  • Stewart Bailey - SVP IR and Group Communications

  • Good morning, everybody and welcome to AngloGold Ashanti's Q3 results with a much diminished crowd here. I gather it's a busy news day. We'll do our effort -- we'll make every effort to be as quick as possible. I'm just going to read the Safe Harbor while everyone's getting arranged here, and then we'll talk through the itinerary.

  • Certain statements contained in the document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and outlook of AngloGold Ashanti's operations, individually or in the aggregate, including achievements of project milestones, commencement and completion of commercial operations of certain of our exploration and production projects and the completion of acquisitions, dispositions or joint venture transactions, liquidity, capital resources and capital expenditures and outcome and consequence of any potential or pending litigations or regulatory proceedings or environmental health and safety issues, are forward-looking statements regarding our operations, economic performance and financial conditions.

  • These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied in these forward-looking statements. Although we believe that the expectations reflected in these statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct.

  • Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social and political and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, and business and operational risk management.

  • For a discussion of these factors, refer to our annual reports on Form 20-F filed with the US SEC. These factors are not necessarily all the important factors that could cause our actual results to differ materially from those expressed in these forward-looking statements. Other factors could also have material adverse effects on future results and consequently, you are cautioned not to place undue reliance on forward-looking statements.

  • We undertake no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after this date or to reflect the occurrence of unanticipated events, except to the extent required by law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or persons acting on its behalf are qualified by these cautionary statements.

  • The communication may contain certain non-GAAP financial measures. We use these measures and ratios in managing our business. These measures should be viewed in addition to, and not as an alternative for, reported operating results or cash flow from operations, or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies use. We post information pertinent to the financial performance of the Company on our website under the Investors tab and you should consult that.

  • (Conference Instructions).

  • Today you'll see that Christine Ramon, our CFO, is not here. Christine's father unfortunately passed away and she is attending his funeral in London. She'll be back tomorrow and it is unfortunate she couldn't be here, but our thoughts are with her and her family today. Pardon me, on Wednesday.

  • Venkat is going to talk through an introduction of the business. Chris Sheppard will talk about South Africa, South Africa's operating performance for the quarter. Ron Largent will take over our international portfolio, then Venkat will follow Graham Ehm, who will talk about projects and he'll talk through the financial performance of the company, before adding some concluding remarks. Venkat.

  • Venkat Venkatakrishnan - CEO

  • Thank you, Stewart, and good morning, ladies and gentlemen. Can you hear me? Okay.

  • I'm pleased to stand here and present another strong operating and financial performance for the third quarter, and if you recap, when we launched our strategy, close to three years ago, we said our approach here is to deliver improvements and sustainable free cash flow and returns, and it's built on five pillars, the first pillar being the foundation in terms of safety, sustainability and people. Then it's around balance sheet flexibility, then managing and optimizing all forms of our costs, both using cost-saving initiatives and operational improvements, and then effectively improving the quality of our portfolio. And finally, the fifth pillar, that mining is a long-term game and we want to keep our optionality intact.

  • In the past 33 months we have been proactive and decisive, despite pretty challenging conditions, gold price included. Over this period we have consistently delivered operating performance and delivered on our objectives. We've been decisive on our actions in terms of our operations and notably the balance sheet. The cost performance speaks for itself. We have improved the quality of the portfolio and we have brought in optionality from in and around our existing mine sites, whilst keeping the long-term option firmly in focus.

  • As you can see from this presentation and this slide in particular, the team at AngloGold Ashanti have been very busy during the quarter as we continue to deliver on the commitments we made for this year, principally focused on deleveraging the balance sheet through a range of self-help measures, as we continue to weather a very increasingly volatile market.

  • If you look at the production across all metrics and cost performance they are better than guidance, but largely thanks to the effort of our international operations once again. During the quarter, we completed the CC&V sale process and we immediately deployed the cash from that sale to reduce debt and here full thanks should go to Charles, Ria, Ron and Christine for making the sale happen, and to Christine and Rob for reducing the debt by about 25% through a very successful tender offer on our expensive bond. Obviously they've got a large team working with them that enabled it to actually materialize.

  • In September, we announced our intention to form a joint venture with Randgold to redevelop Obuasi and realize its full potential. We are working very hard to [consume] the joint venture early next year.

  • Next slide. Turning to safety, Chris will cover some of this detail in his presentation, but it's suffice for me to say that we had a very bad quarter in South Africa on safety. The fatalities during the quarter were unfortunately spread across our operating units in this region. The last time we have had five fatalities such as this was in the third quarter of 2012.

  • What is clear is that we need to redouble our efforts if we are to return to our strong safety performance of the last two years, so our focus here is improving compliance to procedures and systems, and influencing the appropriate behavior, both in terms of the workforce and at the supervisory level. The standards are there. The procedures are there. We have got to get everyone to follow that meticulously.

  • On the brighter side, other safety metrics have certainly shown the right trend. The all injury frequency rate has improved 12% quarter on quarter and the lost-time injury frequency rate has improved by 16%, but these can never compensate for the lost five lives.

  • Continental Africa maintains a very strong quarterly cost and production performance, and it's reflected in the safety performance as well, as we have seen, Siguiri, Iduaprem and Sadiola go injury free for the quarter.

  • As the table shows, we have continued to manage our controllable variances despite a sharp year-on-year drop of 12% in the gold price, which is outside of our control. Looking at our normalized production level, and here we normalize it for CC&V and Obuasi going into limited operating phase, so that we compare apples and apples, the 5% shortfall in production was primarily due to South Africa.

  • But even in South Africa, where we lost 20% of our planned production to safety stoppages, both enforced and self-initiated, we came in very close to what we produced in the second quarter of this year, showing what the latent potential in this business is if we can get our safety record to where it was same time last year.

  • We have certainly done well across all aspects of costs, and while lower gold prices and volume flow through to the bottom line, we have kept our EBITDA margin steady and posted modest free cash flow after stripping out the impact of the bond take out.

  • With those introductory comments I now call upon Chris to update you on our South African performance.

  • Chris Sheppard - COO South Africa

  • Thanks Venkat. Good morning, ladies and gentlemen. At the outset I'd like to address the key issues that have impacted the South African region performance in Quarter 3 and, I might add, are being addressed in Quarter 4, so as to deliver an uplift in 20 16.

  • The key issues are, firstly, an unsatisfactory safety performance that saw unprecedented safety stoppages and resultant loss of life and production, and secondly, a constrained immediately stope-able face length resulted in a lack of mining flexibility.

  • A thorough review of the five fatal incidents for the quarter has focused our management attention on the following areas. One, the knowledge base of critical skills and supervision need attention as we seek to improve the overarching level of compliance to standards in our operations. Secondly, addressing safe behavior patterns of supervisors and work teams through the entrenchment of established worker teams, combined with safety leadership from our management teams. Thirdly, entrenchment of key critical hazard controls as we further seek to improve the levels of safety compliance in our operations.

  • Besides the 48,000 ounce impact of safety stoppages on our operational output, mining volumes were further constrained by less than adequate stope-able face length, which was impacted upon by consequences of seismic damage to workplaces or reserve development delays and geological features.

  • Concerted efforts are under way to address the underlying issues in this regard, which should manifest improvements in this regard, moving into 2016. These measures include increased resourcing and performance management of teams to equip the requisite face length; that is stope panels to provide the necessary flexibility to improve production team efficiency.

  • Secondly, critical ore reserve development oversight to ensure timeless delivery of ore reserve blocks for commencement of stoping operations, and thirdly, a heightened focus on quality of initial stope ledging operations to ensure future efficient stoping operations.

  • The successful implementation of these measures will see an uplift in production performance moving into 2016, and it's important to note that recovery from Quarter 3 stoppages and their challenges is only taking place through Quarter 4, and the full benefit will only be evident in the new year.

  • Right, this presentation would not be complete without referencing the 2015 gold sector wage negotiations. After the longest negotiation process on record, we succeeded in signing a wage agreement during the quarter with the NUM, Solidarity and UASA, who represent the majority of our employees, and thereby we extended the agreement to our AMCU affiliated employees.

  • I believe it's important to note, from the slide, that despite the widely publicized demand for ZAR12,500 per month wage, that our settlement delivers a total monthly guaranteed pay package, inclusive of medical and retirement contributions, of exactly that. AMCU has appealed the Labor Court judgment upholding our right to extend the 2013 agreement to AMCU and we await the outcome of that appeal somewhere between now and Quarter 1 of 2016. It must be noted that this legal process is totally separate from the recently reported judgment relating to the reinstatement of dismissed AMCU members, the content thereof which we are still studying to determine our further response.

  • Although the slide focuses on our category four employees, it should be noted that miners, artisans and officials agreed to an increase of 6% on standard rate of pay in year one and 6% or CPI, whichever is the greater, in years two and three.

  • Yes? Thank you. Mr. Technology. Good. Thank you.

  • All right, turning to the operational performance of our West Wits mines, Mponeng has stabilized its production levels in line with the derisk plan implemented over the last two quarters, to address the seismic challenges. The reduction in planned extraction rates in specific areas has shown an improved seismic response, and the learnings from our recent seismic related fatality has seen our seismic monitoring and response protocols improved to further ameliorate the effects of seismicity.

  • Regarding the below-120 project, the 123 level section has commenced a production ramp-up to expectation and the completion of the 126 level infrastructure and support work continues to plan. Activities relating to the operational readiness for the phase two project, access to the lower carbon leader reserve below TauTona, is progressing, while we review options to extract further value from the below 120 footprint.

  • Turning to TauTona, despite the regrettable seismic-related fatality during the quarter, it must be noted that TauTona celebrated a lifetime achievement of 3m fatality-free shifts in its 58-year history, during this quarter. TauTona delivered a modest improvement in efficiencies with ore reserve development performing to expectation.

  • And then the technology project, within AngloGold Ashanti. This has shown significant progress during 2015 and in this last quarter has seen the successful deployment of our latest generation of reef boring machinery at the TauTona lower carbon leader shaft pillar. We've seen reef boring cycles of 159 hours per hole, improving through Quarter 2, and achieving close to 82 hours per hole during Quarter 3, and this in relation to our blueprint of 72 hours per hole, a most pleasing development that continues to receive focused management attention.

  • We have furthermore succeeded in developing our ultra-high strength backfill product, to the point where we are able to pump the product over the required 1,000 meter distance, a prerequisite for a full production mining cycle.

  • Turning to our Vaal River operations, Moab Khotsong performed relatively well, despite volume deficiencies related to the three fatalities in the district. Concerted efforts to establish face length in the middle area of Moab continue, as we migrate resources from previously seismically damaged workplaces in the Great Noligwa portion of Moab mine.

  • The Zaaiplaats project continues to be on hold while an option study is underway at present and will, by the end of Quarter 1 2016, conclude whether to proceed with a prefeasibility study through 2016.

  • Regarding Kopanang, Kopanang has been impacted upon by face length deficiency, which has negatively affected ore production. This is now systematically being managed back to normality and recovery in this regard will be evidenced in 2016. Obviously the previous comments made relating to safety stoppages and the impact thereof apply equally in the case of Kopanang.

  • And lastly, the previously reported progress and benefits of the restructured Vaal River district continue, while we actively seek to reduce the overall surface footprint of the district.

  • All right, then turning to surface operations, our surface operations consist of the hard rock, marginal ore dumps, or MODs, and our tailings retreatment mine waste solution business. MOD production was characterized by an overall drop in grade, as planned production migrates to lower grade resources over time, coupled with short-term grade fluctuations as we move into new production area MODs.

  • Key focus continues with regard to debottlenecking surface transport logistics, flowing from changed centers of gravity of production, the screening of MOD materials being introduced towards the end of the quarter, thereby increasing the grade reporting to our treatment plants.

  • Volumes of material treated through mine waste solution has improved through the quarter, but the plant recoveries have continued to disappoint. A decision has been taken to reconfigure the treatment plant to float off the uranium first and then perform the carbon and leach extraction, and thereby improving the overall recovery of uranium and gold. The changeover is under way at present and the first of two flotation screens will be recommissioned in Quarter 1, 2016.

  • I'll now hand over to my colleague, Ron Largent, who'll report on the international operations. Thank you.

  • Ron Largent - COO International

  • Thank you, Chris, and good morning. I will provide some detail regarding our Quarter 3 operating results for continental Africa, Australia and Americas region, and also discuss some critical work streams that are under way to develop the optionality within the portfolio. As usual, I'll not dig into the details, as these details are contained within the quarterly report.

  • Before I get into each regional outcome for Quarter 3 I'd like to reflect on some of the trends that we've seen in the international portfolio over the past two years. Since we embarked on our drive to improve efficiency and not only navigate this volatile low gold price scenario, but prove that we can actually thrive in this environment, for the past two years I've asked you to watch the numbers on a quarterly basis and make your own decision whether we're providing an effective and sustainable cost management profile.

  • This slide, as I stated last quarter, I think we can all agree that it tells a compelling story around the outcomes that have been achieved by focusing the operations and driving the efficiencies. Now, with more than two years of data to support us, I think we can illustrate that not only that it's been effective but it's also sustainable, within the processes we've implemented.

  • As we saw our first step change in early 2013, and then a second step change in costs in 2014, we've now put three continuous quarters to drive our all-in sustaining costs to less than $850 per ounce. We believe the next step in managing and improving these metrics is defining detailed metric management at each site.

  • The foundation we've put in place has allowed the improvements shown on this slide, and have been ingrained in our operating strategy and have set the foundation for our next operational efficiency improvements. Overall the international operations account for 70% to 75% of the production and have continued to improve margin even in this reduced gold price.

  • I first presented this slide last quarter to illustrate our journey and how we compete internally and compares to the global gold industry. The data is from publicly available information. As you can see, we think it has been a transformational move for the international set of assets. We've moved from top quartile in 2013 to lower quartile in 2015. Our next step is managing cost and improving these efficiencies, is currently being defined and planned. For 2015 the international ops has taken another $100 per ounce off the all-in sustaining costs from the 2014 base. This is even greater if you compare it to previous years' outcome.

  • The international operations group performed well on all production-related metrics in Quarter 3. Production totaled 702,000 ounces, which is a 7% reduction, compared to Quarter 3 2014, as Venkat explained, with an associated $826 per ounce, a 14% reduction in sustaining costs in Quarter 3, compared to Quarter 3 2014.

  • Now, if we briefly touch on each regional component, Continental Africa, production for Quarter 3 was 349,000 ounces, at cash costs of $687 per ounce, compared to 410,000 ounces at a cash cost of $799 in Quarter 3 2014. The reduction is primarily due to -- it was anticipated with the reduction at Obuasi and our anticipated grade reduction at the Siguiri mine. Geita mine had a very good quarter, 138,000 ounces, at cash costs of $483 per ounce. And the Kibali mine, of course operated by Randgold, had another strong production quarter, producing 72,000 attributable ounces, at $658 per ounce.

  • In the Americas region production for Quarter 3 was 219,000 ounces at cash costs of $570 per ounce, compared to 195,000 at $700 (sic - see slide 18 "$702") per ounce in Quarter 3 2014. The numbers I just gave you did not include any of Q3 CC&V production.

  • Ounce production from Brazil totaled 148,000 ounces at $538 per ounce. This is a considerable improvement from the 133,000 ounces at $724 one year ago. And even though, in Argentina, with the inflationary pressures, the operation had a 15% improvement from Quarter 3 2014 at 71,000 ounces and had cost improvements of 4%, even with the inflationary challenges we face.

  • Australia, for Quarter 3 2013 (sic - see slide 19 "Q3 2015"), was 134,000 ounces at $718 cash cost, compared to $861 cash cost for Quarter 3 2014.

  • Sunrise Dam, I think I'll make a little comment again, as we continue to put this through transition, its underground production annualized at 2.75m tons per year. This is aligned with the plans for increased ore extraction from the underground operation. The mine tonnage is critical for establishing the future mine plans and asset capability. Quarter 3 production, however, was impacted by ore grade reconciliation differences.

  • At Tropicana, 83,000 attributable ounces at $500 an ounce was produced. This asset is producing at the designed throughput and cost assumptions. Just early in the fourth quarter it produced its millionth ounce of production at that mine site.

  • The next slide, I won't go through this in detail, but it's each individual asset is either being analyzed for improvement, there's mine planning, there's drilling, there's projects, and I'd like to touch on a few of these. At Sunrise Dam in Australia, I touched on that, but I think the change from open pit to underground was our challenge. I think the metrics we've been able to put in place from the site by the reduction in mining unit cost by 40% and increasing to the 2.75m tons per annum underground rate, was critical. We did have a challenge this quarter in reconciliation, but we were able to get, develop on top of the (technical difficulty) deposit and put our first fan of drill drilling through that resource. The initial results are very encouraging.

  • At Tropicana, like we've stated for some time, the regional exploration program continues to fulfill life of mine improvements and right now there's a very different scenario planning of backfilling to really optimize the mining unit cost. It's critical to the future cost management at Tropicana.

  • Siguiri mine in Guinea, the priority work is around access to area one, for reserve drilling, which is a community and government affairs priority. The prefeasibility has been completed on the hard rock project and now finalizing feasibility. And then with that comes the optionality work on the remote ore bodies of [Cuncun] and [Serio].

  • At Geita I think there is a critical step being made. We're mobilizing the underground contractor for the Star and Comet ore bodies in Quarter 4. This is the commencement of underground work at site. It continues to, I guess, create the leverage we needed to start evaluating the deeper Nyankanga ore bodies and the Geita east potential.

  • At SerraGrande -- we sometimes don't speak of SerraGrande, but it's -- there's considerable work going on to change this asset. The Inga ore body, we will be producing ore out of that by mid-2016. It's 1,000 meters below the surface and it's the same type of geological system the Mina III, which was the backbone of the SerraGrande mine for the past 20 years, high grade quartz veining. And then the definition of the Palmeiras Sur ore body, which is a sister structure to the Inga ore body.

  • And I think the last one I'll touch on is the Iron Quad or Cuiaba. Great results in 2015, but I think the most exciting piece there is identification of hanging wall ore bodies which are quartz veins and they can be in the hanging wall or the foot wall that change our drop-down rate considerably which help manage operating costs. And with that we're confirming the vertical continuity way down below the 20 level which gives mine life into plus 10 years at that operation.

  • So I guess with that said, my intent there is to show that there's considerable work going on, considerable optionality. And last quarter I touched on the Colombia work. We've reduced costs. In 2015 we're in all reality cutting them in half again our plans into 2016 but what we are doing is maintaining the optionality.

  • I think a critical path or a critical decision point is being made right now. We expect the environmental permits for Gramalote in Quarter 4 and we've competed pre-feas. We'll go back and rework pre-feas but we have time to make an investment decision which is what we call under a condition precedent, which we have about three years. So we're not committing to an investment but I think being the first large scale mine within weeks or whatever being permitted in Colombia is a very successful program.

  • So with that said, I will turn this over to Graham Ehm.

  • Graham Ehm - EVP Planning and Technical

  • Thanks, Ron. Today I'll cover projects, a little bit on studies, and speak to some of the exploration results from brownfields. Firstly in regard to Kibali, Ron has already spoken to the strong production performance at Kibali which is mostly from the KCD and Mengu Hill open pits. Underground production is ramping up on plan via the declines and will then be via the shaft coming in in 2017.

  • The shaft sink was completed in July and the shaft fit-out is expected to be completed in the first half of 2016. Off-shaft development of the crusher and loading systems will then follow, with production hoisting commencing in 2017.

  • Commissioning of the second hydropower station at Ambarau has just commenced and this will bring on 10 megawatts of hydropower. The detailed design of the third and final hydropower station at Azambi has just commenced and that would add another 10 megawatts.

  • In regard to Colombia, I won't say too much. Ron has covered the progress on the studies. But overall Colombia provides a significant opportunity for the longer term -- in the longer term for AngloGold. However, in the current environment we are reducing our spend rate, while preserving our optionality for the future.

  • At Colosa, work is in progress with the (inaudible) mountain options at various scales, including options to start small and grow over time. And technical work at Gramalote is progressing well. We're optimistic that work on several fronts is sufficiently encouraging to advance this project to PFS in 2016.

  • And on the Quebradona and Nuevo Chaquiro copper gold deposit the scoping study work is continuing but at a reduced pace.

  • In regard to Obuasi, it's been quite a significant quarter in regard to developments at Obuasi. In regard to the limited operating phase, this has progressed again quite well during the quarter. Production was 13,000 ounces coming from tailings retreatment and this will be completed in Quarter 4 and we will then proceed to place the plant on care and maintenance.

  • The Obuasi deeps decline has proceeded on plan and work on optimizing the draft feasibility study is progressing quite well.

  • The most significant development in the quarter has been the investment agreement with Randgold. Clearly there's considerable work to be done in order to complete the pre-conditions for the formation of the joint venture next year.

  • In parallel with our work on optimizing the draft feasibility study and Randgold's due diligence, Randgold are preparing a development plan which builds on AngloGold's work. Randgold's focus is on geology, on mine design and scheduling and on cost optimization in order to progress the project to both companies' investment hurdles.

  • The other significant work stream is our joint engagement with the Government of Ghana to negotiate a development agreement which will define a stable framework for the redevelopment of Obuasi.

  • One of the most significant engagements needs to be with the EPA so that we can agree the approach for operating the new mine and the reclamation plan for the historic mining areas and infrastructure, dating back to last century, when it was operated by Ashanti Goldfields and the Government of Ghana.

  • A few comments on brownfields exploration results. Ron spoke earlier briefly about Sunrise Dam and the plans for Sunrise Dam. At Sunrise Dam good brownfields results are coming through. Cosmo is a lode that produced close to 1m ounces at 6 grams per tonne. Four significant intersections have been hit at Cosmo North, directly along strike from the Cosmo ore body. These potentially adds higher grade ore into the production profile in the medium term. The best result was 10.6 meters at 22.9 grams per tonne, hosted in volcaniclastics, exhibiting strong alteration and abundant fine grain pyrite and visible gold.

  • Also at Sunrise Dam we have reported on Vogue previously based on surface drilling. We have now established underground access to the top of Vogue and have commenced infill drilling and extensional drilling programs. The results are looking good and are proving up our plans to establish Vogue as another main production area.

  • The results have just been received and are shown in the cross-section and they include 8 meters at 6.8 grams per tonne, 6.5 at 7, almost 20 meters at 14 and 11.5 meters at 5.

  • And at Cuiaba, Ron also spoke to the licensed mine. And underground drilling is infilling the continuation of the Serrontinho ore body below the 17 level or below current production levels. The underground drilling intercepts are quite impressive and range from 6 to 20 meters in width at grades of 12 to as high as 70 grams per tonne.

  • Notably the underground drilling is identifying mineralized quartz veins in the hanging wall and footwall of the main lodes. This increases the ounces per vertical meter and consequently decreases the development cost per ounce, as they are close to existing development.

  • In addition, a surface drill hole intersect at 20 meters at 25 grams per tonne between the 20 and 21 level, showing ore body continuity approximately 400 meters along strike from current workings.

  • With that brief summary I'll pass back to Venkat. Thank you.

  • Venkat Venkatakrishnan - CEO

  • As you can see from this slide, the trend for the past 33 months can show that we actually work very hard to adapt to a falling gold price environment where gold has fallen by around roughly $600 an ounce. But despite the headwinds impacting on our South African performance we have more than shown a 40% drop in our all-in sustaining cost whilst our all-in costs have halved from their peak. And as you can see from both Ron and Chris's presentations, we're working on wringing more benefits out of the business.

  • I'm not going to spend too much time on this slide which is largely self-explanatory, and some of it has been covered before. The costs are certainly down. Debt is down. Free cash flow is modest given the lower gold price. What to look out for in subsequent quarters is obviously the reduction in the interest bill following the repurchase of the high yield bond during the quarter and the annualized savings is forecast around $66m.

  • Importantly, we remain a beneficiary of weakening local currencies and fuel prices, both of which provide an important shield to our margins in times such as these.

  • Looking at our cost performance during the quarter, this slide unpacks the details around the cost reductions year on year. Whilst our improved cost performance reflects the benefit of weaker currencies and oil prices, there's also a fundamental shift in efficiency improvements as we continue to outrun the ore body decline and mining inflation that continues to snap at our heels. And here we build the cost reductions in two stages. At the time of the budgeting process, we ensure that our target numbers take into account a chunk of the benefits which need to be obtained during the year and we set a very high threshold of hurdle rate for the operations to jump to ensure that we can actually continue to drive our costs down.

  • Unfortunately this quarter has had a lot of noise around our earnings. So if I can spend some time unpacking the noise. Our adjusted headline earnings, which is earnings after removing the impact of the bond take-out and the Obuasi provision, was a loss of around $52m. However, this was after a number of accounting non-cash adjustments, most notably the deferred tax adjustment of $37m which largely relates to Brazil wherein we use US dollars as a functional currency. And that creates deferred tax swings with sharp currency movements. So in simple terms, when the real weakens you create a hit to the income statement under deferred tax and when it strengthens you record a gain.

  • In addition, the other adjustments include inventory write-downs, certain tax and rehabilitation provisions. And if we didn't have these during the quarter, we would have been positive at around $18m.

  • Turning to the balance sheet, our proactive and decisive approach around ensuring balance sheet flexibility has served us very well. Having kept net debt steady despite a falling gold price over this period, we have now achieved a step reduction of 25% in our net debt level. This has helped us improve our net debt to EBITDA ratio by a similar level from its recent peak, closer towards our targeted range of 1.5 times through the price cycle.

  • Our balance sheet is in a much stronger position than it was a year ago. We have ample liquidity, covenant headroom, good mix of facilities with no imminent material bond maturities until 2020.

  • Now looking at the outlook. Given the strong cost performance which we have recorded so far this year we have improved our cost guidance for the year, as shown in this slide, and certainly this is the first time in AGA we have actually managed to do that.

  • Our total cash cost guidance has been improved by $50 from $770 to $820 an ounce to $720 to $770 an ounce, our all-in sustaining cost by $50 to $70 from $1,000 to $1,050, down to $950 to $980 an ounce, our CapEx bill, which was reduced to $900m to $1b earlier this year, we are now looking at coming in closer to the $900m, thereby saving $50 on cash costs, $50 to $70 on all-in sustaining and around $25 to $27 on our CapEx spend.

  • We have also narrowed our production guidance for the quarter and still within the previous guidance at between 3.8m to 4m ounces. Obviously these are provided with the usual health caveats and the stated exchange rate assumptions on the slide.

  • To conclude, as you can see from the slide here, we have quarter by quarter, brick by brick built a strong track record of consistent performance and delivery that now spans close to three years. We have either met or beaten our production guidance and performed better on the cost side. With a global business of 19 operations in 9 countries, hiccups are bound to happen, so we could miss a quarter here or there, but so far our performance is certainly in the right direction.

  • The slide you see here before you tracks the last 12 months' production by asset and the last 12 months' all-in sustaining cost, and our objective here is to move those bubbles to the left-hand side and high as we can on the left-hand side. And that's the strategy which we are using to create a high-quality, high-margin portfolio which unlocks sustainable free cash flow and improvements and returns into the future.

  • As you can see, some of our assets already fit into this category and work is underway to get some of the outliers into the desired target zone. We see Obuasi as one asset having that potential to provide us with a high quality long-life asset that delivers growth. And that is why you are seeing a lot of heavy lifting which has taken place in the last two to three years, thanks to the help of Ron, Graham and David Noko.

  • South Africa currently sits as an outlier and we are working on key areas of improvement to move it to the left, some of which Chris has actually outlined.

  • The final slide is our scorecard and if you look at where we have come from to where we are now, considerable improvements have taken place on the foundation and area where we need to get back to where we were with safety, and that's a key lever for South African improvement.

  • Then on balance sheet flexibility, Cripple Creek and Victor were sold for $820m plus a royalty stream. We applied the proceeds to take out a large portion of our high yield bond to reduce interest to get the debt within the target range.

  • In terms of cost optimization, our cost reduction programs and optimization programs we are starting to see the benefit. We are seeing currency benefits across the portfolio coming through. We are relentlessly looking at our overhead structures, both at the mine level through to corporate, and what we are looking at going into next year is rationalizing our Colombian spend by about 50%, given current market conditions, whilst keeping the optionality alive.

  • Obuasi redevelopment plan is currently underway as Kibali continues to ramp up and safety is a key lever in terms of SA improvement. And constantly we are working on improving the portfolio. I did mention a number of my executives' names but I'd be amiss for not mentioning my colleague, Paul Dennison, who's a common thread through all of this in terms of getting some of these transactions past the door.

  • In terms of long-term optionality, we keep our eyes firmly on the long-term optionality. If you look at the reef boring, last year same time we projected producing 3,000 ounces from reef boring. We are now at 13,000 ounces for the year. And our exploration, as Ron and Graham have alluded, starts to bring in ounces from later periods back into inventory, and we regard Colombia as certainly the long-term game changer within our portfolio.

  • So with those comments, happy to take questions.

  • Stewart Bailey - SVP IR and Group Communications

  • Thanks. I think we'll start off with Johann Steyn over here. Leon, if you wouldn't mind. He was quick on the draw. Or perhaps while the mike's on the way, Derryn, do you want to kick off?

  • Derryn Maade - Analyst

  • Good morning, everyone. It's Derryn Maade from HSBC. Just two questions more of a strategic nature. The first one is with the -- the South African business continues to be a drag, as you rightly point out, on the overall portfolio. Balance sheet has largely been repaired at this stage. Do you have conservations, I'd say probably internally at this stage, about the business come back onto the agenda?

  • And then the second one is also sort of related to -- you spoke about the reduction in interest payments. Surely conversations around resumption of the dividend must be fore and frontmost internally. When do you expect that that could be a feature?

  • Venkat Venkatakrishnan - CEO

  • Okay, let me pick up the second question first and then come back to the first question. Certainly dividend is foremost in terms of our minds, in terms of when we can resume going back to pay dividend. Obviously it's a function on where the gold price is, where the free cash flow is, and in that regard getting the SA lever to produce an extra 10% compared to what we are currently seeing in 2015 would be the right step in that direction.

  • What we don't want to do obviously is borrow money to pay dividend. That's unsustainable and it's a dumb financing strategy. So in that regard certainly firmly in focus but given the current gold price environment and balance sheet pressures, obviously you've seen debt taking precedence but it's certainly firmly on the agenda. What I don't want to do is to lock ourselves with a particular timeline in terms of when dividend payments will resume. But before resuming we'll ensure that it can be sustained going into the future and what we wouldn't do is resort to borrowing to keep that track going.

  • With regard to your first question, you never say never and I think that's important. That's one thing I've learned in life. But having said that, I do point out that you're dealing with a portfolio of assets and just because a particular group within that portfolio is having a rough ride for three or four or five quarters, it doesn't mean you throw the baby with the bathwater out. We have seen going back in time we have had issues in our Australian portfolio, it's turned around, Continental African portfolio has turned around. So the key objective here is to maximize the value from the portfolio in terms of South Africa. And that's where the focus is currently. And that's the best I can provide at this stage.

  • Derryn Maade - Analyst

  • Thanks very much.

  • Stewart Bailey - SVP IR and Group Communications

  • Johann?

  • Johann Steyn - Analyst

  • Hi guys. Can you hear me? Johann Steyn from Citi. Maybe just to follow on with the question from Derryn. Back in the late 1990s, before we got sold -- sold off some of the free state assets, etc. and one has to look at your current South African portfolio and basically see that you do see some of the same kind of symptoms that were seen with those assets at that stage in present. You haven't capitalized these assets over the past two years; ore reserve flexibility is deteriorating; you guys have really been cutting a lot, not just you, the whole industry. Now the problem here is are these assets basically at a point now where they do become almost irreversible in terms of ore reserve development where it just requires too much capital? It doesn't make sense at this stage to consider selling them, like AngloGold did in the late 1990s. Or do you think it's going to be one of those things that you -- when the gold price picks up you're basically just going to plow CapEx back into these assets to resuscitate them, not really to grow them? How do you think about that? Because clearly that's kind of an important economic consideration at this stage.

  • Venkat Venkatakrishnan - CEO

  • I think Johann if I can pick this up. And certainly what you've seen in the South African region is the impact of the safety stoppages having a knock-on impact not just on the current production, on the unit cost; it has impacted ore reserve development in certain areas and also the project advancement rate. So we are seeing the triple whammy come through in terms of our SA operations.

  • For us, the key is the penultimate slide that I showed with the bubbles in the last 12 months' production. Our objective as a management team is to drive those bubbles, asset by asset, to the correct side of the portfolio. And absolutely, like any portfolio a manager does, you give it your best shot and if you can't get the asset to move into the correct side of the portfolio, we've got to look at other options in terms of assets.

  • So we're not closed to effectively looking at potentially assets that don't fit the portfolio having done these changes to move off the portfolio; you keep the options open. But currently I think there is certainly good potential from the suite of South African assets and we are directing our attention in that regard.

  • What you wouldn't see us is when the gold price goes up plowing money back into the business. What you would see is if the safety performance goes up you will start to see the ore reserve development rates pick up and mining flexibility coming back on. Chris, anything to add?

  • Chris Sheppard - COO South Africa

  • No, I think our focus is on actually getting our unit costs down and extracting as much value as we can out of the operations.

  • Venkat Venkatakrishnan - CEO

  • One thing, Johann, you should know me well enough not emotionally attached to any asset. At the end of the day either it fits or it doesn't fit the portfolio. But we are talking asset by asset.

  • Johann Steyn - Analyst

  • Okay, thank you. It's been a real struggle the past few quarters, especially on safety as well. Clearly that has to concern you and I'm sure it does, I'm sure it does. And then maybe just a last question is with regards to your guidance for the full year dollar cost -- dollar per ounce guidance going down, how much did your rand assumptions change? 1,360 this time around, I don't know what it was last time around.

  • Venkat Venkatakrishnan - CEO

  • John, do you have that handy? As compared to your original guidance to where it was now. I think it was still in here. It was around 1,205 when we started in the year and we have changed it for the whole year at 1,260, the moving average.

  • Johann Steyn - Analyst

  • Okay, so it's part of the reduction (multiple speakers).

  • Venkat Venkatakrishnan - CEO

  • It's exchange rates as well, correct.

  • Johann Steyn - Analyst

  • Thank you.

  • Stewart Bailey - SVP IR and Group Communications

  • Kane?

  • Kane Slutzkin - Analyst

  • Good morning. It's Kane Slutzkin from UBS. Maybe just a follow-on on that question? You've had the benefit from the currencies weakening for some time now. Are you comfortable with the true cost structure of the assets outside of these currencies weakening, i.e. if the currencies were to stay stable for a prolonged period now that's in the base and if they weren't to weaken materially from here are you happy with the cost structure, the true operating cost structure? And if you're not, what levers do you have still to pull?

  • And then just secondly on Colombia, you're reducing your spend but you want to retain an optionality. Are you still looking to monetize there?

  • Venkat Venkatakrishnan - CEO

  • Okay, let me pick up the second question first and then the first one and Ron and Chris can come in to supplement the answer to the first question. With regard to Colombia, yes we are looking at options around potential joint ventures but there again one has to be realistic about market conditions, where to get joint venture partners for development assets which have not been producing in the past, you're not going to get the best value for it. So in that regard, whilst we are looking for joint venture partners, at the end of the day one has to be realistic to say this is not going to happen within the next 12, 18 month period potentially, and we've got to look at tightening the purse strings in this regard.

  • With regard to your first question, are you happy with your cost structure. Little would we imagine that we would have pulled our costs down by what we did going back two and a half years ago. If you had asked us two and a half years ago, do you think you'd report a cash cost of $735, all-in sustaining cost of $937 and in international case $674 and $826, I would have said there's a better chance of me falling pregnant by wind pollination. But it's happened.

  • So in that regard what we certainly want to do is continue our drive in squeezing a lemon out of the juice and at each planning cycle, having sat through two or three of them, both Ron and Chris effectively dial in improvements into the cost base. And it's not purely cost cutting; it's more -- and it goes beyond cost cutting. It's around optimizing your life of mine plan and seeing what changes you can actually make to get the best value out of the business.

  • Understandably it is getting progressively difficult, but having said that, it's not time to give up in that regard. Ron?

  • Ron Largent - COO International

  • No, I think that's fair, Venkat. The key is we do have an inflationary impact each year so just to maintain means you've pulled something. If we look around at what you've presented, Chris, on the labor numbers in South Africa at 6% as that sort of a global -- instead of 15% three or four years ago.

  • But there's still leverage. I think the challenge with each asset is you continue to consume the resource, things get deeper, things get longer from the shaft, those sort of things, but I think the objective and the actual outcomes will be based on refining efficiencies in the operation. And this always pushes you there and then the question is are you high grading, are you cutting your future, and those are all the things you're weighing as you go through this. So, yes, there's still room to improve.

  • Kane Slutzkin - Analyst

  • Thanks.

  • Stewart Bailey - SVP IR and Group Communications

  • All right, Patrick?

  • Patrick Mann - Analyst

  • Morning, it's Patrick Mann from Deutsche Bank. Just to go back to the ore reserve development, and maybe this is for Chris, could you give us a sense of how big the backlog is and when do you think you'll start to catch up on it? I know you said Kopanang next, you're you hoping to start to see a bit of a benefit into 2016, but maybe if you can give us a sense of when you are at a steady state place that you're comfortable with and how much it will cost to get back to then and the time? Thanks.

  • Chris Sheppard - COO South Africa

  • All right. Patrick, I think the first point is we've got stable ore reserve position as it stands right now. Has it deteriorated? Absolutely not. I think we see safety stoppages which have impacted on the reported production levels. You've also had development also being impacted upon. But if you actually look at your extraction rate of development versus stoping, it hasn't caused any catastrophe at all.

  • If you talk to any mining engineer, in the underground tabular situation you're looking at somewhere between 18 months and 24 months of ore reserve. So just to give you some color, (background noise) in Kopanang, and I can share it with you, is sitting at 23 months ore reserve; Moab's at 21; TauTona being the grand old lady with 58 years and obviously is in its twilight zone, is sitting on 16 months of ore reserve, and Mponeng sitting with 27. That one's had an uptick. (inaudible) because of having recalculated that months of ore reserve on a lower derisk base volume which doesn't mean that's miraculously increased; it's just the denominator that's changed.

  • And of course we've also had some serious work being taking place. Kopanang has seen some pleasing bringing to account of ore reserve, not by luck, by absolutely getting the development in place, and there we go.

  • Patrick Mann - Analyst

  • Maybe could you tell us where you would like them to be in terms of months on average?

  • Chris Sheppard - COO South Africa

  • I would love to be at 24 months and have it oozing out my ears, put it that way. The issue really goes around having mining flexibility because therein lies the conversation around unit cost. If you can get your mining flexibility right you naturally increase the efficiency of your work teams. Therein lies the secret of success.

  • Stewart Bailey - SVP IR and Group Communications

  • All right, I think that that more or less closes it out. Thanks everybody for joining us today. We can carry on the conversation outside. Thanks.