one by one.
We have a high-quality portfolio of long-life gold assets with very good leverage to gold price with high margins, energy and currencies. We are a transparent and decisive management team that is focused on delivery and returns. This is a team that comes out and tells you this is what it's going to do, goes away does it, comes back and sets a higher hurdle for the next round of improvements.
We continue to prioritize margins over production growth with relentless cost and capital discipline. Our decisive actions to date have provided us with the much needed balance sheet flexibility that this industry needs right now.
Finally, when I stood before you last year, I said that I felt optimistic about the prospects of this business and this has been proved right a year later. I see little reason why this optimism should wane during 2016.
And on this note, thank you, ladies and gentlemen. I'll hand you back to Stewart.
Stewart Bailey - SVP, IR and Group Communications
All right. Questions, just your name and organization. We'll start with Kane and then Derryn.
Kane Slutzkin - Analyst
Good morning. Thanks. It's Kane Slutzkin from UBS. Just on, Christine, just on the ForEx, there's obviously been a strong tailwind in, at least in the short term it's very strong and maybe even in the medium term, but when do you expect to see that margin being eaten away by inflationary pressures in those local jurisdictions, maybe not Australia, but South Africa and the Americas?
And then Venkat, just on more top-level strategy. You mentioned the priorities, de-leveraging still. Could you maybe just touch on your thinking on capital allocation and whether dividends has been something you've been thinking about? You've obviously got a bit of free up in capital given that you don't have CC&V and you're also not proceeding with Randgold.
Christine Ramon - CFO and Executive Director
Yes. Thanks for the question, Kane. I think importantly is we don't actually give sort of long-term outlooks apart from the outlook that we've actually just provided for the year ahead. And you can see that in the outlook we have got weakened overall exchange rate assumptions as well as the oil price assumption. I think quite importantly, and this is what we were really trying to say, it's not -- so clearly when you expect the exchange rates to pull back, it does actually have an impact on inflation and it has an impact on the gold price.
So I think quite importantly in our operation there is actual flexibility. Ron has actually spoken to the efficiency improvements. Chris has actually got a challenge for the coming year. And what we've demonstrated to you in our cost slide is that in essence the benefit from the exchange rates have actually offset -- the volume and grade issues and the benefit from the exchange rates have actually been -- have offset each other. And importantly is the efficiency improvements that we actually see.
So we do actually have flexibility in our business. We don't actually only rely on the benefit of the exchange rates and the oil prices. And I think certainly it is a challenge for the business going forward, if you actually see some of that reversing, but hopefully we'll actually see benefits coming back on the gold price as well.
Stewart Bailey - SVP, IR and Group Communications
Yes. Maybe Ron can comment on what are you seeing on the ground there in terms of costs?
Ron Largent - COO, International
Well, I will tell you the way I've managed this is we work in local currency and hold each country accountable for a local currency, so you don't get into the just seeing a benefit from an exchange rate.
And I also say with losing CC&V out of the portfolio, the impact of the oil price isn't as big as it used to be because they're still controlling price in Argentina/Brazil. By the time we get oil to a site in Africa, the price of oil is 30% to 40% of the price to the delivery. And it showed because I think you showed $6 per $1 -- was that what you said? We used to show $10.
And that's why I state it, Christine states it, there is a currency benefit. So we don't want -- we're not taking that as an efficiency benefit. But I think that the key is we're showing that we've taken plus 50% out of pure efficiency and cost management, and that's got to be the push.
So for me continue to work in local currencies, deal with the inflationary piece there and let the currencies come out really on our reporting at the end of the day. It's a good position to be in and we understand that it can turn, but we're trying to prepare ourselves so that's not driving our work or driving our opinion that we're having success in cost management.
Srinivasan Venkatakrishnan - CEO
In very simple terms, it's the same principle. You are running down an escalator coming up. You better run faster if you want to get down to the bottom.
Going back to your question on capital, I think capital discipline is front and foremost on the agenda. At the end of the day every spare dollar generated by the business competes across a number of wants, and certainly dividends is one such want. And we basically see where is the best way to apply that extra dollar. Currently certainly in terms of debt you get the best bang for the buck.
In terms of philosophy for dividends, yes, it's got a place in our investment case and we would want to get back to dividend declaration. But it's got to be a consistent dividend. It shouldn't be volatile every time the gold price moves up or down. And importantly we do not want to borrow money to pay dividends. That would be a disaster and it's a wrong capital strategy.
Long-term vision, whenever operations come to present a project, what we'd like to see is the first slug from the revenue line being a percentage which goes to the shareholders, even before royalty and the cost comes through. That's the long-term objective of getting there.
Stewart Bailey - SVP, IR and Group Communications
Derryn.
Derryn Maade - Analyst
Thanks. Good morning. It's Derryn Maade from HSBC. Just two questions. Chris, firstly, on South Africa, 10% targets or the improvements in production volumes that you're targeting, is that a constrained to one asset? Is that focused on Mponeng or is that more generally across the portfolio?
And then just the second question was not easy when someone next to you steals your question, but maybe I could just expand a bit on Kane's question and that was along the lines of medium-term strategy. And I think what's very clear with regards to the direction of the Company is in the short term, and that's de-leveraging, relentless focus on operational performance, which has been delivered, as you've rightly pointed out. But maybe just in terms of what's beyond that horizon, what's the two to three year horizon? Where are the priorities then? How do you see the direction of the Company evolving along those lines? Thanks very much.
Chris Sheppard - COO, South Africa
Just firstly, it's across the whole piece, the whole region, every single operation. You will recall earlier on in 2015 we had significant safety related stoppages which impacted all our business units and the trick for us is to in actual fact become unstoppable, from a safe production point of view. Just also recall that we actually lost some over 2 tonnes of gold last year out of safety stoppages and that's what we need to arrest in the year ahead. Secondly, is the de-bottlenecking within specific areas of our business units and to also return better efficiencies and productivities.
Srinivasan Venkatakrishnan - CEO
If I can pick that question on strategy here, you're absolutely right; it may come across as us trying to prioritize the short term vis-a-vis the long term which is not the case. And that's why in every action which we take we look at what the long-term implication is. But in reality what you've got to do is to balance between the debt you can sufficiently carry and the asset portfolio, which is what we have done thus far.
Looking at a two to three year view and even beyond that, if you look at incremental opportunities that exist, quite a few from within our mine sites, whether you look at Sunrise Dam, whether you look at Geita, whether you look at Siguiri. We are going back to look at whether we can come up with a low-cost capital option, in terms of Sadiola as well. We are getting good promising opportunities in Brazil and Argentina.
But if you were to say longer term growth for the Company, and I'm looking beyond a five to seven year horizon, that has to come from Colombia, where we have potentially got the option to unlock the entire reserve base of the company coming from one single jurisdiction. And that for us is where the long-term price is. And on the South African side it's basically on the technology side, but that would be more incremental. So that's the directional trajectory which we are heading towards.
Derryn Maade - Analyst
Thanks very much.
Stewart Bailey - SVP, IR and Group Communications
Thanks. Adrian and then Allan.
Adrian Hammond - Analyst
Morning. It's Adrian Hammond, Standard Bank. I'd like to ask a question about your strategy around South Africa. 18 months ago you planned to unbundle these assets. How has your thinking changed? Is that still on the agenda? And would you potentially not want to sell these assets at current record Randgold prices?
Srinivasan Venkatakrishnan - CEO
Adrian, you never say never. But at the end of the day our focus is basically getting the best out of the portfolio. And the focus certainly right now is to deliver that 10% improvement in the South African asset portfolio which gives you a very good performance both in terms of production and also in terms of cost. That's where the priority right now is to get to the best value in terms of our existing asset base. You never say never in terms of any portfolio changes for the right price, so you keep all options open. Whichever option gives the best value for the shareholders, that's what we'll pursue.
Adrian Hammond - Analyst
And just on the balance sheet then for Christine, have you come to any ideas or options around the remainder of the high bond that you would like to restructure and drive your balance sheet to offer some more flexibility?
Christine Ramon - CFO and Executive Director
Look, we obviously do keep in tune with all options that are on the table in the market. I can't talk specifically to the strategy because as you know market conditions have actually changed quite significantly from where we were actually last year. So I think at this point of time, like I said, we're really seeing the high-yield bond as an option at the end of July. And I think the real focus is how do we actually bring down the interest bill in the Group and improve free cash flow generation. So it's more the cost of debt around that that's the issue at this point in time, so.
Adrian Hammond - Analyst
Thanks. And just lastly, for Graham, on Sadiola, you haven't removed the reserves relating to the sulfides project that you had some time ago and it would look to me now that you've actually run out of oxide. So firstly, how long will it take should you progress ahead with that project to access that ore? And what will you do in the interim between now and then? What is the mining plan? Thanks.
Ron Largent - COO, International
I'll talk about the oxide piece first. We've got right now a two year plan of oxide delivery in front of us and we have a small brownfield work going on right now to continue working on that. We've been successful in keeping that one creating a cash flow over the last two years. So you're right, you remember over time, we were supposed to be done by now.
When we make that decision, it will be based -- the timing is based on the time to construct, if we can go and do something similar like we're doing at Siguiri, putting on a front-end to the current plant and the ore availability is basically right there. We have very limited time it takes us to get into the sulfide material. It's one of the things we've been successful in the last year, so it's through the strategically redesigning the ore. Before it had like a 100m tonne strip. It was quite a large strip that needed to be done. That doesn't need now to feed it. So we make a decision when we get the numbers and the ore delivery is not the constraining issue.
Adrian Hammond - Analyst
Thanks.
Stewart Bailey - SVP, IR and Group Communications
Could you just pass it down to Allan, if you wouldn't mind? Thanks.
Allan Cooke - Analyst
Hi. It's Allan Cooke from JP Morgan. Just to put some numbers to some of the answers, if you don't mind. Chris, in SA that 10% improvement in operating performance you talk about, does that mean we should expect more than 1.1m ounces of production this year from SA at all-in sustaining costs of closer to $400,000 a kilo? Is that right or --
Chris Sheppard - COO, South Africa
You'll find us coming in at 1.1m ounces.
And costs, it was a good question you asked me then. I think the important bit, as I mentioned in my part of the presentation, it is a Project 500 initiative to actually target the $500m of off-mine costs which fundamentally changes the business and our future optionality around our future projects. That's a key point that I would make. On top of that at each of our business units, every single general manager is now being held to account to actually deliver a suite of cost reductions and production enhancements and de-bottlenecking of the business. So we'll see what happens at the end of the year.
Allan Cooke - Analyst
Okay. And then just briefly on the technology. I know in the past you were looking at rolling out prototypes at other mines and I don't know if you've been set back, but you've changed the program for new technology and you're not rolling it out to some other sites now. Are you slowing down with that or is it just a refocus of that project please?
Chris Sheppard - COO, South Africa
Definitely not slowing down. Definitely a refocus. On the small diameter machines down in the Vaal River area, we have put that on hold because the nature of the rolling reef meant that we weren't actually drilling out enough of the reef band itself. We've actually changed the technology to that of thermal spoiling -- spalling, rather, sorry, and we're actually seeing some early success. And I remain cautiously optimistic about that, but it's still early days.
As far as reef boring technology is concerned, obviously we've focused everything on the TauTona shaft pillar and that's showing pleasing progress. And most recently, we're actually preparing now to get ready for the Savuka pillar on the Carbon Leader. Obviously the VCR is not higher grade enough to actually make it a business case at this stage.
Allan Cooke - Analyst
Thanks very much, Chris. And then just a last one on the numbers.
If your net debt was lower, Christine or Venkat, would you consider paying a dividend? Because your net debt to EBITDA has reached your target 1.5 times now, when do you start considering dividends? When your net debt to EBITDA gets to $1b? When you've taken out the rest of that expensive corporate bond? Just so that as we move through this year at higher Randgold prices or, let's hope, higher gold prices and your net debt comes down with your free cash flow, when should we start penciling in that dividend?
Srinivasan Venkatakrishnan - CEO
I think it's good question, Allan and what we don't want to do is to lock ourselves into one particular timeline for providing dividends. Our strategy is to under-promise and over-deliver. So we are not locked into a particular number or particular time. It's obviously a function of where the gold price trends are heading as well and the free cash flow generation. But rest assured we're getting closer to a dividend distribution as every day goes by. That's the best we can commit at this stage.
Stewart Bailey - SVP, IR and Group Communications
Right, I think that's more or less it. Thanks everybody for your time and we'll do this all over again in -- sorry, Johann were you going to ask --
Johann Steyn - Analyst
If we can get one more question.
Stewart Bailey - SVP, IR and Group Communications
Sure.
Johann Steyn - Analyst
Hi. Johann Steyn from Citi. Just very quickly on Obuasi, we have to ask about that. It's drained a lot of cash, Venkat, since 2004, another $70m this year. Let's say for instance that you do go through this study now, the final tweaks to it, and you don't get something that's compelling, it's marginal, what do you then? Is there something you continue to try and hope that sometime, someday will get right for this mine or will you able to walk away from it? Will the Ghanaian government allow you to walk away from it?
Srinivasan Venkatakrishnan - CEO
I think at the end of the day I don't want to make any assumptions at this stage because we are privy to what the studies are showing, so it's rather premature to assume that we can't make the returns meet, Johann. That's point number one.
And point number two, I think the comment I would make with regard to the Ghanaian government was that a number of people said you're never going to be able to get the Ghanaian government to agree to all retrenchments and going into limited operating state. They did agree at the end of the day. So let's not speculate. Let's see what happens this year. That's the best we can say right now.
Stewart Bailey - SVP, IR and Group Communications
All right. Everybody, thanks very much. We'll see you again in six months.